HomeMy WebLinkAbout180-15 SPECIAL INSPECTION REPORT 6-9-15 NENNO EHM Engineers, Inc. Reinforced Concrete/ Structural Masonry
Special Inspection Report
BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE s r„
Date: 06/09/15 EHM Project No. 180-15 Project Name: Islamic Center—Twin Falls, Idaho
Contractors Name: Raywall Masonry Building Permit No.: NR
Inspectors Name: . W.J. Nenno _Weather Sunny, Warm, Calm, 930 F.
CONCRETE MASONRY
❑ Inspection ( ❑ Continuous ❑ Periodic) Inspection ( [] Continuous Periodic )
❑ Inspected reinforcing steel placement at: Inspected: ■ reinforcing steel placement ❑ block placement
Masonry Wall-All
❑ Observed placement and consolidation of concrete . Observed placement and consolidation of grout
Placement location: ■ Lowlift Hilift ❑cleanouts E Elevation: 0-4'
Placement location:
Same as above
Work Inspected was:■in general compliance with the approved plans and specifications❑except as noted below Ore-inspection is required
Notes:Per project plans and specifications.
Observed construction of 8x8x16 masonry prisms.
Inspecto ' atur Reviewed By:
621 North College Road - Twin Falls, Idaho 83301
Phone: 208-734-4888 Fax: 208-734-6049