Loading...
HomeMy WebLinkAbout18-2876 419 6th Ave E Add-Rem Permits CIT, AF Project Type: Residential Building Permit Applied Date: 09/27/2018 Permit Type: Residential Addition Issued Date: 10/15/2018 oA 4.oa i Permit No.: 18-2876 j Address: 419 6th Ave E Owner Name: Fitzgerald,John Contractor: Eds All Po Box 1428 4351 N 1100 E Twin Falls ID 83303 Buhl ID 83316 208-280-6811 Phone: 208-731-5328 Contractor License/Registration# RCT-16463 Permit Information Description of Work _ Addition&Interior Remodel Property Location in City Limits - Y Lot Number Block Number Subdivision Name���M_m.__ Number of Dwelling Units - 1.00 Sq. Ft.First Floor 1212 Sq. Ft.Second Floor Sq. Ft.Basement Finished 792 Sq. Ft.Basement Unfinished Sq. Ft.Garage Sq. Ft. Patio Building Total Sq. Ft. 2,004.00 . Project Value 64,000.00 -_ Impact Fee Type N/A Fee Date Description Qty/Hrs Fee City Amount Total Waived 09/27/2018 Investigation 0.00 No 487.00 487.00 09/27/2018 w_ Permit Fee Residential City 64,000.00 No 667.50 667.50 09/27/2018 Plan Review Fee Residential City No 200.25 200.25 Total Fees: 1,354.75 Payment Amount: 1,354.75 Amount Due: 0.00 This permit is not transferable(between contractors)and becomes null and void if work is not commenced within 180 days or is abandoned for a period of 180 days. Property Owners:By signing this form you are certifying that you are the legal owner and will personally perform the work covered by this permit. You recognize that this permit is only valid for the work on a primary or secondary residence and associated outbuildings not used for commercial purposes. By signing this,you accept responsibilitly for all work being performed,and understand that all work must be inspected by the City of Twin Falls, Building Department. Any work in the right-or-way requires a seperate permit from the Engineering Department. Please contact them at 208-735-7248. Inspection Line Phone Numbers: Building 208-735-7333 Electrical:208-735=7235........Mechanical:208-735-7289 Plumbing:208-735-7299 Signature: -- Date: 1 I CITY OF Project Type: Residential Building Permit rrMN FALLS Applied Date: 09/27/2018 Permit Type: Residential Addition OAte Q�0 SFRv1NG Building Permit Application Address: 419 6th Ave E Permit No.: 18-2876 Owner Name: Fitzgerald,John Contractor: Eds All Po Box 1428 4351 N 1100 E Twin Falls ID 83303 Buhl ID 83316 208-280-6811 Phone: 208-731-5328 Contractor License/Registration# RCT-16463 Permit Information Property Location in City Limits Y Lot Number - Block Number Subdivision Name Number of Dwelling Units 1.00 ..,,._._ Sq. Ft. First Floor 1212 � Sq. Ft.Second Floor Sq. Ft. Basement Finished 792 Sq. Ft. Basement Unfinished Sq. Ft.Garage Sq. Ft. Patio Building Total Sq. Ft. 2,004.00 Project Value 64,000.00 Impact Fee Type Fee Date Description Qty/Hrs Fee City Amount Total Waived 09/27/2018 Permit Fee Residential City 64,000.00 No 667.50 667.50 09/27/2018 Plan Review Fee Residential Clty No 200.25 200.25 09/27/2018 Investigation Fee 0.00 No 487.00 487.00 Total Fees: 1,354.75 Payment Amount: 0.00 Amount Due: 1,354.75 Building Permit Application Only -This is not an approved permit This application is not transferable and becomes null and void if work is not commenced within 180 days. Property Owners: By signing this form you are certifying that you are the legal owner and will personally perform the work covered by this permit. You recognize that this permit is only valid for the work on a primary or secondary residence and associated outbuildings not used for commercial purposes. By signing this,you accept responsibilitly for all work being performed,and understand that all work must be inspected by the City of Twin Falls, Building Department. Signature: Date: c r o,;F City of Twin Falls Building Department 324 Hansen Street East a Phone:208-735-7238 < ° P.O. Box 1907 Fax:208-736-2256. Twin Falls, ID 83303-1907 www.tfid.org Residential Building Permit Application ***All information to be filled out in its entirety or application will not be taken in*** ,PROJECT INFORMATION { Project Address: R t o � ( t>e' C Subdivision Lot: _� Block: a G__ n �e� PROPERTY OWNER INFORMATION, CONTRACTOR INFORMATION Name: Y p OF e ql� Business Name: Address: (5 ` I qge/j Address: 4351 City,State,Zip: + 1'b Fo U :Z3— 830 City,State,Zip: Phone: �6 �� ��`� Phone: I - Fax: Fax: AJO i 8 Email: Email: &; �i,�t t.