Loading...
HomeMy WebLinkAbout14-2348 1951 Fillmore St plans COMcheck Software Version 4.0.0 Interior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2007)Standard Project Title: Ulta Store#1044 Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 1951 Fillmore St. Bob Wirsing Davis Dickerson Twin Falls, ID 83301 Chipman Design Architecture Inc. Dickerson Engineering Inc. 2700 S. River Rd, 8101 Milwaukee Ave. Suite 400 Niles, IL 60714 Des Plaines, IL 60018 847-966-0290 847-298-6900 Davis.Dickerson@dei-pe.com Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Retail:Sales Area 9146 1 .70 15548 Allowance: Decorative Appearance/Fix. ID:G3 215(a) 1.00 215(b) Allowance: Decorative Appearance/Fix. ID:G4 495(a) 1.00 495(b) Allowance: Decorative Appearance/Fix. ID:G4A 55(a) 1.00 55(b) Allowance:Decorative Appearance/Fix. ID:G4NS 110(a) 1.00 110(b) Allowance:Decorative Appearance/Fix. ID:G4 165(a) 1.00 165(b) Allowance:Vehicles,sporting goods,small electronics highlighting/Fix.ID:G6 672(a) 1.70 672(b) Allowance:Decorative Appearance/Fix. ID:G6NS 168(a) 1.00 168(b) Allowance:Decorative Appearance/Fix. ID:G8 1512(a) 1.00 1512(b) Allowance:Decorative Appearance/Fix. ID:G8C 2052(a) 1.00 2052(b) Allowance:Decorative Appearance/Fix. ID:V 1000(a) 1.00 1000(b) 2-Common Space Types:Active Storage 596 0.80 477 3-Common Space Types:Restrooms 166 0.90 149 4-Common Space Types:Office-Enclosed 61 1 .10 67 5-Common Space Types:Corridor/Transition 60 0.50 Total Allowed Watts= 22715 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Retail:Sales Area (9146 sq.ft.) Linear Fluorescent:G3:3'SURFACE STRIP:36"T8 25W:Electronic: 2 5 43 215 Linear Fluorescent:G4:4'SURFACE STRIP:48"T8 32W:Electronic: 2 9 55 495 Linear Fluorescent copy 1:G4A:4'SURFACE STRIP:48"T8 32W: Electronic: 2 1 55 55 Linear Fluorescent copy 2:G4NS:4'SURFACE STRIP:48"T8 32W:Electronic: 2 2 55 110 Linear Fluorescent:G4:4'COVE STRIP:48"T8 32W: Electronic: 2 3 55 165 Linear Fluorescent:G6:6'SURFACE STRIP:36"T8 25W:Electronic: 4 8 84 672 Linear Fluorescent:G6NS:6'SURFACE STRIP:36"T8 25W:Electronic: 4 2 84 168 Project Title: Ulta Store# 1044 Report date: 03/26/15 Data filename: H:\13004.56\TWIN FALLS, ID.CCK Page 1 of 6 A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Linear Fluorescent:G8:8'SURFACE STRIP:48"T8 32W: Electronic: 4 14 108 1512 Linear Fluorescent:GBC:8'COVE STRIP:48"T8 32W:Electronic: 4 19 108 2052 LED:U1 &U1E:8"SQUARE DWN LGHT:Other: Electronic: 2 153 42 6426 Incandescent:V: PENDANT:Incandescent 100W: 1 10 100 1000 LF-G3:G3:T ARCH STRIP:36"T8 25W: Electronic: 2 2 43 86 LF-G4:G4:4'ARCH STRIP:48"T8 32W:Electronic: 2 38 55 2090 LF-G6:G6:6'ARCH STRIP:36"T8 25W:Electronic: 4 40 84 3360 Linear Fluorescent copy 1:G8:8'ARCH STRIP:48"T8 32W: Electronic: 4 26 108 2808 Common Space Types:Active Storage(596 soft Linear Fluorescent:GBD:8'STRIP:48"T8 32W: Electronic: 4 6 108 648 Linear Fluorescent copy 1:G4D:4'STRIP:48"T8 32W:Electronic: 2 1 55 55 Common Space Types:Restrooms(166 sa,.ft.l LED: U1:8"SQUARE DWN LGHT:Other: Electronic: 2 2 42 84 Incandescent:V:PENDANT:Incandescent 100W: 1 1 100 100 Common Space Types:Office-Enclosed (61 sq.ft.) Linear Fluorescent:G4D:4'STRIP:48"T8 32W:Electronic: 2 2 55 110 Common Space ypes:Corridor/Transition(60 sa.ft.) LED:U1 &ME:8"SQUARE DWN LGHT:Other: Electronic: 1 2 42 4 i Total Proposed Watts= 22295 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Ulta Store # 1044 Report date: 03/26/15 Data filename: H:\13004.56\TWIN FALLS, ID.CCK Page 2 of 6 COMcheck Software Version q Inspection Checklist Energy Code: 90.1 (2007) Standard Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. " (C Qo n Rev�e�r omp(I( Comrrten s umpt tatsfard _ �� 4.2.2 ;Plans, specifications, and/or ❑Complies :Requirement will be met. [PR4]1 ;calculations provide all information ;❑Does Not ;with which compliance can be Location on plans/spec: Sheet EO-1 &E1-1 ;determined for the lighting and ;❑Not Observable' 4 electrical systems and equipment and 3❑Not Applicable document where exceptions to the :standard are claimed. Information ;provided should include interior 3 i ;lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. 'Plans, specifications, and/or 1❑Complies Requirement will be met. 8 4 -lcalculations provide all information 3❑Does Not with which compliance can be :Location on plans/spec: Sheet EO-1 & E4-1 9 determined for the electrical systems ;❑Not Observable and equipment and document where 1❑Not Applicable j M,exceptions are claimed. Feeder ii: 10Iff 1 connectors sized in accordance with ; �1.a approved plans and branch circuits jp „ , ,sized for maximum drop of 3%. Additional Comments/Assumptions: 1�High Impact(Tier 1) 2! Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Ulta Store# 1044 Report date: 03/26/15 Data filename: H:\13004.56\TWIN FALLS, ID.CCK Page 3 of 6 (2007) Rough In EI€cctrical Inspection Complies'? Crer�ar �r�tslAssurt� t€cn �` Standard 9 4,1,1 'yilAutomatic controls to shut off all ;❑Complies :Requirement will be met. [['EL1]2 :building lighting installed in buildings ❑Does Not >5,000 ft2 Location on plans/spec: Sheet EO-1, EO-2 & E1-1 ❑Not Observable _ ❑Not Applicable 9.4.1.1i,1Independent lighting controls installed ❑Complies ;Requirement will be met. i[EL2J�a��� per approved lighting plans and all j❑Does Not Fl�manual controls readily accessible and; Location on plans/spec: Sheet E0-1, EO-2&E1-1 ',visible to occupants. ❑Not Observable ❑Not Applicable 9.4.1.4 ;Separate lighting control devices for ;❑Complies 'Requirement will be met. [EL4]1 specific uses installed per approved :❑Does Not ;lighting plans. ; :Location on plans/spec: Sheet EO-1, EO-2& E1-1 ,❑Not Observable, _ ;❑Not Applicable 19.4.2 ;Ballasted one and three lamp fixtures ;❑Complies :Exception: Electronic high-frequency ballasts. �[ELI :with >30 W/lamp have two lamp TlDoes Not ;tandem wired ballasts when >=2 ; (Location on plans/spec: Sheet EO-1 & E1-1 ' fixtures in same space on same :❑Not Observable' control. '❑Not Applicable 9.4.3 ;Exit signs do not exceed 5 watts per ,❑Complies ;Requirement will be met. [EL6]1 face. ❑Does Not 'Location on plans/spec: Sheet EO-1 & E1-1 ❑Not Observable; ' ;❑Not Applicable 9.6.2 ;Additional interior lighting power €❑Complies Requirement will be met. [EL8]1 :allowed for special functions per the QDoes Not approved lighting plans and is ❑Not Observable Location on plans/spec: Sheet EO-1, EO-2 & E1-1 automatically controlled and ❑Not Applicable separated from general lighting. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Ti( 3) Project Title: Ulta Store# 1044 Report date: 03/26/15 Data filename: H:\13004.56\TWIN FALLS, ID.CCK Page 4 of 6 90.1 {2007) Final Iti ee i n, Comp les7.. Coq�a nts/A andari3 � � �� - 8.7.1 Furnished as-built drawings for ;❑Complies ;Requirement will be met. [FI16]3 :electric power systems within 30 days '❑Does Not of system acceptance. :[-]Not Observable ❑Not Applicable 87.2 ,Furnished O&M instructions for ;❑Complies !Requirement will be met. )[F117]3 !systems and equipment to the ;❑Does Not building owner or designated 3 representative. :[—]Not Observable; _ ;❑Not Applicable ; 9.2.2.3 ;Interior installed lamp and fixture ;❑Complies ;See the Interior Lighting fixture schedule for values. [F118]1 :lighting power is consistent with what :❑Does Not 3 i is shown on the approved lighting i plans, demonstrating proposed watts F❑Not Observable j are less than or equal to allowed ;❑Not Applicable watts. Additional Comments/Assumptions: 1 1 High Impact(Tier 1) PKI Medium Impact(Tier 2) F3 Low Impact(Tier 3) Project Title: Ulta Store# 1044 Report date: 03/26/15 Data filename: H:\13004.56\TWIN FALLS, ID.CCK Page 5 of 6 �� rq Uo ��l/ LtdlL� OMcheck Software Version 3.9.3 Mechanical Compliance Certificate 2012 IECC Section 1: Project Information Project Type:New Construction Project Title:Ulta Store#1044 Construction Site: Owner/Agent: Designer/Contractor: 1951 Fillmore St. Joseph Thomas Twin Falls,ID 83301 WCW Engineers,Inc. 760 Creel Drive Wood Dale,IL 60191 630-595-8800 Joe.Thomas@WCWengineers.com Additional Efficiency Package:Unspecified Section 2: General Information Building Location(for weather data): Twin Falls,Idaho Climate Zone: 5b Section 3: Mechanical Systems List Quantity System Type&Description 1 RTU-1(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=180 kBtu/h Proposed Efficiency=80.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Single Package DX Unit,Capacity=93 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.50 EER,Required Efficiency=11.00 EER Fan System: RTU-1 I RTU-1--Compliance(Motor nameplate HP method):Passes Fans: RTU 1 Supply,Constant Volume,3000 CFM,3.0 motor nameplate hp 1 RTU-2(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=180 kBtu/h Proposed Efficiency=80.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Single Package DX Unit,Capacity=93 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.50 EER,Required Efficiency=11.00 EER Fan System: RTU-2 I RTU-2--Compliance(Motor nameplate HP method):Passes Fans: RTU 2 Supply,Constant Volume,3000 CFM,3.0 motor nameplate hp 1 RTU-3(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=180 kBtuth Proposed Efficiency=80,00%Et,Required Efficiency=80.00%Et Cooling:1 each-Single Package DX Unit,Capacity=93 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.50 EER,Required Efficiency=11.00 EER Fan System: RTU-3 I RTU-3--Compliance(Motor nameplate HP method):Passes Fans: RTU 3 Supply,Constant Volume,3000 CFM,3.0 motor nameplate hp 1 RTU-4(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=180 kBtu/h Proposed Efficiency=80.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Single Package DX Unit,Capacity=93 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=12.50 EER,Required Efficiency=11.00 EER Project Title:Ulta Store#1044 Report date:03/03/15 Data filename: Untitled.cck Page 1 of 2 Fan System: RTU-4 I RTU-4--Compliance(Motor nameplate HP method):Passes Fans: RTU 4 Supply,Constant Volume,3000 CFM,3.0 motor nameplate hp 1 HWH-1: Gas Storage Water Heater,Capacity:100 gallons,Input Rating:199 Btu/h w/Circulation Pump Proposed Efficiency:80.00%Et,Required Efficiency:80.00%Et Section 5: Compliance Statement Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet requirements in COMcheck Version 3.9.3 and to comply with the mandatory require ent the Requirements Checklist. aid .-,-1O S'Ephr IN d M45 3 Name-Title qna-tu're- Date 98 rp Section 6: Post Construction Compliance Statement �� (Pj g O HVAC record drawings of the actual installation and performance data for each equipment provided to the owner 5� e 1 system acceptance. . HVAC O&M documents for all mechanical equipment and system provided to the owner within 90 days after system acceptance. O Written HVAC balancing report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Title: Ulta Store#1044 Report date:03/03/16 Data filename:Untitled.cck Page 2 of 2 COMcheck Software Version 3.9.3 Inspection Checklist Energy Code: 2012 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 1 INigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3y Project Ulta Store #1044 Report date: 03/03/1 Data Untitled.cck Pagel of 10 2012 IECC Plan Review Complies? Comments/Assumptions C103.2 Plans,specifications,and/or ❑Complies Requirement will be met [PR2]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the mechanical ❑Not Applicable systems and equipment and document where exceptions to the standard are claimed.Load calculations per acceptable engineering standards and handbooks. — C103.2 Plans,specifications,and/or ❑Complies Requirement will be met. [PR311 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the service water ❑Not Applicable heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. C406 Plans,specifications,and/or ❑Complies Requirement will be met. [PR911 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable determined for the additional energy ❑Not Applicable efficiency package options. Additional Comments/Assumptions: 1 High Impact(Tier 1)� 2 Medium Impact(Tier 2)�1 3 Low Impact(Tier 3) Project Ulta Store #1044 Report date: 03/03/1 Data Untitled.cck Page 2 of 10 2012 IECC Footing/Foundation Inspection complies? Comments/Assumptions C403.2.4. Freeze protection and snow/ice ❑Complies Exception: Requirement does not apply. 5 melting system sensors for future ❑Does Not (FOg]3 connection to controls. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low impact(Tier 3) Project Ulta Store#1044 Report date: 03/03/1 Data Untitled.cck Page 3 of 10 F201�2�Plumbingh-In�Inspect�jonComplies? Comments/Assumptions C404.3 Temperature controls installed on ❑Complies Requirement will be met. IPL5J3 service water heating systems(110 QF ❑Does Not for dwelling units and lavatories in See the Mechanical Systems list for values for HWH-I. public restrooms and 90 QF for other ❑Not Observable occupancies.) ❑Not Applicable C404.4 Automatic time switches installed to ❑Complies Requirement will be met. {PL31I automatically switch off the ❑Does Not recirculating hot-water system or heat See the Mechanical Systems list for values for HWH•I. trace. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions- 1 High Impact(Tier 1) 2 Medium Impact{Tier 2) 3 Low Impact(Tier 3� Project Ulta Store #1044 Report date: 03/03/1 Data Untitled.cck Page 4 of 10 Section Mechanical Rough-ln Pians Verified Field Verified # Complies. Comm+3its/Assumptions inspection Value i Value C403.2.3. ;HVAC equipment efficiency Efficiency:_ Efficiency:_ ❑Complies 'See the Mechanical Systems list [ME55]2 verified. ❑Does Not for values. ❑Not Observable ; ❑Not Applicable C403.2.5. Demand control ventilation "- ❑Complies Exception:Systems with I provided for spaces>500 ft2 and ,i; ❑Does Not design outdoor air of less [ME59]1 >25 people/1000 ft2 occupant t ' ; than 1200 cfm. density and served by systems x �'_;❑Not Observable with air side economizer,auto ❑Not Applicable modulating outside air damper rr }; f `control,or design airflow>3,000 cfm. C403.2.7 ;HVAC ducts and plenumswR-_ R-� ❑Complies Exception: Requirement [ME60]2 :insulated.Where ducts or ❑Does Not does not apply. plenums are installed in or under ;a slab,verification may need to ❑Not Observable occur during Foundation ❑Not Applicable Inspection. C403.2.8 Thermally ineffective panel "❑Complies Exception: Requirement [ME41]3 tsurfaces of sensible heating � r ,❑goes Not does not apply. ;panels have insulation >=R-3 5 i❑Not Observable ❑Not Applicable C403.3.7 Ducts and plenums sealed based % ❑Complies Requirement will be met. [ME10]2 :on static pressure and location. .' f❑goes Not -]Not Observable -,[]Not Applicable C403,2.7. ',Ductwork operating>3 in.water ❑Complies �vException:Requirement 1.3 column requires air leakage ;❑Does Not does not apply. [MEII]3 ;testing. ❑Not Observable See the Mechanical Systems list i❑Not Applicable for values for RTU-I. C403.2.7. ;Ductwork operating >3 in.water '❑Complies Exception:Requirement 1.3 column requires air leakage =❑Does Not does not apply. [MEll]3 !testing. f ❑Not Observable `See the Mechanical Systems list ❑Not Applicable -for values for RTU-2. C403.2.7. Ductwork operating >3 in.water ;❑Complies Exception: Requirement 1.3 +column requires air leakage ~❑Does Not does not apply. [MEII]3 ;testing. ❑Not Observable :See the Mechanical Systems list ❑Not Applicable for values forRTU-3. C403.2.7. ;Ductwork operating >3 in.water E< ❑Complies Exception: Requirement 1.3 i column requires air leakage ,-, ❑Does Not does not apply, [ME11]3 testing. '❑Not Observable See the Mechanical Systems list []Not Applicable ;for values forRTU-4. C403.3.1, Air economizers provided where `.^'❑Complies Requirement will be met. C403.3.1. required,meet the requirements ❑Does Not 1 for design capacity,control ❑Not Observable See the Mechanical Systems list [ME62]1 signal,ventilation controls,high for values forRTU-1. limit shut-off, integrated ❑Not Applicable economizer control,and provide } a means to relieve excess outside air during operation. C403.3.1, .Air economizers provided where []Complies Requirement will be met C403.3.1. required, meet the requirements ❑Does Not 1 'for design capacity,control ❑Not Observable `See the Mechanical Systems list [ME62)1 signal,ventilation controls,high for values for RTU-2. limit shut-off, integrated ❑Not Applicable economizer control,and provide a means to relieve excess outside air during operation. I lHigh Impact(Tier 1) 2 Medium Impact(Tier 2) �F3 Low Impact(Tier 3) Project Ulta Store #1044 Report date: 03/03/1 Data Untitled.cck Page 5 of 10 Section Mechanical Rough-in 1 Plans Verified Field Verified # Compiles. Comments/Assumptions &"Req ID Inspection Value Value _ - ---- - — - ---- -- ------ --- ----- C403.3.1, :Air economizers provided where ❑Complies Requirement will be met, C403.3.1. required,meet the requirements a❑Does Not 1 for design capacity,control See the Mechanical Systems list [ME62]1 :signal,ventilation controls,high- []Not Observable "for values for RTU-3. limit shut-off,integrated ❑Not Applicable ,economizer control,and provide a means to relieve excess outside air during operation. C4033.1, :Air economizers provided where '❑Complies ;Requirement will be met. C4033.1. required, meet the requirements ❑Does Not 1 for design capacity,control Not Observable See the Mechanical Systems list [ME62]1 signal,ventilation controls,high- ❑ for values forRTU-4. limit shut-off,integrated ;❑Not Applicable economizer control,and provide 'a means to relieve excess outside air during operation. C408.2.2. 'Air outlets and zone terminal '❑Complies Requirement will be met. 1 devices have means for air i❑Does Not [ME5313 ;balancing. QNotObservable ;..❑Not Applicable C403.4,2 VAV fan motors>=7.5 hp to be EJVSD _--[] VSD— —. [Complies Exception:Requirement [ME66]2 driven by variable speed drive, ❑ Vane axial ❑ Vane axial ❑Does Not does not apply. have a vane-axial fan with fan fan 'variable pitch blades,or have Other ❑ Other ❑Not Observable See the Mechanical Systems list controls to limit tan motor '❑Not Applicable for values forRTU-1. :demand. C403.4.2 ;VAV fan motors>=7,5 hp to be ❑ VSD ~i❑ VSD ❑Complies Exception:Requirement [ME66]2 driven by variable speed drive, ❑ Vane axial ❑ Vane axial ❑Does Not :does not apply. have a vane-axial fan with fan fan ❑Not Observable !variable pitch blades,or have Other ❑ Other See the Mechanical Systems list ❑ ;controls to limit fan motor Not Applicable for values forRTu•2. demand. C403.4.2 VAV fan motors>=7.5 hp to be VSD [] VSD ❑Complies Exception:Requirement [ME66]2 i driven by variable speed drive, ❑ Vane axial ❑ Vane axial ❑Does Not does not apply. ;•have a vane-axial fan with fan fan joNot Observable 'variable pitch blades,or have Other ❑ ❑ Other See the Mechanical Systems list controls to limit fan motor Not Applicable i for values for RT(1.3, :demand. C403.4.2 :VAV fan motors>=7.5 hp to be VSD —� VSD J — ❑Complies ;Exception:Requirement [ME66]2 driven by variable speed drive, ❑ Vane axial ❑ Vane axial ❑Does Not 'does not apply. :have a vane-axial fan with fan fan ;variable pitch blades,or have [] Other ❑ Other ❑Not Observable ;See the Mechanical Systems list controls to limit fan motor ❑Not Applicable for values forRTU-4. demand. C403,4.2 ;VAV fan motors>=7.5 hp to be ;❑ VSD ❑ VSD ❑Complies Exception:Requirement [ME66I2 driven by variable speed drive, ❑ Vane axial ❑ Vane axial []Does Not does not apply. have a vane-axial fan with fan fan variable pitch blades,or have Other ❑ Other ❑Not Observable :See the Mechanical Systems list controls to limit fan motor ❑Not Applicable ;for values for HWH•1. demand. C403.2.6 I Exhaust air energy recovery on ;[]Complies [ME5711 'systems meet(ng Table C403.2,6 ElDoes Not I❑Not Observable ;❑Not Applicable C403.2,11!Unenclosed spaces that are ;❑Complies ;Exception: Requirement [ME71]2 heated use only radiant heat. ;❑Does Not does not apply. IQNot Observable ❑Not Applicable 1 High Impact(Tier 1y 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Ulta Store #1044 Report date: 03/03/1 Data Untitled.cck Page 6 of 10 Section Mechanical Rough-in Plans Verified Field Verified # Complies, Comments/Assumptions & Re ;1D Inspection Value Value C403.4.7 Hot gas bypass limited to: <=240• .`;z ❑Complies Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% i❑Does Not See the Mechanical Systems list [Not Observable for values for RTU-1. ❑Not Applicable C403.4.7 Hot gas bypass limited to: <=240 Tel❑Complies Requirement will be met. [NIE35]1 kBtu/h-50%>240 kBtu/h-25% a❑Does Not See the Mechanical Systems list '❑Not Observable ifor values for RTU-2. ❑Not Applicable C403.4.7 :Hot gas bypass limited to: <=240 ❑Complies :Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% ;❑Does Not See the Mechanical Systems list ❑Not Observable for values for RTU-3. '❑Not Applicable C403.4.7 Hot gas bypass limited to:<=240 ❑Complies Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% ❑Does Not See the Mechanical Systems list ❑Not Observable for values for RTU-4. ❑Not Applicable Additional Comments/Assumptions. IT igh Impact(Tier 1) 2 Medium Impact(Tier 2) i 3 Low Impact(Tier 3) Project Ulta Store #1044 Report date: 03/03/1 Data Untitled.cck Page 7 of 10 2012 1ECC Final inspection Complies? Comments/Assumptions C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 2 controlled by a thermostat control. ❑Does Not [FI4713 Minimum one humidity control device See the Mechanical Systems list for values for RTU-1. per installed ❑Not Observable humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 2 controlled by a thermostat control. ❑Does Not [FI4713 Minimum one humidity control device See the Mechanical Systems list for values for RTU-2. per installed ❑Not Observable humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 2 controlled by a thermostat control. ❑Does Not [F14713 Minimum one humidity control device See the Mechanical Systems list for values for RTU-3. per installed ❑Not Observable humidification/dehumidification ❑Not Applicable system. C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 2 controlled by a thermostat control. ❑Does Not (FI4713 Minimum one humidity control device See the Mechanical Systems list for values forRTU-4, per installed ❑Not Observable humidification/dehumidification ❑Not Applicable system. C403.2.4. Thermostatic controls have a 5°F ❑Complies Requirement will be met. 2 deadband. ❑Does Not [F138]3 ❑Not Observable ❑Not Applicable C403.2.4. Temperature controls have setpoint ❑Complies Requirement will be met. 2 overlap restrictions. ❑Does Not [F120]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies Requirement will be met. 3 controls using automatic time clock or ❑Does Not [F13913 programmable control system. ❑Not Observable ❑Not Applicable C403.2.4. Automatic Controls:Setback to 551F ❑Complies Requirement will be met. 3 (heat)and 85°F(cool);7-day clock,2- ❑Does Not [F140]3 hour occupant override, 10-hour backup []Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Requirement will be met. 3.3 controls. ❑Does Not (FI4113 See the Mechanical Systems list for values for RTU-1. ❑Not Observable ❑Nat Applicable C403.2.4. Systems include optimum start ❑Complies Requirement will be met. — -3.3 controls. ❑Does Not (F14113 See the Mechanical Systems list for values for RTU-2. ❑Not Observable ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies Exception.,Requirement does not apply. 3.3 controls. ❑Does Not (FI4113 See the Mechanical Systems list for values for RTU-3. ❑Not Observable ❑Not Applicable C403.2,4. Systems include optimum start ❑Complies Requirement will be met. 3.3 controls. ❑Does Not [FI4113 See the Mechanical Systems list for values for RTU-4. ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2} 3 Low Impact(Tier 3) Project Ulta Store #1044 Data Untitled.cck Report date: 03/03/1 Page 8 of 10 2012 IECC Final inspection Complies? Comments/Assumptions C408.2.5. Furnished FIVAC as-built drawings ❑Complies Requirement will be met. 1 submitted within 90 days of system ❑Does Not [FI713 acceptance. ❑Not Observable ❑Not Applicable C303.3,C4 Furnished O&M manuals for HVAC ❑Complies Requirement will be met. 08.2.5.2 systems within 90 days of system []Does Not [FI813 acceptance. []Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system ❑Complies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [F14311 systems. ❑Not Observable ❑Not Applicable C408.2.3. HVAC control systems have been ❑Complies Requirement will be met. 2 tested to ensure proper operation, ❑Does Not [F11011 calibration and adjustment of controls. ❑Not Observable ❑Not Applicable C404.3 Public lavatory faucet water ❑Complies Requirement will be met. [Fl11]3 temperature<=110°F. ❑Does Not ❑Not Observable See the Mechanical Systems list for values for HWH-1. ❑Not Applicable C404.5 All piping in circulating system ❑Complies Requirement will be met. (F12512 insulated ❑Does Not ❑Not Observable See the Mechanical Systems list for values for HWH-1. ❑Not Applicable ---------------------- C404.6 Controls are installed that limit the ❑Complies Requirement will be met. [FI1213 operation of a recirculation pump ❑Does Not installed to maintain temperature of a ❑Not Observable See the Mechanical Systems list for values for HWH-1, storage tank. ❑Not Applicable C403.2.2 HVAC systems and equipment ❑Complies Requirement will be met. (F12713 capacity does not exceed calculated ❑Does Not loads. ❑Not Observable ❑Not Applicable C408.2.1 Commissioning plan developed by ❑Complies Requirement will be met. [FI2811 registered design professional or ❑Does Not approved agency. ❑Not Observable _ ❑Not Applicable _ C408.2.4 Preliminary commissioning report ❑Complies Requirement will be met. (F12911 completed and certified by registered ❑Does Not design professional or approved agency. ❑Not Observable ❑Not Applicable C408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of ❑Does Not [F13011 receipt of certificate of occupancy. []Not Observable ❑Not Applicable _ C408.2.1 HVAC equipment has been tested to ❑Complies Requirement will be met. 1 ensure proper operation. ❑Does Not [FI3111 ❑Not Observable _ ❑Not Applicable C408.2.3. Economizers have been tested to ❑Complies Requirement will be met. 3 ensure proper operation. ❑Does Not [F13211 ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Ulta Store#1044 Report date: 03/03/1 Data Untitled.cck Page 9 of 10 2012 1ECC Final Inspection Complies? Co mmentstAssumptions C406 Efficient HVAC performance,efficient ❑Complies Requirement will be met. [F134)1 lighting system,or on-site supply of ODoes Not renewable energy consistent with ❑Not Observable what is shown the approved plans. Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2} 3 Low Impact(Tier 3) Project Ulta Store#1044 Report 03/03/15 Data Untitled.cck Page 10 of 10 G.C.TO RECEIVE,UNLOAD&INSTALL BID ALTERNATES OWNER SUPPLIED GLASS&ARRAY SHEET - - ----- -- MAR 2 5 2015 TENT REMARKS CITY OF TWIN EAT, G.C.TO PROVIDE COST TO ADD(1)ADD'DONAI BUILDING ING DEPTH^ BU SHELVES&BRACKETS(COORDINATE WITH ELECTRICAL FLOOR FLOOR OUTLET.PRIOR TO FINISH FLOOR COL,'TO OWNER).G.C.TO DISPOSE OF PACKAGING OUTLETS INCLUDE UP TO 10 LINEAL FEE'OF ELECTR CA TRENCHING. MATERIALS.SEE DESCRIPTION OF SHELF ELECTRICAL GC TO PROVIDE COST TO ADD(25)ADDITIONAI + FLOOR OUTLETS,PRIOR TO FINISH FLOOR.COST TO A/ QUANTITIES ON SHEET A-1.1 FLOOR INCLUDE UP TO 10 LINEAL FEET OF ELECTRICAL m R T OUTLETS TRENCHING. A � L L/ E A ■ Y MOISTURE PRODUC PR TO COVERG.C.TO OVIDE COST T HE ENTIRE SALES RESISTANT FLOOR.SUPPLY&INSTALL AN MRB AND A TOP COAT BARRIER OF A CEMENTITIOUS BASED PRODUCT PER (MRB) MANUFACTURER'S INSTRUCTIONS.SMOOTH,FLAT AND READY TO AC 7� �/ ( OAOOOO PAID U O R MAR262015�00� 00 //\\// 9 O o STOR 11 O o J O iWINfALLSfIREDEP�® v v 1ti11/f11 Falls Fire Dept. SITE MAPN O O ODOOO F 0N H 0ON �2�►�OO OOOO SCALE: NONE -I�I� LOCATION- lie THE INTENT OF THE SCOPE CONTAINED WITHIN THESE DOCUMENTS RELATESTOTHE INTERIOR REMODELING 1. IF SIGNIFICANT DISCREPANCIES OR CONFLICTS INTHE DETAILS OR DIMENSION ARISE,OR IF UNFORESEEN n��jp ��nnpp 2 �ja®D2� REVISION v SITE L OCA O IION- /BUILD-OUT OFAMERCANTILE/INTERIOR SPACE CONTAINED WITHIN AN EXISTING SHELL BUILDING THEARCHITEC CONDITIONS IN THE EXISTING BUILDING IMPAIR THE ABILITY TO PERFORM THE WORK AS DESCRIBED APPLICABLE ABL E CODES SHEET SHEET NAME 0O CANYON 1� HAS NOT INSPECTED THE CONDITIONS OR THE INTEGRITY OF THE EXISTING SHELL BUILDING AND SHALL NOT AND/OR DETAILED.THEN REPORT SUCH OCCURRENCES TO THE ARCHITECT BEFORE PROCEEDING. * Q CANYON PARK WEST ASSUME RESPONSIBILITY OR LIABILITY FOR SAME THE RESPONSIBILITY AND LIABILITY FOR THE EXISTING SHELL 2 DO NOT SCALE DRAWINGS-WRITTEN DIMENSIONS TAKE PRECEDENT 9�,g q F�p p a�I R'�jEF� BUILDING CONDITIONS AND INTEGRITY,AND FOR THE CONFORMANCE OF THE EXISTING BUILDING SHELL TO ALL 3. ALL THINGS SHOWN ARE NEW AND PROVIDED BY TENANT GENERAL CONTRACTOR UNLESS OTHERWISE BUILDING: 2012 INTERNATIONAL BUILDING CODE CS-1 COVER SHEET eN PILLIMIOWLS ST. NOTED. ppi�pp FALLS, p p s�s� q APPLICABLE LOCAL CODES AND ENVIRONMENTAL REQUIREMENTS,IS SOLELY THAT OF OTHERS,AND NOT THAT OF q ALL WALL CONSTRUCTION FACING RESTROOM AREAS MUST UTILIZE MOISTURE RESISTANT GYPSUM MECHANICAL-. 2012 INTERNATIONAL MECHANICAL CODE CS-2 RESPONSIBILITY SCHEDULE luul TWIN Ir AL�L�S, ID 8330 a THE ARCHITECT.THE ARCHITECT'S SCOPE OF WORK IS STRICTLY LIMITED SOLELY TO THE INTERIOR BUILD-OUT OF BOARD VENDOR CONTACT INFORMATION&SUBMITTAL �� � PLUMBING 20121NTERNATIONAL PLUMBING CODE uul AN EXISTING INTERIOR SPACE LOCATED WITHIN AN EXISTING SHELL BUILDING. S ALL DOORS TO BE KEYLESS IN DIRECTION OF EGRESS. CS-3 REQUIREMENTS C) ® m 7� I� DEVELOPER- 6. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED: ELECTRICAL. 2014 NATIONAL ELECTRICAL CODE HOT ACCESSIBILITY DETAILS � e LANDLORD DEVELSOPESP- A. 5.0LB.F.(22.2N)FOR INTERIOR DOORS WITHOUT CLOSURES. LIFE SAFETY: 20121NTERNATIONAL FIRE CODE B. 15 L.B.F.(67N)FOR ALL OTHER DOORS. A-0.1 SITE PLAN-FOR REFERENCE ONLY vD® � �L CANYON PARK DEVELOPMENT, LLB SCOPE OF WORK STATEMENT 7. DOORS INDICATED AS PART OF THE REQUIRED MEANS OF EGRESS SHALL HAVE HARDWARE WHICH IS ACCESSIBILITY: ICC Al 17.1-2009 BOX g p ryq 5�p�g FALLS, Q� READILY OPERABLE FROM THE EGRESS SIDE WITHOUT THE USE OF A KEY,SPECIAL KNOWLEDGE OR A-1.0 MERCHANDISE&EGRESS PLAN U < pO� �Pa,®, LOJAa®/�daaS�aY'U7G7p IUC9M�N Ir2NVI�IISo I® ®33®3 SCALE, NONE 8. ALL WALL&CEILING FINISHES TO BE CLASS B OR BETTER,FLAME SPREAD 26-75 WITH MAXIMUM SMOKE ENERGY CONSERVATION: 20121NTERNATIONAL ENERGY CONSERVATION CODE A_IA FIXTURE PLAN&SPECIFICATIONS Q Ufy Luu CONTACT- TINA F. LUPER DEVELOPED OF 450. - Pn n®N�e R�®®n �y��_®��� A. AREA ETC. ETCETERA P.C.C. PRE CASTg. ALL INTERIOR TRIM TO BE CLASS C,FLAME SPREAD 76-200 WITH MAXIMUM SMOKE DEVELOPED OF 450. OCCUPANCY LOAD CALCULATIONS A-2,0 DIMENSION PLAN,DETAILS B'NALL TYPES Q If'l 4 ®Y 6 ® A.B. ANCHOR BOLT EXIST. EXISTING CONCRETE i0, FLOOR COVERINGS TO HAVE AFLAME SPREAD RATING NOT TO EXCEED 75. 3 � L� 0 FAX- �F Amp®®n �������� RE A.C.I. AMERICAN EXP. EXPANSION PH.BID PHONE BOARD 11 ALL COMBUSTIBLE INTERIOR FINISH&TRIM ITEMS ARE TO BE APPLIED DIRECTLY TO A NON-COMBUSTIBLE GROSS AREA: 9,930 S.F. A-2.1 ENLARGED SALON PLAN G) Ir A YS ®Y _ CONCRETE EXPOSED PKG. PARKING BASE. MERCANTILE AREA: 9,020 SQ.FT./30 SO.FT.PER PERSON= 301 EMAIL. n INSTITUTE EXT. EXTERIOR PI.. PLATE A-2.2 STUD FRAMING AND WALL BLOCKING DETAILS Lsum AIL. Una.IM er8ne I enco.com ACQUIT. ACOUSTICAL FD. FLOORGRAIN PL. PLASTIC LAMINATE 12. PROVIDE FIRE EXTINGUISHERS AS REQUIRED PER APPLICABLE CODES AND COORDINATE EXACT P FDN. FOUNDATION LOCATION WITH FIRE MARSHAL. OFFICE 69 SOFT.1100 SOFT.PER PERSON= 1 A OA. AMERICANS WITH PLMB. PLUMBING � A-2.3 DOORB HARDWARE SCHEDULES DISABILITIES ACT FE. FIREEXTINGUISHER FILM PLYWOOD 13. PROVIDE AND INSTALL OCCUPANCY SIGN IN A CONSPICUOUS LOCATION IN ACCORDANCE WITH STAGING AREA. 596 SO.FT./300 SOFT.PER PERSON= 2 gp2npn�p5�- ADH. ADHESIVE F.E. FINISHEDEND PHIL. PANEL STATE&LOCAL CODES. ---- _ A-3.1 REFLECTED CEILING PLAN&DETAILS TENANT-VV//NN00��I100 ADJ. ADJACENT FIN. FINISH P'0 s. POINT OF 14. ALL EXTERIOR WORK AND BUILDING SHELL WORK,INCLUDING THE STRUCTURAL INTEGRITY OF TOTAL OCCUPANCY: 304 ERSONS_ ENLARGED SALON REFLECTED CET;iNG PLANB A-3.2 ULTA pp T� A.F.F. ABOVE FIxT FIXTURE SALE EXTERIOR WALLS,AND ROOF,AND ITS ABILITY TO SUPPORT THE TENANTS AWNING AND/OR SIGNAGE BUILDING p I�p�e L�F� T�I� IC�p DETAILS ULS FINISHEDFLOOR FUR. FLOOR PR. PAIR OR ANY OTHER ELEMENTS,IS THE RESPONSIBILITY OF THE LANDLORD.ALL OF THE WORK SHALL BE La]«,J/016 D��pul�J I1�7�r QQ�Q�}I�cl �r p�+T� A41 FLOORFINISHPLM'.I !CHSCHEDULE& 11�� ARBOR D�OpnF� ARC AUTHOaITVHAwNG FJi.P. FORCEDFIBERGL PLAYS PREP. PREPARAnow HANDLED UNDER SEPARATE PERMIT AND ITS NOT A PART OF THESE PERMIT DRAWINGS.THIS SHALL CTICATIONS aT /NIF-O L� Inl DRIVE ALTERJURISINATE FORCED rK; POUNDSD INCLUDE VERIFICATION OF ANY EXISTING CONDITIONS AND BUILDING STRUCTURE THAT IS A PART DESCRIPTION CODE SECTION REQUIREMENTS A-6.1 INTERIOR ELEVATIONS Ifil®I&611ZOVI LIZF IL 80448 ALT. ALTERNATE FT. FOTING P.S.F. POUNDS PER Ifll II�IJLS V LS LS `V`U AL.IALUM. ALUMINUM CA FOOTING SOUNDS FOOT LA THE LANDLORD'S WORK AS DESCRIBED IN THE LEASE AGREEMENT BETWEEN ULTA AND USE GROUP: IBC CHAPTER 3,SECTION 309 M ERCANTILE) A-6.2 INTERIOR ELEVATIONS CONTACT- SC OTT DOWNER AMP AMPERE GA GENERAL CO PSI POUNDS PER LANDLORD. E CONTACT-W�9 0 �d B'�'OVLSIFII ANOo. ANODIZED G.C. GENERAL CONTRACTOR SQUARE INCH 15. SIGNAGE AS SHOWN IN THESE DRAWINGS IS SCHEMATIC ONLY FOR ILLUSTRATION PURPOSES AND NUMBER OF STORIES 1 A-6.3 INTERIOR ELEVATIONS FnIM®Ia02a ArL®9®D a9�B$_�/941 V,I AIN ST AMERICAN GALV. GALVANIZED PT_ PARDPOINT DOES NOT IMPLY OR DESCRIBE ANY MEANS METHODS,OR DETAILS PERTAINING TO INSTALLATION PHONE. 4YYa71 6� 4.Y 4L 24 NATIONAL GD. GRADE PVC. POLYVINYL OF THE AWNING OR SIGNAGE.IT SHALL BE SOLELY THE SIGN CONTRACTOR'S RESPONSIBILITY TO CONSTRUCTION TYPE: ISO TABLE 601 TYPE II-BI ISTING NO CHANGE) q-7.1 EXTERIOR ELEVATION 2_IA bl�p IL- �,dl®����.®Q.IIU�1 ®� STANDARDS IS, GLASS CHLORIDE DESIGN FABRICATE,AND INSTALL THE SIGN UNDER SEPARATE PERMIT.ANY AND ALL STRUCTURAL FIRE SPRINKLERS: IBC SECTIONS 506.3,507.3 FULLY SPRINKLERED ---LS IIVNII 0.11 U INSTITUTE GYP GYPSUM PvmT. PAVEMENT CONSIDERATIONS SHALL BE COORDINATED BETWEEN THE SIGNAGE CONTRACTOR,LANDLORD,AND A-8.1 CONSTRUCTION DETAILS U APE OX. APPROXIMATE H. HIGH OTY. ouANTNv HIS DESIGN PROFESSIONALS.THE AWNING/SIGN CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TENANT AREA: IBC SECTION 507.3 9,9305.F.AREA OF WORK - - - -- 1� IL�I I� ANcn. ARCHREcv Hc. HANDICAP RA. RADIUS AIR DESCRIBING THE AWNING/SIGNAGE DESIGN INCLUDING FINISHES,COLORS AND DESIGN DIMENSIONS A43.2 CONSTRUCTION DETAILS ARCHITECTS- AMER ACCESSIBLE RIRAD. RADIUS OCCUPANT LOAD: 304 PERSONS - IL�I 1a� 2�7 ARCHITECTURE 2r� f�2 A.STM. AMERICAN SOCIETY H.c. HOLLOW CORE R.D. ROOF DRAIN TO THE OWNER FOR DESIGN INTENT REVIEW ONLY PRIOR TO AWNING/SIGN FABRICATION. A-8.3 CONSTRUCTION DETAILS CHIPIMAN DESIGN A RCHITECTUPL FOR TESTING HD HIGH DENSITY RECPT RECEPTACLE 16. SPRINKLER WORK WHERE NEW OR WHERE MODIFICATIONS TO EXISTING SYSTEMS ARE REQUIRED BY NUMBER OF EXITS: BC TABLE 101&1 2 REQUIRED v�9 p p M RIVER I� p p 2 MATERIALS HI HEADER REINF REINFORCING CODE OR CONSTRUCTION CONDITIONS SHALL BE SUBMITTED UNDER SEPARATE PERMIT BY A 2 PROVIDED 6tl®® S`®16YTW W�VLSW ROAD, SL4d�TLS ®® AVG. AVERAGE HOW. HARDWARE REOD. REQUIRED LICENSED SPRINKLER CONTRACTOR.TIE SPRINKLER&FIRE ALARM INTO BASE BUILDING FIRE - --- 81 BOTTOM OF HOWO. HARDWOOD RM. ROOM PROTECTION SYSTEM. EXIT WIDTH: 63"REQUIRED F-1.1A PERIMETER FIXTURE DETAILS DES PLAINES, ILLINOIS 60018 BD. BOARD N.o, HOLLOW METAL Ro. ROUGH OPENING17. GC.TO INSURE THAT PROPER ENVIRONMENTAL CONDITIONS ARE MET FOR THE INSTALLATION OF BC TABLE 1005.1 12"PROVIDED BEY. BEVERAGE H.O. HIGH OUTPUT aR. RESTRDOM F11B PE RIME TER FIXTURE DETAILS AND FIXTURE CONTACT- JUAN CASTILLO 6FP, BUILDING H.P. HORIZONTAL 'AN RONITATOPRY Nil 8. REFEALL R FIXTURE MANUAL FOR INFORMATION ON ALL FIXTURES.R FINISHES, MAX TRAVEL DIST: BC TABLE 70161 250-FT MA% ELEVATIONS BFP. BACK PREVENTION N.P. HIGH POINT SAN. SANITARY PHONE- Q���D ���_��®® PREVENTOR H.RC HEATING& Sc sOLIDCORE 9. NO ELEMENTS ARE TO BE ATTACHED TO OR SUPPORTED FROM THE ROOF DECK OR BOTTOM CHORD REQUIRED PLUMBING FIXTURES &K. BLACK REFRIGERATION ECHO. SCHEDULE OF ROOF JOISTS. SP-1 SPECIFICATIONS FAX,, (847) 298-8988 BLK'G. BLOCKING CONTRACTORS) SECT SECTION 20. GC.SHALL NOT USE GAS POWERED CONSTRUCTION EQUIPMENT MALE FEMALE _._._ ___- Revisions 22 n AI m I� eaG. BEARING HT. HEIGHT SERv. SERVICE 21, VERIFY ALL EXISTING CONDITIONS PRIOR TO ANY CONSTRUCTION OR FABRICATION.IF DIFFERENT LAVATORIES: 1 REQUIRED 1 REQUIRED SP-2 SPECIFICATIONS ISSUE FOR CLIENTILL RE ES-uVu/NIL' D�'�1�{��II®®�uu�I7"g���j�®�������� ®� BRKT. BRACKET H.v.A.C. HEATING, sEv. SEVER THAN SHOWN,NOTIFY ENGINEER/ARCHITECT IMMEDIATELY FOR MODIFICATION OF DRAWINGS. IBC TABLE 2902.1 - -- -- �03106/15 V' BTM. BOTTOM VENTILATION.AIR SF. STOREFRONT SP-3 SPECIFICATIONS SIN. BETWEEN CONDITIONING sHT. SHEET 22. ALL CONTRACTORS ARE REQUIRED TO COORDINATE THEIR WORK WITH ALL DISCIPLINES TO AVOID - 1 PROVIDED 1 PROVIDED _ ISSUE FOR BIDIPERMIT MECHANICAL �a/� ry p pM AII� CAB. CABINET HZ. HERTZ ESimNT SIMILAR CONFLICTS.ALL STRUCTURAL,MECHANICAL ELECTRICAL AND PLUMBING ASPECTS ARE NOT IN THE TOILETS. iREQUIRED iREOUIRED SP-0 SPECIFICATIONS �03106/15 OUVa E�oSnnWnANICAL22& PLUMBING- C.F.M. CUBICFEET I.G. ISOLATEDGROUND S.J. SAWCUT JOINT SCOPE OF THESE DRAWINGS.THEREFORE ALL REQUIRED MATERIALS AND WORK MAY NOT BE IBC TABLE 2902.1 VINYL FLOOR TILE PREP.INSTALLAT REVISION PER CITY WOW ENGINEERS,S, INC.`bo PER MINUTE IN. IN HIES SIM sMAIL INDICATED.IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THESE DRAWINGS WITH ALL 1PROVIDED 1PROVIDED SP-5 YIRNAND 03/25115 C.G.F. COMPACTED INCL. INCLUDEIED SPECS. SPECIFICATIONS OTHER CONSTRUCTION DOCUMENTS.LOCATIONS.SIZES AND NUMBERS OF ALL OPENINGS MAY NOT ADHESIVE SPECIFICATION �ofo�2l� f�pp2 DRINKING FOUNTAIN: 1REQUIRED ��® V�WLSLSL DRIVE GRANULAR FILL INFO. INFORMATION /PRINK. SPRINKLERS BE COMPLETELY INDICATED IN THE ARCHITECTURAL DRAWINGS.THE RESPECTIVE CONTRACTOR IBC TABLE 2902.1 C.J. CONTROLJOINT TIC INSTALLATION/ so SQUARE SHALL VERIFY THEIR WORK WITH ALL OTHER DISCIPLINES. 1PROVIDED IHI-LO) MECHANICAL REFLECTED CEILING PLAN,NOTES, Q c.L. CENTERLINE INSTALLED SO.FT. IQUARE FEET 23, THE CONTRACT DOCUMENTS DO NOT INDICATE THE METHOD OF CONSTRUCTION.THE CONTRACTOR - M-1 AND SYMBOLS WOOD DALE, IL 80191 CEILING INSUL INSULATION SS.s:s STAINLESS STEEL SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SERVICE SINK: BC TABLE 29021 REQUIRED � M-2 ENLARGED REFLECTED CEILING PI AN Q CONTACT- /��0 M f� Fo�2F�,p�2Im CLOS. CLOSET INS. INTERIOR STD. STANDARD SUCH MEASURES SHALL INCLUDE,BUT NOT LIMITED 10,BRACING.SHORING,UNDERPINNING,ETC. 1 PROVIDED &4®NT/NCTe D�VI® W®WNSIJ LSIf 1j�lLS ll lj CUR, CLEAR J-Box JUNCTION BOX sn. STEEL ARCHITECT IS NOT RESPONSIBLE FOR THE CONTRACTOR'S MEANS.METHODS,TECHNIQUES, - M-3 MECHANICAL SCHEDULES AND DETAILS Q MM II�� A p ®® C.M.U. MASONRY JST. JOIST STN. STATION SEQUENCES OR SAFETY PROCEDURES DURING CONSTRUCTION. ----PHONE- QS�®D ���-®®®® MASONRY UNIT JS. JOINT STRUCi. $TRUCSUREIAL M-0 MECHANICAL SPECIFICATIONS --- PAX- (830) 6EPS-8818 CCOUNTER K.S.I KIPS PER SO IN SUPPL SDEFENDED -_ _ E-MAIL. ,,�I ,,�I E,, 1E�� CQ. QOMPANY LAM. GAM/"ATE SUSP. IDIPE"QED GENERAL NOTES CODE& BUILDING SUMMARY M-5 MECHANICAL SPECIFICATIONS E /MA LL1 ave d1.horPOesbargergwcweilrg� nealrs.c®m Co.OL COLUMN LAY. LAVATORY TI Top OF -,_- GONG. CONCRETE LAW LAVATO POUNDSFORCE To THROUGHBOLT COND. CONDUIT LBS. POUNDS TO TOP&BOFT0 4L'- NONE SCALE'. NONE CONN. CONNECTION L.F. LINEAL FOOT i8G TONGUE BGROOVE ---- --- P-1 PLUMBING PLANS AND NOTES ELECTELECTRICAL, TL�'�(�/� CONSTR. CONSTRUCTION EGG. LNNDLOftD'S TEMP. TEMPERED SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION - fRICAL- CONS. CONTINUOUS GENERAL CONTRACTOR TGC TENANT _ 0 P-2 SANITARY ISOMETRIC DICKERS I�ENGINEERING ape INC. CONTR. CONTRACTOR L.P. LOWPOINT GENERAL SECTION ELEVATION WALL TYPE -��-- -- U25I15 ®DICKERSON��,9ENp pNI3�IIIN�IEERIIC CORP. CORPORATE LL LANDLORD CONTRACTOR TAG-SEE TAG LEE O TAG-SEE qG0 � P-3 WATER ISOMETRIC II Lr-. ®1®1 N. /MIL�"9 W�UWI515 AVEVIS CT. CERAMICTILE MA. MILLIAMPERE THIN THROUGH X - ____--__..__- DWG,AS DWG As x-X WALLS Q AR wrecT CS.I. CONSTRUCTION MATL. MATERIAL ivP. TYPICAL Xx Xx /� P-0 PLUMBING SCHEDULES AND SPECIFICATIONS NILES �I SPECIFICATION MAX. MAXIMUM U.L. UNDERWRITERS NOTED NOTED LEGEND ES IL. (50714 INSTITUTE MECH. MECHANICAL LABORATORIES � 1 ' � P-5 PLUMBING DETAILS CONTACT. AUGUST p TL�II�I� /� T��7 CU. CUBIC MFGI MANUFACTURER UNO. UNLESS NOTED \\ i -'-- -- ---- CONTACTs AUGUST HERNANDE CUST, CUSTOMER MANUF. OTHERWISE PO \ P-6 PLUMBING SPECIFICATIONS rFliM®IA fl2- q®A9A RArI��_®��® D. DEPTH MIN. MINIMUM UV. ULTRAVIOLET - -- '- - --- ------- PH �VLLSS '(847) a9 KY DETAIL FINISH ihG- ROOM JOIINn. OBE. DOUBLE MISC. MISCELLANEOUS V. VOLT X P-7 PLUMBING SPECIFICATIONS BTA I I NO DIN. DIAMETER M0. MASONRY OPENING VC. VOLUME CONTROL X NOTED XX SEE FINISH NUMBER -_STOREb EO-1 SYMBOL LIST FAX (847) 988-0294 DEG. DEGREES MM. MILLIMETER B VAPOR BARRIER X- ROOM _ FAX-dd�®a 4 Y SS DWG.AS LEGEND TAG EMAIL. I�,, �I ��1I DIM. DIMENSION M.R. MOISTURE VCT. VINYL COMPO- ,ONE LINE DIAGRAM LIGHTING LSOFY AIL. augLhernandez deI -pe.c®m DISC. DISCONNECT RESISTANT SITION TILE ULTA - SYMBOL LE DN. DOWN MSRV. MASONRY V.I.F. VERIFY IN FIELD -_ EREBYCERNI-AT-HFSEP-HAVE DR. DOOR MTD. MOUNTED V.P. VENT PIPE EO-2 PANEL SCHEDULES RA sou ANor AT -_.. .__..... IiF SAME wNPIYw C�UILDIN� DEPARTMENT- DTL DETAIL MITI METAL VERT VERTICAL ELEVATION DOOR TAG- REVISION E-03 ROOF PLAN-POWER,DETAILSBARCH LIGHTING EuµsoFrwNr II �g DWG. DRAWING NIA NOT APPLICABLE W. WIDE �- BENCHMARK SEE HARDWARE 7qG �• ELEVATIONS esu leN CITY OFF TWIN FALLS /\p p S OWLS. DOWELS N.IC NOTINCONTRACT W:C WITHIWITHOU O SCHEDULE Q El-i FLOORPLAN-LIGHTING �8 Ir @N9 II`YI Ir/7�1 LEIS EA. EACH NOM. NOMINAL W.B. WALL BALE a'�EI CONT/Y TI, 32 E /NSEN ST. EIFS EXTERIOR N.FS, NUMBER WBG COWHIT E 80TACT b � E2-1 FLOOR PLAN-ELECTRICAL DIMENSIONS @9 OCI /N Vv °V II-ll/NOV LSOV INSULATION N.T.S. NOT TO SCALE CONTRACTOR AacH r[cT TWINTWINf�G°aLLS ID �sy ay®1 FINISH SYSTEM CA OVERALL WC WATER CLOSET E2-2 FLOOR PLAN-POWER DrawnB N FALLS, iid�3 ELECT ELECTS DIAL O.C. ON CENTER WD. WOOD ------- ----- ----- -- - qM _ y Chetke EJI F� ✓� 9 g 9q� ELECT. OD. OUTSIDE DIAMETER Wow. WINDOW 9' CW PHONES- (208) 035- 238 KEY NOTE y E3-i FLOOR PLAN WIRING ELEV.IEL. ELEVATION DE OPPOSITE HAND W.M. WATER HEATER X RESTROOM k -- ------- S.,B Dsw �/SnL�X 1( I� EMPL. EMPLOYEE OPT, OPENING WK. WORK E3-2 FLO SECURITY ""^^- `�®�� ��"_���� ENG. ENGINEERIED OPT. OPTIONAL WP. WATERPROOF ACCESSORIES b _- NONE 03106'15 4lAAfZ F�SIT2- h..(yb Ny-//���p/iO.Jly®��/ E0. EQUAL OPP, OPPOSITE WT. WEIGHT E4-1 BILE CAL L'I�ATIC1N'Y'have Job No. �w CCgq LESS LL LESS OOUIS V' UO 8L EQUIP. EQUIPMENT PC. PERSONAL WW.F. WELDED WIRE I�®VR��I 7FIeld and a"TW [I(1 e(� a COMPUTER FABRIC V_N5J{ (NUJ O SUreCtPROJECT CONTACTS ABBREVIATIONS SYMBOLLEGEND AREA MAP DRAWING INDEX Tnspection sneel No. SCALE. NONE SCALE. NONE SCALE: NO SCALE SCALE. NONE S„ALE NONE ° C e Date - DIVISION OF WORK DOES EXIST LANDLORD/LGC ULTA GC ULTA DOES EXIST LANDLORDILGC ULTA GC ULTA DOES EXIST LANDLORD/LGC ULTA GC ULTA <FZ;' DESCRIPTION NOT To REMARKS DESCRIPTION NOT TO REMARKS DESCRIPTION NOT To REMARKS ` APPLY REMAIN 'URN F-BT FURN NSTALL FURN NSTALL APPLY REMAIN ,URN NSTALL FURN VISTA L FURN NSTALL APPLY REMAIN FURN INSTALL FURN NET. Fl RN VISTA I �m DIVISION 1 GENERAL REQUIREMENTS DIVISION 9 FINISHES DIVISION 15 MECHANICAL AS APPLICABLE SEE GENERAL NOTES ROOF TOP UNITSI HVAC EQUIPMENT SEE MECH DRAWINGS BNOTES INCLUDES GAS PIPING.ALSO,SEE SEE A-2.0 AND REFERENCE LANDLORD SHELL DRAWINGS.DETERMINE LANDLORD SHELL DRAWINGS FOR REFERENCE ONLY. DIVISION 2 SITE WORK FINISH CONDITION FROM LANDLORDS WORK.G.C.TO PROVIDE FIRE SAFING ROOF DRAINAGE SEE MECH DRAWNGSBNOTES.ALSO,SEE LANDLORD SHELL DRAWINGS DEMISING PARTITION TO MAINTAIN READ.FIRE RATING.G.C.TO CONFIRM REQUIREMENTS WITH FOR REFERENCE ONLY. SLAB CUTS AS REQUIRED AND NOTED.SEE TRENCHING DETAIL61A3.3. LOCAL FIRE MARSHAUNSPECTOR REPAIR DEMISING PARTITION AFTER CONDENSATE DRAINAGE SEE MECH DRAWINGS FOR LOCATIONS B NOTES.ALSO,SEE LANDLORD REMOVAL OF EXISTING GYP.BD.FOR IN WALL BLOCKING INSTALLATION. INSTALLING BLOCKING TO MAINTAIN READ.FIRE RATING, SHELL DRAWINGS FOR REFERENCE ONLY. DEMOLITION WORK LANDLORD PROVIDING DEMOLITION OF ALL EXISTING TENANT ITEMS NOT SEE MECH DRAWINGS FOR LOCATIONS B NOTES.ALSO,SEE LANDLORD BEING REUSED BY ULTA,REFER TO LANDLORD SHELL DRAWINGS FOR SEE LANDLORD DRAWINGS FOR REFERENCE ONLY.SEE ALSO A20.GC, HVAC DISTRIBUTION SHELL DRAWINGS FOR REFERENCE ONLY.LANDLORD PROVIDING METAL TO REMOVE EXISTING GYP.ED.AS REFERENCE. METAL STUD AND GYP BD FURRING ON MASONRY DUCT DROPS FOR TENANT CONNECTION. SITE WORK WA PERIMETERWALLS • • MILLWORK BLOCKING AND REPLACE GYP.BD, D TO PROVIDE IN WALLFOR WASHER DRYER VENTS SEE MECH DRAWINGS SHELL NGS FO REFERENCEO ONLY. UGC. METAL STUDIGYP GO(INTERIOR PARTITION WALLS) SEE X2.0 SEEALS L SEE LANDLORD DRAW DRAWINGS FOR REF R EN REFERENCE ONLY. DIVISION 3 CONCRETE VENT AD RHEA TER INTAKE AND EXHAUST,6'TYPEB SEE LANDLORD SHELL DRAWINGS FOR REFERENCE ONLY. FURRED GYP SO ON MASONRY WALLS'CONCRETE ONE IT R ROOF PENETRATION. LANDLORD PROVIDED 4-CONCRETE STAB ON GRADE WITH BX6W2.9XW2.9 � � AS REQUIRED ONE 10'ROUND DUCT WITH ROOF CAP MODEL (429)MESH OVER COMPACTED GRANULAR FILL.THE SLAB SHALL BE LEVEL ACOUSTICAL TILE CEILING SEE SIT A3.I FOR LOCATIONS&NOTES.PROVIDE(1)CASE OF ACT FOR GREENHECKIIGRS 10 AND 10'DIAMETER EXHAUST VENT SEE LANDLORD SHELL DRAWINGS FOR REFERENCE ONLY. TOWRHIN US INCH TOLERANCE IN 10 FEET,SMOOTH,AND READY TO ATTIC STOCK. WITH GOOSE NECK TERMINATION. AOCEPTTENANTS INTERIOR FLOOR FINISHES.SEE ENGINEERING SHEETS PORCELAINTILE SEE FINISH SCHEDULE FOR LOCATIONS ROOF MOUNTED EXHAUST FAN SEE LANDLORD SHELL DRAWINGS FOR REFERENCE ONLY. CONCRETE SLAB AND ADDITIONAL DETAILS FOR UNDER-SLAB DISTRIBUTION PROVIDED BY G.C.UNDER THIS PERMIT. SEE FINISH PLAN It SCHEDULE FOR LOCATIONS.PROVIDE REMAINING VT-3 SEE PLUMBING DRAWINGS FOR LOCATIONS&NOTES.ALSO,SEE VINYL STRIP FLOOR TILE,VT-3 (NO GLUE ON BACK)FOR ATTIC STOCK.G.C.TO PROVIDE 3YEARS LANDLORD DRAWINGS FOR REFERENCE.LANDLORD TO PROVIDE 2'WATER ULTAGC.PROVIDING NEW SLAB AT TRENCH AREAS.SEETRENCHING INSTALLATION WARRANTY.SEE SHOP DRAWING SUBMITTAL TESTING B WATER SUPPLY STUB IN TO SPACE SERVICE STUBBED AT REAR OF THE SPACETIGHT TO STRUCTURE WITH 50 DETAIL61A3.3.D.C.TO MAKE SLAB LEVEL,SMOOTH,SEALED AND READY INSPECTION REQUIREMENTS THIS SHEET. TO60 GPM(90GPM MAX)FLOW,BACK FLOW PREVENTER AND WATER TOACCEPT INTERIOR FLOOR FINISHES. VINYL FLOOR TILE FORATIIC STOCK,VT-0ANDVi-5 SEE FINISH 5CHEDULE FOR LOCATIONS.PROVIDE REMAINING VINYL TILE METER THAT WILL BE LOCATED IN MANHOLE ON SITE. ,pn CONCRETE PAD AT WATER HEATER SEE PLUMBING DRAWINGS WALL BASE(ALL PERIMETER WALL FIXTURES) SEE SCHEDULE FOR LOCATIONS.PROVIDE REMAINING WALL BASE WATER SUPPLY DISTRIBUTION SEE PLUMBING DRAWINGS FOR LOCATIONS&NOTES Q VD FORAT71C S70CK SEE PLUMBING DRAWINGS FOR LOCATIONS B NOTES.ALSQSEE tt CONCRETE RECEIVING PADILOADING DOCK REFERENCE LANDLORD SHELL DRAWINGS, WALL BASE IALLWALLSAND COLUMNS) PROMMEIN LANDLORD SHELL DRAWINGS FOR REFERENCE.LANDLORD TO PROVIDE4" GLUE ON BACK FOR ATTIC STOCK SANITARY STUB IN TO SPACE SANITARY SEWER LINE AT REAR OF SPACE,THE INVERT SHALL BE NO ZF7 DIVISION 4 MASONRY FLOOR TRANSITION STRIPS SEE FINISH SCHEDULE FOR LOCATIONS HIGHER THAN 43'BELOW FINISHED FLOOR. m MASONRY WALL SEE IANDLORD DRAWINGS FOR REFERENCE ONLY SANITARY ROOF VENTS LL TO PROVIDE TWO SANITARY ROOF VENTS IN WHICH G.C.IS TO CONNECT g WALL COVERING VINYL SEE FINISH SCHEDULE FOR LOCATIONS T0,SEE LANDLORD DRAWINGS FOR REFERENCE. DIVISION 5 METALS PAINTING EXTERIOR FACADE SEE LANDLORD DRAWINGS FOR REFERENCE ONLY SEE PLUMBING DRAWINGS FOR LOCATIONS B NOTES.B.C.TO PROVIDE Lu J.MANAGER WITH ROD AND VIDEO SCOPE OF SEWER LINES TO CC CO SEE LANDLORD SHELL DRAWINGS FOR REFERENCE ONLY REGARDING THE SEE ELEVATIONS FOR LOCATIONS.PROVIDE(1)FULL GALLON OF EACH SANITARY SEWER ROUGH-INS FOR PLUMBING FIXTURES LANDLORD'S MAIN PRIOR TO CONSTRUCTION START B TURNING SPACE � ��—/iG SHELL BUILDING STRUCTURAL SYSTEMS. PAINTING OF INTERIOR GYP BOARD AT STOREFRONT 0 0 COLOR FOR ATTIC STOCK. OVERTOULTA.COPY OF VIDEO TO BE PROVIDED TO PROJ.MANAGER AT 6 /�— STRUCTURALFRAMINGSYSTEMS ULTA G,C.TO PROVIDE STRUCTURAL FRAMING SYSTEM AT MANAGERS • • SEE ELEVATIONS FOR LOCATIONS.PROVIDE(1)FULL GALLON OF EACH TIME OF PUNCH LIST. 2 PAINTING INTERIOR PARTITIONS OFFICE. COLOR FOR ATTIC STOCK. SEE PLUMBING DRAWINGS FOR LOCATIONS 8 NOTES PLUMBING FIXTURE FSTEEL ABRICINTELS,H-FRAMES,RTUCURBS,MISC. SEE GENERAL NOTES ON SHEET CS-1.SEE LANDLORD DRAWINGS FOR CSEE OLOR ELEVATIONS FOR LOCATIONS.PROVIDE(i)FULL GALLON OF EACH TOILET,URINAL,ELEC.WATER COOLER a LL Ns PAINTING INTERIORDDORS&FAAMESIWINOOW FRAMES 0 0 SCHEDULE Q � a FABRICATION REFERENCE ONLY. COLOR FOR ATTIC STOCK. SEE PLUMBING DRAWINGS FOR LOCATIONS PLUMBING FIXTURE ��ln1 RESTROOM SINKS � � I� � �d PERIMETER WALL FIXTURES SEE ELEVATIONS FOR LOCATIONS SCHEDULE. REINFORCEMENT FOR HVAC EQUIPMENT SEE LANDLORD DRAWINGS FOR REFERENCE ONLY SEE PLUMBING DRAWINGS FOR LOCATIONS B NOTES PLUMBING FIXTURE r�r� FRP PANELS MOP SEE ELEVATIONS FOR LOCATIONS SINKS IN MILLWORK SCHEDULE. W ILA DIVISION 6 WOODS&PLASTIC SEE PLUMBING DRAWINGS FOR LOCATIONS&NOTES.ALSO,SEE ROUGH CARPENTRY AS APPLICABLE TO EACH CONTRACTORS SCOPE OF WORK WINDOW SHADES 0 0 GAS LINE STUB IN FORWH LANDLORD SHELL DRAWINGS FOR REFERENCE.LANDLORD TO PROVIDE APPROPRIATELY SIZED LOW PRESSURE GAS LINE STUB INTO SPACE FOR FINISH CARPENTRY AS APPLICABLE TO EACH CONTRACTIXOS SCOPE OF WORN( METAL PANELS AT INTERIOR STOREFRONT WATER HEATER.G.C.TO VERIFY LOCATION OF INCOMING STUB IN FIELD. =Vomm SEE LANDLORD SHELL DRAWINGS FOR REFERENCE LANLDORDTO MILLWORK DIVISION 10 MISCELLANEOUS SPECIALTIES PROVIDE FULLY FUNCTIONING UNITS CONNECTED TOTHE GAS PNO �d Botl. ELECTRIC SERVICE AND OPERATIONAL AND POWERED UP AS OF THE �V& CL-; RESTROOM TRIM AND MOLDINGS TOILET ROOM ACCESSORIES SEE A-6.3 DETAILS FOR LOCATION&SCHEDULE UTILITIES TO ROOF TOP UNITS PREMISES DELIVERY DATE,THE LANDLORD SHALL COORDINATE AND Qj Q»=^ TOILET ROOM MIRRORS SEE AILS DETAILS FOR LOCATION&SCHEDULE SCHEDULE R FACTORY START-0P INATEFOR EACH CTORY STARTNIT THE - WALL BLOCKING � � SEE NOTES ON SHEET A-1,18A-2U APPLICABLE TIME.GC.TO COORDINATE FACTORY START UP SCHEDULE �Uo_ Na W BLOCKI INSTALLATION. NG FOR PERIMETER FIXTURES WITH LANDLORD IF REQUIRED AFTER COMPLETED DUCTWORK TURES INSALES SALON STATION MIRRORS C AREA FOR SURFACE MOUNTED CLEATS SEE SHEET A-2.0 �a•ma LANDLORD PROVIDING 3W EXTERIOR GRADE PLYWOOD BLOCKING AT EXTERIOR SIGNS FOR FULL SCOPE OF WORK REFER TO A-7.1&El-1 GAS'ELECTRIC WATER HEATER E u'_�tl FRONT AND SIDE EXTEROR WALL SIGNS. INTERIOR ILLUMINATED SIGN BOX FURNISHED BY ULTA VENDOR(KIEFFER WALL BLOCKING FOR EXTERIOR WALL SIGNS ULTA G.C.TO VERIFY WITH KIEFFER IF LOCATION OF PLYWOOD IS INTERIOR ILLUMINATED SIGN SOX SIGNS),INSTALLED BY LANDLORD G.C.,FINAL ELECTRICAL WIRING AND SHAMPOO SINKS SUFFICIENT,IF NOT,ULTA G.C.TO PROVIDE ADDITIONAL BLOCKING AS CIRCUITING BY ULTA G.C. LANDLORD ELL PROVIDE BUILDING WITH COMPLETE AUTOMATIC FIRE REQUIRED. U CASH COUNTEWRECEPIICN DESK � � SCRIBE TOE KICK BASE TO FLOOR SPRINKLER SYSTEM THROUGHOUT TIGHT TO THE UNDERSIDE OF THE DIVISION 7 THERMAL&MOISTURE CONTROL SPRINKLER MAIN&SPRINKLER SYSTEM ROOF STRUCTURE MIN 15 AFF AND TURNED UP HEADS AT THE TIME OF SALES AREA FIXTURES LANDLORD TURNOVER G.C.TO PREPARE SPRINKLER SYSTEM DRAWINGS ROOF INSULATION SEE LANDLORD DRAWINGS FOR REFERENCE ONLY AND SUBMIT FOR SEPARATE PERMIT AS REQUIRED FOR MODIFICATION TO INTERIOR SIGNAGE&GRAPHICS(NON ILLUMINATED) � � � SYSTEM TO ACCOMMODATE INTERIOR TENANT LAYOUT. ROOF ACCESS AND LADDER LANDLORD PROVIDING ROOF ACCESS IN LANDLORD COMMON UTILITY PER LOCAL REQUIREMENTS.G.C.TO PREPARE SPRINKLER SYSTEM ROOM.FIELD VERIFY LOCATION WITH ONSITE MALL MANAGEMENT. INTERIOR SIGNAGE(ILLUMINATED) REWORK OF SPRINKLER SYS INCL DESIGN,HEADS It DRAWINGS AND SUBMIT FOR SEPARATE PERMIT AS REQUIRED FOR INSULATION IN WALLS EXTERIOR PERIMETER WALLS AND � SEE LANDLORD DRAWINGS FOR REFERENCE ONLY • • ACCESSORIES MODIFICATION TO SYSTEM TO ACCOMMODATE INTERIOR TENANT LAYOUT. OEMSIING WALLS RECEIVING ROOM SHELVING,UPRIGHTS AND BRACKETS G.C.TO SUBMIT SPRINKLER DRAWINGS TO ULTA FOR REVIEW. INSULATION IN INTERIOR PARTITION WALLS SEE AAA FOR LOCATIONS SOUND SYSTEM&SPEAKERS REFER TO ELEC.FOR G.C.SCOPE OF WORK DIVISION 16 ELECTRICAL DIVISION 8 DOORS,WINDOWS&GLASS SALON FI%TURESISEATIN INVALL CABINETS 0 0 SERVICEMAN SUB PANELSITRANSFORMERS SEE ENGINEERING DRAWINGS FOR NOTES ALSO,SEE LANDLORD SHELL EXTERIOR DOOR,FRAMES AND HARDWARE SEE DOOR B HARDWARE SCHEDULES. • • ADD'LSU&PANELS DISTRIBUTION,bBOXES,WIRINGS DRAWINGS FOR REFERENCE, Revisions SEE LANDLORD DRAWINGS FOR REFERENCE ONLY. OFFICE FIXTURES,SHELVING UPRIGHTS BRACKETS SEE ENGINEERING DRAWINGS FOR NOTES LANDLORD PROVIDING INTERIOR VESTIBULE DOOR(IF REWIRED BY CODE). OUTLETS ISSUE FOR CLIENTILL REVIEW INTERIOR DOOR,FRAMES AND HARDWARE ALL OTHER INTERIOR DOORS BY ULTAGC.SEE DOOR B HARDWARE EASE SECURELY ADHERE TO FLOOR.COORDINATE WITH INSTALLATION CIRCUIT BREAKERS INSTRUCTIONS ULTA SEE ELECTRICAL ONE-UNE DIAGRAM NOTES ON E0.1 03106/15 SCHEDULES AND SEE LANDLORD DRAWINGS FOR REFERENCE ONLY. ISSUE FOR BID/PERMIT VINSULATED CLEAR GLASS IN SATIN ANODIZED ALUMINUM FRAMES COFFEE MAKER 0 0 UNDERGROUND CONDUIT&JN3OXES SEE ENGINEERING DRAWINGS FOR NOTES A03106115 STOREFRONT GLAZING PROVIDED BY LANDLORD,SEE LANDLORD DRAWINGS FOR REFERENCE C17-FURNISHED BYGD. REVISION PER CITY ONLY.ALSO,SEE PLANS AND ELEVATIONS. REFRIGERATORS G10FURNISHED BY TENANT. kSE�RE FLOOR BOXES • SEE ENGINEERING DRAWINGS FOR NOTES.SEE SPECNLTY-CTVENDOR CONTACT INFO ON CS-3 SHEET. 03I24115 DOOR VISION PANELS WITH ONE WAY MIRRORSIGLAZING SEE DOOR B HARDWARE SCHEDULES FIRE EXTINGUISHERS 0 EXTINGUISHERS FROM ULTA'SVENDOR.SEE CONTACT INFO ON SHEET UNDERGROUND WIRING B BOXES SEE ENGINEERING DRAWINGS FOR NOTES COLUMN ENCLOSURES WIRING B J-BOXES FOR FIXTURES SECURITY SYSTEMS � � � SEE ENGINEERING DRAWINGS FOR NOTES STOREFRONT MODIFICATION SEE PLANS AND ELEVATIONS LOCKERS • SECURELY ADHERE TO WALL.COORDINATE WITH INSTALLATION EXIT SIGN WIRING&TIME CLOCKS SEE ENGINEERING DRAWINGS FOR NOTES INSTRUCTIONSB ULTA VESTIBULE SYSTEM,SOFFIT ABOVE,DOORS B HARDWARE SALON TIP BOX TO BE LOCATED NEAR THE TOP INSIDE EDGE OF THE CABINET DOOR STOREFRONT SIGNAGE SEE ENGINEERING DRAWINGS FOR NOTES WITHIN THE CONCIERGE DESK AND CASHWRAP.SEE SHEET INTERIOR ENTRY ARCH PORTAL DRAWING STORAGE TUBE 0 4"CIA.CAPPED PVC TUBE LOCATED NEAR ELECTRICAL PANELS EXTERIOR SITE LIGHTING SEE LANDLORD SHELL DRAWINGS FOR REFERENCE INTERIOR ENTRY ARCH DOORS AND HARDWARE BE DOORS HARDWARE SCHEDULES EXTERIOR AWNINGS SEE SHEET A-7.1 INTERIOR GENERAL UGHTING WI LAMPS HANDRAILS SEE DETAILS PAID PLANS FOR LOCATIONS WALL STORAGE SYSTEM SEE INTERIOR ELEVATIONS OF STAGING AREA STORAGE SYSTEM TO BE WIRING&J-BOX FOR INTERIOR LIGHTING AND TIMERS SEE ENGINEERING DRAWINGS FOR NOTES ORDERED AT START OF CONSTRUCTION, INTERIOR ACCENT LIGHTING WI LAMPS SEE ENGINEERING DRAWINGS FOR NOTES EXIT&EMERGENCY LIGHTING SEE ENGINEERING DRAWINGS FOR NOTES 03/25/15 SEE ENGINEERING DRAWINGS FOR NOTES.ALSO,SEE LANDLORD SHELL LICENSED POWER REQUIREMENTS FOR MECH EQUIPMENT DRAWINGS FOR REFERENCE.LANDLORD TOWNE UNITS TO HIGHER ARCHITECT VOLTAGE AND PROVIDE APPROPRIATE BREAKERS. AR 985350 WEATHER PROOF RECEPTACLE @EA,HVAC UNIT DOOR CHIME WI TRANSFORMER&PUSH BUTTON CONDUIT AND WIRE BY G.C. AS REQUIRED BY LANDLORD AND LOCAL CODES.G.C.TO PREPARE FIRE JOINJA.CNIPA1AN FIRE ALARM SYSTEM ALARM DRAWINGS AND SUBMIT FOR SEPARATE PERMIT.SEE VENDOR STA-10AHO CONTACT INFORMATION FOR APPROVED ULTA FIRE ALARM VENDOR VECTOR. S CHECKPOINT SECURITY SYSTEM • CONDUIT BY G.C.IF REQUIRED BY CODE,REFER TO ELEC.DWGS.AND LE D NFPA 13. NOTES FOR MORE INFO. I HEREBY CENTEY TW THESE P &NAVE BEEN PEE SECURITY SYSTEM(GENERAL) • • CONDUIT BY G.C.IF REQUIRED BY CODE.REFER TO ELEC.DWGS.AND IrM. :LEo. :�E�;MORANDT TT.THEIT—LIBEEs. 