December 12,2024
City of Twin Falls—Engineering
Attn:AC Stowe
P.O.Box 1907
Twin Falls,ID 83303-1907
RE:Request for Qualifications:Wendell Filer Martin Round-a-Bout Project
Dear Mr.Stowe and selection committee,
J-U-B ENGINEERS,Inc.(J-U-B)is pleased to present this proposal for the Wendell Filer Martin Round-a-bout Project.We live,work,and
play in the Twin Falls/Magic Valley community and are passionate about supporting the City of Twin Falls in improving our local infrastructure.
We are grateful for the opportunity to work with you again and collaborate with you to refine a solution to the Wendell/Filer/Martin
intersections.
We have done our research.Our commitment to the City of Twin Falls is to provide you with the highest value in terms of a consultant
partner.From our current understanding of the project and after meeting with Mr.Stowe,we started to refine the City's conceptual layout
taking into account the existing traffic issues,right-of-way limitations,and irrigation needs.We think there are a variety of geometric
solutions,three are shown on page 6 of the proposal,that we can use for conversation as we begin to develop the ideal solution with you.
We offer the City a truly efficient partner that will guide the process towards a successful outcome—on schedule and with a focus on quality
products and processes.
We are experienced.J-U-B has extensive roundabout experience and brings a team of experts and a portfolio of roundabouts to support
you through this project and process.We also understand that this will only be the second roundabout in Twin Falls,the first constructed
by the City,and that communication and education of the public will be critical.To address this need,we will use our in-house public
involvement subsidiary,The Langdon Group,to assist you in providing public outreach and roundabout education to the community.This will
be essential when developing a unique transportation solution,likely the first of its kind in Twin Falls.
We are local.The majority of our design team will be out of J-U-B's Twin Falls office,who you know and have worked with.Chelsea James
and Matt Sipple,our project leadership team,commit to providing the key staff we have identified in this proposal for the duration of the
project.Our entire team is dedicated to exceeding your expectations for quality,schedule,and budget.
We are honored to have the opportunity to team with you on such a unique project and are truly excited for the opportunity to help the City
of Twin Falls deliver this improvement to the community!
Respectfully,
J-U-B ENGINEERS,Inc.
6141— XA�r_
Chelsea James,PE Matt Sipple,PE
Project Manager Project Engineer
208-733-2414 1 cjames@jub.com 208-949-5703 1 msipple@jub.com
2114Village Park Avenue,Suite 100,Twin Falls,ID 833011(208)733-24141 jub.com
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Qualifications of Project Manager
ProjectChelsea James, PE I Twin Falls, ID / ..
"As your local J-U-B project manager,I will be there to help guide this project from beginning to end.From the
layout refinement to PS&E,and from the first contact with the public through the end of construction,me and the
" ) J-U-B team will be there to support you."
Qualifications:Chelsea is a project manager for J-U-B in the Twin Falls office and serves as the SW Idaho Regional
Transportation Manager within J-U-Bs Transportation Services Group(TSG).Chelsea has a diverse range of project experience
including roundabout design,urban arterial and collector widenings,pedestrian improvements,drainage studies and design,utility
coordination,traffic control,and construction staging.
Roundabouts are one of her passions,and her expertise includes the design and performance checks of single and multi-lane roundabouts.
She understands the unique design considerations for balancing roundabout geometrics with the safety and operation of the intersection
and the impact to surrounding properties.She has been the lead engineer on at least six roundabouts and has created conceptual layouts
for over 20,including non-circular and peanut shaped roundabouts.She understands the full project implementation process,from
understanding the client's needs,preferences,and site constraints,to developing layout alternatives,creating the horizontal and vertical
design,plan production,and facilitating the public involvement process.Her experience also includes the design of signing and pavement
markings to ensure optimal operation.
Experience:
600 South 250 East Roundabout UDOT Region 1,Pin 19732 1 Smithfield,UT 1 2022-2024
As the Deputy Project Manager and Lead Engineer,Chelsea led the design of a single
lane roundabout from concept through PS&E.The roundabout is located next to a
high school and RRFBs were used at the crosswalks to better illuminate the pedestrian
crossings.The project was constructed in 2024 with no change orders.Similarities to
'- our project include:
r Management and oversight of a single lane roundabout design on a local collector
roadway.
l� Biweekly team meetings with the design team and monthly team meetings with the
client for proactive coordination.
