HomeMy WebLinkAboutWendell Filer Martin Round-a-Bout Project - Precision Engineering SOQ PRECISION
E N G I N E E R I N G Cover Letter
December 12, 2024
City of Twin Falls— Engineering
Attn: AC Stowe
P.O. Box 1907
Twin Falls, ID 83303-1907
Re: City of Twin Falls Request for Qualifications
Wendall Filer Martin Round-a-Bout
Precision Engineering, LLC (Precision) is pleased to submit this proposal to provide professional services to the City of Twin
Falls for the above referenced project. The following proposal material outlines our expertise and we highly recommend
contacting our enclosed references. Our Project Manager for this effort will be:
Joel Grounds, PE, PTOE I Project Manager 1 379 E Shore Drive, Suite 120, Eagle, ID 208.938.1695
We are excited for the opportunity to provide services on this roundabout project. We bring a technically sound, multi-
disciplinary team that has a deep understanding of the City's goals and expectations. With this project being the first
roundabout on a major road in Twin Falls, it is critical to have a team with the experience, knowledge, and track record of
successfully delivering similar local roundabout projects. We have designed nearly 30 roundabouts and have in-depth
knowledge of the best practices, standards, and requirements specific to roundabout design. For example, we understand
requirements from the recent Public Rights-of-Way Accessibility Guidelines (PROWAG) ruling on safety and accessibility
and when rectangular rapid flashing beacons (RRFBs) are required in roundabouts.
We consider ourselves fortunate to have a good working I appreciate the quick turn around on the recent
relationship with the City. We are dedicated to giving back roundabout design, this design will allow the City
and have prepared more than 6 grant applications for the 44 to apply for available grant moneys. You and your
City of Twin Falls. The grants where prepared by Precision staff should take pride in knowing you continue to
pro bono, saving the City thousands in upfront costs and contribute to improvements that will have a
created more than $12 million dollars in construction positive impact on our community. "
funds for the City. - Becky Crofts, City of Middleton
Our goal is to build on our long standing relationship with the City of Twin Falls for this project, and are committed to
providing the necessary resources to meet and exceed the City of Twin Falls' quality and schedule expectations.
Thank you for considering Precision Engineering, LLC.
Sincerely,
w .go
Joel Grounds PE PTOE
PRINCIPAL ENGINEER --
t'
City of Twin Falls I Wendall Filer Martin Round-a-Bout
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project
QUALIFICATIONS OF PROJECT MANAGER
Joel Grounds, PE, PTOE (Project Manager)
,*� • • Joel will serve as the Project Manager for this project. He has 20+ years of experience
managing, designing, and providing construction support in Idaho. Joel will have primary
project oversight to ensure that the quality and timeliness of our services continually meet
and exceed project goals. Joel's experience brings a streamlined project development
approach which reduces costs, minimizes risks, and accelerates the schedule.
Since Joel's first fast track intersection project for the City of Twin Falls over a decade
ago, Joel has managed multiple roadway projects with the City. He is proud to have an
Joel Grounds, PE, PTOE outstanding record for completing all projects on time and budget. Joel looks forward to
PRINCIPAL ENGINEER continue working with the City and leveraging his local experience for a successful
IL project outcome.
As the project manager for this roundabout project, Joel will have day to day involvement
Projects ' R' • coordinating with team members to ensure adequate and appropriate personnel and
Managed. �12 Roadway—,:Design Projects
About resources are allocated for the successful completion of this project.