4 FDFLOOR NOTES FOR MORE INFO. INAHCESOF—Fws.Io NOTE: CONDUIT,J-BOXES,COVERPLATES FOR SOUND SYSTEM CONDUIT BY G.C.IF REQUIRED BY CODE.REFER TO ELEC.DORIS.AND unxeTOSTaUMBEEANDBUDINGS LGC LANDLORD GENERAL CONTRACTOR G.C. GENERAL CONTRACTOR VIF VERIFY IN FIELD NOTES FOR MORE INFO, NOTE: CONDUIi,J-BOXES,COVEAPLATES FOR TELEPHONES CONDUIT BY G.C.IF RED RED BY CODE.REFER TO ELEC.DWGS.AND 1. G.C.TO PROVIDE FORK-LIFT WITH FORK EXTENSIONS ON SITE THROUGH ENTIRE CONSTRUCTION PERIOD.SEE VENDOR CONTACT NOTES FOR MORE INFO. AacnrtEar INFORMATION ON CS-3 SHEET. CONDUIT,SECURITY SYSTEM,J-BOXES COVERPLATES CONDUITBYG.C.IFREOUIREDBYOODE.REFER TO ELEC.DWGS.AND 2. G.C.TO CONTACT LANDLORD REPRESENTATIVE FOR LANDLORD REQUIRED CONTRACTORS.SEE COVER SHEET FOR LANDLORD NOTES FOR MORE INFO. Drawn By Checked By CONTACT INFO. TELEPHONE SERVICE CONDUIT STUB CW BW 3. G.C.TO FURNISH AND INSTALL TENANT SPACE ADDRESS PER LANDLORD'S REQUIREMENTS. TELEPHONE BOARD Scale Date A. G.C.TO VERIFY SIZE AND SHAPE OF TENANT SPACE BEFORE LAYING OUT STORE. TEMP LIGHTING DURING CONSTRUCTION PER NONE 03MI15 5. G.C.TO PROVIDE 314'PLYWOOD PROTECTION UNDER ALL DEBRIS BOXES AND STORAGE CONTAINERS. REGULATIONS(STANDARDS 29CFR)ILLUMINATIONS-1926.56 6. G.C.TO PERFORM FINAL CLEAN PRIOR TO PUNCHUST WALK THROUGH.PRIOR TO STORE OPENING ULTA TO PERFORM STANDARDS Job No. L� PROFESSIONAL CLEANING AND FLOOR CLEANING THE WEDNESDAY BEFORE THE FRIDAY SOFT OPENING. e ul 7, G.C.TO TOUCH UP PAINT PRIOR TO STORE OPENING. NJ 9 8, G.C.TO USE ULTA VENDOR FOR FINAL CONSTRUCTION DUMPSTERS.SEE VENDOR CONTACT INFORMATION ON CS3 SHEET. 9. G.C.TO PROVIDE PHOTOGRAPHS TO ULTA CONSTRUCTION MANAGER.SEE REQUIRED PHOTO LIST ON CS-3 SHEET.ALL PHOTOS ARE Sheet No REQUIRED TO HAVE A DATE STAMP.ALL PHOTOS SHALL BETAKEN AND PROVIDED TO CM PRIOR TO WALLS BEING ENCLOSED AND MIRRORS BEING INSTALLED TO ENSURE PROPER INSTALLATION, Q� �m z FIRE ALARM NOTIFICATION DEVICES,ADA. WHILE THE ITO CODE DOES NOT REQUIRE A FIRE ALARM � z SYSTEM,THE STATE FIRE MARSHAL DOES REQUIRE IN / BWLDINGI WITH A FIRE SPRINKLER SYSTEM TO PROVIDE \/\ NOTIFICATION DEVICES THAT ANNUNCIATE AT THE FIRE ALARM PANEL AND SHALL INITIATE OCCUPANT NOTIFICATION UPON ACTIVATION OF THE SPRINKLER WATER FLOW DEVICES AUDIBLE `) p� prlp A. FIRE ALARM PLANS SHALL BE SENT THE STATE FIRE MARSHAL AND VISIBLE NOTIFICATION APPLIANCES SHALL BE PROVIDED IN / uui OFFICE AND DESIGNED IN ACCORDANCE WITH NFPA 11.PLANS SHALL PUBLIC.COMMON AREAS,RESTROOMS AND EMPLOYEEWORK 1 l BE IN 118 INCH SCALE AND SENT ELECTRONICALLY TO AREAS.THE INTENT IS TO MEET THE PROVISIONS INCLUDED IN f e KNUTE SANDAHLMDOIIDAHO.GOV. THE AMERICANS WITH DISABILITIES ACTACCESSIBILITY Re GUIDELINES FOR BUILDINGS AND FACILITIES(ADAAG). B. HARD COPIES ARE NO LONGER ACCEPTED, I IDAH0 STATE FIRE MARSHAL O 700 WEST STATE STREET,BRD FLOOR FDL-EXTERIOR STROBE INSTALL AN EXTERIOR STROBE IN THE AREA OF THE FIRE % REQUIRED CONSTRUCTION PHOTOGRAPHS B01SE,IDAHO83720 DEPARTMENT CONNECTION. ® Q f DATE SENT TO AIO PHOTOGRAPHS CPM: CC 0=� � Z SHOP DRA PECION RE NT ®co ® . � Q I�Lu Q �5 %mmmoRrm 14ifteopp, DESIGNED AND/OR INSPECTIORqqm IN-WALL BLOCKING-VALANCE BRACKETS mo I� DESIGNATED BY: REVIEWED BY REQUIRED/BY: SEPARATE PERMIT SUBMITTALS � ALUM.STOREFRONT SYSTEW WINDOW MULLION ARCHITECT ARCHITECT NO IN-WALL BLOCKING-MIRRORS,INCLUDING J-CHANNEL 0 r SYSTEM (IF SYSTEM IS REWIRED BYAHJ) INSTALLATION O NJ AUTOMATIC DOORSI SECURITY GRILLES ARCHITECT OWNER NO Q (LOSS PREVENTION) SUBMITTAL ITEM PERMIT AS REQUIRED: SUBMIT WITH ARCH DRAWINGS: IN-WALL BLOCKING-TOILET ROOM ACCESSORIES P z Z CANOPIES I AWNINGS OWNER VENDOR OWNER NO INTERIORIEXTERIOR PAINT ARCHITECT ARCHITECT NO YES NO YES NO CONTINUOUS PLYWOOD AT BACKSIDE OF VALANCE CONTRACTOR SHALL CONDUCT ASTM F1B69-STANDARD TEST ARCHITECT ULTA INDEPENDENT TESTING FIRE SPRINKLER SHOP METHOD FOR MEASURING MOISTURE VAPOR EMISSION RATE OF AGENCY DRAWINGS CEMENT BOARD IN TOILET ROOM AND AT MOPBASIN CONCRETE SUBFLOOR USING ANHYDROUS CALCIUM CHLORIDE AND ASTM F 170 PH TEST AND ASTM F-2170-09 STANDARD TEST RECOMMENDED 3RD PARTY FIRE ALARM DRAWING& • • IN-CEILING CONTINUOUS BLOCKING AT ALL TRACK �Uoma METHOD FOR DETERMINING RELATIVE HUMIDITY IN CONCRETE CONCRETE TESTING: EQUIP SPECIFICATIONS BLABS AND USING RAPID RHO RELATIVE HUMIDITY AND IFTI(INDEPENDENT FLOOR TOILET ROOMS THE SATURDAY PRIOR TO OPENING TEMPERATURE SENSOR KIT AS MANUFACTURED BY WAGNER TESTING&INSPECTION) STOREFRONTIWINDOW fn CL a a METERS(8W)634.9981.OR EQUAL AND PH TEST PAPER AS 2300 CLAYTON ROAD SIGNAGE • EXTERIOR SIGNS,INCLUDING PYLON DAY AND NIGHT p'"To� MANUFACTURED BY MICRO ESSENTIAL LABORATORY,OR EQUAL. SUITE 1240 TESTING SHALL BE PERFORMED BY INDEPENDENT THIRD PARTY CONCORD,CA 9/520 LOW VOLTAGE PERMITSISUBMITTALS WIRING AT EAS-STORE ENTRANCE AND TOILET ROOM TESTING AGENCY WITH RESULTS SUBMITTED TO ULTA.TESTING CORRIDOR PERFORMED BY FLOORING INSTALLATION CONTRACTOR SHALL CONTACT. (IF SYSTEM IS REQUIRED BYAHJ) a _ a NOT BE ACCEPTED BY ULTA.IF MOISTURE LEVELS ARE HIGHER JENNIFER ARMSTRONG ROOFTOP EQUIPMENT-IF FURNISHED AND INSTALLED "p THAN THE FLOOR COVERINGS ALLOWABLE LIMIT,THE SUBSTRATE TEL 800 490 3657 X 217 SUBMITTAL ITEM PERMIT AS REQUIRED: INSPECTIONS REQUIRED BYTGC y.�..om SHOULD BE REMEDIATED WITH ARDEX MC"'RAPID.SEE ARDEX jennifecarmEhng@i8i.com CL2 CONTACT INFO ON THIS SHEET. WALL BABE AT COLUMNS AND CORNERS w .G STOREFRONT SIGNAGE OWNERVENDOR OWNER NO YES NO 'YES NO 2 o a, _ WALL COVERING WHERE VALANCE MEETS ADJACENT ILA d OFF ICE STORAGE FRAMING-G.C.TO HIRE AN INDEPENDENT STRUCT.ENGINEER OWNER TESTING LAB MUTAK . WALL STRUCTURAL ENGINEER OR TESTING AGENCY TO INSPECT THE191111111111111111 OFFICE FRAMING TO MEET THE STANDARDS SET FORTH FOR THE HANGING ALU FRAMES ALONG STOREFRONT TO VIEW CONSTRUCTION OF THE OFFICE WALLS SUPPORTING THE ALIGNMENT PLATFORM LETTER OF COMPLIANCE TO BE FORWARDED TO EAS SYSTEM ULTA ALL FLOOR TRANSITIONS AS INDICATED ON A-41 POST CONSTRUCTION AS BELTS GC OWNER NO BURGLAR ALARM C.C.TV 0 ARDEX MATERIAL BEING USED HVAC EQUIPMENT CUT SHEETS I MECH.ENGINEER I MECH.ENGINEER I NO HVAC AIR BALANCE REPORT MECH.ENGINEER MECH.ENGINEER INDEPENDENTTEST TELEIDATA VAPOR BARRIERS&DOWELS AT TRENCHES-MIN.OF U . AGENCY LOCATIONS REMOTE FROM EACH OTHER RWDING AND SCOPE OF SANITARY SYSTEM GC OWNER INDEPENDENT ;IF INSPECTIONS ARE REQUIRED THE VENDOR WHO PULLED PERMIT MUST IN FOR EACH INFECTION AND AGENCY COMPLETED EXHAUST FAN DUCT WORK METAL STUD FRAMING ARCHITECT ARCHITECT NO BE PRESENT FOR EACH INFECTION. Revisions NOTE: G.C.IS TO COORDINATE THE SHIPMENT,DELIVERY AND INSTALLATION OF ALL ITEMS TO BE FURNISHED BY OWNER AND ULTAIS VENDORS.VENDOR CONTACTS ARE AS FOLLOWS: ISSUE FOR cLIENTJLL REVIEW 03106/15 ACRYLIC PANEL. CLEANER: DOOR HARDWARE: FIRE EXTINGUISHERS: LIGHTS(CONTJ: MUSIC: SALON EQUIPMENT; TOILET ROOM ACCESSORIES; ISSUE FOR BIDIPERMIT 03106116 CREATIVE CONCEPTS CLEANWAY LOCKNET COMMERCIAL FIRE,INC. CAPITOL LIGHT B SUPPLY MOOD MEDIA COLLINS MANUFACTURING CONTACT,PAMELA ROOYAKKER REVISION PER CITY CONTACT..BRYAN KOESTNER (P):631.288-6300 CONTACT:JEFF CARROLL CONTACT:ERIK CROSS CONTACT:JANE YOUNG CONTACT:LINDSAY MIJARES CONTACT BEN SWANN (P):77328&7221 �03/24115 (P):630-940-0500 800332-6996 IF):800353-2562 09 2465 ST.JOHNS BLUFF RD.S. 3146 SOUTH BENTON CIRCLE 1703 WEST5TH STREET IF):800-292-6450 EMAIL:pamia-yakkar@b-lusa.wm 0 EMAIL:jeBreyc@locknet.mm AND OR JACKSONVILLE,FL 32246 MESA,AZ 95212 AUSTIN,TX78703 EMAIL.ben@mIssmfgw.mm OR "TOILET PAPER DISPENSER&PAPER BACKROOM EQUIPMENT: COLUMNCOVER: CONTACT:JEFF KIRKNER IP)800-241-1277097 (P),48098641557 (P)512483561Jfi CUSTOMERSERVICE TOWEL DISPENSER Q (P);800353.2562x131 EMAIL:enk.cross@mmmerdSINemm (F),4809%9275 EMAIL,mclsay.mijares@moodmediamm CONTACT:MELINDA SWANN MOONLIGHT MOLDS,INC. EMAIL:mnst"I'lllocknet.mm EMAIL:jam.pArg@wpitollightoom "SH4MPOO BOWLS&REMAINING Q GRANGER 24 HOUR SERVICE GLASS: SALON EQUIPMENT WALLCOVERING: CONTACT.HEATHER GLEASON 14920 S.SAN PEDRO ST. (p)ggp.35.2562 NEW STORE INSTALLATIONIBREAK FIX (P).630-880-1725 GA:ENA,CA 90248 EMAIL:service@locknetcom DILLMEIR GLASS UGHTBUL85: SUPPORT: DESIGNTEX Q EMAIL.heamerglezmn@grairlgermm TEL 310 538 9142 CONTACT:PHYLLIS COOPER SECURITY SERVICES: CONTACT.AMY JAGUNICH "LOCKERS.4 WHEEL CARTS,LADDERS, FAX:310538-9717 SIXSPECIALTY-CT WMPUWM,INC. P800-221-1540 x60D9 EMAIL.am g 99' EMAIL:pXXXs@d,LTES207 I I BABY CHANGING TABLE&WETIDRY �1 es@mmnli htrmlds.mm EMAIL pmoper@dlllmeirglass.mm CONTACT:LORRAINE GARICdIANO CONTACT JOHNNY RESTREPO ULTA (f130b722d703 SHOP VAC CHECKPOINT "PROVIDES ALL GLASS SHELVES THAT 35 INDUSTRIAL PARK ROAD#10 PROJECT MANAGER CONTACT:DAN PETROUSEK EMAIL ajsgmch@dtex.wm CONTACT:LYNN SEILO WILL REQUIRE A LIFT TRUCK(RECEIVEO CENTERBROOK,CT W409 www.compuwrI IF):6304104B33 COLUMN COVER:IALTERNATEI (Pp.8110x2ll johnny.mshepo@mmpummwm EMAIL,dpehousSM&Ra.mm BRACKETS B GRAPHIC TRACK: 8180 UPLAND CIRCLE BY G.C.) EMAIL:Ig@sSilgh6ngmm D):2014M.3499 WEARLON COATING: FORMGLAS PRODUCTS LTD. CHANHASSEN,ON 55317 FHC MARKETING CONTACT:DAVID AQUILINA (P)206-283-9299 (C 7321869840 VINYLGRAPHICS: ECOLOGICAL COATINGS,LLC CONTACT,KELLY MARTIN 2 CHAMPAGNE DRIVE (C),206'501-1337 GONDOLA"ALLIED PANELS MILLWORK: 03/25/15 (P).773-7243004 TORONTO,ONTARIO M3J 2C5 EMAIL:yn,SSb@cherhplwm PRINTED BY (PI:51838&9585 UNIWEB PLE%I DISPLAYS AND%3C TABLE: nLICENSED EMAIL..kmanin@hcmarketrg.wm (T):416535-4119 NO CAP GF% ARCHITECT "METAL BRACKETS FOR GONDOLA IF):41fi535-65B6 CONTACT:BILL BENDER CONTACT:CHARLENE PROSNICK ARRAY MARKETING CONTACT:JOEL MCREE WINDOWSHADES: AR 985350 SHELVES-RECEIVED BY G.C. EMAIL:daquilina@formglascom ENERGY MANAGEMENT SYSTEM; (Pp,800-4864932 445455 MCCORMICK BLVD. CONTACT:VAANEE KUGARAJAH IF):847-5434635 INSTALLED BY STORE wNw.formglas.Com COLUMBUS,OH 43213 (p);416-299 9847 xi29 EMAICjmpee@gfxi.mm OR ulp@gNl.wm INSOLAR WINDOW TREATMENTS "UNIWEB GONDOLA"AWED PANELS" CONTACT: EMAIL:billb@uniwebinc.mm CT:NICK KRATSIOS (P)'.fi148fi3.33fi3 EMAIL:vkugarajah@amaymarkedng.mm SHIPPED THROUGH: CONTACT:JULIE OORFM4N8 BRACKETS (Pg 312.5875565 IT INSTALLER: EMAIL:cpmnik@wpassocSSE.m "PRODUCT RECEIVED AND INSTALLED UNITED FULFILLMENT JERRY HERST "WI SHELVING B LED LIGHTING CONCRETE LEVELING AGENT: BY GC. CONTACT:CHRIS HUMBLES D):8476754114 ?�l�­ ARDEX (C)AIL:16,kate "WALL CLEATS IS PRIOR TO EMAIL nick,Nralsios@novacmm CPT NETWORKS ( (P):312-03141600 EMAIL inmlar@insdacmm sTATEOFIDnno CONTACT:KEN VAN FIXTURE DELIVERY) CCTYBALARMS: CONTACT:JENNIFER DAVIS 1062 THORNDALE AVE. "PERIMETER WALL FIXTURES& PORCELAIN TILE: VINYL FLOORING�MTIC01:NATIONAL ACCOUNT SPECIALIST EQUIPMENT RENTAL: BENSENVILLE,IL 60106 ARCHES,INCLUDING THE SALON ARCH TELEPHONE&DATA: VECTOR SECURITY (P):7242035062 "CASHWRAP,SALON,CONCIERGE, TRANSCERAMICA CONTACT;M,keW deh (CI�,6307357006 IxeResviceanerTxeT Txese RuxsxavE seer ERe ey (C):951.8%7384 UNITED RENTALS COLOR LIBRARY,MGRS.OFFICE,SKIN CONTACE NOREEN SCHERTLER TEIAID MANNINGTON MILLS,INC. ulla@cptrleMlarkscom 100I EABTTOUHY AVENUE,SUITE 250 EMAIL:jendaps@aMexamencas.mm CONTACT TOM PARETI CARE ROOM,BACK RM.STANOARDSB 314 WEST SUPERIOR CONTACT.JACK THOM45 JR. CONTACT;RICH CAMPBELL of Mr KnowLeose.Txe seas couRxr wnx u�RULES . DES PLANES,IL60018 CHICAGO,IL 60654 9550 MONTICELLO ROAD 1750N.WOLCOTT AVE.S-105 REG-TINS AND ORDINANCES ,11.lo STRATEGIC ACCOUNT MANAGER SHELVES REWIND TC STRUDTUNES AND amLDNDe, (P)8 4 74 2 8-1411 EMAILtpareti@ucmm LIGHTS: "GONDOLA(SALESFLOORFIXTURES) (P);312-34246B8 LENEXA,KS 66227 CHICAGO,IL 60622 EMAIL mweyrich@vectoeemmy.wm CONSTRUCTION DUMPSTERS: (C):630-774.9896 "HAIR DRYER BOX FIXTUR a ES,PON EMAIL:ns@trarWeRS .wm (P):913-76&1996 D)7736978539 Joe 0.oLU;.DwSSMDunIyoXn SPECIALTY-CT SHOP,NESTING,PROMO,FRAGRANCE (C):91M20.9092 (C).71&7913305 JAMIE BOYD-jpboyd@vectorsemrity XXn WASTE MANAGEMENT C&D TEAM CONTACT.LORRAINE GARIGLIANO EMAIL.jthoma p @ rM n aacxrtEaT (REQUIRED FOR FINAL DEBRIS BOX) EXTERIOR SIGNS: OR JESSICA RIVERA &CHI TABLES,ID PRODUCT BAR pORCEWNTILECLEANER: I s@IMaitl.mm EMAIL ndI_wm he'I manni to wm AND MIS"ACKRO;T MISPLAYS Drawn B Checked B 86&33&2342 HIT OPTION 2 ANON LIVE 351NDUSTRIAL PARK ROADg10 Y Y REPRESENTATIVE WILL BE READY TO KIEFFER STACKROSINCLUDIN AND (TEXSPAR PLUS) TILE GROUT: CW BW CEILING TILE: C)B60-7RDDK,CT Gfi409 48'MET L,2Y 48'ME AL, TAKE YOUR CALL CONTACT.tARRY CARACCIOLO p Bfi0.767-0itOx211 WATER LEGGE COMPANY O /&'METAL,20'X18'METAL, Scale Date THIS PHONE LINE IS AVAILABLE 585 BOND ST. EMAILI Ihhncan or (P):8003453443 MAPEI ARMSTRONG 9 9 9 121 WALLMOUNT STOHD, NONE 03106115 241713650R EMAIL TO LINCOLNSHIRE,IL 60069 Nvrx.Mggesystems.mm CONTACT:MIKE GRANATOWSKI CONTACT..BETH RINEHART P:847-415-5710 jkr@ssligh6ng,mm HANG ROD BRACKETS,12', wmsscCYeam@wm.mm (I EMAIF)IL rigns en Jo o IPf.800441'4412 EMAIL Ia kie8ersi ns.com HANG ROD,48' EMAIL.aurelrongcsa@amishpg.mm nY@ 9 EMAIL mgmnalawsM@mapN Dom 5549 VENDOR CONTACT INFORMATION Sheet SALE: NONE s-- 5 �in 36 min --_= 2 min 2 in gg IIryry� —ers o..cona, 31 1 [,; 18s mn 42L m�18 30 EA.MSIOE� s +ss � roes I ass _ 6• I F/CONTROIMAX. CLEAR of � (. \ / E� _ 0 FLOOR w � �m 18"TO 19" SPACE Q ----�°^ Q ...... � —— is `1 24 7 _ 24 18;,TO 34min Q 48z om 60 min (o)I 24 46 von tszs Proper oars Bros In —_ International Symbol f Accessibility 30 ..an ,mua,... Fig.28 O (b) I- To 9" S6mi 59min nr.mwm.a.... Clear Floor Space at Water Closets 30 60-in(1525-in -Dianeler Space T-Shaped Span fa 180 Turns 42 min Io ( zn ��I�444ppp ��` Fig.3 oppmoM only, 59min Standard Sld lend of row) ® I Wheelchair Turning Space • o oMer approocFee ((pp z ,e min ((a Display C�diva s -- L rrr,,, tmStanddr�Stall InternationalSymba of Accessibilityla rn � G. %min 12 max 36 min 10 7 7 10 36min 6" 54 min accessible path of travel ms le � Amin Inro P 12 min 12 min 12 42�sn meet MEMOS 48 — fig.A3(a) �p w nos ws W'. Pwar : O a 1220 n m 6"MAX. 8°MIN c • IF 78 Yin NONE m R Iwas.. 4 H WOMEN °� m„ n DRINKING FOUNTAINS 54min a " O) a �b Wall Hung Type Urinal -- --O() pn min66min Rear W.l of Standad Stall Bac Wall Sid all Inle IlonalcTDD Symbol W l/O ....m.um.e.... 'n ..nr.m..m.a w.w Fig,29 " .� rz•s Grob Bars at Water Closets % 12 max 40 Win zeo zoo ma ies .�asi--e`ie`—i 6 .......... I 01 fig.45 F" A2 �1 s .E I I Minimum Clearances for Seoting and Tables NOTE:Footrest may extend further fa all people 19' 0 1/2" MAX. � 17 mn P 4" MAX. � H'0 Fig.A3 ITO BEVELED THRESHOLDS I m °al•t I. s I ' Dimensions of Adult-Sized Wheelchairs LEVEL FLOOR OR LANDING: THERE SHALL BE A LEVEL AND 42 mm ot`M1 = E E as M gg °PProaM onl Y• m 1 x E ='s j; ow o � � M CLEAR AREA ON EACH SIDE B O EXIT DOOR.THE LEVEL oaer opProocxee m o ers n ®p G— AREAS SHALL BE AS SHOWN BELOW IN FIGURE 7A.THE SPACE ,a mr - BETWEEN TWO CONSECUTIVE DOOR OPENING VESTIBULE SHALL (VESTIBULE) (b) Fiy.30 em Sidedls p1 "' N Intonational Spn6d of(Access for Hearing Loss // O PROVIDE 48 INCHES OF CLEAR SPACE FROM ANY DOOR Alternate Stalls Toile,Stalls r!4!8.�­ 17-19 OPENING INTO SUCH SPACE SEE BELOW). fig.43, aao-ws _i ,J�� M ( ) 1R • International Symbols (bVD M 6ma m. Fig.32 ..a.",. ....... _. Hinged)Door f� Clear Floor So ace Lavatories x".. 8 mn 32 min - (( pp/�� "°'°"`• 17 a.Pu ess DB�u'I min 1 co _ ea fy J1 *E: ° zi Lavatory Clearance fl"E ....... sm----� ..... Sliding Doa 1 8 to `" 7 48 ) _ 8 ((���� Ron�1 i 10 max 30 J L� T I.a .a mo o` Clear FNM Space 8 min 6 m x a E.E eaulPment Pamau.a m Moeea moo Clear Floor Spoce(o)Parallel Approach ( out Height and Maximum fJeoorwa Depth Rnee Cleaaace �d) Y (( \ l Foldi g Door High Fordaf8�each Limit R Fig.24 'y 36min 'r Clear Doorway Width and Depth �5Y1 �1 4 min a°w .n mn.<,..".•e for s gl 1 r lh 55 xeo _ nm rzxa M 1 2 3 4 Fig. 10 max30 i o �•ai orpis:u°"..II reemo.e•.rmr..I Ir", , now,.xe.mze wI or me Single CWheel hair 17 Al4 in 4 Mini i' war eel. m."ee poe lwr� '°'I°"• It �I C (/// \\\\ — J .er. .. zeo E wmx.. P.lo�aelraPl"� 1 tie•Ie Ire xa,,.ty ( se " (()) (award Approach DiagaafaApproach m ' a 24 max „n szn P21 _ (b) �� Fig.2648 Clear Floor Space L=.- Two Hinged Doors in Sties sir Ibe25 r6 R0)z aII be xWnen 20I�(510 m then y shall be 48 of(1220 mm)maximum. 48a P�1t25n lU to mm;A that he�{in 1110 mmmmum (6)A Y�p ( )(( 3 Parallel cApproach '°° I Unobstructed Side Reach Lirnils AR E Maximum Forward R2A over an Obstruction a w`•nel�rwP.�aefon..«row. Tina®> c",I",,,""to"E 3.01 0 1 refored 9 I- -� 1 ppp Forward Reach Side )roach clear width on amount E Fig.A6 Fig.2 «� Wheelchair Transfer Minimum Clear Width x a rw III 1 4 NOTE x=12 in(JOS man)it doe has bath a Revisions for Two Wheelchairs tO�_ II close and klch. Lobby 4mox enter thunl2 $° X s,a QISSUE FOR CLIENTILL REVIEW sos realo Non 12 : _� w sae Front Appraache �Swinging Ooas 12 m54 mn P 03106/15 ... ... (c) - _ l lu QISSUE FOR BIDIPERMIT it e-5Standdn 3106/15 NOIE:x c24 in(610 mm). FanPlain a Co�a 0 E S o E : r2xm ounlaN aepiw n� � - Enewdon / ......_..__. 15:x 7 in(915 m mnl if y=60 h I I N"� Plm T1 m Fig.B(c)Free-Standing Overhanging Objects ( n 13 mmj 42 m`065 mm)mn'xnwn if y= \\fll Q eO$ —- .E o Maxmum Side Reschc)over Obstruction I. ��a Ialc^aM(alIo220 mn)minimum if doe has Q protect shaded x area from 66 min ---- '+'' a Fig.6 if door has both a latch and closer. cross-traf is Is � N lE:x i 15 in(360 mm.) Side Reach �to Fi.8(a) Hinge Side Approa es-Swinging Ooas X Walking4rallel to Wall r. -- n (d) ,pX X ",xA ry e (a) Clear Floor ace in Alcoves Isle. 4 min Pua,sla. 4m dd o in cABE Forward or Rear Access Fountain torlHCooler BETE a ax c E ....... e.iar:iv"erePu,twnepmpet � _— Fig.27 Fig.8(c-1)Overhead Hazards ,E Drinking Fountains and Water Coolers _ o NdoslEey=54 b(D70 mm minimum if ilea has 03/25115 E w ucENsen NOTE y=481,(1220 mm)minnum if doe has ARCHITF.C7 E 'E rr 11 doser AR 906950 Latch Side AppraacALAs-Swinging Door, ? x mdammart dlrocuon 3O g 21 max. NOTE:All dons in daoves shill cam with the IB.n.G fa front a roaches.Fla.at " sLwton ve Walking Perpllndmular to°a°Wall f f of o-°ram 1� Minimum der One Passage Width 0e��eelchair Po deal s4 or��ce nt6nth�.QOalnmdb'b �� a Shelves / Maneuvering Clearances at Doers aotlNn EFig.25 ( 5� aos 9 .O 9 1 Objects Mounted an Posts or Pylons FIg.B <0 a'rAm aIIDNIa Fig.8 Protruding Objects Fig.54 a Protruding Objects(Continued) Tableware Areas , F'uu 8(f) Fig.8(g) E T_ M_ 36 min d (e) vEo urvcoenTur suPERvsaxnrwioH�nr.aeEx Pree Carpel lP�e Thickness Gralinys (� ADD ocn g awe oraYME-ELESTHe snnewnPLrw TnnHeams Front A r ch. 55lidin Doors Slide Side ro -SIi6n D L uLEsaPinolding Doorgs and Fald'ng Doors necuwT oxsaxooreowascas or IwxeuLs,o long dmenson o reswsnc ro sTreucrvr+Esaxo BUILDINGS per and color to E I NOTE:All does n claims shal cum th the deamaes la hart a oachss ere �D of travel I 4� II I dY wI PP NOTE If x A5 h((380 )try an additional $ mmeuvemg deeraAce o�{2 in 4Sn05 mmJ shall be 21 ma — ARCHITECT j ( I 66 rain I pronded Is shown. sae -y— --- x " r Iazs x Drawn By Checked By W Irl.°o«ma,°r`z°(aos) E CW BW b el �g� �5� Sde(Access Additional Maneuvzrinq Clearances fa Alcoves b Closets / Scale Dale I+e�a T,sal. I°r°�wo°ue aue.iren Plm () (f) F g 46 Fig.4 / Fi Latch Side Approach-5i g Doors and Folding Doors AS NOTED 03106/15 Fig.A4 F' 8 h Space Requrements for Wheelchair Minimum Clear Floor Space for Wheelchairs Storage Shelves Closets Fig.25 Cane Technique Grating DEADLIER Setting Spaces in Series Fig.53 9 Maneuvering Clearancs at Doors(Continued) Joball o/� /,_= n /� Food Service Lines IUI t5 LN•mil///4H L9 ACCESSIBILITY DETAILS Sheet Na M�(/� SCALE: NONE II Il lJ—1 o 1 I 97T� SITE PLAN FOR REFERENCE ONLY- ® ® ALL EXTERIOR & SHELL BLDG. ' AREA OF WORK-INTERIOR TENANT 3 WORK BY LANDLORD UNDER IMPROVEMENT FOR PROPOSED PERMIT. ULTA BEAUTY n 'All J1 co coo Lu Z ® ®vi QrQL L� sa3 r Q,O / � w � 0 a a In t 1 - _ •� Revisions 00SSUE 306/150R CLIENTILL REVIEW ISS QUWE150R BIDIPERMIT ® a0000� Z� 03/25/15 rl LICENSED ARCHI(ECT AR 085350 ,ol / // �owwa.EanrB+nu %/ aTATI OFIpANO ® cr\ TMYSUPERVIBbNANDSiwliiOTHE BEST ❑ /,� � // I.—E.E. w laNs nNooxoNANCEsofRT lNF-s�iouLEs, REIATING t0 STRUCTURES AND BUILDINGS. ❑ cr DNITECT Drawn By Checked By CW BW Scale Date 1/4"=T-0' 03/06115 Job No. j /GJ• / NORTH Sheet No. I 1 ALLIED PANEL(AP54)PLACEMENT NOTES: 1 ' HAIR FASHIONS-ALL ALLIED PANELS HAIR ACCESSORIES-ALL ALLIED PANELS COSMETIC APPLICATORS-ALL ALLIED PANELS TRIAL.ALL ALLIED PANELS PRO BRUSH-1 ALLIED PANEL AT OUTSIDE END i 1 BATH ACCESSORIES-ALL ALLIED PANELS I m MASS COSMETICS ALL ALLIED PANELS NO DIVIDER PANELS -- - EASIHAIR-ALLIED PANEL I 11 WHEN THERE IS 24OF MASS COSMETICS ON THE WALL THE BRANDS THAT WILL GO IN THAT LINEAR WILL `� --- -- ----- -- --------- —-—-—-—-—-— ALWAYS BE ALMAY AND REVLON FOR THOSE BRANDSI THE OUTRIGGERS THAT GO ON THE PERIMETER WALL DO NOT GO ON THOSE SECTIONS DUE TO THE CABINETRY BEING USED BY THE VENDOR. STAGING OFFICE SALON SHAMROOIDRYING CLOSET CORRIDOR EXIT#2 02 103_j CLEAR EXIT WIDTH 36°' 105 104 109 110 OCCUPANTLOAD'. 1 36'10,2'. �.. PER PERSON= --- 180 PEOPLE E I.. PH =_--------- gy-- I r —_ —_— --__ WASHER/DRYER ELEC ------ — � ' I PANEs� i.Tw i.i� In 104 _l1/_ RESTROOM EAS SECURITY ' '.:; I WALL MOUNTED DEVICE i r/1i co 108 cc i1 ra„� I THESALON IrQ —T2O 0 _- Dermol°g ca s I ERMALOGICA MEN$ ,I 1011 Redken LD'H I -I 1 1 107 J CfP SALON HAI RCARE , �13r -J. -� C� 4 III B♦--- ——————————— , 1 ® Q ® z Q L I V chyLRPMI tEk1 5/ E1s 15P 15P rv€ i- _ I Mort 8 e cu 8 Juc It _ IrLv GUY LO 1 & o x a I I HIGHT cM1 81'ss 6' r Y GG p - ,•_` '. I tD 2ClPdspPlc9 � _—_—_—_—_—_12 11 10 9I2 22 I PRESTIGE SKIN D tj Noil I68 Algen at DermcOrblend _ P N it Twotment B B Pro-I Prom° I"° pTR EFuv1—6 SALES 16 � 17 I 01 w I Pl. t uah tfi 8 gIP sea/ I E "' E ` LL R e a CPa B.B.12- I u EEu y P p E i 15 1 18-1 ' o G.2 I w H I Illona 16' I w '� 4 H°i 4 Holr I E L T I y�N A ry g t na Pnq 8 sty Acc a Foan one I ° STYLING TOOLS I 14 19 pryers 8'Demo Dryers 8 Non-Demo seltsrs I Both AB' Oral Whl4 M.B. I Trme EC ,M.BIy ? N cc s Hi9hTech EC ~ - 8 I BATH&BODYCARE I I wButl Lou fi'Hrcore 20' E—Y Ba a Prestige Bath 8' 13 20 _W ue t6 P l9 B lM1 18 F 119 NUIRY 8 llpaRkEk I Q a I 7 1 M G co 9 I Oueen w 'Cleo H color 16- I Pl.H 4 Mena 5h--8 w `° ° u 11 Cosmplka 9 8 Is" (J I.. cr°°mn Mena Skncore a 2u 8 R—E 20' P Hoir 8' 9 " I -It ervahea 9' N 6kincora 20' 6 1 T 9 16 I Banefll ReAsiGc$ TR Fxlure Llp I I ISSUE FOR CLIENT/LL REVIEW Ij E2 EC Eeaenca EC Solutions EC I s fragrances 16' I �D3ID8115 ISSUE jq FOR BIDIPERMIT - _Ewa _ - �03106115 E 2221 Rollerboll '' g" g x 0 1I BENEFIT - _ I FRAGRANCES _.i o mrtes .� g z 6 � 1 5` 4�— 2 U, Smca R 9'3 ,�„ �� � \\ „�, COLOR COSMETICS 'O" II pl is/cosee h lza eae / Uroon Dacoy9 _ o 17 Noil Tre 1'Cel Nils 'o Urb°n pecoy 9' - MASS COSMETICS i / i i 03125115 f I - n LICENSED L— — J ARCHI EECT - I---r----r------ a nRsa6sso r t SECURITY B reMlnerde w _ BOLLARDS --- ,BARE m' JDHNA.CHIPMAN - B reM Paraa I` STATE OPIDAFID I �II€: I I � _�, Wv� TI.. 'HER EBYCEMT FTTHPT THESE PIFNSINYEBEEN PRE PARED UNCERMYSUPERVSION ANOTINT TOTHEBEBT A L..�- ®._�.®..,..�. ,.,,.,...�.m..e r GF MY kNO'MEGGE THE SAME COMPLY WITHFLL gULES, ®r RECUTATIONSANDORD—CESOFTWINFA W 0 - -. REWNG TO STHUMBES AND BUILDINGS. EXIT#1 CLEAR EXIT WIDTH:72" ARCHITECT I PCP LOAD:72"/0.2" EXISTING PER U PERSON=360 PEOPLE \ V Drawn By Checked VESTIBULE 100 cw BW Scale Date PLAN J No NORTH NORTH a 1 3-554 9 MERCHANDISE PLAN sheet No. ASCALE 8"=1'0 �� A e QII"o O FURNITURE SCHEDULE ITEM NOTE: 1. ANY REVISED I ADJUSTED FIXTURE PLANS RECEIVED FROM ULTA,WILL SUPERSEDE THE FIXTURE LAYOUT INDICATED ON THIS SHEET.PLEASE NOTIFY ARCHITECT IF ANY CONFLICTS OCCUR. 2. INSTALL HOLDING CLIPS FOR PLEXI DIVIDERS AT PERIMETER. LITA cc 3. REFER TO FIXTURE MANUAL FOR INFORMATION ON ALL FIXTURES. 7)Portable Fire Ext guisher(s) III 4. TENANT CONTRACTOR TO UNLOAD THE ARRAY ORDER WHICH CONSISTS OF 25 PALLETS OF STORE a.Add and or relocate portable Fire extinguishers as needed to fully protect the area.(IFC oGICAroD c GO EQUIPMENT. CONCRETE PAD&BOLLARDS FOR POWER ROUGH-INS,SEE Q PROVIDED BY L.L.UNDER DETAIL 2IF-1,1BAND 806.i) 5. LEVEL ALL OWNER SUPPLIED FIXTURES.. SEPARATE PERMIT. ELECTRICAL DRAWINGS. 11 oRGEARCHracx I 6.Install portable ui extinguishers to meet the requirements the Install one(1) < 6. THE FOLLOWING FIXTURES WILL RECEIVE GLASS SHELVES'W-5,W-5-S,W-4,W-4-S,X-1AL,%-iBL, � portable fire extinguisher with a minimum rating o/2A-lOS in the reception area.The X-12,X-2AL,X-213L,X-10L,X.1011,AND X-11. ALL SOLID SURFACE TOPS TO BE travel distance from an extinguisher shall not exceed 75 feet.The extinguisher shall be m AB GKINCARE ARCH ULTA cc 7. SCRIBE M-513 PANELS TO ADJACENT WALLS AS REQUIRED. JOINED,FUSED AND FINISHED mounted in a conspicuous location,unobstructed and unobscured from view. ALA zaze swxx°mER unA ec B. PLUG IN ALL OWNER FIXTURES THAT NEED TO BE PLUGGED INTO OUTLETS. BY AN EXPERIENCED SOLID Response:Sheet A1.1:Added locations of fire extinguishers.Actually locations to aALB TABLE MOUNTED SGRACE A TABLE MOUNTED SEDNAME uLTA GLCA CEILING ELEVATION BY CUTTING DOWN THE BASE TO ACCOMMODATE THE UNEVEN FLOOR SLAB. ------"-"--- -- --I- ---- -- STORAGE ABOVE OFFICE, 9. ADJUST THE HEIGHTS OF THE ILLUMINATED ARCH FIXTURES AS REQUIRED TO MAINTAIN THE _ SURFACE CONTRACTOR be coordinat ith local fire mareball as required. AL 83 AC IGNEL PIVOT IOUNI I. VERIFY WITH MILLWORK MANUFACTURER. 10. ASSEMBLE THE ROLL-AROUND CARTS(6 ROLL-AROUND CARTS TYP.PER STORE)SHELVES ARE TO SEE A 8.2 BE 12^O.C. STAGING OFFICE SALON SHAMPOO/DRYING CLO R 11. UNLOAD ETAGERE UNITS&STORE THEM IN THEIR ASSIGNED STORAGE AREA. 102 103 1OS 1 O4 1 O9 11 O 12, ALL JOINTSISEAMS TO BE CAULKED WHERE MILLWORK MEETS WALL U.N.O.,CAULK COLOR.WHITE 13. SECURE I.D.BOUTIQUE END CAP SHELVES TO BRACKETS. o 14, G.C.TO FURNISH AND INSTALL STANDARDS,BRACKETS,AND J-HOOKS FOR MISC.FIXTURE STORAGE IN STAGING.SEE INTERIOR STAGING ELEVATIONS. ALaa GLTA I c. 15. FIXTURE RUN DIMENSIONS ARE SHOWN FOR REFERENCE ONLY.CONFIRM ACTUAL MILLWORK ALHOR u c DIMENSIONS WITH FIXTURE MANUFACTURER, u+as 16. G.C.TO INSTALL OWNER FURNISHED FIRST AID KITS IN SALON AND STAGING.COORDINATE WITH �i u c. E _______ APu as&sa ALLIED PANEL ULTA cc ULTA CONSTRUCTION MANAGER FOR EXACT LOCATION. -----_--- -- - - -' --f----- _ --- - - - _._-- - FRIAR _ 187 CAULK SEAMS&JOINTS IN FIXTURES USING WHITE CAULK,CAULK COUNTERTOPS TO CABINETS. ,"Yw+k c� "• FH B -M -- AL a AL a .uz --- e WASH � C B, °PEKE ULTA cc 18, G.C.TO COORDINATE FINAL SHELF LOCATION WITH STORE SET TEAM AND STORE MANAGER. - $ ry 1,9' L is 1O4 EANry B Au a TwonTO " ______ PANELS uTER xEnv+a c,o REFRIGERATOR STAGINGx LTA G.c. V \( xsrau+zrsTR c,s SHELVING wE CnroouaEsoT Una Gc f ( FCAy - C C C 3 6' I� 01� uPR curse BFuxcE �✓J eRACRErs aeOCI e n S - ORrc CUT SHEETS .,� WOMENS I -- G49 C-03 CJ9 r ��� UNDER CIUNTER Me OR ( 4$De R� )4 1s_- 5 7 REFRIGERATOR Axsrzscu SEE Muw RGERArOR FOR COFFEE BAR AND _ ` ARzsew NTER ORELEVAToxs FOR GO B.0 - (� RzscU FT Au°wARLE&REAF ALTERGAID REPRCERarDR - ALIGN a cB wHre MaDEL.nIisEoz� 2 0" I- .s os �,� C+s czs cis-,s C B ALIGN Cm COFFEE MAxER G.0 TO SUPPLY,a WATER unA G.c. .__.__ t ad III GC ti,,= 14-10" < -4 r�- M onE MIENS LNE ' P wABHER m - 107 o m L� Czz URVER a GC. " I I' r z CIAMLNOwAMExLOUNGE GC --- -- _- UL a U - o mr� ,`n W< css Rou xc HAIR DRYER AND _ 4 0 4 0" _ 4.0" �°'e^� - o��j(Ilm� rY-2 I °' Do co ! MB m wL s 11AMIDLLM�DxaD�MR GL I 4 9 ° CUT Caa EDOBOwLw W UL A * 4A^* * w� w M w x Q 7r^ 4 _ ® �J IGN ALL aTRESTOEHEAv UnA MR 3 - us sxN OF VAIAIEFACE SHE ULTA GC r.l. Y-L N F -_ PRO B-I AT ON W m �B eas SERVER case uPRDxrS&,s�Fux CURVIDEWLLWORK IX URE IL aRAc%nst<e�OCI R, FLOOR ELEMENTS.SEE ` X µN III g' 4'-&" 3'-_8_"�Ie CURVED MILLWORK FIXTURE Q�� cu DEMosrarox uI, GO SHEET A-4.1 FOR DETAILS- --- A8 3-8'll. '� - "' ,' WALL.SEE A-4.1 FOR SPECS. � CH, Mol ALUMINUM SANBTODL ULTA GO M.Ma �71 �1 FOWLER UT Aiou pEosT Nc a cc ROUGHHADACOUNTER.FOR POWER W LL FR iz OFFICECHAR a GO ., TL : - - E 1.1B AND FR11 LOUNGE CHAR ULTA GC _ _ _______ i 1 =4 ROUGH-INS SEE DETAIL 31F- AN 15 BREAx TABLE - .. .. ..GO > sALONHARCARE U GONDOLA "A Gc. L.I. * ELECTRICAL DRAWINGS _ sH m - xaBA 3-0' - L cxreox +s -__ M10& COFFEE BAR SNN AxD U Eo ' %JA %BB - > e NSTAL n Mz[6 OOVBLE REGTRWMVANtt SNx ANO - - -- &NGTAL N , M M �_ SALES eAT SNGLERESTROOMvaxry 6N5�"eEsewGN. LTA G.C. e p Y $ i .iY 7-9 I3BL %18 30i %3 - + -------__ 101 M.z,z sHELv xGAT LoNES RHEA. AR%ER ✓. b € .. _._ _ n _77 % 4A 4'8.' y C NDARSTORAGE E�Ex nEER a g g M - o sTHRurEasxEL U WIN GLASS MaucERS OFFc vER Fr zE x - M•is TOP ANO SHELv MIR,O d > T ., srAwou+Os n 7 9" x-�#-x-..: , szs � V I '= Q_ 141' s woarc CORNIER HEEDED%RADLusrMEN 4'-0" 4'-0" *3'-9' 78 --Iv 77• I M.,B Mu P ELARCER rHAx Man TEREDTABLB b o § _ -- u 3 M•szs TEREDPROMo ILIA cc In xL .zB.L xaB.L - - M.sa FaAGRAxcE FEaruRE rABLE ULTA cc _F.. 4'-0' < T oT , cLP BOARD HOLDER ne-x 78^ En < x.]A.l x.zB. xfea xseL Y w i B.L T.m. uN:LPBDARo HOLDER LENGTHI wTx G, -- _ _ Q -_ zIA _ !- IS 4-0^ x -� x Tm MALssonF LE MDuxre A �' � - - BATTERY OPEMTEO WALL Mo°NT ABLTA 2FL PeI %IB�L 3aL %3BL 16 v nMW� Y CLCgt OFF CEAx OR Nl0uN6E °C _- TYe BULLET1RGNAL11 B ITUMMIGNTE A-5 ULTA I [ x - 3 Uf, TBe BULLETIN OwRD zN III ATIL'AED ATOFsswrc U s 4.0 '_-. -- _ -.--x- _ 47-* �"�" -x `Q 2,7' 3.B" -III AT rF 1 __ L. �e FRSTAm Axo BLOW BOURNE srocrcaooxxEAR SL �[ y vATxocsxrcT � {xzaL x.zOL xzem xmLM 7 3 _ 3 sFExsrav NEAR _fi 6 4 ReMbions ONE.-AT SAING ETV CNE coraFDDOR A - x L a -11' ____ - Q ISSUE FOR CLIENTiLL REVIEW r.a SOLE quo O'SPEEARYR - _ -__ __-.-- ..- m -- Te% _ Tr% - L O O xxc O SEC'R EE-IDEoYISMA ULTA - 5 fi szs ^ m - -- L,I S106/1 RBIDIPERMIT cuaN o rvore C _ - �03/O6I15 DERsroRAGE giis® T rK R F.D. S __ _-_-_ _ _-_-_-_-_-_ o REVISION PER CITY .VERIFY L �03I24115 T,S PAPERr EL DISPENSER u G.C. w p fD x „ wFlxISHOPMAC DLTA GL � � � � � k p w uNT °LTA 4 m . ' ---,a-- w�LUxT * G2 42 a' - ' ! 0 WGWPER WALL UNIT GLTA ' 8.9._ t 11 1EGINITE111-11T CUTS ISO * ,. >< ULTA ED cz EF4'-6"- CEILING ELEMENTS, 3'0" I SEESHEETA-3.1 A 4'1° 4A" 4'2" - 3 B -_Ail FOR DETAILS. M <PE rwARCH PERMnER wau w _- -- _.. hryP 9 fi eA -.-3-8 xTA I. xa -SIB we FDA 16H w/MGONDOIRRORS A END IN IT ULTA SO Na 33'HIGH ADA COUNTER WITH 30 WIDE m Ai x-zUa x-La, xz J' 4=. xg u I. x,Bx PLAxx.xGONDDu D � - _ o * ' 38 6 zia FDA LOW coxoou ACCESSIBLE SIDE APPROACH SEE - xz _ -. a 8.7 -' zieE FDA LOW coxo°usxxuxr DLTA cc. YY 11AE,1.FOR POWER ROUGH INS,SEE A­ NERCHANDISING TABLE CH, LTA D.c. DETAIL VF-1.115 AND ELECTRICAL qE, 0$I25115 DRAWINGS. a "' 4x"A n "'rNSLD e PRo G.C.TO START INSTALLING PERIMETER a as --_ --- -0^ ARCHITECT AR 985350 WALL FIXTURES FROM THIS POINT I � �vP �+� F i k' � I x.uL a Gc � � RErALcoxoou x-,Oa aEin conooin cA&PRo U G.c. M G� o W BENEFTERFIXTOL - p� °o PER MnERFxruRE GUTA Gc. xza ROLL xGBE MLTELwCER ULTA G.C.TO COORDINATE CASHWRAP -- _ _ _- zB Msie xn 91 i - 35 �--_-- Ms '\x OAR Gc _ LOCATION WITH CONDUIT_BTUBS 3 10 - I 1- - zaA.L MASS CO ETCS GONDOW unA cc AND ELECTRICAL REQUIREMENTS 56 - azeL MASS COSMETICS c°x°OLA uLTA at LOCATE CONDUIT TIGHT TO SIDE uSB 1fir srwAc�I nEd z-aL c°mROSMETIS GONDOL unA cr. " Y < 'm x<r-" -4 FLOOR ELEMENTS, LIBRARY OF CASHWRAP,SEE ELECTRICAL I 60 SEE SHEET A4.1 FOR .-I caLORLIBRARY xoou OLu I DRAWINGS FOR ROUGH-IN PLAN_ "-"A F I DETAILS. ru . - J x1U BExEFTCo6AxD BROW ULTA "-- --� --- - - - - -- --- -T TT T `+ - --- �,EREBrcERTFVTHAT 'E BEEN PRE TABLES naimw G.c. A _-_-_- __.__.___...._ _.__ ___ _-_ _J�_-: _ _ ___ ___yam_____ham ��.�_ 1111 UNDER My SUPER' E1111 NOTE'. ` G.C.TO START INSTALLING OWM1EDCE.TIESME..M RULES. .-II UIPPLANDMI-ANDICIG ULTA ED1. ALL SOLID SURFACE TOPS TO BE PERIMETER WALL FIXTURES LATINc TOSTND-INA CES"LLCTURESND wcs JOINED,FUSED AND FINISHED BY AN I FROM THIS POINT zse PRESTIGE GONDOLA EXPERIENCED SOLID SURFACE t SEE EXTERIOR CONTRACTOR. ELEVATIONS&CS-2 FOR &aL Low F°mRE ULTA cc _23 0"_ _ 6'-_2_'_'_ (_20'-0" _ _6_'-2" 1T-0' 4'-2 aRcwrECT 11. Gc 2. FOR CASHWRAP AND BACKWRAP -10 AWNING INFORMATION, INSTALLATION ONLY SCRIBE TOE I EXISTING ^Y^�,v�,y�,-\,�^,� Dr-By Chocked By xaE LowsxovxruRE °" BB"`°`ORLBRRYxBER, VESTIBULE ru MAESGENERAL PCA&PRo a /�oo pp pplIo�pp ii�� I�I��pp IMLII F�I�qq KICK BASE TO FLOOR ANDINSTALL FIRE EXTINGUISHER MINIMUM RATING CW BW Ex , ALLOWABLE irOu SH AREA AREA/SR SECONDARY BASE AFTER.- I 78'it L-E100 t � OF 2A-10B THE TRAVEL DISTANCE vzL MABSCOSIAETCSENOCAP u a FROM AN EXTINGUISHER SHALL NOT Scale Date vT PREsr G11.11 P ILIA SALESIRETAIL AREA 8,320 1 2 3 EXCEED 75 FEET.COORDINATE EXACT 118'=1'-0" 03106115 \�/ Job No rs PRO xnx ExocAr a TA SALON AREA 745 YAPSH ,A§,FJ QUI..,�.,FI LL PLAN e 5549 z-I Lml cAsxwRAP LEFT ON RIGHT uL,A -. zu SERMmE COUNTER LATE uon SUPPORT AREA osPeus>nIFxuLwnvsoDMs 865 ASH LEAS E UI E TVPIC L NORTH WQDRTra'O SM xG.CUTTING COLOR slat AxDFAOLET FINiNLRxED T 2-z �Ow nsn xc STAY axsw uLEDer cC TOTAL SOUARE FOOTAGE 9,930 1-T DxBT FIXTURE PLAN zT CoxcBRGE Dssrc AREAS ARE NOT TO BE USED FOR CALCULATING OCCUPANCY,EXITING.PLUMBING A SheBl Na zsLWe Mluwoarc PARnaL HEIGHT TO BE AssEMOuow FIELD. u,TA FIXTURES,ETC.FOR USE BY ULTA ONLY.SEE CS FOR OCCUPANCY CALCULATIONS SCALE'. lid"=1'U" PLAN KEY NOTES: 1❑ EXISTING PERIMETER WALL:EXISTING DEMISINGIBUILDING WALL TO REMAIN. - ") STL.STUD @ 18"O.C.SEE I 8"INTEGRAL COLORED SPLIT-FACE CMU I �" "' •` ""-O G.C.TO FIELD VERIFY COLUMN LOCATIONS&NOTIFY ARCHITECT&ULTA CONSTRUCTION PROJECT PLAN FOR STUD SIZE I BEHIND 8 MTL.STUD FRAMING WITH I r MANAGER IMMEDIATELY OF ANY DISCREPANCY. BATT INSULATION. PROVIDE(7)ROWS OF 2 x 4 HORIZONTAL FIRE RATED BLOCKING FOR INSTALLATION OF 10'.0"TALL GYP.BD.-518' I METAL STUD WILL BE CLIPPED TO CMU. 4❑ STANDARDS.SEE DETAIL 71A-8.3 FOR ADDITIONAL INFORMATION. G.C.TO VERIFY CONSTRUCTION IN I FIELD PRIOR TO START OF WORK. G.C.TO PROVIDE PLYWOOD BLOCKING IN WALL FOR MIRRORS.REFER TO ELEVATIONS FOR MORE INFO. < m ❑5 SKIM COAT WALL TO LEVEL 5 FINISH FROM FLOOR TO UNDERSIDE OF ARCH, CONTINUOUS 4"x 3/4'FIRE-RATED PLYWOOD BACKING PLACED ABOVE GYP.BOARD&SECURE TO GYP. y i YY11"\ ❑6 BOARD CEILING FRAMING SYSTEM BETWEEN STUDS,TRACK STARTS @ 6'FROM INTERIOR PARTITION WALL CLEAT WITH 2X8 ____________ BIYYIYIrj h OR ARCH FIXTURE ILA0 y4� `w I F _-_-_- _-_-_-_-_-_ _-_-_-_-_-_-_-_-_-_-_ -_-_-_-_-_- 3 �a CONTINUOUS WOOD \J G.C.TO INSTALL ULTA(FIXTURE CONTRACTOR)SUPPLIED WALL CLEAT&G.C.SUPPLIED&INSTALLED BLOCKING BEHIND 7 WALL BLOCKING(2 ROWS)AT HEIGHTS INDICATED IN PERIMETER WALL.SECURE CLEAT TO BLOCKING. '-'- ¢ -OCCURS AT PERIMETER I SALON SHAMPOO/DRYING CLOSET CORRIDOR ❑ w A-2n STAGING OFFICE FOR BLOCKING&LOOSE CLEAT HEIGHTS,REFER TO 2/A-2.0. 3 g $ WALL FIXTURES ONLY. 1O2 103 ' 105 10� 109 WINDOW SHADES ARE BE INSTALLED ALL WINDOWS.SHADES WILL NOT BE LOCATED ON H �i I -TRANSOM AND VESTIBULULEWINDOWS.SEE FURNISHED BY ULTA& 110 A4.1 FOR SHADE SPEC. N 3 N " INSTALLED BYG.C.SEE BLOCKING DETAIL 9IA-22, r------- -- -----,.. --------- -..----...-.-T J^•.: --- ---� ..,` ❑9 SEE DETAIL 81A-8.3 FOR WALL BASE INSTALLATION AT PERIMETER FIXTURES. NAILER RAIL-OCCURS AT 3 3 2 - r 10 G.C.TO PROVIDE(2)2 x 12 FIRE TREATED WOOD BLOCKING IN WALL FOR LENGTH OF VALANCE. q gym 0 3°?o- PERIMETER WALL FIXTURES , 1 ATTACH PLATE WITH 3112'LONG LAG BOLTS.SEE DETAIL 11A3.1 FOR ADOTIONAL INFORMATION. "3^"O 3 y ONLY FURNISHED BY ULTA ; III_'_J A p A 1 A 1 a T ^ Jj &INSTALLED BY G.C. 11 REFER TO SHEET P-5 FOR WATER HEATER PROTECTION REQUIREMENTS. ,�„ 3 E _-_- ;192 _J__ I�-J+-^- ^-i L'-U" -- 7�. f08 ❑ w ..... ao . -I WASHERIDRYER--- ❑ REFER TO ELECTRICAL DRAWINGS AND INTERIOR ELEVATIONS FOR TEMPERATURE SENSOR AND LIGHT -'-- SWITCHLOCATIONSATOFFICEANDCOORDINATEMETALSTUDFRAMING, /Pµa/ / / C Eli B 109 B-� 1Oa ❑ 3l4"FIRE RATED PLYWOOD FLOOR SLAB TO 6"ABOVE CEILING ON ALL THREE SIDES OF ETAGERE I h �/ +' .� 1 .-,H.H�u 3 p^ 13 NOTE:G.C.TO INSTALL WOOD BLOCKING WITHIN WALL.PATCHIREPAIR GYP.BD. I i. / STORAGE PAINTED P-1. .I 10A BACK OF SIDEWRAP TO BE ANCHORED TO WALL.G.C.TO INSTALL 2X8 WOOD BLOCKING IN WALL.TOP TO ORIGINAL CONDITION WHEN BLOCKING IS REQUIRED INSIDE EXISTING WALLS. 14BE MOUNTED AT I 1 3 8 11 15 i, C° OCKING DETAIL. G.COF.TO FLAT TAPE WALOOD St.DCKING TOLS POST INSTALLATION OF FLOORING:G.C,TO FLAT2.2 FOR TAPE ALL WALLS TO BLOCKING AT PERIMETER WALL FIXTURES,TYP. i L ❑3 15 FLOOR FOR WALLS THAT REQUIRE COVE BASE. 2 I A I 13 B C i'68 107 I WO OBNS V Q _ _ IMF h SCALE: 111z'-1'-0" 163 15 `�So?', 11 Sa'� �I �. w NOTE I 3 i2t ro C / �B N Ip...... N 4 a=1 FOR WALL CLEATS AND W000 BLOCKING REFER TO LATERALLY BRACE TO LATERALLY BRACE TO 1 �r BLOCKING AT PERIMTER WALL FIXTURE DETAIL THIS SHEET. STRUCTURE ABOVE.SEE STRUCTURE ABOVE,SEE 162A 15 7 m a,: v , NOTE#10 BELOW.ATTACH NOTE#10 BELOW.ATTACH TO I I I 1` r I } x x TO TOP OF TRACK WITH(2) NOTE: xA TOP OF TRACK WITH(2)#10 ❑ #10 SCREWS. OFFICE WALLS TOiA SCREWS. ;? I 7 B c c MENS co A x x OUTSIDE FACE. ----...--.�-.-Y�-- REFLECTED CEILING PLAN FOR STORAGE •..1/ REFLECTED CEILING PLAN 1 �,"�- T 9 \ ' PROVIDE LEVEL 5 FINISH 5 j 107 Mil co ABOVE OFFICE 10 15 10 LINE OFCEILING-SEE A-8.2 FOR FRAMING LINE OF CEILING-SEE 1 -r -- - ---------------7----------- EXTEND GYP BD ON r OUTSIDE FACE SEE � 7c -- �j G.0 TO VERIFY BLOCKING NOTES: U) EXISTING STUD - GYP.60.-5/8`, A-6.1 - A-8.1 GYP.BD.-518, --? (CEMENT BD.AS REQ'OJ .7 GENERAL NOTES. 0 y� FRAMING,SIZE, I 1, ALL IN WALL BLOCKING BY T.G.C. z SPACING,GAUGE 1 Q .,,� STL STUD @ i6'O.C.SEE I FLOOR ELEMENTS.SEE 7❑--.'--,I 2. PLYWOOD BLOCKING IN WALL BETWEEN AND FLANGE PLAN FOR STUD SIZE , SHEET h4.1 FOR DETAILS. , STUDS FOR ANCHORING REPORT FINDINGS STL STUD @ 16"O.C.SEE 9❑-J- 3. ALL WOOD BLOCKING TO BE MIN.314"THICK Lgy G TO ARCHITECTS. PLAN FOR STUD SIZE SOUND ATTENUATED I6.. 10 I FIRE RETARDANT TREATED(AS REDID.BY ®y Q INSULATION 38'-7' I 39'-1" I I CODE) ------------------ - ------------------ 4. ALL PLYWOODAND TREATED(AS BE FIRE LINE OF EXISTING ______ -`I _-_ _-_-_RETARDANT TREATED(AB BLOCKING REOD.TO BY CODE) DEMISING/EXTERIOR .� p I i WALL.PA"rCH AND POWER DRIVEN FASTENER @ POWER DRIVEN FASTENER I I I SALES. REPAIR AS REO'D.TO 32"O.C.(TYPJ SEE DETAIL @ 32"O.C.(TYP.)SEE -- PERIMETER WALL CASE FIXTURES MAINTAIN FIRE )ETA ti u RATING 51A-22. DETAIL SIA-2.2. 2) I FIXTURE CLEATS FURNISHED BY ULTA&INSTALLED •y STL.STUD RUNNER STL.STUD RUNNER SALES BY G.C.,BLOCKING FURNISHED&INSTALLED BY G.C. „w SEE MILLWORK FIXTURE CUTSHEETSAND O'°o�' HOLD GYP,BD.FROM HOLD GYP BD.FROM f I 101 BLOCKING AT PERIMETER WALL DETAIL THIS SHEET. UE UNFINISHED FLOOR.SEE UNFINISHED FLOOR.SEE /� B/A-8.2 FOR DETAILS AT BIA-8.2 FOR DETAILS AT _� C 1)}- I FOR RETROFIT INSTALLATION AT EXISTING GYP,BD., 4). PERIMETER WALLS AND PERIMETER WALLS AND 7 a REMOVE DRYWALL AS REQUIRED TO INSTALL a v u v B A-4,1 FOR FLOOR FINISH C A-4.1 FOR FLOOR FINISH EXISTING DEMISING WALL: Il..l.I IN CONTINUOUS 2x8 AND REPAIR WITH NEW GYP.BD. E U'- O O LOCATIONS. O LOCATIONS 518`GYP.BOARD OVER 8"MTL.STUD I 9 7 TO MATCH EXISTING DRYWALL TYPE AND FRAMING WITH BATT INSULATION (FULL THICKNESS)OVER 6" y THICKNESS. STUDRETURN,SCREW BLOCKING STANDARD CMU.METAL STUD WILL BE A WITH KERN AT STUD RETURN.SCREW BLOCKING BE CLIPPED TO CMU.G.C.TO VERIFY = TO EXISTING STUDS THROUGH STUD FLANGE AND U CONSTRUCTION INFIELD PRIOR TO `� :r z°� -I z STUD WEB TO SECURE EACH SIDE.USE'TRU-GRIP" START OF WORK. 1 Q SCREWS. / SECURELY ATTACHED TO EXIST. c I I OFFICE: DEMISING WALL.SEE DETAIL VA-2.2 ---d-�7 @ 2 }L_.',I 1 Q SHELVING 36"HIGH BLOCKING @ 63"ARF F.F. I LJ COUNTER TOP- BLOCKING CENTE / LINE OF CEILING-SEEENTERED � REFLECTED CEILING PLAN P-1 'A.F.F. HEADER TRACK I 10 I STAGING AREA: CONTINUOUS SURFACE MOUNTED HORIZONTAL STL STUD@i6'O.C.SEE Typ, 7 FIRE RETARDANT 2,4 BLOCKING AT EACH SCREW LINE OF EXISTING WALL PLAN FOR STUD SIZE 518'GYP.BD. I I 518'CEMENT BD. �I I r A 2 2 I 1 5 HOLE IN WALL STANDARDS.SEE INTERIOR '�'� I ❑ ELEVATIONS TO PROVIDE MORE WALL BLOCKING FOR Revi6ons j GYP.BD.-518" 6" FRP PANEL 38'4" 39'-1" 1'-i = 031061150R CLIENTILL REVIEW �i WALL MOUNTED STORAGE.SEE INTERIOR 3 ELEVATIONS FOR LOCATIONS&SPECIFICATIONS. � � , ISSUE FOR BIDIPERMIT P-i ______ ______________ _ _______ I'. MOP SINK SIDE C '1-----------y --'^ --- �03108/15 STL STUD @ i6'0 C.SEE PLAN - I} RESTROOM9 / l REVISION PER CITY FOR STUD SIZE SECURELY - r ! i G C TO PROVIDE SUFFICIENT WALL BLOCKING FOR 1Q �„�-CEILING ELEMENTS.SEE 03124115 ATTACH NEW STUDS TO EXIST. G.C.TO VERIFY EXISTING REINFORCED WALL MOUNTED TOILETS-GRAB BARS AND j - SHEET A-3.1 FOR DETAILS c STUD WALL CONSTRUCTION. CONCRETE SLABS GRADE IS 4 'I� > ACCESSORIES.SEE PLUMBING SHEETS FOR TOILET Q ` 2112 DIA.STEEL POST AT EACH MINIMUM THICKNESS MIN LOAD I I z SPECIFICATIONS. END.CORE AND GROUT SOLID INTO CONCRETE SLAB WITH BEARING CAPACI fY 100LBS/SQ FT POWER DRIVEN FASTENER @ WB-2 NON-SHRINK GROUT. AND PROVIDED WITH MINIMUM SHEET 2 A-6,1 3 I Q TO MATCH 32"O.C.(TYP.)SEE DETAIL VAPOR RETARDER ASTM E1745,CLASS EXISTING BASE TO 51A-2.2. i�. POWER DRIVEN FASTENER 32" I, I 'C',10MZL.CONTACT ARCHITECT i WRAP AROUND ALL @ " STL.STUD RUNNER SIDES I i O.C.(TYP,)SEE DETAIL 51A-2.2. 7 IMMEDIATELY WITH DISCREPANCIES. 1 I _... UN FINISHED FLOOR.SEE VT-4 9 ! 1 BIA-8.2 FOR DETAILS AT , - I I HOLD GYP.BD.FROM li STL.STUD RUNNER PERIMETER WALLS AND A4.1 .. i OFOR FLOOR FINISH LOCATIONS O ...,L Jf VT-4 A . D '� 2A, EXISTING DEMISING WALL: f �\ 518'GYP.BOARD OVER 6"MTL.STUD 03125115 El FRAMING WITH BATT INSULATION(FULL ...I, THICKNESS)OVER 8"STANDARD CMU. 71 LICENSED DEPTHN) /FLANGE WIDTH ATTACHED FLOOR OF AL SHANK DIA.x PARTITIONS 314"PENETRATION @ 32' DIRECTLY TO THE FRAMING WHEN THE WALL IS PERPENDICULAR TO I PD A-8.2 2B 1 14.., w METAL STUD WILL F CLIPPED TO CMU. ARCHITECT' DEFT 1N) \ / (111001N) 1)THE BOTTOM PLATE OF ALL INTERIOR PARTITIONS SHALL BE 3)THE TOP TRACK OF EACH FULL HEIGHT WALL SHALL BE ATTACHED I j I r LL G.C.TO VERIFY CONSTRUCTION IN FIELD AR 086350 1 ' 111 W:" `^ PRIOR TO START OF WORK. ;.,FLOOR ELEMENTS SEE A 800 J 200 - 54 O.C.POWER RIVEN FASTENER HILTI DS,0A77"SHANK,1-112"MIN. FRAMING AND TO BLOCKING BETWEEN FRAMING @ 4'-0"WHEN THE 2C SHEET A-4.1 FOR DETAILS MEMBER PENETRATION,2,000 PSI MIN.CONCRETE,ESR-1663. WALL IS PARALLEL TO THE FRAMING. 15 ALIGN w (M LSKNEOSS 5 PROVIDE CEMENT BOARD UNDER ALL WALL TILER BEHIND ALL FRP, B ' A _ r" _-_-_-_-_- _ -_-_-_- Ju9Nn.w1IIR6xMl TYPE 2)WALL STUD TABLE: ) @ - - ------------�-- III - CONVERSION ( MAXIMUM ) -------- t4 1I(- ' r.��1 - STnmoFlonlro J=JOIST(OR STUD) TABLE WALL HEIGHT STUD SIZE SPACING REMARKS 6)NOTE ALL BRACING AND SUSPENDED COMPONENTS ARE FROM 10IT [ 15 8 ..�. q 1 [5 O e 15 'f PROVIDE ADDITIONAL LAYERS=STUD STRUCTURE(NOTFROM DECK)DO NOT PENETRATE THROUGH DECK JABOVE. II OF GYP.BD.AS REQUIREDT-TRACK MILS GAGE 13'-01 362S162S3 16"O.C. ESR188P. A ---- _: :-, --.,-__-.-.---- �- - -. r - _ -� ^� �� LL TO PROVIDE R FLUSH WALL. uroERMYTHAT 18 25 ) A T. .., 100 .___.-.._'�A., _-_-_-_-_--- EENUTANDER AoaoPERVI 18'-0' 3625162.43 i6"O.C. 7 ALL COLD FORMED STEEL FRAMING COMPONENTS BY CLARK DIETRICH, �' I HER BY CERMY iXAi iNE6E PLANE HAVE BEEN PRE EET 27 22 18'-0' 362SI62-64 16"O.C. 8)INSTALL COLD-FORMED METAL FRAMING ACCORDING TO TABLE AND awx OMLHATro ALL RULES, uEcauP�r mrH ALL Ru�Rs, 3g p0 362S162S8 ALT.6008162-33 16"O.C. AISI'S'STANDARD FOR COLD-FORMED STEEL FRAMING-GENERAL w,.! ! -f AxcasoPrwlx PAna.lo REIAlINTI NSAAD0RoN6Paea F.pN0.9, 22'-0" BOOS162-33 16"O.C. PROVISIONS"AND TO MANUFACTURER'S WRITTEN INSTRUCTIONS. 2'-10' 23'-0" 6'-2` 10'-6" 6'-0" 3'-6" 6'4" 18 8" 4'd' 43 18 9)WATER-RESISTANT GYPSUM BACKING BOARD SHALL BE USED AS A - 24'. 1 800$162.43 16"O.C. BASE FOR THE TILE IN WATER CLOSET COMPARTMENT WALLS INSTALLED 54 16 ARCHRECT 28'-0" 60OS162-54 i6`O.C, Fy=W KSI IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS. 40'-0" 40'-0" 68 14 10)WALLS TO BE BRACED TO STRUCTURE ABOVE USING ALTERNATING EXISTING 28'-0" 6005162-54 i6"O.C. Fy=50 KSI STUDS(3626162.33).MAX.UNBRACED LENGTH OF 4'-0'.SEE CONNECTION Drawn By Checked By W 97 1z VESTIBULE cw Bw 30'-0" 8005182-03 i6"O.C. DETAILS ON SHEET A-8.1. NEW PARTITION WALLS,SEE WALL I 1 I 1OO I NOTE:ALL STEEL TO BE MIN.Fy=33 KSI U.N.O, 11)SEE STUD WALL CONSTRUCTION DETAILS ON SHEET A-2 2. TYPES FOR FUTHER INFORMATION 1"INSULATEp C EAR Scale Date A-7.1 NOT (68 E:GAUGE EQUIVALENT STUDS ARE NOT AN ACCEPTABLE STUDS WITH FIXTURE ATTACHED TO WALL TO BE BRACED WITH SATIN ANODIZED ALUMINUM EXTERIOR AWNING OF 2 AS NOTED 03/06115 ALTERNATE G.C.TO PROVIDE COPY OF MANUFACTURER'S 15OU50-54 COLD ROLLED CHANNEL(CRC)@ 4'-0"O.C.VERT. -� EXISTING PARTITION 1 2 3 FRAMES PROVIDED BY LANDLORD MTL CANOPY PROVIDED BY PROVIDED BY LANDLORD AND PLAN Job No. METAL STUD SUBMITTAL TO ARCHITECT PRIOR TO ORDERING. SEE DETAIL 6/A-2.2. ��"�,^„ -i ihl NEW INSULATED INTERIOR PARTITION UNDER SEPARATE PERMIT. LANDLORD. UNDER SEPARATE PERMIT,TYP.1, NORTH NORTH 13-5549 WALL TYPES NOTE:G.0 TO INSTALL WOOD BLOCKING WITHIN WALL.PATCHIREPAIR GYP BD DIMENSION PLAN TO ORIGINAL CONDITION WHEN BLOCKING IS REQUIRED INSIDE EXISTING WALLS. Sheet No. 1 A -2o0 SCALE: 1.1/2"=1'0" SCALE: 118"=1'-0" Y I I , I I I I I , I I I SHAMPOO/ WASHER/ OFFICE DRYING CLOSET CORRIDOR DRYER ' _--------- -------------------- - 103--------------- ---------------� --- --------------- - 110-----------104-- �`-------- I I ' I 6A I I , , 1B WATER TE PADHEATER AND GUARD AT 6D I '... WATER HEATER.SEE WATER A-6.2 6B I A-6.3 HEATER DETAIL ON P-5 O z v 78'-s" 6C o � Q 38'-10" 21'-8" � ao CO1'-53/4' 5" 5" 5" 5" 5' 5" I 0 co 6'-0. 18'-10 3/4' 4'-7" A T-5112" 16'4" 3'0" 2'-5" 3'-11" 4'-1" D.O. I"', 5 D.O. ( 4A UL 9(6 w V.I.F. V.I.F. ®-i 4D A-fie 4B —_ - - - - �i - - --- - -- ----- - ------- -- ._ PHI - -- a H ( 4. ^l -- j -08 T 3A 7A 1A ELEC.j m PANELS _�_J✓ f ------ �� 1C - 3D A-6z 3B ,� 7D A-sz 7B � 1IF A$.a A- 3'0' I 0" 3'0" 5$' 3 0" 3 9 1 5" 51, 0 3C _o— -- Do. _ 7C MEN — — I r 38• ..5 C 17 8 C3 STAGING ;2---- I ` 107 c m ti 102 m o- WOMEN 1 a 5. U 7" Ia 7 1 4 1i A-38 3 5A c9 s LnM 7'4° >U. ———^T • —----75D 5C M s I ! I A ' I. I A-6,3 p,0„N fir_ M '. I I. 1 I I Revlsians 1D A-6.2 1B ISSUE FOR CLIEN71LL REVIEW ! 5B 5B SE �03106/15 A-6.2 A$.2 Q 3SU6E FOR BID/PERMIT 6112' OPP. REVISION PER CITY D.O. I _ 1 03124115 IL- I I SALON ! }-�1 �. ---------------� Q � I INSTALL WC-5 AT SIDE OF NEW WALL ��-.— CONSTRUCTIO AP WC4 --_--- I ARCH.IINSTALLLIWARL CO ERING ND WW N PRIOR TO INSTALLING LIGHT ARCH f 1 TO ENSURE WALL COVERING I _——— I EXTENDS BEHIND ARCH, / ! INTER f — ---_ 1 INSTALL WC-SATSIDE OF NEW! I --- ! IOR WALL ' 1 WALL CONSTRUCTION.WRAP ! I 1 VVC BEHIND ARCH.INSTALL I 1 WALL COVERING PRIOR TO I �: I L... I� _.._�I 1- >, 03/24/15 INSTALLING LIGHT ARCH TO �. ! \ ENSURE WALL COVERING i F1 LICENSED 1 \ EXTENDS BEHIND ARCH. ! 4r I \` I ARCHITLCT tl- ARCH I AR 965%0 `-------1-TE�tO�W�L�---. I I i I I L I� JOHNA.CLIIPh1AN D - ------- i-BB — - -- -- — ---- __ - - -—-—-—_----—------ 6iAlEWIONI(1 tl I I I HERE BY CERTIFY THAT LHESE PLANS HAVE BEEN PRE r PARED UNDER MY SUPERVISION AND THAT TO THE BEST 't OF MY A—EDGE,THE EMHE COMPLY ARTH ALL RULES, REGULATIONS AND ORDINANCES 0P TWINF�r L},24.i0 IATING TO BTRUDTURES AND BUILDINGE 1 ARCHITECT Drawn By Checked By NEW PARTITION WALLS,SEE WALL ® TYPES FOR FUTHER INFORMATION I Scale CW Date BW 0 EXISTING PARTITION I PLAN 0 NEW INSULATED INTERIOR PARTITION _ ( I NORTH NORTHJG 1 3=6 5 4 9 ENLARGED SALON PLAN Sheet N0. 1 SCALE 114--l'0 — c NOTE:REFER TO MANUFACTURERS DETAILS 14" .O J DIAM.(U.N ACT-1 NOTE: ADDITIONAL INSTALLATION INFORMATION. PREMANUFACTURED p'1 G.C.TO FIELD VERIFY STRUCTURAL COLUMN COLUMN COVER FIBER SIZES,NOTIFY ARCHITECT IF COLUMN IS TOO REINFORCED GYPSUM LARGE FOR PREMANUFACTURED COLUMN F WB-1 PROVIDE COLUMN TRIM RING AT CEILING. ENCLOSURE. LT.GA.STIFFENER Q G.C.TO USE"MANUFACTURER APPROVED 4'-0"O.C.VERT. VINYL LATEX TOUCH UP PAINT"ON ALL COLUMN COVER TO EXTEND 6`ABOVE CEILING CUT EDGES OF ACOUSTICAL PANELS. 3628182-43 FASTENERS Q 6" O.C:COUNTERSINK iA p.g TI RUNNER TRACK _ I} TAPE,FILL AND SAND BY ATTACHMENT ALL SIDES I INSTALLER TYPICAL AA i SHIM AS REQ'D RUNNER TRACK BLOCKING AS RED'D S _ A-2.2 STRUCTURAL STEEL BEND METAL RECEPTACLE COLUMN-EXISTING WB 1 FACE PLATE TO MATCH COLUMN ENCLOSURE RADIUS. PROVIDE COLUMN TRIM COORDINATE LOCATION AND RING AT CEILING ---- SEE SHEET CBS FOR HEIGHTWITH ELECTRICAL COLUMN COVER VENDOR. DRAWINGS 8 SECTION @ COLUMN COVER 7 COLUMN COVER DETAIL SSEE A 4.1 FOR PECIFICATIONSNISH Q SCALE: N.T.S. SCALE: 1112"=V=0' TYPICAL O GS BRACING SCHEDULE + JAMB Q r STUD P Q ITEM ORDER# REMARKS TYPICAL 0 'CRC" 112CR16 "BRC"TO BE ATTACHED WITH M 0 J�JI WALL STUD BRC3 STUD SIZE=3B%B (2)-010 SCREWS O ® z Q 'BRC' TO"CRC"ANO TO THE STUD BRCS STUD SIZE=6"ORB" QCONTIHERE RACTOR TO SUBMIT PRODUCT INFORMATION V ® Q� z FOR REVIEW IF ALTERNATE VENDOR IS SELECTED. + TOP TRACK ATTACHMENT SCHEDULEMATERIAL FASTENER SPACING REMARKSTYP.LATERAL BRACING SPLICE HILTI DS,0.177"SHANK, �1♦ CONCRETE 32'O.C. EMBED 1"MINIMUM �r' zUSE:(1)-12"LONG'CRC' 1-112"MINPENETRATION, INVERTED OVER CENTER OF SPLICE 2,000PSIMIN.CONCRETE, Lnp�WITH MIN.(3)-#10 SCREWS } ESR-1663 v0 mON EACH SIDE OF SPLICE \�' X-U P.A.F. "CRC"(COLD ROLLED CHANNEL), BRACING TERMINATES AT (1)-#10 SCREW 32"O.C. MATERIAL 143 MILS(>18 GA.) TO BE SPACED AS RED'D BY DESIGN BUILT-UP JAMB OR POST,EXTEND"CRC" STEEL U . INTO PUNCH-OUT.ATTACH"CRC" (1),110 SCREW 18"O.C. MATERIAL<43 MILS(<IS GA.) p: TO JAMB OR POST WITH"BRC"WITH _ SCREWS Q PRE-DRILLED HOLES OTHER ATTACHMENT TO BE APPROVED BY DESIGN ENGINEER •� .H tl o F: C J, PARTITION DETAIL - LATERAL BRACING 2 PARTITION DETAIL - TOP TRACK Etm=w PA _ - 0 - 6 S E: N.T.S, - L TYPICAL u WALL STUD (SEE PLANE FOR SIZE) HILTI DS,0.177"SHANK,1.112- MIN.PENETRATION,21000 PSI MIN.CONCRETE,ESR-1883 TYPICAL RUNNER TRACK (SEE PLANS FOR SIZE) RevTBi0115 r CONCRETE FLOOR SLAB ISSUE FOR CLIENTILL REVIEW ISSUE ISSUE FOR BID/PERMIT 2 a"MINIMUM DIETRICH E543 EASY -- J" '+ 03108115 EDGE DISTANCE CLIP Q 4'-0"OC / Q 16 GA.CLIP ANGLE AT TOP (2)#10 SCREWS / OF EACH WALL STUD + j BELOW TOP TRACK WITH 2 Q + /i/ -#10 TEK EACH LEG, Q EXTEND 12"ABOVE ' /� SUSPENDED CEILING 0 ' EXISTING MTL.STUD DEMISING L1 WALL CONSTRUCTION ------ 5 PARTITION DETAIL-TRACK ANCHORAGE � , 18 GA.CLIP ANGLE AT EACH / STUD WITH 2-#10 TEK SCALE: N.T.S. EACH LEG,CLIP ANGLE AT MID.SPAN OF EACH LEG. 54 MIL(16 GAGE) + ' / SLOTTED SLIP TRACK. 03125115 ATTACH SLOTTED SLIP TRACK n LICENSED TO MAIN STRUCTURE " 0 ARCHITECT 16"O.C.(N.T.S.) (SEE ATTACHMENT SCHEDULE) O 1"GAP All 085380 TYPICAL WALL STUD(SEE I"GAP TO ALLOW TABLE ON A-2.0 FOR A GYPSUM BOARD WALL SIZEISPACING COVERING(SEE PLANS) FOR VERTICAL O ) - DEFLECTION aOIIN A.cFImMAn NEWIEXISTING LIGHT GAGE " 0 SEE DETAIL FOR >< aTnTo GFIDAIIIB METAL WALL STUDS(SEE O 0 TRACK ANCHORAGE PLANS FOR NEW STUD SIZES) O FIN.FLOOR SECTION VIEW ,%�` (HEREBY CERTIFY THAT RESE PLANE HAVE BEEN RE PAREDUNDER MYSUPER MISMANDTHATTOTHEBEST .!1 OF MYANOWLEDGE,THEBAMECOMPLYWITHALL RULES, REGUTATIONSANOOROINANCESOF]WIN FALLS.ID NOTE: RELATING TOSTRUCTURES AND BUILDINGS. 2x8 WOOD BLOCKING FOR ALTERNATE GAP AMOUNT, NOTCH KERF FOR STUff'�'TTRUI 8-15x1Yz"ITW BUILOEX NOTIFY ARCHITECTIENGINEER ANcnRem - FLANGE LIPS TYPICAL SCREWS,MIN.2 PER SIDE WALL STUD Drawn By Chocked By ATTACH TRACK TO STUD CW BW WITH SCREW FOR ATTACHMENT OF SLOTTED Q EACH FLANGE. SLIP TRACK TO WALL STUDS: D:PARTITION TYPE FROM A-2.0:NEW STUD WALL NOTE:NEW STUDS TO ALIGN WITH EXISTING Scale Dale TIGHTEN SCREWS,THEN BACK ADJACENT EXISTING INTERIOR METAL STUD WALL. DEMISING WALL STUDS. AS NOTED 031G6115 NOTE:SEE PLANS FOR BLOCKING HEIGHTSILOCATIONS OFF 112 TURN. SEE A-2.0 FOR WALL PLACEMENT TO[Nf,LOSE NOTE:ALL WORK TO MEET LOCAL BUILDING BUILDING COLUMNS. Job No. ---- CODES,ORDINANCES,AND SSMA SPECIFICATIONS.ONE d 9 BLOCKING DETAIL 4 PARTITION DETAIL SLOTTED TRACK 3 NOT USED DEMISING WALL (TYPE D) ShGGINo@ SCALE: N T.S. SCALE: Q2D2 N.T.S. SCALE: N '!UFlLE; N.T.S. NOTE:CABINET GRADE WOOD TRIM PROVIDED 100 VESTIBULE 104 WASHER/DRYER CLOSET —'�,I AND INSTALLED BY G.C.TRIM PIECES TO BE EXTERIOR DOOR PULLS '� STANDARD ITEM IN STOCK,CUSTOM PIECE IS ITEM QUANTITY FINISH MANUF. MODEL# ITEM QUANTITY FINISH MANUF. MODEL# MOUNTING HT.NOT TO BLOCK I�I il. I. WHITE ACCESSIBLE y NOT REQUIRED. __.. _— LOCKACCESS ilk ka I SYMBOL(TYP.) MANUAL FLUSH BOLT EXIST, EXIST, MTD.ON INACTIVE TRACK 1 - JOHNSON 100 LOCATE CLOSERS I\ BRAILLE LETTERS NOTE:SEE PLAN AND INTERIOR ELEVATIONS LEAF G.C.VERIFY PER ADA 7 FOR APPLICABLE LOCATIONS. -- -'— � � INSIDE �--�------ 'v 3/4"FINISHED WD 1I2'x2"PERIMETER WD. 4 t12"X4112"B.B.WI NON ACCESIBILITY&GENDER < BUTTS EXIST EXIST, TOP PIVOT SET 1 - JOHNSON 107 ALUM.STRFT i SIGNAGE AS PER STATE JAMBIHEAD.(DO NOT CASING.SETBACK}j" REMOVABLE PINS I PROVIDE STOP AT FROM FACE OF JAMB — - -_- DOORS(BY ILL.) &LOCAL CODES(ONLY m JAMB) PUSH EXIST. - EXIST, DOOR HANGER 1 - JOHNSON 1125 a RESTROOM DOORS) --------------------------- ---- 2X FIRE TREATED WD,BLOCKING -- --- CHARCOAL GREY WITH PULL EXIST. - ELMES T6010-01.001-L452 TRACK STOP 1 - JOHNSON 1155 WHITE LETTERS& SEE A-2.0 FOR WALL TYPES SYMBOLS UNLESS CASED OPENING. 112"x2"PERIMETER ogb ,-.4, OTHERWISE REQUIRED (DO NOT PROVIDE LOCKSET 1 BEST &CONSTRUCTION PANEL HINGE 3 PR. - JOHNSON 1703 - o�ih"''� BY CODE CASING.SETBACKYE' 518'GYP.BD.TYP.BOTH SIDES.SEE CORE)CYLINDER KICKPLATE STOP AT JAMB) PLAN VIEW FROM FACE OF JAMB INTERIOR ELEVATIONS FOR FINISH _ b i o SOLID CORE. CLOSERS/PIVOTS 2 EXIST. EXIST, TOP JAMB MOUNTING BOTTOM PIVOT 1 - JOHNSON 1706 O —— _ A LOCK FLUSH-BOLT TOP AND B BOTTOM PIVOT CYLINDER BOTTOM AS APPLICABLE THRESHOLD EXIST. GPEMKOROUT p255A INCOMPLIANCE WI ANSI BRACKET ' JOHNSON 1011 AS APPLICABLE \ PROVIDE WHITE\ GROUT SOLID CABO it7.A4.t3.B. SEE DOOR HARDWARE SEE DOOR HARDWARE CAULK,TYP.Q \ GASKETINGBSILL DOOR ALIGNER 1 - JOHNSON 1808 SCHEDULE SCHEDULE non \ / INSIDE CORNERS \ WEATHERSTRIP EXIST. EXIST. SWEEPS I^�� 1'-0" VISION PANEL WITH \ / \ I�'�`�f4�L EMPLOYEE ONLY" P1�P \ / \) 101 SALES DOOR KNOB 1 - JOHNSON 33 _ LOUVERED SIGNAGE MOUNT TEMPERED GLASS (REFLECTIVE SURFACE T - DOOR FACING OUTSIDE M I —���- �'--'-' � _-� DIRECTLY UNDER � \ ITEM QUANTITY FINISH MANUF. MODEL# 106 SHAMPOO/DRYING-EXTERIOR(BACK) WITHF LSE ROOM)PAINT FRAME WITH FALSE VISION PANEL.SEE T WD.TRIM, I ------ ----- LOUVER,SEE DOOR SCHEDULE P-1 / 4 112"X4 tl2"B B.WI NON f/ DETAIL 1A FOR LOCATIONS, EQ. EQ.\TYP. Burrs Exlsr. Exlsr, ITEM QUANTITY FINISH MANUF. MODEL# souocoRE. \ / _ _- REMOVABLE PINS 1 THIS SHEET ? PREMACHINED FLUSH ((fly P-1 u' \ / PUSH EXIST. EXIST, BUTTS EXIST. STAINLESS STEEL - 41/2"X41/2'HEAVY DOOR.DUTY j P-1 pTEL705 COCKNEY PULL EXIST. - ELMES T6010-01-001-1-452 CONTACT PANIC DEVICE 1 - COCKNEY JEFFCARROL Q Q PAINT DOOR ISOMETRIC VIEW CLOSERS 2EXIST EXIST. TOP JAMB MOUNTING HEAVY-DUTY SPEC C EWER D &FRAME P-1 8 FRAME CLOSERS EXIST. ALUMINUM WI THRU BOLT 60"A.F.F. P-7 � co 102A STAGING INSULATED - ---- WEATHERSTRIP EXIST. - GASKETS&SILL TI? O HOLLOW INSULATED ITEM QUANTITY FINISH MANUF. MODEL# SWEEPS ` METAL DOOR HOLLOWPEMKO � IN COMPLIANCE WI \ EXIT METAL DOOR pp� Lu 7 WOOD CASED WALL OPENING DETAIL _ THRESHOLD GROUT p255A ANSICABO DEVICE EXIT DEVICE VO®co BUTTS 1.112 PR. US26D BOMMER BB500041/2 X4112 GROUT SOLID 117A413B #8400,10'HIGH%35" PASSAGE LOCKSET \.T.S. LOCKSET 1 626 YALE SATIN STAINLESS WIDE- AU5401LN KICKPLATE EXIST. NEWSTEEL 8400 U532D40X35-CS v -4 `4 12'02"ONE WAY LL ICKKI /PLATE ICKPLAT 0 PUSH SIDE �' VISION PANEL 1 ONE-WAY - GLASS MIRROR b� WHERE NECESSARY DRILL HOLES TO _ TEMPERED GLASS 107 MEN �'g 0 _ ADHERE BREAK METAL TO FEED WIRES THROUGH VERTICAL FLUSH BOLT TOP I' STOREFRONT MULLION MULLION SYSTEM TO CAMERA, STOP 1 US26D ROCKWOOD 440 - E AND BOTTOM F 0i WITH 3MTWIN STICK TAPE ITEM QUANTITY FINISH MANUF, MODEL# OR SCREW FASTENER IF — KICKPLATE 2 US32-D ROCKWOOD K1050 10"HIGH x 34" APPROVED BY LANDLORD i 1 �'`Q}.v Sic ' _ WIDE BUTTS 1.112 PR. US26.0 SOMMER B8500041/2 X 4112 ��tr!— _l-- \ RUN CABLE CLOSER 1 689 DORMA 7414 ARP SNB ( -. � (�..•N'O. THROUGH/ \ METAL TO DOOR LOCKSET 1 626 YALE PRIVACY LOCKSET (� P" 18" CLEAR SPACE \ AU5402LN ( , MIN. CENTERED ON TACTILE I MULLION 102E STAGING-EXTERIOR DOUBLE DOOR LOCATION OF TACTILE SIGNS AT DOORS CHARACTERS /) I CAMERA - --- STOP 1 US32-D ROCKWOOD WALL BUMPER 409 I\ ITEM QUANTITY FINISH MANUF. MODEL# \\ BREAK METAL BUTTS 2 OR EA.LEAF EXIST, STAINLESS STEEL NON REMOVABLE PINS CLOSER 1 689 DORMA 7414 ARP SNB / \ / CHANNEL TO REMAIN __—___ __ ( / E \ 1 OPEN AT ENDS HEAVY-DUTY SPEC.WI CLOSER EXIST. THRU BOLTS.1609 STRIKE KICKPLATE 1 US32-D ROCKWOOD K115 0 10"HIGH x 34" ( Q / IN COMPLIANCE WI ANSI ( :E/ THRESHOLD EXIST. - J / _ °AB°"'A°'3B 108 WOMEN S DOOR MULLION CAMERA DOOR SWEEPS EXIST. GC TO PROVIDE 1/2'x1/2"16 — — ITEM QUANTITY FINISH MANUF. MODEL# SEE A-4.1 FOR FINISH GAUGEUSHAPED BREAK WEATHERSTRIP EXIST. GASKETING AND SILL 2 DOOR TYPES\ / / SPECIFICATIONS. ®1 ( SAMPLE / / METAL CONTINUOUS FROM ____ _ SWEEP / I TEXT / / MULLION TO MULLION TO RAIN HOOD EXIST. BUTTS 1.112 PR, US26.0 SOMMER BB50004 V2 X 41/2 SCALE', 1/V V-0" / \ / / CONCEAL WIRE FOR DOOR - — _ CAMERA.COLOR TO MATCH VIEWER EXIST. SATIN STAINLESS ROCKWOOD p6220NE WAY VIEWER ON LOCKSET 1 626 YALE PRIVACY LOCKSET / STOREFRONT SYSTEM. STEEL ACTIVE DOOR AU5402LN r SATIN STAINLESS K1050,10'HIGH x 35'WIDE- Sl8"TYPE"X" KICKPLATE EA.LEAF-E%IST. ROCKWOOD STOP 1 US32-D ROCKWOOD WALL BUMPER 409 GYP.BD.EACH STEEL US32D-10X35-CS PUSH SIDE SIDE OF THE b 4 --- -- STUD FRAME FLUSH BOLT i OR EXIST. STAINLESS STEEL MTD,ON INACTIVE LEAF CLOSER 1 689 DORMA 7414 ARP SNB WALL DOOR SEE Revisions GC TO PROVIDE AS BOX MTL FLOOR PLAN ISSUE FOR CLIENT/LL REVIEW SILENCERS ROCKWOOD 608 KICKPLATE 1 US32-D ROCKWOOD K1050 10"HIGH x 34" FRAMING STUD �03106115 REQUIRED WIDE p.1 �\ - — LINTEL CAULK /�ISSUE FOR BIDIPERMIT JI #TEL-105 TEL-DDA 48228- BOTH (�031M15 TTXX-377:LOCKNET 109 COAT CLOSET SIDES 16 GAUGE STEEL PANIC DEVICE CONTACT COCKNEY - COCKNEY 16 GAUGE REVISION PER CLIENT HEIGHT OF TACTILE CHARACTERS ABOVE FLOOR OR GROUND CONTACT:JEFF CARROL STEEL DOOR DOOR RAME. 03124115 800-887.4307 EXL 239 ITEM QUANTITY FINISH MANUF. MODEL# FRAME p.1 0 DOOR HOLDER 2 US26-D ROCKWOOD 461L KICK DOWN STOP 45/8" P-1 6 LOCATION OF TACTILE SIGNS AT DOORS 5 TYPICAL DOOR MULLION CAMERA DETAIL — -- 156G SERIES WITH TRACK 1 JOHNSON 100 O MTL.FRAMING Q SCALE: 1/2"=1 a" SCALE. 