�t? - - t•.,.a .. _ i€t 1 State Registration# &Expiration Date:'�CT-1644- 0 r�-AC/-AO f e' r _ o LAN DESIGNER/ARAI TSPERSON/AR(IIITECP ADDITIONAL CONTACTS, Project Manager, etc,` w P --3�--h • s Y e ay. frl Business Name: �� } Business Name: Contact Name: C1 � Contact Name: Address: +�Qv Address: City,State,Zip: %CA�A\ City,State,Zip: Phone: Phone: Email: Email: Type of Permit Requested (This area to be completed by Designer) ittit oerresoondin eit ClSingle Family Dwelling ODuplex ❑Zero Lot Line First Story: 12,1 _Sq.Ft. 6Remodel/Repair/Egress Windows Second Story: Sq,Ft. Description �9-0 Basement Finished: Sq. Ft. 0,Addition 33G Sq. Ft. L Basement Unfinished: Sq.Ft. Description Garage Sq. Ft. O Detached Accessory Structure(shed>200 Sq.ft.) Sq.ft. Carport Sq. Ft. ❑Misc.Fence/Pool/Deck Covered Porch/Patio Sq. Ft. (� Pool or Deck Sq. Ft. Fire District(Area of Impact)—Total Cubic Feet /' Total Sq.Ft. ` r�o C) Sq:Ft. Project Value: $ Iv Na ` o ooa_cb A. Project Value is used to calculate fees for the building permit. Project Value is the total value of the construction work for which the permit is issued,iucludin overhead and ne ofit as well as finish work,painting,roofing,electrical, plumbing,heating/air conditioning,elevators,fire extinguishing systems,other permanent equipment,and owner supplied items. Project value excludes the value of the land. B. I certify that the value&scope of work provided above are the mqq.. ccurate available at this time: Print Name Signature Date .. i 5/2017 Plan Submittal Requirements Single Family Dwellings, Duplexes,Zero lot line, room additions, remodels, patio covers, accessory structures, etc. • If submitting paper plans: 2 full sets of plans (Min. 18"x 24", Max 24"x 36") Min%"Scale on floor plans, 3/16"or 1"=5'for site plans (smaller paper may be allowed on small jobs). • If submitting electronically:A PDF is required,save the PDF directly from the CAD file,instead of a scan if possible. Submit plans and application to: buildingfax@tfid.org NOTE: Impact Area Permits submit by one of the methods above along with South Central Public Health District stamp &permit, Twin Falls Highway District Approach Permit, and cubit feet for fire area. ❖ Additional permits are required for any electrical(in city limits only),plumbing and mechanical installations. ❖ Permit applications are reviewed in the order in which they are received,so in order to avoid any delays make sure that all of the required information,is provided. ❖ When the structure is more than two stories in height,10'single story,of an unusual design,or exceeds prescriptive code requirements,an architect or licensed engineer is required to stamp the building plans and specifications. •A Plans to be designed to the 2012 IRC Code&2012 IECC.(with Idaho amendments) ❖ Provide cubic feet of fire area when building in the area of impact where no fire hydrants are present. 1. Is the property in a flood plain? ❑ Yes Z No(If Yes attach Flood Plain No-Rise Certificate from Engineer) 2. Planning and Zoning Information Land Use Zone Is the property in the area of impact? ❑ Yes �J No(If Yes and this a new construction or an addition,plans must be approved and stamped by South Central Health District and must have a Twin Falls Highway District Approach Permit.) 3. Energy Code Compliance Plans must be submitted demonstrating the Prescriptive Approach or the Performance Method approach for energy code compliance. In marking the option below,and with all information attached to the plans,in signing this application,I declare that I am the permit applicant/builder and that construction of the dwelling will be in compliance with all energy standards as adopted by the City of Twin Falls. ❑ Option 1: Performance Approach A copy of the REScheck compliance report is attached to the plans. (This includes both the cover sheet and the Inspection checklist.) ❑ Option 2:Prescriptive Approach(R-38 Attic, R-20 Exterior Walls,R-30 Floors or R-13 perimeter walls, .35 U Value Lo-E windows) ***This option will need to be clearly shown on page 1 of plans*** ***An Energy Efficiency Certificate will be required to be posted in the electrical panel at final inspection*** 4. Curb,Gutter,&Sidewalk If your property does not currently have curb,gutter or sidewalk,you may be able to defer construction of these items if you are in an area where these are non-existent. You will need a Warranty Deed showing proof of ownership,and we will notarize the deferral here at the Building.Department. This is not required if you are not adding more than 25%of existing square footage to property. 