sincContact As you know, we enjoy working with Precision as you set the bar high and make our jobs
Phone: 208.938.1695 much easier. I don't think I can give all 5's-but this is pretty darn close. ESPECIALLY on a
project this crazy. With any other consultant, this project could very well have failed and
Location dissolved. I think your project management skills and ability to adapt allowed this project to
379 E Shore Dr Suite 120 continue-even after massive scope changes. " - Amanda LaMott, PE, LHTAC PM
Eagle, ID 83616
Roundabout . - - -
Education
BS, Civil Engineering ✓ Franklin & Birch RAB, Nampa ✓ Eagle & Taconic RAB, ACHD
Boise State University (1998 - 2002) ✓ Middleton & Linden RAB, HD4 ✓ Linder & Floating Feather, ACHD
Years of Experience ✓ Lake Hazel & Maple Grove RAB, ACHD ✓ SH-16 & Floating Feather RAB, ITD
22 years Total ✓ Middleton & Sawtooth RAB, Middleton ✓ US-2 & Boyer RAB, ITD
12 years at Precision ✓ Hartley & Willis RAB, Middleton ✓ Emmett & Willis, Middleton
Professional License ✓ Middleton & Cornell Mini RAB, Middleton ✓ Emmett & 9th, Middleton
P.E. Idaho (No. 12754) ✓ Eagle & Zaldia RAB Peer Review, ACHD ✓ River & Middleton RAB, Middleton
P.T.O.E. (No. 2531) ✓ Warm Springs RAB Peer Review, ACHD ✓ Middleton & Bass RAB, Middleton
Statement of Qualifications PrecisionEngineeringllc.com 1
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project
QUALIFICATIONS OF FIRM AND STAFF
We have assembled our team to best fit the project goals
and all team members have successfully delivered similar PROJECT MANAGER QA/QC MANAGER
Joel Grounds, PE, PTOE Precision Kevin Kingsbury, PE Precision
roundabout projects. One of our team's greatest assets is
our relationship with the City of Twin Falls, built on years of
trust that the project will exceed their standard of care. ROADWAY/STORMWATER LEAD SURVEY LEAD
For this project we have partnered with EHM Engineers for Andy Elliott, PE I Precision Chris Harmison, PLS I EHM
Survey and Right-of-Way tasks and STRATA if subsurface ROUNDABOUT DESIGN LEAD GEOTECHNICAL (IF NEEDED)
investigation is needed to determine stormwater facilities and Brandon Mapes, PE I Precision
pavement section.
KEY PERSONNEL
Andy's role will be the roadway and stormwater design lead Education
and he brings over 16 years of specialized experience in BS, Civil Engineering
roadway geometrics, site development, grading & drainage Boise State University (04 - 09)
design, including the engineering and construction of Green Years of Experience
Stormwater Infrastructure (GSI). He has successfully 16 years Total
l completed 100+ Idaho projects covering a wide variety of 10 years at Precision
project types including intersections, urban roadways, Professional License
Andy Elliott, PE stormwater/irrigation design, grading and modeling. Andy will P.E. Idaho (No. 15778)
have day to day involvement with the project, leading the Location Availability
ROADWAY/STORMWATER LEAD grading, stormwater, and irrigation designs. Eagle, ID 85%
As roundabout design lead, Brandon will oversee the Education
1 horizontal geometric design, fastest paths calculations, and BS, Civil Engineering
sight distance determinations. He will also lead the striping, Boise State University (09 - 13)
signing, illumination and ADA design portions of the project. Years of Experience
He brings more than 10 years of transportation design 10 years Total
experience in Idaho. His design expertise includes 15+ 10 years at Precision
roundabouts in Idaho, enhanced pedestrian crossings Professional License
Brandon Mapes, PE (RRFB's &Pedestrian Hybrid Beacons), and continuous street P.E. Idaho (No. 17889)
lighting. Brandon will have day to day involvement with the Location Availability
ROUNDABOUT DESIGN LEAD project, leading the roundabout geometric and traffic design. Eagle, ID 85%
Statement of Qualifications PrecisionEngineeringl/c.com 2
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project
QUALIFICATIONS OF FIRM AND STAFF
As QA/QC Manager, Kevin will utilize his technical expertise Education
and comprehensive transportation experience to ensure BS & MS, Civil Engineering
compliance with Precision's rigid project quality standards. University of Idaho (04 - 10)