-- _ ..... Oversight of conceptual layout through PS&E.
i,. Analyze pedestrian needs and make recommendations for
suggested treatments.
Cleveland Massillon Road ODOT PID 103293 Fairlawn,OH 1 2016-2020*
I� As the Deputy Project Manager and Lead Engineer,I was involved in the
cradle-to-grave development of 1.25 miles of suburban arterial widening from a
�• congested two-lane roadway to a four/five-lane corridor with multi-lane roundabout
and signal improvements.I managed or was involved with every aspect of the project
e development from the traffic and safety studies,to securing federal funding,through
t PS&E.Similarities to your project include:
Major reconfiguration of the side streets for optimal placement of
the roundabout.
■ Extensive coordination with stakeholders and utility companies.
■ Active participation in public involvement with concerned citizens.
SR 619 and Myersville Rd Roundabout Green,OH 1 2018-2019*
' As the Deputy Project Manager and Lead Engineer,Chelsea managed the design of a
single-lane roundabout for the City of Green.Minimizing adjacent property impacts
was a major concern for the City.Through the conceptual layout phase,the design
team decided to shift the roundabout significantly to the west to impact vacant fields
instead of residential properties.Similarities to your project include:
■ A robust conceptual layout phase with the City to identify the ideal layout for
the site and to reduce impacts to residential properties.
■ Property owner coordination for input on design decisions and to
build consensus.
■ Led a public open house to present the layout to the public with continued
public outreach.
*Completed while working forAECOM.
(JU_ 1
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Qualifications of the Firm and Staff
J-U-B ENGINEERS,Inc.is a full-service,
��,�,� professional services corporation that �rOKAN
specializes in engineering,surveying,and LEWIS
planning.Our corporate culture values CLARK COEUR D'ALENE
the importance of establishing long-lasting and trusted VALLEY Moscow
relationships with our clients.We currently act as a trusted
technical advisor for numerous districts,cities,and counties KENNEWICK CRAIGMONT
throughout the northwest.Founded in 1954,J-U-B provides
innovative ideas and responsible engineering,planning,and c
design services to public agencies and municipalities.For 70 LA GRANDE '—CODS
years,J-U-B has experienced steady growth in company size, MERIDIAN�\ ,IDAHO FALLS
professional expertise,and in the scope,number,and /'
complexity of our projects.The work for this project will be PocATELLo
IN FALLS GARDEN CITY
performed mainly by our Twin Falls office,with RENO r ��EVANSTON
assistance from our other offices as needed. LOGAN //r"
Our Subsidiary Companies KAYSVILLE /
The Langdon Group(TLG)is a J-U-B subsidiary that SALT FT. L
® provides public involvement,facilitation,mediation, CITY
OREM O
conflict management,and strategic visioning for clients. WESTERN
We design and conduct processes to help our clients and their do i COLORADO LIN
.
communities solve problems and implement solutions.TLG sT GEORGE
works with many municipalities by providing public outreach
efforts,including a 24/7 public hot line,email updates,
door-to-door notifications,stakeholder interaction database . .and much more.
Gateway Mapping,Inc.(GMI)is another subsidiary mJA,. Years in business
ANNIVERSARY�.:� company to J-U-B dedicated to the geospatial Offices in 7 states
technology profession,serving clients across the West Founded in 1954
23
since 1991.Our mission is to provide customized GIS solutions.
GMI staff has a wide variety of experience using GIS,including 530+ Employees Q Over 100 local, regional,
data processing,analysis,and asset management.We have and national awards
specific experience and expertise in incorporating GIS with
utility projects and have performed analysis and asset
management for municipalities across the Western US.
Organization Chart and Qualifications of Key Staff
J-U-B has assembled a qualified,experienced team to complete the proposed Wendell Filer Martin Round-a-Bout Project.This team
understands the City's goals and expectations for this project,what public feedback to expect,and how to smoothly navigate these
challenges.Below you will find our team organization for this project.Individuals represented by are considered key staff,for which roles,
bios,and project experience are detailed on the following pages;all others listed are support staff and will assist key individuals as they work
to complete the scope of work.
