Loading...
HomeMy WebLinkAboutVISTA RIM SUBDIVSION (SEWER)bedding, tracer wire, manholes replacement 08-15-22 ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Sunny, 900 F. Date: 08-09-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line ® Sewer Line ❑ Storm Sewer ® Pressure Irrigation ❑ Streets ❑ Gravity Irrigation Inspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 ® SDR-35 M C-200 '1`-)epth: 42" (36" Minimum) ® Tracer Wire Observed ® Yes ❑ No ® Pipe Bedding Inspection: In Conformance: ® Yes ❑ No Bedding Type: M I ❑ III ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches Specific Location of Inspection and/or Testing from approved plans: Progress inspection of Sewer Line Reviewed y. William J. Nenno, C.E.T. v�i North College Road -Suite 100 Twin Falls, Idaho 83301 L 111f1E�I`5, , SUILIO NG THE FUT3.skE ON A;:0L)N0AT;0N OF EXL,LUZW—E Ph. 208-734-4888 Fax 208-734-6049 ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Cloudy, 80' F. Date: 08-10-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line Z Sewer Line ❑ Storm Sewer ® Pressure Irrigation ❑ Streets ❑ Gravity Irrigation wspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 M SDR-35 ® C-200 Pipe Depth: 42" (36" Minimum) ® Tracer Wire Observed ® Yes ❑ No Pipe Bedding Inspection: In Conformance: ® Yes ❑ No Bedding Type: ® I ❑ III ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches -Specific Location of Inspection and/or Testing from approved plans: Progress inspection of Sewer Line — Manholes tops have been replaced. Reviewed By: William J. Nenno, C.E.T. 621 North College Road - Suite 100 Twin Falls, Idaho 83301 HM Engineers, Inc. BU8B..U3NG THE FUTURE ON A FOUNDAWN OF EXCEU.ENCE Ph. 208-734-4888 Fax 208-734-6049 ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Sunny, 780 F. Date: 08-11-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line M Sewer Line ❑ Storm Sewer © Pressure Irrigation ❑ Streets ❑ Gravity Irrigation Inspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 ® SDR-35 ® C-200 Pipe Depth: 42" (36" Minimum) M Tracer Wire Observed ® Yes ❑ No M Pipe Bedding Inspection: In Conformance: M Yes ❑ No Bedding Type: ® 1 ❑ 111 ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches Specific Location of Inspection and/or Testing from approved plans: Final bedding inspection of Sewer system. Reviewed By: William J. Nenno, C.E.T. 621 North College Road -Suite 100 Twin Falls, Idaho 83301 EHM Engineers, Inc. l3t11LNW3 THE FUTUR ONFOUNt?ATION OF"CULEW-E Ph. 208-73474888 Fax 208-734-6049