Loading...
HomeMy WebLinkAboutMechanical Plan ROOF TOP HEATING 4 AIR CONDITIONING UNIT 5GHEDULE PLAN NOTES: OUTSIDE AIR BLOWER GAS HEATING GOOLING NEW GAS METER BY LOCAL 6A5 COMPANY SIZED SYM. GFM SP CHAR WA WEIGHT REMARKS FOR 150)000 BTU AT 2 P51 DELIVERY PRESSURE. EQUIPMENT 6A5 PRESSURE REQUIRED N.P. GONN BTU IN BTU OUT EAT LAT MBN EAT WB REGULATOR RT 2,110 1q0 0.1" 1 2.0 208/60/3 41.0 1 105# 3/4" 150000 120,000 65-F I 104°F 1 12.0 1 80'F I 62°F LENNOX K6AOg0545 WITH FACTORY ROOF CURB AND 2F TO 112E 1 1 1 ECONOMIZER O2 R15E 3/4"(2 P51)6A5 LINE UP IN INTERIOR 5TUD ALL ROOFTOP UNITS TO COME WITH FACTORY INSTALLED 5TARTER/DI5CONNECT AND CONVENIENCE OUTLET SPACE OF WALL TO ROOF AND P15E THRU ROOF TO GAPPED PRESSURE TEE SERVE ROOFTOP UNIT. O RUN 514"(2 P51)6A5 LINE ON ROOF TO NEW ROOFTOP IIII EXHAUST FAN SCHEDULE UNIT AND CONNECT. INSTALL PRESSURE REGULATOR AS SHOWN ON DETAIL THI5 SHEET. 5YM. TYPE G.F.M. 5.P.E WATT5 CHAR. R.P.M. CONTROL REMARKS MANUAL MAIN O4 INSTALL UL LISTED SMOKE DETECTOR IN RETURN AIR GROUND = SHUT-OFF VALVE EF Ell IIIL050NE SELECT MODEL LI00 WITH BAGKDRAFT DUCT AND CONNECT TO ROOFTOP UNIT FOR THRU 3 CEILING MOUNTED 100 .40 8l 120/60/I l50 SEE ELECT. DAMPER. 6"m EXHAUST DUCT TO FLAT ROOF GAP JOINT UNION EMERGENCY FAN SHUT-DOWN. FLEXIBLE 6A5 O INSTALL NEW I"PRV STATION IN ACCORDANCE WITH CONNECTOR. — CURRENT IDAHO STATE PLUMBING CODE AND CITY OF 15"MAX. — — TWIN FALLS REQUIREMENTS. O CONTRACTOR TO INSTALL COMPLETE DOMESTIC, PROVIDE E5CHUGEON v_ WATER,WASTE AND VENT PIPING SYSTEMS FOR PLATE AROUND PIPING w BUILDING IN ACCORDANCE WITH CURRENT IDAHO > STATE PLUMBING CODE AND GIN OF TWIN FALLS �O 'PILLOW'TYPE REQUIREMENTS. DRIP LEG SAME _ — SUPPORTS 51ZE A5 PIPE = O CONTRACTOR TO INSTALL IN-LINE BAGKFLOW PREVENTOR ON EAGH 112"GIN LINE SERVING HAND ROOF III F , SPRAYER LOCATED BEHIND EACH TOILET. O ALL PLUMBING FIXTURES TO BE SELECTED BY CONTRACTOR AND APPROVED BY OWNER. INSTALLATION TO BE IN ACCORDANCE WITH STATE AND LOCAL CODES. ROOF TOP GAS PRESSURE REGULATOR DETAIL Oq RUN DUGTWORK FEEDING TOILET ROOMS AS HIGH AS POSSIBLE TO ALLOW STORAGE ON PLATFORM ABOVE. Q NO SGALE i 10 CONTRACTOR TO COORDINATE AND VERIFY LOCATION OF BOTH DOMESTIC WATER AND SEWER a--� 2"m RGD 12"0 RGD 12"m RGD 12"m RGD TAPS PRIOR TO INSTALLING ANY PIPING UNDER THE 1 210 GEM EUILDIN6. WATER PIPING CONCRETE I 210 GFM 210 GFM 2l0 GFM U PROVIDE CONDENSATE OVERFLOW SWITCH ON INSULATION SAND 10"m SA CONDENSATE DRAIN OF NEW ROOFTOP UNIT. A INTERLOCK WITH UNIT TO PROVIDE COMPLETE U Q SHUT-DOWN OF UNIT IN CASE OF BLOCKAGE OF DRAIN — I"MIN. N N SYSTEM. o 0 o a a 0C L_L < m a — — 5 (A . -o 4„ Ibxl45A Ibxl45A ��� 1000 GFM o 4" III IT 11 a 3 .°°°es° °�'.