112-V-0" DOORBELL 1 EDWARDS TRANSFORMERS AND WOOD FACIA P-' Q NOTES L OPERATING FORCE, CONFEOUIRE ALL A PLICASLEFEDERALI ST HEIGHTSL SIGNALING BUTTONS WEATHER986 SER EOOF S DOOR TOP HANGER1 - JOHNSON 1VOT SET 1 JOHNSON 1125 R CRHEAD07 N AL SEE STUDF A`M°GYP,BD, Q FRAME ,STATE LOCH RIP MARK LOCATION TYPE SIZE DOOR TYPE FINISH HARDWARE REMARKS ACCESSIBILITY CODES(INCLUDING BUT NOT LIMITED TO MOUNT 103 OFFICE OF THE E WALL 2, ALL TRIM FOR INTERIOR DOORS TO MATCH DOOR FINISH PLAN 100 VESTIBULE A (2)3`0'XB'-0"X1-314'EXIST. ALUM. ALUM. EXIST. 100 1,3,4,5,7,8,9 3. ALL EXTERIOR DOOR HARDWARE SHALL BE PROVIDED BYG.C.UNLESS NOTED ITEM QUANTITY FINISH MANUF. MODEL# TRACK STOP 1 - JOHNSON 1155 BI-FOLD OTHERWISE. DOOR SEE BI-FOLD 4. G.C.VERIFY HARDWARE ON EXISTING EXTERIOR DOORS BUTTS L112 PR. US26-D SOMMER BB5000 41/2 X 4 112 PANEL HINGE 3PR. - JOHNSON 1703 FLOOR PLAN JAMB 101 SALES A (2)Y-0"X 8'4"X 1-3/4'EXIST. ALUM. ALUM. EXIST. 101 1,5,7,8,9 5. ALL EXITS TO BE OPENABLE FROM INSIDE WITHOUT KEY OR SPECIAL HEAD KNOWLEDGE. -------- P' 6, PROVIDE NEW DOOR PULLS,PAINT EXISTING DOOR TO MATCH SURROUNDING LOCKSET 1 626 YALE ENTRANCE LOCKSET BOTTOM PIVOT 1 - JOHNSON 1706 102A STAGING 0 3'-0"X7'-0"X1-3/4" WOOD H.M. SEE ELEV. 102A 1,2,11,13,15,16,17 STOREFRONT. B-AU5407LN _. ----- �3/2$/1$ EXIT SHALL HAVESIGN ON OR ADJACENT TO DOOR 7 STATES'THIS DOOR TO REMAIN UNLOCKED WHENEVER THE BUILDING IS STOP 1 US26D ROCKWOOD 440 BOTTOM PIVOT SEE A4 1 FOR 1 - JOHNSON 1011 1/� BI-FOLD DOOR DETAIL SPECIFICATONSNISH ARCk INECO 102B STAGING E (2)3'-0"X T-0"%1314'EXIST. EXIST, EXIST. SEE ELEV. 102B 113,4,5,8,10,12,13 OCCUPIED"WITH 1"HIGH LETTERS IN CONTRASTING COLOR WITH _ BRACKET /'1 AR 985350 BACKGROUND. 12"x12"ONE WAY SCALE: 3"=1'-0" B, MAXIMUM EFFORT TO OPEN DOORS SHALL NOT EXCEED'. VISION PANEL 1 ONE-WAY - GLASS MIRROR DOOR ALIGNER 1 - JOHNSON 1808 _. 103 OFFICE D T-O"X 7'-0"X 1-314" WOOD H.M. SEE ELEV, 103 1.2,11,13,17 A. 5.0 L.B.F.(22N)FOR EXTERIOR DOORS. S 5T TEMPERED GLASS ACH SIDE OF THE B. 5A L,B.F,22N FOR INTERIOR DOORS WIOUT CLOSER. C. 75.0 L.B.F!67N FOR FIRE DOORS. KICKPLATE 2 US32-D ROCKWOOD III PLAN STUD FRAME WALL 518"TYPE"%"GYP.BD. CLOSER 1 689 DORMA 7414 ARP SNB DOOR KNOB 1 - JOHNSON 33 f � 1 ( ) 518"TYPE"%"GYP.BD. EACH SIDE OF THE Rouen cwPAmry 104 WASHERIDRYER C (211'-6'X 7'-0"X 1314" WOOD H.M. SEE ELEV. 109 1,2,13 B, COORDINATE LOCATION AND MOUNTING HEIGHT FOR THE HOURS OF STUD FRAME WALL STATI:'It'Inrtlln OPERATION DECALS WITH ULTA. K1050 10"HIGH x 34" SHAMPOO/ 10. LOCKNET HARDWARE.T.G.C.TO CONTACT LOCKNET AT START OF WIDE 106 DRYING F 3'-0"X 7'-0"X 1-314"EXIST, EXIST. EXIST, SEE ELEV. 106 1,3,5,510,13 CONSTRUCTION.G.C.TO COORDINATE INSTALLATION WITH LOCKNET. 7,BOX MTL.FRAMING MTL.FRAMING LOCKNET CONTACT,JEFF CARROL 800-887-4307 EXT.239 STUD LINTEL 11. HM FRAMES TO BE KNOCK-DOWN TYPE AND TO BE INSTALLED AFTER FLOORING 16 GAUGE STEEL DOOR I HERE BY CERTIFY THAT-SE PLANS Hove BEEN PRE 107 MEN B T-O"XT-0"X 1.314" WOOD H.M. SEE ELEV. 107 1,2,11,13,14,17 INSTALLATION.FINISH FRAME JOINTS TO PROVIDE AN EVEN SURFACE AND NO FRAME,PAINT PARED UNUER NY SUPERVISION AAD THAT TO THE BEST CAULK BOTH SIDES P., OFMYIMO*LEDGE,THE SANECWLY WITH ALL RULES, IMPERFECTIONS.ALL SCREWS SHALL BE RECESSED,CAULK FRAME TO WALL. REGULATIons ANDOMINu�CESOI n_NFALLS.ID 12, G.C.TO INSTALL ULTA SUPPLIED STICKER WITH STORE TELEPHONE NUMBER ON RELATING TOSTRUCTURSSANO BUILDINGS 108 WOMEN 8 3'-0'X T-0"X 1314" WOOD H.M. SEE ELEV. 108 1,2,11,13,14,17 REAR DOOR TO COORDINATE DELIVERIES(AFTER CONSTRUCTION), 16 GAUGE STEEL DOOR 13, G.C.TO PURCHASE ALL DOORS,FRAMES,AND HARDWARE THROUGH LOCKNET, FRAME.PAINT 109 COAT CLOSET C (2)V-6"X T-0"X 1.314" WOOD H.M. SEE ELEV, 109 1,2,13 LOCKNET CONTACT',JEFF KIRKNER 800-887-4307 EXT.131 P-1 w n 74. UNDERCUT DOOR t".SEE ALSO MECHANICAL DRAWINGS, AROWTECT 15, INSTALL'EMPLOYEE ONLY"SIGNAGE. 18, PAINT DOOR AND FRAME P-6(BOTH SIDES). Drawn By Checked By 17, ALL WOOD DOOR CLOSERS ARE TO BE INSTALLED WITH THRU BOLTS WITH SNB CW BW FASTENERS. TREATED WOOD CAULK BOTH SIDES DOOR SEE FLOOR PLAN Scale Date BLOCKING AS NOTED 03/06115 DOOR SEE FLOOR PLAN TREATED WOOD Job ND. HEAD JAMB BLOCKING 1 3 e 5 5 n DOOR SCHEDULE HARDWARE SCHEDULE DOOR DETAIL SEE SPECIFIll FOR FINISH Sheel No. 4 3 1 FICATIONS. n e^LSJJe SUALE, NONE (lr(�\\\f, 11 SCALE' Q2 2'-0"STAGGERED FLUORESCENT TUBE-DOUBLE ROW FIXTURE GBNS 8'-0'FLUORESCENT TUBE-DOUBLE ROW FIXTURE,NON STAGGERED LIGHTING NOTES AT WALL FIXTURES: NOTE': Q3 3, 6"ROUND DOWNLIGHT-REFER TO LIGHTING PLAN ON ELECTRICAL DRAWINGS FOR TYPE N 1 EQ, EQ. OFFICE P-1 -1. G.C.TO REFER TO ELEVATIONS AND ALL OTHER SHEETS FOR ADDITIONAL -0'STAGGERED FLUORESCENT TUBE-DOUBLE ROW FIXTURE CSD LIGHT IX UR 1. FIXTURE WORK STOPS AT CEILING FOR ILLUMINATED ARCHES,REFER 103 GYP,BD,CLG. p._. :_ ..p CEILING/SOFFIT INFORMATION AND DETAILS.CONTACT ARCHITECT WITH A-8.2 G NS 3'-0'FLUORESCENT TUBE-DOUBLE ROW FIXTURE,NON STAGGERED d.1 DOWNLIGHT-REFER TO LIGHTING PLAN ON ELECTRICAL DRAWINGS FOR TYPE OF LIGHT TO 31A3,1 AND ELECTRICAL DRAWINGS FOR ADDITIONAL _ @ 8', A.F.f. QUESTIONS PRIOR TO PROCEEDING. FIXTURE INFORMATION,ACOUSTICAL CEILING TO EXTEND TO PERIMETER WALL "" _ CCTV MONITOR, 2. CEILING ELEVATION TO BE 1V-0"FROM HIGHEST POINT OF FLOOR SLAB. G4 4'.0'STAGGERED FLUORESCENT TUBE-DOUBLE ROW FIXTURE d.1 DOWNLIGHT,DOUBLE LAMP,FIXTURE WIRED TO EMERGENCY/NIGHT LIGHTING SYSTEM- iG4D o MOUSE, 3, ALL CONDUIT&J•BOXES TO BE SUPPORTED BY WIRE INDEPENDENT FROM r REFER TO LIGH ING LAN ON ELEC.DRAWINGS FOR TYPE OF LIGHT FIXTURE 2. AT VALANCE LOCATIONS WITH TWO TUBE FLUORESCENTS,CENTER - �- = KEYBOARD, ACOUSTICAL CEILING. G4AGROUP OF LIGHT FIXTURES OVER RUN OF MILLWORK LEAVING BLANK I 'l 4 KVM 4. FIXTURE RUN DIMENSIONS ARE SHOWN FOR REFERENCE ONLY.CONFIRM 4'-0'SURFACE MOUNT FLUORESCENT FIXTURE-SINGLE ROW FIXTURE DIV PENDANT 10OW,SEE ELEV�FOR MTO HEIGHTS CSY I 4 UNDER CABINET FLUORESCENT LIGHTING.FIXTURE TO BE MOUNTED TO UNDERSIDE OF AREAS ON EACH END. I' i _ OFFICE CEILING ACTUAL MILLWORK DIMENSIONS WITH FIXTURE MANUFACTURER. < ® 4'-0"FLUORESCENT TUBE WITH BAFFLE U® r 0 d BELOW I 5. FOR SPRINKLER HEADS LOCATIONS,SEE DETAIL 4/A-3.2. A INET.SEE MILLWORK DWGS.FOR LOCATION, V 6. FOR SALES FLOOR GENERAL LIGHT FIXTURE LOCATIONS,SEE DETAIL 3/A-3.2, r. G® G® 4A'SURFACE MOUNT FLUOR, - L R. - LINE OF OVERHEAD GRAPHIC TRACK "I"` -- ----- -- - 7, FOR CEILING TILE AT COLUMN LOCATIONS,SEE DETAIL 7/A-3.2. SE"MANUFACTURER PROVED G® SYSTEM EM RGE CY BATTERY BACKUPGSYSTEM EMERGENCY BATTERY BACKUP ®AE AV-0�SURFACE MOUNT SUPPORT WIRES SSPEAKERS BY UONE AZAK DTOACH CORNME ER OF C IN EILING CARE TILE CONTAINING EIAKER.DE ILING GRID F ---------- JI`. ACT2 ------ --- - ACTORAGE-- ACT4 --- ACT2- ACT-1--- 8 ALL CUT UEDGES OF ACOUSTICAL PANELS.VINYL LATEX TOUCH UP PAINT"ON G4eNS 4'-0"FLUORESCENT TUBE-DOUBLE ROW FIXTURE,NON STAGGERED ® EXIT SIGN,EMERGENCY BATTERY BACKUP 'I CUB.HT.@ I C. HT.@ CL�.HT.@ CLG,HT.@ CLG.HT.@ G6 a D SURFACE MOUNTED 2-HEAD EMERGENCY LIGHTIEXIT SIGN COMBINATION 13'-0"AF.F. I 11'-0'A,F.F. 11"4"A.PF. 9'-0"A,F.F. 9'-0"A.F.F. "'STAGGERED FLUORESCENT TUBE-DOUBLE ROW FIXTURE ® SEE ELECTRICAL DRAWINGS FOR TAILS L STAGING OFFICE I SALON SHAMPOOIDRYING CLOSET CORRIDOR a D I 109 110 o SEE ELECTRICAL DRAWINGS FOR DETAILS 2. CABLE RUN FROM RACK TO L.P. GSUE ELECTRICAL DRAWINGS FOR DETAIL GeS BF-0"STAGGERED FLUORESCENT TUBE-DOUBLE ROW FIXTURE SURFACE MOUNTED 2-HEAD EMERGENCY LIGHT WITH BATTERY BACKUP CART IN RUN ,1 1OZ 103 105 'UWG5 4 -- 6'-0`FLUORESCENT TUBE-DOUBLE ROW FIXTURE,NON STAGGERED 1. CCTV`HEAD END IN LT.RACK I 4 3, CABLE RUN FROM I.T,RACK TO CASED OPENING K HEAD @ GYP,BD.SOFFIT 838A '-0"SURFACE MOUNT FLUORESCENT FIXTURE-SINGLE ROW FIXTURE E� DIFFUSER GRILLES,VERIFY WITH MECHANICAL DRAWINGS RETURN DIFFUSER CHECKSTAND PULLED THROUGIi I @7-O A.F.F.SEE T-O"A.F @6'-8"A.F.F. ACT-2 TO LOCATION OF CCTV MONITOR- I „ DETAIL 11A2,3 SEE 31A-3.1 GUBC 11.0F.FLUORESCENT TUBE WITH BAFFLE® 8'-0"SURFACE MOUNT FLUORESCENT FIXTURE-DOUBLE ROW FIXTURE (/E �------------- "�-"' I I _ =� i-_ __ /•X WC-5 - 11 --- -2'x3'FIRE TREATED PLYWOOD, GBD ___. �! ._.. "_ __.' -, WASHEWDRYER GCLTNO INSTALL TO ABOVE ® SYSTEM EMERGENCY FLUORESCENT UP # SECURITY CAMERA BY BETA VENDOR r)OHDOiFlTE FINAL LOCATIONS WITH ULTA. IT CABINET MAINTAIN MIN CLEARANCE - I' ----- �< 4'-,,;,, CL G8AE RESCENT FI D L PROVIDE OPENING IN CEILING GRID FOR WALL STUDS'. ® U 104 LL PLYWOOD WITH __ Ll ❑ ❑ O 1 zv AJ-BOX ADJACENT TO SIDE FOR GBDE - FIXTURE WI - OF 3'-0"ON ALL SIDES.SEE DETAIL BD GtlD RESTROOM SAS SECURITY ® NIGHT LIGHTING SYSTEM,EMERGENCY BATTERY BACKUP 101A-32,INSTALL ANGLED UNISTRUT I ® I II -- --- - 1 DEVICE.REFER TO DETAIL 81A 3.2 BRACE PRIOR TO PERIMETER BULKHEAD. _. = p Q CEILING SYMBOL LEGEND SEE SHEET CS 3 FOR ULTA LOCATION OF BULKHEAD DEPENDS ON GHU 8D RESTROOM SAS SECURITY ucnnNGVENDOR INSTALLATION OF ANGLED UNISTRUT, F - - .-- w I EML w I E WOMENS P-1 DEVICE ACT-2 EXTENDS ABOVE I I I -- -- -- - _ .+• 1 OB GYP,BD,CLG. SCALE. NONE SEE DETAILS ON A-0.3.--- � V W o 0 BD GBD I y .I i) ® GA G G3 J i w m w 0 @ 9'-0"A.F.F. RECESSED HANGER FIXTURE STORAGE PLATFORM 1 - - -- - -- - O -- - '-- '' '- i FILLER PANEL ABOVE C-45. CANT,362Ti82.33 WIRE HANGER VALANCE WITH EGG `� I P-1 SEE SECTION DETAIL 4/FAA B. _ q.q' / ATTACH TO EXISTING CANT 3825762.33 BRACING -CRATE LOUVER I I G4 GB 6 Q GYP.8D,CLG, WC-5 E ,� WALL FRAMING. ARMSTONG CEILING TILES -1 +Te, i - ATTACH TO HORIZONTAL& F - MENS @ S-0"A.F.F. e / i I @ BETHRINEHART NATIONALACCT.REP. ILL MIN TE AR H J I ❑ - .. I 32 107 _ _ _ _ _ 1 15/8" GYP.iBD 3ATTACH VERTICAL ARMST RON GP(DUCT I m _ -_-- - -- I _ / I- IL UMI AT A H 1 Ifi II ry p / I RSTUDS TO EFER TO DETAILS LS ON SHE NE 2 x4 SECOND LOOK II y� �J + + + + UCTURE ABOVE #2712 DU 1 ,. T ._ i s J..t I. ] I R'I !;I n #7300 12'MAIN RUNNER 1 I = m I �I a 1_b A-8.1 FOR CONNECTION o D s w Q�P-1 4XL73484MAIN RU TEE HEAVY DUTY ea, '..' .-#7301 12' qq^^ ' CROSS TEE ® I ® I ,�,>`8 l=/D®� SEE PLAN EL=15'-0" #XL73424'CROSS TEE HEAVY DUTY ❑ 01 e I 4 p _j m a - G C TO CONFIRM EXISTING WALL AND WINDOW HEAD CONSTRUCTION TO DETERMINE ti SOFFIT #7800 10' .. luul BOT@GYP.B.D CEILING gXL73282 CROSS TEE _ � c � NEED FOR BLOCKING BLOCKING FOR TRACK&SHADE TO BE"FIRE RETARDANT 162 162.33 @ BOTTOM OF #780012'WALL MOLDING _ " y /� L+ WALL MOLDING 2"x2"SEISMIC > ® A L PLYWOOD THE ENTIRE LENGTH OF THE TRACK&SHADE,BETWEEN STUDS.WIDTH -- z LR _......_. TO BE DETERMINED IN FIELD TO WORK WITH EXISTING WINDOW HEAD. TOP"AEF, #XL7318 V CROSS TEE A-3.2 w- ��-ii @ STOREFRONT BERG 2 SEISMIC CLIP _ _ �JJ 1 1L /cam SIDE MOUNT SHADE.REFER TO MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR O'l �U ❑ e Q 1„ BLOCKING REQUIREMENTS.SHADE SHALL EXTEND FROM 4 TO 4 OF VERTICAL 1 - � MULLIONS$O THAT THE SHADE PULL CORDS ALIGN WITH THE CORD TENSION DEVICE EXPOSED-FEE GRID(SECURED MOUNTED ON THE VERTICAL MULLIONS.SEE A-4.1 FOR WINDOW SHADE SPECIFICATION.fc ABOVE) I p F---------- --- _ - -- - - - - --- - - - - - - - _ I EXISTING EXTERIOR WALL.SEE SHEET A-6.1 FOR WALL FINISHES EL=1V.0" h I Li GBC LIGHT FI%TURES WILL BOT,@ LAY-IN CEILING4 I I fin. TRACK-ATTACH TO WINDOW HEAD FRAMING EVERY 12"WITH#10 SCREWS 5' EXTEND OVER ACT4 AT ❑ eO ° CORNERS SEE DETAIL VA3.1. - _--� ;; �"w STOREFRONT-EXISTING P.1 CAULK SALES n0 INSTALL CEILING GRID CROSS x ® ® 101 n =, ......_. CORD TENSION DEVICE.MOUNT ON VERTICAL MULLION SO THAT BEAD CHAIN IS TAUT. FINISH WITH PAPER EDGE BAR EVERY 4'-0".PROVIDED BY e rL REFER TO SHADE MANUFACTURER'S INSTALLATION INSTRUCTIONS. G.C. y ® I i6 I C tU g DETAIL a 4 NOTE:ALSO REFERENCE INTERIOR ELEVATIONS. FQ C d,n z SCALE: N.T.S. NOTE: 1. SATIN METAL GRAPHIC FRAME, �? 8 U KICKER - ❑ ❑ e ❑ i STRUCTUURERE 48'0,C,MAX. ACRYLIC INSERT,AND WOOD I REFER TO VA8.1 FOR - VALANCE BY FIXTURE ACOUST.CEILING TILE STRUCTURE CONNECTIONS CONTRACTOR AND TO BE 1 - J INSTALLED BY G.C.POP RIVET WC-5 r (- GRAPHIC FRAME TOGETHER. SEE INTERIOR z ❑ aa.l P- 362S162-33 FRAMING AND BRACING __ LIGHTING INSTALLED BY ELEVATIONS.RUN COVERING FROM A31 13 12"BELOW CLEAT TO UNDERSIDE OF ELECTRICAL CONTRACTOR.GYP. o U �-, TO WALL STUDS @ 16"0.0 ALL CEILING. > 0 ❑ 7 ❑ DU N ¢ CONNECTIONS(2)q10 SCREWS -- __ SO SOFFIT AND FRAMING BY G.C. z 2, TAPE AND USE BONDO(ALL --CORNICE BRACKET WI ADJ,FLANGE A 1 ® 2 ACT 1 > PURPOSE PUTTY)ON VALANCE AT 16'O.C.MANUF:CAPITOL 1 JOINTS FOR SMOOTH TRANSITION HARDWARE 800-327.6063 na.l CL 10 I LG. T. � ❑ aJ., C G.H. / T 11'-0"A.F. , PRIOR TO WALL COVERING FINISH:ANTIQUE IVORY i ® 11'-"A.,F. 1'-0" .F.. 8 I 11-0' F.F. �_-�- INSTALLATION.SEAL AND PRIME STYLE:2166-18"(+6"ADJ FLANGE) I I - JOINTS PRIOR TO WALL CORNICE BRACKET TO BE ATTACHED I ❑ ❑U Revisions COVERING INSTALLATION. TO WOOD VALANCE WI I.1l4"#10 i I QISSUE FOR CLIENTILL REVIEW WC-5 --._-__.....__.. ..... .........- ...._-_........._ SCREWS. j (_ _ '-^ 03/06/15 «t PROVIDE A METAL ANGLE AND 314"X G ® ❑ 1,-; �• ISSUE FOR BID/PERMIT „i 4"PLYWOOD BACKER(PRIMED)AT C ------'--- -- - - - +' ---- ------ �03106115 A.F.F. __ Q REVISION PER CRY BACK OF WOOD VALANCE WHERE IT 1 03/24115 B MEETS ADJ.ARCHIM 513 OR GYP.BD. ❑ O ❑ O 1 z4 5/8"GYP.BOARD OVER SEE PLAN TO PROVIDE SOLID CONNECTION. Q 3625182-33 @ 18"O.C. EL=i f'-0' `� Q WRAP WG5 BOTTOM OF CEILING ❑ - TO UNDERSIDE OF SOFFIT 2-0 WOOD VALANCE BY MILLWORK I VENDOR.VALANCE SHALL BE SEALED °d ❑ d-I ❑ ❑ 0 PRIOR TO INSTALLING WALL COVERING. Q INSTALLATION OF VALANCE AND WALL e I 1 I 1 -- L.-- H COVERING BY G.C. - I CONTINUOUS 314"X 4"PLYWOOD ® _ Ce SOFFIT DETAIL BACKER(PRIMED)GLUED TO WOOD - 3 VALANCE.ALIGN WITH BOTTOM OF j ® aa.f I CORNICE BRACKET BACKLIT WHI"TE ACRYLIC ❑ OU ❑ > SCALE: 1"=1'-0" PANEL WITH LIGHT FIXTURE 771) WG6 MOUNTED ABOVE SEE INTERIOR 6 1'•1" ELEVATIONS. INTERIOR CEILING-TYP. - COVERING AROUND BACKSIDE OF WIRELESS ACCESS POINT I ❑ YP. 03125115 q VALANCE TOP AND BOTTOM. _ I ❑ 2 11 O LICENSED ARCIHrrEar EL-8'-4"AFF CCTV MONITOR I -',, m Aft 985960 ........_..__._.__ __--_.. J A-ST ..p 1 TOP OF BRACKET I 12 1 9 CONTINUOUS WOOD BLOCKING 34'- 1'•9" a CHAIN HUNG ATTACH TO STRUCTURE ABOVE I FURNISHED AND INSTALLED BY G.C. tq UNISTRUT WIRE HANGER BLOCKING TO BE GLUED&SCREWED TO WOOD VALANCE. " f 5' 4 CEILING SUSPENSION SYSTEM " U_ _ _ _ _ - 1 B _-_-_-_-_- r. ` ..._...... -_ _... JO4INa.DIIIPMaN WIRE HANGER FLUORESCENT LIGHTING,INSTALLED w - - ur i SIGNAGE TRACK@CEILING - 6 STATE OPIDAIIO TEGULAR - BY G C PROVIDED BY ULTA. ACT-1 cYi SATIN METAL GRAPHIC FRAME WITH I c' I ae., CEILING PANEL( <0 INSTALLED BY T,G.C.,TYP. r^ _ e 5'-5" Ei#� '8.0'�. v '_q j v N 1. HIC GETHER CAULK SEAMF FO PREOVENT LIGHT I ..-.�_.e II /II __________ IIEREOYCERTIFY iYNi rHEBE RANI HAVE BEEN PRE LL ACRYLIC INSERT.POP PIVOT �� '' L 1 PARED UNDER MY SUPERVSIONAND TeAr r0NIEeESr _ OF MY-EDGE,THE SAME f-OMPLYW re ALL RULES, REGULATIONS AND ORO NANCE S OF I MN FALLSTEG .0 CEILING PANEL ACT-1 AR ACRYLIC PANEL BY G.C. RELanxc To erflucmRES AND BUILDINGS. ? PENETRATION SIGNAGE TRACK @CEILING FLEXIGLASS#2447-WHITE 4'-11" e'-0" I 8'-0" 4'-9" LINE OF I PROVIDED BY ULTA. 118"THICK G C TO PURCHASE (2)2 X 12 FIRE TREATED WOOD TYP, IL CL EXTERIOR G• NP. INSTALLED BY T.G.C.,TYP. "T"SUPPORTS AT ACRYLIC PANEL FROM CREATIVE CONCEPTS' BLOCKING IN WALL LENGTH OF LINE OF EXTERIOR CANOPY AncxlTeaT 4'-0"D.C.,TYP CONTACT:BRYAN KO CEPTS"AT VALANCE ATTACH PLATE WITH 3112' AWNING,TYP, p.i LINE OF EXTERIOR AWNING,TYP. (630)940.0500 LONG LAG BOLTS 4 4 EXISTING p.i 4 Drawn By Checked By P.CAME RA CROSS VIEWS A'a, A3.1 VESTIBULE O 131 GYP.BD.CLG, PERIMETER FIXTURE,INSTALLED BY SIM. GYP.BO CLG. 15.0"A.F.F. CW SW CAM ERA 4=REGISTERS 1,2,3 100 @ 1 CAMERA 5=REGISTERS 4,5,&SAFE @ 15'-0"A.F.F, Scale Dale PERIMETER WALL CLEAT,COORDINATE U PLATFORM ABOVE CEILING FOR ( ) ACT-1 J D.C.#14DOOR MULLION CAMERA EXIT VIEW). AS NOTED 03106115 NOTE: j '-" WITH FIXTURE SUPPLIER,INSTALLED BY 1 2 3 G.CTO PROVIDE BREAK METAL TO MATCH GBC LIGHT FIXTURES WILL A, G.C. SIGNAGE INSTALLATION. PLAN Job No. ....._ STOREFRONT AS REQUIRED TO CONCEAL EXTEND OVER ACT-i AT LINE OF ARCH,M 513,OR GYP.BO COORDINATE HEIGHT AND LOCATION NORTH NORTH2I o CORNERS. TYP,PLAN CORNER Of Ti17 -- - BEYOND - OF PLATFORM WITH SIGN VENDOR. WIRING.SEE DETAIL 5/A-2.3. - Ill/ d 2 1 A REFLECTED CEILING PLAN 3fEGYlEETA4,FDftFINlan Q DETAIL VALANCE DETAIL PEgFE,aTIONa Bhaal No ��j� {II SCALE: N.T.S. SCALE: 1 112"=1'0" SCALE: 'lle 'I'-0` ---..,._,.. `�o u KICKER BACK TO _ WIRE HANGER STRUCTURE 48,O.C. NOTE:SEE IC CONT.362T162-33 MAX ELECTRICAL ATTACH TO EXISTING CONT.3625162-33 BRACING DRAWINGS FOR WALL FRAMING. ATTACH TO HORIZONTAL& POWER } VERTICAL STUDS. EXTEND GYP.BD.6" �- PAST TO THE TOP OF IT REQUIREMENTS FOR + + A-BPEFOR CONNECOTIOR TO DETAILS ONry VERTICAL ET BINET ^ ^ EAS SYSTEM (O T P O STUDS TO STRUCTURE ABOVE. OOIDRYING E4LE5-0 _ _:....,. 2548 O.C.3 BRACE �m TI VEST 46"O. GYP.BD. P-1 CEILING -- - 3'X2'FIRE TREATED SEE PLAN EL=15'-0° SOT @ GYP.BD.CEILING n PLYWOOD.SECURELY �V EXISTING WALL.G.C. TTACH TO WALL STUDS. .C.TO CONFIRM EXISTING WALL - --'"!�� _ --__ AND WINDOW HEAD CONSTRUCTION CONT.362S162-33 @ BOTTOM OF SOFFIT -�1--- EXPOSED TEE GRID(SECURED �13'-0"A.F.E ABOVE) _ NEW 5/8"GYP BD.OVER VESTIBULE-EXISTING MTL.STUD FRAMING.SEE EL=11'-0" CAULK A-2.0 FOR STUD SIZE.SEE INTERIOR ELEVATIONS FOR 3, BOT.@LAY-IN CEILING WIT 52-33 EL=9'-0' FINISH. WITH 518"GYP. / BUT @ CORRIDOR P-1 CAULK BD.PAINT n - _ P-1 (ACT-1) FINISH WITH PAPER EDGE pp�p �J 11 DETAIL -VESTIBULE NOTE:ALSO REFERENCE INTERIOR ELEVATIONS. 10 IT CABINET ACCESS DETAIL 9 NOT USED 8 EAS AT TOILET ROOM CORRIDOR SCALE: N.T.S. SCALE. 1"=1'=0" SCALE: NONE SCALE. 1-112"=1'-0" a O Z 0 CONTINUOUS PLYWOOD FOR Q CORNICE BRACKET----'�-- °+ CORNICE BRACKET —WOOD VALANCE O Q a TYP.ACOUSTICAL TOP OF M-513 TO ALIGN WITH LU1R ® QQ CEILING TILE.SEE A-3.1. 'r'-.?` BOTTOM OF VALANCE.PROVIDE nncc 314'z4'PIECE OF PLYWOOD THE llL WIDTH OF THE M-513 AT BACK 0 OF WOOD VALANCE AND M-513 - -- - - _5 < Z EGG CRATE LOUVER . LIGHT FIXTURE WITH Q Q STRUCTURAL COLUMN AND COVER SHOWN FOR CONTINUOUS WOOD BLOCKING. P Z A REFERENCE ONLY. WALL COVERING ON M-513 SIDES SEE A-3.1 FOR ADDITIONAL INFO. TO WRAP OVER TOP EDGE PROVIDE SECONDARY --METAL GRAPHIC FRAME GRID PARALLEL TO NOTE: SHORT SIDE PERIMETER OF CEILING TILE,TYP. TAPE AND USE WOOD FILLER ON U v INTENT IS TO HAVE AS VALANCE JOINTS FOR SMOOTH LITTLE SECONDARY GRID TRANSITION PRIOR TO WALL COVERING INSTALLATION.SEAL a AS POSSIBLE. SIDES OF M-513 TO EXTEND AND PRIME JOINTS PRIOR TO 0-O TO BOTTOM OF VALANCE. WALL COVERING INSTALLATION. A/j o C 7 CEILING TILE AT COLUMN DETAIL 6 NOT USED 5 VALANCE LIGHTING ACROSS M-513 AT DERMALOGICA AREA E b SCALE'. 3M-1'0" SCALE'. NONE SCALE'. N.T.S. �— NOTE: 1. SATIN METAL GRAPHIC FRAME, V ACRYLIC INSERT,AND WOOD VALANCE BY FIXTURE WC- SEE INTERIOR 4 CONTRACTOR AND TO BE ELEVATIONS.RUN COVERING FROM INSTALLED BY G.C.POP RIVET 12"BELOW CLEAT TO UNDERSIDE OF 4'-0" GRAPHIC FRAME TOGETHER. CEILING. 2' 2'-0" LIGHTING INSTALLED BY ACOUST.CEILING TILE ELECTRICAL CONTRACTOR.GYP. ILLUMINATED ARCH.FIXTURE WORK STOPS BE,SOFFIT AND FRAMING BY G.C. CORNICE BRACKET CA ADJ.FLANGE EXISTING WALL,G.C.EL VERIFY 2 TAPE AND USE RONDO(ALL AT i6"O.C.MANUF:CAPITOL @CEILING.SEE 31A-8.1 AND ELECTRICAL CONSTRUCTION INFIELD. P %3 1 URPOSE PUTTY)ON VALANCE HARDWARE 800-327-6083 DRAWINGS. UNISTRUT CHANNEL 1.518X 1-5/8 JOINTS FOR SMOOTH TRANSITION FINISH:ANTIQUE IVORY X 12 GA. ATTACH TO TOP PRIOR TO WALL COVERING STYLE:2166-18"(-6"ADJ FLANGE) - CHORD AS INSTRUCTED BY INSTALLATION.SEAL AND PRIME CORNICE BRACKET TO BE ATTACHED Revisions LANDLORD.SEE CONNECTION JOINTS PRIOR TO WALL TO WOOD VALANCE W/1-114'M10 ISSUE FOR CLIENTILL REVIEW DETAIL#4 ONA-8.1 SHEET. COVERING INSTALLATION. SCREWS. w "� ------- -- -(—PROVIDE A METAL ANGLE AND 3/4"X AlEiSUE'FOR BIDIPERMIT 4"PLYWOOD BACKER(PRIMED)AT --- - -- 03N6/1 PROVIDE MIN.(5)1/2"0 BACK OF WOOD VALANCE WHERE IT / I ^Q ^V ^� J I `N Q - - - THREADED RODS TO SUPPORT MEETS ADJ ARCH/M-513 OR GYP.BD. i J VU V Il BOTTOM UNISTRUT CHANNEL. TO PROVIDE SOLID CONNECTION. / CLIPANGLE PROVIDE RODS AT BOTH i. EL=11.0. L-------- --- ----- ---- ---- ---------- (� Q PROVIDE BRACING CORNERS AND @48"O.C. BOTTOMOFCEILING Q BACK TO STOREFRONT - - @ 48"0 C WOOD VALANCE BY MILLWORK VTYP. STICAL CEILING TILE,SEE A-3.1. EXIST,STUD FRAMING VENDOR. ''II J L BE R TO INSTALLING WALL S!. SPRINKLER HEADS TO BE CENTERED WITHIN 2'x2' " ----- -_- -- J,- (3) TOZ ,� COVER NG.A SEALED ANSTALLAT OLN F I — �. UPORTION OF 2k4'SECOND LOOK ACT TILE,TYP. ATTACHED TOOTHREADED _--- 'RODSWITHPIPE CLAMPS V CONTINUOUS 314"X4"PLYWOODADJUST'V"TYPE PENDANT VALANCE AND WALLCOVERING BV4 — _5 0'MAX. T—— CORNVALANCE BRACKET INTENTLIGN BOTTOM OF I s t i.� I ` I- �- t LIGHT ALONG AXIS INDICATED SPRINKLER HEAD DETAIL SO THAT PENDANT IS3 MIN SCALE 3,4-1-0' 600T162-43 SECURELY ) \ FROM NEAREST CEILING SPLINE. ' INTENT IS TO HOLD q.PENDANT LIGHTS 9 OF -"` EXTENT OF GYP.BD.CLG�-- AN 'FROM CHORED INTO EXISTING ) _ j —, EXTERIOR WALL FRAMING ) - WC- EDGE OF SALON COUNTER AND SEE INTERIOR '� C CENTERED BETWEEN THE 03/25/15 " EL=15-0" p ELEVATIONS.WRAP WALL I --1 ❑ I - ■ SALON CHAIRS `� �'v COVERING AROUND BACKSIDE OF - LI CNSED i T/VESTIBULE CLG. l _ ^ ARCHITECT RECESSED LIGHT FIXTURE �" VALANCE TOP AND BOTTOM. I >t"_._I T 2'� 2-0" _ EXIST.MTL.STUD VESTIBULE FRAMING. N EL=e'-4"AFF 4 0 FURNISHED AND INSTALLED BY G.C. O SEE PLAN i� TOP OF BRACKET CONTINUOUS WOOD BLOCKING - - ri 2" 4'2" 4 V 5' -' BLOCKING TO BE GLUED&SCREWED rus»n.crnrxuw o i r 1,. TO WOOD VALANCE. —� 7 U .-.`__aU_- - ❑U Slnre ov luarin v ------------------- - - SATIN METAL GRAPHIC FRAME WITH - _ ACRYLIC INSERT.POP PIVOT - CONTINUOUS FIRE TREATED m GRAPHIC FRAMES TOGETHER 2z4 ALONG PERIMIETER OF LL ¢o G.C.TO PROVIDE WHITE ALUMINUM EL=T-O"AFF HEREarcERnrrrneTTnsSEPLAREMEBEERPRE- PLYWOODPLATFORM ^^ Fz ANGLE ALONG WALL AND VALANCE AND - '� WED UNDER Mr SUPERASiON µO TEST TO THE BEST FIRE TREATED TH ui RuiEs. ^ T-GRID AT 2'-0"INCREMENTS.THE CAULK SEAM TO PREVENT LIGHT a,aOF MY ooRolwwc THE Es or TwwruLam PLYWOOD DECK 600S16243 MTL.JOIST @16" LENGTH OF THE AREA OF EGG-CRATE unRDTosTRUCrosESANOEUnmHDS. � O.C. PENETRATION ~ LOUVER.ALIGN WITH BOTTOM EDGE OF PROVIDE CONTINUOUS VALANCE AND INSTALL ON PERIMETER FLUORESCENT LIGHTING,INSTALLED 60OT162-43 TO ENCLOSE END BY G.C. aRcevEIT O OF OPENING TO SUPPORT EGG-CRATE i--------_ � � i OF FRAMING (2)2 X 12 FIRE TREATED WOOD BLOCKING IN G.C.TO PROVIDE V X 1"WHITE EGG UNISTRUT CHANNEL P1001(1 5I8" Drawn By Checked 8y z3114",12 GA.)AT UNDERSIDE WALL LENGTH OF VALANCE ATTACH PLATE CRATE LOUVER AT DERMALOGICA CW BW TYP.ACOUSTICAL CEILING TILE. i WITH 3112"LONG LAG BOLTS ONLY,SEE PLANS FOR LOCATION. SEE A-3.1, .OF PLATFORM FRAMING Scale Date NOTE:ANY CEILING MOUNTED FIRE ALARM DEVICES,SPEAKERS,OR LIGHT FIXTURE TO BE CENTERED WG SEE INTERIOR ELEVATIONS LINE OF ARCH,M-513,OR GYP.6D. AS NOTED 03/06/15 SECURITY CAMERAS SHOULD ALSO BE WITHIN 2'x2'PORTION OF 2k4' LOCATED PER THE SAME DIRECTION. SECOND LOOK ACT TILE,TYP. NOTE:COORDINATE HEIGHT, _ BEYOND PLAN Job No WIDTH,AND LOCATION OF — NORTH NORTH ZI�e�� /,1//4II9 PLATFORM WITH SIGN VENDOR IIII 3 LIGHT FIXTURE DETAIL 2 PLATFORM DETAIL CEILING HEIGHTS 1 EGGCRATE VALANCE DETAIL A ENLARGED SALON REFLECTED CEILING PLAN Shee1ND Q NOTE:SEE A-3.1 FOR SCALE 3 -1 0 SCALE: 112"=1'-0" SCALE. 1112'=V'0' SCALE: 114"=V-0" �n� ROOM FLOOR WALLS REFER TO PLANNORTH CEILING REMARKS MARK LOCATION FINISH BASE NORTH EAST SOUTH WEST FINISH HEIGHT T 100 VESTIBULE PT-2 W8-1 - P-1 - - GYP.BE.P-0 1 101 SALES PT-21PT-61VT-3 WB-1 WC-5IWC-6 P•1 WG51WC46 WC-51WC-6 ACT-11 15'-0"l11'-0" N° GYP.BE.P-1 ED 102 STAGING VT-4/VT-5 WB-2 P4 P-1 P-1 P4 ACT-2 13'-0" I I �__....__-...-... J m 103 OFFICE VT4 WB-2 P-1 P-1 P-1 P-1 GYP,BD.P-1 8'-0" ..__ ...... I I 104 WASHEWDRYER PT-2 WB-2 P-1 P4 P-1 P-1 ACT-2 11'-0" --- 105 SALON PT-21PT-6 WB-1 WC-5 WC-5 WC-5 WC-5 ACT-1 111-0" N° VT-0 VT-4 PT-6 PT-2 PT-2 PT-2 106 SHAMPOOIDRYING PI W8-1 WC.5 WC-5 WC-5 WC-5 ACT-1 III-0' �""o,""E1A11�',°EE.1111R.a"D J STAGING OFFICE SALON SHAMPOO/DRYING CLOSET CORRIDOR uTHE ::D,x,NEAr w wnEREB ErT,u DEAMUTSA u a 102 103 105 104 09 10 107 MEN PT-2 PT-2 WC-51PT-2,PT-7 WC-5/PT-2,PT.7 WC-51PT-2,PT-7 WC-51PT-2,PT-7 GYP.BD.P-1 9'-0" w 108 WOMEN PI PT-2 WC-S/PT-2,PT-7 WC-5/PT-2,PT-7 WC-5IPT-2,PT-7 WC-51PT-2,PT-7 GYP.BD.P-1 9'-0" _I LL VT;RE 5 AT 'p{ L� o ED MOP W.H. 10 Lu CONC. Aaz 110 CORRIDOR PI W8.1 WC-5 WC-5 WC-5 WC-5 ACT-1 9'-0" -1 P4 P-1 ACT-2 9'-0" SINK ` -- 1 i-- ANEL3f -_-_____- E WASHERIDRYE PT-PORCELAIN TILE ACT-ACOUSTICALCLG.TILE PL-PLASTICLAMINATE --SPECIFICATION.SEE FINISH SPECS,ON A-41 ...( ) WD-WOOD WB-WALL BASE WC-WALL COVERING 'I" 1 1 (J 1 FINISH MATERIAL 2 ROOM FINISH SCHEDULE I =a'r!i I L } 15 9B, �_ _ ,oB PT-2 EXTEND CO) - WOMENS KEY MAT'L. MFG. SPECIFICATION FL&sMOKEAO NOTES: REMARKS /7 7 -� sA '�2^ k e2E I PoacELAIN S,ALE NONE _ Ho / C� sae, TILE 4'-O UP ALL z 1 L RESTROOM 1L DESCRIPT - U�°_� �� �" v 1 n DEVELOPMENT �_ �'� � I WALLS SEE Oo -" ..4 ( INTERIOR _DUNE SECOND LOOK PRELUDE 122X4%314",15116"ANGLED CLASS A-258 USEE LTANA ZONAL ACCCTINFOON SHEET CS-3 FOR �•� MENS ELEVATIONS. III :v v ® M ACT-1 ACOUSTIC TILE ARMSTRONG TEGULAR WITH PRELUDE 15116 50 ULTA NATIONAL ACCOUNT ( ( ) I � 107 PT-z JI IJ e� e11 � CORTEGA-769-24x48x518"WITH PRELUDE%L 15118' CLASS 258 SEE VENDOR CONTACT INFO ON SHEET CS-3 FOR I I ACT-2 ACOUSTIC TILE ARMSTRONG } x\ 00 RE ALSELECT PEARLEXPOSED TEE SYSTEM(501FINISH 10 ULTA NATIONAL ACCOUNT PEARL 550)FINISH ON WALLS AND FLAT 547 P-1 PAINT TEAGD77MI;COLOR WHITE NIA JASON WALKER NIA FINISH GYP,BO.WITH PRIMER AND PAINT TO FLOOR FINISH ON SOFFITS AND CEILINGS.SEMI GLOSS 1 \ `�, pn ® co BENJAMIN _ 7-8698; - I III IIIII N/D® P-6 COATING WEARLON WEARLON 711 WA INSTALLATION FRAM AFTER P-11 HSEE VENDOR PRIOR TO (551)ON DOOR FRAMES&TRIM .. .. I WILLIAMS WII APPLYSEMI-TO DOORS SAND FRAMES.G.C.TO USE P-7 Lu PAINT SW 7071 GREY SCREEN WA 860539 PEZZATO BIANCO(MATTE) V'GROUT JOINTSETTING •� ( ( 1 ' - IIIII ® (� ND FURNISHED BY ULTA PORCELAIN GRANITI GROUT COLORRMAPER27EX X5 SILVER) G.C.TO USE TEXSPAR PLUS TILE CLEANER IN NILE STAL EDHASED BY G CA SETTING MATERIALS&GROUT PT 2 TILE FIANDRE 12"x12"x318"NOW 30 CM x 30 CM WA THEIR FINAL CLEANING OF THE TILE.SEE VENDOR FURNISHED&INSTALLED BY G.C.ALSO SEE D __ `______ CONTACTINFOON SHEETCS-3 FOR TEXSPAR SPECIFICATION SHEETS. _TEL(312)342.4889 CONTACT NOREEN SCHERTLER PLUS INFO � 866539 PEZZATO BIANCO(MATTE) 118"GROUT JOINT .. _ tl TILE PURCHASED AND FURNISHED BY ULTA "a SETTING MATE USE TEXSPAR IN - '. IIIII I Jn. OPT-6 PORCELAIN GRANITI GROUT COLORRINAAPER 7 SILVER WA THEIR FINAL CLEANING GpOF THE TILE.SEE VEN ENDOR INSTALLED BY G.C.SETTING MATERIALS&GROUT TILE FIANDRE FURNISHED&INSTALLED BY G.C.ALSO SEE - - IIII- - - SALES n TEL.(312)342.4689;CONTACT:NOREEN SCHERTLER PLUS INFO SPECIFICATION SHEETS. 24 x24"x318"NOM.,60 CM x 60 CM CONTACT INFO ON SHEET CS-3 FOR TEXSPAR pp OINT 861999 PEZZATO BIANCO(MATTE) B.C. 00U EJTEXSPAR PLUS TILE CLEANER IN 1 - III I f ( a- ( I I I' ( N m CP TILE PNSTAURCHASED AND FURNISHED BY ULTACP SETTING MATERIAL:ARDEX XS THEIR FINAL CLEANING OF THE TILE.SEE VENDOR :r"> a PORCELAIN FIANDRE „ FURNISHED&INSTALLED IBYGCNG T ALSO SEE ERIALS& ROUT III- III iII �., ! j IIII i I a pT.7 GROUT COLOR:MAPE127 SILVER WA CONTACT INFO ON SHEET CS-3 FOR TEXSPARBY _ O 3'x12'x 3l8 PLUS INFO.G.C.TO USE ES MAPEI KERACAULK S W c TEL.312)342.4689;CONTACT:NOREEN SCHERTLER SPECIFICATION SHEETS. I MEETS THE WALLPAPER. , VINYL FLOOR SPACIA LIMED WOOD NATURAL SS5W2549 COLOR.SILVER TO TOP OF BULLNOSE WHERE IT PURCHASED AND FURNISHED BY ULTA INSTALLED III I ;III: IIIII U I, 0 e1 w -3 TILE Al 4,5'X36"X2.5MM CLASS 1-<450 BYG,0. r �I I j t V _ IIII I.- I VT-0 VINYL FLOOR ARMSTRONG STANDARD EXCELON IMPERIAL TEXTURE CLASS 1-<450 FURNISHED AND INSTALLED BY G.C.O TILE 51915 CHARCOAL 12"x 12"x' I I j 1 1 STANDARD EXCELON IMPERIAL TEXTURE VT-5 VINYLIFL OR ARMSTRONG 51816 CHERRY RED-12"x12'x�' CLASS 1-<450 FURNISHED AND INSTALLED BY O.C. IIIII I � w 11H ILECHAIN CLUTCH ROLLER SHADE F E ULAR 1 a ,, ��U W-1 WINDOW SHADE DRAPER INC 0 DRAPER ROLLER FLEX SHADES PW4410 3%OPENNESS; SEE VENDOR CONTACT INFO ON SHEET CS-3 FOR GC TO FURNISH AND INSTALL ON ALL < III III P FASTENED SNOWY SC FASCIA. WITH WHITE MECHANICALLY ULTA NATIONAL ACCOUNT STOREFRONpURCHASEDTFURNEPT TRANSOM ISHED AND(INSTALLED BY G.C. I, R'. G.C.TO SCRIBE THE 4"BASE TO FIT UNDER THE - - - RUBBER BASE-4 WALL COVE MOLDING INSTALLATION TO BE COMPLETED BY Revisions CONTINUOUS ROLLED PRODUCTS. WB-1 RUBBER BASE JOHNSONITE NUMBER:DC-69;COLOR:STERLING SILVER CLASS A-<450 PERIMETER SALES AREA FIXTURES.USE FLRIMETERNFIXTUB EASESE INSTALLER. SEE O ( ICI 1 AISSU 150R CLIENTILL REVIEW VINYL BASE-4"WALL COVE MOLDING ` I ISSUE FOR BID/PERMIT WB-2 VINYL BASE JOHNSONITE CLASS B-<450 USE CONTINUOUS ROLLED PRODUCTS. PROFESSIONAL OINYLB SE COMPLETED INSTABLER, i >-I-�,I '-H.I (j ��1 I IT ---- } - �03/06/15 NUMBER:Cl COLOR:GREY -' PURCHASED,FURNISHED AND INSTALLED BY O.C. NOTE THESE FIGURES ARE FOR ULTA ( (I III OWGS VINYL DESIGN TEX CUSTOM PRODUCT SILVER VINYL WALLCOVERING', CLASS A-20& SEE VENDOR CONTACT INFO ON SHEET CS-3 FOR PURCHASED AND FURNISHED BY ULTA INSTALLED APPROXIMATESREFERENCE .GAC.DTORE WALLCOVERING_ PRODUCT#43920152 PROJECT#43912001595 60 ULTA NATIONAL ACCOUNT BY G.C. PERFORM TAKE-OFFS AND ' .._ SUBMIT TO ULTA. ( L III 1 1 I ! I III - j. it VINYL X CU$TOM PRODUCT WHITE VINYL WALLCOVERING', CLASSA-20& SEE VENDOR CONTACT INFO ON SHEET CS-3 FOR PURCHASED AND FURNISHED BY ULTA INSTALLED ROOM# ROOM NAME FLOOR FIN. AREA DESIGN TE O WALLCOVERING PRODUCT#439.20157 PROJECT#43912001595 60 ULTA NATIONAL ACCOUNT BY G.C. 101 SALES VT-3 7586.61 SF FINISH SPECIFICATIONS 101 SALES PT.2_ 99s4SF I II Q 101 SALES PT fi 345.16 SF 1 102 STAGING VT 5 6672 SF I I IIII I I - I II SCALE: NONE 102 165 SAON STAGING Pi 6 385.86 SF �� < - 103 OFFICE VT-4 56.65 SF i. REFER TO FINISH SCHEDULE FOR FLOOR COVERING AND FINISH CODES AND SPECIFICATIONS. 4 PLAN KEY NOTES: :2 ' 2. TILE IS SHOWN FOR FIELD RUN AND PATTERN ONLY,REFER TO COLOR AND FINISH SCHEDULE FOR MATERIAL SPECIFICATIONS. 105 SALON PT 76.78 SF _ I 1 I ! I- I I' I �7 � 1 START TILE @ CENTER OF CIRCLE. 3. PROVIDE WBA @ WALLS AND COLUMN ENCLOSURES 1a6 SHAMPOOIDRYING PT 2 220.60 SF III IIIII // 6 1�? APT _ - 03I25/15 4. ALL PAINTED AND WALL COVERING SURFACES SHALL BE PRIMED.SEE ARCHITECT'S SPECIFICATION SHEET AND PAINT MANUFACTURER SPECIFICATIONS. 107 MENS(FLOOR&WALLS) PT�2_ 169,28 SF 2 CONTROL JOINT.SEE DETAIL 9EIA-8.2 5. PAINT ALL SURFACES FLOOR TO CEILING,INCLUDING PRIMING VALANCE PANELS BEFORE WALLCOVERING INSTALLATION. ' ICI ❑ �I it 1 - LICENSED 8. ALL METAL SURFACES TO BE PAINTED WITH LOW GLOSS OIL BASE PRIMER AND OIL BASE FINISH COATS IN COLOR INDICATED ON DRAWING. ID7&ID&RESIROOMS(WALLS) PT4 12'V SF III II __ __ II ARAIR'98S 50 CUT PORCELAIN TILE WITH AW NSITE.T. 108 WOMENB FLOOR&WALLS PT-2 164AUSF I 7. PAINT ON ALL GYP.BD.SURFACES TO BE APPLIED WITH A HEAVY KNAP ROLLER ( I .. I ' I I �n _ � � ; DO NOT CUT PORCELAIN TILE ON SITE. 8. GROUT TO BE SEALED PER MANUFACTURER'S RECOMMENDATIONS CLEAN SEALER OFF THE ADJACENT FLOOR FINISHES. 110 CORRIDOR PT 2 108.93 SF ! �1 Y<' 98 DETAIL AT PERIMETER WALL. ! it SEE DETAIL 8AIA-8.2. 10, SEE DETAIL 9 A-112 FOINSURE PROPER IRONMENTAL R INSTALLATION AT CIONS ARE MET FOR THE ONCRETE CONTROL JOIINSTALLATION OF ALL NTS.FOR TIE CONTROL JOINRS,IFOLLOW TILE MANUFACTURER'S RECOMMENDATIONS. -LINE OF CTC EDGE - DETAILATPERIMETERWALL. - i ❑5 11, FLOOR FINISHES TO CONTINUE UNDER GYP.BE.GYP,BE.TO BE HELD UP FROM FLOOR SLAB.SEE DETAIL ON SHEET 81A-B.2.IF GYP.BD.DOES NOT ALLOW FINISH ____________ (- ._ - --,- _______ JOhNA.0 IPMAN UNDERNEATH,HOLD FLOOR SEE DETAIL 861A41.2. B _ III ❑6 CONTROL JOINT,SEE DETAIL 9CIA-8.2 12. TRANSITION STRIPSTO BE MITEIREDAT INTERSECTSH AS TIGHTAS TIIONSLE TO GYP.BD. - !_ _ 4 ! 1 .- 1c T 4(I sra'reorlonNo 14. G.C.TO TOUCH UP PAINT PRIOR TO STORE OPENING. I ! ! !-I 'III (i I .-- ( III 15. G CT TO PROVIDE PORCELAIN TITWO LAYERS OF CRAFT PAPER OVER ALLE WITH A WATER JET.DO NOT CUT LTRE AND GROUT ON FLOORS.TAPE DOWN AND STAGGER SEAMS BY HALF THE PAPER WIDTH ON THE -__- - _ - -! _ ! i--s II -_ --LAIN TILE ON SITE, yl 4_ ------- IxBRser CERTIFYrrwTmsss nAtrs HAVE essry PRE- PI LAYER. 1 A F- Z-- - PIED UNCERMY SUPERVISION AND THAT TO THE BEST FLOOR COVERINGS ARE TO BE SLIP RESISTANT THROUGHOUT THE MEANS OF EGRESS. `/ , -;_t. I \, �_ `., -I1 - I OF M RH osauauE SAMEES CMPI WITH ALL RHBE 17. G.C.TO INSPECT CONDITION OF EXISTING FLOOR$LAB AND PATCHIREPAIR SURFACE IMPERFECTIONS,IF FLOOR LEVELING IS REQUIRED,ARDEX MUST BE USED AND - I 14 _-. - -_ _ ROF IT MUST BE INSTALLED BY AN ARDEX LEVEL MASTER®ELITE OR ARDEX CHOICE CONTRACTOR INSTALLER.SEE VENDOR CONTACT INFO ON CS-3 SHEET.G.C.TO ABz PROVIDE A WARRANTY LETTER ON ARDEX CORPORATE LETTERHEAD.A MINIMUM OF 5 YEAR WARRANTY MUST BE PRESENTED. 1 -- - O.START FULL G.C.TO REMOVE 19. SEE SHEET CS-3 FOR CONCRETE SLAB MOISTURE TEST REQUIREMENTS.TESTING PERFORMED BY FLOORING INSTALLATION CONTRACTOR WILL NOT BE ACCEPTED. I I PT-2 TILE AT C OF LANDLORD PROVIDED AacmrecT 19. G.C.TO USE MOISTURE BARRIER PRODUCTS RECOMMENDED BY FLOORING MANUFACTURER OR EQUAL APPROVED BY FLOORING MANUFACTURER. 1 I DOOR OPENING THRESHOLD. I EXISTING Drawn BY Checked By VESTIBULE 100 cw Bw FLAN Scale Dale AS NOTED 03106115 NORTH NORTH 13-5649 Joh No , GENERAL NOTES A FINISH PLAN & ESTIMATED TILE AREAS Sheet No SCALE. NONE il8"=1'-0" CUSTOM VALANCE PROVIDED GYP.BD.WALL GENERAL NOTES: BY MILLWORK CO.INSTALLED BY G.C. SEE 31A-8,1 FOR EXTENT Si t FIELD VERIFY DIMENSION.G,O.TO CUSTOM 3 SIM. S26 ORDER FINAL VALANCE'RA SO IT IS WG5 1 P-1 p.e.i 3 1. INSTALL ALL ARCHES TIGHT TO CEILING TILE. �F 'CUT TO FIT'VIA FIXTURE VENDOR Rs1 GYP.BFNISH D.WALL kB.i 2. VINYL ARCH SIGNAGE SUPPLIED AND INSTALLED BY ULTA GRAPHIC VENDOR. 1 LEVEL 5 p-1 1 2 WC_5 3, G.C.TO COORDINATE FINAL SHELF LOCATION WITH STORE SET TEAM AND STORE MANAGER, 4. PROVIDE GRAY ELECTRICAL DEVICES AND STAINLESS STEEL COVER PLATES AT LOCATIONS WHERE EL=11'-0" __ WC-50CCUR5 ACTS — SALON RCARE o�marogro 5. SEEFIIA AND F-1.1B FOR FIXTURE DETAILS. WC6 - 6. ACCESS PANEL TO BE PROVIDED AS REQUIRED.SEE MEP DRAWINGS,ALL ACCESS PANEL MUST BE AA METAL.ACCESS PANELS HIGHERTHAN 24'A.F.F.TO BE FINISHED TO MATCH SURROUNDING WALL. Eq. EQ FACE AND SIDES / 30"x24" 30"24" 30"x24' 30"x24' 30"x24" 30"z24` 30"x24" 30"x24" 30"x24" _ 7. FIX CHIPS AS REQUIRED ON ALL FIXTURES,TYP, CAULK BACKSPLASH TO PLAN KEY NOTES: M-513 WALL WITH GRAY CAULK ILLUMINATED ACRYLIC ARCH SUPPLIED BY ULTA,INSTALLED BY G.C.SEE ELECTRICAL DWGS.FOR (DAP DNA YFLEX T LIGHTING ARRANGEMENT. GFI ABOVE COUNTER,SEE ELEC. OUTLETS FURNISHED&INSTALLED BY G.C.IN THE BACK PANEL OF MILLWORK FIXTURE.LOCATE z DRAWINGS FOR MOUNTING HEIGHTS. AS SHOWN.SEE ELECTRICAL DRAWINGS FOR MOUNTING HEIGHTS, G.C.TO PLANE DOWN ENTIRE BUNKER EDGE AS REQUIRED TO FIT BEYOND WALL BASE &REAPPLY EDGE BANDING. L .� _ _ _ _ ❑4 CAULK THE PERIMETER OF THE MILLWORK TOP,TO SIDES OF ARCH AND GYP.BD.WALL WITH I` WHITE CAULK. EL=0'-0" - CENTER OUTLET HORIZONTALLY IN BACK FIXTURE INSTALLATION CONTRACTOR/G.C.TO ENSURE SQUARINGILEVELING OF THE FIXTURES AS V FIN FLOOR WC-5 BEST AS POSSIBLE.CAULK SEAM BETWEEN WALL PANEL AND ARCH,TYP.EACH SIDE.CAULK WC-5 PANEL OF CABINET.OUTLETS FURNISHED SHOULD BE USED AT A MINIMUM.IF GAP IS LARGER THAN 114",CONTACT FIXTURE VENDOR FOR 1" A WB 1 5 W-4-CENTER FIXTURES WITHIN ARCH WB 1 B &INSTALLED BY G.C.SEE ELECTRICAL W&1 WE-i PIECE OF MELAMINE AND INSTALL TIGHT TO ARCH.SEE CS-3 SHEET FOR FIXTURE VENDOR DRAWINGS FOR MOUNTING HEIGHTS. 5 CONTACT INFORMATION. A-3 A-2 PRO RETAIL 4 ELEVATION - SALES /� SCALE: 114"=1'-0" V�d CUSTOM VALANCE PROVIDED -- SIM. - GYP.BD.CLG.P QO BY MILLWORK CO.INSTALLED BY G.C. GYP.BD.WALL S29 525 SIM. 5 831 - _' Q ENTRY Q FIELD VERIFY DIMENSION.G.C.TO CUSTOM 1 1 WC-5 SEE 31A-8.1 6 1 WG5 GYP.BD.WALL 5 1 WC-5 GYP. D.WALL na �_ 7- tt ORDER FINAL VALANCE FRAME SO IT IS FOR EXTENT LEVEL 5 FINISH "CUT TO FIT"VIA FIXTURE VENDOR. asa ksr aa.i aar _ __ as i LEVEL 5 FINISH n-e r WC5 WC-6 2 P-1 1 5 WC-6 _ Mill > EL=11EL= -0' S P-1 4 1 WG6 5 P-1 4 1 ACTY 1 EQ _O EQ _ _ _ = _ Plosophy EL 11 0" M PARTICLE TO BE FURNISHED AND INSTALLED BY G.C.APPLY WC 5 ABOVE vrl®(d fr 30"x24" 30"x24" 30"24' 30"x24" j,'�// 30"x24" 30"x24" 30"24" 30"x24" 30"x24° 3"x24" 30"x24" 30"x24" ARCH. F 8"i.010 / / as J FACE& 16(a I� w SIDES 0 0 i c M-513 / IT c Li DO V FIN FLOOR IBUNKER FILLER PANEL FURNISHED 8Y MILLWORK fin.c COAT HOOK 3 VENDOR,INSTALLED BY G.C.80TH SIDES,TYP. 3 2 5 3 2 WG5 SEE A-6.3 W'B- WB-1 Wg.i WB-1 WBq WB-1 �N FOR SPEC. W-3-CENTER FIXTURES WITHIN ARCH _ a" W-2 5 A-6 W-2 BENEFIT W-2 BARE (7 a_ 3 ELEVATION - SALES E u �p a� SCALE: 114"=11-0" - d r V c m EL=15EL OUTLETS FURNISHED&INSTALLED GYP.BD,WALL U 4 ry n' GYP,BD`� CLG. GYP.BD.WALL gY G.C.SURFACE MOUNTED TO THE SEE 31A-8.1 FOR ENTRY SEE 3/A-8.1 FOR EXTENT 534 WC-5 EXTENT S19 WG5 5 BACK PANEL OF MILLWORK FIXTURE 5 FACE AND SIDES P-1 nal WITHIN THE CHASE SPACE.REFER 1 p-1 aei 1 WGS 5 1 TO FIXTURE DETAIL ON F-I 1B.SEE WC-6 aa.i 2 1 aa.1 WGB WG5 ELECTRICAL DRAWINGS. ACT-1 3" QILTA �` � STYLI /TOOLS 30"x24" 30"z24' 30"x24" 30"x24" 30"x24' 30"x24" 30"x24" 30"x24" 30"x24" 3P'x24" 30"14" 30"x14' 30"x24" ' I' }—r—: - ISSUE FOR CLIENTILL REVIEW �L 3 D 1s BIDIPERMIT i i _ 3106115 � ISSUE FOR ' I 1 1OO t I I * i I� id 17 Lt I I e e e e I I I I I I I I I I I I I I 5" 5" i I F I F I Q FIN FLOORS 3 0 WB-1 WB-1 WB-1 W&1 W&1 W-8-CENTER FIXTURES WITHIN ARCH WB-1 W-5 W4-8-CENTER FIXTURES WITHIN ARCH, W-5 Q A-9 5 A-4-S4 5 PRIVATE LABEL PCA 2 ELEVATION - SALES SCALE: 114"=1'4" VINYL ARCH SIGNAGE SUPPLIED AND INSTALLED BY ULTA GRAPHIC VENDOR P-1 GL.-GLAZING(EXISTING) EL=15'-0' ALIGN T.-TEMPERED SAFETY EXISTING GLAZING.WITHIN 24`OF EITHER SIDE OF 03/25115 Jl DOOR AND WITHIN 18"OF A WALKING SURFACE. `#GYP..S CLG.8 EXIST.STOREFRONT \ \ \ �� �� \ ICENSED ENTRY 1 G.C.TO INSTALL GRAPHIC HANGING RODS PLUMB. i GI c� G� GL cL ULTA Interior Signage 1�23 Description RemarksG1 GL GL. ADVANCED SKINCARE APPLIED TO FACE OF PANEL EL=11'-0' ____________ ___________________ ________________ _ _______________ ___________________________ SALON HAIRCARE APPLIED TO FACE OF PANEL ACT-1 - --- -------- ----- ------- ---_-_------ `\- ------ - ----- `- - _--_-- ------- STYLING TOOLS APPLIED TO FACE OF PANEL THE SALON APPLIED TO FACE OF PANEL EL=1 TIN \ \ \ \ �\ \ i \ \ \ N\ \ THE COLOR LIBRARY APPLIED TO FACE OF PANEL T/EXISTING ,L. gL. u.. >L. GL 6i. GL GL. f,'L (3t GL. GL. L CAL GL STOREFRONT COLOR COSMETICS APPLIED TO FACE OF PANEL Y presligefragrances APPLIED TO FACE OF PANEL H-aff IFr rnAr rnasE PLaws xAVEeEE1 PRE. AL-M1 TYP.AL-M2 AL-Mt AL-M2 AL-M2 AL-M2 AL-M2 AL-M2 BENEFIT APPLIED TO FACE OF PANEL oiwowaEMv suPEavisionaxoTHaTrorHEassr f eGE,THEEPAff DAMPLY WITH ALL RMLEe, RAPHIC GRAPHIC RAPHI GRAPHIC x\ \y GRAPHIC GRAPHIC GRAPHIC GRAPHIC DERMALOGICA APPLIED TO FACE OF PANEL REcuunoxsAND anoLvoacesorrwiry rxLs.io 22"X56" 44"X56" 22"X56" 44"X56" \ `� \ \ 44"X56" 44"X56" 44"X56" 44"X56" APPIIED TO FACE OF PANEL-FINAL aeunrvc TO sraucruRESAwo euaowcs. i S27 CLINIQUE FRAME FRAME �\ FRAME FRAME v� �\r i FRAME FRAME FRAME FRAME \ ARTWORK TO BE DETERMINED BY ULTA - �\ 2'MIN.ABOVE 26"X61" 48"X61" \ 26'X61" 48"X61" I 48"X61" 48"X61" 46'X61' 48'%61" . \\ S28 BATH&BODYCARE APPLIEDTOFACEOF PANEL THE BACKWRAP S29 PHILOSOPHY APPLIED TO FACE OF PANEL AncnHEcr T. T. T. T. T, �� \\\ / \ i \ �� -10 S30 SKIN&BODYCARE APPLIED TO FACE OF PANEL Drawn By Checked By S31 BARE MINERALS APPLIED TO FACE OF PANEL CW gW Lj�= S32 EL=0'-0" T. T. I T. T. N U o S33 LANCOME APPLIED TO FACE OF PANEL Scala Date FIN 0L 0" URBAN DECAY APPLIED TO FACE OF PANEL 114 i'-0" 03I06/15 S34 ULTA APPLIED TO FACE OF PANEL WB-i WB-1 Job No /[�� 13-654 9 ELEVATION - SALES Sheet No. 1 SCALE. 114"=1'-W _ PROVIDE GRAY ELECTRICAL DEVICES AND STAINLESS STEEL COVEII PLATE AT LOCATIONS WHERE WG5 OCCURS. EAS SECURITY WALL $h EL=11.0 FACE AND SIDES FACE AND SIDES MOUNTED DEVICE .Y q�T-i X• WG5 WG5 WC•5 WG5 WC-5 WC-5 � EL=9-0" -�ACT-1 V G6.760.SOFFIT ( EL ly-ly' FIRE TREATED — j —._._.-- - ) GYPGYP,BD.SOFFIT m ( BLGCK.NG IN � ) ) (nus Loc,nnoN 11 0 OPEN ) TO 1 ) BEYOND ( 1 � v I • `vI I i r ._ ) I I FINFW FL A CAULK(CLEAR SILICONE)WHERE �p WB-1 DRINKING FOUNTAIN MEETS WALL y D WB-1 C W&1 D `WB-1 GFI FOR REFRIGERATOR,SEE ELECTRICAL DRAWINGS FOR MOUNTING HEIGHTS GFI FOR COFFEE MAKER,SEE ELECTRICAL DRAWINGS FOR MOUNTING HEIGHTS 8 NOT USED 7 ELEVATION - CORRIDOR SCALE: NONE SCALE: 114"=1'-0" z VINYL ARCH INSTALLALLARCHESETIGHTC V CEILEND NG TILE GEE INTERIOR SIGNAGE REAR SUPPLIED PROVIDE GRAY ELECTRICAL DEVICES G.C.TO COORDINATE FINAL SHELF INSTALLED BY ULTA GRAPHIC VENDOR AND STAINLESS STEEL COVER PLATES LOCATION WITH STORE SET TEAM ANO � ATLOCATIONS WHERE WE-;OCCURS. STORE MANAGER. TABLE ON A-6.1 SHEET HAIR COLOR BAR" G.C.TO PROVIDE STAINLESS WALL-MOUNTED GRAPHIC IN ILLUMINATED ACRYLIC ARCH TYP. S20 G.C.TO INSTALL WHIT FEATURE WALL-SEE FIXTURE DWGS. FACE 8 SIDES a STEEL ROD,METAL BANNER SIGN HOLDER, SUPPLIED BY ULTA.IN 3 WC-5 MELAMINE PANEL COMPUTER&TEL.OUTLETS IN BACK 'HAR COLOR BAR"REAR"ARCH"STIFFENER AND I'43'DEEP INSTAL GIN G.C., BY G.C.SEE ELECTRICALDWGS. aaa FURNISHED BY PANELOF CABINET.SEE ELECTRICAL WC S- WC-5 WC-5 f�Jl WHITE MELAMINE SHELVES SUPPLED BYULTA PROVIDE FOR LIGHTING ARRANGEMENT. THE SALON ON FEATURE WALL FIXTURE DWGS. P-1 P-0 P-1 hEL=it'-0" MILLWORKVENDO DWGS.FOR MOUNTING HEIGHTS. V ACT1 BLOCKINGAS REQUIRED. ACT IS STEEL FROM EQ EQ , it - -WRAF TOP OF BACK SPLASHES I AROUND WC-5 EO 1 ,LG CORNER BEHIND p OF ARCH.FACING SIDES / BOTTOM OF ACRYLIC BIN _ 22 X56 <� ( ILLUMINATED �D -, 3U"x24" 30°x24" 30"x24" 30"x' _ ` / ARCH COUNTERTOP PROVIDED RAPHI / [ _ i ( GRAPHIC 0 BY MILLWORK , FRAME � ( —SIDE OF 44X56 Q � � Cc MANUFACTURER AND • °°°-�--°' ) ILLUMINATED FRAME Q _ DECORATIVE PENDANT -- _ - INSTALLED BY G.Q i � LIGHTS 0 T-0'A.F.F. z ARCH-----_, 48X61 � _ z CAULK SEAM WHERE r--I OPEN)/ PROVIDED BY ULTA.(TYP.) hEg BACKSPLASH MEETS _T 0' ( TO M v BACK PANEL.CAULK w SPEC:GE5050 SILICONE II " v c Od ( rBEYOND ALUM.METAL SEALANT; C-A8 `: v v -tr—, I V F N FLOOR A WB-2 B _ WB-2 C WB•2 D W8 2 V IN FL 0 COLOR:METTALIC GRAY `. / I i s hEL-0 F OOR A CENTER FIXTURES WITHIN AREA BASE BY MILLWORK MANUFACTURER CENTER OUTLET —————-' B C D C-48 E � STAINLESS STEEL COVER PLATES FOR OUTLETS ON HORIZONTALLY IN BACK BASE BY MILLWORK WB-1 CONTINUOUS WB-1 WB-1 „n THIS WALL.CENTER OUTLET IN MILLWORK PANEL. PANEL OF CABINET,SEE WG5 7 MANUFACTURER SEE ELECTRICAL DRAWINGS FOR MOUNTING HEIGHTS. ELECTRICAL DRAWINGS A-2,3 a FOR MOUNTING HEIGHTS. WB-1 - Nk cw 6 ELEVATION - CLOSET 5 ELEVATION - SALON E ate . SCALE'. 114"=1'0" SCALE: 114'=1'-0" •�'^- G.C.TO COORDINATE FINAL SHELF PROVIDE GRAY ELECTRICAL DEVICES G.C.TO COORDINATE FINAL SHELF ,U.a" STAINLESS STEEL-BRUSHED ALUMASTEEL CLEAR CAULK FLUSH TO TOP OF JOINTS AND STAINLESS STEEL COVER PLATES LOCATION STORE SET AND LOCATION WITH STORE SET TEAM AND U STORE MANAGER. 6277(419),PANELS ON 314"BOARD PROVIDED BETWEEN FIXTURES 7 WALL-MOUNTED GRAPHIC IN AT LOCATIONS WHERE WC-5 OCCURS, STORE MANAGER. BANNER SIGN HOLDER,INSTALLED BY MILLWORK,INSTALLED BY GC. CENTER OUTLET HORIZONTALLY ON EACH AE.3 STAINLESS STEEL COVER PLATES SHAMPOO STATION.SEE ELECTRICAL BY G.C.,SUPPLED BY ULTA. WG5 WC-5 FOR OUTLETS ON THIS WALL DRAWINGS FOR MOUNTING HEIGHTS. TYP. P 1 P 1 P 1 P 1 PROVIDE BLOCKING AS REQUIRED. EXTEND WALL COVERING BEHIND MILLWORK hh h EL=11'`y' �T ACT 21 0 C-15 Q d - I, EQ LL 4 ACT-1 I � .-w........,-. 1 FlL-M4 AL III AL-M4 ,.,EL 7 0' GRAPHIC 4 8" GRAPHIC GRAPHIC iIEULI(HEAD - 4"X5 44"X56" 44"X66" Revlslans FRAME FRAME FRAME 7. IB X61" 48"X61 - 48"X61 ISSUE FOR CLIENTILL REVIEW - - \ z 03106115 OPENJ a OPEN v ISSUE FOR BID/PERMIT tJ r i I' _ o �� �� A C-22 _ ,' i k1EY0NU \� ;�+ BE TO 03106115 -BEYOND REVISION PER CITY - , 3124115 .' II FIN,'_ O,.p,___-- C C.21 D - R FIN fL00R n --- C _ __ D Y f1 D fi SHAMPOO BOWLS C35 C35 C39 WB-1 WB-1 WB-1 WB-1 WB-1 WB-1 Q WB-2 WB-2 WB-2 WB-2 7 WRAP A 2 3 TO SHAMPOO Q PEDESTAL,TYP. 4 ELEVATION - SIGN CRIP TIONSTIONS SCALE: 114"=1'.0" SCALE: 1/4"=1'0" GL.-EXISTING GLAZING NOTE: T.-EXISTING TEMPERED SAFETY GLAZING 1. COORDINATE ALL HEIGHTS OF ELECTRIC,PHONE,& WITHIN 24"OF EITHER SIDE OF DOOR AND DATA OUTLETS WI ELECTRICAL DWG.FOR WALL RUN ALL CONDUIT ABOVE OFFICE CEILING 03125115 WITHIN 18"OF A WALKING SURFACE. FIXTURE MOUNTING HEIGHTS SEE FIXTURE G.C.TO FURNISH AND INSTALL(3)BLACK VOICEIDATA J-BOX FOR PC, PHONE OUTLET Q48"A.F.F. J-BOX FOR MUZAK SOUND J-BOX FOR SMART LICENSED �EL=15'-0" P 1 SCHEDULE.PROVIDE ACCESS PANEL IN CEILING WOOD 8"X10"PICTURE FRAMES SECURE CCTV,PRINTER Q 18"A.F.F. W1314"CONDUIT CONTROL W/1"CONDUIT TEMPERATURE SENSOR ARCHII TITI STD`► REFRONT ------- FOR OUTLETS ABOVE CEILING AS REQUIRED. AND ATTACH TO WALL FOR CERTIFICATE W1314"CONDUIT(1 J-BOX J-BOX FOR SOUND SYSTEM WITH LCD DISPLAY AR 900360 SECU RE THE SH ELVES TO THE CUPANCY,LIGHTING ZONE AND CAN P TO 6 GYP.BD.CLG. GL\ GL\\\ \ GL\ E. GL // GL /� 3, CAULK SHELVING SHAND WADS WITH WHITE CAULK.RTACKETS. OFO ONE DIAGRAM(SEE MECH.DWGS.) HOLD 10T CLEAR FOR FILE) (1M SOLATEDIDEDICATED QUAD W1314"CONDUIT E GL GL GL GL GL OL GL GL GL GL GL P•1 CABINET.INCREASE Q 78 A.F.F. AK,SCANNER P 1 EL=8'-0" CLEARANCE IF GUN,MOTOROLA RADIOS) JOHNA.arnrnvvl EL NECESSARY TU AL LOW T-5 ernraoF lunrlu ]GL\ FGLO FOR ITEMSMOUNTED ON P-1ADJACENT WALL M 214 COORDINATE LOCATION T-3i HERE3Yc FYrwvrXESEPUN3NNVE II—RE.T� O SO ATOEDI RK WITH M-213§ qEU NO WlEOGEaii0TIE0ESi L GL GL GL GL GL T-6 OF TA3 TO W FILE CABINET DRAWER OF MY xN OEq MY SUPEgJ30NAN0 iNwIiXP1L gULE3, ITO)VRU0g01NMlOESOFTIII FNLL3.10 e LO6}RUCiUPE3allo 0UIL01NO3. DUPLEXQI8""ADICATED (MONITOR&KVM e - �EL=0'-0" SWITCH FOR CCTV) agcgq3a FIN FLOOR Drawn By Checked By A (1)CONVENIENCE KNEE BRACES Q 48" B (1)CONVENIENCE yyg.2 D KNEE BRACES Q 48"0.Q CW BW LT DUPLEXQI8"A.F.E O.C.OC TO ADJUST AG (1)ISOLATEDIDEDICATED QUADQ WB-2 C QUADQ18"A.F.F, OC TO ADJUAST T T T WB 2 REQUIRED MAINTAINING 18"A.F.F.(COMPUTER EQUIP.) J-BUX FLAT PLATE WI HOLE DUPLEX REQUIRED MAINTAINING Scale Data OUTLET CLEARANCES (1)ISOLATEDIDEDICATED DUPLEX OUTLET CLEARANCESAS NOTED 03106115 FIN FL00 - T T TEL=O'-0' ___-. _ \\i 1 __,_ F LT T Q18"A.F.F.(COMPUTER EQUIP.) R (1)CONVENIENCE QUAD Q IB"A.F.F. Job No. 13-5548 2 ELEVATION - VESTIBULE ELEVATION - OFFICE SheetNoo�o SCALE: 14'=t'-U" SCALE: 114"=T-0" NOTE: 1. ALL JOINTSISEAMS TO BE CAULKED WHERE CERAMIC TILE MEETS WALL COVERING,CAULK COLOR: GRAY WRAP DRAIN 8 8"KNEE HOT WATER CLEARANCE 2. AT OUTSIDE TILED CORNERS,TILE TO HAVE LAP JOINT IN A CONSISTENT DIRECTION.NO MITERING OF SUPPLY PER tt TILES. ;,. ESSIBILItt CODESFEY F 3. CAULK BACKSPLASH TO WALL TILE WITH WHITE CAULK. COD o 4. CAULK ALL PLUMBING FIXTURES WHERE IT MEETS WALL/FLOOR TILE&COUNTERTOP WITH WHITE 6 illR�N CAULK. WRAP WC-5BEHIND 5ALIGN GROUT LINES ON THE WALL AND FLOOR TILE. 3"x12"TILE 3"xl2'TILE MIRROR 3"x12'TILE 6. PROVIDE GRAY ELECTRICAL DEVICES AND STAINLESS STEEL COVER PLATES AT LOCATIONS WHERE BORDER BORDERBORDEREURINAL (EWC2)(EWCi) WC-50CCURS. FRAMELESS MIRROR WITH PT-7 WC-5 PT-7 WC-5NCE ELECTRIC WATER COOLER(EWC) SEE FROSTED BORDER.AX. 9'-0' SEE DETAIL C THIS SHEET LAVATORYIMIRROR `r'GYP.BO P-1 FOR INSTALLATION DEPTH 39"MIN. ( ) INFORMATION.DO NOT NOTE: IN TILE BEHIND U 42' 36' IF VERTICAL GRAB BAR IS 3'-1" MIRROR ND 24' MIN. MIN. REQUIRED,GC TO FURNISH 12" MAX, � AND INSTALL AN EXTENSION - 7"MIN. TRIM RING AT TOP BAR 4 4' iM WRAP WC-5 g � g g•M ATTACHMENT SO TOP OF GRAB 7 i - TYP AND BEHIORNEND BAR,ATTACHED TO WALL AND BEHIND ABOVE WALL TILE,PROVIDESA ------ 2 y MIRROR SANITARY NAPKIN GRAB BARROILET GRAB BAR TOILET PAPER PLUMB INSTALLATIONw - DISPOSAL MAINTAINING A CONSISTENT - DISPENSERDO (WOMEN ONLY) CLEARANCE BETWEEN BAR e� ` LL EDGE OF WALLCOVERING TO TOP OF RECESS KIT TO AND TILE.ALL EXPOSED T'l EXTEND BEHIND MIRROR BE 1/2"DOWN FROM TOP PIECES SHALL MATCH GRAB EL - CAULK OF BULLNOSE BAR FINISH. E WALL COVERING IN TOP J-CHANNEL - A PT-2 B PT-2 5 C PIPES.ryp XPOSED PT2 D PT-2 CAULK(70 MATCH GROUT p D645A - COLOR)AFTER QR LADRENQE CO. - RESTROOM GENERAL NOTES 3 ELEVATION - MEN " -XAb T.o'� NOTE:SEE SHEET A-4,1 FOR WALLCOVERING Www.cdaumoce.com — INSTALLATION.SEE PT-7 3/4'IN WALL FIRE TREATED 4" FINISH SPECIFICATIONS NOTES ON Ad.1 SHEET. IN. SCALE: NONE v'd PLYWOOD BLOCKING SCALE, IA"=V-0- PT-7 _ 114"CLEAR MIRROR _ CAULK PERIMETER WALL COVERING TO -_. WITH POLISHED EDGES WITH CLEAR CAULK EXTEND 118'BELOW SILICONE IN PLACE 0 TOP EDGE OF TILE. tt r DO NOT GROUT TOP BOTTOM JCHANNEL - OFTILE. 9 D636A c, PT 6 CR LAURENCE CO. M waw.cdaurence.wm pp n�pp SECTION THROUGH WALL I TILE HAND DRYER DECORATIVE PENDANT LIGHTS WRAP WC-5 lug b� luul CO BACKSPLASH 'DIMENSIONS SHOWN ARE TO OUTSIDE TRIM OF 3"x12'TILE 3"x12"TILE 3k12'TILE @6'-8'A.F.F.PROVIDED BY BEHIND MIRROR. C)co 3"BO TILE d II p SECTION THROUGH MIRROR RECESSED KIT.CONTRACTOR TO VERIFY ROUGH OPENING ULTA INSTALLED BY GC. L� luul BORDER BORDER BORDER FRAMELEBS MIRROR WITH 1 Y,' BORDER 1L /� 0 to REQUIREMENTS WITH MANUFACTURER INFORMATION. FROSTED BORDER. SEE DETAIL ��nn Ir WG5 PT-7 8 PT-7 WG5 PT-7 WC-5 'EQ. EO C THIS SHEET FOR INSTALLATION 7 2 PT-7 WC-5 Vd EL=9'-0" INFORMATION.DO NOT INSTALL C TYPICAL MOUNTING DETAILS V GYPBD.(P-1) TILE BEHIND MIRROR. 1 0 . il4"=1'-0" WRAP WC-5 AT CORNER SCALE Q <« 3'-1"- AND BEHIND MIRROR f�J ITEM# DESCRIPTION COMPANY I MODEL MOUNT FINISH REMARKSISUPPLY r - to 1 COAT HOOK HAGER 945P SATIN-FINISH UNLESS NOTED OTHERWISE,MOUNTED 48'A.F.F.I �' q iv 7 W LS Q e STAINLESS STEEL BY G.C.PROVIDE ELKS.AS REQ'D . i I;:> 2 ACCESSIBLE SATIN FINISH ' - TYP 2 ELKAY RLL-VR12 SEE TYP.MOUNTING HEIGHTS DETAILS/BY G.C. � I'- q LAVATORY STAINLESS STEEL O AT MOP SINK B COFFEE BAR LOCATION.PROVIDED v PAPER TOWEL BY ULTA AND INSTALLED BY G.C.MTD.MAX.46'TO a'o 3 DISPENSER SURFACE \ N j < �d OPERABLE PARTSILOCAL CODES CONCEALED SATIN-FINISH SEE TYP.MOUNTING HEIGHTS DETAILS I BY G.C. 4 GRAB BAR BOBRICK B-5806 4' FIN FLOOR {y ^c MOUNT STAINLESS STEEL PROVIDE NECESSARY BLOCKING. A B INSULATE EXPOSED C Q PT-2 PT-2 5 6 PT-2 PIPES.TYP. D 9 1 PT-2 o- 5 TOILET PAPER SURFACE SEE TYP.MOUNTING HEIGHTS DETAILS.PROVIDED C DISPENSER BY ULTA AND INSTALLED BY G.C. c 4, SANITARY NOT USED ELEVATION -WOMEN NOTE.SEE SHEETAd.1 FOR " B-270, SATIN-FINISH U> e 6 NAPKIN BOBRICK SURFACE SURFACE STAINLESS STEEL SEE TYP.MOUNTING HEIGHTS DETAILS/BY G.C. D 2 FINISH SPECIFICATIONS,NAPKIN SCALE: NONE t__7__ 1 SCALE. 14"=1'-0. 7 WALL MIRROR SURFACE SEE TYP.MOUNTING HEIGHTS DETAILS BY G.C. GLADIATOR GARAGEWORKS DEEP HOOK GLADIATOR GARAGEWORKS GEAR TRACK CHANNEL 6'X48", O QUAD OUTLET.SEE ELECTRICAL U Q N BABY CHANGING KOALA,CARE MOUNTED AT 34'MA%.A.F.F.TO CHANGING BED. 7.5'WX5.25"HX11"D.MODEL NO.:GAWUXXOHRH MODEL NO.:GAWC042PPY.ALTERNATE STORAGE SYSTEM: 5 DRAWINGS. G.C.TO COORDINATE FINAL SHELF C-15 SHELF MOUNTING HEIGHTS 8 GRAINGER SURFACE A-8.3 STATION KB20-00 PROVIDED BY ULTA,INSTALLED BY G.C. ALTERNATE STORAGE SYSTEM:CRAFTSMAN CRAFTSMAN VERSA TRACK TRACKWALL 5.5"x48'MODEL NO.:10124 IT CABINET PROVIDED BY ULTA LOCATION WITH STORE SET TEAM SHELF HEIGHTS LISTED TOP TO HOOKTITE STANDARD DOUBLE HOOK _ _ BOTTOM AND IDENTIFIED AS PROVIDED BY ULTA AND INSTALLED BY G.C.MTD. PROVIDE IN WALL 2X6 FIRE RETARDANT TREATED INSTALLED BY G.C. AND STORE MANAGER. EXCEL DRYER INC. XL-W WITH RECESSED/ 3.5'WX5.75"HX10.75"D.MODEL N0.:10102 9 HAND DRYER COLOR:WHITE EPO%Y 37'(MAX.)TO BOTTOM OF HAND DRYERILOCAL WOOD BLOCKING BETWEEN STUDS AS REQUIRED. 7 LARGE OR SMALL SHELVES. XLERATOR® RECESS KIT LOW PROFILE COORDINATE FINAL LOCATION CODES MB.3 P-1 P-1 WITH STORE SET ON SITE. DIMENSIONS ARE TO TOP OF NOTE.GC.TO PROVIDE ALL RESTROOM ACCESSORIES UNLESS NOTED OTHERWISE I I SHELF.SHELVING FURNISHED BY ow EL-_1_3'A�' I SM. ULTA AND INSTALLED BY GC. ACY T-2 FRP PANEL i PCA DAMAGES I i'� 1fi.5'-small shell T.5'-small shelf 7' I (WHITE)T04'-0" I 4' F I I A.F.F.(ON WALLS 1 Si�E 165'-small sheu 7.5'smalls en SURROUNDINGMOP 165^-s 11 shelf 9' mall seen s TOILET ACCESSORIES N P -- —__---CUSTOM C-15 PERIMETER TO i 35'-leg-If 18.oarg¢hNl QS B SCALE NONE { I Baeelaslow ash ISSUE FOR CLIENTILL REVIEW SEED AIL I g I 9e 03/06115 11A-B.3 OR ----------- -9 sheu QISSUE FOR BID/PERMIT _ _______ i T-6 TYPE SUT CLEANING I ETAGERE RAR CLEANING Q03106115 PH.LA OUT STORAGE to"-smalfsherc 1r-large shelf i i is \ I I I II II I I " ZIP T-06 T-y WH WHO 1o^-small sham n^large sheu ------- i/ T-6 81r-sell shelf 19'�lerge sheu Q I II II II II I 11 I IL —J 6fi'large 6hel( H1 13� 1�� I Q WOMEN'S '� 3n MEWS EL=O'-0' o 1111 Q L ELECTRICAL PANELS SHOWN PVC DRAWING SEE PLUMBING SEE PLUMBING ' FIV N FLOOR FIR PANEL(WHITE)TO4'-0"A.F.F. FOR REFERENCE,REFER TO STORAGE DRAWINGS FOR B ``DRAWINGS FOR WB-2 D W8-2 2D A-sa 28 3D A 6.3 3B WB-2 ELECTRICAL DRAWINGS. TUBE.SEE BASIN) ND EXTEND ADMIN.24oP PIPE RAILING PIPE RAILING SHEET CS-2 BEYOND FACE OF MOP SINK.CAULK INSTALLATION INSTALLATION zC 8 5 9 1 3C PERIMETER TO GYP.BD.CAULK SEE DETAIL 2/A-8.3 FOR AROUND MOP SINK AND TOP OF WB-2 MOP SINKACCESSORIES. ENTIRE AREA OF ETAGERE FACE 8 STORAGE TO BE 3/4"FIRE 4 SIDES RATED PLYWOOD 1E3 TYP. 7 7 7 03/25/15 ` A-B.3 AAS 1 i \ PAINTED P 1 P 1 p 1 Aaa rl LICENSED 60 6D" ELF=13'-0" TYP TYP. P'1 ARCHITECT AC'r 7-2 Aft 985350 I I NO C-15 C-O %. C-O C-15 > SEE NOTES SEE NOTES s SEE NOTES SEE NOTES SEE NOTES SEE NOTE3 FOR SHELF FOR SHELF FOR SHELF FOR SHELF FOR SHELF FOR SHELF LOCATIONS LOCATIONS C-15 C-15 LOCATIONS LOCATIONS LOCATIONS LOCATIONS C-15 Tyr BTATEDFpAMI © ` HEREar CERT ry rHAr 1HE6E PUN6 NAVE BEEN RIVE vAREO uuoER Mr suvERvs uv AND THAT TO THE6EST ETAGERE ` oFMr NNOm6ocE THE SNSEcoMVLrwTx AiLwLEs, C-10 STORAGE - HANGROD C-25 a6cDarorvsAND ORo xAxcEs of lwNWcFULe ID - o RE—NG TO STRUCTURES AND 6u LDs. I i -.. -. SEE SHEET A-21 FOR WALL DIMENSIONSI ILj ` i 4 x�_ T 10 �� u+cHlrecT _ '�i �i - Drawn By Checked By NOTE. s s CW BW 1 ALL JOINTS/SEAMS TO BE CAULKED WHERE CERAMIC EL-0'-0" TILE MEETS WALL COVERING CAULK COLOR GRAY FI PCA PCA - Scale Dale 2. AT OUTSIDE TILED CORNERS,TILE TO HAVE LAP JOINT IN G.C.TO COATS DAMAGES PCA PCA A CONSISTENT DIRECTION.NO MITERING OF TILES. E Al SECURELY ANCHOR PROVIDED BY ULTA, Wg.p WB-2 F WB 2 AS NOTED 0310fi/15 INSTALLED BY G.C. Job No. FACE 8 SIDES LOCKERS TO WALL ��e TYP. 5549 A RESTROOM FIXTURE PLAN ELEVATION - STAGING 11eE1 No. SCALE: 114"=1 0" SCALE'. 1 4-1'0" Q—8 a 3 �E U�L,TA Q� JOB ` OPPORTUNITIES J n Ila.[omlcareer6 NOTE: 0 O 1. G.C.TO INSTALL WINDOW CONSTRUCTION BANNERS AS INDICATED.VERIFY WITH ULTA CONSTRUCTION MANAGER PRIOR TO INSTALLATION. 2. SEND DIGITAL PICTURES TO ULTA ONCE BANNERS ARE INSTALLED(WEEK 1). 3. ATTACH THE BANNERS TO THE STORE FRONT WINDOWS USING THE TAPE ON THE FRONT OF THE BANNERS,REPEAT THE LAYOUT PATTERN UNTIL WINDOWS ARE COVERED, 4. RE-ATTACH WITH TAPE TO ALU FRAMES AFTER FINAL CLEANING. 5. CONSTRUCTION BANNERS ARE TEMPORARY AND ARE REMOVED PRIOR TO STORE OPENING. 6 CONSTRUCTION BANNERS ARE NOT APPLICABLE TO MALL STOREFRONT.COORDINATE BARRICADE GRAPHICS WITH ULTA. 2 WINDOW CONSTRUCTION BANNERS SCALE: NONE + Z c � ' I � 1 ow ®0 0� ' o a 'NOW HIRING'BANNERS FURNISHED BY ILLUMINATED SIGNAGE BY OTHERS UNDER 'COMING SOON"8"NOW OPEN"BANNERS FURNISHED BY ULTA ULTA,INSTALLED BY G.C.G.C.TO SEPARATE PERMIT,SIZE AND SIGNAGE TYPE PER AND INSTALLED BY G.C.GA,TO INSTALL"COMING SOON" S r INSTALL'NOW HIRING'BANNERS ON ULTA SIGN VENDOR,LL SIGNAGE CRITERIA AND BANNER AT CONSTRUCTION START AND REPLACE WITH"NOW '.