HomeMy WebLinkAbout180-15 SPECIAL INSPECTION REPORT 10-7-15 LUPER Reinforced Concrete/ Structural Masonry
N" '' EHM Engineers, Inc. Special Inspection Report
BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE P P
Date: /o 7 l5 EHM Project No. : IF6-15 Project Name:
Contractors Name: IPfA�6/ b�L10L Building Permit No.:
Inspectors Name: g go,r Weather: Pjl�, ,
CONCRETE MASONRY
❑ Inspection ( ❑ Continuous ❑ Periodic) Inspection ( ❑ Continuous ❑ Periodic )
❑ Inspected reinforcing steel placement at: Inspected ® reinforcing steel placement ❑ block placement
at the following location:
❑ Observed placement and consolidation of concrete Observed placement and consolidation of grout
Placement location: ® Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: �f
Placement location:
Work Inspected was: Q in general compliance with the approved plans and specifications ❑ except as noted below ❑ re-inspection is required
Notes:
f
Inspectors Signature Z .� Reviewed By: