Loading...
HomeMy WebLinkAbout180-15 SPECIAL INSPECTION REPORT 10-15-15 LUPER Engineers, Inc. Reinforced Concrete/ Structural Masonry BUILDING THE FUTURE ON A FOUFiDi.T10,11 OF EXCELLENCESpecial Inspection Report Date: 16) i ; l S EHM Project No. : 1gD-/S Project Name: 7,; Contractors Name: EC U.2r l� 4�hA r- 7 Building Permit No.: Inspectors Name: 13r t l ,, o ,r Weather: CONCRETE MASONRY Inspection ( ❑ Continuous Periodic) Inspection ( ❑ Continuous Periodic ) Inspected reinforcing steel placement at: Inspected ❑ reinforcing steel placement ❑ block placement at the following location: /yl Ph J i d c R lra s. ❑ Observed placement and consolidation of concrete Q Observed placement and consolidation of grout Placement location: ® Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: 20. Placement location: LAN 4 1✓- )2/ i Work Inspected was: in general compliance with the approved plans and specifications ❑ except as noted below ❑ re-inspection is required Notes: �f`D a i. a Inspectors Signature :7 r Gam ` Reviewed By: _ 621 North College Road - Twin Falls, Idaho 83301 Phone: 208-734-4888 Fax: 208-734-6049