All,
See Joels response to the PED grant and ROW issues on the Falls & Maurice HAWK proposal.
From: Joel Grounds <joel@precisionengineeringllc.com>
Sent: Thursday, April 28, 2022 4:10 PM
To: Robin Hite <RHite@tfid.org>
Subject: RE: Child Ped Grant Moneys
\[EXTERNAL SENDER\]
Sorry Robin been a crazy day,
Please find attached our quick layout. You will be need the school to allow the signal and cabinet to be installed so
granting a permanent easement, I don’t see that being a problem. I would not touch the ped ramp on the SW corner
and install a 12-ft ped signal pole at the west side of the ramp. I am not sure where the ROW falls relative to the back of
the sidewalk but the lip to lip measurement on Maurice seems to be about 33 feet and the ROW looks to be 55-ft but
not sure were that is relative to the back of walk the aerial and parcels lines are typically off on the assessor maps just
not sure how much.
We also took a quick look at constructing a 6-ft bulbout on the SW corner into Maurice so shifting the ramp east giving
more space.
Again this is a quick look but I think we can get it to work one think I don’t like is the guy wire but I have no idea how to
get rid of that, maybe Idaho Power could swap it out to the ones that go straight out the down and don’t have to take up
so much space but again that is a maybe.
Thanks,
Joel Grounds, P.E., PTOE
Principal Engineer | Precision Engineering, LLC
539 S. Fitness Place, Ste 120 | Eagle, ID 83616 | Office: 208.938.1695
Cell: 208.859.0485 | website: www.precisionengineeringllc.com
539 S. Fitness Place, Ste 120 | Eagle, ID 83616 | Office: 208.938.1695
Cell: 208.859.0485 | website: www.precisionengineeringllc.com
1