Loading...
HomeMy WebLinkAboutFW: Twin Falls Training Mike Plane From:Kathy Markus Sent:Monday, January 23, 2023 07:42 To:Matt Clark; Dee Davidson; Mike Plane Subject:FW: Twin Falls Training FYI From: Amelia Marek <Amelia@PivotNorthDesign.com> Sent: Friday, January 20, 2023 21:28 To: Tad Bradley <Tad@PivotNorthDesign.com>; Kathy Markus <kmarkus@tfid.org>; Mandi Thompson <mthompson@tfid.org>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org> Cc: Jon Leazer <jleazer@tfid.org> Subject: RE: Twin Falls Training \[EXTERNAL SENDER\] Hi Kathy, You can download the link to our complete set of the Twin Falls Training Facility here: https://pivotnorthdesign.sharefile.com/d-sa9a82ad245ac44989d0fad932a609de6 I’ve also attached are our specifications. Please be aware that the Civil and Landscape drawings included in this set are being issued separately as an ASI for the Site Only Permit package issued last February, which is why their title blocks look different and you’ll see clouds on them. The Training Facility building will occupy this site that is currently in construction. For cohesion, I included all civil and landscape sheets despite only some of them being included in the ASI. Please let me know if there’s any other information you’re seeking. Thank you and have a great weekend. Amelia Marek PROJECT DESIGNER 116 South 6th Street, Boise, ID, 83702 208.690.3108 From: Tad Bradley <Tad@PivotNorthDesign.com> Sent: Thursday, January 19, 2023 10:45 AM To: Kathy Markus <kmarkus@tfid.org>; Mandi Thompson <mthompson@tfid.org>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org> 1 Cc: Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training Kathy, Amelia will be sure send to send you a link to our complete set, once it has been compiled. You will receive this tomorrow. Thank you for helping coordinate all of this, Mandi. Have a great day. TAD BRADLEY PROJECT ARCHITECT 116 South 6th Street, Boise, ID, 83702 208.690.3108 x727 From: Kathy Markus <kmarkus@tfid.org> Sent: Thursday, January 19, 2023 10:42 AM To: Mandi Thompson <mthompson@tfid.org>; Tad Bradley <Tad@PivotNorthDesign.com>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org> Cc: Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training Mandi, We would like to look at the entire set. We will not get them automatically. Please have someone send us the complete documents or a link to the complete documents. Kathy From: Mandi Thompson <mthompson@tfid.org> Sent: Thursday, January 19, 2023 10:32 To: Kathy Markus <kmarkus@tfid.org>; 'Tad Bradley' <Tad@PivotNorthDesign.com>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org> Cc: Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training Kathy, The drawings submitted are to building, engineering and P&Z. I am not sure you will have access to them through that process. Do you want to look at the entire set or specifics portions of the entire set? Regardless, Tad can likely send you a link. Mandi 2 Mandi Thompson Assistant to the City Manager City of Twin Falls (208) 735-7237 From: Kathy Markus <kmarkus@tfid.org> Sent: Thursday, January 19, 2023 10:16 AM To: 'Tad Bradley' <Tad@PivotNorthDesign.com>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org>; Mandi Thompson <mthompson@tfid.org> Cc: Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training Tad, If you are submitting a complete for our review tomorrow, that will be fine. Kathy From: Tad Bradley <Tad@PivotNorthDesign.com> Sent: Thursday, January 19, 2023 09:37 To: Kathy Markus <kmarkus@tfid.org>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org>; Mandi Thompson <mthompson@tfid.org> Cc: Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training \[EXTERNAL SENDER\] Kathy, Good morning. If you would like drawings prior to what we are submitting for the City’s review tomorrow, please let me know what information you are most interested in and I am happy to send over the applicable drawings. We are still receiving drawings from our consultants after final coordination items, but I am happy to help however I can. Thank you. TAD BRADLEY PROJECT ARCHITECT 116 South 6th Street, Boise, ID, 83702 208.690.3108 x727 From: Kathy Markus <kmarkus@tfid.org> Sent: Thursday, January 19, 2023 8:55 AM To: Tad Bradley <Tad@PivotNorthDesign.com>; Rich Hall <rhall@tfid.org>; Les Kenworthy <LKenworthy@tfid.org>; Mandi Thompson <mthompson@tfid.org> 3 Cc: Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training