Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
435 Monroe Advanced Cleaning and Restoration Invoice
Advanced Cleaning and Restoration TWIN Summary for Dwelling Line Item Total 39,242.59 Material Sales Tax 116.06 Replacement Cost Value $39,358.65 Net Claim $39,358.65 Michelle Mitchell Q BIBLE MISSIONARY_CHU 1/2/2025 Page: 18 !" Advanced Cleaning and Restoration TWIN r. Total:Downstairs 34.97 22,900.99 Line Item Totals: BIBLE MISSIONARY CHU 116.06 39,358.65 Grand Total Areas: 8,924.77 SF Walls 4,838.17 SF Ceiling 13,762.94 SF Walls and Ceiling 4,914.93 SF Floor 546.10 SY Flooring 1,116.66 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 1,111.69 LF Ceil.Perimeter 4,914.93 Floor Area 5,108.71 Total Area 8,563.52 Interior Wall Area 4,155.59 Exterior Wall Area 461.73 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length BIBLE MISSIONARY CHU 1/2/2025 Page: 17 Advanced Cleaning and Restoration TWIN BIBLE_MISSIONARY_C HU Main Level Main Level CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 1. WTR ESRV + Emergency service call-after business hours 1 1.00 EA 0.00+ 341.36= 0.00 341.36 2. WTR EQ + Equipment setup,take down,and monitoring(hourly charge) 6 6.00 HR 0.00+ 81.81= 0.00 490.86 To drive,monitor and set up equipment on the first day. 3.WTR EQ + Equipment setup,take down,and monitoring(hourly charge) 8 8.00 HR 0.00+ 81.81= 0.00 654.48 To drive,monitor and take down equipment on the last day.Also to map floor plan. 4. WTR NAFAN + Negative air fan/Air scrubber(24 hr period)-No monit. 4*10 40.00 DA 0.00+ 80.57= 0.00 3,222.80 Used during day of demo and for 3 days of drying due to health concerns. 5.WTR FHEPA + Add for HEPA filter(for negative air exhaust fan) 4 4.00 EA 0.00+ 210.12= 46.07 886.55 Filters are replaced every job to prevent cross contamination and per manufacturer guidelines on remediation use. 6.DMO DTRUCK - Single axle dump trick-per load-including dump fees 1 1.00 EA 227.26+ 0.00= 0.00 227.26 For construction debris. 7. WTR EQD + Equipment decontamination charge-per piece of equipment 25 25.00 EA 0.00+ 46.67= 8.64 1,175.39 To decontaminate equipment after mitigation to prevent cross contamination and in accordance of the IICRC 12.3.2 Engineering Controls: Containment and Managed Airflow and IICRC 12.3.3 Bulk Material Removal and Water Extraction. 8.HMR PPE+ + Add for personal protective equipment-Heavy duty 4*2 9.00 EA 0.00+ 39.81= 19.11 337.59 9. CDC BX + Provide box&tape-medium size 6 6.00 EA [*] 0.00+ 4.68= 1.68 29.76 Unit price changed to match purchase price. 10.FEE SCAN31) + 3D geospatial scan(Bid Item) 1 1.00 EA [*] 0.00+ 350.00= 0.00 350.00 Total: Main Level 75.50 7,716.05 Sanctuary Height: 8' s ar a 39'1 1464.66 SF Walls 1976.19 SF Ceiling r 3440.85 SF Walls&Ceiling 1976.19 SF Floor Sanctuary t H P a 219.58 SY Flooring 183.08 LF Floor Perimeter - 193.08 LF Ceil.Perimeter BIBLE_MISSIONARY_CHU 1/2/2025 Page:2 AAW Advanced Cleaning and Restoration TWIN Insured: Bible Missonaq Church Home: (208) 733-7671 Property: 427 Monroe St Twin Falld,ID 83301 Clain Rep.: