Loading...
HomeMy WebLinkAboutC1 Architectural Site plan Sip L 80p1y 5(ATE o,, CODE REVIEW Code: 2012 International Building Code Construction Type: III—B,(602.3/T-601) I Building Area: 2.699 sq.ft. did, /DANp Occupant Classification (303.4)A-3,places of worship `�'SED p0.Cp� I Allowable Area: (T-503) III—B/A-3 9,500 sq. ./3 story j Occupant Load: (1004.1.1) 102 occupants (per design as per owner/City agreement) 62'-8" 5-0 I i Occupant Load Posting: "Maximum Occupancy 102"1004.3) 60•_0• Exit Arrangement: (1015.2.1) 72'-3"/2=36'-2"min.reqd.,36'-6'separation provided Travel Distance: (T-1016.2) 200'max.,54'max provided X X x X X 89.49'0"E i Fire Sprinkler: not required<12,000 s.f.,<300 occ's(903.2.1.3) 124.94 n p U � U ------------ w 0 0 0 ® O I � I General Notes: z 0 I A1work to comply with IBC,ADA,and all other local&national codes that may apply. 0 Al:l lumber in contact with concrete or masonry to be pressure treated. / i All footings to be on undisturbed soil&below frost grade,see structural. (`/ 58'-8" i Fur out interior of all CMU walls with 2"Z furring channels 0 16"o.c.such as Clark Dietrich (www.clorkdietrich.com)fastened to CMU per manufactures recommendations.With 2"R-10 rigid insulation&%"GWB,tape texture&paint. Interior framing to be of 20's&2x6's at 16"o.c.with%"GWB,tape,texture&paint. NI interior electrical to be bidder designed per City&State standards.Electrical an CMU to be ran on inside of CMU in shallow boxes to flush with GWB. Lighting to to be bidder designed&comply with IECC as required. Electrical contractor to provide proper grounding for future minaret. Contractor to coordinate&verify with Civil engineering as well as providing required drainage,water retention,and landscaping.Civil drawings are to be by others. ,:�i. •� lay—in ceiling system to be part of future construction. /NEW BUILDING : i New roof system to consist of.60 ml PVC roofing membrane over R-30 rigid insulation.Roofing to •� I finish floor elevation 3722.0 I be installed my certified&licensed installer.System to include 1 year workmanship warranty&20 I year manufactures warranty. FOT Plumbing system to be bidder designed system to City&Stale requirements. Provide seismic bracing for suspended ceiling system when installed. 6 IPN I Finishes&colors to he by owner - Fff I Plumbingcontractor to provide On Demand water heaters as required. I a W � All interior locksets to be lever handle. 30,STREET RIGHT—OF W I � I Uw•cuw�tr I jca © o o a = _CIO cl� o N Z n f N 0 sewer_�ce mech._________ J _ ____ ____ __ — r 4 � naWrw yxv a` r water(see mach.) i LIw I E Q ill � ¢ Y C o r i � z O N cl N Y L m O O O -0N � co w �iW � W � w 10 14 15 16 10 18 w w W ra LU a _ u0 - w k v O r O U O �( C a CL LL a I w w w w w w w w i I l o S/Df1FN,Y �£lfA!!f I I e I N11901,MW 124.9' jS 89'49'00"W I_--------_ EXTS7/NG CONCRETE STAB LKrYIT PtlLE SITE PLAN "°R'" W3 BENCH MARK W E o FIRE HYDRANT SCALE: T.F.C.B.M. #3901-2943 ELEVATION=3722.576 Site plan is for general illustration,we Civil drawings for actual;set backs, m utilities,parking,sidewalks,curb cuts,drainage,landscaping,elevations,etc. Provide curb mmps as required(max rise 5.75' w ADDISONAVENUE - - - W e° w a• s' w e' Site Plan,Notes Date reissued 04/08/2015 Sheet No. C i