Hello, We have not had the opportunity to review the full plan. The plan that we reviewed was outdated and not complete. We would like to see it in its entirety, not just snippets. As for when you submit it, that would be up to Les and Mandi. Kathy From: Tad Bradley <Tad@PivotNorthDesign.com> Sent: Thursday, January 19, 2023 08:50 To: Rich Hall <rhall@tfid.org> Cc: Kathy Markus <kmarkus@tfid.org>; Jon Leazer <jleazer@tfid.org>; Amelia Marek <Amelia@PivotNorthDesign.com> Subject: RE: Twin Falls Training \[EXTERNAL SENDER\] Rich, Good morning. We are scheduled to submit our full drawing set tomorrow 01-20. Are you looking for something in particular or is this plan acceptable? Thank you. TAD BRADLEY PROJECT ARCHITECT 116 South 6th Street, Boise, ID, 83702 208.690.3108 x727 From: Rich Hall <rhall@tfid.org> Sent: Wednesday, January 18, 2023 4:45 PM To: Tad Bradley <Tad@PivotNorthDesign.com> Cc: Kathy Markus <kmarkus@tfid.org>; Jon Leazer <jleazer@tfid.org> Subject: RE: Twin Falls Training Tad, Can we get a current version of the plans for review? Thanks, Rich 4 From: Tad Bradley <Tad@PivotNorthDesign.com> Sent: Friday, January 13, 2023 7:28 AM To: Jon Leazer <jleazer@tfid.org> Cc: Mandi Thompson <mthompson@tfid.org>; Les Kenworthy <LKenworthy@tfid.org>; betcheverry@catorruma.com; Michael Arrington <michaela@starrcorporation.com>; Kathy Markus <kmarkus@tfid.org>; Rich Hall <rhall@tfid.org> Subject: RE: Twin Falls Training \[EXTERNAL SENDER\] Jon, Good morning. Thank you for your response. Now I see the issue. You had an older version of the plan and I missed that there was not a door in that drawing. Below is a snip from our model this morning. I have highlighted the door going into the IT room. Currently there is no ceiling planned for above the Elec. or IT room for ease of access and maintenance. See snip #2. Given this new information are you agreeable to move forward as the drawings are shown? Thank you for your time and feedback. TAD BRADLEY PROJECT ARCHITECT 5 116 South 6th Street, Boise, ID, 83702 208.690.3108 x727 From: Jon Leazer <jleazer@tfid.org> Sent: Thursday, January 12, 2023 4:17 PM To: Tad Bradley <Tad@PivotNorthDesign.com> Cc: Mandi Thompson <mthompson@tfid.org>; Les Kenworthy <LKenworthy@tfid.org>; betcheverry@catorruma.com; Michael Arrington <michaela@starrcorporation.com>; Kathy Markus <kmarkus@tfid.org>; Rich Hall <rhall@tfid.org> Subject: Re: Twin Falls Training The reason we wanted to relocate the panels is the IT portion didn’t have a door entering the space. We have many of our electrical and IT rooms combined, so interference is not a concern. The electrical stub outs are for the future portion, from what I could see on the plans is that the ceiling is hard lid so in the future we would have to surface mount conduits and cut sheet rock so we would like them to be installed in the finished walls and ceiling for a much cleaner install. I’m out next week but when I get back we can chat about these items. I have included Kathy and Rich so you can also contact them. Thank you Jon Leazer City of Twin Falls Master Electrician 208-308-7225 On Jan 12, 2023, at 3:52 PM, Tad Bradley <Tad@pivotnorthdesign.com> wrote: \[EXTERNAL SENDER\] Jon, Good afternoon. We had a review/check in meeting with our consultants this afternoon. I made sure they had your notes, sent over by Mandi. I have asked Michael to review your notes and quantify any additional cost that may be incurred from what Starr had priced, most recently. We discussed the request to move the electrical panels to the south wall. The only way this would be possible is to remove the dividing wall between the IT room and the Electric room. This was not recommended/desirable because of the potential for static interference. Was there a specific goal in moving the panels to the south wall? Maybe we can relocate them or IT equipment to the mezzanine level?...as real estate on the main floor has been accounted for. Another question was regarding the note \[same sheet\] the conduits stubbed out for future ‘build out’. Are you just referring to Phase II? Were you wanting these to run through the demising wall into the Phase II space? If so, we would need to treat these appropriately to maintain the 1hr rating of the demising wall. 6 Thank you very much for your time and help. Have a restful evening. TAD BRADLEY PROJECT ARCHITECT 116 South 6th Street, Boise, ID, 83702 208.690.3108 x727 7