Michelle Mitchell Business: (208)745-0037 Company: Advanced Cleaning and Restoration E-mail: advancedcleaningidaho@gmail. Business: 1435 Lindsay Blvd com Idaho Falls,Id. 83402 Estimator: Michelle Mitchell Business: (208)745-0037 Company: Advanced Cleaning and Restoration E-mail: advancedcleaningidaho@gma Business: 1435 Lindsay Blvd il.com Idaho Falls,Id. 83402 Claim Number: AA192460 Policy Number: Type of Loss: Sewage Coverage Deductible Policy Limit Dwelling $0.00 $0.00 Other Structures $0.00 $0.00 Contents $0.00 $0.00 Date Contacted: 12/14/2024 5:00 PM Date of Loss: 12/14/2024 5:00 PM Date Received: 12/14/2024 5:00 PM Date Inspected: 12/14/2024 5:19 PM Date Entered: 12/16/2024 1:01 PM Price List: IDTF8X_DEC24 Depreciate Material: Yes Depreciate O&P: No Restoration/Service/Remodel Depreciate Non-material: Yes Depreciate Taxes: Yes Estimate: BIBLE MISSIONARY CHU Depreciate Removal: No Advanced Cleaning and Restoration TWIN CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 11.WTR DRY + Air mover(per 24 hour period)-No monitoring 5*3 15.00 EA 0.00+ 31.00= 0.00 465.00 12.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 15809.53 CF [*] 0.00+ 0.07= 0.00 1,106.67 13. CLN AV + Clean the walls and ceiling WC 3440.85 SF [*] 0.00+ 0.70= 2.06 2,410.66 14. CLN FCC + Clean and deodorize carpet F 1976.19 SF [*] 0.00+ 0.80= 1.19 1,582.14 Totals: Sanctuary 3.25 5,564.47 8��" Stoarge 2 Height: 8' 298.96 SF Walls 83.67 SF Ceiling - s`°a`x`' = 382.64 SF Walls&Ceiling 83.67 SF Floor 9.30 SY Flooring 3 7.3 7 LF Floor Perimeter 37.37 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 15. CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 669.39 CF [*] 0.00+ 0.07= 0.00 46.86 16. CLN AV + Clean the walls and ceiling WC 382.64 SF [*] 0.00+ 0.70= 0.23 268.08 17. CLN FCC + Clean and deodorize carpet F 83.67 SF [*] 0.00+ 0.80= 0.05 66.99 Totals: Stoarge 2 0.28 381.93 Office Height: 8' 'a 294.75 SF Walls 81.57 SF Ceiling _ o 376.32 SF Walls&Ceiling 81.57 SF Floor oer°e t 9.06 SY Flooring 36.84 LF Floor Perimeter 36.84 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL BIBLE MISSI0NARY_CHU 1/2/2025 Page: 3 Advanced Cleaning and Restoration TWIN CONTINUED-Office CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 18.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 652.55 CF [*] 0.00+ 0.07= 0.00 45.68 19.CLN AV + Clean the walls and ceiling WC 376.32 SF [*] 0.00+ 0.70= 0.23 263.65 20.CLN FCC + Clean and deodorize carpet F 81.57 SF [*] 0.00+ 0.80= 0.05 65.31 Totals: Office 0.28 374.64 ~� Nursery Height: 8' f' 313.33 SF Walls 93.24 SF Ceiling Nursery 406.57 SF Walls&Ceiling 93.24 SF Floor - 10.36 SY Flooring 39.17 LF Floor Perimeter 39.17 LF Ceil.Perimeter 1 IL s-4^-� CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 21.