Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
VISTA RIM SUBDIVSION (SEWER)bedding, tracer wire, manholes replacement 08-15-22
ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Sunny, 900 F. Date: 08-09-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line ® Sewer Line ❑ Storm Sewer ® Pressure Irrigation ❑ Streets ❑ Gravity Irrigation Inspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 ® SDR-35 M C-200 '1`-)epth: 42" (36" Minimum) ® Tracer Wire Observed ® Yes ❑ No ® Pipe Bedding Inspection: In Conformance: ® Yes ❑ No Bedding Type: M I ❑ III ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches Specific Location of Inspection and/or Testing from approved plans: Progress inspection of Sewer Line Reviewed y. William J. Nenno, C.E.T. v�i North College Road -Suite 100 Twin Falls, Idaho 83301 L 111f1E�I`5, , SUILIO NG THE FUT3.skE ON A;:0L)N0AT;0N OF EXL,LUZW—E Ph. 208-734-4888 Fax 208-734-6049 ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Cloudy, 80' F. Date: 08-10-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line Z Sewer Line ❑ Storm Sewer ® Pressure Irrigation ❑ Streets ❑ Gravity Irrigation wspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 M SDR-35 ® C-200 Pipe Depth: 42" (36" Minimum) ® Tracer Wire Observed ® Yes ❑ No Pipe Bedding Inspection: In Conformance: ® Yes ❑ No Bedding Type: ® I ❑ III ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches -Specific Location of Inspection and/or Testing from approved plans: Progress inspection of Sewer Line — Manholes tops have been replaced. Reviewed By: William J. Nenno, C.E.T. 621 North College Road - Suite 100 Twin Falls, Idaho 83301 HM Engineers, Inc. BU8B..U3NG THE FUTURE ON A FOUNDAWN OF EXCEU.ENCE Ph. 208-734-4888 Fax 208-734-6049 ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Sunny, 780 F. Date: 08-11-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line M Sewer Line ❑ Storm Sewer © Pressure Irrigation ❑ Streets ❑ Gravity Irrigation Inspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 ® SDR-35 ® C-200 Pipe Depth: 42" (36" Minimum) M Tracer Wire Observed ® Yes ❑ No M Pipe Bedding Inspection: In Conformance: M Yes ❑ No Bedding Type: ® 1 ❑ 111 ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches Specific Location of Inspection and/or Testing from approved plans: Final bedding inspection of Sewer system. Reviewed By: William J. Nenno, C.E.T. 621 North College Road -Suite 100 Twin Falls, Idaho 83301 EHM Engineers, Inc. l3t11LNW3 THE FUTUR ONFOUNt?ATION OF"CULEW-E Ph. 208-73474888 Fax 208-734-6049