Project Leadership Team
% Availability Project Manager
■ Day-to-Day Involvement Chelsea James,PE
■ Occasional Involvement Twin Falls,ID(55916) QA/QC
Travis Marden,PE
Project Engineer St.George,UT(559vo)
Roundabout Geometrics
Matt Sipple,PE /'
Meridian,ID(50916)
Irrigation Design Survey/ROW Public Involvement
Gary Haderlie,PE Tom Ruby,PLS r Rebecca Coulter
Twin Falls,ID(4096) Twin Falls,ID(60%) Meridian,ID(70916)
Roundabout Design,Drainage,Traffic Control
Lead Roadway Designer Lead Drainage Designer Designer Designer
Cooper Felton,PE Chaitanya Koya,EIT Jayr Ayala,EIT Shive Huggins,EIT
Meridian,ID(60916) Twin Falls,ID(70%) Meridian,ID(60910) 0 Twin Falls,ID(60916)
('J-UB 2
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Sipple,Matt . - Design
Project Engineer/Roundabout Geometrics MS, Civil&Environmental Engineering, Hydraulics Emphasis
MS, Civil Engineering Role:On this project,Gary will use his extensive
wiRole:As the Project Engineer and part of the project < experience to lead the irrigation design to pipe the
leadership team,Matt will work closely with Chelsea existing Lateral 38 on the south side of Filer Ave
to oversee the project and be responsive to the City under the roundabout.
PM so that there is always someone available to Qualifications:Since 2007,Gary has been climbing
respond to your needs.Additionally,he will lead the in manholes,testing pump stations,flow measuring sewer pipes,
development of the roundabout geometrics and oversee the design collaborating closely with local city staff,and working hard to
team as they assemble the construction documents. understand the intricacies of municipal water,sewer,stormwater,
Qualifications:Matt has more than eleven years of transportation and irrigation infrastructure.He has unsurpassed knowledge of
related experience and has served as project manager,design local systems,providing modeling,planning,and design efforts.As
team lead,project engineer,and construction manager on a a result,cities have come to trust and rely on Gary for some of the
variety of urban/rural roadway and interstate projects.Matt has most difficult issues.He has been a Project Manager and Engineer
also managed,designed,and supported a variety of roundabout on several major Magic Valley projects,including the Jerome and
projects.Through this experience,he is equipped to address Twin Falls Water Master Plans and the Twin Falls Collection System
project challenges including ROW limitations,heavy truck traffic, Master Plan.Gary also provides gravity irrigation system designs
temporary traffic control,construction staging,and bike/pedestrian and expertise for the Twin Falls Canal Company and other districts.
facilities.Matt was the Project Engineer on the Mountain View Gary's unique ability to investigate an issue from several different
Roundabout project for the City of Moscow.This is one of two perspectives assures his solutions are well-considered and practical.
roundabouts in Moscow,and the second to be constructed,so Experience:■ Betaseed TFCC Lateral 18 Piping I Peterson Brothers
roundabout education was an important aspect of the project. 12018 1 Project Manager•TFCC Lateral Pipe Sizing and Design
Experience:■ Mountain View Road I LHTAC I Moscow,ID 1 2016- Reviews I TFCC 12007-Ongoing I Project Manager
2022 1 Project Engineer. ■ Middleton Road Roundabout I M3
Developers I Middleton,ID 1 2023-2024 1 Quality Control Rebecca Coulter I Public Involv"
BA, Communication
Travis Marden, PE I • • RolBS, Civil Engineering e:As the public involvement lead,Rebecca will be
there to support you.She will be available at any
9URole:Having designed or reviewed more than 20 level needed,which could include facilitating
roundabouts throughout his career,Travis will one-on-one meetings with property owners,helping
provide QA/QC of all roundabout performance checks address concerns from the public,coordinating with
and deliverables to ensure a complete,constructible, stakeholders,holding a public open house,or providing
and quality design is delivered to you. roundabout education to the public.