'f Kevin has over 14 years of experience working in the civil Years of Experience
engineering industry with public agencies. He has worked on 14 years Total
100+ projects throughout Idaho and has years of experience 7 years at Precision
�_ working effectively to develop and review critical Professional License
Kevin Kingsbury, PE improvement projects. Kevin will be heavily involved on the P.E. Idaho (No. 1629)
project for interdisciplinary QA/QC and constructability review Location Availability
QA/AC MANAGER leading up to design review submittals. Eagle, ID 70%
Chris will serve as the Survey Lead and has over 30 years of Education
extensive experience in Boundary and Right-of-Way Associates
resolution, ALTA Surveys, final mapping, legal descriptions, Idaho State University (87
)
M. construction staking and topographic surveying. His accurate Years of Experience
_ ---- and thorough work provides clarity on the most complicated 30 years Total
survey matters. Chris will be heavily involved with the project 10 years at EHM
when survey tasks are being conducted. Professional License
Chris Harmison, PLS PLS Idaho (No. 15778)
SURVEY LEAD Location Availability
Twin Falls, ID 100%
TECHNICAL STAFF (Availability 75%)
Nolan Lindquist, El Logan Jensen, El Connor Hamnquist Griffin Halley
STAFF ENGINEER STAFF ENGINEER STAFF ENGINEER GRAPHICS DESIGNER
Education Education Education Education
BS, Mech Engineering BS, Civil Engineering BS, Civil Engineering UCLA
Boise State University Boise State University California Baptist University
Experience Experience Experience Experience
1 year Total 1 year Total 1 year Total 2 years Total
1 year at Precision 1 year at Precision 1 year at Precision 2 years at Precision
Statement of Qualifications PrecisionEngineeringllc.com 13
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project
RELEVANT PROJECT EXPERIENCE AND REFERENCES
We are local intersection and roundabout design experts, having successfully performed 125+ intersection designs including the
design of nearly 30 roundabouts varying from mini roundabouts to complex five leg multilane expandable roundabouts in Idaho.
For this roundabout project we will conduct the required fastest path calculations, natural paths, speed differential calculations for V1
thru V5, Phi angle determination, stopping and intersection sight distance, path overlap, roundabout grading, and circular roadway
profiles.
Every team member is actively involved in all our roundabout projects. Our experienced discipline leads guide each phase of the
design, assisted by our technical staff for design support, plan production, and quality control review.
The following is a sampling of relevant projects completed within the last five years:
�- --- Middleton Rd & Sawtooth Lake Dr Roundabout I City of Middleton
Precision provided design services to construct a unique multi-lane roundabout with five
approaches at the intersection of Middleton Rd and Sawtooth Lake Dr in Middleton. The
project had a compressed project schedule with a timeline from start to finish of only 3
,_. months, completed on time and within budget. The proximity to the Boise River and fifth-
approach leg provided a complex challenge along every step of project development
from the design of the roadway profiles, fastest path calculations, and truck turns.
'i Required Expertise: ✓ Complex Roundabout ✓ Sign/Pavement Markings ✓ Development
Coordination ✓ RAB Lighting ✓ Traffic Analysis ✓ RRFB ✓ Traffic Control
Reference: Jason Van Gilder, PE I Public Works Director 1208.585.3133
Eastland Drive Reconstruction I City of Twin Falls
Precision provided design services to reconstruct one mile of Eastland Dr with concrete
pavement and widen a two-lane bottlenecked portion of the segment to five-lanes. The
- project was made possible through a successful grant application Precision wrote pro-
bono, resulting in the project being awarded $8.4 million from ITD's Strategic Initiatives
/ Grant Program. The project involved significant water utility and irrigation company
coordination and design including replacing an existing culvert with pipe and replacing
headgates with a diversion structure.