5. Fire Department Access&Fire Protection Plan(Area of Impact) Show the location of the 20 foot fire department access road to within 150 feet to all exterior walls of the building. Show fire department turn-a-round when the access road is longer than 150 feet. When there isn't a fire hydrant within 150'of residence, Residential buildings exceeding 56,000 total cubic feet within the fire district will need to be: 1)divide the building with an approved fire wall,2)install water storage for fire protection(NFPA1142),3)install an automatic fire sprinkler system,4)install a fire/smoke monitoring system. ***NOTICE*** All permits expire 180 days from the date of their issuance or the date of the last inspection. Expired permits will require reactivation at such time that the responsible party decides to complete the project. Reactivation fees will be required on all permits. Please contact the Building Official with any requests for reactivation or extension. USE AND OCCUPANCY OF BUILDING A Certificate of Occupancy will be issued upon completion of the project and after approval of final inspection. Nq ogqqLancyis allowed until issuance of the Certificate of Occupancy or Certificate of Completion. A temporary C of 0 can be issued for certain incomplete work under extenuating circumstances(such as frozen ground)with$1000 refundable fee. trN c City of Twin Falls Building Department .� � 324 Hansen Street East Phone:208-735-7238 P.O. Box 1907 Fax:208-736-2256 ry Twin Falls, ID 83303-1907 www.tfid.org Residential New Home Checklist ***Designer: Please fill out and submit with application*** 2 full sets of plans (Min. 18"x 24", Max 24"x 36") Min '/4" Scale on floor plans, 3/16" or 1"=5' for site plans (smaller paper may be allowed on small jobs). Pages to be numbered and stapled. A PDF is required for digital plan review, including paper plans. Please save the PDF directly from the CAD file, instead of a scan if possible. Digital plans to be submitted to buildingfax(ctfid.org NOTE: Impact Area requires 2 full sets of plans with South Central Public Health District stamplpermit and Twin Falls Highway District Approach Permit. (This can be sent to us as a PDF as well). Notice to all applicants: This checklist is designed to provide the basic information needed to allow the various agencies within the city to complete a plan review of the proposed project. The basic requirements outlined below may not be all inclusive. Check each item below as you complete it or mark N/A if not applicable. Site Plan Zite plan typical scale 1:5 or 3/16". Can be drawn 1:10 or 1/8"when house or lot is very large. N Buildings shall be correctly oriented(no reverse plans),and be site specific. p Show orientation with north arrow. 'Show setbacks from structures to the property lines,lot dimensions and lot square footage. Show location of all existing and new structures(dimensions of and between structures)on the site if applicable. ❑When building in the area of impact&not in a subdivision,please include an aerial vicinity map showing where the property is located. Indicate all easements for water,sewer line,utilities,access,etc. El Show all zoning setbacks(indicate location and dimensions). U''Show all streets that border lot on site plan(ie.Corner lots or lots with street in front and back) El Show: (1)the storm water drainage system(typ.Arrows and grades),(2)the drainage from the building. (3)the retention areas. (All drainage must be retained on lot&be maintained after landscaping)"Slope grade away from house,6"in 10'min." ❑Indicate lot corners including finished grade&finished floor elevation. F.F.E.>/=15"min.above curb. Show and dimension all existing and proposed concrete work(patios,AC pads,sidewalks,driveways,curb&gutter,etc.)Note: Driveway's to be hard surfaced.