Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule.. How do you manage a phased project and can there be any cost savings in doing
so? Cott ---
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties? , /
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
- �0
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors t at want to make in-kind donations?
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
't's. '04- kLASZ'&(_ r.,t4r-4 a-,- n_ai
V�LU 67X s r
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
I)T evie/nek 01 sf, O't5 A„Ldf
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
'r -_
6. Are you willing to work with subcontractors that want to make in-kind donations?
A-F 1,4,, i.w �t oL F �'5;
ira,1��u k2ri
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
2. What is the biggest challenge the City will face in delivering this project and what n you
do to help overcome that challenge? P
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can r
still perform their job duties? J
i
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7, Other:
sizk-Irv-
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do[you manage a phased project and can there be any cost savings in doing
so? 0 plolec grkci 26tq,
/h
r�2 What is the biggest challenge the City will face in delivering this project and what can you
I4,
to help overcome that challenge?
/ /"fig,rGa/_' M4 6" Cj le"1livG,
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
6P/,trlGG JdrA % chi f� _r"I
�4 How
//do you communicate challenges, change orders/revisions, delays, etc to the owner?
Ay
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements? 7.7--
6, Are you willing to work with subcontractors that want to make in-kind donations?
Yeir — ,�t i;.<� in �;J P,c/'al e. t
7. Other:
s u,h",jr-
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
2. What is the biggest challenge the City will face in delivering this project and wha an u
do to help overcome that challenge?
00
rjot- ckQl(e
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
iAJ �-
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
PN�
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
4-n V-1
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
G CXMVr1.ww,C_ - 9-11--
C."" t
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
Urge J
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
ai '� J&V$ -
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so? Q
CY
CV/VW
P
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
O
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
O
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
5ubwV-hA�n
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so? % YES Lw -' drr—
/lUy►it/ 04yi' ho 4/prv,i G 11,ri
Flo p G(IfloMee- AIX i e, of c �e9 rya,
2 What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
AC41t eIlhej t 1;1y
(, /p AA��iJJ�+�! f R ® C�Af ✓Go r� /71�V
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties? /y,0//
i
i
�4 How do you communicate challenges, change orders/revisions, delays, etc to the owner?
w'olve (Y"le !-Mar,lr� r d.A C. GJte�(y
/jj " Cll fie, AbVA/4,
�W&elc 4,o k 4 e.
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to
negotiate fee structure of the general conditions and
requirements? ej- — )eA.1et 6i_rI.
.Lrr�vl�/tC� �di/T i u4 omre//l e .
6. Are you willing to work.with subcontractors that want to make in-kind donations?
,I --
i� c Awk ,
n 1cr-,,1
yes ;/ ,,/-
7. other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
,�t,,dt, ��"f wt,.D� � I'►�c.�r"�-�t�e. �'"�+r►-u-l�t..r..�..1
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
T q t yt'A LC!WL-i2Q.,
yvLA vk-i wL,;V vL3XS oru -h iaV.-
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
411(W
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements? y,
6. Are you willing to work with subcontractors that want to make in-kind donations?
VW�T
7. Other:
i
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent? These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
Jet��Zec�. S
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
14 .1 A
(q I &a
5 tw
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
i
i
I
I
i
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. Wow do you manage a phased project and can there be any cost savings in doing
so?
2� What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
��ecc✓�;
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still
��perform
pqtheir job duties?
How do you communicate challenges, change orders/revisions, delays, etc to the owner?
IfCY 0/1
We e IVY
5, Will you provide us with a detailed fist of general project conditions and requirements, including
fee inclusions/exclusi9ns?Are you willing to negotiate fee structure of the general conditions and
requirements? 9-0o/ y Ve
kxell'yl b4kl y �grsed d,,' /.0
6. Are you willing to work with subcontractors that want to make in-kind donations?
Are b A y 1x'A,*xet- hr/W jz'�) - l4yf1ib
7. Other:
m 1
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
Ka"�' , Q�w ' VAAOR.,
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
r
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
pcz�
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
R 3(�✓
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so? �. hdi ra f 1P-4(-sal►" re —
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
C.44t4 b Cs w lnti U
o CVL G -`
4. Now do you communicate challenges, change orders/revisions, delays, etc to the owner?
� P"CdV_e__
q�yc. L
to
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
V
6, Are you willing to work with subcontractors that want to make in-kind donations?