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 745.89 CF [*] 0.00+ 0.07= 0.00 52.21 22.CLN AV + Clean the walls and ceiling WC 406.57 SF [*] 0.00+ 0.70= 0.24 284.84 23.CLN FCC + Clean and deodorize carpet F 93.24 SF [*] 0,00+ 0.80= 0.06 74.65 Totals: Nursery 0.30 411.70 BIBLE MISSIONARY_CHU 1/2/2025 Page:4 Advanced Cleaning and Restoration TWIN �J_.w ~ Bath 2 Height: 8' T 246.67 5F Walls 45.67 SF Ceiling 3ath w = 292.33 SF Walls&Ceiling 45.67 SF Floor 5.07 SY Flooring 30.83 LF Floor Perimeter 1 30.83 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 24. CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 365.33 CF [*] 0.00+ 0.07= 0.00 25.57 25. CLN AV + Clean the walls and ceiling WC 292.33 SF [*] 0.00+ 0.70= 0.18 204.81 26. CLN F- + Clean floor F 45.67 SF 0.00+ 0.70= 0.03 32.00 Totals: Bath 2 0.21 262.38 Hallway Height: 8' tillwpa 694.64 SF Walls 234.04 SF Ceiling 928.68 SF Walls&Ceiling 234.04 SF Floor 26.00 SY Flooring 90.33 LF Floor Perimeter 90.33 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 27. CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 1872.32 CF [*] 0.00+ 0.07= 0.00 131.06 28. CLN AV + Clean the walls and ceiling WC 928.68 SF [*] 0.00+ 0.70= 0.56 650.64 29. CLN FCC + Clean and deodorize carpet F 234.04 SF [*] 0.00+ 0.80= 0.14 187.37 Totals: Hallway 0.70 969.07 BIBLE MISSI0NARY_CHU 1/2/2025 Page: 5 Advanced Cleaning and Restoration TWIN Batli 3 Height: 8' F 10000* 220.00 SF Walls 45.60 SF Ceiling 265.60 SF Walls&Ceiling- - - g 45.60 SF Floor �i Bath 3 5.07 SY Flooring 27.50 LF Floor Perimeter 1 I 27.50 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 30.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 364.78 CF [*] 0.00+ 0.07= 0.00 25.53 31.CLN AV + Clean the walls and ceiling WC 265.60 SF [*] 0.00+ 0.70- 0.16 186.08 32.CLN F- + Clean floor F 45.60 SF 0.00+ 0.70= 0.03 31.95 Totals: Bath 3 0.19 243.56 9 T Entry Height: 8' Entry 7 184.00 SF Walls 63.00 SF Ceiling 1_T I 247.00 SF Walls&Ceiling 63.00 SF Floor � �,�„1 7.00 SY Flooring 23.00 LF Floor Perimeter ,2„ 23.00 LF Ceil.Perimeter Missing Wall 9'X 8' Opens into STAIRS CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 33.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 504.00 CF [*] 0.00+ 0.07= 0.00 35.28 34.CLN AV + Clean the walls and ceiling WC 247.00 SF [*] 0.00+ 0.70= 0.15 173.05 35.CLN FCC + Clean and deodorize carpet F 63.00 SF [*] 0.00+ 0.80= 0.04 50.44 Totals: Entry 0.19 258.77 BIBLE MISSIONARY_CHU 1/2/2025 Page: 6 Advanced Cleaning and Restoration TWIN t9a`s #s faS> n, J F 9'4" Stairs Height: 13' 141.09 SF Walls 60.00 SF Ceiling Stairs 201.09 SF Walls&Ceiling 109.85 SF Floor 1 12.21 SY Flooring 15.51 LF Floor Perimeter 13.33 LF Ceil.Perimeter 9' Missing Wall 9'X 12' 11 15/16" Opens into ENTRY CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 36.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 660.86 CF [*] 0.00+ 0.07= 0.00 46.26 37.CLN AV + Clean the walls and ceiling WC 201.09 SF [*] 0.00+ 0.70= 0.12 140.88 38. CLN FCC + Clean and deodorize carpet F 109.85 SF [*] 0.00+ 0.80= 0.07 87.95 Totals: Stairs 0.19 275.09 Total:Main Level 81.09 16,457.66 Downstairs T Piano Room Height: 8' 389.33 SF Walls 146.00 SF Ceiling 0 Piano Room 535.34 SF Walls&Ceiling 146.00 SF Floor 16.22 SY Flooring 48.67 LF Floor Perimeter 41 -11 6 48.67 LF Ceil.Perimeter -G'10" CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 39. CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 1168.04 CF [*] 0.00+ 0.07= 0.00 81.76 40. CLN AV + Clean the walls and ceiling WC 535.34 SF [*] 0.00+ 0.70= 0.32 375.06 41. CLN FCC + Clean and deodorize carpet F 146.00 SF [*] 0.00+ 0.80= 0.09 116.89 Totals: Piano Room 0.41 573.71 BIBLE MISSIONARY_CHU 1/2/2025 Page:7 Advanced Cleaning and Restoration TWIN 1 ~- Storage 1 Height: 8' jTPr - 12'3„ 384.00 SF Walls 142.38 SF Ceiling - o Storage 1 - 526.38 SF Walls&Ceiling 142.38 SF Floor 1 15.82 SY Flooring 48.00 LF Floor Perimeter JL 48.00 LF Ceil.Perimeter 9'3" �2'9"A CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 42.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 1139.00 CF [*] 0.00+ 0.07= 0.00 79.73 43.CLN AV + Clean the walls and ceiling WC 526.38 SF [*] 0.00+ 0.70= 0.32 368.79 44.CLN FCC + Clean and deodorize carpet F 142.38 SF [*] 0.00+ 0.80= 0.09 113.99 Totals: Storage 1 0.41 562.51 Hallway Height: 8' , , „� I 479.33 SF Walls 158.76 SF Ceiling �, H a-a T 63 8.10 SF Walls&Ceiling 158.76 SF Floor 17.64 SY Flooring 59.92 LF Floor Perimeter y �6,1„ 3�, 8,� 59.92 LF Ceil.Perimeter Missing Wall 5' 11" X 8' Opens into CLASSROOM 2 CAT SEL ACT DESCRIPTION CALL QTY REMOVE REPLACE TAX TOTAL 45.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 1270.11 CF [*] 0.00+ 0.07= 0.00 88.91 46.CLN AV + Clean the walls and ceiling WC 638.10 SF [*] 0.00+ 0.70= 0.38 447.05 47.CLN FCC + Clean and deodorize carpet F 158.76 SF [*] 0.00+ 0.80= 0.10 127.11 Totals: Hallway 0.48 663.07 BIBLE MISSIONARY_CHU 1/2/2025 Page: 8 Advanced Cleaning and Restoration TWIN A10 1Ia- awffw M�'' r 1 � 1, 14 Wa9 Classroom 1 Height: 8' F-a r 549.15 SF Walls 242.71 SF Ceiling _ 791.86 SF Walls&Ceiling 242.71 SF Floor Classroom I j 26.97 SY Flooring 68.64 LF Floor Perimeter I--� 68.64 LF Ceil.Perimeter -12�1" CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 48.CLN DODRHZ + Deodorize building-Ozone&hydroxyl treatment V 1941.68 CF [*] 0.00+ 0.07= 0.00 135.92 49. CLN AV + Clean the walls and ceiling WC 791.86 SF [*] 0.00+ 0.70= 0.48 554.78 50. CLN FCC + Clean and deodorize carpet F 242.71 SF [*] 0.00+ 0.80= 0.15 194.32 Totals: Classroom 1 0.63 885.02 nT Classroom 2 Height: 8' = 1 1 598.00 SF Walls 334.01 SF Ceiling - -Ossro=2 932.01 SF Walls&Ceiling 334.01 SF Floor T T 37.11 SY Flooring 74.75 LF Floor Perimeter o = _ 74.75 LF Ceil.Perimeter Missing Wall 5' 11" X 8' Opens into HALLWAY CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 51.WTR EXTSA+ + Water extract carpeted floor-Cat 3 wtr-Hvy-after hours F 334.01 SF 0.00+ 2.74= 0.00 915.19 52.CON LAB + Content Manipulation charge-per hour 1 1.00 HR [*] 0.00+ 81.81 = 0.00 81.81 53.WTR BARR + Contaimnent Barrier/Airlock/Decon.Chamber 75 75.00 SF 0.00+ 1.26= 0.77 95.27 54.WTR BARRZ+ + Peel&seal zipper-heavy duty 1 1.00 EA 0.00+ 18.04= 0.75 18.79 55.WTR TRIMA - Tear out trim and bag for disposal-up to Cat 3-aft hrs 17 17.00 LF 1.88+ 0.00= 0.19 32.15 56.WTR PADSA - Tear out wet carpet pad,cut/bag-Cat 3 