Qualifications:Travis has over 26 years of engineering experience Qualifications:Rebecca is a public involvement specialist at J-U-B,
in a wide range of transportation projects.He specializes in with 15-plus years of experience in a variety of transportation
urban street design,single and multi-lane roundabouts,bridge planning projects for state,county,and local agencies across Idaho.
replacement projects,transportation studies,and federal aid She specializes in multi-agency,transportation-related construction
highway projects.His hands on expertise also includes local and planning projects.Her strengths lie in her innovative thinking,
roadway/highway design,pedestrian improvements,right-of- value of relationships,and respect for the relevance of held
way acquisition,illumination,utility relocation,and roadway perspectives in the overall planning process.Rebecca knows how
safety improvement projects.Travis is very experienced in design to develop key messaging,how to concentrate communication
details,plans,specifications,and cost estimation for both local and efforts to identify appropriate outreach opportunities,and how
federally funded projects.Additionally,having designed more than to ensure pertinent information reaches appropriate parties.She
20 roundabouts throughout his career,and having provided QA/QC also understands the process for discussing sensitive land use
on dozens more,he is ideally suited to review both the roundabout designations and property acquisitions with property owners.
performance checks and the construction plans. Experience:■ US-30 Business Loop(Burley Main Street)I ITD
Experience:■Clubhouse Lane Roundabout I City of Richland,WA D4 12024-Ongoing I Public Involvement Lead ■ Linden Street
20211 Project Manager/QC• Middleton Road-Quarry Roundabout Corridor Study I Ada County Highway District 2024 Public
M3 Development 12023 1 Design Review/QC Involvement Specialist
Survey/Tom Ruby, PLS I - •
TechnologyDrafting
Role:Tom will lead the data collection,boundary
verification,and existing alignment layout to support
accurate design.
Qualifications:As the discipline lead for surveying
at J-U-B,Tom has had the opportunity to take the
lead on a wide variety of survey projects,including large-scale
control surveys,aerial mapping survey control,conventional
mapping projects,preliminary and construction engineering
surveys,bathymetric surveys,ALTA surveys,cadastral surveys,and
property surveys.Tom has thirty-two years of experience in the
survey profession and has been professionally licensed in the State
of Idaho for twenty-one years.
Experience:• State Highway 16 Extension I ITD,TECM
2018-Ongoing I ROW Acquisition Lead ■ Shoshone Falls Grade I City
of Twin Falls 12023 1 Survey QA/QC
('J lJ� 3
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Relevant Project Experience and References
Twin Falls needs an experienced team to develop this project.J-U-B is that team!Below,you will find a list of projects with similar scope
as your project.These projects demonstrate the skills of our team coupled with references for our clients who can vouch for our quality
deliverables,integrity on the job,and our clear and concise communications.
600 South 250 East Roundabout, UDOT Region 1, Smithfield, LIT (2022-2024)
Description:The City of Smithfield hired J-U-B to design a single-lane roundabout at
ya the intersection of 600 South and 250 East in Smithfield,Utah.The project included a
concept analysis to minimize ROW impacts to residential properties on the northwest,
southwest,and southeast corners and utilize the open field south of the school on
the southeast corner instead.The roundabout design included a detailed fastest
path and truck turning movement analysis as well as pedestrian investigation and
<- recommendation of treatment options.The J-U-B team then took the project from
concept design through PS&E including roadway horizontal/vertical design,drainage
design,utility investigation,coordination and relocation,lighting design,ROW plan
preparation,landscaping design,environmental evaluation,and coordination with the
�
y school district and impacted property owners.J-U-B also performed the construction
{ engineering management for the city with no change orders during construction.
Due to the heavy volume of school traffic during the school year,this project was
constructed in approximately ten weeks while students were on summer break.
Similar Team: Project Relevance:
Chelsea James(Project Engineer), ■ Roundabout concept analysis to reduce ROW impacts to residential properties
Chaitanya Koya(Lead Roundabout Designer) ■ Roundabout,roadway,drainage,and lighting design
Public Involvement: Utility investigation
J-U-B and City Staff Pedestrian considerations
■ Right-of-way design and coordination with impacted property owner
Owner/Reference: Construction engineering management
Clay Bodily,Smithfield City Engineer
435-563-6226
Description:LHTAC and the City of Moscow retained J-U-B to design improvements
to Mountain View Road as well as the intersections at Joseph Street and 6th Street.
