Loading...
HomeMy WebLinkAboutFW: Child Ped Grant Moneys Mike Plane From:Robin Hite Sent:Thursday, April 28, 2022 16:51 To:Troy Vitek; Josh Baird; Erin Steel; Mark Thomson Subject:FW: Child Ped Grant Moneys All, See Joels response to the PED grant and ROW issues on the Falls & Maurice HAWK proposal. From: Joel Grounds <joel@precisionengineeringllc.com> Sent: Thursday, April 28, 2022 4:10 PM To: Robin Hite <RHite@tfid.org> Subject: RE: Child Ped Grant Moneys \[EXTERNAL SENDER\] Sorry Robin been a crazy day, Please find attached our quick layout. You will be need the school to allow the signal and cabinet to be installed so granting a permanent easement, I don’t see that being a problem. I would not touch the ped ramp on the SW corner and install a 12-ft ped signal pole at the west side of the ramp. I am not sure where the ROW falls relative to the back of the sidewalk but the lip to lip measurement on Maurice seems to be about 33 feet and the ROW looks to be 55-ft but not sure were that is relative to the back of walk the aerial and parcels lines are typically off on the assessor maps just not sure how much. We also took a quick look at constructing a 6-ft bulbout on the SW corner into Maurice so shifting the ramp east giving more space. Again this is a quick look but I think we can get it to work one think I don’t like is the guy wire but I have no idea how to get rid of that, maybe Idaho Power could swap it out to the ones that go straight out the down and don’t have to take up so much space but again that is a maybe. Thanks, Joel Grounds, P.E., PTOE Principal Engineer | Precision Engineering, LLC 539 S. Fitness Place, Ste 120 | Eagle, ID 83616 | Office: 208.938.1695 Cell: 208.859.0485 | website: www.precisionengineeringllc.com 539 S. Fitness Place, Ste 120 | Eagle, ID 83616 | Office: 208.938.1695 Cell: 208.859.0485 | website: www.precisionengineeringllc.com 1