wtr-after hours F 334.01 SF 1.74+ 0.00= 1.40 582.58 BIBLE MISSIONARY_CHU 1/2/2025 Page: 9 Advanced Cleaning and Restoration TWIN CONTINUED-Classroom 2 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 57.WTR FCCSA - Tear out wet non-saly.cpt,cut/bag-Cat 3 wtr-after hrs F 334.01 SF 1.83+ 0.00= 1.40 612.64 58.WTR GRM + Apply anti-microbial agent to the floor F 334.01 SF 0.00+ 0.38= 1.00 127.92 59.CLN F- + Clean floor F 334.01 SF [*] 0.00+ 0.77= 0.20 257.39 60.WTR DRY + Air mover(per 24 hour period)-No monitoring 2*3 6.00 EA 0.00+ 31.00= 0.00 186.00 Totals: Classroom 2 5.71 2,909.74 Qh Fumace Room Classroom 3 Height: 8' �y 'r--is ri o 756.00 SF Walls 499.90 SF Ceiling = T 1245.90 SF Walls&Ceiling 489.90 SF Floor - ssroom 3 ,ea 54.43 SY Flooring 94.50 LF Floor Perimeter a - 94.50 LF Ceil.Perimeter 6" , di1 TV-4 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 61.WTR EXTSA+ + Water extract carpeted floor-Cat 3 wtr-Hvy-after hours F 489.90 SF 0.00+ 2.74= 0.00 1,342.33 62.CON LAB + Content Manipulation charge-per hour 1 1.00 HR [*] 0.00+ 81.81= 0.00 81.81 63.WTR TRIMA - Tear out trim and bag for disposal-up to Cat 3-aft hrs 119 119.00 LF 1.88+ 0.00= 1.36 225.08 64.WTR PNLS - Tear out wet paneling,bag for disposal-Cat 3 335.25 335.25 SF 1.25+ 0.00= 1.81 420.87 65.WTR DRYW4S - Tear out wet drywall,cleanup,bag,per LF-to 4'-Cat 3 44.7 44.70 LF 10.77+ 0.00= 1.85 483.27 66.WTR PADSA - Tear out wet carpet pad,cut/bag-Cat 3 wtr-after hours F 489.90 SF 1.74+ 0.00= 2.06 854.49 67.WTR FCCSA - Tear out wet non-salv.cpt,cut/bag-Cat 3 wtr-after hrs F 489.90 SF 1.83+ 0.00= 2.06 898.58 68.DOR AV - Remove Interior door unit 8 8.00 EA [*] 33.86+ 0.00= 0.00 270.88 BIBLE MISSIONARY_CHU 1/2/2025 Page: 10 Advanced Cleaning and Restoration TWIN CONTINUED-Classroom 3 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 69.WTR HEPAVAL + HEPA Vacuuming-Light-(PER SF) 157 157.00 SF 0.00+ 0.50= 0.00 78.50 70.CLN STD+ + Clean stud wall-Heavy 157 157.00 SF [*] 0.00+ 2.11 = 0.28 331.55 71.WTR GRM + Apply anti-microbial agent to more than the floor 17+157 646.90 SF 0.00+ 0.38= 1.94 247.76 72. CLN AV + Clean part of the walls and ceiling WC-157 1088.90 SF [*] 0.00+ 0.70= 0.65 762.88 73. CLN F- + Clean floor F 489.90 SF [*] 0.00+ 0.77= 0.29 377.51 74.WTR DRY + Air mover(per 24 hour period)-No monitoring 3*3 9.00 EA 0.00+ 31.00= 0.00 279.00 75.WTR DHM> + Dehumidifier(per 24 hr period)-70-109 ppd-No monitor. 1*4 4.00 EA 0.00+ 88.89= 0.00 355.56 Totals: Classroom 3 12.30 7,010.07 T ' Kitchen Height: 8' e 516.00 SF Walls 226.47 SF Ceiling 7 C4 742.47 SF Walls&Ceiling 226.47 SF Floor J 25.16 SY Flooring 64.50 LF Floor Perimeter T 64.50 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 76.WTR EXTSA+ + Water extract carpeted floor-Cat 3 wtr-Hvy-after hours F 226.47 SF 0.00+ 2.74= 0.00 620.53 77.WTR RFDA + Refrigerator-Detach-after hours 1 1.00 EA 0.00+ 63.09= 0.00 63.09 78.WTR BASEBA - Tear out baseboard and bag for disp.