The intersection at 6th Street was redesigned from a two-way stop to a single lane
roundabout.The Joseph Street intersection included the addition of left-turn lanes
for Mountain View Road and the east leg of Joseph Street.The existing roadway width
j of 24 feet was widened to 36 feet to accommodate a two-lane urban road section
/:r 4 ,• with bicycle lanes,curb and gutter,and a 5-foot separated sidewalk on the west
• aY °�. ;� side(a 10-foot-wide paved path existed on the east side).Street lighting was added
throughout the corridor,and a rectangular rapid flashing beacon(RRFB)was installed
for pedestrians crossing Mountain View Road at 7th Street.J-U-B prepared the traffic
analysis,concept report,preliminary design,NEPA document,final design,right-
of-way plans and legal descriptions,and PS&E documents.We also performed the
stormwater and lighting designs and managed public involvement activities,which
L, included door-to-door stakeholder meetings,mailers,and two public open houses.
c ,<. This project was unique in that it involved very difficult utility relocations and multiple
unknown utility conflicts.J-U-B successfully completed construction engineering and
inspection for the project and helped navigate sensitive change orders throughout the
process.
Similar Team: Project Relevance:
Matt Sipple(Project Engineer) ■ Roundabout,roadway,drainage,and irrigation design
Public Involvement: ■ Right-of-way design and coordination
The Langdon Group(TLG) ■ Public involvement including door-to-door outreach and public open houses
■ Construction engineering management
Owner/Reference:
Scott Bontrager,PE,City Engineer
208-883-7030
('J-U-B 'h 4
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Description:The Quarry Subdivision is a new luxurious multi-phase residential
QUARRY project in Middleton,Idaho.J-U-B has been involved in the master planning,
SUBDIVISION i entitlements,and design of this community since early 2021.Conditions of Approval
from both Highway District 4(HD4)and the City of Middleton required extensive
frontage improvements to Middleton Roadway,a rural arterial road,including a multi-
lane roundabout at the intersection with the Quarry Subdivision entrance.
The new Middleton Roadway Corridor will continue to provide access to local existing
companies such as Idaho Materials Company,Idaho Power,and Rule Steel,while
providing greater access for pedestrian and bike transportation south of the Boise
River by providing a shared-use pathway and a bike lane.In addition to increased
s transportation opportunities,the roundabout and frontage improvements will give
new life to the area's aesthetic nature through well designed landscaping and lighting.
Design considerations for the improvements include:
■ Pedestrian and Bicycle accommodations
■ Continuation of heavy industrial and construction traffic
■ Extending the urban reach of Middleton City
■ Providing a beautiful yet functional subdivision entrance
The first phase of design included nearly one mile of roadway frontage improvements
3 and a multi-lane roundabout.J-U-B provided roundabout analyses and concept
layouts,roundabout plans,roundabout grading,drainage design,signage and
MIDDLETON ROAD pavement markings,illumination,construction traffic control plans,and construction
support.
Similar Team: Project Relevance:
Travis Marden(Project Manager),Matt Sipple(QC ■ Roundabout design and performance checks
Lead),Jayr Ayala(Project Designer) ■ Multi-agency collaboration
Public Involvement: Concept alternatives
Client Construction support
■ Coordination with a private developer
Owner/Reference:
Mark Tate,M3 Project Manager
208-939-6263
Description:The City of Sandpoint retained J-U-B to address a mobility need in
a critical area of their city,Schweitzer Cutoff Road's(SCO)intersection with Boyer
Avenue.This area includes direct access to the airport,county fairgrounds,county
sheriff's office,countyjail,designated local industrial truck route,commuter traffic
�. and Schweitzer Mountain Resort.The public was experiencing traffic congestion,long
t delays,and no pedestrian facilities.Several public meetings were held during the
design process to gain input from the community and address concerns.Some of the
topics covered included:multi-use pathway location,aesthetics,airport proximity,
.� impacts to Sand Creek,utilities,and construction duration/timing.The trucking
community also expressed concerns over the roundabout and possible limitations
'! to truck movement.A"roundabout rodeo"was held in a large parking lot where the
= planned roundabout was marked out with cones and the trucking community was
allowed to"drive"the roundabout.This not only made truckers more comfortable with
the prospect of a roundabout,but it also allowed the design team to slightly adjust the
roundabout design to better accommodate the largest expected trucks.Full pedestrian
facilities(sidewalks and shared-use paths),bike lanes,the new roundabout,and a
new bridge were all tied together.J-U-B helped assemble three funding packages and
staged the improvement over several years to make the entire system work well and
look like a single project upon completion.
