Loading...
HomeMy WebLinkAbout180-15 SPECIAL INSPECTION 10-13-15 LUPER Reinforced Concrete/ Structural Masonry EHM Engineers, Inc. Special Inspection Report BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE M Date: /6 EHM Project No. : jgU-/_J Project Name: Contractors Name: kr49G1J &46-lonr Building Permit No.: Inspectors Name: Bri C,d L,kTr, Weather: 14/�G, CONCRETE MASONRY ❑ Inspection ( Continuous Periodic) Inspection ( ❑ Continuous Periodic ) ❑ Inspected reinforcing steel placement at: Inspected Q reinforcing steel placement ❑ block placement at the following location: i ❑ Observed placement and consolidation of concrete ® Observed placement and consolidation of grout Placement location: 53 Lowlift ❑ Hilift ❑Cleanouts ❑ Elevation: Placement location: Work Inspected was: ® in general compliance with the approved plans and specifications except as noted below re-inspection is required Notes: Inspectors Signature r , t fir,_ �-�,.I492kl`[ Reviewed By: 621 North College Road - Twin Falls, Idaho 83301 Phone: 208-734-4888 Fax: 208-734-6049