Loading...
HomeMy WebLinkAbout180-15 SPECIAL INSPECTION REPORT 10-7-15 LUPER Reinforced Concrete/ Structural Masonry N" '' EHM Engineers, Inc. Special Inspection Report BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE P P Date: /o 7 l5 EHM Project No. : IF6-15 Project Name: Contractors Name: IPfA�6/ b�L10L Building Permit No.: Inspectors Name: g go,r Weather: Pjl�, , CONCRETE MASONRY ❑ Inspection ( ❑ Continuous ❑ Periodic) Inspection ( ❑ Continuous ❑ Periodic ) ❑ Inspected reinforcing steel placement at: Inspected ® reinforcing steel placement ❑ block placement at the following location: ❑ Observed placement and consolidation of concrete Observed placement and consolidation of grout Placement location: ® Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: �f Placement location: Work Inspected was: Q in general compliance with the approved plans and specifications ❑ except as noted below ❑ re-inspection is required Notes: f Inspectors Signature Z .� Reviewed By: 621 North College Road - Twin Falls, Idaho 83301 Phone: 208-734-4888 Fax: 208-734-6049