HomeMy WebLinkAbout180-15 SPECIAL INSPECTION REPORT 11-12-15 TOLMAN Reinforced Concrete/ Structural Masonry
113!
HM Engineers, Inc. spPecial Ins ection Re ort
LDING THE FUTURE ON A FOUNDATION OF EXCELLENCE
Date: a1 T EHM Project No. Project Name: JS 6A,1 r. Ceyl teY
Contractors Name: i;e-h�va+i t Al o-S oni Building Permit No.:
Inspectors Name: E.—T) 1,ve on Weather:
CONCRETE MASONRY
❑ Inspection ( [] Continuous [] Periodic) ❑ Inspection ( [] Continuous [:]Periodic
)
❑ Inspected reinforcing steel placement at: Inspected 13 reinforcing steel placement ❑ block placement
at the following location: r
LJ I 0
❑ Observed placement and consolidation of concrete 0 Observed placement and consolidation of grout ff gq�J
Placement location: ❑ Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: 7 J1 U
Placement location:
A 1 i iC,fiAR/;Ell yll!u- -6-,ow 7—�3'
Work Inspected was: ❑ in general compliance with the approved plans and specifications ❑ except as noted below ❑ re-inspection is required
Notes:
Inspectors Signature <(/.- << 1L.�__ Reviewed By:
621 North College Road - Twin Falls, Idaho 83301
Phone: 208-734-4888 Fax: 208-734-6049