-up to Cat 3 aft hrs PF 64.50 LF 1.88+ 0.00= 0.74 122.00 79.WTR TRIMA - Tear out trim and bag for disposal-up to Cat 3 -aft hrs 34 34.00 LF 1.88+ 0.00= 0.39 64.31 80.WTR PADSA - Tear out wet carpet pad,cutibag-Cat 3 wt•-after hours F 226.47 SF 1.74+ 0.00= 0.95 395.01 BIBLE MISSIONARY CHU 1/2/2025 Page: 11 Advanced Cleaning and Restoration TWIN CONTINUED-Kitchen CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 81.WTR FCCSA - Tear out wet non-salt'.cpt,cut/bag-Cat 3 wtr-after his F 226.47 SF 1.83+ 0.00= 0.95 415.39 82.WTR CABLOW - Tear out cabinetry-lower(base)units 4.9 4.90 LF 13.55+ 0.00= 0.00 66.40 83.WTR SNKD + Sink-single basin-Detach 1 1.00 EA 0.00+ 43.66= 0.00 43.66 84.ELE OSCOV - Remove Outlet or switch cover 1 1.00 EA [*] 1.12+ 0.00= 0.00 1.12 85.CAB CTFSPL6 - Remove 6"backsplash for flat laid countertop 6.6 6.60 LF [*] 1.63+ 0.00= 0.00 10.76 86.WTR DRYW4S - Tear out wet drywall,cleanup,bag,per LF-to 4'-Cat 3 PF 64.50 LF 10.77+ 0.00= 2.67 697.34 87.WTR HEPAVAL + HEPA Vacuuming-Light-(PER SF) 129 129.00 SF 0.00+ 0.50= 0.00 64.50 88,CLN STD+ + Clean stud wall-Heavy 129 129.00 SF [*] 0.00+ 2.11= 0.23 272.42 89.WTR GRM + Apply anti-microbial agent to more than the floor 17+129 355.47 SF 0.00+ 0.38= 1.07 136.15 90. CLN AV + Clean part of the walls and ceiling WC-129 613.47 SF [*] 0.00+ 0.70= 0.37 429.80 91.CLN F- + Clean floor F 226.47 SF [*] 0.00+ 0.77= 0.14 174.52 92.WTR DRY + Air mover(per 24 hour period)-No monitoring 3*3 9.00 EA 0.00+ 31.00= 0.00 279.00 Totals: Kitchen 7.51 3,856.00 Utility Height: 8' n I 265.33 SF Walls 64.58 SF Ceiling 329.92 SF Walls&Ceiling 64.58 SF Floor C iiim 7.18 SY Flooring 33.17 LF Floor Perimeter l 33.17 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL BIBLE MISSIONARY_CHU 1/2/2025 Page: 12 Advanced Cleaning and Restoration TWIN CONTINUED-Utility CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 93.WTR EXTHSA + Water extract from hard surf flr-Cat 3 wtr-after hours F 64.58 SF 0.00+ 1.51= 0.00 97.52 94.WTR WHD + Water heater-Detach 1 1.00 EA 0.00+ 125.26= 0.00 125.26 95.WTR TRIM - Tear out trim and bag for disposal-up to Cat 3 17 17.00 LF 1.31+ 0.00= 0.19 22.46 96.WTR BASEBA - Tear out baseboard and bag for disp.-up to Cat 3 aft his PF 33.17 LF 1.88+ 0.00= 0.38 62.74 97.WTR DRYW4S - Tear out wet drywall,cleanup,bag,per LF-to 4'-Cat 3 PF-6.2 26.97 LF 10.77+ 0.00= 1.12 291.59 98.WTR HEPAVAL + HEPA Vacuuming-Light-(PER SF) 68 68.00 SF 0.00+ 0.50= 0.00 34.00 99. CLN AV + Clean part of the walls and ceiling WC-68 261.92 SF [*] 0.00+ 0.70= 0.16 183.50 100. CLN STD+ + Clean stud wall-Heavy 68 68.00 SF [*] 0.00+ 2.11= 0.12 143.60 101.CLN F- + Clean floor F 64.58 SF [*] 0.00+ 0.77= 0.04 49.77 102.WTR GRM + Apply anti-microbial agent to more than the floor F+83 147.58 SF 0.00+ 0.38= 0.44 56.52 103.WTR DRY + Air mover(per 24 hour period)-No monitoring 2*3 6.00 EA 0.00+ 31.00= 0.00 186.00 Totals: Utility 2.45 1,252.96 ~ Bath 1 Height: 8' r 6,9" h°"e` = 298.67 SF Walls 75.85 SF Ceiling 9,,...1 Bath 374.52 SF Walls&Ceiling 75.85 SF Floor 8.43 SY Flooring 37.33 LF Floor Perimeter L9'6"" i' 37.33 LF Ceil.Perimeter -9.