° °°°e°°°s o'a,°o•:°°` =111=1°_Ps°°e_'.o.e °°:11=111 — --- 2Ox20 RAG ~ •III—III—III—III—III— I—III—III—III—III° II ICI- - -I I1=1I—I III—I ICI \ 1000 GFM I III—III—III=1I1=1I�I I1=1I I�I I�I1=1' I 1=1I1=1I1=1I�I I1=1I1=1I I�I1=1I1=1I1=1' I \ � �� �� I Ili III—I 1=17-17—I�1r=T=1T �= 1= =17—I�I I—III—I I�I1=17=17= \ O \ N E L——— \ v 20x2O RA SECTION'A' COMPACTED EARTH - \\ 20x20 RA6 -ALL WATER PIPING INSTALLED UNDERFLOOR SHALL BE TYPE"K"COPPER 10 FM / PRAYER ROOM I I ---- I 000 GFM I2`0 RGD a m NOTES: xq CD t 0 GFM o Z N co 2-WATER PIPE INSULATION ON UNDERFLOOR PIPING SHALL BE ARMAFLEX 5/4'THICK RUBBER I i i MECHANICAL LEGEND PIPE INSULATION. TAPE INSULATION AT ALL SEAMS. I I I o VESTIBULE 2"m RGD6 i i SYMBOL DESCRIPTION Y = o o 3-MINIMUM PIPE SIZE UNDERFLOOR SHALL BE 3/4" 0 GFM c� -a 4-SAND FILL AROUND PIPING SHALL BE A MINIMUM OF 4"THICK, MATERIAL SHALL BE HAND \ / 11 OT ELECTRONIC THERMOSTAT N o TAMPED,PODDED OR LIGHTLY COMPACTED DURING INSTALLATION. CARE SHOULD BE \ / II RT 10"m 5A Lu a> _ TAKEN NOT TO DEFORM OR OTHERWISE DAMAGE PIPING OR INSULATION. \\\ (ON ROOF) m g 2 Fj EQUIPMENT SYMBOL d a E T---7�— UNDER 5LA5 PIPE INSTALLATION DETAIL qxq GD \ , x e6D� HAND DAMPER NO SGALE i L_ Iso b 5 3/4"(2 P51) ON ROOF I ROUND BRANCH DUCT -- WITH HAND DAMPER bob FM HEN I"I"GW 1 L———, ° a j"y 1 III UNDER5LA RECTANGULAR SUPPLY AND RETURN AIR DUCT TAKE-OFF HD 2F II q JJJ N IOxIO 5A O IOx10 SA Ibxl4 5A Ibxl4 SA JJ o HDULF, 1 I TURNING VANES ROOF CURB ROOFTOP q B _UNIT O MEN DUCT TRANSITION IIII bxb GD NAILING 0 IIII 10 GFM STRIP '9 INSULATED FLEXIBLE DUCT bxb GD ROOF DECK O 10 GFM l O III WOMEN 12"m RGD 2l0 GFM 12"m RGD JOISTS IIII CLASSROOM 210 GFM RETURN AIR OR I b 0 !I I EXHAUST GRILLE FASTENER WITH 3 6 IIII bxb C 1 CEILING DIFFUSER RIGID NEOPRENE WASHERS O O O IIII 10 GFM 1 INSULATION COUNTER FLASHING IIII NEW 4"SEWER AIN(UNDERSLAB) CEILING MOUNTED ROOF DECK _VERAL(TORCHED) EXHAUST FAN JOISTS PREPARED SURFACE 10 II v 51N6LE PLY ROOFING SEE 51TE PLAN�L ORIGINAL DRAWING SIGNED BY:RON D.RICE FOR GONT. I OI O DATE ORIGINAL SIGNED:MARCH 21,2015 N m I L-71 —J m J ORIGINAL ON FILE AT ENGINEERED SYSTEMS ASSO NOTE:POSITION ROOF CURB GANT STRIP CIATES OVER ROOF JOISTS IN SUCH A SINGLE PLY 1355 EA5T CENTER,POGATELLO,IDAHO 8320I MANNER A5 TO SPREAD THE ROOFING MATERIAL En Ip \\ inered MECHANICAL WEIGHT OF THE MECHANICAL L— -------------------- —_ g ASPHALT UNIT OVER A5 MANY TRUSSES SEE 51TE PLAN f,0 PROp Systems FLOOR PLAN AS OF P05511BLEHON RS ARE RUNNING FOR COW. F'Rr\GI Nj F `�o Associates c3 Z 1355 EAST CENTER FLOOR PLAN - MECHANICAL 6159 0 ➢ POCATELLO,IDAHO 83201 Date TYPICAL ROOFTOP MOUNTING DETAIL 9j. OP PHONE: (208)233-0501 03/27/15 NO SGALE SGALE: I/4"= I'-0" NORTH R N OFRGE EMAIL: esa(208)2 ms0529 Sheet No.n p 1 of IVI ESA JOB NUMBER: 15003