Loading...
HomeMy WebLinkAbout180-15 SPECIAL INSPECTION REPORT 11-12-15 TOLMAN Reinforced Concrete/ Structural Masonry 113! HM Engineers, Inc. spPecial Ins ection Re ort LDING THE FUTURE ON A FOUNDATION OF EXCELLENCE Date: a1 T EHM Project No. Project Name: JS 6A,1 r. Ceyl teY Contractors Name: i;e-h�va+i t Al o-S oni Building Permit No.: Inspectors Name: E.—T) 1,ve on Weather: CONCRETE MASONRY ❑ Inspection ( [] Continuous [] Periodic) ❑ Inspection ( [] Continuous [:]Periodic ) ❑ Inspected reinforcing steel placement at: Inspected 13 reinforcing steel placement ❑ block placement at the following location: r LJ I 0 ❑ Observed placement and consolidation of concrete 0 Observed placement and consolidation of grout ff gq�J Placement location: ❑ Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: 7 J1 U Placement location: A 1 i iC,fiAR/;Ell yll!u- -6-,ow 7—�3' Work Inspected was: ❑ in general compliance with the approved plans and specifications ❑ except as noted below ❑ re-inspection is required Notes: Inspectors Signature <(/.- << 1L.�__ Reviewed By: 621 North College Road - Twin Falls, Idaho 83301 Phone: 208-734-4888 Fax: 208-734-6049