Date: 16) i ; l S EHM Project No. : 1gD-/S Project Name: 7,;
Contractors Name: EC U.2r l� 4�hA r- 7 Building Permit No.:
Inspectors Name: 13r t l ,, o ,r Weather:
CONCRETE MASONRY
Inspection ( ❑ Continuous Periodic) Inspection ( ❑ Continuous Periodic )
Inspected reinforcing steel placement at: Inspected ❑ reinforcing steel placement ❑ block placement
at the following location:
/yl Ph J i d c R lra s.
❑ Observed placement and consolidation of concrete Q Observed placement and consolidation of grout
Placement location: ® Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: 20.
Placement location:
LAN 4 1✓- )2/ i
Work Inspected was: in general compliance with the approved plans and specifications ❑ except as noted below ❑ re-inspection is required
Notes: �f`D a i. a
Inspectors Signature :7 r Gam ` Reviewed By: _