}/L��E, INTERIOR SIDE OF STOREFRONT LOCAL CODE,SIGNAGE SHOWN S PROTOTYPICAL OPEN"BANNER AT THE TIME OF STORE OPENING.THE 1(Y 3l9 M`l WINDOWS SIZE AND IS FOR REFERENCE PURPOSES ONLY. AMOUNT OF BANNERS TBD.BANNER WILL NEED TO BEUU ALSO,SEE ELECTRICAL DRAWINGS. INSTALLED WITH FULL FRAME OF GREY PVC PIPING WITH FOAM ES�L=35_'-�4' PIPE INSULATION ON THE CORNERS TO KEEP FRAME OFF THE TIEXISA _ BUILDING.ATTACH PIPE INSULATION WITH GREY ZIP TIES. CCN"J _ G.C.TO REMOVE"NOW OPEN"BANNER AFTER 30 DAYS PROTECT EXTERIOR BUILDING FINISHES C t) -o -- - ---- 1 ---- -- --. EXISTING LIGHT FIXTURE BY .; LANDLORD TO REMAIN 1 EXISTING LIGHT FIX V1 CL LANDLORD TO 0) EXISTING LIGHT FIXTURE BY ROOF LINE-V.I.F. EXISTING AWNING PROVIDED BY LANDLORD EXISTING LIGHT FIXTURE BY I EXISTING AWNING PROVIDED BY LANDLORD D LANDLORD TO REMAIN UNDER SEPARATE PERMIT,TYP,SHOWN FOR LANDLORD TO REMAIN UNDER SEPARATE PERMIT,TYP.SHOWN FOR 0 REFERENCE ONLY. REFERENCE ONLY, C� EL Comment 93.A-7.1,Address Numbers I V TI EXIST.PARAPET a.Buildings shall hem e p y g Q the street and of a contrasting or(IFC 505.1).Address size is based on distance from \ •— TV -- reef:up to 50 ft. 4 in.,51 to 100 ft.is 6 in.,101 to 150 ft.is 8 in.,151 to 200 ft.is the street. 10 in.and greeter Is 12 in.,IFC 505.1. -- b.We have had problems with seeing(time of day and sunlfphtJ the address In the B E A U T Y location that you have Indicated.After waking with Dick's Sporting Goods,they put their I address on the build/ng using 12 it numbers.Originally, theirs was in the seine location the,you show on your plans. r r Response:Building address numbene are to be provided under the landlord shell building permit.Please refer comments to landlord architect Dustin Glazierx4th Woodbury Corporation,d Dies erRenoodburycoro com _ - - 6)Knox Box _- -- - -- q a.A rapid entry(Knox Box)system is recommended for immediate Ere department access to the facility(IFC 506.1).An application may be obtained at Station i dudrg _-- -- - - _- -- normal business hours. 3 The Knox Rapid Entry System model most commonly used s the i Series 3200 The visions _.__. _- - _ eves 3200 is available With a hinged door,Litt of door or recessed mount.The Series - 1 3200 may also be monitored utilizing the buildings tire alarm system. ISSUE FOR CLIENT/LL REVIEW 1. .. —..___. '_.__. EL=15'-0" - _ I c.Ifpurchesed,the Knox Box shall be installed to the right of the mein access door(s).It 03106115 ---- ISSUE FOR BIDIPERMIT V TI EXISTING STORE - — - --- � — i should be mounted out of normal reach and no higher than fen feet from ground level (IFC 506.1).Alternative locations Will have to be approved by the Fire Department. 03106115 FRONT rp�ENTRY — -- _ ---- - ---- I Response:Knox Box is to be provided by the landlord under the landlord shell -- bung permit.Please refer comments to landlord architect Dustin Glazier with EL=12'-0" Woodbury Corporation,d alazieribwoodburycore com B1611ST�,METAL - _ ___ ..__... CANOPY ._-._. _ ULTA .._... _..-_. ULTA Q TI EXISTING STORE FRONT-V.LF. '0 0 '0 0 '� Q '� NRW NOW O O O O N TA 1;'H /_/ --'\\\. 5 isroRe.44'X56' ---- ---_ ,.�TA, 44"X56" 44"xss° 44'X56' 44'X56' 44"X56" 44"X56" 44" — — --_ ---— - -- -- C7_X56" 44"X56" 44"X56" 44"x56' 44"X56" ECw \ 44X56" 44'X56" I (XD,L —--' Oil 03/25/15 LICENSEDEL= I AR(:kl l fECT FIN.FL� OOR AR 085350 I G.C.TO PROVIDE$"HIGH(OR AS STORE HOURS DECAL APPLIED TO INSIDE WINDOW CONSTRUCTION BANNERS REO'D.BY THE AHJILANDLORD)WHITE CE OF GLASS FURNISHED AND INSTALLED FURNISHED BY ULTA,INSTALLED BY ADDRESS NUMBERS APPLIED TO B ULTA(SIGNAGE VENDOR).PLACE CENTER G.C.SEE WINDOW CONSTRUCTION INSIDE FACE OF GLASS.PURCHASE 0 VINYL TO THE HEIGHT OF DOOR HANDLES BANNERS DETAIL THIS SHEET. ,lunua clnrMAN VINYL UMBERS FROM GFX.SEE A D 2"(HORIZONTALLY)FROM DOOR MULLION. sTATe nr lDArm VE CONTACT INFO ON CS-3. 7T-6112" STOREFRONT ` NOTE, 1, EXTERIOR ELEVATION SIGNAGE FOR REFERENCE ONLY. I HER BY CERTIFY THAT THESE PLANS HAVE BEEN FFE. PA ED UNDER MY SUPERVISION AND THAT TO THE BEST Or MY NNOMEDGE,THE BANS COMPLY WITH ALL RULER. 2, POWER CONNECTION FOR SIGN NEEDS TO BE WITHIN 6 FT.FROM SIGN.G.C.TO COORDINATE SIGN AND AWNING INSTALLATION WITH ULTA REGUTATIoNEANOOROI EBOFTWS FAua.lo SIGN VENDOR(KIEFFER SIGNS AT$47.415.5710)PRIOR TO ROUGH-IN. RELATING TOSTRMCTURESAND BUILDINGS 3. G.C.TO VERIFY QUALITY OF EXISTING EXTERIOR FINISHES,FOR EXAMPLE;PATCH AND REPAIR AREAS OF FINISHES.NOTIFY ULTA CONSTRUCTION MANAGER OF ANY AREAS REQUIRING WORK.IF AREAS OF EXTERIOR FINISH WORK ARE REQUIRED SEPARATE OUT THISAR-TEDT COST WITH EXPLANATION IN BID, Drawn By CneckeG By 4. G.C.TO CAULK AROUND WALL PENETRATIONS CREATED BY SIGN INSTALLATIONS.CAULK COLOR TO MATCH EXTERIOR FINISH, CW BW 5. G.C.TO PATCH,REPAIR AND PAINT EXTERIOR TO MATCH EXISTING. Scale Dale A$NOTED 03N6/15 6. THE COMING SOON AND NOW OPEN BANNERS WILL BE FURNISHED BY ULTA AND INSTALLED BY GC.G.C.TO REFER TO INSTALLATION Job No, GUIDELINE PROVIDED BY SIGN VENDOR. 1 3—15 p/L11LN�J1 n �� EXTERIOR ELEVATION Sheet No /N�JJ 1 ;::ALE 1,4"1 u �° —U c1 Q� �m (2)SECTIONS OF (2)SECTIONS OF �/' v ppnnpp UN I STRUT INSIDE CABINET UNISTRUT INSIDE CABINET FQ O Iuu' CONNECTING BOTH �"'� CONNECTING BOTH ,.r - (MIST TIONS ID ,;� tt ✓ UNISTRUT INSIDE CABINET __ THREADED RODS ¢` INSTALL TW0318" THREADED RODS F' —METAL DECK INSTALL TWO 318' c� VERTICAL THREADED F c 4 CONNECTING BOTH �, VERTICAL THREADED O O INSTALL TW0318' THREADED RODS � ''- b RODS PER HEADER JOINT II RODS PER HEADER JOINT /-"., VERTICAL THREADED FCj p " SPACED PER UNISTRUT#P4010 SPACED PER RODS PER HEADER JOINT UNISTRUT#P1000 CHANNE CHANNEL NUT LS � � J MANUFACTURERS SPACED PER c Cc MANUFACTURERS dI RECOMMENDATIONS. y"' "'q MANUFACTURERS ,•"'"r, RECOMMENDATIONS. " d� �I F4 N �J 1 RECOMMENDATIONS.__----, ECOMMENDATIONS. / TO RD / PLATE FITTING NOTE: l OF BAROJO ST FIXTURE VENDOR PROVIDES THE FOLLOWING: J ( _ UNISTRUT FLAT Q 7 z�-- NOTE FITTING Il- -(2)TWO 318"X 10'-0"PIECES OF ALL THREAD PER FIXTURE VENDOR PROVIDES THE FOLLOWING: NOTE: DOUBLE 112"HEX NUT 112"DIAMETER THREADED p0p� HEADER JOINT.INSTALLED BY G.C. FIXTURE VENDOR PROVIDES THE FOLLOWING'. ROD TO STRUCTURAL �y PROVIDE 2X -(2)TWO 318"X 10'-0"PIECES OF ALL THREAD PER CHANNEL BELOW -0)ONE 80'PIECE OF UNISTRUT PER HEADER FIRE TREATED HEADER JOINT.INSTALLED BY G.C. -(2)TWO 318"X 10'-0'PIECES OF ALL THREAD PER JOINT SPRING NUTS,HEX NUTS,WASHERS,AND WD.BLOCKING HEADER JOINT,INSTALLED BY G.C. UNISTRUT MOUNTING PLATES.INSTALLED BY G.C. ATTACHED TO -(1)ONE 80'PIECE OF UNISTRUT PER HEADER NOTE: JOINT SPRING NUTS,HEX NUTS,WASHERS,AND WHERE PRACTICAL,A BEAM CLAMP MAY BE USED AS AN ALTERNATE ATLEASTTWO -(DONE tl0"PIECE, UNISTRUT Uv b EXISTING ROOF DECK MOUNTING METHOD TO THIS ASSEMBLY.BEAM CLAMPS SHALL 8E ATTACHED STUDS WITH#12 UNISTRUT MOUNTING PLATES.INSTALLED BY G.C. JOINT SPRING NUTS,HEX NUTS,WASHERS,AND emu.u UNISTRUT ATTACH TO TOP CHORD - TO THE TOP CHORD OF THE BAR JOIST. "m OF ROOF JOIST @ PANEL POINT SCREWS UNISTRUT MOUNTING PLATES.INSTALLED BY G.C. °„y "° ONLY.SEE CONNECTION DETAIL 04 —EXISTING ROOF DECK THIS SHEET. ATTACH UNISTRUT CHANNEL TO _ EXISTING ROOF JOIST TOP CHORD OF EXISTING ROOF C ° J015T USING UNISTRUT BEAM So° INSTALL TIGHT TO CEILING TILE. ATTACH CLAMP. EXISTING ROOF DECK NO GAPS ALLOWED. UNISTRUT UNI-STRUT.SEE CONNECTION UNI-STRUT ATTACH TO TOP CHORD UNISTRUT CONNECTION E u,Ww 1l2"PARTICLE BOARD ENCLOSURE TO BLOCKING DETAIL#4 THIS SHEET. OF ROOF JOIST @PANEL POINT 4 `- 3l8"THREADED ROD TO AT FRONT 8 SIDES OF LIGHT ARCH, WITH ONLY.SEE CONNECTION DETAIL#4 SUPPORTARCH SUPPLIED,FITTED BINSTALLED BY UNISTRUT MILLWORK BUILDOUT PROVIDED MILLWORK BUILDOUT THIS SHEET. SCALE: IN T.S. G.C.MI'ER OUTSIDE CORNER 8 P1048 BY FIXTURE CONTRACTOR. PROVIDED BY FIXTURE MILLWORK BUILDOUT PROVIDED ALIGN PARTICLE BOARD INSTALLED BY G.C. CONTRACTOR. EXISTING ROOF JOIST BY FIXTURE CONTRACTOR. ENCLOSURE WITH LIGHT BOX,NOT INSTALL ARCH TIGHT TO CEILING INSTALLED BY G.C. �--INSTALL ARCH TIGHT TO CEILING INSTALLED BY G.C. _ 'J"CHANNEL.SEAMS SHALL NOT -- TILE.NO GAPS ALLOWED. - TILE.NO GAPS ALLOWED. CEILINGISOFFIT INSTALLATION NOTES: GYP,BD.CLG. - CEILING GRID CEILING GRID _ __ _ BE EVIDENT THROUGH WALL -, SHORT SECTION OF UNI-STRUT - SHORT SECTION OF UNISTRUT COVERING.TAPE AND USE WOOD BLOCKING AS REQ'D. - 1.SUPPORT,BRACE,AND CONNECTIONS OF CEILIN PECIFIFITS TO ROOF STRUCTURE ABOVE AS PER 11" INSIDE ARCH W/WASHERS 8 NUTS _ 11" INSIDE ARCH WI WASHERS 8 NUTS APPLICABLE CODES AND MANUFACTURER DESIGN/SPECIFICATIONS.ATTACHMENTTO ROOF DECK IS NOT SMOOTH H TRANSITION JOINTS FOR BLOCKING CONNECTING BOTH THREADED CONNECTING BOTH THREADED PERMITTED. SMOOTH TRANSITION PRIOR TO AS REO'D. RODS AT EACH JOINT RODS AT EACH JOINT BLOCKING WALL COVERING INSTALLATION, DOUBLE TUBE STAGGERED DOUBLE TUBE STAGGERED 7 AS REQ D 11" SEAL AND PRIME JOINTS PRIOR TO WALL COVERING INSTALLATION. 2.ALL GALVANIZED STUD AND JOISTS SHALL BE FORMED FROM STEEL THAT CORRESPONDS TO THE FLUORESCENT LIGHTING.LAMPS FLUORESCENT LIGHTING.LAMPS MINIMUM REQUIREMENTS OF THE LATEST EDITION OF THE A.I.S.I.STANDARDS PROVIDED BY LIGHTING VENDOR. PROVIDED BY LIGHTING VENDOR, SHORT SECTION OF UNI-STRUT INSTALLED BY G.C. INSTALLED BY G.C. 2.ALL STRUCTURAL MEMBERS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE AMERICAN INSIDE ARCH WI WASHER38 NUTS TRANSLUCENT WHITE PLEXIGLAS TRANSLUCENT WHITE PLEXIGLAS IRON AND STEEL INSTITUTE(A.13 1)'SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL CONNECTING BOTH THREADED STRUCTURAL MEMBERS"LATEST EDITION. FACE IN METAL FRAME PROVIDED FACE IN METAL FRAME PROVIDED RODS AT EACH JOINT BY FIXTURE CONTRACTOR, BY FIXTURE CONTRACTOR. Revisions DOUBLE TUBE STAGGERED 3.PROVIDE ALL ACCESSORIES INCLUDING,BUT NOT LIMITED TO,TRACKS,CLIPS,WEB STIFFENERS, ISSUE FOR CLIENTILL REVIEW INSTALLED BY G.C. IN BY G.C. PAINT GYP ANCHORS FASTENING DEVICES RESILIENT CLIPS AND OTHER ACCESSORIES REQUIRED FOR COMPLETE I FLUORESCENT LIGHTING.LAMPS �03/O61 S BD.WALL Ef7:MILLWORK BUILDOUT PROVIDED MILLWORK BUILDOUT PROVIDED AND PROPER INSTALLATION AND AS RECOMMENDED 8Y THE MANUFACTURER FOR THE STEEL MEMBERS PROVIDED BY LIGHTING VENDOR. E FOR BIDIPERMIT Y ISSUE B FIXTURE CONTRACTOR. BY FIXTURE CONTRACTOR. P-1 INSTALLED BY G.C. USED. �I03106115 INSTALLED BY G.C. INSTALLED BY G.C. 2-0 DOWN TRANSLUCENT WHITE PLEXIGLAS FROM '1 ° FACE IN METAL FRAME PROVIDED OOUBLE TUBE FLUORESCENT DOUBLE TUBE FLUORESCENT 4.FASTENING OF COMPONENTS SHALL BE WITH SELF-DRILLING SCREWS OR WELDING.SCREWS OR WELDS Q BY FIXTURE CONTRACTOR. LIGHTING PROVIDED BY LIGHTING PROVIDED BY SHALL BE SUFFICIENT SIZE TO INSURE THE STRENGTH OF THE CONNECTION.ALL WELDS GALVANIZED UNDERSIDE LIGHTING VENDOR.INSTALLED LIGHTING VENDOR.INSTALLED STEEL SHALL L BE TOUCHED UP WITH AZINC-RICH PAINT.ALL WELDS OF CARBON STEEL SHALLL BE TOUCHED Q OF ARCH. INSTALLED BY G.C. BY G.C. BY G.C. WITH PAINT.WIRE TYING OF COMPONENTS SHALL NOT BE PERMITTED. U.N.O.ON MILLWORK BUILDOUT PROVIDED BY Q THE FIXTURE CONTRACTOR.INSTALLED PAINT GYP.BD,WALL P-1 PAINT GYP.BD.WALL P-i INTERIOR BY G.C. 2'-0"DOWN FROM UNDERSIDE 2'-0'DOWN FROM UNDERSIDE Q ELEVATIONS DOUBLE TUBE FLUORESCENT OF ARCH U.N.O.ON THE OF ARCH U.N.O.ON THE --- LIGHTING VENDOR.ROVIIDEDDB YLIIGHTING -� INTERIOR ELEVATIONS. - INTERIOR ELEVATIONS. Q 11 6 ARCH VALANCE SECTION DETAIL 5 ARCH VALANCE SECTION DETAIL 3 ARCH VALANCE SECTION DETAIL 2 SOFFIT/CEILING NOTES SCALE: 1"=1'-0" SCALE: 1"-1'-a" SCALE: l"=1'-0" SCALE: N.T S. 2-#10 SDS EA.STUD STEEL DECK STEEL DECK LATERALLY BRACE TO 03/25/15 STUD SDS EA. STRUCTURE ABOVE STUD STEEL DECK-EXISTING USING METAL STUDS LICENSED 2-3625162-54 3623162-03 @ 4'-0'. ARCHITECT --_._ 2-362Si62-54 2.0.157'OHILTIX-UP.A.F. WALLS TO HAVE AR086350 @4'-0"O.C.MAX MAXIMUM UNBRACED y 2-#10 SDS EA. LENGTH OF 4'-0" + 2-3625182-54 ` / 16 GA CLIP ANGLE JDNNA.cHmMAN s 20 GA.TRACK Wl2-#10 SDS EACH LEG sTArco,ID;nID 2#10 SDS �1 2-p10 SDS @ 1fi"O.C. @ 16"O.C. v` ! 2-#10 SDS EA,- =--mot + + + i6 GA.TRACK 2-#10 SDS STUD 362T125.43WI2410 14 GA.ANGLE ----- +I SDS EA.STUD 14 GA.ANGLE WEB WEB STIFFENER - I HERE BYDENTSYTHAT THESE PLANS HAVE BEEN PRE 20 GA,TRACK STIFFENER IF BEARING IS IF BEARING I3 2.3628162-54 HATTOTHE BEST GREATER THEN 4"FROM GREATER THEN 4" OF My Iwow�EDGE,me SArnEOD LY 7HAu RULES, gEDULATIOHSIND QEDINANCESOF TWINFALl3.ID STEEL TRUSS PANEL POINT FROM STEEL l A LAIND TO STRUCTURES ANDBwmwoS. TRUSS PANEL 2410 SDS --�--- - -- POINT @ 16'O.C. 12 GA.CLIP ___ ANGLE 2-110TEK r r STEEL JOIST STEEL JOIST-EXISTING EA.LEG _�_. ANoHFECT B STEEL JOIST @6'-0"O.C.MAX. s s @6--0"O.C. Drawn By Checked By 2-#10 SDS CW BW A. CONNECTION DETAIL B. CONNECTION DETAIL A C. CONNECTION DETAIL D. LATERAL BRACE E. WALL CONNECTION ScaIAS NOTED Dale 03106/15 PERPENDICULAR TO STEEL JOIST PERPENDICULAR TO STEEL JOIST PARALLEL TO STEEL JOIST CONNECTION DETAIL DETAIL Job No. AT STEEL ROOF STRUCTURE AT LATERAL BRACE — 1 3 e 5 5 4 9 CONNECTION DETAILS Sheet No. SCALE: N.T,S. ..�,... `.- (/ U u 88.1 V NOTE W NOTE: _--- — F ILL HAS NOT PROVIDED THIS THRESHOLD I. TOP OF VT-3 TO BE FLUSH EDGE VINYL TILE TO BE FRAME FLUSH WITH VINYL TILE. REMOVE AND PROVIDE AS SPECIFIED. WITH PORCELAIN TILE. FTC EDGE ANODIZED ALUM.CLEAR VINYL TILE/ TRANSITION LINE AT BACK > 2. TILE VARIES.G.C.TO SELECT FINISH MANUFACTURED BY CERAMIC WOOD STRIP OF FRAME(STAGING SIDE) r•OTC EDGE THICKNESS TILE TOOL COMPANY(800)236 5230 FLOORING i �a - x ! VINYL i I YL TILE VINYL TILE I �m ARDEX X5 THIN FEATHER-UP WITH ARDEX ADHESIVE BY SET MORTAR K15 LEVELING COMPOUND. MANUFACTURERS cADHESIVE BY MANUFACTURERS 0 10'-"WIDE AT PERIMETER. SPECIFICATION SPECIFICATION A-PORCELAIN-VINYL DETAIL D-VINYL TILE-VINYL TILE a PEMKO PART#255A PORCELAIN PROVIDE 118"GROUT JOINT PORCELAIN SOFT JOINT \\\ SOFT JOINT \ ;.L.::.::..::.: COMMERCIAL NO.10X 1-112 TILE AS RECOMMENDED BY TILE TILE THRESHOLD FHWS,PHILLIPS MANUFACTURER LINE OF CONCRE TILE GROUTED SOLID (FACTORY PROVIDED) ALIGN TILE CONTROL JOINT TE SHADED AREA INDICATES a :., —_ _. 1 ..... •:. •'.. I EXTENT OF CRACKCA <> ISOLATION MEMBRANE — ARDEX XS THIN HINSET B-PORCELAIN-PORCELAIN DETAIL SET MORTAR a \x: _..._ MORTAR BASE `' y / NOTE: NOTE: JOINT SEALANT COLOR: ARDE%X5 THIN SET MORTAR G.C.TO VERIFY CONTROL PLAN VIEW JOINT SEALANT COLOR G.C.TO VERIFY CONTROL LIMESTONE JOINT LOCATIONS INFIELD LIMESTONE JOINT LORDINA E. FIELD TILE AND COORDINATE. ARDEX XS THIN SET MORTAR TIL� TILE AND COORDINATE. TILE �y P z6 SLAB) �1 APPLY ARDEX 8,9 SLAB - ° � CRACK ISOLATION V-6" EXISTING CONTROL APPLY ARDEX 8-9 CRACK ISOLATION. cm (MIN.)TO EITHER SIDE JOINT IN SLAB THE CRACK ISOLATION MEMBRANE C-FLR CONTROL JOINT @ COL.LINES DETAIL OF CONTROL JOINT E-FLR CONTROL JOINT @COL.LINES DETAIL° MUST COVER THE ENTIRE WIDTH OF THE EXISTING CONTROL TILE OVERLAPPING THE CONTROL JOINT ((n JOINT IN SLAB WHERE CONTROL JOINT&TILE JOINT DO NOT ALIGN WITH SOFT JOINTS ON BOTH SIDES. In 10 ENTRY DOOR TRANSITION 9 FLOOR TRANSITION DETAILS Q -A ILL SCALE: N.T.S. SCALE: NONE -- — — LID NOTE:ALL STEEL TO BE MIN.Fy=5p K51 v C aj o tea- y� Ada n METAL FRAMING AT p�= PERIMETER WALL 362SI37-33 STUD WI(2)#8 SMS INTO o_ 518"GYP.BD.AT DBL STUD AND N)#8 SMS EA SIDE C PERIMETER WALL TO TRACK WALL BASE •"' 0 VINYL FLOORING Qa,_o CONTINUE UNDER GYP.BD. (4)#8 EMS @ 8-OC EA SIDE HOLD GYP.BD.31V FROM UNFINISHED FLOOR TYPICAL AT U W ALL PERIMETER WALLS WHERE VINYL IS USED 362T125-54 WI #8 SMS @8"OC A-DETAIL AT PERIMETER&INTERIOR WALLS&VINYL FLOORING EA SIDE MEL FRAMING AT (2)362S137-33 PERITAMETER WALL (2)362S125-54 WI#8 SMS 518'GYP.BD.AT HEADER // @8'OC PERIMETER WALL // STAGGERED. WALL BASE e °/ / / PORCELAIN TILE FLOORING / // / / Revisbns CONTINUE UNDER GYP.SD. /// ISSUE FOR CLIENTILL REVIEW / 16GA ANGLE WI �03106/15 NOTE:ALL STEEL TO BE MIN.Fy=50 KSI — NOTE:ALL STEEL TO BE MIN.Fy=50 KSI HOLD GYP.BD.3/4'FROM UNFINISHED FLOOR TYPICAL AT (2)912 SMS IN EA ISSUE FOR BID/PERMIT 1 112'X 1 112'METAL CORNER ALL PERIMETER WALLS WHERE PORCELAIN IS USED LEG(T&B) �03106/15 GUARD,TYP.@ PERIMETER OF OPENING OTE: OFFICE WALLS TO B-DETAIL AT PERIMETER INTERIOR WALLS&PORCELAIN FLOORING Q $10 SCREWS AT 6'0.C_ EXTEND TO DECK LAE -g'-7318 - _ ACOUSTICAL 314"FIRE TREATED APA RATED WITH GYP.BE.ON CEILING TILE 362T150-54 STRUCTURAL-1 PLYWOOD OUTSIDE FACE. (TOP&BOT) Q DECKING WI#10 SCREWS @ 6° AS O.C.PLYWOOD EDGES&12' _EL O.C.@ FIELD ACTY 2 COPE FLANGES AND PROJECT WEB TO BEND 2"-FASTEN WITH 2#10SCREWS 8 DETAIL AT PERIMETER WALLS 7 NOT USED 6 [�SCALE: FICE STORAGE HEADER DETAIL SCREWS AT 6'O.C.TO 3625182-03 STUD@16" -- --- _-- TRACK BELOW O.C.AT AL WALLS SCALE: N.T.S. SCALE: NONE N.T.S. ONE#10 SCREW EACH BLOCK INOTE.LIVE LOAD OF STORAGE AREA IS 40 LBS PER SO.FT. EXTEND y=50 KSI 3628162-43 AT ifi"O.C.,TYP. ACOUSTICAL NOTE:ALL STEEL TO BE MIN.F 03125115 CEILING AND GRID OVER OPENING 4B 4A LICENSED O 40 3/4"FIRE TREATED APA RATED _ naz Aaz ARAR 9B5350 STRUCTURAL-1 PLYWOOD PLYWOOD METAL CORNER GUARD ,yam %� 4 ACT-2EL -0" AV DECKING WI#10 SCREWS @ 6" SIDE BEYOND) AT PERIMETER,REFER TO I ACT-2 L --0 C PLYWOOD EDGES&12" I DETAIL THIS SHEET. EL.=13'-0'A.F.. 314"FIRE TREATED A° �.. B.O.ACT.CEILI G STD L,�E 6-7 31g 0 C @FIELD PLYWOOD DECKING '�- AREA PAINTED 8'-7318"A.F.F. �AfFEA� JJIINA,CMIPfAAN 6005162-43 AaB i / BENJAMIN OORE 10 T.O.SHELF C $TATEOFIpNIp 3l4"FIRE TREATED007 JOISTS @ 16" PLYWOOD SHEATHING ON F.FO.C. • • • • • tP3 FRAM N362S162G 3 STUD — THREE SIDESB O.GYP.BD.CEILING Ae.z60OS162-43 • • • . II I B.O. BD. EILI TEXTWHICOVIDE ` s2 r A1JOISTB AT I6"O.C. deaesr teener mnT wsse Paws xnve eeIrvBLOCKING@ h EL=8'-0'4'-0"O.C.MIN. • • • • naz 580.mr rcxamuaesnwoelPow smnuames• B.O.CEILING HEIGHT /62-03 JOISTS @ i6"O.C. 5A necuuTewsawooaa SMo or rxwruis,o LT.GAUGE CONT.GYPSUM i;' READS'NO 'ieur rvcroCLIP ANGLE 25-030R fi00T125-09 ae.z MANAGER'S OFFICE BOARD TO TOP OFSTORAGE ABOVE ' 5AWl3#10 362T125-43 TRACK WITH2#10 @ OR BOOSi62-03 CEILING FRAMING: THIS LINE", aez ___ __ WALL(NO JOINTSK WITH 2#10(MIN.) rkw-TAT FLOOR LINE OFWS @EACH JOIST TYP.THREE SIDES i 600Si62-03 BLOCKING FROM SCREWS @ 362Si62A3 362Si62-43 AND > EACH LEG PLATFORM) 600Si62-43 JOISTS WITH LEDGER TO FIRST INTERIOR Drawn By Checked By STUD ifi"O.C.SEE PLAN 314"PLYWOOD DECK JOIST AT 16'O.C. CW BW (MIN.)SCREWS @ EACH JOIST FOR STUD SIZE. - #10 SCREWS _ h EL=O'-0" Scale Date AT 7"O.C.TYP. SEE PLAN.STUD @ 16"O.C. "14TRACK MIN.LEG 1N 18 GA 4"FIN FLOOR O SEE PLAN. O TRACK WI SCREW X 1°RAT OB 618"GYP.BD.SHEATHING EL=H FL G.C.TO PROVIDE SIGNAGE AS NOTED 03106115 HEAD SCREW @ 6'O.C. FINISH FLOOR "STORAGE AREA NOT TO Job No. CERTAIN ELEMENTS NOT SHOWN FOR CLARITY -`"-0.145"CIA SHOT PIN @ NOTE: EXCEED 40 LBS PER SQ.FT."IFO.C.EMBED 1.114"MIN. NOT ALL ELEMENTS SHOWN FOR DIAGRAM CLARITY.SEE DETAILS. CENTERED ABOVE DOOR Q ue6 4 5 OFFICE STORAGE FRAMING DETAILS 4 OFFICE STORAGE FRAMING DETAILS 3 OFFICE STORAGE DIAGRAM 2 OFFICE STORAGE ELEVATION DETAIL 1 ICE STORAGE FRAMING PLAN Sheet No. Ae O o2 SCALE: 3-=V-0' SCALE: 1 6 =1'-0" SCALE: 1I4'=V-0' SCAT E: iw=1'-0' SHELVES&STANDARDS TO BE PROVIDED BY MILLWORKVENDORAND TYPICAL WALL STANDARD,SEE STANDARD WITH#10 INSTALLED BY G.C. _ INTERIOR ELEVATION FOR _ EL=13'-0" PHILLIPS SCREWS MOUNTING HEIGHT CEILING a TO BLOCKING 0 CONTINUOUS 2x4 BLOCKING r FACE UP GYP.BD.WALL 2X4 BLOCKING SCREWED INSTALLATION NOTES. —— 8 GLUED TO STUD -CONTINUOUS 2x4 BLOCKING TO BE SECURELY CONSTRUCTION. ATTACHED TO WALL A STUD LOCATIONS. PROVIDE(3-M'LONG) - -MOUNTING HEIGHTS FOR 2x4 BLOCKING TO Q SCREWS AT EACH CORRESPOND TO SCREW HOLES IN WALL CONNECTION,(7)ROWS STANDARDS, AT HEIGH jT SHOWN. -SCREW HOLE DIMENSIONS SHOWN ARE FROM THE MOP HOLDER CONFIRM HEIGHTS WI TOP OF THE STANDARD.SCREW HOLES ARE TO LINE 1,10„ PAPER TOWEL METAL STANDARDS IN - UP WITH THE CENTER OF THE 2x4 BLOCKING EXCEPT DISPENSER AT THE BASE.BOTTOM OF STANDARD AT BASE MUST T-16 7q SITON FLOOR. T-B SCREW HOLES MUST ALIGN HORIZONTALLY.THE 2X4 BLOCKING o 0 �.FIELD. METAL STUD IN WALL BOTTOM OF THE STANDARDS MAY NEED TO BE CUT 'y"FIRE TREATED TO HAVE THE SCREW HOLES ALIGN AND TO PLYWOOD,TYP. FIRST AID KIT ACCOMMODATE ANY SLOPE OF THE FLOOR. - ®� -STANDARD INSTALLATION SHALL START AT THE HIGH BIOHAZARD KIT POINT OF THE FLOOR. _ -COORDINATE BLOCKING LOCATIONS WITH WALL O STANDARDS RECEIVED FROM OWNER. 1x4 FIRE-TREATED,TYP. O -USE#10 PHILLIPS FLAThIEAD WOOD SCREWS 3"-3j" _ SCALE G..T.S. MINIMUM. 2x4,TYP. SCALE:Ys„,1�_0„ o 10 NOT USED 7 STAGING BLOCKING DETAIL DEMISING/STAGING WALL SCALE: NONE SCALE: AS NOTED i nnnnnn STEEL DECK G.C.TO PROVIDE MOISTURE i ` � Iuul (2)HILTI X-U PAF UNISTRUT UNISTRUT#P4010 RESISTANT BARRIER AT Jj �1 O POURBACKS.COORDINATE WITH 68 #P1000 CHANNEL ,,rCHANNELNUT FLOOR FINISH MANUFACTURER. A � CLEANING RACK G.C.TO ENSURE LEVEL POUR A� �1 c OPENING BACK TO ALLOW FOR i 1 Iu� � WIDTH INSTALLATION OF TENANT BOTTOM OF PERIMETER 4" FINISHES TOPCHORD UNISTRUT#P2864 FIXTURE ° c ER L OF BAR JOIST FLAT PLATE _�— DRILL AND EPDXY GROUT INTO `p V Il or FITTING I° - EXISTING SLAB WITH#3 REBAR x -I i III @ 18"C.C.EACH SIDE WITH 3- ON 0 ISTRUT 1354AW ��� ADJUSTABLE DOUBLE 12'HEX NUT 1l2"DIAMETER III III I fk V/ MIN.EMBED. pn THREADED ROD HINGE TO STRUCTURAL CONNECTION CHANNEL BELOW ELECTRICAL OR OVERLAP EXISTING AND NEW i WALL BASE ATTACHED TO 3/8' EXIST.JOIST PLUMBING LINE VISOUEEN 10 MIL AS MUCH AS NOTE: PLYWOOD BACKER PROVIDED ( ) W UNISTRUT P1000 WHERE PRACTICAL,A BEAM CLAMP MAY BE USED AS AN BY GC TO UNDERSIDE OF POSSIBLE �\x1 BUNKER,FROM FINISHED BACKFILL W/SAND OR I I ALTERNATE MOUNTING METHOD TO THIS ASSEMBLY.BEAM 1 '� '4"FIRE TREATED CLAMPS SHALL BE ATTACHED TO THE TOP CHORD OF THE FLOOR TO UNDERSIDE OF GRAVEL 8 COMPACT 1 `� PLYWOOD TO FLOOR BAR JOIST. BUNKER.TYP.ATALL TAPE SEAM Uo PERIMETER FIXTURES. NOTE: SCRIBE TO FLOOR.PAINT 1. NEW CONCRETE IN-FILL MUST SE LEVEL WITH EXISTING STEEL DECK CONNECTION DETAIL PLYWOOD P1 PRIOR SLAB,SMOOTH,ANDREADY TO ACCEPT TENANT FINISHES. W8-2 Q '•rA a_ 2. REFER TO SHEET CS-3 FOR MOISTURE SLAB TESTING TO ATTACHING WALL BASE. REQUIREMENTS.COORDINATE MOISTURE BARRIER G.C.MUST LEVEL TRENCH POUR BACKS QJ p" APPLICATION WITH FLOORING VENDOR. TO ACCEP"f TENANT'S FLOOR FINISHES. __' 9 IT CABINET CONNECTION DETAILS 8 PERIMETER FIXTURE BASE DETAIL 6 SLAB ON GRADE TRENCH DETAIL 4 SHELF STORAGE SECTION 2 MOP S I NK ACCESSORIES SCALE: N.T.S. SCALE: 1-1-4- SCALE: 1'=1'0" SCALE: 3I4"=1'-0- SCALE: 112'=1'-0" - d� o IT CABINET WEIGHT:475 LES. U SEE }"NUT,BOLT AND i"THREADED UNISTRUT WASHER ROD(TYP) CONNECTION '4^FIRE TREATED ON 9/A-8.3 PLYWOOD 3'2" METAL STUD WALL — —————��—— ——— I ———'1 NOTE: T'FIRE TREATED PLYWOOD IT CABINET ALL SURFACES TO BE PAINTED P-1.REFER TO FINISH ATTACH PLYWOOD TO UNISTRUT WITH�" 3/4"PLYWOOD SPECIFICATIONS. Revisions NUT,BOLT AND WASHER,TYP.OF(10) U-0" ISSUE FOR CLIENTILL REVIEW ,DEL=9'-4"A.F.F. I 2x4 FRAMING BLOCKING NOTES: IT CABINET PROVIDED 8Y ULTA TOPTOP OF ITT CpgINET _47!2=�ff=a--r�—�- =mot FROM EDGE OF ELEC.PANEL 03106115 INSTALLED BY G.C. ——— —— — 3I4"PLYWOOD FROM �I EL=CEILING TO EDGE OF LOW WALL ISSUE FOR BID/PERMIT SHELF GENERAL NOTES: ETATHREESUNGGERE O STORAGE —ISTRUT FLOOR SLAB TO 6' 1. ALL IN WALL BLOCKING BY 03106115 ATTACHITCABIRET ANDTO WANE MN11„U@TP1000 p000(TYP) -- 2. T G.C.BODyyEEN STUDS f , WITH WOOD SCREW AND WASHER, _ _ — TYP.LE H USE EXISTING UNISTRUT FITTING(TYP) J �L__ T G C !I LOCKING IN LEVELER HOLES IN CABINET. DIRECTION AREA FOR Q (2)#'14SCREWS(TYP) ix8 ALIGN UNISTRUT 1354A FOR ANCHORING ROUTER WITH II (3)3/4"FIRE TREATED ADJUSTABLE HINGE 2'-0'x 6'.0"FIRE TREA'FEO PLYWOOD 2 3 TREATED PLYWOOD,ALL RWOODY SHELF 'Al SECURELY ATTACHED TO WALL STUDS FRAMING,AND BLOCKING III PLYWOOD(4'X 6' PLAN CONNECTION SIZE) ••____ ________ _____ __®-----_-----— TO BE FIRE RETARDANT AREA FOR " ——— / DOUBLE NUT 1 VECTOR " THREADED CODE) ( EO B Q CONNECTIONS __——— _ IT CABINET II I OA FRONT ELEVATION 2 _____ _____ _ --_ _ __ Es L CEILING o® o o M / B THREADED 1 -- ;" ROD(TYP) X; I II I _ I AREA FOR I, 3'2" SEE UNISTRUT �"FIRE TREATED PLYWOOD `_ TEL.VENDOR 03125/15 - - CONNECTION ON 1. $SHELF o—'-- -----®— — ® 9/A-8.3 PN000(TYP) I —SE 8 SECTION ON EL m PLYWOOD FRAMING,TYP. P. AREA S R— ——— _ __________ E UNISTRUT I ISTRUT LICENSED 5'-2" ARCHITECT' AR------ DOUBLE NUTALL �� THREADED IT CABINET I WOOD SCREW 8 SHv ELF _ 1 6 it -0 CONNECTIONS (DOOR SIDE) VI WASHER G.C.TO PROVIDE ) UNISTRUT 1354A UNISTRUT ,DEL=9'-4"A.F.F. I UNISTRUTP1325 HEAVY DUTY EYE I 4104A.MIIPMM ADJUSTABLE HINGE P1000(TYP) TOP 0 •x ANGLE FITTING BOLTS IN A 2X4 ! :I STATE Of IUAHO SECURED TO WALL `- ---_--- -- CONNECTION SHELF -- — (TYP) WITH CHAIN-TYP. 1 V EL=FIN.FLR. UNISTRUT P1000 'S THREADED (2)2X4 WOOD ELEC.PANEL PVC DRAWING MIN(iJ@EA ROD(TYP) BLOCKING Br DERnFYBHATINEBE FANIS HAVE BEEN PRE- DIRECTION 1-4 VA I STORAGE TUBE NnnEEo UNOER uv sUREauISION AND THATTo THE BEST PLAN UNISTRUT P1000 I of n MIN UNISTRUT 3'-0' (2)#145CREW5 ER L=F�N,FLR, IwaNSMD WWCEcomPEvmALSID Es, aEGTINGO.ANooaarvulcasoPTwose 0.ELATINGi05iRUCiUREBPNO BUIUJINGS DIRECTION P J'FIRE TREATED UNISTRUT 1354A PLYWOOD I METAL STUD WALL 0 WB-2 O WB-2 ADJUSTABLE HINGE Aa I CNITECT CONNECTION I Drawn By Checked By DOUBLE NUT ALL ICI CW BW _ THREADED I I ScaI Dale CONNECTIONS O SIDE ELEVATION I I AS NOTED 03106/15 Job No. 13-5649 5 3 E SHELF DETAILS 1 Shea1N°Qo 0 0� IT CABINET SHELF DETAIL - STRUCTURAL ETAGEI� TYPICAL EMS/TEL. LAYOUT ,LALL N1, NOTE: NOTE:INSTALL TIGHTTO CEILING 1. ALL SHELF HEIGHTS TO BE COORDINATED WITH OWNER. CEILING 2. FOR ANY QUESTIONS ABOUT THE FIXTURES DETAILED ON THIS SHEET,PLEASE CONTACT MILLWORK VENDOR. CEILING VALANCE SIGN 3. FOR BLOCKING CONSTRUCTION,REFER TO DETAIL 91A-2.2.ALSO, I- WI SEE WALL TYPE DETAILS ON SHEET A-2.0. MILLWORK ! TRANSLUCENT REFER TO ARCH WHITE PANEL ARCHITECTURAL _ _--., is PROVIDED BY DRAWINGS FOR S MILLWORK FURNISHED BY - �f7 ELECTRICAL OUTLETS:MILLWORK HANGING SIGN W/ ELECTRICAL OUTLETS:MILLWORK TO CEILING HANGING SIGN WI MILLWORK INFO VALANCE BI ARCH y VENDOR. NOTE:INSTALL TIGHT CEILING PANEL BY MILLWORK r-- INSTALLED BY INFORMATION ---- INSTALLER TO CUT HOLES ON SITE TRANSLUCENT WHITE INSTALLER TO CUT HOLES ON SITE TRANSLUCENT WHITE VENDORAND - �- CEILING — � TO ACCOMMODATE ELECTRICIAN PANEL BY MILLWORK TO ACCOMMODATE ELECTRICIAN --- ---- - I ^� HANGING SIGN WI' EQ EQ. PROVIDED DUPLEX OUTLETS. VENDOR AND INSTALLED PROVIDED QUAD OUTLET. REFER ' VENDOR AND INSTALLED a ' TRANSLUCENT WHITE FJ G.C.GRAPHICS ! PANEL BY MILLWORK GRAPHIC OR REFER TO ELECTRICAL DRAWINGS BY G.C.CENTER WITHIN TO ELECTRICAL DRAWINGS FOR ALL BY G.C.CENTER WITHIN BY OTHERS VENDOR AND FOR ALL LOCATIONS.NOTIFY FIXTURE.GRAPHICS BY LOCATIONS,NOTIFY ARCHITECT OF FIXTURE.GRAPHICS BY BRANDING ARCHITECT OF ANY DISCREPANCIES OTHERS.(TYP.OF 4) ANY DISCREPANCIES PRIOR TO MILLWORK ARCH OTHERS. WALL CLEAT t��:- IN BY G.C. OVER PRIOR 70 CUTTING HOLES. CUTTING HOLES. MILLWORK 10131ifi" q CENTER WITHIN TRANSLUCENT PROVIDED BY �i ARCH FURNISHED O BIARCH _ FIBY OTHERS. XTURE.GRAPHICS WHITE PLEXI MILLWORK =- PROVIDED BY MILLWORK EQ Q. m O O. i i I AT ALL VENDOR. BY !I VENDOR AND MILLWORK INSTALLED ELECTRICALOUTLETS: ILLUMINATED pn VENDOR. ! _ BY G.C. (W-4-S ONLY ARCHES wJ0 MILLWORK INSTALLER ry PLASTIC 2 6 SR 1'-4114" 1'/s BLOCKING TO CUT HOLES ON RUBBER o TYP WALL CLEAT WALL CLEAT 5114 IT PANEL SUPPORT VALANCE SIGN SITE M COATED PIN Q GROMMET V-91/2" 111 ! 1-9112" ACCOMMODATE WHITE(3 PER 8 V2„ 1'8" 8112- ELECTRICIAN DRYER) FURNISHED BY FURNISHEDGLASS SHELVING O O O PROVIDED DUPLEX ' MILLWORK BY MILLWORK o ................... ...... OUTLETS.EACH PROVIDED BY "-"""' ELECTRICAL 3" VENDOR AND VENDOR AND ! 1'BLOCKING OUTLET IS ON A OUTLET I ULTAAND CLEAR SPAC INSTALLED BY G.C. e INSTALLED ! ! ! STANDARD _ SEPARATE CIRCUIT 0 12 SHELVING _ INSTALLED BY — _ m O a o BY G.C. SUPPORT G C - 5'�— AND IS TO BE LABELED a HAIR DRYER i m O O O BY THE EC WITH THE DISPLAY, - CIRCUIT NUMBER. a o -BACK EL PLUG STRIP TO BESHELF,AND BRACKETS B p- v w w v o MOUNTED AT THE WHITE _ ;� ! MILLWORK Y ® x - CENTER OF THE PULL VENDOR. M M ELECTRICAL ! LAMINATE a ! ! OUT DRAWER AND - OUTLET:REFER r 3 ii II II ELECTRICAL o TO ELECTRICAL ! qn DIVIDER PANEL PLUGGED INTO EACH O(� ! - RECESSED ! OUTLET'.REFER DRAWINGS AND j ! ! WITH ! DUPLEX.REFER TO GLASS IIII�� u u u LJ OUTLET ELECTRICAL E INTERIOR 9' ! 'v, STANDARDS TRANSLUCENT ELECTRICAL SHELVING& Imo' 6W L_J 1'-113I4" i WHITEACRYLIC l DRAWINGS FOR ALL BRACKETS O DRAWINGS AND ELEVATIONS FOR SOLID - ~ LOCATIONS.NOTIFY OTHERS INTERIOR ALL LOCATIONS. II w ,� �I ARCHITECT OF ANY ELEVATIONS _ e — i SURFACE w ALUMINUM TRIM i' 0 FOR ALL ! FURNISHED DISCREPANCIES ! BY MILLWORK i PRIOR TO CUTTING - LOCATIONS. "" rc 9 ! ! VENDOR.SEE HOLES. m ILLL, I 3'i" 3'1" 3'-1" 3'-1" T NOTE:DRAW(CAULK RECESSED P �_ 3'1" 1'-7112" -- ! MILLWORK 23/4' j i STANDARDS 7 W 7 WITH SHELVES W-7 WITH CABINET ! ALL SOLID NOTE:CAULK ALL [� LJ LJ L SURFACES TO SOLID RECESSED W-7 ELEVATION SECTION @ ELEVATION @ W-7 SECTION @ MILLWORK = SURFACES To STANDARDS W-7 WITH SHELVES WITH CABINET W-7 WITH CABINET WALL BASE m 1'-61/8" m 4 MILLWORK O.Q - 4 1 1'-2 3/4' u.. I 33/8' 23/4" FLOOR WALL BASE W-5 ELEVATION W-5 SECTION W-4-S ELEVATION W-4-S SECTION '5 n 6 W-7 FIXTURE 5 �— FIXTURE 4 W-4-S FIXTURE E ,act a9a SCALE: N.T.S. SCALE: N.T.S. SCALE: N.T.S. GENERAL NOTES: U - 1. THIS SHEET IS PROVIDED FOR REFERENCE ONLY.FOR QUESTIONS AND SITE SPECIFIC MILLWORK INFORMATION,CONTACT CAP 8 ASSOCIATES,INC. CONTACT:CHARLENE PROSNICK WALL 445-455 MOCORMICK BLVD. CLEAT NOTE:INSTALL TIGHT TO CEILING NOTE:INSTALL TIGHT TO FURNISHED CEILING, CEILING. CEILING (P)L6148643336343213 BY _..._ ___- ____- 2. FOR BLOCKING&LOSE CLEAT HEIGHTS REFER TO WALL TYPES ON A-2.0. MILLWORK NI 3. REFERTO A-1.1 FOR MILLWORK LOCATIONS. VENDOR -.Dy 4. REFER TO DETAIL B/A8.3 FOR WALL BASE INSTALLATION AT PERIMETER AND CEILING MILLWORKFIXTURES. 01 HANGING SIGN W/TRANSLUCENT INSTALLED 5. G.C.TO COORDINATE ALL SHELF HEIGHTS WITH ULTA. WHITE PANEL BY MILLWORK BY G.C. WALL CLEAT FURNISHED BY MILLWORK VENDOR VENDOR AND INSTALLED BY G.C. 1 MILLWORK AND INSTALLED BY G.C. I"_MILLWORK REFER TO 3evisions CENTER WITHIN FIXTURE. B/� TEQ. EQ.' VENDOR. BY AWALL CLEAT ND(INSTAL EDNI VENDOR INFORMATION VALANCE ARCH ARCH BY GRAPHICS BY OTHERS. DRAWINGS FOR PROVIDED BY B/ARCHh _- MILLWORK 1013/16" VALANCE ISSUE FOR CLIENTILL REVIEW INFORMATION 03106/15 EO. EQ. VENDOR, Ir ISSUE FOR BID/PERMIT IL 03106115 VALANCE --LZ 4 SIGN WI t{T Q TRANSLUCENT FROSTY 3112" 3112` WHITE PANEL Q WHITE(MEL) BY MILLWORK GLASS SHELVING 2 6 VENDOR AND Q 8112" 1'-8" 8112" GLASS INSTALLED BY PROVIDED BY ULTA AND G.C. Q INSTALLED BY SHELVING GRAPHICS BY VALANCE SIGN 3" 1'-9112" i'-9112" 3" PROVIDED BY 81/2" G.C. HANGING SIGN WI OTHERS TRANSLUCENT WHITE PANEL ULTAAND 1"BLOCKING TH BY MILLWORK VENDOR AND INSTALLED BY LF_ STANDARD ALUMINUM GC. GLASS SHELVING INSTALLED U G.C.CENTER ALUMINUM PROVIDED BY II TRIM WITHIN FIXTURE.GRAPHICS STANDARDS ULTAAND II ii SUPPORT BY OTHERS. TRIM INSTALLED BY G.C. II Ii RECESSED STANDARDS y DIVIDER PANEL 7 N _j TRANSLUCENT RECESSED - 03/25/15 lWHITEACRYLIC STANDARDS f LICENSED DIVIDER PANEL a gLICENSED o TRANSLUCENT o AR 980360 a LOOSE CLEAT - DIVIDER PANEL II II Ii a WHITE Q -INSTALL ON r� WITH a i TRANSLUCENT - da WHITE ACRYLIC - TV-6 III SOLID SURFACE FURNISHED N SOLID SURFACE - F JoxNA.cmPMMi SOLID SURFACE BY MILLWORK VENDOR.SEE FURNISHED BY = srnreorwAllO �I II FURNISHED BY MILLWORK DRAWINGS. MILLWORK ALUMINUM TRIM MILLWORK - NOTE:CAULK ALL SOLID 3314" !, - II VENDOR.SEE VENDOR.SEE I SURFACES TO MILLWORK MILLWORK MILLWORK DRAWINGS. THESEPIANsxnvEBEENPRE- DRAWINGS. NOTE:CAULK _ES UNDER MrsuxaERViSIONAHO—TOTHE BEST NOTE:CAULK 1 /4" DRAWER WITH HEAVY DUTY ALL SOLID or Mrxrvow�EocE.THEsnMECOMPL—THnL R 1'8" _ SURFACES TO k- xeeuwr�oxsnxoanaTNANC sor Twlarues ALL SOLID SIDES ___ I! SURFACES TO D -_ • MILLWORK unrvc ro srRvcnREsoNO svlLOixcs. MILLWORK ELECTRICAL OUTLETS: I MILLWORK INSTALLER TO CUT `/ HOLES ON SITE TO �_ _=q WALL BASE cxire r ACCOMMODATE ELECTRICIAN —— _ _ FLOOR nR c PROVIDED DUPLEX OUTLETS, f f Drawn By Checked By 3'-03/4" REFER TO ELECTRICAL 1'-0" 1'-23/4" CW BW 3318' 2314" DRAWER FRONT ELECTRICALOUTLEI"S:MILLWORK 3318' 23/4" DRAWINGS FOR ALL LOCATIONS. 2' INSTALLER TO CUT FIOLES ON SITE TO 1'-6118" S ale Date WALL BASE i'-10118" 3'-1' NOTIFY ARCHITECT OF ANY 1'-6118" _ 3'-1" AS NOTED 03/06115 ACCOMMODATE ELECTRICIAN PROVIDED DISCREPANCIES PRIOR TO DUPLEX OUTLETS. REFER TO ELECTRICAL W-4 ELEVATION W-4 SECTION W-3 ELEVATION C16TTINGHOLES. W-3 SECTION W-2 ELEVATION DRAWINGS aFANYoOCATIONS.NOTIFY R W-2 SECTION Job No DRAWER PULL - K(e //II`V' TO CUTTING HOLES. 4 9 3 W-4 FIXTURE 2JW-3 FIXTURE 1 W-2 FIXTURE GENERAL NOTES Sheet N.I {II SCALE: N.T.S. SCALE: N.T.S. -.�... SCALE: N.T.S. SCALE: N.T.S. " o�° "A LEDGE OMPUTERIDATA OUTLET UPLEX OUTLET HIME PUSH BUTTON AT „ TOP OF OPENING. `� r ELEPHH ONE 3I4 BE TIP BOX TO F BOARD HEADER/FILLER i BE MOUNTED NEAR PANELEL FURNISHED BY FIXTURE VENDOR INSTALLED BY G.C. __ - TOP,INSIDE EDGE SECURE TO WALL WITH BLOCKING. d OF CABINET DOOR \\�DUPLEX OUTLET CENTERED AT BACK OF CABINET SPACE COMPUTERIDATA OUTLET WC-5 CONDUIT STUBS(CHIME,VOICE AND ' DATA)FOR THIS FIXTURE TO BE qq�� LOCATED AS PER PLAN.CONDUITS TO 'vlD COME UP UNDER FIXTURE WITHIN TOE-KICK SPACE.WIRING TO CONTINUE a qn TO TERMINATION BEHIND OPEN a� co DRAWERS OR IN BACK PORTION OF ZSPACE . ! CONTAINER.I FOR TRASH Q /. C-45 / NOTES: PROVIDED BY MILLWORK MANUFACTURER. O INSTALLED BY G.C.COORDINATE OUTLET LOCATIONS WITH % MILLWORK MANUFACTURER, tt J / 2. ALL CONDUIT I WIRING WITHIN FIXTURE FURNISHED& M W INSTALLED BY G.C. oc 11.-:("00 M w 3. REFER TO ELECTRICAL DRAWINGS. C)(o 4. INSTALL OUTLETS ON INSIDE FACE OF BACK PANEL OF V�Lu CASHWRAP UNLESS INDICATED OTHERWISE. ®� u 4 1 - 1 �1��101 DETAIL 3 CONCIERGE/POWER ROUGH-IN ELEVATION Q U 2 SCALE: oLALE', 112"=V-0" 7 Lwl � DUPLEX QUAD DUPLE% QUAD DUPLEX QUAD DUPLEX QUAD a Q OUTLET OUTLET OUTLET OUTLET OUTLET OUTLET OUTLET i OUTLET LL:jU fLC_—_ LL u_ _ _ —N..i::A z - — WORKSTATION WORKSTATION WORKSTATION WORKSTATION --w ra n „ -- — — — t9 NOT USED REAR SIDE ELEVATION-(SIDE FACING SALON BACKWALL) E 6 DUPLEX DUPLEX DUPLEX DUPLEX Q SCALE. NONE OUTLET OUTLET OUTLET OUTLET ____ _ _ __ _ _ _____ G.C.TO RUN AND TUCK ALL LED CORDS INTO THE RECESSED i ..... _ .. _ _ _ \ - a STANDARDS BETWEEN SHELVES THEN INSERT BACKER RODS,SHELVES JUNCTION BOXES I I V SHOULD BE INSTALLED AFTER WIRING IS RECESSED INSIDE STANDARDS IN FLOOR TO BE iq BUT PRIOR TO BACKER RODS.WHITE RUBBER PLUGS BY MILLWORK LOCATED UNDER % .. .. ;.:;,— 5 - O.. C> 4 NCO C�_ n U. I VENDOR FOR THE STANDARDS ABOVE THE TOP SHELF WILL NEED TO BE ACCESS PANEL. q 7___ INSERTED INTO THE STANDARD CHANNEL TO CONCEAL THE CHANNEL CONDUITS TOQO OO OABOVE THE SHELF.NO LED CORDS DANGLING BETWEEN SHELVES.0 TOFURNISHAND .LED WALL OUTLETSNOT TOCLEAT NOTE:INSTALL TIGHT TO CEILING IMPEDE USE OF - ---.. _ 11 TOREOPENLVE THE RECESSEDS SHOULD ALL BE BEG AND ENTER THE OPENING G \ INSTALL SELF ADHERING WIRE CORNER WALL MOLD TO CONCEAL WIRES THIS CABINET. ' BY HIN WEEN CONSULT WITH ULTA PM IF THERE ARE ANY QUESTIONS. VENDOR FURNISHED CEILIN PLAN AS THEY LEAVE THE RECESSED STANDARDS AND ENTER THE OPENING VENDOR _ DUPLEX QUAD DUPLEX QUAD DUPLEX QUAD DUPLEX QUAD AND h OUTLET OUTLET OUTLET OUTLET OUTLET OUTLET OUTLET OUTLET HANGING SIGN WI TRANSLUCENT INSTALLED - - - - WHITE PANEL BY MILLWORK BY G.C. F-, -- V`!i - -Ll'�;yJ -—- LJGL VENDOR AND INSTALLED BY G.C. • - MILLWORK --- ------- ---------- -. ------- Revisions CENTER WI THIN FIXTURE.' - D ARCH w ISSUE FOR CLIENT)LL REVIEW GRAPHICSBY OTHERS. �� �h PROVIDED BY z — WORKSTATION --- WORKSTATION WORKSTATION WORKSTATION -- - 003106116 _ BI ARCH �; _._ MILLWORK �hm i.Fl ISSUE FOR BIDIPERMIT r� w EQ. VENDOR. uwi __-_._.._ __ _.._._ �03/06115 .C.TO PROVIDE FRosr oRMTL FRAME FRONT SIDE ELEVATION (SIDE FACING FRONT OF STORE) IL WHITE(MEL) ATTACHMENTTO - ACK PANEL OF NOTES: MILLWORK FIXT. 1. G.C.TO INSTALL OUTLET TIGHT TO THE TO THE UNDERSIDE OF THE CABINET TOP,ON BACK Q 1"BLOCKING PANEL BEHIND DRAWER IS PER SALON ISLAND). STANDARD Q SUPPORT I METAL FRAME 2, G.C.TO INSTALL DUPLEX AND QUAD OUTLETS AT CENTER REAR CUTOUT OF TOOL DRAWER. ROVIDED BY 3' 1'-8112" 1'-9112" 3" RECESSED LTA VENDOR II II „ STANDARDS ANDINSTALLED MIRROR Y G.0 SALON / POWER ROUGH-IN ELEVATION . ^ I PROVIDED BY ETAL L II ULTA VENDOR HELVING AND SCALE: 112"=1'-0" II II AND INSTALLED RACKETS BY G.C. WITH BUILT IN 03/25/15 IGHTING) SALON TIP BOX TO BE SAFE OUTLET+30" CHIME PUSH CREDIT CARD DATA+30" OUTLET FOR ELECTRICAL m ROVIDED BY uCENSEO MOUNTED NEAR TOP, BUTTON N&' CCN' OUTLET:REFER OUTLET FOR CCN+30" ARCHttECT LTA VENDOR INSIDE EDGE OF OUTLET+6" TO ELECTRICAL o AR 085360 rc a ND INSTALLED ABINET DOOR DRAWINGS AND ¢ - --- ------ ----- TELEPHONE+6" II II II O YG.D. ---_.— ---.___ N . INTERIOR II i ELEVATIONS FOR - - - - - - --- ALL LOCATIONS. o � I II II II y y �— % i ih c CCESS PANEL _ w I I I I I I PEN CHASE - �a OR ROUTING HEREBYCERTIFYTLATMESEPIANSHAVE BEEN PRE- PARED li II II m ONDUTAND —PERV AND THAT To THE BEST OF MY KNOWLEOOE,THE SPME GOMPLYWIIHALLRN E3, STALLING aEeuunorvsnrvooaolwweECDAPLY eM-R I I r 6" URFACE OUTLET 130" OUTLET+Z' OUTLET+30' OUTLET+30" OUTLET+30' GATNGmsAND ORDINANCESES AND FBESLE. ILDINCe OUNTED COMPUTERIDATA COMPUTERIDATA COMPUTERIDATA COMPUTERIDATA COMPUTER/DATA UTLETS OUTLET+30" OUTLET*30" OUTLET+30' OUTLET+30" OUTLET+30' w n URFACE NOTES: ARCHRECR DO OUNTED 1. FIXTURE PROVIDED BY MILLWORK MANUFACTURER. LECTRICAL INSTALLED BY G.C.COORDINATE OUTLET LOCATIONS WITH Drawn By Chocked By UTLET MILLWORK MANUFACTURER. CW BW WALL BASE 2, ALL CONDUIT)WIRING WITHIN FIXTURE FURNISHED& Scale Dale SOLID SURFACE FURNISHED BY INSTALLED BY G.C. MILLWORKVENDOR,SEE 3. REFER TO ELECTRICAL DRAWINGS. AS NOTED 03I08115 W-8 ELEVATION MILLWORK DRAWINGS W-8 SECTION 4. INSTALL OUTLETS ON INSIDE FACE OF BACK PANEL OF Jab No. NOTE:CAULK ALL SOLID CASHWRAP UNLESS INDICATED OTHERWISE. _ SURFACES TO MILLWORK_ _ _ _ _ 1 3—5 5 4 g W-8 FIXTURE CASHWRAP / POWER ROUGH-IN ELEVATION F5 Sheet No F-1°1 o SCALE: A T.S. SCALE: 112"=1'0" SECTION 01010-SUMMARY OF WORK A.Coordination, 1.8 MANUFACTURER'S INSTRUCTIONS SECTION 01660-STARTING OF SYSTEMS E.Regulatory Regaremams.Comply Wim governing EPA notification regular...deem orting Galachva C.High-Range,Waler-Reduaing Admixture:ASTMC 494,Type F. 1.1 GENERAL B.Field engineering. A.When specified in individual specification sections,submit manufactures'printed instructiens for 'I.PART 1 GENERAL demolition.Comply with hauling and disposal regulations of authorities having jurisdiction D.WalerReducing and Accelerating Admixture:ASTM C 494,Type E. A.The Project consists of Tenant build-out within an existing Landlord owned building. C.Culling and patching. delivery,storage,assembly,installation,start-up,adjusting,and finishing,in quantities specified for t.1 SECTION INCLUDES F.Landlord will occupy potions of the building Immediately adjacent to selective tenant demolition ass. E,Water-Reducing and Retarding Admixture:ASTM C 494,Type O. 1.Project Location:As described on Cover Sheet, 1.2 COORDINATION Product Data. A.Sterling systems. Conduct selective demolition so that Landlord's operations will not be disrupted.Provide not less than 72 2.8 FABRICATING REINFORCEMENT 2.Tenant:As described an Cover Sheet A.Coordinate scheduling,submittals,and Work of the various Sections of specifications to assure B.Identify conflicts between manufacturers'inslruclions and Contract Documents.1.8 B.Demonstration and instructions, hours notice to Landlord of activities that will affect Landlord operations. A.Fabricate steel reinforcement according to CRSI's"Manual of Standard Practice." B.Contract documents,dated 0 310 612 01 5,were prepared for this Project by Chipman Design Architecture, efficient and orderly sequence of installation of interdependent construction elements,with provisions MANUFACTURER'S CERTIFICATES C,Testing,adjusting,and balancing. G.Landlord assumes no responsibility for actual condition of buildings to be Selectively demolished. 2.9 CURING MATERIALS - Inc. for accommodating items installed later A.When specified In individual specification GeCdignr submit manufacturers cedificale to 1,2 RELATED SECTIONS H.Storage or sale of removed items or materials on-site will not be permitted. A.Evaporation Retarder.Walerberne,monomoecular film forming,manufacluretl for application to fresh Q D C.The Specifcstions following are generic,performance requirement type for general extend of work on B.Verity that ulilily requirement characteristics of operating equipment are compolible with building Anchkect/Engineer for review,in quantities specified for Product Data. A.Section 01400-Quality Control:Manufacturers field reports. 1.2 PRODUCTS(Not Applicable) concrete. systems performance,end set forth the Intent of the Tenant,Ulle Salon,Cosmetics,Fragrance for utilities.Coordinate work of various Sections having interdependent responsibility for installing, B.Indicate material or product conforms to or exceeds specified requirements.Submit supporting B.Section 01700-Contract Closeout:System operation and maintemarwe data and exta materials. 1.3 EXECUTION B.Moisture-Retaining Cover:ASTMC 171,polyethylene film or white Burlap-polyethylene sheet. materials and services to be provided to develop a complete and ready to operate tenant space, connecting to,and placing in service,such equipment. reerence dale,affidavits,and certifications as appropriate, 1.3 STARTING SYSTEMS A.Survey the condition of the building to determine whether removing any element might result in Q Clear,Solvent-Borne,Membrane-Forming Curing Compound:ASTM C 309,Type 1,Class B. D.The Work Wit be constructed under a single prime contract. C,Coordinate space requirements and installation of mechanical and electrical work which as indicated C,Certificates may be recent or previous test results an material or Protlucl,but must be acceptable to A.Coordinate Schedule for start-up of various equipment and systems. structural deficiency or unplanned collapse of any portion of the structure or adjacent structures during PART3-EXECUTION JW E.All construction procedures used must meet or exceed all national,stale,O.S.H.A,and local codes. diagrammatically on Dawings.Follow routing shownfor pipes,ducts,and condul,as closely as AshftecUEniineer. B.Notify Owner seven days prior to start-up of each, selective demolition. 3.1 FORMWORK F.Sepaate Contract The Tenant,Ulta,Salon,Cosmetics,Fragrance has awarded a separate contracts practicable;place runs parallel with line of building.Utilize spaces efficiently to maximize accessibility 2.PART2 PRODUCTS C,Verify that each DISCO of equipment or system has been checked for proper lubrication,drive rotation, S.Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities. A.Design,construct,erect,Show,bace,and maintain formwork according to ACI 301. for construction operations that will be conducted simultaneously with work under this Contract.That for other installations,for maintenance,and for repairs. A.Not Used. bell tension,cenlrol sequence,or other conditions which may cause damage, C.Maintain existing utilities Indicated to remain in service and protect them against damage during B.Support vertical,laferel,static,and dynamic loads,and construction loads that might be applied,until Contract includes the following, D.In finished areas,conceal pipes,ducts,and wiring within the construction.Coordinate locations of 3.PART3 EXECUTION D.Verify that tests,meter readings,and specified electrical characteristics agree with those required by selective demolition operations structure can support such loads. 1,Contract Separate contacts are awarded for signage,display fixtures,security and alarms.Refer fixtures and outlets with finish elements. A.Not used. the equipment or system manufacturer. D,Utility Requirements:Locete,identify,shut off,disconnect,end seal or cep off indicated ulilily services C.Construct formwork so concrete members and structures are ofsize,shape,alignment,elevation,and to section N and O for additional Information. E.Coordinate completion and clean up of Work of separate Sections in preparation for Substantial E,Verify wiring and support components for equipment are complete and tested. serving building to be selectively demolished. position indicated,within tolerance limits of ACI 117. G.Cooperate with separate conlactore so mat Work under those contracts may be carted out smoothly, Completion. SECTION 01400-QUALITY CONTROL F.Execute start-up under supervision of responsible manufacturer's representative in accordance with 1.Where ulilily servicesare required la 6e removed,relocated,or abandoned,provide bypass D,Construilforms llghlenuughto preventloss of concrete mortar without Interfering with or delaying work under this Contract. F.Attar Owner occupancy of premises,coordinate access to site for correction of defective Work and 1.PART1 GENERAL manufactures'instructlons, onnections to maintain continuity of service to other pars of the building before proceeding with E.Fabricate forms for easy removal without hammering or prying against concrete surfaces.Provide crush H.Not Assigned. Work not in accordance wim Conlacl Documents,to minimize disruption of Owner's activities. 1.1 SECTION INCLUDES G.When specified in individual specification Sections,require manufacturer to provide authorized selective tlemolilion. or wrecking plates where stripping may damage cast concrete surfaces. Provide lop forms for inclined I.The Work will be conducted in a single phase. 1.3 FIELD ENGINEERING A.Qualilyassuancaandwnlrolofinstallation. representativeto be present al site to Inspect,check and approve equipment or system lnslallalion E.Drain,purge,or otherwise remove,collect,end dispose of chemicals,gases,explosives,acids, surfaces sleeper than 1.5 horizontal to l vertical. J.Conlraclor Useof Premises:During construction the Contractor shall have full use of premises, A.Employ a Land Surveyor registered in me Slate of the project location and acceptable to the Owner B.References. prior to start-up,and to supervise placing equipment or system in operation. flammables,or other dangerous materials before proceeding with selective demolition operations, 1.Install keyways,aglets,recesses,and the like,for easy removal. including use of the site,The Contractor's use ofpremiusis limited only by the Tenant's right to perform and ArchilecUEngineer. C.Manufactures'field services and reports. H.Submit a written report in accordance with Section 01400 that equipment or system has been properly F.Employ a withiin,licensed exterminator to treat building and to control rodents and vermin before and 2.Do not use rust-stained steel form-facing material. work or employ other conlactore on portions of the Project B.Owner will locale and protect survey control and reference points. 1.2 RELATED SECTIONS Inslallad and is functioning correctly. during selective tlemolilion operations. F.Set edge forms,bulkheads,and intermediate screed strips for slabs to achieve required elevations and 1.General Contractor shall contact Landlord to verity the limes that he may work,routes of access C.Cannot datum tar survey is that established by Owner provide survey. 1.4 DEMONSTRATION AND INSTRUCTIONS G.Conduct tlemolilion opealions and remove debris to ensure minimum interference with roads,streets, slopes in finished concrete surfaces.Provide and secure units to support screed strips,use strike-off A.Section 01300-Submittals:Submission of Manufacturers'Instructions and Cadifcaes. and areas of use,stoage,elc.including deliveries,and secure written approval of same prior to work D.ngineefigl surveyerirtices. es.Establish elevations,Ilnes,and levels,utilizinA recognized B,Section 01600-Material and Equi ment;Re uirements for material and roducl ualit, A.Demonstrate operatlon and maintenance of Products to Owner's personnel one week prior to dale of walks,and other adjacent occupied and used facilities. templates or compacting-lype screeds. start. engineering survey prailices. 1.3 QUALITY ASSURANCEICONTROL OF INSTALLATION D q y Substantial Completion. H.Conduct tlemolilion operations to prevent injury to people and damage to adjacent buildings,facilities, G.Chamfer exterior corners and edges of permanently exposed concrete. 2.Biddam are to better acuaint themselves with conditions under which the will work at roject site E,Submit a co ofrelstemd site drawin end cedificale s'nedb the Land Surveor that the and site imrovements to remain.Ensure safe ass eof r 4 Y P I PY 9 9 g Y Y A,Mknifor quality control over suppliers,manufactures,Products,services,site conditions,and B.Forequipmenl or systems requiring seasonal operation,perform demonstration for other season P p rag pe cons around ere of demolilion.Erect H,Clean forms and adjacent surfaces to receNa concrete. Remove chips,wood,sawdust,dirt,and other and locate all utilities before beginning work. elevations end locations of the Work era in conformance with the Conlrecl Documents. wilhtn exmonths. temporary barricades andlor covered passageways as required fo prevent injury to persons. debris just before placing concrete. workmanship,to produce Work of specified quallty. K,Use of the Site:Llmll use of premises to areas indlcaled.Do not disturb portions of the site beyond the 1.4 CUTTING AND PATCHING B.Corn full with manufacturers'Instructions incudin each sty in se uence. C,Utilize opeation and maintenance manuals as basis for instruction.Review contents of manual with 1,Provide temporary weather protection,during interval between demolition and removal of existing I.Relighlen forms end bracing before placing concrete,as required,to prevent mortarlSake and maintain area Alinicated. A,Employ skilled and experienced Installer to perform Cutting and patching. C.Shoud manufactuem'instructions conflict with Contact Documents,reuest clanlission from Owners'personnel in must to explain all aspects of operation end maintenance. construction,on exterior surfaces and new construction to ensure that no water leakage or damage proper alignment I.Allowfor Owner/Lendlowl end adjacent tenant occupancy and use by the public. B.Submit written request In advance of cutting or skating elements which affects: ArchilecVEn ineer before raceetlln. g D.Demonstrate stall-up,operation,control,adjustment,rouble-shooting,servicing,maintenance,and occurs to structure or interior areas. J.Coal contact surfaces of erns with formerelease agent,according to manufacturer's written instructions, 2.Keep driveways and entrances clear.Do not use these areas for parking or material storage. 1.Structural integrity of element D.Corn wifhs ecified standards as a minimum ualit for the Work exce twhom more Strn ent shutdown of each item of equipment al agreed-opon times,al equipment location. 2.Protect walls,ceilings,floors,and after existing finish work that are to remain and ere exposed during before pining reinforoeml. SchetWledellveres to minimize on-site storage of materials and equipment.Delivery schedule shall 2.Integrity of,care,exposed or moisture-resistant elements. PY P 9 y D g E.Prepare and insed additional data In operations and maintenance manuals when need for additional selective demolition operations. 3.2 VAPOR RETARDER tolerances,codes,or speciiieU requirements indicate higher sentlards or more precise workmanship. bef the Eetlby Landlord. 3.Visual cy,main of sogheexposed elements. ' E.Perform workb ersons ualified to roduce workmanshi ofsecifietl ualll. data becomes apparent during insiruclion. 3.Coward m protectert proof fumitions ad temporary enlos hes to li it du removed. to Igestdi ensio,and repair vh diretion of sheets accordingfoASTM E1643;place sheets in position wim L.Use of the Existing Building:Maintain building weather light.Repair damage caused Dy conslroclion. 4.Visual qualities of sight-exposed elements. si g p D P q Y 1.5TES'fING,AOJUSTING,AND BALANCING I.Erect and maintain tluslproof partitions end temporary enclosures to limit dust and did migration and to longest dimension parallel with direction of pour. F.Secure Products di placewilh isfig cement.age devices designeU and sized to withstand stresses, Prolecl the building and its occupants during construction Conlraclor shallprovlde harcades as S.Work of Owneror separate conlraclor. vibration, hsical dislodion or diafi uremenl. A.Conlraclor will appoint,employ,end pay(or services of an indeperclent Arm to perform teslin9, separate areas from fumes and noise. B.Lapjoinls 4lnchsand seal with manufacturer's recommendeU tape. necessary Go as to prevent public access to unsafe contlilions end construction site.Wore must be C,Execute cutting,fitting,and patching Including excavation and fill,to complete Work,and to: 1.4 REFERE CES g adjusting and balandng. J.Provide and maintain interior and exterior shoring,bracing,or structural support to preserve stability and 3.3 EMBEDDED ITEMS V�s secured each evening,or when construction is not preformed,to ensure that patronslpublic do not have 1,Fit the several pads together,to integrity with other Work A.Conform to reference standardb Uale of issue currenton dateof ConlreclU c m 1. B.The independent firm will perform services specified in Mechanical sections. prevent movement,settlement,or collapse of building to be selectively demolished. A.Place and secure anchorage devices and other embedded items required for adjoining work lull is tar access to dangerous condillome 2.Uncover Work to install or correct ill-timed Work. Y o u ens C.Reports will be submitted by the independent firm to the ArchitectlEngineer indicating K.Use water mist,temporary enclosures,and other suitable methods to limit the spread of dust and dirt. attached to or supposed by pail-in-place conamle.Use Setting Drawings,templates,diagrams, QO B.Shout copiesedTolerance whenrequired by with Cotmot Do um M.Paslal Tenanl0ccupancy:The Tenant reserves the right to occupy and to place and install equipment 3.Remove and replace defective and non-conforming Work. observations and results of tails and indicating cornplience or noncompliance with specified Comply with govyrning anvironmentalpmtaction regulations, inslrudions,and directions furnished wim items to be embedded. � C,Should specified reference standards conflict with Contrail Documents,request clarilicelion for L,Remove and trans ort debris in a manner that will prevent spillage on ad in completed areas of the tenant lease area pear to Substantial Completion.Plating equipment and 4.Remove samples of installed Work for lesting. g proceecin. requirements and with the requirements of the Conlrecl Documents. P jacenl surfaces and areas. 3,4 STEEL REINFORCEMENT Q axial Otto an do not constitute acce 1 nce of the Work 5.Provideo enin Archltee En ineer before 0) p p cY pa p methods whicholwavoid amagetlooser Work,alnd prov eeprope Work. D.The Contactual relationshi of thegayive to the Contract shall not be altered from the Contract 2.PART2 PRODUCTS M,Clean adjacent slroctures and improvements of dusl,dis,and debris caused by selective tlemolilion ACompty with CRSI's"Manuel of Standard Practice"for lahricaliny,placing,and suOPosing reiniorcemem. P LEI/ 1.General Contractor is to apply for and obtains Certificate of Occupancy from building officials prior D.Execute work by methods which will avoid damage to other Work,end provide proper surfaces to y mamion or inerence otherwise in an reference document, A.Not Used. operations.Return adjacent areas to condition existing before sled of selective demolition. 1. Do not cut or puneere vapor retarder.Repair damage and reseal vapor retarder nnn to Tenantoccu fancy, receive tchin DAUmFACT a 0) D pa g and finishing. 1.5 MANUFACTURERS'FIELD SERVICESAND REPORTS &PART t EXECUTION N.Demolish and remove existing conslruclion only to the exlenl required by new construction and as before placing concrete. DC �0) 2.Mechanical and electrical systems shallbeoperational and required'mspecliens and tails E.Cut rigid materials using masonry saw or core drill. A.Nol Used. indicated. 3.5 JOINTS A.When specified in individualsied staff pe Sections,require siteralor Productditionsoor QQ completed prior to pasial Tenant occupancy.Upon occupancy,the Tenant will Opeale and maintain F.Restore Work wim newproducts in accordance with requirements of Contract Documents. O.Promptly patch and repairholes anddamaged surfaces caused to adjacent constructon by selective A.General:Construct joints true to line wilheces perpendicular to surface plane of controls. (� o systems serving occupied portions of the lease area. G.Fit Work tight to pipes,sleeves,ducts,conduit,and other manufacturers ro provide qualified staff pesonnel to observe site contlilions,conditions n surfaces O d� penely sualoids. surfaces. and installation,qualify of workmanship,sled-up of equipment,lest, ad'usl,and balance of SECTION 01700- NTRA TCL tlemolilion Operations B.Cpons indicted ores appeand by Arlsoas not to impairslrenglh orappearance ofconcree,at I= ® < 3.The Tananl will be responsible la maintenance and custodial service for occupied portions of the H.Maintain integrity ofwall,ceiling,or ttoor construction completely seal voids. 