Similar Team: Project Relevance:
Matt Sipple(Project Designer) ■ Extensive public involvement,outreach,and education
Public Involvement: ■ "Roundabout rodeo"was a creative use of stakeholder engagement to address
The Langdon Group(TLG) concerns regarding vehicle circulation,in particular,truck traffic
■ Roundabout design and alternatives development
Owner/Reference: ■ Pedestrian facilities
Dan Coonce(Valley County),LHTAC PM
208-382-7195
('JU- 5
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Project Approach, Methods, and Anticipated Timeline
Project Approach access,etc.will continue in Phase 2.Throughout Phase 2,it will
The Wendell Filer Martin Round-a-Bout project gives the City be important to keep the public aware of the project status and
a unique opportunity to improve mobility and safety for the timelines.Public outreach,education,and involvement are critical!
traveling public.Increasing traffic volumes,lengthy queuing,and q
3
underutilization of these roadways due to the existing geometry a
jERDGE CENTER,
ENTE HERBAGE ASSISTED
have shown the need for improved mobility,and a roundabout doesI I I VNGOFTWIN FALLS
just that. 4 3
The goal of a roundabout is two-fold:1)move traffic efficiently _ �-
through the intersection;and 2)reduce the number and severity of
accidents compared to other intersection types.To achieve these " FI -"—
objectives,close attention to approach angles;fastest path,natural --
path,and swept path analysis;design vehicle;site triangles;truck
aprons;etc.must be considered.
lConc;eptl:
In addition,J-U-B will utilize an internal Quality Control(QC)process where designs and deliverables are checked by a Senior
Roundabout Engineer and/or Senior Traffic Engineer.Our ProjectManagers perform Quality Assurance(QA),where the QC process is Peanut Roundabout
documented using an internal QC Review Sign-off Form.
Project Methods
J-U-B believes clear goals/objectives during scoping will be the ERFi°°E`E TE
cornerstone of project success and will help carry it through the 3 ,
alternative's development phase.This should also consider any future vision vision of the corridor.Completing the project in two phases 3 3
will help the project team develop the most complete solution and FILERAVEW-�
meet the goals of the City:Phase 1 will be to determine the preferred
alternative and acquire necessary right-of-way;Phase 2 will be 3 —"
design development,a PS&E package,and bidding support.
HAVEN ROCK
Phase 7 SUBDIVISION
The team will move into a two-step process to select a preferred -
alternative.Step 1 will include data gathering of the existing Concept 2:Standard Roundabout -
conditions and site constraints(survey,traffic data,alignments,
cross sections,right-of-way constraints,irrigation constraints,early
stakeholder engagement,etc.). �� o i J ERT GE SSSTE
SLIVING GF TWIN FALI
Informed by Step 1,in Step 2 the team will review the data,develop 3 RIVER RIDGE CENTER
alternatives,measure them against selection criteria,and identify a 3
preferred alternative(s).A public input period/open house will follow,
and will conclude with the selection of a preferred alternative to �I
move into right-of-way acquisition and formal preliminary design. FI ERAVEW '�
Since meeting with the City to discuss the project,J-U-B developed
three potential alternatives based on the City's initial layout and HAVEN ROCK — -
preliminary conversations with City staff.Those concepts are the SUBDIVISION " 3
following: _
■ Concept 7:Reconfiguring Martin Street and utilizing a"peanut" " "-
roundabout(similar to City layout)
■ Concept2:Reconfiguring Martin Street and utilizing a standard Concept 3:Mini-Roundabouts - -
roundabout at Wendell/Filer "
■ Concept3:Mini-Roundabouts at Martin/Filer and Wendell/Filer Public Outreach
Implementation of roundabouts and creative intersections in some
Based on goals/objectives described above,the concepts will require communities may be controversial due to misconceptions,fear of the
refinement and public input.These concepts are an example of what unknown,and concerns over the effect they may have on businesses
can be explored with the City during Phase 1,taken to the public for and economic growth.These issues can arise from decision-makers,
input,and measured against the goals/objectives of the project to stakeholders,public agencies,elected officials,or the traveling
ensure a solution is developed that meets the specific needs of this public.Effectively addressing the challenges of a new roundabout
project.The preferred alternative will then be progressed to a level of in a community is critical to the overall success of the project.
detail sufficient to develop a legal description for the City to use and Presenting technical information in a way that the general public
acquire the needed right-of-way from the Haven Rock Subdivision can easily understand is incredibly important to gaining support.