(SUI zone min.50'solid surface from roadway) ❑Submit well and septic tank permits,if applicable along with stamped site plan from SCDH. ❑Fire District application—show the location of the 20 foot fire department access road to within 150 feet to all exterior walls of the building. Show fire department turn-a-round when the access road is longer than 150 feet. ❑Accessory buildings 3'minimum from property lines(1'eave overhang max). Also, 10'minimum separation from house. ❑Twin Falls Highway District approach permit(if being built in the Area of Impact) Foundation/Floor Framing Plan 'Foundation and required expanded footing shall include dimensions and reinforcement's type,size,and locations. 0`Detail insulation material types with notes as to R-value,location and weather protection of thermal envelope for slab,foundation stems, mono footings,crawlspaces and/or basement walls. ®Hold-down types or other embedded hardware for framing attachments,including locations. JX11ndicate location of all foundation vents and sizes. (vent crawl 1:150)or show conditioned crawl space(to be noted on plans). i i I i I I Indicate location of crawl space access(s). NCross section of the foundation and details. Show footing sizes,stem wall sizes&all rebar(quantity&sizes). &II floor joists are noted&with dimensions. If using I-joists,please specify manufacturer&type&size of I-joist being used. N Show 30"clear in crawl space. Show over dig as applicable. XShow 15"min.width footings for bonus rooms&2 story walls. 9 Show damp proofing on all foundation walls. Clearly note pony walls on plan that support bearing walls above. ❑Engineering may be required on spot footings when large point loads are present from girder truss loads above. Floor Plan/Roof Framing Plan (Window and door sizes,type and location. (Mark all egress and tempered windows) Show location of smoke detectors. (Inside each sleeping room,outside of each sleeping room and on each story of a dwelling.) 7Carbon Monoxide Detectors outside all bedrooms(if house contains fuel fire appliances,fireplace,or has an attached garage) ❑Wall Bracing Design(Exterior and interior)shall be clearly indicated and a schedule included which specifies the method of bracing to be used and the foundation attachments. (see IRC 602.10)(Design to be provided on a separate page&include dimensions to BWP's) ZLabel intended use for all rooms and ceiling heights of each room on floor plan. ❑Indicate location and types of fire separations,(including detail and full IJUGA Listing)and construction methods to be used. L FProvide square footage summary of each of the following:livable area,garage,carport,covered patios,shops,porches,and basement (Finished or unfinished),and any other areas. (Dimensions based upon exterior of foundation). XDetail insulation material types with notes as to R-value at the intersection of floor systems with exterior walls,crawl spaces,basement walls, mass walls,and at conditioned space separation barriers. •I 5Show 6 sided assembly detail in bonus rooms.(OBS against trusses,2x6 stud wall w/r-20 insulation,&sheetrock) Floor framing plan,showing size of headers and all interior pony walls. ®'Show any interior bearing walls clearly on floor plan&roof framing plan. Z,Roof framing plan. Showing truss layout,any interior bearing walls,girder truss locations,and header locations. Engineering will also be required on job site from Truss manufacturer. Provide actual truss layout&profiles from truss engineer on large and complex roofs. ',Location,size and design of basement egress window wells;including headers over windows and height from floor. ❑Size and location of attic access to any attic space>30"tall. 2Show how attic will be vented(if applicable). ®Show bathroom exhaust fan or operable window. ZConstruction details on all steps,stairs and landings. Provide cross section showing rise&run,framing,handrails,and head clearance. ®,Size,type and location of all bearing beams and/or headers. Call out continuous headers if using any of the PORTAL FRAME methods. El Energy Compliance Path(ResCheck current version)or indicate on Site Plan prescriptive method(showing all R-values and types). ❑A minimum of one fully dimensioned building cross-sections from foundation to roof with all materials specified. Include insulation baffles, roof framing,roof sheathing, roof covering and roof pitch. Please include full cross section for 2 story houses showing both stories. ❑Exterior elevations(North,East,West&South sides)showing finish&height of walls.