Loading...
HomeMy WebLinkAboutRE_ Islamic center Building Project (2) Mandi Thompson From:Tim Lauda Sent:Friday, August 23, 2019 5:32 PM To:Jarrod Bordi; Jonathan Spendlove; imad eujayl; bakhritinyusupov1@gmail.com; International Food Cc:Erin Steel; Kortnie Kent Subject:RE: Islamic center Building Project Imad, Here are the things I will be looking at for my final inspection. 1. All emergency exit signs and lighting remains lit when the lighting power has been turned off. This is a 90 minute test. 2. Fire extinguishers are installed as shown on the plans. 3. The building has address number located so they can be seen from the road. Below is some information on fire extinguishers and addressing that I hope will help you. ADDRESS NUMBERS Buildings shall have approved address numbers, or approved building Identification placed in a position that is plainly legible, visible from the street or frontage road fronting the property and of a contrasting color , Light on Dark, or Dark on Light. (IFC 505.1). Address size is based on distance from center of the street to the building: up to 50 ft. is 4 in., 51 to 100 ft. is 6 in., 101 to 150 ft. is 8 in., 151 to 200 ft. is 10 in. and greater than 200 ft. is 12 in. In an effort to be consistent with other buildings being built in the area, I am requiring you to place the address numbers on the upper right side of the building that faces the street, or as agreed upon by the City of Twin Falls Fire Marshal. Portable Fire Extinguishers Add and or relocate portable fire extinguishers as needed to fully protect the area. (2015 IFC 906.1) Install portable fire extinguishers to meet the requirements of NFPA 10. Fire extinguishers shall be 5 LBS with a minimum rating of 2- A: 10-B:C rating and spaced on the basis of one 2-A rating for each 4,000 sq. ft. of floor area, with a maximum 75 ft. travel distance to an extinguishers shall be mounted on hangers or brackets, or in a cabinets. If a cabinet housing is provided, the cabinet shall not be locked, mounted handle at 48” A.F.F. Extinguishers shall be conspicuously located along normal paths of travel, where they will be readily accessible and immediately available in the event of fire. The fire extinguishers shall be current with inspection/testing and provided with a qualified and approved inspection. (IFC 906, NFPA 10) 2015 IFC 906.9.1 Extinguishers weighing 40 pounds or less. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that their tops are not more than 5 feet (1524 mm) above the floor. Sincerely, Fire Marshal Tim Lauda Twin Falls Fire Department nd 345 2 Ave. E. Twin Falls, Idaho 83301 1 tilauda@tfid.org (208)735-7232 From: Jarrod Bordi <jbordi@tfid.org> Sent: Friday, August 23, 2019 2:49 PM To: Jonathan Spendlove <JSpendlove@tfid.org>; imad eujayl <imadeujayl@gmail.com>; bakhritinyusupov1@gmail.com; International Food <intlfood2011@hotmail.com> Cc: Erin Steel <esteel@tfid.org>; Kortnie Kent <KKent@tfid.org>; Tim Lauda <Tilauda@tfid.org> Subject: RE: Islamic center Building Project Imad, In addition to Jonathan’s list and comments below, here is what we have left for the building department final inspection items: 1. Provide Emergency Lights directly outside Exit doors. 2. Provide Interior Emergency lights as shown on plans. 3. Provide Handicap parking and accessible route to an entrance. I have included Tim Lauda, Fire Marshal, on the is email too. Just want to make sure you get everything needed to complete this project. Thanks, Jarrod Bordi, Building Official CBO#5006857 Building Safety Department City of Twin Falls, Idaho 208.735.7288 From: Jonathan Spendlove Sent: Friday, August 23, 2019 2:27 PM To: imad eujayl <imadeujayl@gmail.com>; bakhritinyusupov1@gmail.com; International Food <intlfood2011@hotmail.com> Cc: Jarrod Bordi <jbordi@tfid.org>; Erin Steel <esteel@tfid.org> Subject: RE: Islamic center Building Project 2 Imad, Here is a recap from our meeting today. The City has received complaints about dust and debris from people using the unpaved parking lot. We need to get the current project of the new building and site improvements finished soon. It has been 4 years since the beginning of the project and it appears the building is being used. We had sent you an email in July, however it was sent to an old email that you no longer utilize. It was the only address we had on file and we understand these things do occur. Now that we have made contact we will work towards helping you bring the property into conformance. Here are some things we need from you: 1. Timeline/work schedule for paving the parking lot. As you stated in the meeting, Christiansen Construction has been contracted to finish the parking lot. Please have them provide a rough schedule of the work so we can observe the progress and close out the code violation you received. 2. Timeline/Work schedule for installing the landscaping. As you stated in the meeting, Kimberly Nursery has been contracted for the landscaping. Please have them provide a rough schedule of the work so we can observe the progress and close out the code violation you received. 3. The alley work will be done on a separate schedule as it is in the Right-of-Way. Please have your contractor contact Erin Steel to set up a meeting to discuss this work as there are some special site issues that may need some attention, particularly the sewer manhole and some grading issues. 4. The issues relating to the building were enumerated on a correction notice from last year. Jarrod Bordi will reply to this email with those items so you may address them promptly. If you have any questions regarding these issues please do not hesitate to contact me. From: imad eujayl <imadeujayl@gmail.com> Sent: Friday, August 23, 2019 1:12 PM To: Jonathan Spendlove <JSpendlove@tfid.org>; bakhritinyusupov1@gmail.com; International Food <intlfood2011@hotmail.com> Subject: Islamic center Building Project Hi Jonathan, This is my new email for all future correspondence. Please replay to all, including Bakhritin and Ibrahim Thank you Imad Eujayl 2082937780 3