Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
VISTA RIM SUBDIVISION (SEWER)bedding insp mh s1 to mh s2 07-26-22 (002)
ISPWC DAILY INSPECTION REPORT "%-j 4{ect Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Sunny, 930 F. Date: 07-20-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek Area of Inspection: ❑ Water Line ® Sewer Line ❑ Storm Sewer ® Pressure Irrigation ❑ Streets ❑ Gravity Irrigation Inspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 ® SDR-35 ® C-200 >epth: 42" (36" Minimum) ® Tracer Wire Observed © Yes ❑ No M Pipe Bedding Inspection: In Conformance: ® Yes ❑ No Bedding Type: ® I ❑ III iJ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench ❑ Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches Specific Location of Inspection and/or Testing from approved plans: Sewer line bedding inspection — Existing ESI Manhole to MH S1 Reviewe y: William J. Nenno, C.E.T. 621 North College Road -Suite 100 I y Twin Falls, Idaho 83301 El "' , _ _ ~ ; Inc. Ph. 208-734-4888 Fax 208-734-6049 ISPWC DAILY INSPECTION REPORT Project Name: Vista Rim Subdivision - Twin Falls, Id. Weather: Sunny, 820 F. Date: 07-23-22 Job No.: 299-20 EHM Representative: C. Earl Contractors Name: IEC Contractors Representative: Derek f rea of Inspection: ❑ Water Line M Sewer Line ❑ Storm Sewer M Pressure Irrigation ❑ Streets ❑ Gravity Irrigation Inspection and/or Testing Details: Pipe Diameter: ❑ 2" ❑ 4" ❑ 6" ® 8" ❑ 10" ❑ 12" ❑ 16" ❑ 18" ❑ 24" ❑ 27" ❑ 32" ❑ 48" Pipe Type: PVC Pipe Class: ❑ C-900 ® SDR-35 IN C-200 Pipe Depth: 42" (36" Minimum) 1 ,ai;er Wire Observed ® Yes ❑ No ® Pipe Bedding Inspection: In Conformance: M Yes ❑ No Bedding Type: ® I ❑ III ❑ Thrust Block Inspection: In Conformance: ❑ Yes ❑ No ❑ Pressure Test Observed: In Conformance: ❑ Yes ❑ No Deflection: ❑ Yes ® No ❑ Density Testing Item: ❑ Trench ❑ Subgrade ❑ Base ❑ Asphalt ❑ Utility Trench L Concrete Testing Item: ❑ Sidewalk ❑ Curb & Gutter ❑ Valley Gutter ❑ Approaches Specific Location of Inspection and/or Testing from approved plans: Sewer line bedding inspection — MH S1 to MH S2 Reviewed By: William J. Nenno, C.E.T. College Road -Suite 100 Twin Falls, Idaho 83301 " E, IM Engineers, Inc. BUILDING THE FUTURE ON AF f,�t��iDATION OF EXCELLENCE Ph. 208-734-4888 Fax 208-734-6049