(Include height from grade to peak) ❑Provide Engineering if walls are over 10'tall. Engineering to be provided on stud size&spacing,shear(sheathing&nailing pattern),and any additional tie downs or footing requirements. Calculations to be provided as well. ❑Provide Engineering on any post and beam or pole barn structure. (Some exceptions may apply. See building department for details) El Provide Engineering for any steel posts or beams ❑Manual S&J Calculations for HVAC system.*NEW WITH 2O09 CODE*(show fresh air in calculations) New construction: Smoke detectors shall receive their primary power from the building wiring. They shall be interconnected for cross activation of alarms and shall also be equipped with a battery backup. Designer to sign application that they completed check off list:zv� / esigner Signature City of Twin Falls Building Department 324 Hansen Street East Phone:208-735-7238 *� P.O. Box 1907 Fax:208-736-2256 Twin Falls, ID 83303-1907 www.tfid.org Residential Interior Remodel Only Checklist ***Designer: Please fill out and submit with application*** 2 full sets of plans (Min. 11x17) (smaller paper may be allowed on small jobs) Min '/4" Scale on floor plans. Pages to be numbered and stapled. A PDF is required for digital plan review, includin paper plans. Please save the PD directly from the CAD file, instead of a scan if possible. Digital plans to be submitted to building fax tfid.org Notice to all applicants: This checklist is designed to provide the basic information needed to allow the various agencies within the city to complete a plan review of the proposed project. The basic requirements outlined below may not be all inclusive. Check each item below as you complete it or mark N/A if not applicable. Floor Plans L rprovide before and after floor plan. If a burn repair,show all areas affected by burn. Window and door sizes,type and location. (Mark all egress and tempered windows) Show location of smoke detectors. (Inside each sleeping room,outside of each sleeping room and on each story of a dwelling.) ❑Carbon Monoxide Detectors outside all bedrooms(if house contains fuel fire appliances,fireplace,or has an attached garage) tZ Label intended use for all rooms and ceiling heights of each room on floor plan. ❑Indicate location and types of fire separations,(including detail and full UL/GA Listing)and construction methods to be used.This requirement is applicable when a single family dwelling is turned into a duplex. ®Detail insulation material types with notes as to R-value at the intersection of floor systems with exterior walls,crawl spaces,basement walls, and at conditioned space separation barriers. Show 6 sided assembly detail in bonus rooms.(013S against trusses,2x6 stud wall w/r-20 insulation,&sheetrock)If applicable. I,XAII floor joists modified are noted&with dimensions. If using I-joists, please specify manufacturer&type&size of 1-joist being used. °�Floor framing plan,showing size of headers and all interior pony walls. (Roof framing plan (if modifying trusses or opening up a bearing wall)showing truss layout,any interior bearing walls,girder truss locations, and header locations. Engineering will also be required on job site from Truss manufacturer if replacing trusses. `*Location,size and design of basement egress windows;including headers over windows and height from floor&window wells(dimensioned) t�l Provide one cross section if building a new interior wall(bearing or non-bearing). [�&ow bathroom exhaust fan or operable window. �7Size,type and location of all bearing beams and/or headers. Ix_IShow insulation in new framed walls(ie.,basement) (Note: Wiring per code required when creating a new space in basement) �KJProvide Engineering for any steel posts or beams Existing Dwellings: Smoke detectors must be provided(throughout house)as above when any changes to the home are made. Interconnection and hard-wiring of smoke alarms in existing areas shall not be required where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure,unless there is an attic,crawl space or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Interconnected