1 CO C OSEOUT P.Where repass to exlstin9 surfaces are required,patch to produce surfaces suitable for new materials. Iocalions indicated or as approved by ArohilecL � �� a equipment as applicable,and to initiate instructions when necessary. 1. PART1 GENERAL Q lease area. I.Refinish surfaces to match adjacent finishes.For continuous surfaces,refinish to nearest intersection; Q.Restore exposed finish es oiates eidence and extend findwideing. into adjoining conslruclionto columnfpe Jonls:oundationD ally sgriade cams,and oh Globs-ations,a endverticalsurfaces,such as pp/�� B.tat areuuppl report observations manutlecisians or Instructionsons. to applicalos or inslallas 1.1 loseoONINCLUDES Vd p� N.Products Ordered in Advance:The Tenant has negotiated purchase arderswifhsupplies of material foranassembly,refinishenUre unit. Ihaf are su lemenal or centre tomenufeclurers'written inslruclions. namanner lhaleliminales eviUence ofpalching and refnishing. column pedestals,foundation walls,grade beams and other locations,asintlicaled. ® V PP ry A,Closeout procedures. RrePalch and re endiving,entlobe incorporated instlhe Works aminseded in are assigned la the Contactor. J.Itlenlify any hazardoussubstancete all,buried or hiddduring lee rior to anyawoutting or ineerfor reaIntorandvr.Proviae afluhend even s where tleniform colorndppearnexlend 1, surfac,unlssoferai Indic depth ofjoinl,tenninalin9 flushwith finished concrete e C.Submilreposinduplicafe within 30 days Ofobservation to ArchilacUEngineerfor review. B.F'mol cleanin. @ �� �n Receiving,handling,storage,and lnslallalion costs are included in the Contact Sum. decision or remedy.Verify and bcate all,buried or hidden,ulilifles prior to any sewculling or coring. p,PART2 PRODUCTS g one finished area Into another.Provideo flush and even surface of uniform poor and appearance. surface,unless otherwise intlkaled, I� 0.Tenant Supplied Items.The Work includes din u rt s stems fo receive Tenant's ui ment, 2,1.PART 2 PRODUCTS C.AUlusting. S.Patch,repair,or reran g g y p p ( ) p j g , e provi g s ppo y eq p A.Nol Used. g exislin ceilin s as necessar to rovlde an even-lane surface of uniform D.Conte anon Control Joinls d Slabs rucGrade.Form weakened-lane equal to at oink,se fourth Q p S and mechanical and electrical rand delivs. A.Nol Used. D,Project record documents. appearance. cancrele into areas as indicated,Consirocl conlraction'oinls facade Ih a � �J 3.PART3 EXECUTION E 0 eration and menenance data. I p equal to atleasl orre-foush of the � � nn n 1.The Tenant will arrange for and deliver shop drawings,product data,end samplesfothe Contractor. 3.1.PART3 EXECUTION � p T,Disposal,Promptly dispose of demolished materials,Do not allow demolished maerials to accumulate concrete thickness. luui A.Not Used. F.Warranties. 2,The Tenrshalll orange andpaytion scheryaccoaingtoth Contractor's Construction Schedule. A.Not Used. tails. E.Doweealf of delleltlowo bavent couppod assemglto one side Where indlcaled.Lubricate orasphau _J �_ 3.Contraclrrshall submitacensfrucfion schedule to TenanVLandlord prior to workstas. G.Spare pass and maintenance materials. 1.Do not burn demolisheU materials. coat one-half of dowel length to prevent concrete bonding to one Title ofjoinl. lug 1.2 RELATED SECTIONS 4.The Conlraclor will inspect items delivered for damage. ECTON 01450-CONCRETE IN-SITU RELATIVE HUMIDITY AND PH TESTING 2.pispose of demolished materiels et designateU spoil areas on Landlords's property. 3.8 CONCRETE PLACEMENT SECTION 01150-ENVIRONMENTAL PROCEDURES A.Section 01500-Construction Facilities and Tem 6.Ihlemsare dam aged. forfildser missing the Ten delivery of Wge(mice to the Cot Pes1-GctionI porary Cong,a.Psting,andalanc 3,wepthe uildin bromclean Off LmpletionoDropesyandolitio opeaati of them. A.Compranspreng,and pacing in Ante. ,ASTM C84,ASTMC1116 and ACI301,tar measuring, 6.The Tenant willarran eforfield servicesand forlhe deliver iwarcenties to the Conlraclor. AGeneral Environmental Concerns:Protect requires maximumenvironmenlally conscious work feasible 1.01 Section Includes B.Section 01850-Slesing of Syslems:Syslem start-up,ailing,adjusting,and balancing. U.Swee the builtlin broom clean on tom letlon ofwleclivedemolilbno eralion. mixln Trans sn 9 Y o P 9 P D g, it g,and placing concrete. 7.The Contactor shall designate delivery dates in the Contactor's Construction Schedule. within limits specified, available materials,equipment,and products A.Provide in-situ concrete relative humidify and surface pH lestlng to ail concrete specified to be covereU 13 CLOSEOUT PROCEDURES V.II is assumed Thal all hazardous materials have been removed riot to contractor's work star,if Burin 1.D B.Secial Environmental Definitions, D 9 epositcenc24 iches(600 mmntleoiding oldj on nd in tconcree in excee nootorkdeign B.The Contact or shallemsashoptedin using the produc,andsamplesand return them no@ng D with door coverings or resinous coatings.Includes concrete placed below,on and aboveyratie.IFor ASubmit Work is co plate in ac Contract with Cotract Docuents and re Work Ownernispection. those maeoals andinon,an additionalndlordoumediatly Ownercovered. and payisnoftodlslurb rl 1.Environmenlel Pollution erld Drama e:Presence of chemical hsical,or blot cal elements ore ants and that Work is tom fete in accordance with Contract Documents and read for Owner's ins action. y - no deeps ban 24 inches(800 rum),avoiding coldpine,and in depths not la exceed formwork desiyn discrepancies or problemsanticipated in using the product. A DY o9� 9 re-modelprojects suspended slabs may be excluded from this requirement) P Y P those materials andnotify Uwnerand Landlordimmedialely.Owner will retain and pay for hazardous pressures. Vu�u which could, B.Provide submittals to Owner mat are required by governing or other authorities. material removal,however it shall be the ma nsibifit of the Geneal Contractor to coordinate this work. 2.Consols 1 ncrele wihm 9.The Contractoris responsible forreceiving,unloading and handling Tenant fumishetl Items al the B.Testing shall take place afar allowing concretetodryfor a minimumof 28days.Tastingis to be po y daece 1 ete floors vibratingequipment. conga site a.Adversely affect human realm or welfare. scheduleU no less ihaniand no morelhan6weeks prior to scheduled flooring installation. C.Submit llnal Application for Payment identifying total adlusled Conlrecl Sum previous payments and 3.Screed and initial-@oral concrete floors and slabs using bull floats or derbies to formauniform and '�/ 10.The Contractor is res nsible for rotectin items from damae,including exosure to the b,Unfavorably alter ecological balances important to human life,affect other species of importance to sum remaining due to Owner. ,Ul a=,,: Po P 9 9 D 1.02 Related Sections oen-texeretl surface lane,free Of hum Tor hollows,before excess moisture or heedwalera ears elements.The Conlraclor shall repairor replace items damaged as aresult of his ape rations. humanity. 1A FINAL CLEANING SECTION 033U0-CAST-IN-PLACE CONCRETE P p D pP n„',, c.Degrade the utilil of the environment for aesthetic,pullual Or historical ses. A.Section 09620-Specialty Flooring on the surface.Do not lusher disturb stab surfaces before slaying Finishing operations. p 1.2 PRODUCTS(N01 Applicable) Y purco A.Execute final cleaning poor to final inspection. PART 1-GENERAL 1.3E%ELUTION END OF SECTION 0f010 2.Class 111 Landfill:Landfill that accepts non-hazardous waste such as household,commerdal,and B.Section 09640-Wood Flooring B.Clean lnreriorand exteriorglass and surfaces exposed loview;remove temporary labels,stains and 1.1 RELATED DOCUMENTS 4.Floors to be level to within�"lolerance In l0 feel,smooth and sealed.Veri(y intended Door finish.Du V`r d_ Industrial waste,including construction,remodeling,repair,and demolition operations. C.Section 09650-Resilient Flooring foreign substances,polish transparent and glossy surfacer vacuum carpeted and soft surfaces. A,Drawings end general provisions of the Contract,including General and Supplementary Conditions and not seal concrete surface where sealer would interfere with floor coaling.Comply with floor Finish __ 3.Construction and Demolition Waste:Solid wastes such as building materials,packaging,rubbish, G Section 09660-Static Control Flooring C.Clean equipment and fixtures to a sanitary condition. Division 1 Specification Sections,apply to this Section. manufacturer specifications, se N°' SECTION 01019-CONTRACT CONSIDERATIONS debris,and rubble resulting tram construction,remodeling,repair,and demolition ope ations. D.Re lace Otters of O tin t. 7.2 SUMMARY 3.7 FINISHING FLOORS AND SLABS v r w u m E.Section 09670-Fluid Applied Flooring p pera gequipmen A.Finish INGFLuORS NfolLAB: CC 1.GENERAL 4.Chemical Wesle:Pelroeum products,bituminous materials,salts,acids,alkalis,herbicides,pesticides, F.Seclien 09680-Carpel E.Clean debris from roofs,guliers,downspouts,anti drainage systems. A,This Section specifies cast-in place concrete,Including formwork,reinforcement,concrete materials, C U_-c" 1,1.SECTION INCLUDES ogenic chemical,and inorganic chemical wastes. F.Clean site;sweep paved areas,rake clean landscaped surfaces. mixture design,placement procedures,and finishes,for the following: 1.Apply rougmformetl finish,defined in ACI 301,to concrete surfaces indicaed or not exposed to public N g'o m A.Schedule of Values. C. i Envi rim nl I 1.03 Releraices view. SDecal ro e llwing seci Coquiremnts, cal requirements specified In Section O1300 for 5 Remove waste and surplus materials,rubbish,and conslruclion facilities from the site. 2Slab on grade,iscellaneous stabsoplace concrnches end general floor patching, B.Application for Payment. submittals and with following special requirements. A.ASTM F-2170.11-Stallard Test Method for Determining Relative Humidity In Concrete Floor Slabs 1.5 ADJUSTING 2.Slab on Bade,miscellaneous cast-in-place concrete 2.Apply smooth-formed finish,defined in ACI 301,to concrete surfaces indicateU and exposed tO public ��'. C.Change procedures. Q Special Recycling Requirements: Using In-Situ Probes A.Adjust opeating Products and equipment to ensure smooth and unhindered operation. 1.3 DEFINITIONS view or to be covered with a coating or covering material applied directly to concrete,such as 1.2 RELATED SECTIONS 1.Implement recycling progam as required that includes sepaale collection of waste materials B.ASTM F-710-11-Standard Promisefor Preparing Concrete Floor and Other Monolithic Floors to 1.6 PROJECT RECORD DOCUMENTS A.Cementiticus Materials:Portland cement alone or in combination with one or more of the following. waterproofng,dampproofing,veneer plaster,or painting. U A.Section 01300-Submittals.Schedule of Values. E,Environmental Controls:Comply with fedeal,state,and local regulations pertaining to water,air,solid Receive Resilient Flooring. A.Maintain on site,one set of the following record documents,record actual revisions to the Work, blended hydraulic cement,fly ash(per ASTM C 618,Class F or C in maximum quantity of 16%)and other a.Do not apply robbed finish to smooth-formed finish. 8.SectIOn 01600-Material and Equipment:Product substitutions and alternates. waste,chemical waste,sanitary waste,sediment and noise pollution. 1,04 Submittals t.Conlrecl Dawings. g000lans,ground granulated blast-furnace slag,and slllcatum.;Subject to compliance wiih requirements, 3.Apply smooth-rubbed finish to smooth-formed finished co acts surfaces indicated or exposed to 1.3 SCHEDULE OF VALUES F.Protection of Naluml Resources:Preserve the natural resources within Project boundaries and outside A.Report all lest results in chart form listing test dates,time,depth of test well,in-silu lempealum, 2,Specifications. 1A QUALITY ASSURANCE public view. • A.Submit typed schedule on All Farm G703-Application and Certificate for Payment Continuation limits of permanent work performed under Contract in existing condition or restore to an equtvelenl or relative humidity and pH levels. 3.Addenda, A.Installer Qualifications:A qualified installer who has can0leted concrete Work similanln malarial,design, B.Finishing Floors and Slabs:Comply with recommendatiions in ACI 302.1 R for Someting,madmighlening, Sheet.Contractor's standard arm or electronic media printout will be considered, improved condition upon completion of Work. om 4.Chan a Orders and other Modifications to the Contact. and exlenl to that Indicatedfor this Protect and whose work has resulted in construction with a record of and finishing operations for concrete surfaces. B.List test locations on chart and show Game 8'G x 11 site map(when such map is made available to g 1 1.Scralch Fiman A scotch finish,defined in ACI 301,to surfaces indicated and 1O surfaces to B,Submit Schedule of Values In duplicate within 20 days a%tar date of Owner-ConteclOr Agreement. G.Hazardous Materials if hazardous materials ere discovered Client Landlord are to immediately notified for testing agency) 5.Reviewed shop drawings,product data,and samples. successful in-service performance,qualified as ACl-certified Flatwork Technician and Finisher ands PPY C.Format.Itlenlify each line Item with number and title of the major specifcatwn Section. remedialica B.Record Information concurrent with construction receive concrete AOor lopping or mortar selling beds for ceramic or quarry Ale,pontand cement C.Deliver results in du licate for distribution to Architect and General Contractor. progress. supervisor who is an ACI-certified Concrete Flalwork Technician. D,Include in each line Item,the amount of Allowances s ecified in This Section. P terrazzo,end ether bonded cementitlous Iloor finishes. P C.Slialfi cations:Legibly mark and record al each Protlucl section description of actual Products B. Manutaclurer Qualificallons,Afum experienced in manufacturing ready-mixed concrete E,Include separately from each line item,atlirecll oposlonal amount of Conlaclor's overhead and 1,06 Quality Assurance 2.FloatFinish:Apply tool finish,defined in ACI 301,to surfaces indicated,to surfeceato receive trowel y SECTION 01300-SUBMITTALS installed. products complying with ASTMC 94/C 94M requirements for production facilities and equipment profit, A.Digital"Reader'and calibrated relative humidity sensors D.Record Documents and Shop Drawings'.Legibly mark each Item to record actual construction. and ACI 117,"Specifcafione for Tolerances for Concrete Construction end Materials" finish,end to surfaces to be covered wim fluid-aDPlietl or sheet waerprooling,built-up or membrane 1.PART 1 GENERAL roofing,or sand-bed terrazzo. F.Revise schedule to list a roved Chan a Orders with each A lication For Pa ment. 1.Facto-celibrated'Smas Sensors"vein Touch-n-Sense'"'1 hn PP 9 PP y 1.1 SECTION INCLUDES ry 9 ec oogy. E.Umittewner required doc titlets toO nTeal from allquired nos. TS teelR RY,STORAGEAND HAND LING 3.Trowel Finish Apply a trowel finish to surfaces indicated and to surfaces exposed to view or to be 1.4 APPLICATIONS FOR PAYMENT 2.NIST-traceable factory calibration F,Submit ownerrequired tlocumenls to 0wnerinfamalrequired by owner with claim forfinal Applicelion A.Steel Reinforcement:Deliver,store,and handle stoat reinforcemenito prevent banding and A.Submittal procedures. covered with resilient facing,carpel,ceamic or quarry file set over a cleavage membrane,paint,or A.Submit three copies of each application on AlA Form G702-Application and Cetliflcale fa Payment. B.Conslaction ro ress schedules, B,Wide range pH paper,and distilled or deAcnized water. for Payment. damage.Avoid damaging coatings on steel reinforcement B.Content and Format Utilize Schedule of Valuesfor listing items in Application for Payment. p g 1.7 OPERATION AND MAINTENANCE DATA B.Waterslo s:Store wateMa sunder cover to roteci from mosture,sunll ht,dld,oil,and other another thin film-finish coating system. Revisions C.Shop drawings. Part 2-Products p P p g a.AAer applying float finish,apply fist trowel finish and consolidate concrete by hand Or power-driven C.Payment Period:30ctays,:Waiverof Lien to Date. A.Submit Iwo sets prior to final Inspection,bound in 8-112 x 11 inch text pages to Owner,three ring contaminants Q ISSUE FOR CLIENTILL REVIEW D.Protlucl data. 2.01-Manufacturers trowel.Continue troweling passes and restraighten until surface is free of trowel marks and uniform 03106115 1.5 CHANGE PROCEDURES E.Samples. binders with suable covers. PART2-PRODUCTS A.The Architect/Engineer will advise of minor changes in the Work not involving an adjustment to A.34-991,or equal humldlly and temperature sensor kll as manufacluretl Uy Wagner Meters(800) B.Prepare binder covens with printed title"OPERATION AND MAINTENANCE INSTRUCTIONS',title of 2.1 FORMWORK in textgeor Noppeaance.Grind smooth any surface defects that would leleyaph mrough applied F.Manufeclurers'inslruclions. fi34-9961,ore Scat ceatin ISSUE FOR BID/PERMIT Contract SumlPrice or Contact Time as authorized by AIA A201,19B7 Edition,Paegeph 7.4 by q project A.Furnish formwork end form accessories accortlin Ira ACI 301. gs or Aaor ceverin9s, G.Manufacturers'certificates. y ry, q C.Subdivide the binder contents with page dividers,organizer)as described below;with lab titling clearly B.Smeom-Formed Finished Concrete:Form-facin g anels that will rovide continuous,true,and smooth h.Finish and measure surface so 03/06115 • issuing supplemenlel inslruclions on AlA Form G710. B,pH test paper as manuecturedb Micro Essential Laboelo ore Scat gap al any point between concrete surface and an unleveled 1.2 RELATED SECTIONS 9F P heeslandmg iPfcot-(3,05-m-)Ion trai bled g g po p yw B.The ArohilecUEngineer may iswea Notice of Change which includesatleteiletl description ofa Parl3-Execution printed under plastic tabs. cencrele surfaces. Furnish in laryesl practicable sizes to minimize number ofjolnls. 9s g fie,restin on two hl hs eanU laced an hereon Q A.Section 01019-Contract Considerations:Schedule of values. me surface,does not exceed the followin: proposed changewith supplementary Orrevised Dawings and specifications,achangein Contract B.Section 01400-Quality Control:Manufaclurere'field services end reports. 3.01-Quentificalion of Relative Humiditya140%of Concrelethickness D.Contents:Prepares Tableof Contents for each volume,with each PoduG or system description 1.Exreriorgrade plywood suitable for concrete forms complying with DOC PS 1,meal,or other A Time for executing the change with a stipulation of any overlow work required.Contactor will prepare 1) 118 inch(3.2 rum). C.Section 01700-Contract Closeout:Correct warranty and manufacturer's certificates closeout A.The lest site should be maintained al the same temperature and humidity conditions es those identified,type an white paper. approved panel materials. Q and submitan eslimale with seven days. antics ated durin normal occu anc These tern erature and humidit levels should be maintained for E,Pad'I:Directory,listing names,addresses,and telephone numbers of Arohllectfingireer,Contactor, C.Rough-Formed Finished Concrete:Plywood,lumber,metal,least two edges and one side for tight fit. 4,Trowel and Flne-Broom Finish:Apply a partial trowel finish,stopping after second troweling,to submittals. P 9 P Y D Y surfaces indicated and to surfaces where ceramic or quarry file is to be installed by either thickset or C.The Conlraclormayproposes and itsby effect oint request for change tome Ate breakdowneer, 1.3 SUBMITTAL PROCEDURES 48 hours prior and during lest period.When a building is not under HVAC control,a recording Subcontractors,and major equipment suppliers. D.Chamfer Strips:Wood,metal,PVC,or rubber strips,3A by 314 inch(19 by 19 mm),minimum. describing the proposed change and Its full effect on the Work,inclutlln9 a complete breakdown F.Par12:0 eration and maintenance instructions aran ed b s stem and subdivided b s ecification E.Form-Release A ono:Commerwel formulated form-r thin-set method.Immediately after second(roweling,end when concrete is still plastic,slightly scarify A.Transmit each submittal wile mil Fortn s Re hygrometer or data t be includ be Tit place recording cendllions during the lest period.A Ianscrlpl of P 9 Y Y Y P 9 Y s ease agent mat will not bond with,stain,Or surface with a fine broom. Indicating leborend malerialscosls lnclutleestatemend tlescribinglhe reason far the change,and the IhisinformaUonmusl be included with the lest re n section.For each cetagory,identity names,addresses,end telephone numbers of Subcontractors end adversely affect concrete surfaces andwill nolimpairsuhsequenitreaMene of cencrele surfaces. B,Sequentially number the lensmitlal forms,Resubmiltals to have original number with an alphabetic W 5.Broom Finish:Apply a broom finish to exterior concrete,brooming with fiber-bristle broom Q effeil on the Conlrecl Sum/Price and Contact Time with full documentation.Daument any requested supplies. 1.Formulate form-release agent with rust inhibllor for steel form-faring rteterials. suffix. B.The number of in-situ relative humidity test soles Is determined Dy the square footage of the facility. tar ndicular to main Iraific route,to I subslilutiyns in accordance wim Section 01600. G.Pay 3:Project documents and certificates,including the following: F.Form Ties:Faclay-fabricated,removable or snap-off metal or glass-fibeTromforced aslic farm ties D � D l concre steps,anti ramps,and elsewhere as indlcaled. C.Identify Project,Contractor,Subcontractor or supplier;pertinent Dawing sheet and detail numbeds), The minimum number of tests to be placed is equal to 3 in the first 1,000 aq.fl.and l per each 6.Verityinlended@oafnish.Do not seal cencrele surfacewhere sealer would interfere wdh floor D.Stipulated Connect Change Order:Basedon Noticeof Change and Contractorsgeed price t.Shop drawings and product data. Uesignetlforesist 19eralpressure of fresh concrete on fortes and to prevent spelling of cencrele on endspecification Sectionnumber,as appropriate. additionalethe squarefeel. cealin Cotn I with floor finish manufacturers quolalion or Contractor's request fora Change Order as approved by ArchitecVEngineer. 2.Alrand water balance repose. removal. 9 PY pecificalions. p,Apply Contractor's stamp,signed orinitialed certifying that review,verification of Products required, C.Delernine the thickness of the concrete slab,typically from conslruclion documents. 3.8 CONCRETE PROTECTION AND CURING _ E.Construction Change pectivee:gned bcthe Owner may issue a directive,on r to Form d wit 3.Photocopie 2.2 STEEL REINFORCEMENT Construction Chan eDireclive si nedb the Owner,inslroctin the Conlraclor to seed witha Feld dimensions,atljacenl construction WorK,and coordination of information,is in accordance with the p,Ulillzinga roto-hammer,drill test holes loadeplh equal to 40%ofiha concrete thickness',i.e,2"deep 4,Pholoco ies of warranties. Geneal�.Prolecl cencrele(rom excessive cold or hot lempealures.Comply with AC1306,1.1990 for g g y g P 1 f the Work and Contract Documents. D A.Reinforcing Bars:ASTM A 815/A 815M,Grade 80,deformed plain-steel bars,col bras Ime to length with change In the Work,for subsequenlinclusion inaChange0rder.Document willdescribechangas in requiremens° foray"Thick slab,oil M°deepfora4"Ielck slaO.Holedlamelershallnot exceed Oulsidediameteroi H.Submiloneco of tom feted volumesin foal form7das riot lofinelins action.Thisce will be ends Scare and free of burrs. cold-weather protecfionand with recommendations in ACI305R-1990 forhot-weather protecliondurin9 E.Schedule submittals fo expedite the Project,and deliver to Anchlassi Engineer at business the robeb m lm D Y D D PY 4 the Wolyexecte thechmethod ofdelermininA any changein Conlacl SumlPrice orContract Time. p y orethan 0ncmtedlust opealit hole berry. 1.fineetlbmittlnal inspection,with Owner commends.Revise coolantofdocumentsasrequired prior B.Plain-Steel Welded TMAabras drawn curing. Prom fl pule mechan e, eddresrCoordinale submission of related items. E.Vacuumand brush all concrete duslfrom test hole. 1.Apply evaporatlon elarder to unformed concrete sudaceslf hal,dry,or windyconditionscause p y axe g to(laid finalvolu C.Plain Seal Welded Wire A6.Wl.ASTM A785,fabricated from as-dawn steal wire into flat sheets. f.Itlenlify variations from Contract Documents and Product a system limitations which maybe ssive moisture loss. F.hage, iMaterial Change0rded Suhe Condition aothe Contr sup podingdataefleer willeter of f.lnsesa relative humidity probe(sensor)lo the fulldeDth olleslhole,Place cap over probe. LSubmilfmal volumesrevised,within l5 daysatterfnal inspection to Owner. Minimum reinforcement of Bxe-W1.4xW1.4 WWF,ASTM A185.65ksi detrimental la successful performance of the completed Work 2.Be in curio after finishin concrete but not before free water has disa change,within time limits lontratSum/ace andlContr the ime act.ovided in the ontrwill determine G.Permitthetest site to acclimate,are uilibrate for l-2hours 9 9 9 ppeareg from concrete surface. G.Provide space fw Conlraclor end ArchitecllEngineer review stamps.Architect's reviewwill commence 4 prior to taking relativehumidily readings. 1.8.WARRANTIES 2.3 REINFORCEMENT ACCESSORIES 3,Cureformed antlunformed concrete for al least seven days Dy moisturecurin, IhechtaindetailedmnContract Sumne on and Contract Tlme basis Proiie me Conlrecl Documents, nreci f ntretr t t H.Remove me cap,insert me cylindrical reading device,and hase button on the device to obtain headin A,Provide duplicate notarized copies. A.Bar Supports:Bolsters,chairs,spacers,and other devices for spacing,supporting,and fastening g uo eploco coreurnednoteTanpadsubmillals.SuUmiflalsreeivedwithoutsuchGaneal P 9 moisture-dseallfloomandslaswithangingandnd. ]3/25/15 G.Maintain detailed records of work done on Time and Material basis.Provide full information required from the In-situ be B.Execute and essamble documents from Subcontractors,suppliers,and manufacturers.Provide fable reinforcing bras and welded wire reinforcement in place.Manulaclure Dar supports from steel wire,plastc, Convector review will be returned nor reviewed. pro 4.Cure and seal floors and slabs with a curing and sealing compound according to manufacturers forevaluation of proposed changes,and tosubsenitate costs for changesintlre Wak. H.Reviseand resubmit submittals as required,identifyall changesmade since previous submittal. I.Readand record tempselureand relative humiUily arms lest site, ofComenisanU assemble in three ring binderwilhduable cover. Orprecasl concrete accerdlnB to DR51'9"Manual ofStandard Practice;'olgreater compressive strength written inslruclions. LICENSED H.Change Order Forms,Aem:Arc Change Order. C,Submit prior G final Application for Payment, than concrete I,Distribute copies of reviewed submittals to concerned parties Instruct parties to promptly report any "Elevated siruclural slab(nol poured in pans)should be tailed atadepih equal to 20%of lls ihlcknass. 3,9 FIELD QUALITY CONTROL ARCND'ECT I.n the Cionof Change Ordetract.lect will issue Change0rdersfor signatures otpasiesasprovided O.For items of Work delayed beyond date of Substantial Completion provide updated submittal within l 5 2,4 RELATED MATERIALS AR 980350 Inability to comply with provisions. 3.02 Quantil n H level. A.Testing Agency:Engage a qualified independent teslin9 and inspecting agency see CS3 for additional inthe NATEions of the Contract. Y�gD days alter acceptance,listing date of acceptance as start of warranty period. A.Vapor Retarder Polyethylene sheet,ASTM E7745,Class C,lO mil requirements. 1.4 CONSTRUCTION PROGRESS SCHEDULES y p 1.9 SPARE PARTS AND MAINTENANCE MATERIALS B.Flexible Wateatops:Rubber,CE CRO-C 513,or PVC,CE CRO-C 572. a 1.6 ALTERNATES A.AI or near the relative humidil test site perform H test A,Su6mif inilialprogress schedule in duplicate within 20 days a@tar dale o(Owner-COnlactor B.Teslin A enc Tests will be edormetl accoMin IO ACI 301 and addilionalre uiremenisas intlkaled A.Altemalesgrnates nBid Fdnswill be revs Contrdctor Ageement ctedat the Owner's option. 1.Pametervealdrops ofwatar onto the concrete surface to formapuddleapproximately l'in A.pecifiaproducts,spare Dross,maintenanceand extra materials in quantifiesspecifeU in indivltlual C.Soli-Exyhydimp Strip Warial. :Reclangulerorlapezoitlalstrip,butyl robberwith sodium bentonite or g g y P y q Agreement for ArohltectlEngineer review. in these drawings,CS3,Specifications and manutaclurer requirements.General conlraclor shall coodinate ACoordin Alternates will be identified Im Owner-Conlrecl or Agreement diameter. sDeliver ton Sections. other hydrophyllc malarial. B,Revise and resubmit asrequired, and Oran ewilha r rate ass B.CoordinR related workand modify surroundingworkas required, 2.Allow the water to set fore roximatel 60 seconds B.Deliver to Proleclsite;obtain receipt prior to llnalpeymenl. D.Joint-Filler Slri ASTMD1751,as halt-safualed cellulosic llber,or ASTMD1752,cork or 9 pp opt p es,VillaAe,elc.,and coordinate with the Owner's Conslaction Manager all C.Subming rstizortk day ofeacheseparate line foreach major sectionofWork or upeetion, DD Y ps. D such leering. JJhINA.01nPMAH 2. PART2 PRODUCTS Idenitlying First work day of each week. 3.pip the pH paper into the water and remove immediately,compare color io chart providedb 20 PART2 PRODUCTS self-expanding cork. A.Nol Used. y paper q.Nol used. E,Bonding Agent:ASTM C 1059,Type II,non-retlis 3,10 REPAIRS 97Sr2UPfbleu - 0,Show complete sequence of conslruclion by activity,idenlityin9 Work ofaeperete stages and other supplier to determine pH wading pesibte,acrylic emulsion or styrene butatliene, A.Defective Concrete,Re arand arch defective areas whena rovedb Archied/Owned.Remove and 3, PART 3 EXECUTION logical) rou ed activities.Indicate the earl and late Start,early and late finish,fast dates,and B.Record and w s results. 3,0 PARTT 3 EXECUTION F.Epoxy-Bonding Adhesive:ASTM C 80t,twocomponent epoxy resin,of class and gade to suit P P PP Y Y9 D Y W replace concrete mat cannot be repaired and patched to requirements of these drawings, A.Insurance:Conlacton shall,prior to commencement of work,their agents of Insurance naming Owner, A.Nul used. requirements. duration C.FlatnesslLevalness Telling:Comply with ASTM E1155,but provide a minimum of one line of sampllny Amhltect,Canshuclion Manager(if any),Landlord lit any)and their agents as Additional Insured,for 2,5 CONCRETE MIXTURES,GENERAL 1.5 SHOP DRAWINGS In Iwo perpendicular directions through each stroctual bay. END OF SECTION 03300 the coverages below: A.Submit in electronic format. SECTION 02070-SELECTIVE DEMOLITION A.Prepare design mixtures for each type and strength of concrete,proportioned on rho basis of laboratory l esRerceamv.renTlHSIO vows rove seen sae. 1.Public Liability including Coniraclons Protective Llabilily,covering explosion and colepce,completed 1.Perform tasting using a"Dipstick Profiler"within 72 hove of concrete DtacemeN. trial mixture or field test data,or both,according to ACI 301. OF MYRHO LEDGE.THESA ioxuro mW Torero eesr 8.Attar review,reproduce and distribute in accordance with Article on Procedures above and for Record 1.1 GENERAL orx+rxNoweeoos.reaasrna comeirwlmui cures, operationscoverages(coveringaperod ofalleant Iwoyearsafterthedaleacceptancet the work 2.Concretecomingfromtile'sets,shall whichfails required Quanta Assurance tasting,opyoirlg B,Portland CemenC ASTMC150 Types 811 SECTION 035416-HYDRAULIC CEMENT UNDERLAYMENT R:GvvgI AND oaowasceaeerwinarias Documents described in Secllon 01700-Conlacl Closeout. A.Da@nilipns:As follows: by OwneU,end broadform blindeath taultinthere coverage,magetll the property ofanyand all Flalnesslevelness Test ismenlyd to be sumoved and replaced atftheroject lloseOyof C.Normal Weight Aggregate:ASTM C33,uniformly graded,not exceeding 1.112'(38-MM)nominal size. PART1-GENERAL Reumno To sraucTURes>no BUILDINGS. 1.6 PRODUCT DATA 1.Remove:Remove end legally dispose of items except those indicated to be reinstalled,salvaged.or daimsfor bodilylmjury,includingdealh resulting therefrom anddamage to the propesy of Flalness/Levelnass Tesl is required to he submilled to Ulla as partolthe Project Close Oul D.Aggregate:ASTMC33,unifamlygraded,fromasingle source. 1.1 RELATED DOCUMENTS A.Submifthe number of copies which the Contactor requires,plus two copies which will be retained by to remain the Landlord's property. other and arising from lls Operations Under theectly employedby any of thetions are performed by Requirements. E.Wader.ASTMC94 mi potable. A.Dewin01senecadoni applytf the Contact,end other related conslruclion documents such as the ArohitecUEngincer.Electronkformal preferted. 2.Remove and Salvage:Items indicated to be removed and salvaged remain me Landlord's property. wch ConiraOompeweanyond Empllyeri Unfilllyesurance as req it them. PAUd airer crontnt ad2.5 ture5percet,ASTM prescribed rateforesullinconcrete at point ofplacemenl DIUMM 07 speciAcationsaDPly to this Section B.MOM to identify applicable products,models,options,end other data.Supplement manufactures' Remove,clean,and pack or crate ifemsfo protect against damage.Identify conlenls of containers and xncwTaor 2 Workmen's Compensation and Employer's Liabllily Insurance as required Dy any Employee Benefit having an air content of 2.510 4.5 percent,ASTMC 260, 1.2 SUMMARY staneard data to provide informationunique tothis Project. 0150000NSTRUCTIONFACILITIES delivered Owner'sstall Remve Unarea. Acts or other statuses applicable where the work Is to be performed as will protecl0wner's 2.6 CONCRETE MIXTURES FOR BUILDING ELEMENTS A.This Section includes a cement-based self-leveling undenayment formulateU wim a special blend of v. C.Allenentsd scribed inin accordance wim Article on Procedures above end pmvide copies for Record A.ATemponbo Power.Prov allow erservice and ltingby required foropeations,wilhower c wiring anti 3.Remove and Reinstall.t damag.Reinndillitem clean sionsi,icaed.4.Exi prepare them for Drawn By Checked By ConiraclOrs from liability under aforemen coned. A.Slabson-Grade:PropoNon normalweight concrete mixture as follows: pot mars used to level and smooth inferior concrete,terrazzo,ceramic 8 Oocuments described in Section01700-Conlrecl Closeout. tlistri,Dus D rid Pollceled Controls rovide ateriainyndmuipmet necessary tocomply wcords reuse;sloreand Proleclatedtodamage.Reinstall items in locations usng led.4.Exiemolio Re main: Y quarrytile,nished oedin 3.Comprehensive Automobile Llabllily Insurance,including the owneship,maintenance,and opealion 1.7 SAMPLE 1.Minimum Compressive Strength:minimum 4000 psi I27.8 MPa)af 28 days or match existing(only if substrates,and non-soluble adhesive residue on concrete prior to the installation of finished @ooring on CW BW S B.Noise,Dust end Pollution r irol Provide materials and equipment necessary to comply with Landlord Protect conslruclion indicated to remain against damage and soiling during selective demolition.When ofan at inj oy and moment owned,hired and con-owned, A.Submit Tam lee to illuslate functional and aesthetic characteristics of the Product,with role cal arts and localre uiremenls(or noise,dust and ollullon conlreL greeter), all gradelev-1 Score Date D 9 P 9 p Dermilled by the Owner,items maybe removed to a suitable,prolecled storage location during selective 4.Pebrell nabilit CProperly Damage. 2.Air Content:Do not allow air content of troweled finished floaslo exceed 3peroenl. 1.ARDEX K-15rg Premium Self-Leveling Untlerlaymenl end attachment devices.Coordinate sample submittals forinterfacing work C.Barriers and Enclosures:Provide environmentally safe barriers as may be required to protect adjacent tlemolilion anti then cleaned and reinstalled in chair original Iocalions. NONE 03I08115 5.Umbrella Lia ndy Coverage:Conlraclor agrees to hold eforeceitl posies harmless on all O,S.H.e 3,Stump:4lnches(100 mm). 2,ARDEX P 51'R Primer rid Stae worker safe)re uirements and shall full corn wim alls chre uirem n B,Submdsamplear'ss leas from the full range of colors selected,textures,and patterns for Cleans g:Com damage from opealions:and as required by governing authorities andlor Landlord. B.Except for isms or maoperty,de olishe materials shall beo einsle Contnromerwioperty andao and Federal a y q y D o u q e is B,Ready-Mixed Concrete:Measure,belch,mix,and deliver concele according to ASTMC 94 and 3.ARDEX P III Ultra Prime Job No. ArchitecVEngineefs selecllon. D.Cleaning:Control eccumuletion ofwaste materials and rubbish;recycle or dispose of off-silo al intervals remain the Landlord's propesy,demolished materials shall Uecome the Contractor's property and shall es they apply to the methods and devices used in the execution of the work. ASTM C I i I6,and furnish batch ticket information. 4.ARDEX E 25'"ReSlfie nt Emulsion � C.Include ihenlumber or SaplsamDle,with fudividal ipfotmalton. approvedsi Landlordantlalloweid.with specialenvironmentalprocedures specified in Section 01150. D Photoratlsor theotee,sfurthntly deositd,al the Cohactotions of a o /[��Q - O.Submit the number or samples specified In IndividualspedfcatlonSections;Oneofwhichwillh E.Signs:No signage shall be allowed. C.Photographs or videotape,sumcientiydetailed,ofexistingconditionsofadjoiningconstructionandsite D.Project-Bile Mixing:Ms Inap bpriatendmixconcrelhmachineandconcreteaccordingtoASTMC94, B.RelatedS033000,dudelhefoleCon: 1� V Mlxconcrete materials In appropriate drum-type parch machine mixer 2 Section 072619,Cast-In-Place Carcreta v `_' SECTION01039-COORDINATION AND MEETINGS retained by ArohitecUEngineer. F. RemovalandCleaning:Removeconslructiontacililies,cleanendrepairdamaga,inexcessolConlacl improventenlslhalmighlbemisconslroedasUamageceusedbyseleclivedemolitionopeelions. p.7ADMIXTURES 2Section072619,TOIcelMoistureVaorMil 1 1.PART1 GENERAL requirementrcaused by operations or use of temporary facilities. D,Record drawings at Project closeout according to Division 1 Section"Contract Closeout" p' p iga ion Sheet No. No calcium chloride ur chlOode--Ion prutlucing admixture shall be used In any concrete. 3.Division 09 Flooring Sections 1,1 SECTION INCLUDES 1. himily andaccurately focete pepped utilises end omen subsurface strucural,elececel,or A, Air Entraining Admixrure�ASTM C 260. e mechanical conditions. B.WalerReducing Admixture.ASTM C 494,Type A. - 1.3 REFERENCES SECTION 05500-METAL FABRICATIONS a.Use Exterior type for exterior locations and whom tudiflented SECTION 07512-ROOFING SYSTEM REPAIR 1.3 EXECUTION SECTION 08410-ALUMINUM ENTRAINCESAND STOREFRONTS A. ASTM C 109M,Compressive Strength Air-Cure Only 1.1 GENERAL b Use Interior Type A,High Temperature(FIT)for anclooded mof framing,framing in attic spaces,End General:Wher penetration of the fixisfing rapefing system is required to awommuclate new construction, A.General:Comply with joint sealant flamplaclumar's instructions applicable to proacers and ILL General: B. ASTM C348,111exural Strength of Hydraulic-Cement Modem A. Submittals:In addition to product date,submit the following: where,offiressis.indicated. perform necessary roofing system repair applications indloated Clean(andlor prime)joints in accordance with manufacturem recommendations A System Performance Requirements!Comply with Structural performance,air infilloation,and Water C, ASTM E84,Surface Burning Characteristics of Building Materials 1.Shop drawings detailing fabrication and emotion,including templates fair anchor bail placement. 2.Identify fire,raterdard-tvaterd mod with approprIate classification marking of testing and inspecting Coordination prior to start of application of joint Sealant Comply with ASTM C1 193 for use of joint sealants as penetration requirements indicated,as demonstrated by testing stock assemblies according to test Pi D. ASTM F2170,Relative Humidity in Concrete Floor Slabs Using in situ Probes 2.Samples,materials and finishes as may be requested by Arai agency acceptable to addhorties having jurisdiction. Before starting work,verify with the Tenant's Construction Manager and the Landlord the following: applicable to materials applications and conditions indicated. methods indicated E.ASTM F1869,Moisture Vapor Emission Rate of Concrete Subdoor Using Anhydrous CE Chloride 35or structural steel fabrication;ABC Calcification for steel fabrication is required. a.For exposed lumber Indicated to meave a stained or rattiml finish,mark end or back of each I Existing doof system materials and installation methods 6 Sealant Installation Standard.Comply with ASTM C I 193. 6,Accessibility Requirements:Enturnes,to comply with ADAIABA Accessibility Guldefini US Architectural F ASTM 71 0-$as attend Practice for Preparing Concrete Floors to Receive Resilient Flooring a.Fabripatom Qualifications:A qualified fabricator who partficipales in the ABC Quality Carfififiestion Program place or amit marking and provide Certificates of treatment compliance issued by inspection agency. 2 Repair work responsibilities and wardenly raquireflands C.Acoustical Sealant Application Standard:Comply with ASTM C91 9 for use offoint Sealants in and Transportation Barriers Compliance Boards,Ameridn's with Dia.luirty Act(ADA).ad Architectural <ID 1 4 SUBMITTALS and designated as an AISC Cartified Plant,Category Sod 3 For exposed items to indicated to receive a stained or natural finish,use formulations that do act Qualifloationi work shall be performed only by an experienced moffing installer approved or acoustical applications, Barriers Act(ABA)Accessibility Guidelines for buildings and facilities,and ANSI At 1 7 1,current version A.Product Date:Subunit mandfacoluxer's product data and installation Instructions for each material and Ift,Welding Qualifications:Qualifying procedures and personnel according to AWS Dr.1,Structural welding bleed through,contain colorents,Or otherwise adversely affect finishes. licensed by the existing roofing system materials manufacturer;with hi less than five years of Successful 0 Tooling Of NC,,.g Sealants lumdrudififloy after sealant applificallon and before skinning or curing C.Thermal Movement Provide for expansion and contraction resulting from an ambient temperature �11111111111111111Z.1 I S product used Include manufacturers Material Safety Data Sheets. .do-dead, E Miscellaneous Lumber:Provide No.3 or Standard grade lumber of any species for Support or experience installing and repairing obefing systems similar to this projects existing Tooling system, begins,tot sealants according to requirements specified in actipparagicaphs below to form Smooth, range Of 180 deg F(I 00 deg C)without buckling,joint Deal failude,undue streas on structure elements, - ,, Qualification Data:For Installer 1.2 PRODUCTS attachment of other Construction,including moftop equipment curbs and support bases,cant Since, Materials:Provide and install only materials approved and recommended by the moling manufacturer for uniform beads of Configuration indicated,to eliminate air poddets;and to ensure doi and adhesion damaging loads on fasteners,reduction of performance,or alreas on glass Doors shall function normally ". QUALITY ASSU RANCE A.General:Provide materials selected for their surface flatness smoothness,and freedom train surface bucks,rafters,blocking,and similar members, repairing the existing roofing System. of Sealant with sides of joint. war specified range A Installation of the ARDEX product must be completed by a factory-trained applicator,such as an blemishes. F.Alr�finfiltmtlom Border Air retarder complying with ASTM E 1677;made front polyolefins;either Installation:Inspect rect surface conditions with roof manufacturer's ropmeani to verify extent End 1.Remove excess sealant from surfaces adjacent to joints. 1.WitalLoads:Provide assemblies capable afrAfthelfiending pressuresof 20 pefurward and outward, ARDEX LevalMostard Elite or Choice Contractor,using mixing equipment and looks approved by the B.St.slandloom Asuflovas cross-laminated films,,oven strands,or spumborded fibers;coated or undooded;with or without location of any other repaire required to ensure a wateright roppling system upon completion of the Guam 2.Use tooling agents that am approved In writing by sealant manufacturer and that do not discolor acting houral to plane of the wall Z) manufacturer.Contact ARDEX Engineered Cements(724)203-5000 for a list of recommended I Flame,Shop.,and Be.:ASTM A 361A 36M. perforations to firearrabot water vapor but not liquid water,and with minimum watemaper transmission mi Make necaboary repairs.Match existing met dope,insulation matensla and roofing membrane sealants or adjacent surfaces 0,Structural Performance.Testm accoulance wi0i ASTM E 330.Them shall be no glass but or E" .installed. 2.Rolled Fluor Plates ASTM A 7861A 786MUROIled from plate Complying with ASTM A361A,36M,Grand C of 10 perms(575 I A a x sq.ar)when tested acconfing to ASTM E 96,Procedure A. materials,eaced as othervise Spooned by the existing roofing system manufacturer to accommodate 3,Provide corsave joint profile per Figure 8A in ASTIS C1 193,unless otherwise indicated permanent damage to fasteners,anchom,hardware or actuating mechanism or permanent deformation J Product must have a hydraulic cement-based inorganic binder content as the Primary binder which or D. G.Fasteners:Size and type indloaded Where hough carpentry is exposed to weather,in ground new construction and repair work.Install curb flashing furnished!by mechanical and electrical trades for END OF SECTION 07901 of framing members In excess of 0,2 percent of their clear span. includes Gotland cement per ASTM C1 50:Standard Specification for Portland Cement End other 3,C.Id-FmRMcI ToloinIy ASTM A 500. contact,or in area of high relative humidity,provide farderflare with a hordip zinc coating per ASTM A how-1 top equipment 1 Deflection Normal to the Plane afthe Wall:Test pressure shall be wind Ind specified Deflection Specialty hydranto cements,Gypsum-based products am not ameptable. 4.Pipe:ASTM A 53,standard weight(schedule 40),unless otheraide indicated Paint black,unless 153 or of Type 304 stainless steal SECTION 081 1 0-STEEL DOORS AN D FRAM ES shall not exceed 1/1 75 of clear span,when subjected to uniform,load deflection test. C Manufacturer Experience Provide products of this rection by companies which have successfully, otherwise,indicated 1.Po-Drived Fasteners:CABO NEIR�272. 1.1 GENERAL 2 Deflection Parallel to the Plane of the Wall:Test pressure shall be 1.5 times wind pressure Deflection specond in production of this type Oliver,for not less then 10 yeard,Contact Manufacturer 5.Gray-ladeCamil ASTMA48,CIj 2 Bolts Steel bolts complying with ASTM A 307,Grade A ASTM F 568,Property Class Aftr with SECTION 07710-MANUFACTURED ROOF SPECIALTIES Representative prior to installation, 6,Concrete Inserts:Threaded or wedge type;galvanized fermus castings,either ASTM A 47(ASTM A ASTM A 563(ASTM A 563M)hex nuts and,where indicated,fiat wershers. PART I-GENERAL A,Submit Product Data for each type of door and frame of members carrying full dead load shall not exceed amount that will reduce glass bite balm 75 1.6 WARRANTY ARDEX K156 installed as pal of a fifterr system,shall be instrilled in conjunrotion with the 47M)mal[eableimorASTMA27)A27M�stst�l.Provide bolts,washers,and shims as required, H,Metal Framing Anchors:Provide gaill steel framing anchors of Structural Capacity,type,and 1.1 SECTION REQUIREMENTS Specified percent of design dimension or edge cleadence balween member and fixed glass or other fixed recommanded ARDEX Tile&Stone Installation Materials or WW HENRY Flooring Admove,as appropriate, h.Hdip g.lvemind par ASTM F2329. size indicated and as follows A Submit Product Data,Shop Drawings,and Color Samples. B.Quality Assurance:Comply with ANSVSDI 100, member above to less then 118!net.Clearance between the member and operable dear or window to pfferide the ARDEX SystemOne I 0,year Comprehensive warranty. C.Aluminum:As follows 1.Research or Evaluation Reports:Provide produce to(which model code research or evaluation B.Provide products that comply with applicable requirements of SMADINA's"Archilectural Sheet Metal C a Fire-Rated Door Assemblies:NFPA 80,loan Neat to assemblies tested per ASTM E 152 and labeled shall be at lessat 1 11 6 inch. nual,"unless otherwise,Indicated. ndi listed by UL,Warnock Hersey,or another testing and inspecting agency appeptable to.othemlifis 3 Wind leads as per local jumadifictional and ode requiredificle. 1.7 DELIVERY,STORAGE AND HANDLING 1.li4rustors,ASTM B 221(ASTM B 221 M),alloy 60I Reports exist that are acceptable to atitharifiest having jurisdiction and that evickhree of Compliance Me PRODUCTS Ev"ju exhotion. 4,Seismic loads,where applicable. A.Deliver products in original packaging,labeled with product identification,manufacturer,batch number 2 Rolled Tread Plate:ASTM B 632(ASTM B 632M)Pattern 1,alloy 60i of metal framing anchors for application indicated with building code in effect for Project. PARI h and an If life. D.Fasteners:Provide plated foraterem Complying with ASTM B 633,Class Fevi 25 for alsolromposibul ziroo 2 Allowable Design Loadi Provide products with allowable design twos,as published by 2.1 ROOF SPECIALTIES 1�2 PRODUCTS 5 Windom.,Debi impact maieftmos,Who.applicable 8 Store products in a dry amm with temperature maintained between 50�and 8i F(1 O'and 29'C)and perating,for exterior use or where built into exterior walls Select fasteners for the type,grade,&,less req'd. manufacturer,that meet or exceed those indicated Manufacturer's published values shall be A.Aluminum coping system manufactured by Peterson Aluminum Co.Barridge,or Architect Approved A.Manufacturers:Subject to complience with requirements,provide Products by one ofthe follovirt E Air Infiltration:Not mom than 0.06 CFM per sq.ft of fixed area(excluding operable door edges)when 1,Arrived Building Products,Inc tested'accordance with ASTM E 283 at inward test pressure differential of 1.57 pef. C Pro Suct train direct sunlight E Shop Primer for Ferrous Metal:Fast-wring lead.and chromate-fass,druveral modifiedi primer with determined from empirical data or by lateral engineering analysis,and demonstrated by ,Equal F Water Penetration:No uncontrolled water penetration(excluding operable door edges)when tested in .Handle products in acconflance with manufacturer's printed recommendattlons good resistance to exprobsion,compatible with finish paint systems,and complionfit with Perform- comprehensive testing Performed by a qualified independent testing al Finish:As noted or as Selected train rommufacturem standard colom 32 Coca Door Products. 1.8 PROJECT CONDITIONS requirements of FSTIl 3.Galvanized Steel Sheet:Hot-dip,zinc-mated steel sheet Complying with ASTM A 653,360 ASTM PART 3-EXECUTION Farman Corp. a cardande with ASTM E 331 at an inward test pressure clifferestral of 6.24 of per sq If IS a' A 4 Kewanee Corp. .Condensation Resistance:Provide units showing condensation remistands,factor(CRIF)of not less than ,Do not install material below 50*F(10'C)surface and air temperatures These temperatures must F.Galvanizing Repair Paint:High-ainc-dust-content paint,with dry film containing not less than 94 percent A653M,Z18O)coatiiigdesignaOon;stmctufal,wfnmercial,orlock-formingquali�,..�tandard�lth 3Ll INST ILLATION 5 Republic Builds.Products 45 when tested in accordance with AAMA 1503 inise 11 maintained during and for 48 boom after the installation of products included in this section. zinc dust by weight. manufacturer for type of anchor reficated. A Coordinate with installation of roof docks and other substrates to produce a watertight...rably 6 SuRforaft. H.Thermal Tranarujitani Providar U-value of not more than 0,65 BTUfth,X Sq.ft.A deg F)at 15-ruph ..It quickly if Substrate is warm and follow Warm mother Instructions aval from the ARDEX G.Concrete Fill:Comply with requirements of Division 3 Section"Gast-in-Place Concrete'for hoduall-Amight 1.&11.Sealer Gaskets:Glase-filbomeraffiffind insulation,fabricated in strip form,for use as a sill sealer capable of withstanding inward and outward loading prossures,and thermal and lateral loads.twists To fiflifical Service Department. a harete with a minimum 28-day compressive strength of 3 000 psi(20 MPG). 1-inch(25-nuh ramilial thickness carripflonsibbs,to 1/32 inch(0.8mi selected from manufacturer's metals from dissimilar metals or carrosive substrates using bituminous Dealings or other means of B.Hot-Rolled Steel Sheets:ASTM A 569 ASTM A 569M). exterior wind velocity when tested in accordance with AAMA 1503. PA 0 h a' -Rolled Steel Sheets:ASTM A 366 ASTM A 36l commarcial quality,at ASTM A 620 ASTM A 1.Submittals:Submit the following: RT2�PRODUCTS .filonsial Metaftic Grout:Factory-packaged,farded-grgragarm grout compilifing;with ASTM C 1107. standard widths to stilt width of sill members indicated pandament separation, C.Cold 2.1 HYDRAULIC CEMENT UNDERILAYMENT I Nordebrick,Nonmetallic Grout:Factory-packaged,nonstaining,nourcom-1 e,nongasmours grout complying J.Adhaservas far Feld Glping Psi to Fronfil Fortruckstion Complying with APA AFG-01 that is 620M),drawing quality I Praduct Data:Include fabrication methods,data on finishing,hardware and accessories and Surface IV A.Hydraulic Camand-lbseard Self-Leveling Undedayment D.Galvanized Steel Sheets:ASTM A 526 ASTM A 526M),commencial quality,or ASTM A 642(ASTM A maintenance recommendations, with ASTM C 1107. approved for use with type of construction panel indicated by both adhesive and panel mandfachumps 2.Shop Drawings:Include layout,installation details,1/4 IT 1.Acceptable Prooducti: J,Fabrication,General:Form train materials oftype,sin thickness,and shapes Indicated.Work to K.Telephone and Electrical Equipment Backing Panels:DOC PS 1,exterior,AD where exposed to view. SECTION 07720-ROOF ACCESSORIES 642M),drawing quality,with A 60 or IS 60(Z 180 or ZF 180)Coating designation,.111 phosphatized -inch scale elevations,detail sections of �ART I GBERAL E.Steel Doord Provide 1-314-ifinch.(44-mm.)thick doors of materials End ANSIUSDI A250.4,A2503 add Composite members,anchod,and reinforcement,hardware mounting heights and glazing details. 0 a ARDEX K 150;Manufactured by ARDEX Engineered Cements 400 Added,Park Drive,Aliquippa, dimensions indicated or accepted on gap drawings using proven details of fabrication End Support, [Exterior,C-C Plugged,.he.acceptable to....rflandlard)[fire-dolardent treated where requiredd]in 1.1 SECTION REQUIREMENTS ANSIBIDI 100 grades and models specified below,area indicated on Drawings or saffieuddles 3.Hardware schedule Organized into sets,Include item and manufacturer's name End designation of �1= I Be I I r'00'USA,(724)203-5000,wwwardex.car, Reassemble items in shop to greatest extent possible. thickness indicated or,if not indicated,not less than 314-ifirch flonfifiral thickness. A,Submit Product Data,Shop Drawings,and mlor Samples I.,Intedor Doors:Level 11,heavy-duty,Model 2,seamless design,minimum 0,0478-inch.(1.2�fldhj each item required @ ft pimer St ndard Porous Concerri ARDEX P 51-Primer 1.Shear and punch metals cleanly and aboui Remove sharp or hough areas and ease exposed edges. 1 3 EXECUTION PART 2-PRODUCTS hick cold-dolled steel sheet faces, 4 Samples:Palm of Samples of each finish on 12-irch-long sections,Where normal color variations (3 (0 rimer Non-paroure substrates,ceramic&quarry file,flon-jer Soluble adhesive residue, 2,Weld corners and seams continuously Use materials and methods that minimize distortion and develop A.Set rough camentry to required levels and lines,with members plumb,true to line,cut,and fitted. 2 1 ROOF ACCESSORIES(as indicated on drawings) 2 Exterior Doom:Level 111,extra heavy-duty,Model 2,searroloax design,minimum 0 06354nol, ,am anticipated,include ads Indicating full range of color variations. W M Z dencrate treated with silicate compounds,metal,and wooden subtfloods:ARDEX P 82-Ultrat strength and cormajon resistance of base metals,Obtain fuslon without undercut or ovedi Remove B,Fit rough Carpentry 10 other construction;scribe and cope as required for amursto fit Correlate A.Prefabricated Curbs and Equipment Supports ffEnami thick galvanized steel sheet faces. Certified test reports shoinfing Systems have been tested and Comply with requirements, ,,,Prime welding flux immediately Finish exposed Wall and surfaces smooth and blended, location of furring,modern,blocking,greards,and Similar supports to allow attachment of other J.Installer Quallfications,Manufacturers authorized Representative who is trained and approved for M 11==: 10 0 Act ARDEX E 25 IN Reaftled Emulsion 1.Provide units with cant strips whom applicable and base profile coordinated Afth roof membeare F.Froures Provide firsome for doom,sidelights,borrowed lights,and other openings that cornply with Go Be 3.Foam exposed whinedlions with hairline joints,flush and smooth,using concealed fasteners where construction pirsaments and with mat insulation thickness and roof deck slope ANSIBIDI 1 00,labrinte to be ABC,neat In appearance and free from defects,warp or installation of units required for this project and an installer who has comIseled not.1latome Similar to 0 0) 2. on and Physical Properties:Meet or exceed the following values for material oured at 73* poi Locate joints where least conspicuous. `q b.M. �_ rfor"- C.Secumly attach rough carpentry Work to substrate by avchoring and fastening as indicated, B.ROD Hatellas i.For interior frames provide units of the knock down type,formed hour 0.0478.inch.