_ _ --- - Required Expertise: ✓ Irrigation Design ✓ Concrete Design ✓ Traffic Control ✓ Utilities
Reference: Jesse Schuerman I Staff Engineer 1208.735.7252
Statement of Qualifications PrecisionEngineeringllc.com 14
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project
RELEVANT PROJECT EXPERIENCE AND REFERENCES
_ ..; Ten Mile Crossing Development Roundabout I Brighton Corporation/ACHD
- Precision provided civil engineering services to Brighton Corp as part of their Ten Mile
Creek development in Meridian ID. The project consisted of designing a roundabout at
p p J g g
Cobalt Dr, traffic signal at Franklin Rd/Wayfinder Ave, and traffic signal at Franklin Rd/
AV
`- �► = - Benchmark Way. We assisted the development site engineer with the required 404
permitting due to the relocation of a canal on the development site. Additionally, we
assisted with the preparation of license agreement applications for improvements within
the R/W for which the development would have maintenance and other responsibilities.
Reference: Ricardo Calderon Capital Projects Manager 208.387.6364
I p 1 g l
Pierce Park Ln and Hill Rd Roundabout I Ada County Highway District
8,�" " +Dm Precision is providing services to construct a single lane roundabout at the intersection of
�. c
Pierce Park Ln & Hill Road as well as replacing an existing bridge over the Farmers Union
w Canal. Design services included traffic analysis, storm drain & irrigation design,
- coordinating the design of the bridge, RRFB/lighting design at the intersection, CLOMR
approval from FEMA, and public involvement including three roundabout alternatives and
. 3D renderings.
Required Expertise: ✓ RAB Lighting ✓ 404 Permitting ✓ Storm Drain ✓ Canal ✓ RM
✓ Public Involvement ✓ Traffic Control ✓ RRFB Design ✓ Sign/Pavement Markings
Reference: Ricardo Calderon I Capital Projects Manager 1208.387.6364
Middleton Rd and Linden Rd Roundabout I Highway District 4
Precision provided design services to install a multi-lane roundabout at the intersection of
Middleton Rd and Linden Rd in Canyon County. A significant element of the project
included installing a box culvert and realigning the Highline Canal crossing within the
roundabout design. Proximity of the structure and box culvert cover requirements were
-- - — -- controlling factors in the grading and fastest path development. Precision worked with
-�=- multiple agencies to develop three concept alternatives which analyzed the design
vehicle paths, fastest paths, and natural paths to ensure that the layouts were feasible.
Required Expertise: ✓ Canal Design ✓ RRFB ✓ Traffic Control ✓ Utilities ✓ Bypass
Reference: Chris Hopper, PE I District Engineer 1208.454.8135
Statement of Qualifications PrecisionEngineeringllc.com 5
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project
RELEVANT PROJECT EXPERIENCE AND REFERENCES
PROJECT APPROACH
oproach and Methods Timeline
The proposed roundabout will require tiling (piping) the existing Lateral 39 irrigation ditch. Our intentions are to complete the design
In our coordination with the Twin Falls Canal Company (TWCC), they indicate a 48-inch within nine months to allow for the piping of
pipe will need to be installed along with a diversion structure at the west end of the ditch Lateral 39 to be completed in the fall /
to turn the pipe under Filer Ave and to perpetuate existing delivery gates. They also winter of 2025. Our team found innovative
indicated the removal of the existing box culvert under Filer Ave and replaced with a 48- ways on the Eastland Dr Projec to break
inch pipe to facilitate the piping of the remaining ditch north of Filer Ave at a later date the project up to accommodate
outside this project. We will leverage our recent experience and relationship from the construction windows, obtain R/W early in
Eastland Rd Gravity Irrigation Project that was just awarded the construction contract, the design process, and make changes "on
which included the construction of several diversion structures and piping to TWCC the fly" to ensure the project does not stall.