$„ CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 104.WTR EXTHSA + Water extract from hard surf flr-Cat 3 wtr-after hours F 75.85 SF 0.00+ 1.51= 0.00 114.53 BIBLE MISSIONARY_CHU 1/2/2025 Page: 13 AdA Advanced Cleaning and Restoration TWIN CONTINUED-Bath 1 CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 105.WTR TRIM - Tear out trim and bag for disposal-up to Cat 3 17 17.00 LF 1.31+ 0.00= 0.19 22.46 106.WTR BASEBA - Tear out baseboard and bag for disp.-up to Cat 3 aft hrs PF 37.33 LF 1.88+ 0.00= 0.43 70.61 107.WTR TLTD + Toilet-Detach 1 1.00 EA 0.00+ 73.16= 0.05 73.21 108.WTR CABVAN - Tear out cabinetry-vanity 2 2.00 LF 13.55+ 0.00= 0.00 27.10 109.WTR DRYW4S - Tear out wet drywall,cleanup,bag,per LF-to 4'-Cat 3 21.21 21.21 LF 10.77+ 0.00= 0.88 229.31 110.WTR FCTS - Tear out non-salvageable tile floor&bag-Cat 3 water F 75.85 SF 7.94+ 0.00= 0.96 603.21 111.WTR BMUD - Add on to tear out mortar bed for tile F 75.85 SF 2.63+ 0.00= 0.00 199.49 112.WTR HEPAVAL + HEPA Vacuuming-Light-(PER SF) 53 53.00 SF 0.00+ 0.50= 0.00 26.50 113.CLN AV + Clean part of the walls and ceiling WC-53 321.52 SF [*] 0.00+ 0.70= 0.19 225.25 114.CLN STD+ + Clean stud wall-Heavy 53 53.00 SF [*] 0.00+ 2.11 = 0.10 111.93 115.CLN F- + Clean floor F 75.85 SF [*] 0.00+ 0.77= 0.05 58.45 116.WTR GRM + Apply anti-microbial agent to more than the floor F+53 128.85 SF 0.00+ 0.38= 0.39 49.35 117.WTR DRY + Air mover(per 24 hour period)-No monitoring 2*3 6.00 EA 0.00+ 31.00= 0.00 186.00 Totals: Bath 1 3.24 1,997.40 Shower Height: 8' I98.67 SF Walls 9.06 SF Ceiling �hower T 107.73 SF Walls&Ceiling 9.06 SF Floor 1.01 SY Flooring 12.33 LF Floor Perimeter 2'5"-' 12.33 LF Ceil.Perimeter 2'9 1 BIBLE MISSIONARY_CHU 1/2/2025 Page: 14 Advanced Cleaning and Restoration TWIN CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 118.WTR EXTHSA + Water extract from hard surf fh•-Cat 3 wtr-after hours F 9.06 SF 0.00+ 1.51= 0.00 13.68 119.DMO HRBR> - Demolish/remove-bathroom(over 50 sf) F+W 107.73 SF 13.14+ 0.00= 0.00 1,415.57 This lie item is for the shower demo 120.CLN AV + Clean the ceiling C 9.06 SF [*] 0.00+ 0.70= 0.01 6.35 121.CLN STD+ + Clean stud wall-Heavy 107.73 107.73 SF [*] 0.00+ 2.11= 0.19 227.50 122. CLN F- + Clean floor F 9.06 SF [*] 0.00+ 0.77= 0.01 6.99 123.WTR GRM + Apply anti-microbial agent to more than the floor F+107.73 116.79 SF 0.00+ 0.38= 0.35 44.73 Totals: Shower 0.56 1,714.82 Furnace Room Height: 8' 11 9 - 489.33 SF Walls 213.52 SF Ceiling n° °°CR°°"' 702.85 SF Walls&Ceiling 213.52 SF Floor _ 23.72 SY Flooring 61.17 LF Floor Perimeter 1 61.17 LF Ceil.Perimeter CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 124.WTR EXTHSA + Water extract from hard surf flr-Cat 3 wtr-after hours F 213.52 SF 0.00+ 1.51 = 0.00 322.42 125. CON LABA + Content Manipulation charge-per hour-after hours 1 1.00 HR [*] 0.00+ 122.84= 0.00 122.84 126. CLN F-+ + Clean floor-Heavy F 213.52 SF [*] 0.00+ 1.10= 0.13 235.00 127. CLN FRFA> + Clean furnace-forced air-Large 1 1.00 EA [*] 0.00+ 168.90= 0.05 168.95 128.WTR GRM + Apply anti-microbial agent to the floor F 213.52 SF 0.00+ 0.38= 0.64 81.78 