(1.2-floon.)thick those required and whose Work has resulted in a record of successful di performande F41-3`Fft(23 C-li and 50%-1-5%.let!.humidity: 4 Form bent-metal corners to smallest radius possible arithout causing grain separstlan Or otherwise complying with the folloaft C sal-and,Smoke Vents cold-mlied steel for openings 48 inches(1220 min)or less In width and from 0.05984ni(1 5-mmi K.Manufacturet's Qualfifificati A firm experienced in manufacturing systems similar to those indicated �_ uu Q is App,cation:Barrel Mix or Pump rapi work 1.CABO NER-272 for proverkirivern staples,P-nails,and allied fasteners. CC(d < Ft a 0 0 to.Ft W Time:I O Minutes D.Monal Grading Roof Valkwory System thick steel for openings over 48 inches(1220 orm)in width nd has a record of successful ItHsturvice performance 0 0 ' K.Rough Hardwood Formed chatem-fichroated!bolts,plates,anchors,flongers,di add other 2.Published Requirements of metal framing anchor mandfacromr. PART 3 EXECUTION 2 For exterior frames provide units with mitered or coped and continuously welded corners,formed L.Design Criteria:Drawings indicate size profile and dimensional requirements End are based On _J d.Initial Set Approx.30 minutes imen larmous steel and ran shapes for supparl and anchoring woodwork 3.Recommended rating Schedule"of doodenced framing standard and with AFRA's Narlonal 3 1 INSTALLATION Hem 0 063i(1.6 di thick galvanDed steel sheet. specific types and models indicated Aluminum ertmuce and stomfmntby other manufacturers maybe ir 2 _J LIP Final Set:Approx.90 minutes 1 Galvanize unless chemire indicated Deeign Speciffintiore for Wood Construction" A.notallationi Unless otherwise indicated,install met accessory items according to construction details 3.Door Sifiencers,3 on Strike jamost of sinfite-doar frames and 2 on heads of double-door frames considered provided cle,,idtions do not change[tie design concept. _J a< - G.Comp­!,.Sireniffith 41DO pai at 28 days,ASTM C109M. L.Lame Baring and Leveling Plates:Provide for steel items bearing on masonry or comparts,as indicated. 4"Table 23-I.Q.-filefling Schedule'of theUniform Building Code of NRCKS"Roofing and Waterproofing Manuel.'Coordinate with installation of houlf deck,vapor G.Tolerances:Comply with SDI 117. 1.2 Pool J U. 0 . I.FlexuZ(Strool 1000 pdat28njmASTM C78. Drill plates to receive anchor bolls 5.'Table 2305.2--l'saterfing Schedule"of the BOCA National Building Code whom applicable barriers roof floulation,roofing,and flashing to ensure combined elements are secum,Embriernf, H.Fabricate concealed afiffamers,reinforcement,edge charmers,lotivem and moldings from either cold-or A,Aluminum Members:Alloy and temper recommanded;comply with ASTM B 221 for extrusions,ASTM < DIP. g VO"911,calculated SCAOMD 1168 1.Galvanize after fabrication 6."Table 1705A.-Fastaning Schedule,"ofthe Standard Building Code B 209 for sheet or plate,and ASTM B 211 for bars,rods,and wid,Kawnear screw spline �= 2.2 WATER:Water an 11 be clean,potable,and sufficiently cool(not warmer than 70-F). M,Lane Steel Untes:Fabricate Rom shapes and to sizes indicated. and weatherfight Verify compatibility for all products and materials used in combination with each he(-soll.d deal Sheet. W 7.'Table 2304.9.1 4adening Schedule,"of the International Building Code. .the, 1.Hardware Prapardation:Prepare doors and frames to recover mustised and conodalso hardware B.Carbon Steel Reinforcement:Comply with ASTM A 36 far aloodunal Shape,plates and bars ASTM A PART 3�EXECUTION a 1.Bahamas,after fabrication D.Use hot-dip galvanized or stainless-steel nails where rough carpentry is es sod to Weather,. _1 T)Z a- PC In according to SDI 107, 61 1 for cold-rolled sheet and strip,or ASTM A 570 for hoi sheet and SLID a,§ 1 3.1 PREPARATION N Shelf and Relieving Angles:Fabricate to sizes indicated for attachment to support framing.Provideallotted ground contact,or in area of high mi humidity. C Glazing Materials:Comply with"Glass add Glazing"section = - P (0 A.Concrete Satifloors:Prepare substrate in accordance with manufacturers instructions holes to receive 34-inch(1 9,mm)bolts,spend not mom than 6 inches(I 50 mi train ends and not mom E Countersink nail heads on exposed Carpentry work arid fill holes with wood filler. SECTION 07840-IFIRESTOPPING J.Glazing Stops:Minimum 0.035i(0.9-mm.)thick steel or 0.040-inch-r-mill thick aluminum D.Panel Com Material:Rigid,Glossal polidurathadde Insulation. l.Pnor to poweding please mor to ASTM F710 Standard Pal for Preparing Concrete Floode to than 24 inches(60i o G 1.Provide nonmmoyable stops on outside of exismor doom and on secure Side of inflemor doors for I F.Framing Standard:Comply with AFPNS'Manual for Wood Frame Construction,"unless offirsovide PART I-GENERAL glass in docre E.Fasteners Aluminum,nonmagnetic stainless steel zinc plated steel,or material warranted to be - Re-Resilient Flooring.All concrete autfifloods must be sound,solid,clean,and free of all all, 1.Furnish wedge-type machiter inserts,complete with fasteners,to attach shelf angles to past-implace Indicated. I I SECTION REQUIREMENTS 2,Provide sprow-applied,removable,glazing beads on Inside of glass in doors midecamelve and compatible with aluminum campmeents,hardware,suchrom,and other comphourds, grease,dfic,curing compounds and any substance that might act as a bord breaker before priming. compost.. G.Air-InfilmationBermer Cover sheathing with alt-infildistlon barrorto Comply with manufacturers A.Subdit Product Data and product Certificates signed by manufacturer derlifying Compliance Alth K Finishes,General:Comply with NAAMM's"Metal Finishes Manual'for recommendabore relative to 1,Do not use exposed fasteners except for application of hardware.For hardware,use Phillips flat-head Mechanically clean it necessary using shot blasting or other Acid etching and the no of 2.Galvanize shelfanglas to be installed an exterior Concrete. widden instructions, Specified requirements. applying and designating finishes, , machine somas that match finish of member or hardware being fastened. r-6.--:a Sweeping compounds and solvents am not acceptable. 0,Mlecellanexpes Framing and Supports:Provide as restalred to complete the Work but not included with 1.Apply fir-linfiltraflon barrier to cover upstanding heading with Hired(I 00-kat overlap. B,Provide firestappIng systems with fife-resistance ratings indicated by reforence,to UL derifignalflons as 1.Apply pir 26-ifinomflock M.:�;PH listed in its"Ft.Residence Directory"or to designations of another testing agency acceptable to L Galvanized Steel Sheet Finishes:Comply with SDI 112 and the Sell minimum extruded aluminum ol and type selected far compatiblity with other Components, ,;,) a=-: 2.All cracks in the artfifloor shall be midaired to minimize telegraphing through the undedayment. structural steel framework Fabricate as indicated and required to receive adjacent construdicr,Fabricate a.All manufacturers ofair barrier,Installation and flashing products are to provide letters of imem and organic finishes to doom and frames after fabrication. Concealed FISSIHIng 0 0179-lach(26 gage)minimum dead-soft stainless steel,oi ..*� 3 Substrates shall be inspected in accordance with ASTM F1869 GrASTM F2170 and codurchad for from structural steel of welded construction.Drill and tap to recow,hardwers,hangers,add Similar items. compatibilifty for these products in combination with each other. suflion lies having jurisdiction. 1.Surface Preparation Clean surfaces with nompetraeurn solvent so that Surfaces are free of oil or G.Brackets and Reinforcements:High-strongth aluminum;where use of aluminum is not feasible provide 4) D�,�!H! moisture or any other ounditions that could affect the performance ofthe undarlayment or the finished Include anchors for building into other work,spaced not mom than 24 inches(600 rem)ax C Provide throughdanctration firestopping systems with F-ralime indicated,as detarmined acconfing to nonmagnetic stainless steel or hot-dip galvanized steel complying with ASTM A 123 0 ., floor covering.For areas where moisture vapor arri,acris exceed the limits required by the Hear P.Miscellaneous Steel Trim,Fabricate from steel shapes,plates,and bars of Iut shown with I as ASFM E 104,buI not less than the firs-reastarrice rating ofthe Constructions penetrated other C.ndindinants.After cleaning,apply a comerach coating of the type suited to the organic mplying with ASTM a .- manu p C . coraing applied over it Clean welds,mechanical connections,and abraded anders,and apply H.C ricreflefitlesonry lmmrts�Cast Iran,malleable Iran,or hot-dip galvanized steel or �,x o-� covering actuar rate'to Section 07 26 19,Topeal Moisture Vapor Mitigation Systems and Continuously welded joints,and smooth exposed edges Miter comere and use Concealed field S SECTION 06200-FINISH CARPENTRY D Provide through-peneation firestappirrit Systems with T-mfinga as ml as F-mlini.a determined galvanizing repair paint specified to Comply with ASTM A 780. A III c ,-- install the app note ARDEX Moisture Control System. whereverposialfible Provide cutouts,fitfings,and anchorages;coordinate assembly and installation with PART 12-GENERAL(Net Applicable) @bparding to ASTM E 814,where indicated 2 Galvanizing Repair Point SSIPC-Pout 20,Ifigh-ohic-dust-denterat pint with dry film cont.ifling not I Compression Woutherstripping Replaceable molded neoprene gaskets Complying with ASTIM D 2000 ID.-C, 8 1 Joint Propostrallonp other Work. PART -PRODUCTS E,For exposed firestopping,provide products with flande-apmed ratings of less than 25 and less than 94 percent zinc dust by weight. or molded PVC Complying with ASTM D 22117. 0 - '' flacking JdmE�hoshor all expansion and isolation joints up through the undarlayment.A flexible 0.Pipe Bollards:Fabricate train Schedule 80 steel pipe Capped with 114-lach(6.4-mm)steel plate 2.1 MATERIALS,GENERAL smoke-deveJoNd ratings of less than 450,as determined according to ASTINI E 84 J.Sliding Weetherstripping:Replaceable wool,polypropylene,or nylon woven pile Areatherstripping,with U��,� Boeing earn 3.Factory Priming for Field-Pented Fill Whand field painting after installation is indicated,apply E 2�-` pound such as ARDEX ARDISEALTM Rapid Plus may be Installed. 1.Fabricate sleeves for toolards from steel pipe with 114-inch.(16.4-trand)thick steel plate welded to bottom A.Lumber Standards DOC PS 20 and gmdlng rules of inspection agencies carfill.d by American PAR]2-PRODUCTS 2.1 FIRESTOPPING adr-dred primer specified below immediately after cleaning nylon fabric or aluminum strip backing,Complying with AAMA 70H.2. 0.�",.: 2. Saw Cuts and Control Joints-fill all con-moving joints with ARDEX ARDIFILl Joint Filler or Of Sleeve. Lumber Standards Committee Board of Review. A.As indicated on drawings. M,Steel Sheet Finishes:Comply with SSPC-PA 1,"Paint Application Specification No.L" K.Hardware:Heavy-duty units required for operation;finish to match door. - C ARDEX SD�F w FEATHER FIN ISHO as recommended by the manufacturer. R.Finish metal abrications after assembly.Comply with NAAMM'Maml Finishes Manual for Archlbacturel B Softwood Plywood DOC PS I C.Hardwood Plywood HPVA HP-1 PART 3-EXECUTION 1.Surface Preparatont Solverri surfaces according to SSPC-SP 1.Remove mill si arid rust 1.Ball-Bearing Butts:5.1drackle,2-beadIngs,steel ball bearing butts sai ad to comply with ANSI At 56.1. .-al v,2 11 Waiddle-tithfilocre must be clean and free of all foreign matter.Seacto Named then vacutionto and Metal Produl for doccommusandations on application of finishes.Shop-prime ferrous marol items hot 2 2 STAND ING AND RUNN ING TRIM 3.1 INSTALLATION = U�-." A Exterior Lumber Trimi Smooth-miltined Clear Heart,Western ad cedar,GaBle A,western ad Cedar, to Comply with SSPC.SP 5(White Metal Blast Cleaning)or 5$PC-SP 8(Pickling) Grade 1:2 butts for deards 7 fast 6 inches or less,3 butts for taller heavier filoom. D remove all dust.Re-nail any loose boards exhibiting movement. indicated to be galvanized. A Install firestopping systems to comply with manufacturers Nation Instructions and With 2 Posomatiment:Immediately after surface promandflarl,apply a conversion coding Suited to organic 2,Non-rem mable Pins at all exterior door locations:Provide set sprow in hinge baral that,who, U,-r!,i", .rem stal actrificare must be clean and free of all mat and foreign matter Where required,a compolve 1.Hot-dip galvanize items Indicated to be galvanized.Comply with ASTM A 153 or ASTIM A 123 as B B&B,Southern yellow pine. requirements listed in the testing agency's directory for the indicated firespasonce rating,F bared Coating appred over it tighteradointo a gmove in hinge pin,prevents removal of Do while antromple door is closed sistand coating should be applied and allowed to dry before priming. applicable. Exterior Primed Hardboard Trim:Hifigh-tarroperatural word,highass,mod fiber Composite:factory installer certifies,from installer indicating penetration firs stopping has been installed in coundfiance with 3.Factory Priming for Field-Paluted Finish Apply shop proneur that complies with ANSI A2241 3,Surlace-Mounded Overhead Closers:Modem type with cover,for hinge side Installation.Complywith E.L.Cotback and other non-water djuble adhesive residues must be wet achaped to a thin,AGIL-loonded 2.Preparation for Shop Priming:Prepare uncoaded ferrous metal surfaces to comply with SSPC-SP 3 Primed;and mmm mended by manufacturer for exterior use. requirements and manufacturer's written repornmersdations acceptance criteria,is compatible with finish paint systems indicated,and has capability to provide a ANSI A156.4,Grade 1.Comply with recommendations for closer size.Include[he following: yer "Power Tool Cleaning." C.Interior Trim:Painted Trim C Select,eastern white pine;B&Sir,Select or Supreme,Idaho white, 1.Penetrations in all fire resistant rated walls. sound foundation for fifild,appierl topcoats Apply count immediately after surface preparation Bud a Hold-open arm. F,Nomporours subfloom such as ceramic and quarry tile as well as tordeno should be dean and free of 3 Apply shop primer per requirements of SSPC-PA I"Paint Application Specification No.1'for shop lodg.pulde,pandeross,or sugar pine,Stal ned Trim rift-sawn,clear,kiln-dried ad oak rejected for 2 Penetrations in horizontal assemblies. pretreatment. b Delayed-action doing. I 11 waxes and earefirs.If necessary,clean by mechanical methods such as Shot blasting or Other. painting compatiflops grain add color. 3.Penetrations in smoke Camara. C ADA,ANSI At 1 7.1 for accessible entrances, I E 1.3 EXECUTION 3,2 APPILI'AT ON OF ARD X K 15d): 1.3 EXECUTION A.General Install stesel doms,franded,and accessories according to Shop Drawings,mandfachush's data, 4.0 GrSflop Floor or wall mounted,as appropriate,with integral rubber bumper,comply with ANSI A. Exa mine substrates and conditions under which materials will be installed, Do not proceed with A Installation,General:Perform cutting,drilling,and fitting required for installing metal fabrications.Set units SECTION 06400-CUSTOM CASEWORK SECTION 07900-JOINT SEALANTS Bad as Specified At 56.16,Grade I hatellation until unsatisfactory conditions am connected. accurately In location,alignment and elevation with edges and surfaces level,plumb,add true Field mrstallation: I I GENERAL 8 Placing Fames:Comply with proxyleore of SDI 105,unless otherwise indicated,BeR frames accurately 5.Cylinders am supplied under another Division 5 Section. B Coonfin IS installation with adjacent work to ensure Proper sequence of constraction.Protect 1.Fit exposed whisections accurately together and weld,unless otherwas Indicated Do not weld.Cut,or I.install basmork floseled 6 0 adjacent:xms from cortact due to mixing and handling of materials. abrade the surfaces of galvanized units that am intended for bolted connections. elperi level�he and straight win no distodens Shim as required using cc A Probarstruction Joint Seelant-Substrate Tests Submit substrate materials representative of actual 1,position,plumbed,aligned,and traded Securely until permanent ancrom are set. .Thumb-Turns:Inside thumb-turn cylinders of cast aluminum alloy . C.Prujing: 2.Provide temporary Grading or anchom in fornowark for items that am to be built into concrete masonry or Shims Ideal]to tolerance of 118"in 8',0"for plumb and love and With no variations in flushness of join[surfaces to joint sealant manufacturer for laboratory testing of joint Sealants for adhesion to prond 1.Except for frames located in existing conchate,masonry,or gypsum board assembly constroutims, %Doarflodo:Mortmed maximum Security deadlock,with minimum tuneful pivoted bolt Bad I Prime for standard absorbent conamse actfilloors:Mix ARDEX P-51 I 1 with werter and apply similar construction, adjoining surfaces Bathe and cut(a fit adjoining work.Anchor to backing or directly to Substrates and unpirmend substrates and for compatibility with joint substrates and other johotHrShated materials. place frames before consloucting enclosing wails and caffingle and after finish flooring installation. tainfleas steel strike box;comply with ANSI At 56 5 Grade 1. without distortion so that cabinet doom fit openings properly and are accurately afigned.Adjust B Subi In addition to product data submit the following: 2.Install at least 3 anchors per jamb adjacent to hinge location on hinge js cor I,and at corresponding 3.1D.adhatchas Mornsei deadletch with stainless steel strike box;comply with ANSI A156.5,Grade evenly with a saft push broom Do nottleaveanybere spots Remove all puddles and excess primer. 8 Set loose items on cleared bearing surfaces using wool or other adjustable devices.Aftertheitarres hardware to canter doors in openlage and to provide free operation Anchor countertops ascurnly to I Samples of each type and w1or of joint sealant dart heights on strike jamb, Revisions Allow to dry to a dear,thin film(min.3 boom,max 24 hours).Underlaymard shall not be applied have been positioned and plumbed,lighten the anchor bolts and flack space with graph..,a, djul units and other support systems as Indicated. 2 Certified test reports for joint Sealants evidencing compliance with requirements 3.Install lim-hated frames according to NFPA80 9.Leverfladdles:Cast aluminum alloy inside units, uniffildeparderiedry.Primer coverage Is approximately 400 to 600 sq.ft.pargallon. 1.Use nordshi metallic grout in concealed locations where not exposed to moisture;a Shi A I End bleed ,ISSUE FOR CLIENTILL REVIEW 2 Primer for dramely absorbent concrate sudificars:Make an initial appileation ofARIDEX P-51 mixed nonmetallic grout in exposed locations,unless otherwise indicated 1 2 PRODUCTS C.Door Installation:Fit hollowmatel doom accurately in frames,within clearances specified in ANS11801 �0.Panic Hardware:Concefired-rod type actuated by full-width crash on.Comply with UL 305. L 03106/15 .Water using a soft push broom.Do not leave any bare spots.Remove all puddles and 1 Repair damaged and defective casmark where possible to eliminate defects,where not possible to A.Compatibility:Provide joint sealants,joint fiflars,and other musted materials that are compatible with LIDO. I Push-Pull Plates:Aluminum push-pull plates of style indicated, with 3 parts C.Anchor hollards in concrete with pipe sleeves preset into concrete Fill space between WIL.Rol and alkees. repair,replace casevenk.Clean,lubricate and adjust hardware for smooth mention. one another and with joint substrates under Service and application candiflons,as demonstrated by 1 Fmai Doom Install with cleaddreas specified!,I Nit 80. 12 Thresholds:Extruded aluminum in mill finish,with anchors and clips,coordinated wild Divate and ISSUE FOR BIDIPERMIT excess primer.Allow to dry thoroughly before procashfing with the standard application of paper as Solidly with nomemnek,nonmi grout 2,Do not deliver or Install woodwark until building is enclosed,mt work is Complete,and HVi System testing and field experience, D.Prime Coat Toccoup:Immediately after emotion,bond smooth any rusted or damaged areas of prime 1 Acer-ponceeled closers. A 03106115 ,described above for standard absorbent commate. 1.Fill bollands solidly with concrete,mounding top surface, is opening and maintaining temperature and relative handfifity at occupancy levels during the B.Colors:Provide color indicated of exposed joint sealants or,if not otherwise indicated,.a Solaced by coal and apply touchup of compatible air-drying primer. 3 Silencers:At locations Without waddherstapping provide neoprene silencers on Stops to prevent P rimer for non-parbous subficame,wooden or metal suldfickers,or cutback and other mul-water soluble 0.Touch up shop paint after emotion Clean field welds,bolted Connections,and abraded areas arid paint remainder of the constructifich period. Art from manufacturer's standard colors. E ProtectionRomoval Immediately before final inspection,remove protectivewroppiroll mr,doors and onstal-to-metall contact. L . adhesive readuesovercondinflic Prime with ARDEX P-82 Ultra Prime MjAPartAjddflwidP.rtB with Same material as used for shop painting, L Fourfing System:Fabricate from extruded aluminum membere of sin and profil a I'd tested I'duch' (white)and apply with a shod-nap of sponge paint roller,leaving a thin owl of primer no heavier than E For galvanized surfaces,clean welds,bolted cournectons,&abraded areas,&apply galivedozing repair C.Eladomeric Sealant Standard Provide riannufacturner's standard chadrifinly Curing,elestormaric fmadea a thin mat of paint Do not leave any bare spots,Remove all puddles and excess primer.Allow to paint. SECTION 07210-BUILDING INSULATION Sealant of base polymer indicated complying with ASTM C 920 requimments. END OF SECTION 081 1 0 reinforcing.Provide for flush glazing Rem the exterior without projecting Stops ShOpolocriode add A of One-Part,spring Pali Sanford:Type 3;Grade NS;Class 12-112;Uses T,M,0,A,and 0. preassemble.Provide frame sections without exposed seams. ry to a clear,slightly tack IN)(minimum 3 boom maximern 24 boom),Unded.yment sholl not be F.Corrosion Freedom Coat concealed surfaces of aluminum that will come into contact with grout,derchote, 1 1 GENERAL 2 One-Pad,M fdow-ReEdbunt Sifificaro Sealant:Type S1 Grade NS;Class 25;Uses NT,G,A,slid 0: SECTION 08211-FLUSH WOOD DOORS 1.milli Panels Flush-laminated panels of thickness indicated,with bare material laminated with Z� Instal I'd until primer is dry,Primer coverage is approxfoready 200 to 400 square feet per gotten. masonry,wood or dissimilar with the following: A.Submittals:Product Data for each type of impuladed pmduct Spout ad waterproof glue between two sheets of Slump,um 4 Minimum drying free for ARDEX P-82 Uftfla�Prrrrsr over cutback adhesive is 18 hours. 1.Cost Aluffirourn Heavy coat of bituminous paint B.Fire-Test-Rompares,Characteristics:Provide insulation and related materials with[he joremplated with fungicide;intended for sealing interior joints with norporous Substrates Exposed to 1.1 GENERAL M Stilandi Type Entrance Doors Pmvide tubular frame members,fabricated with mechanical joints A D.MISimi Comply with manufactumes printed mOdetions and the folloving 2,Extruded Aluminum:TWO-to of at.,lacquer. fire-lear-rospords,characteristics indicated as detchinflared by testing identical products per ASTM E 84 high humidity and temperature extremes. A,Subunittals In addition to product date,submit the following: iihinki heavy inserted rainfocong plates and concealed te-rods or jl 1.Add 7 quarts(SE L)of clean potable water per two 55-pound beg, ASTM E 1 1 9,or ASTM E 136 by UL or another leading and Inspecting agency son ptall to authorities D Butyl Sealant rManufacturner's standard pree-part,romserg,solvempalesse-curing,poplyrderaski Coal 1.Shop dradvings indicating location and sai a of each door,elevation ofearch kind of door,detail.of ,xionottly Provide arap-on Z�s 2 Mix using a I/,"(650 rpm)low speed heavy-duty III drill with an ARDEX T-I mixing paddle Do SECTION 06100-ROUGH CARPENTRY sealant complyi if with A8TM C 1085 and fiermulated With mmimum of 75 percent solids to be .Glazing:Fabricate to facilitate replacement of glass or panels,without disi he ing jurisdiction.Identify materials with appropeam markings of applicable testing and inspecting construction,location and extent of flardwas blocking,and other pertment data. extruded aluminum glaing stops with exterlar stops anchored for nondampi not overw ter. I I GENERAL agi�.rrcy nonstaining,Portable,and have a tack-free time of 24 hours or less. 2 Samples of actual materials in small sections(or Bach few material and finish. 2.Design:Provide 1-314-incift-dick doods of design indicated. .1 -_ 3 Aggregate ml..Far areas to be Installed....1 1/2'thick,aggregate.By be added to reduce A.Submittals Submit the following: C All manufactudere of vapor border,insulation and flashing products,am to provide letters of E Acrylic-Emulsion Sealant:One-part,horsed,mildew,mastard,idonflable,acryfic-earralsion sealant B.Quality Standards a Medium stile(3-1/2-Inch nominal width). material costs Mix ARDEX K 150 with Water first,then add from 113 up to I pal by volume of 1.Product Data for anglineened wood products,underlayment,insulating sheathing,alrinfiltration compatibility for these Products In combination with each other. .implying All ASTM C 834. 1 Comply with the allowing standards: N.Falbroatiom Fabricate components to designs,�!as and thicknesses indicated and comply with washed,well graded pea gravel aggregate(118"to 114"or larger),Do net use sand.Note:The border,metal framing anchom,and Construction adhesives. 1.2 PRODUCTS F.3111cone-Emulsion Sealant:Product complying with ASTM C 834 and,except for weight less a NWWDA Quality Standard:LS,1-A,"Architectural Wood Flush Doom,"of the National Wood indicated slarrickards.Sizes and profiles am indicated an the dmwings. addition of aggregate will diminish the warrobifity of the make it necessary In notaft a firoah wet to 2.Material Certificates for dimension lumber specified to comply with minimum allowable unit stressms. A.Gedi Provide,Insulating materials that Comply with requirements and with referenced Standards. measured fl or ASTM C 7g2.with ASTM C 920,that accandrientes joint movement of not,note than Window add D...Association, 1.Therinal-Breek,Construction:Fabricate framing with an integrally concealed,low Conductance obtain a smooth surface Ards,doppromendle a%'application of ARDEX K 15@1 neat to be lostafted 3.Wood treatment data,including chemical treatment manufacturer's instructions for handling,Etching, 1.Preformed Units.Sizes to fit applications incladmi selected ft=manufacturer's Standard 25 percent in both extension and compression for a total of 50 percent. b AWL Quality Standard:"Aromaceprad Woodwork Quality Standards"of the Architectural Woodwork thermal barrier,between exterior materials and interior husumber,to eliminate direct mat.1-tonnetal as the finish coat installing,and finishing treated materials. thiclarese,wil add angirs. G.Acoustical Sealant:Nomag,paintable,nonstaining,latex sealant complying with ASTM C 834 and flautubs. contact. 4.For pump installations,ARLEY K 1 50 shall be mixed using the ARDEX Levelfiraft Automatic Mixing 12 PRODUCTS B.Polyisodyandrate Board Insmation:Rigid,cellular polyisocyanurate thermal insulation hand on both effective in reducing airborne sound transmission thorough In difiter joints and opeadingen ball G,WIC Quality Slarni'Manual of Millwork"of the Woodwork Institute of Califorria. 0.Prelabrication:Complete fabrication,assembly,finishing and hardware application before shipment to . courstruction as demonstrated by testing representative assemblies per ASTM E 90. Pump.Start the pump at 21 0 gallons of water per hour,and then adjust to the ardirtimum water A.LumberGerneral;Comply with DOC PS 20 and with applicable grading miss ofinspection agencies sides with aluminum foil to comply with requirements indicated beIowc 2.Performance Grade: the Project.Disassemble only as neddespary for shipment and installation, befififled by the American Lumber Standards Committee's(ALSC)Board of Review.Provide dressed 1.ASTM Standard:ASTM C 1289,Type 1,Class 1 or 2. H Acoustical Sealant for Concealed Joints:Nordlying,michardleming,nonakinfling,nonstaining, 03/25/15 reading that still allows self-leveling properties.Do not Diameter.Check the consistency of the lumber,848,with each fifirece factory marked with grade stamp of inspection agency. red a Heavy Duly unless otherwise indicated. I�Do not drill and tap for surface-mounted hardware items until Lima of instaflation Got on the floor to ensure a uniform Ifistributori of the sand aggregate at both the top surlaces and C Unlaced Mineral-Fifilear Blanket Insulation:ASTM C 665,Type I(blankets without mearomme facing) gumarable,synthetic rubber Sealant recommended for sealing interior Concealed joints to pas b.Extra heavy Duly,public restrioners,exits,staging enhance. 2,Proglaze door and frame units to greatest extent possible _" ­ 'h ad t transmission of airborne sound. n US Rom of the pour 1.Provide lumber with 15 percent maximum moisture content at time of Creasing for 2-ifich nominal of type described below: C Standard Duty:Closed,W.,hadDys,Claded. P Welding Comply with AWS recommendations,Grind exposed won smooth.Restore mechanical AIGIVrMlff E.Alplefification:Comply with mandfachurra printed instructions and the allowing. (38-yan actual)thickness or less,unless otherwise indicated. 1.lifinard-Fiber Type Fibers manufactured from glass,slag wool,or mck woul. 1.Tape Sealant:Solvent-firee,butyl-based tape sealant with a befide content of 1 00 percent formulated 1 2 PRODUCTS fidsh. \AIR 985350 1 ARDEX K 15ty must be installed at a minimum thickness of 1/8'over the highest point in the,floor B.Wood-Premervelve-Trearted Materials:Comply with applicable requirements of AWPA C2(lumber)and 2.Mineded-Fiber Type:Fibers manufactured train glass to be houstarring,paintable,and nomodgmi in contact with nonporous sundecore with or without A.Manufacturers Qualification A qualified manufacturer fiat is certfied for chain of custody by an Q.Reinforcing Install reinforping;for hardware and as necessary for performance requi afints,Bag typically ' mInfamencent thread to ficavent stretch and packaged on rolls with release paper an an ads I'SC-cratfited certification body Subject to compliance with requirements,provide doors by we of the resistance and rigidity. a a 4 which results in an average thickness of%'over the entire mor.ARDEX K 15@ can be AWPA C9(plywood).Mark each treated item with the Quality Mark Requirements offin inspection 3.MinerailkFicer Typec Fibers manufactured from slag or rock wool. J Preformed Foam Sealant:Preformed,fludepoldressed,open-call,high-density braffisSne 08M sai allowing(or approved equal) R Dissimilar Metals Separate dissimilar metals with bituminous paint,suitable sealant,marabsor five 1� 4 - agency approved by ALSC'S Board of Rendiew. 4.Surface-Burning Characteristics:Maximum lame-sproad and firmake-devel.ped indion of 25 and impregnated with a nomfirying,water repellant agei in flosexampressed sin and in ad oer Stick form 10 1.Algeria Hardwoods Ind. plastic or elaccomeric tape or gasket between surfaces,Do not on coatings containing Ind. Installed up to 1%'over large areas neat,and up to 5"with the addition of proper aggregate ARDEX ,r::::c`rpjj. K 150 bed arm be featheredged to match exisfing elevations. 1.Pressure treat aboveriffound items with waterborne proservatives to a minimum retention of 0 25 50,roseactively. fit joint widths Indicated:permanormy elastic,mild-hosistand,nommigradjory,nonstaining,Compatible 2.Pour or pump the liquid ARDEX K I 5@ and spread in place With the ARDEX T-4 Spreader Use the III ft.(4.0 kil mr.After treatment,kiln-dry lumber and plywood to S maximum moisture pardent D.Faced Mineral-Fiber Blanket Insulation:ASTM C 665,Type III,Class A(blankets with reflective 2.Fenestra Corporation. S.Continuity Maintain accurate relation of planes and angles,with hairlider fit of mfitacting members. JOI IN A.Ouldol ARDEX T-5 Surroother and featheredge and touch-up Wear nommehadfific cleats to avoid leaving of 15 percent.Treat indicated item and the following: wpor-rolorder membrane facing and flame spread of 25 or less);with foil-scrini foil-scrim,or with joint substrates and other joint sealants;and as follows: 3.Mohawk Flush Doors,Inc T Fasteners:Conceal lasternerewhourrover possible. STAR-OF IDAHO marks in the liquid ARDEX K 150 �.Wood cents,naters,cuts,equipment support bases,blocking,stripping,and andflar members in foll-scrim-polleftyleshe vapor-retarder membrane an 1 face 1.Impregnating Agent:Manufacturees standard. 4.Waysm.order CC J.ProvIde finger guards of wilapsible neoprene or PVC gaskefing securedy anchored into frame at 3 Abood sulfifloods require the use of the mesh-minforced ARDEX KI 50+E251-Resilient Emulsion conmebtflon with owing,flashing,vapor barriers,and waterproofing 1.Mineral-Fiber Type Fibers manufactured from glarns. 2 Density:Manufacturers standard. B.Interior Solid Core Doors far Opaque Finish:As i hinge-jamb of center-pivoted duarm. . Underpayment System After priming,install 3.4 galvanized diamond daral oth by Stapling to the b.Wood sills speopers,blocking,furring,Shipping,and similar coressided members In contact with E.Polyethylene Vapor Retarder ASTM D 4397,6 mile(0.1 5 mi thick,with max"d in pecounarce 3.Backing:Pressure-sensitive adhesive factory applied to one side,with protective wrapping. I Faces:Medium-density overlay over standard thickness hardwood face Nonfifirs. V.Finishes:Comply with NAAMM"Metal Finishes Manual"for recommendations relative to application wooden selfifixor approximately every 6 inches to center masonry or concrete. rating of 0.1 3 parm(7.5flogi A a x sq TV and vapor retarded tape:pressure Heardsifive tape of type K�Sealer t Bookings,General;Nonstaining;Compatible with joint substrates,Sealants,Orders,and 2 Grade Premium. .addesigned.rSoffmah,S Fir daisguatems prefixed by'AA'conform to the system established by a Wood coming members less than 18 inches(460 mind above grade. .tharjurd filler,approved for apthications indicated by sealant manufacturer based on field experience 3,Construction:7 plies. I HEREBY CERTIFY THAT THESE PLANS HE's SEEN Pas, 4.Metal subtfloore require the use ARDEX K1 5@+E25�Resilient Emulsion Underaymand System recommended by vapor retarder manufacturer for sealing joining and penetrations in vapor retarder to the Aluminum Association for designeeng aluminum finishes. WED ODER MY ELPERVISCH AND THAI TO THE BEST d.Wood flea plates installed over concrete slabs directly in contact with earth. F.Adhesive for Bonding Insulation:Product with demonstrated Capri to bond insulation securely and labors ry testing. 4.Car.GlLad-blCGk... W.Class I Color Anodized Finish:AA-Ml2C22A42Ii Comply With AAMA 606.1 or AAMA 608.1 OF MY SNOMI THE SAME COMPLY WITH ALL RULES 5 S feel subficore require that the substrate firat be primed with an anti-carroadve paint.After thorough 2 Complete fabrication of treated Items before treatment,where possible.If cut after tradifinfird,apply substrates indicated without damaging insulation and substrates.Verify compatibility of mompacturso,c, 1.Plastic Fee.Joint Flifirso Preformed,campressible,resilient,norwaxing,flonextrusling strips of 5 Bonding:$tiles and mile bonded to Com,then entire dift abrasive planed before veneering 1 Color ClearAnodfized RREEGUW�NSMDORDINMOESOFr&ML8LU,& drying of the paint,Photo the surplace with ARDEX Pi Ultra Prime hold treatment complying with AWIPA M4 to cut surfaces.Inspect each piece of lumber or plywood insulation. plastic foam of material indicated below,and of size shop,,and density to Control sealant depth and C.Fire Rated Doors.Doors complying with NFPA-80 that are listed and labeled by a qualified testing 1.3 Execution: WING TO STRICTURES AND loollocia . F1 C bring after drying and discard damaged or defective plains. 1.3 EXECUTION ofthemse dentributer to producing optimum sealant performance. agency,for fire isoctectifich rating where indicated. A.Exarmno substaites for Compliance with requirements,installation tolerances,and candiflons that affect ARDEX K150 can be walked an in 2-3 hours.Moisture-insonaltive tiles such as Ceramic quarry and 3 For exposed itence indicated to receive a stained or natural finish,use Chemical formulations that do A.lnstallation,General:Comply With insulation manufacturame written Instructions applicable to products a Opi polyurethene foam. O Fabricate flush mod doors to comply with following requirements installation Correct unsatisfactory conditions before proceeding, pi in can be installed after 0 hours Undarlayment Dan accept all other finish door covering not require inclaing,contain accounts,bleed through,or othensise adversely affect the finishes. and application indicated IT Blasi polyethylene foam,nonalbso,bent to liquid water and gas,noroudgessing In 1 In sizes indicated forjoi fitting B Installation:Comply with manufacturers instructions Set units plumb,level,and true to line,without ARCHITECT m=after 16 hours at 7C*F and 50%relative humidity For resinous systems such as epoxy and C.Dimension Lumber Provide dimension lumber of grades indicated according to the ALEC National 1,Install Radiation that is undamaged,dry,unsoiled,and has not been exposed at any time to ice and comminuted state. E Shop prime exposed perhoure of doors for paint finish with one mat of mod primer specifiedth DivNion warp at duck of framing brambece,doors,or panels Install in proper alignment and station to established pollydrathame floors please ConI the ARDEX Technical Services Department. Grading Rude flNGR)previsions of the inspection agency indicated. an.. c.Proprietary,instificulated,closed-call polymeric foam,nornoutimealng,with a densifty,of 2.5 pof and 9 Section Ii.inting' lines and grades.Pineville support and anchor securely in placs. Drawn By Chocked By a 3.4 FIELD QUALITY CONTROL 1.Framing Other than flon-Load-Boading Partitions:Provide Construction or No.2 grade End any of the 2.Extend insulation in thickness indicated to erwelop entire area to be Insulated.Cut add fit Ughtly tensile strength of 35 psi per ASTM D 1623,and with water absorption less in n 0 02 grahloubdo 1.3 EXECUTION C DO and tap frames and doors and apply surface-hounted hardware. cw BW centimeter perASTM C 1083 A.Install wood doors to comply with manufacturer's instructions arid referenced quality standard and as D Sell off member in bed of Si a with joint filled,a,g.mosts. A Whom specified,field sampling of the Andex undersyment is to be done by taking an entire unopened following species: smand obstructions and fill wide with insulation.Remove projections that linderfere wlth placement did Any material ndicated,bove. indicated. E Refer to"Glass,Bud Glazing"Section far installation of glass and other panels glazed into doors and Scale Date bag of the product being installed to an Independent testing facility to perform compressive strength a.Species:Southern pfir SPIB. 3.Apply single layer of Insulation to produce thickness Indicated,unless multiple layers am otharxies, 2,E stannearric Tubing Joint Filled;Nei butyl,EPDM,or silicone tubing complying With ASTM D re.Seal cut framing NONE 03/06115 . testing in accordance with ASTM C 1091modiffied.fircum only.Them am no in situ test procedures ta Species Douglas fir-I.Rich;NLGA,INGLIS,or Whi shom or required to make up total flockmad, - B Align and fit doors in frames with uniform clearances and bervele Machine doom far hardwe far the evaluation of compressive strength, e Species:Hem-fir;NUGA,WCLIB,or III 8,Install boord insulation on concrete Substrates by adhesively attached,spinfli insulation 1056.nonabs,ment to water and gas,and capable of remaining reactiand at temperatures do-to 26 surface.after fitting and machining and pretreatment. F,Adjust hardware to furation properly. 1 3.5 PROTECTION d.Species:Douglas fir south;WWPA .uplari deg F(.32 deg B) I�Shop Primer Zinc-dust,zinc-oxide primer paint complying with performance requirements of FS IS Clean Completed system aftem installation.Avoid damage to malings Job No, A Prior to the inatellation of the finish flooring,the Surface of the unclarlayment should be protected train 2.,Fmming Other than Non-Load-Beaffing P811fitionS:Provide any species and grade with a modulus of C Extend vapor retarder to extremities of areas to be protacted from vapor transmission.Secure in 3,Sond-Bai Tape Polyethylene tape or other beefic tape as recommended by Sealant TT.P.641,Type It H.Clean glass after Installation.Comply with"Glass and Glazing"Section for cleaning and maintenance abuse by other trades by the use of plywood,Mai or other suitable protecdon Course. plasticity of at least 1,300,000 psi(8950 MPM)and an extreme fiber stress in banding of at least 850 place with adhoolves or other anchorage system Seal all joints caused by Seams'pipes'cooddits' L flarniflacklosr for preventing bond between sealant and joint filler or other materials at back offlolint. END OF SECTION 084 1 0 13-5549 it(5.9 M Pal for 2-inch nominal(313 mor-actual)thickness and 12-Inch nominal(286-mm actual)width electrical boxes and similar items perretrating objects and vapor retarders.Repair tears of punctures I Primer:As recommended by joint sealant manufacturer where required for achresion of sealant to for single member Mi immediately before cance.firmin by.the,work. dird Substrates indicated. Sheet No. - ai D.Fir itardant-Treated Matemblei D.Protect installed insulation and vapor retarders from damage due to haderful weather exposure, 1,Gene red:Comply with performance requirements in AWPA C20(lumber)and AWPA C27(plywood). physical abuse sunlight UV)and other causes __ SP-2 SECTION 08710•DOOR HARDWARE 1,2 PRODUCTS L.Acouallcal Sealant for Concealed Joints:Manufacturer's standard nondrying,nonhardening, G.Inatelfug Trim Accessories,Putrid aaessories with back flanges,fasten to framing with the same H.Cleaning.Upon completion of placement and grouting,clean all ceramic tile surfaces so they are free of SECTION 09305-TILE AND STONE SETTING MATERIALS AND ACCESSORIES 1.1 GENERAL A.Manufacturers:Subject to compliance with requirements,provide products by one of the following. nonskinning,nonstaining,gunnable,synthetic-rubber sealant recommended for sealing interior concealed fasteners used to fasten gypsum board.Otherwise,fasten trim accessories awarding to accessory foral matter,Use only recommended cleaners by the the and grout manufacturer's and only after L1 GENERAL A.Submit samples of hardware items,showing each required finish from each manufacturer(for 1.Grid Suspension Assemblies. pints to reduce transmission of airborne sound, manufacturer's directionsfor type,length,and spacing of faslenere. determining that cleaners are safe to use by testing on samples of the the and other surf to be cleaned, A,Section Includes acceptance of color and texture only). a.Armstrong World Industries,Inc. M.Miscellaneous Materials:Provide auxiliary materialsfor gypsum board construction that comply with 1.Install cornerbead at external corners. 1,Remove latex-pornnd cement grout residue from the as soon as possible. a B.Submit final hardware schedule organized by"hardware fiefs°to indicate specifically the product to be b.Chicago Metallic Corp. referenced standards and recommendation of gypsum board manufacturer. 2,Install edge lam where edge of gypsum panels would otherwise be exposed,Provide edge trim type with 2,Unglazed life may be cleaned with add solutions only when permitted by rile and grout manufacturers 2.Groundslileand sto mortars and adhesives r• furnished for each item required on each door. c.USG Interiors,Inc. 1,Spot Grout ASTM C 475,setting-type joint compound recommended for spot-grouling hollow medal face flange formed to receive joint compound,except where other types are indicated, printed instructions but no Sooner than l4 days after installation,Protect metal surfaces,cast Borland 2.Groul far rile and stone, 1.Furnish templates to each fabricator of doors and tames as required for hardware preparation d.Worthington Steel Company(fo kkdy National Rollinzeg Mills). doorframes. a.Install LC-Dead where gypsum paroswe tightly abutted to other construction and back tanks,can be vitreous plumbing fixtures from effects of acid cleaning.Flush surface with clean water before and after 3.Sea Leveling Underlaymenl,skimcoatin9 and patching. Q-D 2,Provide keying schedule,Verify keying and master keying requirements with tenent landlordlowner as 2.Gypsum Board and Related Products: 2,Fastening Adhesive for Wood:ASTM C557,as recommended by manufacturer, attached to framing or supporting substrate. cleaning. 4.Moisture Mitigation System required. a.Domtar Gypsum, 3,Fastening Adhesive for Metal:Special adhesive recommended for laminating by manufacturer b.Install L-bead where edge trim can only be Installed after gypsum panels are installed. 3.Before final inspection,remove temporary protective coaling,by method recommended by coaling B.RELATED SECTIONS �- C.For fire-rated openings provide hardware tested and listed by UL or FM(NFPA Standard 80).On panic b.Georgia-Pacific Corp. gypsum panels to sheet framing. c.Install U-bead where Indicated, manufacturer that is acceptable to brick and grout manufacturer,Trap and remove coaMg to prevent it from 1.Section 09300-Tile:Ceramic rile materials. exit devices provide UL or FM label indicating"Fire Exit Hardware.' c.National Gypsum Co.;Gold Bond Building Products Division. 4.Steel drill screws complying with ASTM C 1002 for the following applications: d.Install aluminum trim and other accessories where indicated. clogging drains. 2.Section 09380-Cut Natural Stone Tile'Stone tile materials, �m 12 PRODUCTS d.United States Gypsum Co. a.Fastening gypsum board to steel members less than 0.033 Inch(0.84 min)thick. e,Install control joints at locations indicated, 4.Finished Tile Work:Leave finished installation clean and(me of cracked,chipped,broken unbcoded,err ,REFERENCES A.Number Designations:Numbers indicating hardware items are ANSIIBHMA standard number B.Steel Framing Components for Suspended and Furred Ceilings:Provide comporeanls complying with b.Fastening 9YPsum board to wood members. f.Install control joints according to ASTM C 840 and manufacturer's recommendations and In specific otherwise defective tile work. C designations. ASTMC754 forconditlans indicated. a Fastening gypsum board 1.gypsum board. Iocalion3a pproved by Architect for visual effect, i,ANSI A108 SerieslA118 Series-American National Standards for Installation of Ceramic Tile. B.Manufacturers:Subject to compliance with requirements,provide products by manufacturers for 1,Wire Ties:ASTM A641(ASTM A 641M),Class l zinc coaling,sob temper,0.062 inch(I 6 mm)thick. 5.Steel drill screws complying with ASTM C 954 for fastening gypsum board to steel membersfrom H.Finishing Gypsum Board Assemblies,Treat gypsum board joints,interior angles,flanges of cornerbead, THIN SET MORTARS ROUT 2.ASTMC 150-Standard Specification far Portland Cement. various products listed below.An asterisk(')following manufacturers name designates manufacturer 2.Wire Hangers:ASTM A641(ASTM A 641M),Class l zinc coaling,sotttemper,0.162-inch(4.1-min) 0,033 to 0.112 inch(0.84 to 2.84 mm)thick, edge trim,control joints,penetrations,fastener heads,surface defects,and elsewhere aS required to G 3.TCNA(HB)-Handbook for Ceramic Tile Installation;Tile Council of America. whose products are indicated in Hardware Schedule,Such products are listed in the schedule by diameter. 6.Steel drill screws of size and type recommended by unit manufacturer for fastening cemenditou6 prepare gypsum board surfaces for decoration. Parts-GENERAL 4,ISO 13007-International Standards Organization,classification for Grout and Adhesives. specific reference to manufacturer's catalog numbers.Except as otherwise indicated,products of 3.Hanger Rods:Zinc coaled or protected with rust-inhibitive paint. backer culls. 1.Prefill open joints,rounded or beveled etlges,and damaged areas using setting-type joint compound. 1.1 RELATED DOCUMENTS D,SUBMITTALS equivalent quality,design,and function by other listed manufacturers may be used,subject to approval of 4.Flat Hangers:Zinc coated or protecled with NSWnhihllive paint. 7,Gypsum Board Nails,ASTMC 514, 2.Apply joint tape over gypsum board joints,except than with trim accessories having flanges not Architect, (5 Channels Cold-rolled sleet,0.0598-inch(1.5-mm)minimum thickness of base metal and 7116-Inch- B.Asphalt-Saturefed Organic Felt:ASTM D226,Type I(No,l5 asphalt felt),nonpedoraled, requiring tape. A.Drawings genes pply toon6of the ConGecl,Ond other related conslNctlon documents such as Division L 3ubmeantlers techonsof Se ationfre 1.Buds and Hin es:Bommer,Cal Royal,Ha er',McKinne,H.Son,Stanle,Raton. (11.1-ram-)wide flanges,and esfollows: 9,Foam Gaskets:Closed-cell vio lfoam adhesive-backed slaw s that allow fastener enetaton without 3 A l oin to eover sum board oints and to flan es of trim accessories,exce tthose with trim UMMARfications apply to this Section 2.Manufacturers technical infarmelion fw each product specified. 9 9 Y Y Y D D DPYI P 9YP 1 A P 1.2 SUMMARY 3.Sam les�,Color charts for selection of rout 2,Key Cers and Lock:Key Control Systems TClkexid F lcon,Owner. a.Currying Channels,2 inches(50,8 ram)deep,5901b11000 feel(88 kg1100 m),unless otherwise foam dhplacemen n:Mateh(3.2 sated el in width to rest metal stud size indicated. having lla(Gypsu Intended for laps es recommended bevels accessory manufacturer. D 9 A.This Section includes materials far the preparation of subetrales to include the application of a 3.Cylinders Dayaks:Arms ite,in-, obi&&Rn,Falcon3ergeat,3Chlekner,Mo indicated. 10.amp.dy Insulation Malerlal lndlcaletl below,of ihkkneas and width to fill voids brined by Z-lurting 4.Levels of Gypsum Board Finish:Provide the following levels of gypsum board finish Der GA-2141ASTM 4.UALI lYA SURANi.ne:Manufacwrer's pnnla lnslructbns for each product. 4.ExiVPanI Devices'.Adams Rlle,Arcow,CoNInBRusswln,Da-0-Matic,Locknet',Monarch, b.Furring Channels:3141nch(18.1 ram)deep,30glb/100g feet(45 kg1100 m),unless otherwise members: C840. walude settin a aterack isolation membrane and materiels far the instelladlon of ilia and alone fnishes to EQUALITY ASSURANCE indicated. a.Unfaced mineral-fiber blanket insulation to corn!with ASTM C 665 forT el a,Level l for ceilin lenum areas,concealed areas,and where indicated,unless ahiher level of finish inclpleteAngmeteodut and sste Prechlon Reed,Sargent Von rbin&,Yele, y Y YD 9 P A B.Complete ARDEX product and ename infilallanon details are provided In their corresponding Technical a Provide Isle grout,n11inA materials,additives,and factory-prepared polymer modified molars from the 5.Overhead Cbsers�.Arcow,Corbin 8 Russwin,Dorms,LCN',International Door Closers,Maaroh, 0.Flnlsh:Rust-Inhibitive paint,unless otherwise Indicated. b.Extruded-polystyrene board insulation to comply with ASTMC 578 fa Type IV,and with is required for fue•resistenca-rated assemblies and sound-rated assemblies. Brochure available at www.ardexamericas.com. same manufacturer. Norton,Rixon-Firemdrk,Sargent,Yale, B.Finish,ASTM A 653,G 60(ASTM A 653M,Z 180)hot-dip galvanized coaling for framing for fisamespread and smoke-developed ratings of 75 and 450,respectively,according to ASTM E 84, b.Laval 2 where panels form substrates for rile and where indicated. C,Related Sections include the followin: F,DELIVERY,STORAGE AND HANDLING 6.Door Control Devices Baldwln,Brookline,Builders Brass Corbin&Russwln,Glynn-Johncon,Hager, exterior softs and where indicated. I I.Polyethylene Vapor Retarder,ASTM D4397,thickness and maximum permeance rating es follows. c.Level 4 for gypsum board Surfaces,unless otherwise indicated. A Ives',Quality,Triangle Brass, 8.Steel Studs for Furring Channels:ASTM C 645,in depth indicated and with 0,0179•rah(0.45-mm) a.4 mils(O,t min),0.19 pertns(10.9 nglPe x 3 x act anI d,Level 5 for gypsum board surfaces,as indicated on drawings.Level5-The highest quality finish is the 1.DlENC 09 Tile&Stone Sections 1.Deliver.Prevent packaged materials!non to maontals by wahr,fre unbroken end Jailer or tctuntil 7.Door Tdm Units:Baldwin,Brookline,Buidere Brose,Hager,Ives,Tnangle Braes, minimum Dose metal thickness,unless otherwise indicated. 12.Vapor Retarder Tape:Pressure-sensrfive tape of type recommended by vapor retarder manufacturer most ettective method to provide a uniform surface and minimize the possibility ofjcint photographing 1.3 REFERENCES ime.fun,2.Prevent damage err contamination to materials by water,sneezing,forego mailer or other a.Kick,Mop,and Annor Plates:Baldwin,Brookline,Corbin&Russwin,Hager,Hiawatha,Ives Triangle a.Protective Comng:ASTM A 653,G 40(ASTM A 653M,Z 90)hot-dip galvanized coating for framing for sealing joints and penetrations in vapor retarder. and of fasteners showing through the final decoration.This level of finish is required where gloss, q,AMI18.3C emical ALSTANDARDSINnableTil(A.etting causes. for extenlor soffits and callin susenslon members in areas within f0 feet3m of exterior walls. 1.3 EXECUTION semigloss or enamel amsecified,or when flaroints amscified over an undextured surface,or where 2A'118.3 Chemical Resistant Watt mortar anta The Portlgdcement Epoxy a.Do notun frozen materials unless specifically allowed by manufacturer. Brass', 9 P ( ) 3 P I Dal 2.A-118.7 High erior ante Comelm mots fo latex Podland cement moner 9.Door SinDPing end Seals:Hager,National Guard,Pemko,Reese,Sealeze,Ullre,Zero. 7,Steel Rigid Furring Channels:ASTM C645,het shaped,0.0179-Inch(0.45-mml minimum base metal A,Install steel(naming to comply with ASTMC754 end with A3TMC840 requirements that apply to critical lighting conditions occur,The prepared surface shall be coated withadrywall primer prior to the b.Deliver end store materiels on wile al least 24 hours before wok begins. 10.Thresholds.Hager,National Guard,Pool Reese,Sealeze,Zero. thickness,unless otherwise indicated. framing ioatell.b.n. application offial decoration.All joints and interior angles shall have tape embedded lnjoinlc.mpound 3.A-118.lOThl Performance DementG.fingrT.brlstallelion c.Provide heeled and dry storage facilities on site. 11.Automatic Drop Seals:Hager,National Guard,Pemko,Reese,Zero. a.Protective Coming:ASTM A 653,G 40(ASTM A 653M,Z 90)hot-dip galvanized coating for taming 1,Examine all areas and substrates including welded hollow metal frames end framing,with installer dud immediately wiped with 4.A-118.10 Thin,Load Bearing Waterproofing Membrane G.PROJECT CONDITIONS for exterior sofets and ailing suspension members in areas within l0 feet(3 in)of exterior walls. present,for comliance withr uirements and other conditions aftectin erformance.Proceed with a joint knife or trowel,lsayin a thin coaling of joint comound over all Cints and interior anles.Two 5.A-118.11 ESP latex Portland cement mortar, P eq AD A P 9 6.A-118.12 Crack Isolation Membrane 1.Maintain environmental conditions and protect work during and after installation to comply with 8,Steel Resaiont653M)Channels 568(ASTMA 568M)taated from St (127-'comdeep hanASTM Inshadiupplem star frami g,blocking,and facing atl corrected Comply with Ard rise. separate coatsied.lcomporangles Fastenr head allflmjoiNsand o hall be coered Wit thr 7 A-1 .01 a n f referenced standards and manufacturer's printed recommendations. SECTION 08800-GLAZING A6531ASTM A853M or ASTM A 568 ASTM A S68M to tam lira-inch-127-ram-tee channel of 2,Install su lemata framin,blockin,and bracin at terminations in OB G nerel Requireme is or Subsurfaces and Preparations by Other Trades 1 ( ) ( ) P PD ry 9 9 9 gypsum boerdassembteatC separate atsofj int co leriond Athi Fastener headsnt compessorish shall bowel aped with three Vy 1,1 GENERAL B.A-108.101nstallation.