standards. One benefit our team recognizes in having
This project will require a 404 permit to be completed for Lateral 39. We are currently the developer as a willing partner is the
working on several projects that require 404 permitting and understand the recent ability to provide a space for construction
changes the US Army Corps of Engineers are requiring for all 404 permit applications staging. This is useful for materials and also
(wetlands, cultural and aquatics). We are also aware of the additional review time due to for a temporary bypass while work is being
the additional efforts. With the recent Army Corps of Engineers changes, this task is a completed on the existing roadway.
critical path item and recommend starting the 404 permitting process early in the design. Recently we have completed two
roundabout designs that were able to utilize
Constructability including a clause in the specifications adjacent properties as a bypass road to
With this being one of the first roundabouts requiring the contractor to survey the lip of minimize disruption to the local traffic,
on a major corridor, selecting a design firm the gutter around the roundabout before saving both time and cost.
that not only understands how to design a paving begins. The contractor must provide
roundabout but also how it is constructed is the information to the designer to confirm I wanted to let you know Capital Paving
critical. Our most recently constructed that the fastest path speeds meet the 44 and ACHD were awarded a Gold
roundabout project (Lake Hazel and Maple design requirements. This simple yet Award from ITD and AGC for the Maple
Grove and Lake Hazel roundabout
Grove Roundabout, ACHD) was effective task ensures safety and project and wanted to say thank you to
recognized for innovation in construction by implements a quality control check on the Precision for providing such good design plans,
AGC and ITD, showcasing our expertise in contractor because if the curbing does not definitely some of the best we have seen so far for
both design and construction practices. A meet the requirements it must be removed a roundabout."
key quality control measure we employ is and replaced. —John Mitchell, Capital Paving
Statement of Qualifications PrecisionEngineeringllc.com 6
City of Twin Falls I Wendell Filer Martin Round-a-Bout Project "JIL
RELEVANT PROJECT EXPERIENCE AND REFERENCES
Construction Administration Public Outreach have presented at multiple public meetings
We provide Construction Administration for A critical component to the success of a in jurisdictions where a roundabout was the
multiple agency projects, including: bid roundabout project will be public first in the community and have learned
solicitation, posting the bid on QuestCDN, involvement, especially when it is the first valuable information and tactics over the
responding to contractor questions, and roundabout introduced to a community. A years to a successful public outreach.
addendums. We partner with local firms for roundabout may represent an unfamiliar
type of intersection that raises questions The following are links to some examples of
on-site construction oversight services. Our yp q our public involvement materials:
team reviews submittals, attends meetings, about navigation and safety. Knowing what
assists with substantial completion and how to present the material at public Amity Road Storymap Project Website
checklist, and prepares record drawings. meetings can make all the difference. We Public Involvement Visualization Portfolio
GEOGRAPHIC CONSIDERATIONS
Physical Location Project Communication Project Management
Precision's personnel are located in Eagle, Maintaining early and often communication We have weekly internal meetings to
ID. EHM Engineers and STRATA's is the cornerstone of Joel's management discuss and monitor project development,
personnel are located in Twin Falls, ID. We approach. Joel takes a proactive budget, schedule, upcoming deliverables,
consider ourselves fortunate to be providing management approach to identify, and outstanding issues. The meetings allow
our services to the City and consider communicate, and address potential issues our team to identify changes to the scope or
projects within Twin Falls to be "local" before they can become a problem. This schedule, and discuss any potential
projects. We do not charge additional travel approach helps avoid surprises for the City difficulties that may arise, allowing us to
time or miles for Twin Falls projects and are and maintains the project scope, schedule, tackle issues early before they become a
always available to meet with the City staff and budget. delay.
on an as needed basis.
I
Local Government Agency Experience -
The best testament to our local government
experience is our record of roadway and
intersection projects for the City of Twin _
Falls and our outstanding relationship with
City staff and partner agencies such as --
Twin Falls Canal Company. a .-
Statement of Qualifications PrecisionEngineeringllc.com 17