developer. J-U-B has the people and the tools to make that happen.Our public
Phase 2 involvement subsidiary,The Langdon Group,will assist in any public
After Phase 1 is complete,the team will move into the design phase involvement/outreach needed on this project.Their tool box includes
and plan production.J-U-B will develop three review sets of plans, public open houses(in-person and on-line),stakeholder meetings,
specs,and estimates,to refine the design with the City(preliminary, on-perline y owner
meetings,
eets projectloon-to-cloor ho oe hot-lines,OW negotiations,
e educational
ons,
final,and PS&E).Addressing additional design elements including materials,social media support,and more.
irrigation relocations/piping,ped/bike improvements,property
(J'lJ� 6
City of Twin Falls I SOQ I Wendell Filer Martin Pound-a-Bout Project I J-U-B ENGINEERS, Inc.
Task
Survey
Concept Development
Public Outreach
Preferred Alternative Initial Design
Right-of-way
Preliminary Design
Final Design
Plans,Specs,and Estimate
Bidding and Advertisement
Construction
Geographic Considerations
Local people supporting each other has been a key tenant of firm(TD&H)working on the Rock Haven Development south of
Twin Falls as it has grown over the past several decades.Established the roundabout from which right-of-way must be acquired.We
in 1973,the Twin Falls office of J-U-B has been supporting your also serve as the design review engineer for the Twin Falls Canal
public infrastructure investments for over 50 years.As a result,our Company(TFCC),who's Lateral 38 bisects the proposed roundabout
understanding of the Twin Falls area,local issues,and personal location and is one of the most critical irrigation laterals in the Twin
relationships with your staff will be the greatest assets to this Falls area.Our long-term relationships with these stakeholders,
project.We understand your long-term visions,infrastructure,local as well as others involved in the project,will aid in the successful
stakeholders,and policies better than any other firm.Our knowledge implementation of this project.
of these ancillary,yet critical,local factors will be paramount to your Communication and Management
project success. g
We strive to provide consistent,meaningful,and clear
Location of Team Members communication and management early and often throughout a
The Wendell Filer Martin Round-a-Bout project will primarily be project so there are no surprises.
managed and designed out of our Twin Falls and Meridian offices. Scoping meetings early in the project allow us to listen to and
Chelsea(Twin Falls)will manage and coordinate all aspects of your understand your immediate and long-term goals and objectives,
project,ensure adequate resources are provided,and communicate budget and schedule constraints,project risks,and non-technical
regularly with you.Matt(Meridian)will lead the design effort issues(public or political impacts).Recognizing that every project
with support from staff in both Twin Falls and Meridian.This"long is different,we provide scopes and engineering solutions to match
hallway"approach between our Twin Falls and Meridian offices your needs.
has been used successfully on several of your recent infrastructure
projects,including Hankins Pump Station#2,South Well#5,and Regular project status meetings will ensure the project scope,
Shoshone Falls Grade.Staff in our Twin Falls office are located budget,and schedule are being met,and provide opportunities to
minutes away from City Hall and the project site,making them adjust our resources if needed for course corrections.
readily available for face-to-face meetings and site visits.This Routine design review meetings at key milestones allow for your
immediate,local,and personal assistance will result in an efficient, crucial input and make sure the project deliverables are clear,
cost-effective,and successful project. concise,and achieve your desired outcomes.
Experience with Local Independent quality control reviews by experienced engineers
Government Agencies are performed at each project deliverable phase to minimize the
Not only do we work together with your staff on a nearly daily potential for project errors.
basis,but our team has developed trusted relationships with many The processes and procedures we have established with your staff
local agencies,regulators,developers,utility companies,and other over the past few decades will allow for the seamless and effective
stakeholders that may influence the design and construction of this implementation of your project.
project.For example,we routinely coordinate with the engineering
Team Member Physical Location
Chelsea James,PE Twin Falls,ID
Travis Marden,PE St.George,UT
Matt Sipple,PE Meridian,ID
Gary Haderlie,PE Twin Falls,ID
Tom Ruby,PLS Twin Falls,ID
Rebecca Coulter Meridian,ID
Cooper Felton,PE Meridian,ID
Chaitanya Koya,EIT Twin Falls,ID
Jayr Ayala,EIT Meridian,ID
Shive Huggins,EIT Twin Falls,ID