129.WTR DRY + Air mover(per 24 hour period)-No monitoring 2*3 6.00 EA 0.00+ 31.00= 0.00 186.00 Totals: Furnace Room 0.82 1,116.99 BIBLE MISSIONARY_CHU 1/2/2025 Page: 15 Advanced Cleaning and Restoration TWIN 6-1 5'7'----------1 Stairs Height: 12' 4" 124.85 SF Walls 28.65 SF Ceiling _ Wist 153.50 SF Walls&Ceiling 55.56 SF Floor 6.17 SY Flooring 15.29 LF Floor Perimeter 12.50 LF Ceil.Perimeter E--6'7" Missing Wall 4' 7"X 12'4 1/2" Opens into LANDING CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 130.WTR GRM + Apply anti-microbial agent to the floor F 55.56 SF 0.00+ 0.38= 0.17 21.28 131.CLN F-+ + Clean floor-Heavy F 55.56 SF [*] 0.00+ 1.10= 0.03 61.15 132.CLN AV + Clean the walls and ceiling WC 153.50 SF [*] 0.00+ 0.70= 0.09 107.54 Totals: Stairs 0.29 189.97 Landing Height: 8' F1'2, 1 2'6"--11'2" 118.00 SF Walls 23.30 SF Ceiling 141.30 SF Walls&Ceiling 23.30 SF Floor Landing - 2.59 SY Flooring 14.75 LF Floor Perimeter 5, i„ I 14.75 LF Ceil.Perimeter r-5's„ Missing Wall 4' 7"X 8' Opens into STAIRS CAT SEL ACT DESCRIPTION CALC QTY REMOVE REPLACE TAX TOTAL 133.WTR EXTHSA + Water extract from hard surf flr-Cat 3 wtr-after hours F 23.30 SF 0.00+ 1.51= 0.00 35.18 134.WTR GRM + Apply anti-microbial agent to the floor F 23.30 SF 0.00+ 0.38= 0.07 8.92 135.CLN F-+ + Clean floor-Heavy F 23.30 SF [*] 0.00+ 1.10= 0.01 25.64 136.CLN AV + Clean the walls and ceiling WC 141.30 SF [*] 0.00+ 0.70= 0.08 98.99 Totals: Landing 0.16 168.73 BIBLE MISSIONARY_CHU 1/2/2025 Page: 16 Advanced Cleaning and Restoration TWIN A440 l Recap of Taxes Material Sales Tax(6%) Manuf.Home Tax(6%) Storage Tax(6%) Line Items 116.06 0.00 0.00 Total 116.06 0.00 0.00 BIBLE MISSIONARY_CHU 1/2/2025 Page: 19 Advanced Cleaning and Restoration TWIN Recap by Room Estimate: BIBLE MISSIONARY CHU Area: Main Level 7,640.55 19.47% Sanctuary 5,561.22 14.17% Stoarge 2 381.65 0.97% Office 374.36 0.95% Nursery 411.40 1.05% Bath 2 262.17 0.67% Hallway 968.37 2.47% Bath 3 243.37 0.62% Entry 258.58 0.66% Stairs 274.90 0.70% Area Subtotal: Main Level 16,376.57 41.73% Area: Downstairs Piano Room 573.30 1.46% Storage 1 562.10 1.43% Hallway 662.59 1.69% Classroom 1 884.39 2.25% Classroom 2 2,904.03 7.40% Classroom 3 6,997.77 17.83% Kitchen 3,848.49 9.81% Utility 1,250.51 3.19% Bath 1 1,994.16 5.08% Shower 1,714.26 4.37% Furnace Room 1,116.17 2.84% Stairs 189.68 0.48% Landing 168.57 0.43% Area Subtotal: Downstairs 22,866.02 58.27% Subtotal of Areas 39,242.59 100.00% Total 39,242.59 100.00% BIBLE_MISSIONARY_CHU 1/2/2025 Page: 20 Am Advanced Cleaning and Restoration TWIN rim Recap by Category Items Total % CONT: GARMENT& SOFT GOODS CLN 28.08 0.07% CLEANING 15,266.66 38.79% CONTENT MANIPULATION 286.46 0.73% GENERAL DEMOLITION 9,302.69 23.64% PERMITS AND FEES 350.00 0.89% HAZARDOUS MATERIAL REMEDIATION 318.48 0.81% WATER EXTRACTION&REMEDIATION 13,690.22 34.78% Subtotal 39,242.59 99.71% Material Sales Tax 116.06 0.29% Total 39,358.65 100.00% BIBLE_MISSIONARY_CHU 1/2/2025 Page:21 Advanced Cleaning and Restoration TWIN rom� ' 1 ] BIBLE MISSIONARY CHU 1/2/2025 Page:22