Loading...
HomeMy WebLinkAboutFW: Harmon Park Proposal - Updated Mike Plane From:Wendy Davis Sent:Monday, February 5, 2024 12:30 To:Mitch Humble Subject:FW: Harmon Park Proposal - Updated Mitch, A?ached is the site plan for the work at Harmon west tennis courts and the updated es?mate for the work. We had budgeted $190,000 for the project, and let it go into reserves. This plan is a good hybrid and does the right thing. This gives us a total of 5 courts at Harmon, which is good for HS use as well as league play, and gives us a few more pickleball courts to spread out the love. The total site plan fixes that awkward space off Locust that isn’t really a parking lot and creates an issue by the dumpster. We don’t have numbers for the expanded parking lot and vendor pad, and recognize it wasn’t part of the original project. Not sure what our next step should be. I recall you had asked to see what the updated project and numbers look like. Wendy Davis Parks and Recreation Director City of Twin Falls O:208.736.2265 C:208.490.0665 Visit our website at: www.tfid.org From: Chance Munns <cmunns@tfid.org> Sent: Monday, January 22, 2024 12:53 PM To: Stacy McClintock <smcclintock@tfid.org> Cc: Wendy Davis <wdavis@tfid.org>; Nibardo Orozco <norozco@tfid.org>; Brandy Mason <BMason@tfid.org> Subject: RE: Harmon Park Proposal - Updated Here’s the new and improved Harmon West layout… Chance Munns Parks Superintendent City of Twin Falls Parks & Recreation Twin Falls, Idaho cmunns@tfid.org (208) 736-2265 #1308 1 From: Stacy McClintock <smcclintock@tfid.org> Sent: Monday, January 22, 2024 11:50 AM To: Chance Munns <cmunns@tfid.org> Subject: FW: Harmon Park Proposal - Updated From: Eddie Lovett <elovett@rennersports.com> Sent: Wednesday, October 4, 2023 8:17 AM To: Stacy McClintock <smcclintock@tfid.org> Cc: Dylan Bird <dbird@rennersports.com> Subject: Harmon Park Proposal - Updated \[EXTERNAL SENDER\] Stacy, A?ached is an updated proposal to include the requested op?ons for a single tennis court with 8 pickleball courts and a 2 tennis courts with 4 pickleball courts op?on. These are shown as the last two build alternates on the proposal. The exis?ng courts sit in approximately a 140’x120’ footprint. The two new layouts would require larger footprints, 180’x120’ and 169’x120’, as a result addi?onal rough grading would need to be completed outside of the exis?ng court footprint. This addi?onal rough grading cost is not included in the proposal as I was under the impression the city would be handling the demo. There is also an op?on to add ligh?ng to these two new configura?ons, the provided ligh?ng will work for both of these layouts. The ligh?ng package shown on the proposal is for ligh?ng fixtures, poles and brackets only, it does not included materials or labor for installa?on. Let me know if you have any ques?ons. 2 Thank you, Eddie Lovett Eddie Lovett Project Engineer L.E.R., Inc. dba Renner Sports Surfaces 3096 S. Davis Dr. Salt Lake City, UT 84115 P.O. Box 651477 Salt Lake City, UT 84165 Phone: 801-673-2603 Fax: 801-261-4588 Email: elovett@rennersports.com Website: www.rennersports.com Confidential Notice - The information contained in this email and its attachments, if any, contain confidential information that may be legally privileged. If you are not the intended recipient, please do not review, retransmit, convert to hard copy, copy, use or disseminate this e-mail or any attachments to it. If you have received this e-mail in error, please notify us immediately by return e- mail or by telephone at (303) 825-3435 and delete this message. Please note that if this e-mail contains a forwarded message or is a reply to a prior message, some or all of it may not have been prepared by L.E.R., Inc. dba Renner Sports Surfaces. 3