(Grout in Tllework 2,Vent temporary heaters to extariortC prevent damage to lalewakfrom carbon dioxide build-up. ®9 . the following configuration suppoutoures,equipmentservices,heavy trim,grab bars,toiletacceswries,furnishings,or similar separele vats ofjolnl compound.Ammskim cy she join compound shill be skim copDng of cohe 9,Pet08.5 Instal board of Ceramic Tile with Latex Thin-StMortr A.System Performance Requirements:Provide glazing systems capable of withslantlin9 normal thermal e a 3.Malnlain lemperelures al not less than 50 deg F(10 deg C)in tiled areas during installation and for 7 e.Single-err bauble-Leg Configuretlon Asymmetric-shaped channel with face connected too single conslruclion. endue surface.Excess compound is immediately sheared.fl,IeavingafJm or skim coaling of compound 1 71 0 movement,wind loading,and impaclloading,wilhoul failure including loss orglass breakage aftributahle fin I- t .,o wi 0.A-0OB,1 nslellalion of Crack lcoallon Membrane days after completion,unless higher temperatures are required by referenced installation age byes ngeeloydeA(web)or hat-expandchannel,ogswebs inch•1381 ) deface 3,Isolate by streming imovemdingstrudure atlocalionsindicaled do prevenllransfer of loading compurpose makng shelled TAsanacermust bomooth and fre oftooll arks and rides"The yfor D.TILE COUNCIL OF AMERICA INC. P to:defective manufacture,fabrication,and inslallallon;deterioration of glazing materials;and other connected to fie es b double-sbte0 or ex nded-metal le s webs. im.sari b structural movement. This ur.se ma bee lied,The surface must be smooth and free of tool marks and rid es.The 1.2 PR DUCTS ufaclurers writen indruclions. ^9 V Pa 9( ) P Y P D Y DP A G3 p� 1.Handbook for Ceramic Tile lnstellalion defects in conslruclion. 9.Grid Sus ensionS temfor lntedor Ceilin s:ASTM C845,menufaclurer3 standard diraf•hun a.Where buildin structure abuts ceilin 1.2 PRODUCTS �xd p ys g A A gperimeteror penetrates ceiling, pre pared surface shallyd coveretlwith tdrywallprimerpriorto the application of thefinal decoration. 1.Glass Design',Provide glass tiles in the thicknesses and strengths(annealed or heat-heated)lo meet system. b.Where padillan framing and wall furring abut slNcfure,except at floor. 5.For Level49ypsum board(nish,embedtape in joint compound and apply trsi,fill(second),end finish E INTERNATIONAL STANDARDS ORGANISATION(ISO) A.MANUFACTURERS �n� or exceed the following criteria based on analysis of Project loads and in-service conditions, C.Steel Framin for Walls and Partitions:Provide steel framin members corn in th the followin 4.Do not brit ebuildin control and ex anion oints with steel framin or furrin members. 1.18013007-Ceramic Tile-Grouts&Adha3wea taut fh Z 9 9 DY 9 wi 9 9 9 P I 9 9 betwe coats ofjolnl compound over joints,angles,fastener heads,rand accessories,Touch re dntl nntl 1.AASO r US- rl Center Rtl.,Deemeld Beach,FL a.Minimum glass ihlekness,nominally,of rites in exterior walls is 8.0 ram(0.23 inch). 1.4 SUBMITTALS (r�� ih requirements, Independently}reme both sides afloinls with framing or furring members as indicated. between coals and after last coal as needed 1.produceasurface free of visual defects and ready for 33442Acce TCIIFree Tel:800-02-MAPEI;Web:wwwmaoei.comNS-EN tug b,Minimumg robabicknenasre dtoes not osed.fae follodor heal-healed glass are nlected colhe 1,Protective Coating:ASTM A 653,G40(ASTM A 653M,attached to and within l0 feet(3 m)of B.Installing Steel Framing for Suspended and Furred Ceilings'.AS follows. decoration A.Product Data:chide mnUfadpres MaterUl data Da is has% inshuctions for each material end w,rs4cese DroDabillly of failure does not exceed thefollowing: product used.Include manufacturers Malerlal Safety Data Sheets. ZTel.Pla 1�6e`fTanufacturec.AP�fTric:Canada, rancis- ghes,Laval,P0,Canada H7L3J5; exterior walls. 1,Sway-brace suspended steel iramingwllh hangers used for support. 6.Where LCvel2gypsum board finish isindlcaled,embedtapeln Joint compound and apply Arst coat of A50,Tel:450-662-1212;Fax:450662-0444;Email.moordloh(dmapei.com, Web' 1)Blilesper1000 forliteassAverlicellyanotover l5degmesoflvedicerand under wind action. 2.Steel Studesnd Runners:ASTM C645/ASTM C754,in de th indicated and with 0.0119-inch 2,Install su ended steel framin corn onents in sizes and ads cin 6 indicated,but not less than the! B.Qualification Dmle:For Installer a Provide safe) lazin In all hazardous locations as definedb coder uirements.Provide labelin D sP 9 P Pa A Ioinf compound, 1,5 QUALITY ASSURANCE ww.mapelcom/CA-EN. � dW � Q Y9 9 Y eq 9 (0,45-mm)minimum base metal thickness,unless otherwise indicated. required by the referenced steel framing installation standard, 7,Where Level l gypsum board finish is indicated,embed tape in joint compound. A,Installation of the ARDE%roduct must be corn letedb a uallfeda licator such as an ARDEX w 3.Substitutions: Not pernifted. p� ai all tempered antllor safety glazing locations, a.Provide 0.0329-inch(0.84 mm)minimum base metal thickness for head runner,sill runner,jamb, 3,Grid Suspension System,Attach perimeter wall track or angle where grid suspension system meets 8,Finish exteriar gypsum sofit board using selling-type joint compounds to prefill joints and embed'ape, P D Y q PD s°/O®(0 0 B.Submltals:In addition to product dale,submit l2-Inch-square samples of each type of glass indicated, and cri le studs at door and other. LevalMeslerO Elite err Choice Contractor,using mixing equipment and tools approved by the manufacturer. B.MORTAR MATERIALS pp partings. verttcalsunces.Mechanically joinmain beam and crns-furringmembers to each otherend bull-cal and forfirst,fill(secondo andndhrenstominimihinelasi coal being Send beteencoat Smooth e except for clearmonollihlc glass protluch,and l2-inch-long samples of each color required(except b,Provide0,0329-inch 10,84-ram)minimum base metalihickneseln locations to receive cementitlous '.(tint.well track. each coal before'oini corn.anti hardens to minimize needforsandin.Send belweencoalsend a8er Please contact Jennifer Davis-ARDEX Engineered Cements(951)85g-7384(.relict of recommentletl tSUting Mortar for Larye Module7ile and Stone:Medium-bed polymer-modified single-component 0 � � JI black)far each type of nahnl or gasket exposed to view. backer units. 4.For exterior wills,install cross-bracing and additional framing to resist wind uplift accordng to details finish coal. I P g installers, mortar complying with ANSI At 18.4 and 18013007.MAPEI"Ultra ntact",15013007: C2ES1P1 or _J Q o O Product-ertshcatessigned by glazing materiels manufacturers caNtying that their products comply with 3.Deflection Track:Steel sheet la runner manufactured to revent crackin of finishes aplied to lntedor on Drewins. a.Paintin exterior sum sofa board after fresh toad has tided issecified in another Division 9 1.6 DELI VERY,STORAGE AND HANDLING MAPEI"Ultracortact RS`,ISO 13007 C2FS1P1(floods only),or MAPEI"Granirdpid",ISO C2FS2P2(for a =RL 0 specified requirements a p 9 P 9 9 9YD D A.Deliver products in original packaging,labeled with product identification,manufacturer,batch number and walls)or MAPEI,'Ullydlile",ISO:13007;C2TES1P1 or MAPEI,"Ultal LF7",1301300TC2TES1Pi or Q � �n� partili.nfreming resulting lam de0ecrion of fitruclure above,in lhicknea3 oat less than indicated for C,Installing Steel Framing for Wallsand Partitions:Install steel elude and furring al spacings indicated. Section. Shelf life. II�� Iuug D.Compa'Iblli'y and adhesion tell reports from sealant manufacturerindicating thatglazing materials studs and In width to accommodate depth of studs. i,Where studs are installed directly against exterior walls,install asphalt fell strips or foam gaskets 9,Finish warentilious hacker units to comply with unit manufacturers directions. MAPEI UItroflex 3,IS013007;C2ES1P1 1� to were testedfor compatibility and adhesion with glazing sealants B,Store products in a dry area with temperature maintained between 50'and 85°F(1Or and 29°C)and aA (cations:Interior floor installations;interior wall installations, 3 a.Producls�.Sublect to compliance with requirements,available products that maybeincoryoreted into between studs and wall END OF SECTION 09250 PPi � � E.Coro allhllil lest re rtfrom Insulatin lass ed a sealant manufacturer indicatin lass ed esealants Protect from direct sunlight. M W P CO P Y W 9A 9 99 9 the Wtrich Metal Frming naamaed loathe following: 2.Extend hereonfmmis areindicatdootermmlte at suspended ceiliings Cesuspended ceilings, 2uspidSyse"hioecomnd Medtastem,fhydra lic m modified hydreulkcemenimerlar,MAPEI N9d were tasted(or compatibility with otherglazing materials. 1 Dietrich Metal Framinq�,SLP-TRK Slatted Deflection Track. exce Iwhere arlliions ere indicated to tarminale at sus ended Ceilin s.Continue framin over C.Handle products In accordance with manufacturer's punted recommendell.ns' "Grenire id System'Iwoc.m nent slam,oft dreulic moner and Oezl6le li aid I mar additive 1 P P P 9 9 SECTION 09300-TILE D an sy Y q POY F.Glazing a licalland Comply with puAVA,d GA,and IGMAssf glass produdmducts i dicat"FGMA 2)MBA BuiltlinqSuppliers;FlalSteel Oefiection Track,Slotted Defiecla Track. frames for doors and openings and lreme around ducts penetrating partitions above ceiling to provide 1.7 PROJECT CONDITIONS comDlythAwah AN51 A1184 and 15013007C2FS2P2 or MAPEI,"Ulirecontacl RS"IS013001;C2FSiP1 Glazing Manual,"anti publications of AAMA,LSGA,end SIGMA as applicable to products indicated, 3 Steel Network Inc(The),Verti ll SLD,VertlTrack VTD Series. su ort for 1.1 General A.Do not maintain dempast7 d lysaftereesmnoln,nless thermm0 indicmore than 85°Fdinstuction I p pp gypsum board. A.ANSI file Standards.Coro I Ih ANSI Ai37 Standards ecification for Ceramic The and ANSI 108 or"Uliraflex LFT Rapid Set",IS0130W;C2TFS1 Pi except where more strinent reuirements are indicated, PdsI D anch lr inANndiwat!east]iinsafidards.legion,unlenoiherwisa indicated in the praduclinsiruclionfi 8 q 4)Superior Metals;Vertunnor Flex Track Stslam(SFTr 3,Cut Sluds112 inch(13mm)shortoifull height to provide perimeter relief. seriestifilei Ceramic TiltdndaMsincludetl under"American National Standard 6peciflcatians for the a.ROUTMAT Ater rwall and floor installations. G,Safety 11 Tha Products complying with ANSI Z97,1 and lasting requirements of l6 CFR Pan 1201 for 5)Telling lndustrles;Vertical Slip Track,(VaNcal Slip Track 111 4.For STC-rafatl and firs-resistance-rated Oarlitiaslhal extend to the undereMe of floalroof slabs and Installation of Ceramic Tile." antllor inODUCT 081nslallalion standards. OGROUT MATERIALS home Category II materials. 4.Steel Rigid Furing Channels,ASTM C 645,hat Shaped,in depth Indicated anti with 0.0179-Inch decks or other continuous solid slructurel surfaces to obtain ratings,install framing around structural PART 2-PRODUCTS r 1.Insulating Glass Codification Council(IGCC). nut I indicated Guidelines:TCA"Handbookkr Ceramic Tile lnstellalion";comply with TCA inslallallon 2,1 SETTINGMORTAR 1.GF;MFast'Ultrngcended polyme-m.d'tied Brous,ANSIA118.8,ANSI A118.7 and IS013007 �dm (0.45-ram)mrNmumben metal type, djunless fabricate Ifrom cod. andother members akepthg bdswficorlroustrain and decks rsde of soio smaori gypsum board melh.ds intlicaled, 2.Associated Laboret.ries,Ina.(ALI), 5,Furring Brackets:Sertetedarm tyre,adjusla6le,fahricatetl from corosi.mre3istentsfeel sheet closures needed to make partitions continuous from floor to underside of solid slNclure.Seal A,5001 US,Products 5000, wwar a ARDEX EngineereO Cements:400 Ardex Park Drive,Aliquippa,PA CG2WAF MAP ssive racolor Plus ay p,:'O a C.Performance RCgdremenls. 15001 USA,724 2 a,Compressive Siren dh,When tasted in aaordance with ASTM C109 at 110 3.National Cedifled Testing taberetories(NCTL), complying with ASTMC fits,minimum Ihlekness of base(uncoated)metal of 0.03291nch(0.84 ram), construction et perimeters,openings,loinh,etc.with a contnuaus bead of acoustical sealant in ( )03.5000,www.ardexamericas.com: g percent Dow: (U ��- 1.2 PRODUCTS 7.Slalic Coetiaenl of Friction For rile lnslalletl on walkways surfaces,provide products with the following 1.ARDEX X 5'"Thin Set Mortar designed for screw atachment to steel studs and steel rigid furring channels used forfanmA, eccannce with manufactures requlremenls. b.Color:lions:er A.Floes Glass:ASTMC1otheT ein Class as Indicated below,and Quallt 3: valuesasdeterminedbytestingthru 0 1proaticcperASTM C102B. B. Performanceand Physic al Properties'. Mehlmexccetl the following values for material cured at 70° 0(,�0 YD Yq 6.Steel Resilient Furring Channels:Manufacturer's standard product designed to reduce sound 5,Frame door openinAsta comply with GA-219,an0 with aDPliceble published recommendationsoi a.Level Surfaces:Mlnimum0.50 thru 0,80 sfalic coefficienlof irictbn. -°F 1° + +-e aApplications:All interiorend exterior tile;joints between 1181nch antlilnch(3mm end 25 ram) t Classi(dasr)unless otherwise indicated. transmission,fabricated from steel sheet corn in wish ASTM A653 ASTM A653M or ASTM A560 Fla (2 C I-3°C)and 50%l5krelativa humitlliy: C - D Y 9 ( I gypsum board manufacturer,untan otherwise Indicated. b,Slep Treads:Minimum 0.50 static cogfticienl of iricli.n. cattle. d-- B.Heal Treatedg-hel Glass Fabrication:Fabricate heahtreatafinufactssby the following method: 1.Meets err Exccetls ANSIA 118.11&ANSIA 7184 Q (ASTM A568M)lo form tl2•inch-(12.7-ram-1 deep Channel of the fallowing configuraliorc. 6.Fremeopening3 otherthen tlocr openings to comply writdetaiis lndicaled or,if none Indicated,as c.Ramp Surfaces,Minimum 0,80 static coefficient of fnctlon. dApplicali.ns:Use far all rile forwhichatlifterenlgrout is not spedfied, D`�o , 1.Verticel(long-held)ar horizontal(rottenhearth)process,al manufacturers option,excepiDrovide a.Single-or Double-Leg Configuration:Asymmetric-shaped channel with face connected to a single required for door openings.Install framing below sills of openings to match framing required above 2,Manufacturer shall veri corn lien and submittal documentation for all materials installed a all D.ACCESSORIES horizontal process where indicated as songless or free of long marks flange by a single-slotted leg(web)or hatshaped channel,with l•tl2•ioch-(38.1-mm-)wide face door heads, ty P WATERPROOFING&CRACK ISOLATION MEMBRANE E U c'? C.Heal-Treated Float Glen Products:As follows: walking surfaces. 1.Floor Skimming Coating and Patching:Per Mapes recommendations. 4)TM'o a connected to flanges by double-slotted or expanded-metal legs(webs). 7,Install Z-furring members and thermal insulation as Indicated and to comply with requirements of D.Submittals:With manufacturer's roduct data and installation instructions for tile work submit samles of Q'- 7,Unccated,Clear,Heat-Treaded Float Glass:ASTMC 1048.Condition A,Type 1,Clan 1,Quality q3, 7,Z-Furing Members:Manufacturer's standard Z-shaped fumin members with slotted or nonslotted manufacturers directors. D p A.Acceptable Products Manufactured by ARDEX Engineered Cemenis 400 Ardex Park Drive,Aliquippa,PA 2,Self•Leveling Fast Track UndedaymenB Pre-blended cemerelllous,for fast track floor covering 2:2- kind as indicated below, A each type,color,and texture of Isle mounted on 12-inch-square backing with joints grouted. 15001 USA,724 w web,fabricated from steel sheet complying with ASTM A 653(ASTM A 653M)or ASTM A 568(ASTM B.Install polyethylene vapor retarder where indicated to comply with the following requirements: 1.2 Products ( )203.5000,wwwardexamericas.com, Installation,far un In dry inferior applications. `c„< a.Kind HSwhereindlcated. A568M);with a minimum base metal(uncoated)thickness of 0.018 inch 0.45 ram,face flan eof a,Extend vs,or retarder to extremlfin of areas to be protected from vs, rtransmission.Saute in 1.AROEX8+9'" a,Acceptable Product:MAPEI Ulhaplan l Plus,fast setting(or over cured operate,exterior grade U Q�a b.Kind FT where indicated. ( ) A D Do A.C.lors,Textures,and Paterns:For tile,grout,and other products requiring nls,ciion of colors,surface B,Performance and Ph sical Pro 1.114 inch(31.8mm),wallaltachment Range of778inch(22.2ram),and of depth required iofit place withmechanicalfasieners or adheslve6.Extend vapor retarderto cover miscellaneous voids textures,atterns,and others arence characteristics,corn with the followin reuirements Y Oe.5%Meet orexcaetlthe following valuesformaterialcured a170° plywood,tre iahwlinch(3 ramto 25 ram). D,3asled Insulating Glass Units:Preanembled units complying with ASTM E 774 and with other insulation thickness indicated, in insulated substrates,includi those filled with loon mineral-flber Insulation. D DDe DV 9 q F+l-3°F(21°C+l-3°C)and 50%+l-5%relative humidity: h.Acce table Product:MAPEI Ultra g, gr ^9 1.Provide nrodicts inadeb grated from manufacturers full range of slandartl colors,textures,anU P Dlen M20 Plus,fast nllin'for over concrete anti exlenor atle requirements indicated. D,Fasteners for Mehl Framin T e,material,size,corrosia resistance,holdin .war,and other b.Saslvertical'oinis in vs,or retarders over framin b la in not less ihen2wall studs.Feslen Y 1.Meets err Exceeds ANSIA 118,10&ANSIA 118.12 plywood,ll4 irx;h(6 mm)ta2inches 50 ram, 1.For propeNes of individual glass lifea making up units,refer to requirements Specified elsewhere In 2.Pol Life:45 Minutes properties requiredreommendatio sot gaud boar manufssecurely to subations involved; vapor retarders loneare 16 al top,end,and bottom edges,al perimeter of wall openings,and at rep B.Sizes and Thickness:As indicated or,if not indicated,as selected by Architect from manutaclurers c.Acceptable Product:MAPEI UIIraplan Easy,fast setting reduced surface preparation self leveling ihlsrforman echarDlefoglasdesign to composted insulati insulating glass units. complying with the recommendations of gypsum board manuhclurers lore liceti.ns indicated. 3.Dry dra pD joints,space fasteners 18 inches(400 ram)o,c. standard sizes and thicknesses. undedayment faslheredge io 2 inches(50 ram),over cured concrete,exterior grade plywood,and adhesives 2.Performance charecterlsdics designated for coaled insulating Alan are nominal values based on E,Gypsum Board Products.Types indicated in maximum lengths available that will minimize Sad-to-hnd c.Seal joints in vapor retarders caused by Pipes,conduits,electrical boxes,and similar items 4.Dry Time:1hr.-coa11,2-far coat2 residues. C.Lila Grade:"Standard Grade"unless otherwise suds-lied. manufacturers published lest data far units with tiles 6.0 ram(0231nch)ihlckan0 nominal112-Inch butljoinhineach areaindicaled to receive gypsum boards lication 5.Aaepte Tile,Within 90 minutes PD peepair nyteam retarderswithvaporretarderripe. D.Unglazed Ceramic Monic Tile:Factory-mounted tat Idle and as indlcaletl on fnish Schedule to comply d,Primer:As recommendetl by Underlaymenl manufacturer, dehydratedmexprsseda Etehourxsq,ft.x de indicated. 1.G sum Wallboard:ASTM C36fCes,unlss lhrcknse indicated, d,Reairm tears or er constnva rretarderimmedlalel before concealln iiith the Inshllallon 8.VOC Content:On 4 hours tars yp p y pu po y A i with manufacturers requirements. 3.Self-Leveling UnderiaymenL Pre-blended cemenlifi.us,for ihlcknesns(ran feather edge,for un in 3.U-values are zing Seeders:Product sq. plying it a Type:Regular here require rfaeare,maltaterwise indicated, plum Boar board oction aconshucling 7.Frond Test: IVE& ROU afar secon0 toad has been applied E Elaslomeric Glazing Sealants:Products comDlYing with ASTM C920 requirement indicated on each E.Glazed Ceramic Mosaic Tile:Provide factory-mounted flat the as indicated on finish Schedule to comply p,3 EPO%Y ADHESIVE&GROUT tlry interior epplicehons. Elastomeric Glazin Sealant Product Data Sheet at the end of this Section In colors indicated b.Type'.TypeXwhere requiredfor fue-resistance-rated asnmblhs. D.Gypsum Board Application and Finishing Standards.Install and finish gypsum panels to comply with with manufacturers requirements. A c.Type:Sag-resistant type for telling surfaces. ASTM C 840 and GA-216, A,Acceptable Products Manufactured by ARDE%Engineered Cements'.400 Ardex Perk Drive,Aliquippa,PA a,AcceDleble Product:MAPEI Navoplan 2,normal-niting,polymer-mndi0ed,for over cured concrete, wmpatble with other materials they will contact. d,Edges,Ta ered. 1.Install sound-attenuation blankets,where indicated,prior to Installn F,Trim le This,Same material,Mze,color,and texture as field tile' 15001 USA,724 203.5000,www.ardexamericas.com: exterior grade plywood,1181nch to 1 Inch(3 min to 25 ram). p ggypsum panels unlen blankets OMarble"thresholds:ASTM C503,withaminimum abrasion resishnce of lO par ASTM C1353a ( ) 1.Addtlional Movement Capability,Provide products,when lefitatl per ASTMC 719,with the capability e,Pro rietar G j p q p y installed ear panels have been installed on one side. 1.ARDEX WA'"Epoxy Adhesive 8 Grout,color as selected by Architect b.Anatable Praducl:MAPEI Novoplan Easy,medium suiting reduced surface preparation p y ypsum Board Products:psum wbc.m lidnce withre uirements, rovide one of the arereddil ASTM C241 and with honed finish. to withstand the specified pamenlage change in the joint width existing al lime of instalhllon end followin roduct where orleta mwallboard is indkaled: 2.Install cellln board anels across iremin to minimize the number of abullin end Dints and to avoitl a.Color p195ilver Shimmer nlf-leveling underlaymeni 118 inch toliah(3 ram t.25 rain),over cured concrete,exterior grade 9 P hip ry 9rd;G 9 D 9 8 1 1.Description Uniform,fine to medium-grained white stone, Revisions remain in ing Ma ere wahng TapequirememsofASTM C920forucerldtap,wit 1)Gypr.ek Firer uerd CG sum Board;DomlarG sum. less tlh end damn imomberal area of each ceilin.Staggerebuliin end joints of ad acenl anels not B,Perf'F(21- and Phyand50%p1-5%Meeverexceetl the fdlowing values for materialcured et70° Dlywoa Primed ASree3 residues. A YP YP e I 9 g I D 2.Dascri lion Match Architect's nm le as indicated on Onish schedule, F.Back-Bedding Mestic Glazing Tape:Preformed,butyl-based elaslomerk tape,with orwithaul spacer 2)Flresiop Type C;Georgia-Paclflc DorD, less than one framing member. P P FH6°F(2t°GI-3°C)and 50%+l-5%relative humidity: aPrimer:As recommended by underlayment manufacturer ISSUE FOR CLIENTILL REVIEW rod as recommended by tape and glass manufacturers for application indicated,and complying with 3)Fire-Shield G;National Gypsum Co.;Gold Bond Building Products Division 3.Spot grout hollow metal door frames for said-core wood doors,hollow metal doors,anti doors over 32 H,Selling Materials,See Section 09305 TILE AND STONE SETTING MATERIALS AND 1.Meets or Exceeds ANSI A-118.3 4.Moisture Reduction Barrier for Concrete Substrates.Suitable moisture reduction border to treat IL 03106/15 ACCESSORIES AAMA 800 for roducls Indicated belay: 2,4 UNDERLAYMENT PATCH P 4)SHEETROCK Brand Gypsum Panels,FIRECODECCore;United Stales Gypsum Co. panes(B13mmlwide,Apply spotgroui al each jambanchor dlpand immediately insert gypsum I,Elasfomeric Sealants:Manufacturers standard chemical)curio elanomerk sealants of base 8 substrate mdstabl Prodihal exniseal emanutoecomofeubsequeercentolds ep mondeens. ISSUE FOR BID/PERMIT G.Expanded Cellularfaces, nd co plondwith polyvinyl forproducmtape,factory coaled with 5)SHEETROCK Brand Gypsum Panels,ULTRACODE Care;United States GYDsum Co. panels into frames. Y 9' A.Acceptable Products5000,wwarde ARDEXEnkmeered Cements.400 Ardex Perk Drive,Aliquippa,PA a,Acce(able Product:Planiseal VS:Alwo-corn neni.100 ercent wlldse ox,oneccet moisture �03108115 polymer eddby Ty that comply with requirements of Division 7 SeUlon"Joint Sealers"Including ASTMC 920 as D W P P Y adhesive on both surfaces,and complying with AAMA 800 far produc1810.5. 1.G um Wallboard:ASTMC 38,in Thickness Indicated. 4,Form control and ex nsion Dints at locatias in accordance with ASTM C840,or as indiceletl and as 15001 USA,(724)203.5000,www.ardexamericas.com: H.Dense Com ression Gaskets:Molded or extruded askets of material indicated below corn in with yPs I relerenced by Type,Grade,Class and Uses barrier ife concrete slabs mat exhibit moisture vapor emissions rates(MVER)uD l0 25 Iha pen 1 6 k P �9 PY A e.Type:Regular for vertical surfaces,unless otherwin indicated. delalled,with ace between ed es of ad'oinin sum anels,as well as su ortin framin behind 1.ARDEX KIS®Sell Leveling Underlaymenl care feeleptabl ( ist sD 9 I 99YD P PP 9 9 7,One-Pert Mildew-Resistant Silicone Sealanls�,ASTM C920,T S,Grede NS,Class 25, Sq 9Der 92,9m')Der 24 hours and reduces transmission rates Wless than Sibs 1,38k standards reerenced with name of elaobmerindicatnd below,and Uprafile and hardness required to b.Type'TypeX where required for fire-resistaraterated assemblies, gypsum ponds yPe 2.ARDSORIE her Finish®Self Drying Patch maintain wake Night seal: c.Tpe Sag-resistant Uses NT,G,A,ackO(toruse injdnisioackin(fiche wit. 2,5 ACCESSORIES r for cncrete Product P xhiibit EMB:AIwo comssionslts(MVER solids epoxy,.newel moisture TM C864. Y type for ceiling surfaces. 5.ISdade perimeter 114.toced-bearing gypsum board widepac slat these ahationss ndtrimt edges as J.Cementitious Backer Units:Propriolery backing units with glass fiber mesh reinforcing and barrier for concrete slabs that exhibit mdswre vap.remissions refas(MVER)up to 201bs Der 1000 L EPDM. STM tl.Edges.Tapered. derailed.Provide 114-to 712-inch-(8,4.10 127-ram-)wide specee al these locations dntl trim edges A.Acceptable Products5000,ctunedby ARDEXEngmeered Cements,400 Ardex Perk Drive,Aliquippa,PA 2.EPDM,ASTMC 864. scaler1.Cem n-Coate on both feces,aapplying with the following requirements. 1,A USA,724 square feet(S07 ri per use,tes usi 24 hours and reduces rrASTMF18 rates to less than 31bs(1.36 kg). e.Proprietary Gypsum Board Products:Subject to compliance with requirements,provide one of the with U-bead edge trim where edges of gypsum panelsere exposed.Seal joints between edges anti 1.Cement-Coated Podland Cement Panels,High-density p.rtland cemem surface ccatanA on ( 1203.5000,www.ardexamericas.com: c.Testing:Prior to use,last using Ceioium ChondaDer ASTM F1869 and ASTM F2170. 3,Silicone,ASTM C 1115. followin roducts where rC rieta 1.ARDEX SX Caulk'" 9P D D ry9d;Doowallbesrdifi indicated: ebuod Framing:Isurfacesumhoard panelsovr both feces and liAhlwelghl concrete core composed of Portland cement and expanded ceramic 4.Thermoplasticpicated nrubber,ASTMCills. 1)Gyprock Fireguard CGypsum Board;Domler GyDwm. 8,Wood Freminganstall gypsum beard anelsover wood iremin with fioatln nternalcorner 2.ARDEXMCTM Morslure Control Systems(RAPID,PLUS,UL7RA) 5.Grout Releaseand Sealers:MAPEI Ullracere Q S,Any material indicated above. 2 Flresto T eC;Geo la-Pacific Cor. construction.Do not attach D 9 91 aggregate;feors Mat rips:Provide thefollow by materi lsas mcomimended by anuf. E.MIXES P YD g D gypsumrnpan an on ltese member wideprovid cnrumber,including K.Miscellaneous Materials:Provide the following materials as recommended by manufacturer as I.Soft Compression Gaskets:ExWdad or molded closed-cell,integral-skinnetl gaskets of malarial 3)Flre-Shield GNatlonal Gypsum Co;Gold Bond Bullding Protluch Division. Boor joists anti headers.Fbal gypsum anels aver mesa members,or rovide conirol'oinls to PARTS-EXECUTION 1,Proportion and mix materiels in accordance with manufacturers most current wrlten lnsiNUons and indicated below,corn in with ASTM C 509,Type 11,black,and of rofile and hardness re uired to P P I coa libh with both the units end group, Q DY 9 P 9 4)SHEETROCK Brand Gypsum Panels,FIRECODECCore;UnBed Stites Gypsum Co, counteract wad shrinkage. applicable TIO standards. malnleln watertight Beal, 1.Temporary soleceve Coating:Where applicable,provideprotective coating to protect 3,1 PREPARATION 5)SHE ypsum Brand Gypsum Panels,ULTRACODE Cora,United Slates Gypsum ick 7.Where nd expan gypsum board assemblies are indions wi seal conslruclion al ofa cousti,behind exposed surfaces of rile egainsd adherence o(monrend grout,es recommended by 1.3 EXECUTION L Neoprene. 2.Exterior Gypsum Soshr Board:ASTMC931,wllh manufacturer's standard edges,in thickness control andexpeneion joint,openings,and penetrallonswithacon(inuousbead ofacouslical sealant A.Subfirtopho eaingple ratethacordw-e 10801'Genlurersquiremints' q,EXAMINATION 2.EPOM. manufacturer compatible w:th ale anti morlarlgrout products. 1.Prior to roceedn lease rater to ANSI A 108.01"General R Indicated. reclommenationsrllhfacas of dgetri and Complywith ASTMCing and manufacturers L,Crack Isolation Membrane, P 9P equation.sforSteand amien the 2Pxamine surfaces to receivelllewoNandconditions under whichfile will be installed. 3,Silicone. a.T :as ante psu Backs g oarcand. recommendadians for location of ed shim and closin.((sound-fhnkin aths around err lhrou h temper"Handbook for Ceramic Tile lntallat09C).0r detailed information.Subshah and ambient 4.Thermoplastic polyolefin rubber yPe A g g 9 D 9 1.General:Installing Contractor is required to Nald inspect substrate prior to file installatlan far Is,mperalures must be a minimum of 50°F(10°C). 2.Do not proceed with tilework until surfaces and condilias comply with requirements Indicated in 3.Water-Resistant Gypsum Backing Board,ASTM C630,In ihlekness lndicate0, gypsum board assemblies. aece table surfaces and rovlde crack Isolation membrane as recommendedb manufacturer to x reference tile Installation standard and manufacturers anted instructions, Y a.T Re ular,unless otherwise indicated. 8 S ace fasteners in g gypsum board application end finishing achieve ro er tile installation results, 2. All eubfloors must be clean and completety tree of all conlaminanis,Including dust,oil,grease,wa 5,An material indicated above. D P Y P ype: g p gyauum pbaccom ccordm to referenced P P t l m t 'I iz n h m l in wit r f rented B,INSTALLATION J.lazinglenaus Glazing Melnts of anufaceo den,se,o ds apeco py A free F.Cementidious Backer Units,ANSIA118,9 enddard edg maximum lengths available to minimize a.Scope andmanufaximum recommendations, sealers,paint varnish,etc.Prepare floor as required by mechanical means.Do not use chemicals to 2,Provide Manutaclurers standard product Thal complies with ANSI A118.12 far standard applingion indicaed.a dwith provenfrecord oat glanamd other surface materialsdIninaflation ing end-to-end bull joints with manufacturers standard edges. a.Space screwsa maximum of l2 inchee(304.8 mm)o.c.for vertical application3. clnstall Boor. 7.Instill ere in dcoortlwceweh manufacturer's printed instructions and the aDPlicaDle requirements of a Ile Date glassa d,and with zi roved record of corn aired ih surfaces contacted in inatallaton. performance and h recommended by the manufacturer far the cturereti.n where required, DD P P Ywi G.Acoeswrias for interior lnstellalion:cornerbead,ed ethm,and control'olnh corn I'n ih ASTMC 9.S ace fasteners in anels that are llfa wbslretesa maximum.(&inches 2032 ram o.c 3,Install cemenWious patch and Underlaymenl as required and in accordance with manufaturers ANSI A1085eries for the materials being and. K,Fabricateglassand oiherglazing pr.duclsinsizes required to glaze Cpeningn indicated kr Protect,with A I pA gwl P p ( ) Includerei^torcementend acce66orres recommended by manufacturer. reaomendalons. 03125115 1047,formed metal or plastic,with mall complying with the following requirement: 10.Install cemenlitious backer units to comply with ANSI A108.11. 2.Install Ills using TCA methods specitetl a the drawings. 1.3 Execution eroduct face Glaser and edge adsuazin condillonsantl bile iredto comply recommendations of 1,Steel sheet zincccetetlb hot-di ratan or rolled zinc. i1.Install less-mat,wafer-resistant B.Joint Prepareaon y pp g gypsum baking board panels to comply with manufacturer's q.Examinee with reuiareas andcondtionswhere thewillbeother ed,with Installerpresent, 3.Floe Tile Instill in accordance with TCNA method F205 and F125 Full. LICENSED product manufacturer anti referenced glazing publications as required to comply with sysem H.Accessories for Exterior Inslallalions�,CornerDnd,e0 a trim,and control.tuts krmetl from steel sheet Installation Instructions. 1.Moving Jdnls-Expansion joints must be provided over existing moving joints and cracks,end where ARCHITECT performance requirements. 9 I for compliance with requirements for inatallefi.n tolerances end other wndllions aftecang subshata materials change c.mposilion a direction er ANSI A108 AN6.7.A flexible nalin corn and 4.Wall Tile install rn accordance with TCNA method W244C,W224F,W245,W246., AR 985350 zinc mated by hot-dip process or rolled zinc complying with ASTM C 1047. 12.Install water-resistant gypsum backing board panels al Showers,tubs,and where indicated install erformance of installed tile.Proceed with Installation onl after unsatisfactory conditions have been D 9 5.Wall ex nsiona accordance with thacwrdwod W W224lhod EJ171. 1,Clean cut or fiat grind vedlcal etlges of but•gland monolithic tits in a manner that produces square P Y such as ARDEX ArdiSeal"Ra id Plus ma be installed. r r d Joint Trealmenl Materials:Provide joint lrealment materials complying with ASTM C4751C475M and the wr1h 1144nch(6.4-mm)ophn spas where panels abut other conslNcti.n or penelrali.ns. corecte0, p Y C.GROUTING edges with slight kerfs atjunclianswith indoc end outdo.faces. recommendations of both the manufacturers of sheaf oducts and of'oint treatment materiels for each 13.Acoustical Tit Ban:Where 2,Sawmanded Control Joints-fill all nonanoving joints with ARDEX ANIFIxTM Jdnt Filler,as pr I gypsum panels form the basefar adhesively applied acoustical tile, B.ExiwUthe wont into recesses and under or behinds ui mend and llxlures,ioform atom tale 1.3 EXECUTION application indicated. install q D p recommended by the manufacturer, 1.Groul pints in accordance with manufacturers innlruclions end ANSI A108,10, gypsum wallboard Panels with lapere0 edges taped and finished to produceailal surface. covering without iniertuptions,exceed as otherwise shown.Terminate work neatly et obstructions, A,lazmplmatericombnep rehere more strisafmanufaements ofglass wahns,ding tho and other 1,Joint Tapefor Gypsum Board:Paper reinforcingtape,unless otherwin lndicetetl, 14.Curved Surfaces 3.2 APPLICATION OF WATERPROOFINGAND CRACK ISOLATION COMPOUND 2.Cleansending wader,dust andfarelgnsubstancesfromjoinls to be grouted. edges end corners wilhoul disrupting pattern or joint alignments.Aauralely form inlerse tocut anti glazing melenals,except where more sthngent requirements are indicated,including those In"FGMA a.Use ressurannsitive or sla le-etached,a n-weave,lash-tberrelnbrdn la ewith corn alible e.Install nets frorizonlall er endicular to su Cds and unbroken to extent ossible across A.Examine substrates and conditions under which maledah will be instilled.Do not procea with installation 3.Clean end dry lrle surfaces. J,n WA.c;I. 0 0 Pa 9 9 P P Pe y(D D PD ) P returns.Perform cuttin and tlnllin of file without marrin isible surfaces.Careful! dcut ina.gnr+ Glazing Manual.' olnt compound where recommendedb manufacturer of sm board and ont treatment materialsfor curved sWace Is12-inch-300-mm-Ion straiht sections al ends of curves and Janet to them. 9 9 9v ygrin until unsatisfactory conditions ereconctad. 4,After routin remove all rout residue romp STAIIOF mnho j y gyp u j pu ( ) g g 9^ edges of isle abutting turn,finish or built-in items for straight aligned joints.Fil rile closely to electrical octets, A 9. 8 p p Y B.Protect glassfrom edge damage during handling end installation, a licatl.n indicated. b.For double la er consWUlon,fasten base le er to studs with screws 18 inches 400 ram o.c.Center B. Centaree shmconta with adjacent work la ensure proper sequence of canniruclion. Protect DP Y Y ( 1 pipiny,extures and Ctmporaretreti.ctva Casing C coactortcovere ndcooale. D.PROTECTION C.Do notexceed edge pressures 6tipulaled by glass manufacturers for indallinggtass tiles, h.Use pressure-sensilivearsdaDle-altached,o en-weave,gran-fiberreiniorcanta with compatible sum hoard face le er over'oints in haoeta er and fasten to sfudSwilh screwss ces l2inches adlecentareas tram conlacldue tomixing and handiingai materials. 9 D joint cornound where recommendedb manufacturer of um bond andoint treatment materials 300 ram..c. C,Field-Applied Temporary Protective Coaling.Contractor to verify and coordinate with rile 1.Floors ProleclfromalllreRe br atlass172 hours afterinalallati.n. D,Set lass Ilies in each series with uniform etlern,taw,bow,end similar cherecteristice. I a y P AYDs 1 � fro ) y I y � C.Install Wateraroofing and Crack Isolation Compound manufacturer methods to prevent adhesion or staining of exposed Zile surfaces by grout end comply a.Do not ste on floor for al least 24 hours ii tratic is unavoidable after Thal,use E,Protect glass hoatter. twith contaminating substances resuming from conslruclion operations for applicator indicate. 15.Single-Layer Fastening MCNads:Apply gypsum anels to su ortfi as follows in aaordance with 1.Reference A-108.13 Installation of Waterproofing Membrann anti A-108,17 Installation of Crack P plywood stepping P PP Wllh mappfdCNren6 r8%Jmmetd0fl0n6 end'm31dI1d11on InlNCliOns. I HEREBY CERTIFY THAT THESE PLANS HAVE BEEN PRE Including weld replacn 2.Joint Tepa for Cemenlitl.us Backer Units'.As recommended by cementitious backer unit manufaclurere installation instructions end specifications: f 'r I Isolation Membrane boards. P Remove and replace glass that is broken,chi ed,crecked abraded,ordama e0 in an wa,Inclutlin 3.Proleclion:When recommended by rile manufacturer,aOplyeprotective coat.neua 2,Coral Ih manufacturersrinted instructions for mixing of material,installation,and cure.For b.Protecl from heev traffic for al least7de safterinslallalion PAREO UNDERUYSUPEAVURONANDTHATToTHE BEV Pp 9 Y Y 9 manpfa-IOrer. a.Fasten writ screws ou c p y y of U,ATN`LE6da THEaOwEaF DdISEE FLL RULES, natural causes,accidents and vandalism,Burin constructs-n eriod. other heavycoverlo duringtco isle walls anti ilocrs.Protect installed ale work with Krat paper or 9 p 3.Setting-Type Jolnl Compounds for Gypsum Baard�,Factory-packaged,job-mixed,chemical-herdenine b.Fasten to wood supports with single nailing. questions contact the ARDEX Technical Services Department al Q24j 2036000. c.When fast-selling materials are used to allow fasleroccupancy,comply wnh the manufacturers REouuilo.NsoNo ceoixarvcasosrnaPULa G,Wash grass on both faces in each area of Protect not more than 4 days prior to date Scheduled for nther heavyeIingall co comslrusbackeriunts and tredamage co wear. D,In stall Tile with Thin-Set Mortar LAnw To sTaucrvRss ono eucowos. powder prnduclsypsu boaroruses Indicated. ..Fasten to wood supports with adubio nailing. O.Af"wel areas,'Inslall cementilious backer antis and tread joints to amply with manufacturers recommendation. manufticturer establish dateof Substantial Completion.Washglassas recommended byglass a,For preening gypsumboard joints,use lormulalian recommended by gypsumboard manufacturer, d,Fasten to wood su rts with adhesive and su lementar nails or screws. 1.Installtwith mlowshctuers printediicarutions for ixin of math In ANSIAftim, PP^ PD Y instructions for type of application indicated. 2.Walls:Profac1lromimpacL vibration and heavy hammering on adjacent and.DPCsile walls for al leas) manufacturer, b.Forfilling joints and treating fasteners of water-resistant gypsum backing board behind ban for 16.Muldayer Fastening Methods,Apply base layers of gypsum panels and face layer to base layers as qumtionscntact the uRDEXrTechthal Scions fs Depangofmat(724 i203-000.and are.For 14 days ereer infihltalion,unlen manufacturers inafructlonsallowashorter period. ceramic tile,use formulation raommended b E.Insuatiion:Coout,an th ethods fin and 1o8.4 icated Comply,ith ma cued rer's a of tile, H T H,Lock Strip Gasket Glazing,Comply with ASTM C716 and gasket manufacturer's printed ygypsum board menufdcturer. follows', questions contact the ARDEX Technical Serukes Department al(724)203-5000. salting materiels,grout,and methods of inalelleilon indicated,Comply with manufacturer's 3.Protect from foalproducts rind chemicals winchorr atleun staining foraileant 1tidays. one Tec recommendefi.na,Provide supplementary wet seal and weep system unless otherwise indicated. a For topping compound,use nndable farmuleUon. a.Fasten both babe layers endface layers separately to supports with screws 3.3 FIELD QUALITY CONTROL instructions for application al proprietary materials. 4.Protect from freezing and total water immersion for ed least 21 days after in3lallalion 4,DryingdVpe Joint Compounds for Gypsum Board:Factory-packaged vinyl-based products complying b.Fasten basaldyers with crews and face layerwllh adhesive and supplemenhryfaslenars. A.Where required,contact manufaclurerforfleld sampling methods and procedures, , 1.Prohibit foot and wheel halAc from using tiled Moors for at least three(3)days END OF SECTION Drawn Sy Checked 8y SECTION 09250-GYPSUM BOARD ASSEMBLIES with the following requirements for formulation end intended use. r.Fasten ban layers to wood supports with nails and face layer with adhesive and supplementary after routin 3.4 PRor Loth In 1.1 GENERAL ry. p y gn:Use grind' A.Pdorloable projection cours finish fioorin from abuwb y pyw CW BW a,Ready-Mixed Formulation:Feclo mixed roduct fasteners. g yotheriradesb the use of I nod,Masonita err A.Sound Transmission Cberaterabou For sum board assemblies with STC retin e, rovide materials 1)All-purpose compound formulated for both taping and lopping compounds, E.Dirsd-BadinA to Substrate,Where gypsum a els are indicated es direct)adhered to a substrate PJdnt Pattern:Ube grid pattern with1 areinch-wade joints Layo t tilerwhe indicated.Aeldsi b when other suitable protaction courn 9YP 9 0 D^ Y adjoining tie on floor,base,walls and Ihw are the same size.Lay out tile work and reviler gelds in both Scale Dale and construction identical to those of asnmblles whon STC ratio aware determined acoordln l0 S.Joint Compound for Cemeniniaus Backer Unlifi:Material recommendetl by cemenlilious backer unit (other than studs,joists,furring members,or base layer of gypsum board),comply with sum board Da I ng, I 9 9 fYP diG Expawahin Cacho ceor onon,a dIsarea.Joints!As indicae file orals Prordance with Tdnl widths. NONE 03106115 ASTM Ego and classified aaording to ASTM E413byaqudlifiedindependenl lasting agency. manufacturer. manufacturer's recommendations,endlemporarily brace orfaohn AYDsum panelsuntil fastening G.Expansion,Control,Contraction,and isolation Joints:Asindicaled,or as in accordance with TCA B.Fire-Test-Response Characteristics:Where fire-reshlance-rated gypsum board aswmbrres are K.Acoustical Sealant for Exposed and Conaled Joints:Manufacturers standard noel paintable, adhesive has nt Handbook Method EA 71.Keep joints free of adhesive and grout Job No. indicated,provide gypsum board assemblies that ere identical to assemblies lasted for I resstance nonstaining latex nalant complying with ASTM C 834 that is effective In reducing atborne,sound F.Exterior Soffits anti Ceilings:Apply exterior gypsum safit board panels perpendicular to supports,with 1.Seal lily joints with elastomeric sealants to comply with Division 7 Settion"Joint Sealers." accordin to ASTME119b aninde endenttestingandins ectin men acoe table to authorities transmission throughparimeterjointsandopeningsinbuildingconstructionasdemonstratedbytesting end joints staggered over supports,Install with114-inch(6.4-min)open space where panels abut other 13-15549 9 Y D p 9 9 CY P re resentative assemblies accordin to ASTM E90.Provide sealants that have VOC content of25011 or construction or structural 2.SeaIlrlg ilia joints is specified in Division7seclion"Join Sealers," having jurisdiction. D A g penetrations.Fasten with corrosion-resistant crews. less when calculated accordthg to 40 CFR 59,supad D(EPA Method 24). Sheet No. �p-3 --- - SECTION 09510-ACOUSTICAL PANEL CEILINGS SECTION 09720-WALL COVERING K.Apply water-based paints only when the temperalow of surfaces to be painted and surrounding air b.Drywall: 3.Galvanized Steel Sheer.ASTM A653IA653M,G60. 1.1 GENERAL 1.1 GENERAL tent eratures are between 50 de F 10 de C and 90 de F 32d C. isl coat Macmraff Super Spec Latex Enamel Undercoescr&Primer Sealer 253 A.Submiftj In addition toroduct data for each( e ofecousticalanel and susensionsstem p g ( 9I g ( ) ( I 4.Mirror Glass:Nomirsilvermg,apaq-platIhickpper glasng,andrmingto ASTMC1503,Type 1,Class p yp p p y fa(any time during the ins(alto(Ionaproduct or installation issue should be discovered-immediately contact L.ADDly solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air 2nd coat Moorcrafi Super Spec Latex Pean Finish(277) I,Quallly q2,and with silvering,eleclro-plated copper coaling,and protective organic coaling. required,submit the following:One set of 124nch-(300-mm-I long samples of exposed suspension your distributor or dealer for fuller directions,additional instructions and/or resolution to address issue lent ratures are between 45 de F 7de C and 95d F 35 de C. 3rd coal Moomraft Super Spec Latex Pear Finish(277) g p galvanized after fabrication. s stem members,including moldings,for each color ands stem g ( g ) ( g ) 5.Galvanized Steel s,boltin Devices:ASTM Af sa hot-dl y y type required. before proceeding,Attar Installing the first3 strips of any wallmvedng immediately confirm quality.Once 1.2 PRODUCTS c.Concrete(concrete/concrete biotic walls): 6.Fasteners:Screws,bolts,and other devices of same material as accessory unit,or ofgalvanizetl � B.Seismic Standard;in areas subject to seismic zones:Provide acoustical file ceilings designed and again,make sure the product is correct,that there are no quality or product issues with the wallcovering. A.Available Manufacturers:Subject to compliance with requirements,manufacturers offering products that lot mat Muorcraft Super Craft Latex Block Filler(285) steel where concealed. installed to withstand the effect of earthquake motions according to the following. Should a quality Issue or question arise,please call the Desigmax installation HOTLINE at 1-800-797-4949, may be incorporated in the Work include,but are not limited to,me following: 2nd coal Mwmrafl Super Spec Latex Pear Finish(277) 7,Kes:Provide universal kes for access to toilet accesso units Y V ry requiring internal access for 1.Standard for Ceiling Suspension Systems Requiring Seismic Resirainl.Comply wpm ASTM E580. Option l,Ext.8349 between lhehoursof8a.mloSp.m EST.Designtex will not lake responsibllily for any 1.Manufacturers:Subloctto mmpllance with requirements,availablemanufaclurers offering prouucts 3rd coatMabrorefl Super Spec Latex Pearl Finish(277I serv'roing,resupply,elc.Provides minimum ofsix keys to Owners representative. 2.Acoustical Installation contractor to verily and Comply with requirements of authorities having quality issues raised after the first 3 strips are cut and installed. that may be incorporated into the Work include,but are not limited to: d.Metals(hand rails,door,frames&grills): C.Suffae-Mounted Roll Paper towel Dispensers:Provided by Ulta and installed by G.C.Fabricate of �" jurimicllan. a.Benjamin Moore&Co. 1st coat IronCiad Latex Low Lustre Metal and Woad Enamel(363) cast aluminum with satin finish. 3,UBS Standard 25-2,"Metal Suspension Systems for Acoustical Tile and for Lay4n Panel Ceilings". Before installing any wellcoverng,verity compliance and acceptable conditions,for any moisture problems b.Sherwin-Williams Company(The) 2nd coal lmpervex Latex High Gloss Metal and Wood Enamel(309) D.Single Roll Toilet Tissue Dispenser:Provided by Ulla and installed by G.C.Size to accommodate care �W 4.ASCE7.'Minimum Design Loads for Building and Other Structures":Section 9."Earthquake Loads". that could have an effect on mold and mildew growth after the wallcovering is installed.Do not install any C.Coronedo Paint 3rd coat lmpervex Latex High Gloss Metal and Wood Enamel(309) type tissue to 5-diameter roll. 5.Special Inspections:Engage a qualified special Inspector to perform the following spacial inspections wallcovering if the walls appear to have any moisture damage or if the buffing appears to have moisture d,Pratt&Lambert e.Metals Volumns,joists). E.Stainless Steel Grab Bars:Provide grab bars with wall thickness not less thari inch(18 gage)and where required by governing authority: infiltration problems.If you are uncertain if moisture problems are present,Contact the manufacturer and e.Zinser Iat coat munClad Latex Low Lustre Metal and Wood Enarml(363) as follows a.Compliance of seismic design. general contractor for the standard of care and best application orfinish far that area and that design of a f.Or Approved Equal 2nd coat lmpervex Latex High Gloss Metal and Wood Enamel(309) 1.Mounting.Concealed,manufacturers standard flanges and anchorages. 1.2 PRODUCTS building.Designtex will not lake responsibility for any quality issues if moisture problems are not addressed B.Paint Materials,General.Provide block fillers,primers,finish coal materials,and related materals that are 3rd coal lmpervex Latex High Gloss Metal and Wood Enamel(309) 2.Clearance:1-112 inch clearance between wall surface and inside face of bar, A.Acoustical Tile Products:Subject to compliance with requirements,provide the following: before installation.You should also refer to the Mold Handbook authored by the Wallcovering Association Compatible with one another and the substrates indicated under conditions of service and application,as f.Ceilings(drywall) 3 Gripping Surfaces:Manufacturers standard nonslip texture. 1.Suspension system and acoustic panels as listed in finish legend within drawings. with respect to considerations for specifying vinyl wallcovering in various climates and for various building demonstrated by the manufacturer,based on tesling and field experience. Iatowl Moorcraft Super Spec Latex EmamelUndercoater&Primer Sealer(253) 4.Heavy-Duty Size:Oulside diameter of l-112 inches. B.Acoustical Tile Standard:Provide ma nofacturers standard tiles ofconfguration indicated that Comply designs.The handbook can be located at:http:llwww.wallcoverings.orgIMOLDbook.pdf C.Material Quality:Provide the manufacturers best-quality trade sale paint material of the various coating 2nd coal Moore's Muresco Ceiling Paint(258) F,Stainless Steel Angle-Framed Mirror Units:Fabricate frame with angle shapes not less than 0.05 inch with ASTM E 1264 classifcatons as designated by types,acoustical ratings,and light reflectances, A.Before Installing: typesspecifiod Paint material containers not displaying manufacturers product identification will notbe 3rd coal Mabre's Muresco Ceiling Paint(256) (18 gage),with square comers mitered,welded,and ground smooth.Provide in No.4 satin polished unless otherwise indicated. 1.Inspect each piece upon receipt,Immediately make claim with the carrier if the pieces are damaged. acceptable. g.Wwd Doors(painted): finish. 1.Mounting Method for Measuring Noise Reduction Coefficient(NRC):Type E-400(plenum mounting in 2.Check to see that you have received what was ordered and that the rolls all have the same style and 1.Proprietary Names,Use of manufacturers proprietary product names to designate colors or materials tat coal lmnClad Latex Low Lustre Metal and Wood Enamel(363) G.Fabrication:Only a maximum l-112inch diameter,unobtrusive stamped manufacturer logo,as which face of test specimen is l 5-3/4 Inches[400 mmj away from the lest surfara)per ASTM E795. run numbers. is not intended to imply that products named are required to be used to the exclusion of equivalent 2nd coatlronClad Latex Low Lustre Metal and Wood Enamel(363) approved by Architect,is permitted on exposed face of toilet or bath accessory units.On either interior 2.Test Method for Ceiling Attenuation Class(CAC):Where acousticaltIFE ceilings are specified to have 3.If the material is to be stored,make sure the pieces are kept in a temperature Controlled,dry area,and products of other manufacturers,Furnish the manufacturer's material data and certiftcales of Insert schedules for exterior and interior paint systems as required,See the Basic Section for surface not exposed to view or hack surface,provide additional identfcation by means of eithera a CAC,provide units identical to those tested per ASTM E 1414 by a qualified testing agency. not crushed. performance for proposed substitutions. examples of various systems. waterproof,printed label or a stamped nameplate,indicating manufacturers name and product model C.Water-Felted,Mineral-Base Tiles:Type Ill,Form 2 acoustical tiles per ASTM E 1264,with painted B.Surface Preparation: D.Colors:Provide color salectlons made by the Architect from the manufacturers full range of standard R.Clean-up:During the progress of the work,remove from site,discarded paint materials,rubbish,cans and number. finish,complying with pattern and other requirements indicated on drawings. 1.Site conditions:For best results,finished lighting should be in place at the lime oferall preparation colors. rags at the end ofeach work day.Upon completion of painting work,dean window glass and other H.Surface-Mounted Toilet Accessories,Geneml:Except where otherwise indicated,fabricate units with D.Wire Hangers,Braces,and Ties:Provide wires Complying with the following requirements, and wallcovering installation 1.3 EXECUTION damaged paint-spattered surfaces,Remove spattered paint and clean damaged finish surfaces.Torch-up light seams and joints,exposed edges rolled.Hang doors or access panels with continuous stainless 1.Zinc-Cnoted Carbon Steel Wire:ASTM A641(ASTM A 641M),Class l zinc coaling,wit temper 2.Acceptable hanging surfaces must be clean,smooth,dry and structurally intact. A.Examination,Examine substrates and conditions under which painting will be performed for compliance and restore all damaged or defaced painted surfaces after completion of work of other trades. steel piano hinge.Provide Concealed anchorage wherever possible. 2.Size:Select wire diameter so that its stress at 3 times the hanger design load(ASTM C 635,Table 1, 3.Any mildew must be removedfrom the walls and surfaces treated to inhibit further mildew growth.In with requirements.Do Cot begin application until unsatisfactory conditions have been Corrected. 1.3 EXECUTION Direct Hung)will be less than the yield stress of wire,but provide not less than 0,I0&tnch-(269-min-) humid,mold,and mildew prone areas use Zinser Plus Mildew Proof Coromandel Wallcovering System B.Coordination:Review other Sections in which primers are provided to ensure compatibility of the total SECTION 10260-SPECIALTY WALL PANELS A.Installation:Install toilet accessory units according to manufacturers'printed installation instructions, diameter wire. or manufacturer approved equal that offers protection against the gmwlh of mildew.More extensive systems for various substrates.On request,furnish Information on characteristics of Finish materals to using fasteners appropriate to substrate as recommended by unit manufacturer.lnslall units plumb and E.Sheet-Metal Edge Moldings and Trim:Type and profile indicated,or if not indicated,manufacturers moisture roblems ma re uire additional ste s before installation. ensure use of Compatible A.Provide surface preparation of substrate wall surfaces and installation of wall protection elements,where P Y q P primers. level,firmly anchored in locations and at heights indicated. 9 9 P 9 P Ys 9 u p g y indicated on the drawings,as specified herein and as needed for a complete and proper Installation.Comply stantlardmome sours at and enetamensNrialan finis astat sedfairexpos d ansims (ems 4.Dartopri inn,l atdan eddryem erafureabeve55de sees Fahrenheit is maintained. 1.Nhe theArchilwlaboutanticipatedproblemsusingthemat�rialsspecifiedoversubs�ratesprimeJby andlevel,flrmlyanchoredinlocationsandatheightslndirated.Verifyandcorn withA.D.A.AG. indicated;formed from sheet metal of same material and gnish as that used art ex osed fan es of 5.Prior to rmin seal dame etld with manufacturers inslallalion instructions,recommendations,procedures and installation sequence. pY p g p A, 9 scoot/facing paper priord skin coating. others. (American's with Disabilities Act Accessibility Guidelines),accessibility guidelines and local governing B. FRP Panels: suspension system runners. 