battery powered smoke detectors will be allowed in inaccessible areas. Designer to sign application that they completed check off list: Designer Signature ICI i 9 Gasv ,Qf` � . City of Twin Falls Building Department c+ ,z wv' 324 Hansen Street East Phone:208-735-7238 << # ° P.O. Box 1907 Fax:208-736-2256 Skyj k,r, Twin Falls, ID 83303-1907 www.tfid.org Residential Addition (enclosed) Checklist (HOUSE, GARAGE, SUNROOM) ***Designer: Please fill out and submit with application*** 2 full sets of plans (Min. 18"x 24", Max 24"x 36") Min V Scale on floor plans, 3/16" or 1"=5'for site plans (smaller paper may be allowed on small jobs). Pages to be numbered and stapled. A PDF is required for digital plan review, including paper plats. Please save the PDF directly from the CAD file, instead of a scan if possible. Digital plans to be submitted to buildingfx(rytfid.org NOTE: Impact Area requires 2 full sets of plans with South Central Public Health District stamplpermit and Twin Falls Highway District Approach Permit. (This can be sent to us as a PDF as well). Notice to all applicants: This checklist is designed to provide the basic information needed to allow the various agencies within the city to complete a plan review of the proposed project. The basic requirements outlined below may not be all inclusive. Check each item below as you complete it or mark N/A if not applicable. Site Plan )<Site plan typical scale 1:5 or 3/16". Can be drawn 1:10 or 1/8"when house or lot is very large. XBuildings shall be correctly oriented(no reverse plans),and be site specific. Whow orientation with north arrow. OjShow setbacks from structures to the property lines,lot dimensions and lot square footage. 'Show location of all existing and new structures(dimensions of and between structures)on the site if applicable. OWhen building in the area of impact&not in a subdivision,please include an aerial vicinity map showing where the property is located. `XIndicate all easements for water,sewer line,utilities,access,etc. El Show all zoning setbacks(indicate location and dimensions). ®,'Show all streets that border lot on site plan(ie.Corner lots or lots with street in front and back) El Show: (1)the storm water drainage system(typ.Arrows and grades),(2)the drainage from the building.(3)the retention areas. (All drainage must be retained on lot&be maintained after landscaping)"Slope grade away from house,6"in 10'min." Indicate lot corners including finished grade&finished floor elevation. F.F.E.>l=15"min.above curb. 'Show and dimension all existing and proposed concrete work(patios,AC pads,sidewalks,driveways,curb&gutter,etc.)Note: Driveway's to be hard surfaced. (SUI zone min.50'solid surface from roadway) El Submit well and septic tank permits,if applicable along with stamped site plan from SCDH. )dire District application—show the location of the 20 foot fire department access road to within 150 feet to all exterior walls of the building. Show fire department turn-a-round when the access road is longer than 150 feet. ❑Twin Falls Highway District approach permit(if being built in the Area of Impact&adding a new approach) Foundation/Floor Framing Plan °Foundation and required expanded footing shall include dimensions and reinforcement's type,size,and locations. j KDetail insulation material types with notes as to R-value,location and weather protection of thermal envelope for slab,foundation stems, mono footings,crawlspaces and/or basement walls. \IN'Hold-down types or other embedded hardware for framing attachments,including locations. ylndicate location of all foundation vents and sizes. (vent crawl 1:150)or show conditioned crawl space(to be noted on plans). Indicate location of crawl space access(s). v'Show attachment to existing foundation.