7, Other;
S�VlN'�� j S�l•�-�S
P` ,—
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent? These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so? D
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
a
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions? Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
UL
P
7. Other:
ark
/1
Vv _
P gc'
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
bCA G��6ew
_44A k fAA02-
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge? ^
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
y still perform their job duties?
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
des
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
PAL
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?L0��,
dke
t#
�2 What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
fB�e/l W%f�h�
4� ow do you communicate challenges, change orders/revisions, delays, etc to the owner?
PdG✓IIE(I1 lw�//l
Ame C-11r,
dim - C�.ia ,
C'm�.►�tr G�+�f� Al lee l- wei kly,
V��/Ct/ �!l�lbQl /I�lr
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements? V�S!
6. Are you willing to work with subcontractors that want to make in-kind donations?
7-,41fr— MV;c Fes1 1cs,
�r.6lr,•, - o � '�1 wr.�.
7. Other: ) J r, n
P.or ly e�+ rJi A
Z�2�,
Twin Fall Animal Shelter Expansion -
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
r �
4UAMq,-
o
v
i
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7, Other:
CC FLE
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome t at challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
�C61-e
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
Q
Cow.
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on-this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
Afee Axrlf - A 1 4 -f--t 6
AJj ItAyof4-fcs - 5-C-61'f .�- wa/I4
2 What is the biggest challenge the City will face in delivering this project and what can you
duo to help overcome that challenge?
Wen At ve l qv6 a.4 J
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
ZAt 6f 4J , ,fie;r r,l flee./A�
i
V How do you communicate challenges, change orders/revisions, delays, etc to the owner?
fe
Am 0
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?1¢f r
6. A�r!e you willing to work with subcontractors that want to make in-kind donations?
��rPl/i do Ge a�'i ��?r lei►
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. Mow do you manage a phased project and can there be any cost savings in doing
so?
11," , P s
c/t'� r�
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
ash V,.(, 4a U '
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
IZbd 4- v -�rAj&c c,,.•�-�- �(�`�✓�-fir °-�. r
i
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
�YL V4 n'k
7. Other:
R+f
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
•_ Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
FkA/�i
A RX - p
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee,inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
my
7. Other: 4- Aw wW S+74, ��'� �"2. rrrv,SS
i
f
i
f
`s
Twin Fall Animal Shelter Expansion
CM/GC Interviews \
October 22, 2025 1
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of tie
contractors and the Council, patrons, and media? -' Y
• Are they client oriented or contractor oriented? P
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
(t�
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
05 --
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties? 04
pc aw
��✓ �
, 5
I
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
7. Other:
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.K
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?ycf
1. As the CM GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
CAI
'WJ/1
What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
JA III -A
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
stti/ill perform their job duties?
G drd/din 7/t s
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
D�tn C®mM•�niG�,j�:sn
OPI ��FE�•
�ro Z lc C�¢y /�lclsf
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements? xeplr.A
�{o cr1/Y Ra/c,
/
6. Are•y�goulwilllling to work
with subcontractors that want to make in-kind donations?
rPI
7. Other:
�ojP�c it j��,j! f�'.✓�,rd
Pwk
1j'a A/
oe-wkra
N v o-o/
Y
�� f
Twin Fall Animal Shelter Expansion
CM/GC Interviews
October 22, 2025
*Items to look for:
• Are they someone you could work with on this project?
• Does their team communicate well amongst themselves and with us?
• Did they bring their project manager and/or superintendent?These are the people we
will have the most day-to-day contact with our team.
• Do they have an obvious leader who is capable of communicating on behalf of the
contractors and the Council, patrons, and media?
• Are they client oriented or contractor oriented?
• Do they have local knowledge and connections?
1. As the CM/GC of this project you will develop and maintain the project construction
schedule. How do you manage a phased project and can there be any cost savings in doing
so?
�'J Q5
2. What is the biggest challenge the City will face in delivering this project and what can you
do to help overcome that challenge?
-
C
3. Provide an example of a project where you have had to perform construction operations in
an occupied facility. What strategies did you use to be successful and ensure occupants can
still perform their job duties?
4. How do you communicate challenges, change orders/revisions, delays, etc to the owner?
5. Will you provide us with a detailed list of general project conditions and requirements, including
fee inclusions/exclusions?Are you willing to negotiate fee structure of the general conditions and
requirements?
6. Are you willing to work with subcontractors that want to make in-kind donations?
4n � r
, A
7. Other: