Loading...
HomeMy WebLinkAboutWOINTERNAL inspection work order of Work Order 167822 City CCTV Sewer Main - Due To BackupCLOSED Priority: F3 Category: WASTEWATER Submit To: COOK, DAVID Initiated By: FREEMAN, ELMER Date: 12/16/2024 8:45:35AM Address: C3-139_C3-247(427 Monroe St) Expense Type: MAINT Supervisor: FREEMAN, ELMER Submit To: COOK, DAVID Submit to Date: 12/16/2024 8:45:35AM Actual Start: 12/16/2024 10:20:OOAM Actual Finish: 12/16/2024 12:40:25PM COMMENTS DATECREATED DCOOK The downstream manhole is a drop manhole.Juan and Jim brought me the bridge so 12/16/2024 12:41:45PN that I can get the camera into the manhole. DCOOK TVed going upstream. 8"Conc lone 320' long. Was able to see 277'of the line. Roots 12/16/2024 12:39:20PN and what looks like a part of a white pipe stopped the camera at 277' Heavy aggregate missing throughout the line. A couple of sags are also in the line. ENTITYTYPE ENTITYUID LOCATION SSGRAVITYMAIN C3-139 C3-247 LABORNAME HOURS STARTDATE FINISHDATE COOK, DAVID 2.37 12/16/2024 10:20:OOAN 12/16/2024 12:42:OOPN 2/24/202E DESCRIPTION HOURSREQUIRED STARTDATE FINISHDATE Page 1 of 1 2/24/2025