(Drill&epoxy 144 rebar in footer&stem,3"min.penetration) wCross section of the foundation and details. Show footing sizes,stem wall sizes&all rebar(quantity&sizes). DAII floor joists are noted&with dimensions. If using I-joists,please specify manufacturer&type&size of I-joist being used. Show 30"clear in crawl space, Show over dig as applicable. Show 15"min,width footings for bonus rooms&2 story walls. (Show damp proofing on all foundation walls. Clearly note pony walls on plan that support bearing walls above. ` Fasteners that penetrate conc.or P.T.lumber to be hot dipped galvanized or equal. Engineering may be required on spot footings when large point loads are present from girder truss loads above. Floor Plan/Roof Framing Plan [Show the proposed floor plan and expanded floor plan of areas adjacent to the addition. pindow and door sizes,type and location. (Mark all egress and tempered windows) Show location of smoke detectors. (Inside each sleeping room,outside of each sleeping room and on each story of a dwelling.) arbon Monoxide Detectors outside all bedrooms(if house contains fuel fire appliances,fireplace,or has an attached garage) . all Bracing Design(Exterior and interior)shall be clearly indicated and a schedule included which specifies the method of bracing to be used and the foundation attachments.(see IRC 602.10)(Design to be provided on a separate page&include dimensions to BWP's) 10 Label intended use for all rooms and ceiling heights of each room on floor plan. Indicate location and types of fire separations,(including detail and full UL/GA Listing)and construction methods to be used. 'RProvide square footage summary of addition(Dimensions based upon exterior of foundation). ®'Detail insulation material types with notes as to R-value at the intersection of floor systems with exterior walls,crawl spaces, basement walls, mass walls,and at conditioned space separation barriers. I(Show 6 sided assembly detail in bonus rooms.(OBS against trusses,2x6 stud wall w/r-20 insulation,&sheetrock) OFloor framing plan,showing size of headers and all interior pony walls. ❑Show any interior bearing walls clearly on floor plan&roof framing plan. N'Roof framing plan. Showing truss layout,any interior bearing walls,girder truss locations,and header locations. Engineering will also be required on job site from Truss manufacturer. 'Provide actual truss layout&profiles from truss engineer on large and complex roofs. D,;Location,size and design of basement egress window wells;including headers over windows and height from floor. Aize and location of attic access to any attic space>30"tall. ❑Show how attic will be vented(if applicable). ;Show bathroom exhaust fan or operable window. U'Construction details on all steps,stairs and landings, Provide cross section showing rise&run,framing,handrails,and head clearance. [Size,type and location of all bearing beams and/or headers. Call out continuous headers if using any of the PORTAL FRAME methods. ❑Energy Compliance Path(ResCheck current version)or indicate on Site Plan prescriptive method(showing all R-values and types). ®A minimum of one fully dimensioned building cross-sections from foundation to roof with all materials specified. Include insulation baffles, roof framing,roof sheathing, roof covering and roof pitch. Please include full cross section for 2 story houses showing both stories. ❑Exterior elevations(North,East,West&South sides)showing finish&height of walls.(Include height from grade to peak) ❑Provide Engineering if walls are over 10'tall. Engineering to be provided on stud size&spacing,shear(sheathing&nailing pattern),and any additional tie downs or footing requirements. Calculations to be provided as well. ❑Provide Engineering on any post and beam or pole barn structure. (Some exceptions may apply. See building department for details) El Provide Engineering for any steel posts or beams [--]Manual S&J Calculations for HVAC system.*NEW WITH 2O09 CODE*(show fresh air in calculations) New construction: Smoke detectors shall receive their primary power from the building wiring. They shall be interconnected for cross activation of alarms and shall also be equipped with a battery backup. Existing Dwellings: Smoke detectors must be provided as above when any changes to the home are made. Interconnection and hard-wiring of smoke alarms in existing areas shall not be required where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure,unless there is an attic,crawl space or basement available which could provide access for hardwiring and interconnection without the removal of interior finishes. Interconnected battery powered smoke detectors will be allowed in inaccessible areas. dr Designer to sign application that they completed check off list: 4 -Uppher Signature