6.Note:Crayon,pen madcers,ink,screw and nail heads,and heavy pewit marks,and stains C.Preparation:Remove hardware and hardware accessories,plates,machined surfaces,lighting lixlures, authorities having jurisdiction. 1.Manufacturers.Subject to Compliance with requirements,0rovide products by one of the followin: need to be sealed with a stain-killer or to 0.090'thickx 4'wide'Marlite FRP",#P-100 While or equal USDA accepted,semi-rigid fiberglass reinforced g psi priming. and similar items already installed Thal are not to be painted,or provide surtace-applied protection prior to 1.Secure mirrore to walls in Concealed,tamperproof manner with special hangers,toggle bolts,or 1 a.Armstrong World Industries,Inc. 7.For all new or refinished wall surfaces,awater-based wallcovering primer should be applied to surface surface preparation and painting.Remove these items,If necessa to corn late/ Plastic paneling(ASTM D5319).If required per twat codes,use CarlgoAP-100 FR White,Class A:UL h.Chico o Metallic Cor oration. before a lication of wallcoverin Use a wallmverin ry, p y paint the items and crews.Set units plumb,level,and square al locations indicated,In accordance with manufacturers 9 P pD 9 g primer that dries to a solid Color to help conceal adjacent surfaces.Following completion of tin classified fame-spread less than 20,fuel Contributed 0,and smoke developed less than 200,per ASTM �s pain g operations in each space or area,have items E 84 inslruclions for type of substrate Involved. �'I c.USG Interiors,Inc. drywall joints reinstalled by workers skilled in the trades involved. C.Panel Flltin 2.Adjust toilet accessories for proper operation and verify that mechanisms function smoothly.Replace F.Fire-Resistance-Rated Suspension System:Provide manufacturers standard metal suspension 8.Where there is a Color contrast between the wall surface and the walcoverng,it is always best to tint D.Cleaning:Clean substrates of substances that could impair the bond of the various coatings.Remove g' damaged or defective items. 0 systems of types,structural classification,and finishes indicated that comply with applicable ASTM C the primer to match the color of the wallcovering. oil and greaserior to cleanin,Schedule cleanin Position panels with 118'gap between each panel and division bar of moldings to allow for normal expansion p g ganfaces.ing sodustand othercactaminanls from the 3.Clean and polish all exposed surfaces strictly according to manufacturer's moommendefions after S _ (0 635rect-Hun.D 9.as R-3 aril non-poraus surfaces sh wallopprimed wilha Coal of an adhesion promoting primer such cleaning psmession nCleall anwet,wresurfacessurfaces. and ce and other pdjecto .Usearboveceied line.Allow not less than or ogap amuod as,eleclrcal removing temporary labels and protective Coatings. l�lll 1.Direct-Hung,Double-Web Suspension System:Main andcross runners rollformed from andcaDDed asR-35 prior to inslallalion of wallcovering E.Surface Preparatiac:Clean and Prepare surfaces to be painted according to the manufacturers fillirgsand ofherprojectlons.Use carbide-lipped powersaws to cutpanels or othermethods as ����ipp ih reaintad or DectrolVltc zinccoated,cold-rolled steel sheet;other characteristics as follows: 10.Verity and coral th all manufacturers inslallalion instructions ands fications. instructions for each rticular substrate condition and ass fed. mended by manufacturer.Draft each panel beforeinstelling. W 0 Z wi p p ion: pact Da Drelnmall b Marlite#C-315 adhesive Com I' ( � � a.Slpctural Classification.Heary-duty system. C.Adhesive Application: 1.Provide barrier coats overincompatible printers or remov�andreprime. panes yusing eying with ASTM G557,aMatlile 1FC551 adhesives SECTION 11400-EQUIPMENT&FURNISHING INSTALLATION WORKINCLUDED: LSD b.Access:Upward,with Initial access openings of size indicated or,if not indicated,as selected by 1.Provide the use of a good quality heavy duty'clear'vinyl adhesive as made by Zinser and Roman as 2.Cementilicus Materials:Prepare cementitioua surfaces to be painted.Remove efflorescence,chalk, where solvent vapors cannot be adequately ventilated)to back of panels for 100%coverage,with a notched A.Install Owner supplied equipment and furnishings,where shown on the drawings,as specified herein,and QD o Architect from opening sizes approved for the firs-resistance-rated assembly indicated.Locate initial recommenced by wallcovering manufacturer.IYs always advantageous to use aprimer and adhesive dust,dirt grease,oils,and release agents.Roughen to remove laze.If hardeners or sealers have trowel.Before adhesive skins wer,selpanels in position and press against wall.Comply with manufacturer as needed for a complete and proper installation.Coordinatefor delivery,naive at the site,unload,protect, ccesso n s throughout the ceilin thin each module formedb main runnere and cross from the same manufacturer. been used to im rove curio,use mechanical methods of surface a aration. insfallatlon inslruclions as required to gash off solvents.Apply adequate pressure to make full contact set-in-place and coordinate final connectons. pent q fiat y p 9 pr P between anal and wall. ® Q unners,end make additionalamess available through progressively removing remaining acoustical 2.Do not dilute adhesive. a.Use abrasive blast-cleaning methods if recommended by the paint manufacturer. p B. Related Work:Plumbing and electrical work required in connection with the retail equipment is included in ppnn tiles. 3.In mildew tuner environments,use of a mildew inhibitor is recommended.More extensive moisture D.Determine alkalinit and moisture Consul of surfaces.Do not E. Panel Moldings: other secllons of theses f to sort ass punt Ing an gs. (0 p y paint surfaces whew moisture content peciicai n pecified on 6 d mechanical drawin 2.Manufacturers:Subject la compliance with requirements,provide products by one of the fallowing. problems may require additional steps before installation. ceeds that permitted in manufacturers printed directions. Provide one-piece matching trim and panel moldings al all joints between panels and al top and bottom C.Quality Assurance:In addition to complying with requirements of governmental agencies having a.Armstrong World Industries,Inc. 4.New vapor permeable primers and adhesives are now available to wallcovering Installers,which could 3.Wood:Clean surfaces of dirt,ail,and other loresgm substances with scra ers,minerals irils,and edges of panels.Install moldings with continuous bead of Marlite Silicone Sealant MS-250 during inslallalion jurisdiction,installation ofall retail equipment shall comply with.Underwriters Laboratory(UL)for items with t �•J b.Chicago Metallic Corporation, reduce the risk of mold for all types of wallcovering,versus the use of traditional primers and sandpaper,as required.Sand surfaces exposed to view smooth and dust off. p of panels.Seal joints between moldings and between molding and adjacent finish material.Remove excess electrical components ANSI standards for vacuum breakers and air gaps National Fire Prevention �< e c.USG lnleriop,Inc. adhesives.Veri recommended roduct wpm manufacturerof wallCovarin.Exam des of such newt a.Scra tend clean small,dr,seasoned knots ands alhin coal of while shellac or other sealant immediately, Assaciation(NFPA)National Electrical Manufacturers Association(NEMA Q ®� 0 N P 9 P Y P Y pPY I F, Stainless Steel Wall Panels:1 an 2 G.Maintenance stock:Al time of completion,provide lwa packages of each type of acoustic panels to available permeable mildew systems are Zlnssers V.P.Vapor Permeablew System,specifically recommended knot sealer before apDlYing primer 8 tl 4gauge,as scheduled on the drawings,lM Brushed Finish.lnslall D.Coordination:Verify and coordinate rougMnlocaliais of eleclrcal and plumbing connections.Examine IL. (� p�p owner forfutum replacement. Shteldz V.P.Primer and Sure Grip V.P.Primer such as described in their attached flyer b.Prime,stain,or seal wood to be painted Immediately upon delivery.Prime edges,end,laces, panels in sheets as large as possible.All Hush and carmerjoinls to be lapped.Break all corners and edges and inspect mugh-tn services and insfallatlon of floor,ceiling or other conditions under which the equipment g- P Z M 1.3 EXECUTION to straight true lines.Exposed fasteners to be stainless steel. is to be installed.Verif d coordinate all volts ere uirements of owner (www zinsser.com del,732469.8100)and Roman Decorating Products°Ultra'"'Plus Mildew System, undersides,and backsides of wood,including cabinets,counters,cases,and paneling. yen g q provided equipment as compatible � � 0 A Geneml,Install acoustical file ceilings to comply with publications referenced below per manufacturers specifically Ultra"Plus Primer and Ultra'"Plus Adhesive(www.romandecorelingnroductecum le1,800 c.Seal tops,bottoms,and Cutouts of unprimed wood doom with a heavy coal of varnish or sealer G.Cleun all panels and protect from damage.Refer to manufacturer's specific cleaning recommendations.Do with butltdng system.Verify that dime s of such hems aria acceptable before inslallalion of the work.Do W instructors and CISCA"Ceiling Systems Hardback" 498-6117) Immediately upon delivery. not use abrasive cleaners. not proceed until unsatisfactory Condition snhave been corrected P 1.Standard for Ceiling Suspension System Installations:Comply with ASTM C636fC636M. 0.Wallcovering Installation:Verify and Comply with manufacturer's current written installation instructions, 4.Famous Metals:Clean ungalvanized frous-metal surfaces that have not been shop-coaled;remove E Installation,Set each item of non-mobile and portable equipment securely in place,leveled and adjusted to 2.CISCA Recommendations per"Ceiling Systems Handbook'for Acoustical Ceilings,Comply with and as a minimum: oil,grease,did,loose mill scale,and other foreign substances.Use solvent or mechanical cleaning SECTION 10522-FIRE EXTINGUISHERS,CABINETS AND ACCESSORIES mecl height.Anchor to supporting substrate where Indicated and where required for sustained operation CISCA'Recommendations for Dtrecl-Hung Acoustical Tile and Lay-In Panel Ceilings" 1.deterrmine whether the pattern match is random,straight across,or drop match.Measure the wall methods that comply with recommendations of the Steel Structures Painting Council. I.I GENERAL and use without shifting or dislocation.Conceal anchorages where Possible. B,Suspend ceiling hangers as follows: height,allowing for pattern match,add 4 inches,and then cut the wallcovering.It will overlap onto the a.Touch up bare areas and shop-applied prime Coals that have been damaged.Wire-brash,clean with A.Submittals:Submit the fallowing: F, Adjust and Clean:Tool eachthern of operational equipment to determine that it is operating propery. V o4°a 1.Secure wire hangers to ceiling suspension members and to supports above.Connect hangers either ceiling and tie base approximately 2 inches solvents and touch up with the same primer as the shop coal, 1.Product Data Include rough-in dimensions,deans showing mounting methods,relationships of box Coordinate repair or replacement ofequipment found to be defective with the equipment supplier.Remove directly to structures or to inserts,eye screw,or other devices that are secure,that are appropriate for 2,Cut rolls in sequential order starling with the highest number working down to the lowest number.Make 5,Galvanized Surfaces:Clean galvanized surfaces with nonpetmleum-bpowl solvents so!list the and triton to surrounding Construction,door hardware,cabinet type and materials,trim style,door protective coverings,if any and clean items,ready for use. 0)a'v_ substrate,and that will not deteriorate or otherwise fall due to age,corrosion,or elevated temperatures, certain that the run numbers are separated al break points such as Comers.Number panels and headers surface is free of all and surface contaminants.Remove pretreatment from galvanized sheet metal Construction,panel style,and materials. apqy�� !1-`A 2 S ha I more than 48 inches 1200 min Co.alon each member su rted direcll from as they are cut From the roll ands I to the wall in the same se uence. fabricated from wil stockb mechanical methods. B.Coordination,Verify that cabinets are sized to accommodate type and Capacity ofextinguishers Vo ' .! . paw rigs oth ( ) 9 PW Y snot q Y O hangers,unless otherwise shown;and provide hangers not more than8inches(200mm)from ends of 3.Any wallcovering design that does nolhave specific direction or horizontal match,couldbeinstalled F.Materials Preparaliom.Caretully mix and prepare paint materialsaccordiny tomanufaclurer's Uirecliats. 'mdiceleJ,as well as walldeplh requirements maybe required. each member. by revering alternate strips to ensure color uniformity al the seams,Ifproductappearsshadedor 1.Sfir material before application to produce a mixture of uniform density;stir as required during C.UL-Listed Products:Fire extinguishers shall be UL listed with UL listing mare for type,mling,and 0 o- 3.Splay hangers only where required to miss obstructions;offset resulting horizontal forces by bracing, parreled after the first 3 strips,we strongly suggest reversing alternate strips. application.Do not stir surface flm into material.Remove film and,if necessary,slban material before rdwrifcalton of extinguisher. r' ��- oumersplaymg,or other equally effecllve means.Where width of ducts and other construction within 4.If the wallsoverng is table trimmed,use of a straight-edge and a razor is recommended.A Fresh blade using. D.FM-Listed Products.Fire extinguishers approved by Factory Mutual Research Corporation for type, a wa ceiling plenum produces hanger spacing that interfere with location of hangers at spacing required to should be used on each CUL"Snap off cutting table are not recommended. 2.Use only thinners approved by the paint manufacturer and only within recommended limits. rating,and classification of extinguisher with FM marklny. support standard suspension-system members,install supplemental suspension members and hangers 5.The"overlap and double cut'method is an alternative mehod ofinstallation with many fabric backed G.Application:Apply paint according to manufacturer's direction.Use applicators and techniques best 1.2 PRODUCTS /� U>-:? infornof Vapezesorequivalenldevices. vinyl walkoverings, suited for substrate and type of material being applied.Do riot paint over did,rust,scale,grease, A.Fire Extinguishers.Provide fire extinguishers as recommended by Owners surety for each cabinet and YL2`°a C.lnslall edge moldings and trim of type indicated al perimeter of acoustical ceiling area and where 6.All wallcoverings should be trimmed 2'to4"on each edge to ensure best appearance, moisture,scuffed surfaces,or conditore detrimental to fomecton of a durable paint Film. for other locations required by Owners surety. E.C.`1 necessary to conceal edges of acoustical ties, 7.If paste does get on the vinyl wallcovering,clean it off immediately with warm water and blot dry with 1.Paint colors,surface treatments,and finishes are indicated in the schedules. 1.Dry Chemical Type:UL-rated l0-B.C.i nominal capacity,in enameled steel Container. I� Uo N� D.Install suspension system runnere w they are square and securely interlocked with one another. clean lint free towel.Use a soft bristle brush to clean if necessary.Change this water frequently.Be 2.Provide gnish mats that are compatible with primers used. 2.Multipurpose Dry Chemical Type:UL-rated minimum 2.A:10-B:C,2.112-ob nominal capacity,in U -, _ Remove and replace dented,bent,or kinked members. certain to wash the ceiling and the baseboard to remove any paste residue,Do not leave any overlap al 3.The number ofmads and the film thickness required are the same regardless of the applicator ameled steel Container. E.Install acoustical tiles in wordination with suspension system.Place splines or suspension system the seams since vinyl will not adhere to itself.Seams should be vertical,have a light fit,and free from air method.Do nut apply succeeding coats unW previous mat has cured.Sand between applications 8,Mountng Breckets:Provide brackets of sizes requiredfor type and capecily ofextinguisher indicated, flanges into varied edges m that file-to-tale joints are closed by double lap of material. and paste bubbles.Seams should not be located closer than 6"to corners. where sanding is required to produce an even smooth surface.Tim each undercoat a lighter shade to in plated Finish. 1.Fll adjoining the to form Flush,light joints.Scribe and cut file for accurate fit al borders and around 8.Avoid burnishing the face of the material.Use a wallcovering brush or a Dlamo scraper to smooth the facilitate identification of each mat if multiple owls of same material aria to be applied.Tint undercoats C.Cabinet Conslructon:Box with trim,frame,door,and hardware to suit cabinet type,trim style,and penetrations through tile. wallcovering onto the wall. to match color if topcoat,but provide sufficient difference in shade of undercoats to distinguish each door style indicated.Weld joints and grind smooth.Miter and weld perimeter door frames. 2.Hold the field in compression by inserting leafdype,spring-steel specas between file and moldings, 9.Use a seam roller to flatten the edges at the seams,railings and baseboards.Use light pressure.Do separate mat. 1.Fire-Rated Cabinets:UL listed with UL listing mark with fre-resistance rating of wall Where it is spaced at l2 inches(305 mm)a.c. not press hard enough to remove the adhesive from underneath the wallcovering. 4,Apply additional coals if undercoats,stains,or other conditions show through inal coal ofpairit until installed - 3.Fabricate awes units for special suspension system access members and the units modified as 10.After Installing the first 3 strips of any wallcovering immediately mnfomn quality of product.Onra again, paint film is of uniform finish,color,and appearance. 2.Cabinet type:Suitable for containing the following: required to allow for removal of access units. make sure the product is correct,that there are no quality or product issues with the wallcovering. 5.The term exposed surfaces includes areas visible when permanent or built-in fixtures are in place, a.Fire extinguisher 4.Clean exposed surfaces of acoustical file ceilings,including trim and edge moldings.Comply with Should a quality issue or question arise please wll our Installation HOTLINE of 1.600-797-4949,Option Extend coatings in these areas to maintain system integrity and provide desired protection. 3,Cabinet Mounting.Suitable for the mounting Indicated. rites written as t mama a We ors for cleaning and touchup of minor finish damage.Remove and /,Ext B349 between the hours of8 a.m toSp.m EST.Designtex will not take respansibllily for any b.Paint surfaces behind movable equipment anUfumiture the same as similar exposed surfaces,Paint a.Recessed.Fully recessed in walls of sufficient depth to suit trim style. replace tiles and other ceiling components that cannot be successfully cleaned and repaired to quality issues raised after the first 3 strips are cut and installed. surfaces behind Permanently fixed equipment or furniture as indicated on drawings. b.Surface-Mounted:Fully exposed and mounted direcll to . y on wa permanency eliminate evidence of damage, Ii.If any of the above conflicts with manufacturer's written instructions,manufacturer written instruction 7,Paint backsides of access panels and removable or hinged Covers to match exposed surfaces. 4.Trim Style:One piece with corners mitered,welded,andgmundsmaclh. END OF SECTION 09510 shall take precedence. H.Scheduling Painting:Apply first coat to surfacesthat have been cleaned,pretreated,or otherwise a.Exposed Trim:One-piece combination trim and perimeter door frame overlapping surrounding wall Revisions 12.It is the responsibility ofthe installer to verify and comply with manufacturer's installation inslruclions prepared for painting as soon as practicable and before subsequent surbee delencrefion.Allow surface with exposed trim face and wall return al outer edge. ISSUE FOR CLIENT/LL REVIEW SECTION 09660-RESILIENT WALL BASE AND TILE FLOORING and Provide a complete and acceptable finished product su0oient time between sumessivecmts to permit DroDerdrying.Do na remat until painlhas dried. 1)Square-edge with 1/4-to 5n64nch backbend depth 1.1 GENERAL END OF SECTION 09720 I.Application Procedures:Apply paints and coatings by brush,roller,spray or other apajoutors awarding 2)Metal:Same metal and finish as door. �03106/15 A.Submittals:In addition to product data,submit the fallowing. to manufacturer's directions. D.Door Material and Construction:Manufacturers standard ofmalerial indicated,coordinated with ISSUE FOR BIDIPERMIT 1.Samples of each type,color,and pattern of resilient base and floor tile. SECTION 09900-PAINTING 1.Brushes:Use brushes best suited for the material applied, cabinet hypes and tram styles selected. 03106/15 2.Maintenance datafor resilient base and floor tile,to be included In Operating and Maintenance 1.1 GENERAL 2.Rollers:Use rollers of carpel,velvet back,or high-pile sheep's wool as recommended by the i.Enameled Sleet:Hollow construction with tubular stiles and balls. Manual specifed in Division 1. A.This Section includes surface preparation,painting,and finishing of exposed interior and exterior Items manufacturer for the material and texture required. 2.Door Glazing:Fully tempered float glass complying with ASTM C 1048,Condition A,Type 1,Quality A B.Extra Materials:Deliver to Owner not less than one box for each 50 boxes or fraction thereof,ofeach and surfaces. 3.Spray Equipment:Use airless spray equipment with orifce size as recommended for the malarial and q3,Kind FT,and Class as follows: Q - class,wearing suram,color,pattern,and size of resilient base and floor file installed. 1.Surface preparation,priming,and finish coats specified are in addition to shop-priming and surface texture required. a.Class 1(Clear). 1.2 PRODUCTS treatments. J.Minimwm Coating Thickness:Apply materials al the manufacturers recommended spreading rate. 3.Identify fre extinguisher in cabinet with FIRE EXTINGUISHER lettering applied to door.Provide A.Avoilable Products.Subject to compliance with requirements,resilient floor tiles that maybe B.Paint exposed surfaces whether or not colors am designated in the schedules,except where a surface Provide the total dry film thickness of the entire system as recommended by the manufacturer. levering to comply with authorities having jurisdiction for letter style,color,size,spacing,and location. Q incorporated in the wore include,but are not limited to,the products specified in the drawings. material is specifically indicated not to be painted or is to remain natural.Where an item or surface is K.Block Fillers:Apply block Fillers at a rate to ensure complete coverage with pores filled. a.Application Process:Silk screen. B.Products:Subject to Compliance with requirements,provide one of the products specified in the not specifically mentioned,paint the same as similar atljacenl materials or surfaces.If Color or finish is L.Prime Coats:Before applying finish coats,apply a prime mat to material to be painted or finished[hat E.Identify bracket-mounted extinguishers with FIRE EXTINGUISHER in red letter decals applied to wall Q . . drawings. not designated,the Architect will select from standard colors or finishes available, has not been prime-coated by others.Ramat primed and sealed surfaces where evidence of suction surface.Letter size,style,and location to comply with authorities having judericeom C.Vinyl Composition Floor Tile:Products Complying with ASTM F 1066,Composition l(noweleslos C.Painting is not required on prefnished Items,finished metal surfaces,concealed surfaces,operating spots or unsealed areas in first coal appears,to ensure a finish coat with no burndhrough or other defects F.Dwr Style:Manufacturer's standard design. Q formulated),and with requirements specified In Vinyl Composition Floor Tile Product shown on drawings. parts,and labels. due to insufficient sealing. 1.FUII-Gass Panel Float glass,118 inch thick. D.Rubber Wall Base:Products complying with FS SS-W.40,Type 1,and with requirements specified in 1.Labels:Do not paint over Underwriters Laboratories,Factory Mutual,or other code-required labels or M.Completed Work:Match approved samples for color,texture,and coverage.Remove,mfish,or G.Door Hardware:Provide doorvoperaling hardware of proper type for cabinet type,trim style,and door the Rubber Well Base Product shown on the drawings. equipment name,identification,performance rating,or nomenclature plates. repaint work not comptytng with specified requirements. material and style indicated.Provide lever handle with cam-action latch,or exposed or conmaled door E.Rubber Accesmrtss:Products Complying with requirements shown on the drawings. D.Submittals.Submit the following: N.Cleanup:At the end of each work day,remove empty cans,rags,rubbish,and other discarded paint m%ndfrsctionlakh,Provide Concealed or continuous-type hinge permitting door to open 180 degrees. F.Concrete Slab Primer Nonstaining type recommended by flooring manufacturer. 1.Product data for each paint system specified including block[tilers and primers. materials from the site. H.Cabinet Finishes.Comply with NAAMM"Metal Finishes Manual"Protect exposed finishes from G.Trowelable Undedayments and Patching Compounds:porlland-cement-based formulation provided or a.Provide the manufacturer's technical information including label analysis and instructions for 1.After completing painting,clean glass and paint-spetlered surfaces.Remove spattered paint Dy damage by application of temporary strippable covering prior to shipment. approved by the manufacturer for applications indicated, handling,storage,and application of each material proposed for use. washing and scraping.Be careful not to scratch or damage adjacent finished surfaces. L Steel Cabinet Finishes:Solvent-clean surfaces to remove dirt,oil,grease,and other contaminants that H.Adhesives(Cements):Water-resistant type recommended by tie manufacturer to suit restitent floor the b.List each material and Cross-reference the specific coating,finish system,and application,Identify O.Protection Protect work of other trades,whether being painted or not,against damage by painting. could Impair paint bond,Remove mill scale and rust from uncoated steel products and substrate conditions indicated. each material by the manufacturer's Catalog number and general classifimtlon. Correct damage by cleaning,repairing or replacing,and repainting,as acceptable to Amhslect 1.Baked-Enanal Finish.Immediately afar cleaning and pretreatment,applyalwocoai based-enamel I.EdgeStips:Vinylofwidthan.,.ofheightrequiredtoprotectexposededgeoftiles,andinmaximum c.Certification by the manufacturer that products supplied complywith]matreguationecontrollinguse P.Provide"WetPaint"signstoprotectnewlypaintedMishes.Remove temporary protective wrappings finishofnsistingofprimematandthermosettingtopcoat.Complywithpaintmanufacturer'sInstructions 03125115 available lengths to minimize running joints. of volatile organic compounds(VOCs). provided by others to protect their work after completing gainfing operations. for application and baking to achieve a minimum dry film thickness of 2.0 mils. 1.3 EXECUTION 2.Samples for initial color selection in Free form of manufacturer's color shads.Ater color selection,the 1.Al Completion of construction activities of other trades,touch up and restore damaged or defaced a.Color and Gloss.Manufacturer's standard designations.Paint the following: LICENSED A.Ex amine areas where Instillation of tiles will occur,with Installer present,to verity mat substrates and Architect will furnish color chips for surfaces to be coaled. painted surfaces. 1)Exterior of cabinet except for surfaces indicated to receive another finish ARCHI'I'BC7 . . mndilions are satisfactory for the Installation and Comply with tle manufacturer's requirements. 3.Samples for Verification Purposes.Provide samples of each color and materal to be applied,with Q.Paint Schedule:Provide the following paint systems(or approved equal)for the various substrates 2)Inleriorofcabtnel, AR9B5360 1.Concrete Subflwm:Verify that concrete slabs comply with ASTM F 710 before beginning installation: texture to simulate actual Conditions,on actual samples ofthe actual substrate.Provide stepped indicated: 1.3 EXECUTION 2.For wood motions verify that underlayment surface is free of surface irregularities and substances samples,defining each separate coal,including block fillers and primers.Use actual Colors when 1.Exterior Surfaces A.Installation:Follow manufacturer's printed instructions. ! with potential to Interfere with adhesive bond,show through surface,or slain tile. preparing samples for review.Resubmit until required sheen,color,and texture are achieved. a.Ferrous&Non-Ferrous Metals(doong: B.lnslall al heights Indicated,or if not indicated,al heights to comply with applicable regulations of 3.Proceed with instillation only after substrate passes tesling according to floor the manufacturers a.Submit samples on the following substrates for the Architect's review of color and texture only: tat waL 1-Clad Latex Low Lustre Metal&Wood Enamel(363) governing aefhoritles. written recommendation. 1)Concrete Masonry Two 4-by-8-inch samples of masonry,with mortar joint in the center,for each 2nd coot Moore's IMC DTM Acrylic Semi-Gloss(M29) 1 Prepare wall recesses for cabinets as required by type and size of cabinet and style of Vim and to .kyHNn,clnw4AN 8.Preparation:Comply with manufacturer's installation specifications to prepare substrates Indicated to finish and woos. 3rd mat:Moore's IMC DTM Acrylic Sai loss(M29) comply with manufacturers inslruclions. STATEOFIVANO meetve tile. 2)Painted Wood:Two 12-Inch-square samples of each color and material on hardboard. b.Galvanized Metal: 2.Fasten mounting brackets and ire extinguisher cabinets to structure,square and plumb. C.Installation:Comply with the manufacturers installation directions and other requirements indicated. 3)Ferrous Metal:Two 4-inch-square samples offiet metal and two&inch-long samples of solid isl mat lRmClad Latex Low Lustre Metal&Wood Enamel(363) C.Comply with NFPA l 0 for extinguisher placement. 1.Lay out tiles from center mares established with principal walls,discounting minor offsets,so tile metal for each color and finish. 2nd met Moore's IMC DTM Acrylic SearkGlose Fill D.Fire-Rated Fire Projection Cabinets,where applicable,Comply with ASTM E814 for fire resistance rating widths al opposite edges of room are equal to one another and am not less than one-half of a die. E,Applicator Qualtficasome.Engage an experienced applicator who has completed painting system 3rd Coat:Moore's IMC DTM Acrylic Semi-Glass(M29) of walls where they are installed. 2.Match Iles for color and ttemb selectin tiles from cartons in same se uence as manufactured a lications similar in material and extent to those indicatedfor the Project that have resulted in a c.Concrete. IcnREouxoRmrawEAvma ANSI wx.7aeEN PR[. Pa Y 9 9 PP I oTHE sesT and packaged. construction record of successful in-service performance. ist mat:Moorbeft Super Craft Latex Block Filler(285) SECTION 10800-TOILET AND BATH ACCESSORIES or Nrxaowtam,TaeanuE canarwiTH,ar sues. a.Layltles with Spun running in one direction F.Single-Source Responsibility:Provide primers and undercoat paint produced by the same manuacturar 2nd coal:MwrGard Latex House Paint(103) w punnausnaaceownNcas osTwwsnus.to b.Lay tales to basket weave pattern with grain direction alternating between reversed tin adjacent tiles. as the finish mats. 3rd coal:MoorGard Latex House Paint(103) 7.1 GENERAL nxc To sTaucTURssNno auaowcs. c.Lay files in pattern with respect to location of colors,patterns,and sizes as indicated on Drawings. G.Field Samples,On wall surfaces and other exterior and interior components,duplicate finishes of d.Stuwo: A Submittals:Manufao materprod imensi ns,eachs,Pramessoryilem specified,ipecifi doptio is of 3,Where demountable parttlions and other items are Indicated for installing on top of finished file floor, prepared samples.Providefull-coat finish samples on at least 100sq.ti.of surface. tat mat:Moore's Acrylic Masonry Sealer(O66) Conslmctionrelative to materials,dimensions,gages,profiles,mounting methods,specifiedoplions,and install file before these items are installed. 1.Final acceptance of moors will be from job-applied samples. 2nd mat:MoraGand Latex House Paint(103) finishes. caimcT D.lnslall metal edge strips where indicated,using countersunk stainless steel anchom. 2.The Owner will select we room or surface to represent surfaces and conditions for each type of 3rd mat:MoorGard Latex House Paint H 03) 1.2 PRODUCTS "a E.Cleanin: m tin and subshats to be ainted.A Coatin s in this room or surface accordin to the schedule or e.Unit Mason Concrete block: A.Maning: rers.SUDIeCt lO compliance with requirements,provide toilet accesscries by one of the DrownB CheckedB 9 a 9 P PPY 9 9 ry( 1 following: Y Y 1.Clean resilient file floors after inslallalion and 4 da s rior to date scheduled for ins octbns intended to 1 sl coal:Mwrcraft Su er Cratt Latex Black Filler 28 y p p asvermaed. P 5) 2 AmefickWashroomEgnc CW BW establish rate tie polianital Completion. H.earing ma ufact r the fame an n a e m ith thelproduct triad 1,unopened packages inductions. 2nd mat MoorGard Latex House aint(1 o3) 2.Bobrick Washroom Equipment,Inc. 2,Apply protective polish acoording to Oacrtile manufacturers directions. bearing manufacturers name and label with the productlrade name manufacturers instructions. 3rd coat MoorGard Latex House Paint(103) Scale Date 3.Com ly with manufacturers written instructions for cleanin rotectin and lishin floor Fla. I.Store materials not In use in ti htl covered containers in a wall-ventilated area at a minimum ambient 2 Interior Surfaces.(refer to finish schedule on sheet A-41 3.McKils,Ge eras. D 9 P 9 pot 9 9 Y ') B,Muireml,Gepecifi dforiceivtoilet accessrytlems From the following materials and according fo NONE 03/06I15 END OF SECTION 096fi0 temperature of45 deg F(7 deg C).Protect from freezing.Keep storage area neat and orderly.Remove a.Wood(painted): requirements specified for individual accessory Items. oily rags and waste daily. tat coat Moomraff Super Spec Latex Enamel Underwater B Primer Sealer(253) 1.Stainless Steel:AISIT 3021304,with lished No.4 finish,0.034-inch(22 Job No. J.Project Conditions:Do not apply paint in show,rain,fog,or mist,or when the relative humidity exceeds 2nd coat Mmmraft Super Spec Latex Semi-Gloss Enamel(276) YPe Po gaga)minimum �i^o r� Thickness,unless o-wile,com mled. ,ul {JC (5) //�) O 85 percent,or al temperatures less than Sdeg F(3 deg C)above lha dew point,or to damp art wet 3rd coal:Moomraft Super Spec LatexSemi-Goss Enamel(278) 2.Sheet Sleep.Cold-rolled,commercial qualify ASTM A1008/A7008M,0.04-inch(20-gage)minimum surfaces. thickness,unless otherwise Indicated,Surface preparation and metal pretreatment as required far Sheet No. applied finish. �p-4 PREPARATION OF SUB-FLOORS: It Is designed for slabs with high vapor emission from the water of hydration,or initial mixing.Amoco PS Adhesive should not be used Mannington Commercial suggests that you reference the current on concrete slabs that do not have a vapor retardant membrane ASTM F710,"Standard Practice of Preparing Concrete Floors to properly placed above the sand layer and next to the concrete, >• Receive Resilient Flooring"and contact one or more of the following or other moisture suppressant system suppliers far assistance: Inalallation Apply the adhesive to the substrate using the recommended trowel. 1 Atdex(724)203.5000 www.ardex.com Holding the trowel at an angle of 600,spread the adhesive evenly < Koester American Corp.(757)425.1206—koesteruse.com aver an area of sub-floor that can be covered within the 3 hour Mapei(800)426-2734 www.mapal.com working time.Wail until the adhesive has lacked up,which Is m Uzin Ltd.(800)505.4610 www.ufloorsyslems.com usually about..minutes depending on site conditions,before placing the tiles In position Press tiles firmly Into position to obtaln contract,paying particular attention to the tile edges.Palls of A.Subfloor Preparation adhesive must be ressaled with lid after use. Cal l I subfloor preparation is vital for an excellent floor appearance and good the adhesion The subfioor must be smooth, Finishing firm,flat,clean,dry,free from defects and fit for purpose,A suitable Finishing the file have been placed In the adhesives,roll the floor within smoothing compound should be used to ensure that no Irregularities show through to the surface of the finished Moor In all cases,the the 3 hour working time with a minimum 1001Its(45 kg)roller to Sol must meal the moisture and pH requirements before ensure complete contact with the adhesive.Remove any adhesive installation. from the face of the the with a cloth moistened with denatured alcohol,The finished floor should be protected from point loads and Below end On-grade concrete subfloors mull haveasultable vapor h traffic for 24 hours after Installation Tiles may be 0 eavy retarder properly Installed beneath the slab.Crewlspaces and damp-mopped 24 hours efler installation. basements directly beneath the new Moor installation should be maintained with a relative humidity+l-10%of the room relative Trowel Recommendation and Approximate Coverage humidity where the Mooring Is Installed,This can be accomplished Porous Substrates by proper ventilation and air circuletlon or using a dehumidifier. Actual size notch: Always follow other manufactures&'written recommendations for the J'X J'x!�"U-Notch use and installation of their proprietary sudace preparation (1.6mm x 0.8mm x 0.8mm) materiels. 200.250 sq.ft./gal.(600.800 sq.f l4gal.) 1.Record site conditions,test results and corrective action(&). Mannington Commercial requires written documentation of site candalons,test results and corrective eclion(s)before processing Non-porous Substrates claims. Actual size notch: 2.Sublloor must be clean(free of did,sealers,curing,hardening or N'X J A t'U-Notch EL 0 parting compounds or any substance that may slain or prevent (7 6.m x 0.8mm x 2rdi W adhesion),smooth,flat,sound,fit for purpose,free of movement, 300.350 sgA.lgal.(1,200-1,400 eq.11d4ge.) excessive moislure and high alkalinity. 3.Slick surfaces such as power troweled concrete shall be profiled F to allow foramechaniCeI bond between the adhesive and subfioor. Note:Trowel dimensions are width x depth x spacing,Coverage is approximate and may vary depending on type,condition,and v= W EL 4.Remove existing resilient Door covering,100%fracas of old porosity of substrate and the angle at which the trowel is held. s� adhesives,paint or otherconter inanls by scraping,sanding, Trowel Illustralloas shown above are not a 100%scale. luul co M4 �d grinding,shot blasting or scarifying the substrate.The use of adhesive removers or solvents In the abatement or removal of � existing or off adhesives is prohibited and may void the warranty. Sizes ®� WARNING:ASBESTOS&SILICA-Refer to the current Resilient l gallon,4 gallons Floor Covering lnstllute(RFCI)document"Recommended Work c cc ® ® I� Practices for Removal of Existing Resilient Floor Coverings'for Shelflife pp^� guidance. 2 years when stored in original unopened containers at VO®� S.Perform corrective actions necessary for elevated moisture or temperatures between+50°F(12°C)End+86°F(30°C).Protect p high alkalinity wnditions. from freezing. L 6.Surface Flatness for all Subfldcm The surface shall be flat to 118" Q LLty in 10 It(3 mm in 3 m),Bring high spots level by sending,grinding etc.and III low spots.Smooth surface to prevent any irregularities P or roughness from telegraphing through the new flooring. 7.Leveling and Patching, W > Q a.For concrete subfloors,use only high quality Portland Cement based materials(minimum 3000 psi compressive strength according to ASTM C109).Mix with water only,do not use latex. Caution Do not lightly skim coal highly polished or slick power troweled concrete surfaces.A thin film of Moor patch will not bond to :,," a slick subfloor and may become a band breaker causing tiles to release at the interface of the subfloor and patching material. b.Wood subfloors require an undedayment(double layer aN•_„ construction)with a minimum total thickness of O 1"(25 mm).Use minimum%"(6 him)thick APA rated •underlaymenl grade"plywood with a fully sanded face or other —_ undedayment panel that is appropriate for the intended usage 02: Install and prepare panels and seams t7 according to the manufacturers'instructions, :U) a�doP S.Installatlon Procedures Before starting the Specie installation,ensure the fallowing are satisfactorily Completed.Start of flooring Installation indicates U wI( acceptance of current subfioor Conditions and full responsibility for completed work. •Acclimation:Acclimate tiles(keep cartons flat),adhesive,jobsite end subfioor to a stable conditlon between 64%ul°F(18°-27°C)and 50%+I-10%RH for a minimum of 48 hours before and offer installation. •Flooring Materials',Check quantity of Specie tile and adhesive are sufficient for area to be installed.Check file for visual defects before installatan.Installation of flooring acknowledges acceptance of meledata. •Expansion Joints,isolation joints,or other moving joints are Incorporated Into concrete floor slabs in order to permit movement without causing random cracks in the concrete.These joints must be honored and not be filled with undedayment products or other Revisions materials,and floor coverings must not be laid over them, OISSUE FOR CLIENTILL REVIEW Expansion joint covering 03/06/15 systems should be detailed by the architect or engineer based upon ISSUE FOR BID/PERMIT intended usage and aesthetic Considerations, 03108I15 •Surface cracks,grooves,depressions,Control joints or other non-moving joints,and other Irregularities shall be filled or Q smoothed with high quality Portland cement based patching or underlayment compound for filling or smoothing,or both.Patching or undedayment compound shall be moisture,mlldew,and alkali-resistant,and shall provide a minimum of 3000 psi compressive strength after 28 days,when tested In accordance with Test Method C 109 or Test Method C 472,whichever is appropriate. Q AMTICO High Moisture PS Adhesive Specifications AMTICO High Moisture PS Adhesive offers the following benefits: • Very low volatile organic compounds(VOC) Meals California SCAOMD Rule 1188 8 Section 01360 Requirements • Solvent-free-non-flammable-non-stalnirg • Extended working time(up to 3 hours) • High lack and bond strength • Excellent plasticizer resistance 03/25/15 • Protected age trial bia-degradation and mold growth • Freeze-lhaw stable to 1WF(5 cycles) fJ LICENSED ARCHITECT Aft 0863G0 This adhesive should be used for bonding Amtico and Spade file floorcoverings to APA registered undedayment grade plywood, ! , terrazzo,existing well adhered tile,radiant heated subNoors where surface temperature do not exceed 81(29.40°C);and above,on, or below grade concrete in the absence of hydrostatic pressure, J041N A.ClImMNN excessive moisture or alkalinity 8'fA'fa OFIDAHO Preparation Sub-floors must be sound,smooth,dry and free from any contamination which will affect adhesion.Concrete subfloors must I HER ARBOU CERTIFY THAT UPETHESE SIONAND7HAVE BEEN ARE- be fully cured,clean,tree from curing agents,excessive relative OF MY UNN LEGGE,ITHE GA IONANNT4A TN AXE BEST humidity(maximum 93%per ASTM F-2170)and or excessive moislure vapor emisslons(maximum 101bs./1000 SF124 ions.par neWING ro smucruRESNum BurnIesMreLlou ASTM F-1Ifil Concreis must have a 5.0 to 12.0 ph(ASTM F-710).If necessary,a suitable moislure suppressanl system Should be applied to the sub-floor On grade and below-grade concrete subfloors must have an approved vapor retardant AacNlrecT membrane(ASTM E-1745)which Is properly installed(ASTM E-1673).Wwden sub-floors should be overlaid with a suitable Drawn By Checked By APA'undedayment grade'sanded face,exterior AC or BC plywood OW BIN with a minimum�(6mm)thickness.Tiles,adhesive and sub-floor should be allowed to alai a temperature between 61 Scale Dale (18°C)and 81°F(27°C),fora period of 48 hours before,during and NONE 03106115 24 hours after installation Tiles must be stored fl Job No. //��'//�� �n Amtico PS Adhesive is not designed to be used over floors with o 5 5/LJ L�:nl Moisture Vapor Emission(VE)from water of intrusion or hydrostatic Illl �J�l�r lllJJJ pressure. Sheet No. Sp-5 HVAC GENERAL NOTES 2012 IMC VENTILATION SCHEDULE PEOPLE AREA PEOPLE AREA ACTUAL ZONE REQUIRED TABLE 403.3.2.3.2 REQUIRED ACTUAL ACTUALSYSTEM PERCENTAJE PEOPLE ZONE REQUIRED ZONE PRIMARY OUTDOOR INCREAS PLAN OCCUPANCY OUTDOOR OUTDOOR PORTION PORTION PRIMARY AIR PRIMARY OUTDOOR SYSTEM OUTDOORAIR UTDOO 1. HVAC SYSTEM';SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE BUILDING CODES. TERMINAL DAMPER IS NOT ACCEPTABLE. MARK ZONE CATEGORY AREA(SF) AIR RATE AIR RATE DENSITY POPULATION OUTDOOR AIR OUTDOOR AIR OUTDOOR AIR FLOW AIR FRACTION VENTILATION FLOW AIR FLOW AIR FRACTION OVER CFM/PERSON CFM/SF (p/1000 SF) PZ FLOW CFM FLOW CFM FLOW VOZJ(CFM) VPZ/CFM ZP=VOZVPZ EFFICIENCY EV VOTICFM (CFM �~ ZP=VOZNPZ STANDAR 2. ALL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED IRON SHEET METAL AND BE FABRICATED 17. THE VENTILATION/HEATING AND AIR CONDITIONING CONTRACTOR SHALL SUBMIT WRITTEN REPORTS OF -- -'- � ACCORDING TO THE S.M.A.C.N.A.LOW VELOCITY DUCT MANUAL AND ASHRAE HANDBOOK EQUIPMENT ALL AIR FLOW READINGS,STATIC PRESSURES,TEMPERATURE READINGS,MOTOR AMPERAGE,ETC.TO RTU 12, SALES 101 RETAIL 7974 7.5 0.12 15.0 120 897 957 1854 8700 0.27 0.8 2317 2340 0.27 1% <Y VOLUME,1988.ALL ELBOWS SHALL HAVE PROPER RADIUS,OR HVAC CONTRACTOR SHALL PROVIDE DOCUMENT PROPER BALANCED AIR FLOW IN THIS HVAC SYSTEMS IN ALL AREAS. DOUBLE THICKNESS,AIRFOIL TURNING VANES REQUIRED BY S.M.A.C.N.A.NO SQUARE THROAT ELBOWS - SHALL BE INSTALLED WITHOUT DOUBLE THICKNESS TURNING VANES. 18. ALL ROOF PENETRATIONS EXCEEDING 12"X 12"IN SIZE SHALL BE FURNISHED WITH BURGLAR BARS. RTU-2 VESTIBULE 100 CORRIDOR 100 0 0.06 0 0 0 6 6 300 0.03 0.8 8 60 0.20 700% 3. THE HVAC CONTRACTOR SHALL INSTALL HVAC SYSTEMS AS SHOWN,NOTED AND SPECIFIED.EQUIPMENT 19. THE CONTRACTOR SHALL WARRANTEE ALL MATERIAL AND GUARANTEE ALL WORKMANSHIP FOR ONE RTU-4 STAGING 102 RECEIVING 520 0 0.12 0 0 0 62 62 1170 0.07 0.8 78 371 0.32 375% MAY NOT BE SUBSTITUTED UNLESS WRITTEN APPROVAL BY THE ARCHITECT,ENGINEER,OR OWNER'S YEAR FROM SUBSTANTIAL COMPLETION. REPRESENTATIVE IS OBTAINED.ANY CHANGES TO THE DUCTWORK LAYOUT WILL NECESSITATE SUBMISSION OF SHEET METAL SHOP DRAWINGS FOR ENGINEER'S REVIEW.ANY UNAUTHORIZED CHANGES 20. ALL CONTRACTOR FABRICATED AND MANUFACTURER FABRICATED COMPONENTS OF THE OUTSIDE AIR, RTU-4 OFFICE 103 OFFICE 53 5 0.06 5.0 1 5 3 8 225 0.05 0.8 10 71 0.32 597% WILL BE REMOVED AT CONTRACTOR'S EXPENSE,IF DEEMED NECESSARY BY ARCHITECT,ENGINEER,OR SUPPLY AIR,RETURN AIR AND EXHAUST SYSTEMS SHALL BE CONSTRUCTED AND INSTALLED AIR-TIGHT. _ OWNER'S REPRESENTATIVE. THE INSTALLED SYSTEMS SHALL BE PRESSURE TESTED AS SPECIFIED.PIPE OPENINGS IN SYSTEM RTU-4 COLOR/DRYING BEAUTY 225 20 0.12 25.0 6 120 27 147 580 0.31 0,8 184 107 0.32 2% COMPONENT SHALL HAVE SHEET METAL BAFFLES,SET IN SEALANT,TO PREVENT LEAKAGE. 105 4. THE HVAC CONTRACTOR SHALL COORDINATE DUCTWORK INSTALLATION WITH ARCHITECT/OWNER'S REPRESENTATIVE IN FIELD AND OTHER TRADES.SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION 21. DRAWINGS FOR HVAC WORK ARE DIAGRAMMATIC,SHOWING THE GENERAL LOCATION,TYPE,LAYOUT AND RTU-4 SALON 106 BEAUTY 408 20 0.12 25.0 8 160 49 209 B40 0.31 0.8 261 266 0.32 2% AND HEIGHTS. EQUIPMENT REQUIRED.THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENTS.REFER TO MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND 1 5. ALL DUCT CONNECTIONS TO EQUIPMENT SHALL BE LOADED TYPE VINYL,VIBRATION ELIMINATION INSTALLATION REQUIREMENTS AS REQUIRED.FURNISH AND INSTALL DUCTWORK,CONNECTIONS, RTU-4 CORRIDOR 110 CORRIDOR 72 0 0.06 0.0 0 0 4 4 75 0.07 0.8 5 24 0.32 340 CONNECTIONS,(F.C.)FLEXIBLE CONNECTIONS. ACCESSORIES,OFFSETS AND MATERIALS NECESSARY TO FACILITATE THE SYSTEM'S FUNCTIONING AS - - _ INDICATED BY THE DESIGN AND THE EQUIPMENT INDICATED.THE WORK SHALL BE IN ACCORDANCE WITH RTU-4 MENS 107 TOILET 59 0 0 0.0 0 0 0 0 50 0.0o O.B 0 16 0.32 6. ALL DUCTWORK TRANSITIONS SHALL BE(FOT)"FLAT ON TOP"UNLESS OTHERWISE SPECIFIED ON PLAN. LOCAL CODES AND ORDINANCES AND SUBJECT TO INSPECTION. p�p�p ��r 7. ALL DUCTWORK AND PIPING SHALL BE ROUTED ABOVE THE SUSPENDED CEILING SPACE UNLESS 22. FLEX DUCT:PROVIDE FACTORY ASSEMBLED CLASS 1 AIR DUCT(UL 181)WITH FIBERGLASS INSULATION RTU-4 WOMEN'S 106 TOILET 59 0 0 0.0 0 0 0 0 50 0.00 08 0 16 0.32 luui W OTHERWISE NOTED ON THE PLANS. AND REINFORCED OUTER PROTECTIVE COVERIVAPOR BARRIER.FLEX DUCT SHALL MEET NFPA 90A WITH _ _ FLAME SPREAD UNDER 25,SMOKE DEVELOPED UNDER 50,AND SHALL BE RATED FOR 2"W.C.PRESSURE - -- - - - 8. ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10'-0"AWAY FROM EXHAUST DISCHARGE OPENINGS AND 0 TO 250 DEGREE TEMPERATURE.MAXIMUM LENGTH SHALL BE PER CODE AND NOT TO EXCEED 6-0" TOTAL 9470 135 12000 2864 3350 AND PLUMBING VENT STACKS. LONG. SYSTEM ppp��n0 9. ALL BRANCH SUPPLY DUCTS SHALL HAVE(VD)MANUAL VOLUME DAMPERS INSTALLED FOR BALANCING. 23. ALL MECHANICAL EQUIPMENT ELECTRICAL'S&STRUCTURAL REQUIREMENTS SHALL BE COORDINATED W WITH OTHER TRADES PRIOR TO PURCHASE AND INSTALLATION OF THE UNITS.NOTIFY If� 10. ALL NEW SHEET METAL SUPPLY AND RETURN AIR RECTANGULAR/SQUARE DUCTWORK SHALL L BE ARCHITECT/ENGINEER WITH DISCREPANCIES IMMEDIATELY. F(rA INSULATED WITH 1-1 12"THICK DUCT LINER.DUCT LINER SHALL BE FASTENED TO INSIDE OF DUCTWORK AS PER MANUFACTURER'S DIRECTIONS AND S.M.A.C.N.A."DUCT LINER APPLICATION STANDARD".SIZE OF 24. GENERAL CONTRACTOR TO REROUTE FIRE SPRINKLER PIPING IF REQUIRED FOR THE NEW SUPPLY AIR Iuu' DUCTS SHALL BE INCREASED FOR DUCT LINER INSULATION.SIZES SHOWN ON PLAN ARE INSIDE FREE AND RETURN AIR DUCTWORK LAYOUT. CODE NOI AREA.ALL NEW SUPPLY,RETURN AND OUTSIDE AIR ROUND/OVAL DUCTWORK SHALL BE INSULATED WITH p -J 2"THICK FLEXIBLE INSULATION,1 POE DENSITY FOIL REINFORCED KRAFT FACING.DUCT WRAP SHALL BE 25. ULTA CEILING SPACE IS NOT PLENUM RATED AND SHALL NOT BE USED AS A RETURN AIR PLENUM. CONTRACTOR TO PROVIDEST pp pp pp CS FASTENED TO DUCTWORK AS PER MANUFACTURER'S DIRECTIONS.ROUND/OVAL SUPPLY AND RETURN AND BALANCE REPORT TINAL Ip ' 0 luui DUCTWORK EXPOSED TO VIEW AND LOCATED IN THE CONDITIONED SPACE SHALL NOT BE INSULATED.ALL 26. PRIOR TO CONSTRUCTION,FIELD VERIFY CEILING SPACE AVAILABILITY TO RUN DUCTWORK AGAINST INSPECTION. I I iuuU (� INSULATION R-VALUES SHALL CONFORM TO ENERGY CODE. EXISTING BUILDING STRUCTURAL CONDITION AND CEILING HEIGHT.NOTIFY ARCHITECT/ENGINEER WITH I M coo _ DISCREPANCIES IMMEDIATELY. C (� 11. CORE-DRILL OR SAW-CUT EXISTING WALLS,ROOF,ETC.AS REQUIRED FOR PIPING OR DUCTWORK AND I o ��M�, p E�2 I ® e n 0 FIRE-STOP OPENING AROUND PIPE OR DUCTWORK.VERIFY LOCATION OF STRUCTURAL BEAMS,JOISTS, 27. ALL LOW VOLTAGE WIRING OR CABLING SHOULD RUN ADJACENT TO THE PERIMETER SOFFITS NOT MORE W`" J^ -��ti Q a �Iu�u� ETC.BEFORE DRILLING. THAN TOFF THEIR DEMISING WALLS (�rp0� I I Uj � 12. WHEREVER FOUNDATION WALLS,OUTSIDE WALLS,ROOFS,ETC.ARE CUT FOR INSTALLATION OF 28. MOUNT REMOTE SENSORS AT 60"ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. 0 //`ccJ��// SYSTEMS,THEY SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION AND SEALED WEATHER TIGHT. I I ( J WORK SHALL BE PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE TRADES. 29. CONTRACTOR SHALL VERIFY AVAILABLE DEPTH FOR DUCTWORK PRIOR TO DUCTWORK FABRICATION. 13. THE MECHANICAL SYSTEMS SHALL BE COMPLETE WITH ALL NECESSARY APPURTENANCES FOR A 30. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING I aQ J L 2 COMPLETE OPERATING SYSTEM. CONDITIONS PRIOR TO SUBMITTING HIS BID.NO ADDITIONAL COMPENSATION WILL BE MADE FOR ANY 4)MI Duct Smoke Detectors I EXTRAS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOBSITE AND/OR PREDETERMINE ALL EXISTING a.Smoke detectors installed in ducts shall be listed far that use.They shall be connected L SEE DRAWING FOR v- - 14. HVAC CONTRACTOR SHALL INSTALL ALL CONTROL WIRING AS REQUIRED.THERMOSTATS SHALL BE AS CONDITIONS BEFORE SUBMITTING HIS BID.ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO to the buildings fire alarm control unit.Activation shall initiate a visible and audible ENLARGED PLANN ` J SCHEDULED WITH THE EQUIPMENT.PROVIDE TRANSFORMERS AS REQUIRED. THE ENGINEER FOR RESOLUTION. supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with the tFC and the IMC. 6 �S IS. PROVIDE UL APPROVED FIRE DAMPERS FOR ALL PENETRATIONS THROUGH FIRE RATED WALLS, 31. MECHANICAL CONTRACTOR SHALL TAG EACH INDIVIDUAL REMOTE SENSOR WITH THE ROOFTOP UNIT Response:Duct Smoke detectors are provided by the landlord under the landlord PARTITIONS,CEILINGS,AND FLOORS.INSTALL FIRE DAMPERS AS PER MANUFACTURER'S DIRECTIONS AND THEY ARE SERVING. shell building permit.Duct detectors are also indicated to be provided In detail#1 AS PER UL GUIDELINES. (Mechanical schedule)on sheet M3. 32. PROVIDED MEANS FURNISH AND INSTALL. 16. HVAC CONTRACTOR SHALL BALANCE SYSTEM TO AIR QUANTITIES SHOWN ON PLAN,BALANCING 1 CONTRACTOR SHALL USE DUCT MOUNTED MANUAL DAMPERS FOR AIR SYSTEM BALANCING,USE OF LEGEND PLAN NOTES I I AFF ABOVE FINISHED FLOOR DET. DETAIL I I 0 `�=...2 o o CD CONDENSATE DM DOWN O1 CONNECT 18/16 AND 14114 SUPPLY DUCTS TO DUCT DROP FROM ��\\\JIII An a LANDLORD PROVIDED ROOFTOP UNIT,RTU-1.PROVIDE TURNING VANE .2 DG DOOR GRILLE,SEE ARCH.DWG'S. DWG. DRAWING ELBOWS AT BOTTOM OF RISER. EF EXHAUST AIR FAN E.A.T. ENTERING AIR TEMPERATURE ETR EXISTING TO REMAIN E.E.R ENERGY EFFICIENCY RATIO O CONNECT 26116 RETURN DUCT TO DUCT DROP FROM LANDLORD I I '� /4)"003 FC FLEXIBLE CONNECTION PROVIDED ROOFTOP UNIT,RTU-1.PROVIDE TURNING VANE ELBOWS AT U G o0�3 E.S.P EXTERNAL STATIC PRESSURE r FOB FLAT ON BOTTOM E.T.R EXISTING TO REMAIN BOTTOM OF RISER. I I C e3o; FOT FLAT ON TOP GA. GAUGE - - - - - - - - - - - - - - - - - - - - - - - - - - -lW MOD MOTOR OPERATED CONTROL DAMPER O CONNECT 20/16 AND 14 SUPPLY DUCTS TO DUCT DROP FROM L.A.T. LEAVING AIR TEMPERATURE LANDLORD PROVIDED ROOFTOP UNIT,RTU-2.PROVIDE TURNING VANE NC NEW CONNECTION TO EXISTING MT'D MOUNTED ELBOWS AT BOTTOM OF RISER. NTS NOT TO SCALE NIC NOT IN CONTRACT Rru ROOF TOP HVAC UNIT REQ'D REQUIRED O CONNECT 26/16 RETURN DUCT TO DUCT DROP FROM LANDLORD S SENSOR T.S.P. TOTAL STATIC PRESSURE PROVIDED ROOFTOP UNIT,RTU-2.PROVIDE TURNING VANE ELBOWS AT T THERMOSTAT TV TURNING VANE BOTTOM OF RISER. ARCH ARCHITECT OR ARCHITECTURAL UCD UNDERCUT DOOR BLD'G BUILDING VD VOLUME DAMPER O PROVIDE SMOKE DETECTOR PER CODE.INSTALLATION BY MECHANICAL CONTRACTOR,WIRING BY ELECTRICAL CONTRACTOR. PROVIDE EXTRA Revisions BAR BRAKE HORSEPOWER W.C. WATER COLUMN SMOKE DETECTOR HEAD FOR REPLACEMENT INSTALLATION AT ISSUE FOR CLIENT/LL REVIEW COL. COLUMN W/ WITH 12"g 12"H 12"O SUBSTANTIAL COMPLETION FOR ALL DUCT SMOKE DETECTORS. 1 500 1 500 qq0 1 �03106115 CONST'N CONSTRUCTION 0 DIAMETER/ROUND 12"0 ISSUEFORBID/PERMIT O18"0 CONNECTION W/V.D.IN NECK. PROVIDE DUCTWORK,VOLUME r---- 1 440 �03/06115 DAMPER AND AIR DEVICE. t �0ER CII5 MECHANICAL SYMBOLS O ON THEROR DRAWINGS.ATURE S ENSORF FURNISHED WITH RTU ANDENSTALLEDLOCATION FOR RTU,TAG NUMBREBY v I 22x22 Q EMS CONTRACTOR. EACH REMOTE SENSOR TO BE LABELED WITH 2 1500 g 2 RTU-1 k r J--t RTU-2 4 6 15002 2 MANUAL VOLUME DAMPER(VD)WITH LOCKING HAND ZONE SERVED. DO NOT LOCATE COLUMN MOUNTED SENSORS FACING '- � `-'�\ +� � _ �� Q QUADRANT HANDLE AND AIR-TIGHT END BEARINGS THE FRONT OF THE STORE,LOCATE THE SENSORS ON THE SIDE OR _ S S RTU-2 RTU-1 BACK OF THE COLUMN WHEN VIEWED FROM THE FRONT OF THE STORE. 5 --- - � i 5 Q )--@5 DEVICE SENSOR WITH DEVICE CONTROLLED MOUNTED ON WALL. � V SALES `J SD DUCT MOUNTED SMOKE DETECTOR TEMPERATURE ZONES 26/16 all DO ROOMS SERVED 1 ptiA/ UNIT Al2"0 NECK SIZE 500 500 1 12"0 1 12"0 o tc 1 TYPICAL SUPPLY DIFFUSER. CFM 101 RTU-1 1 - �• \ RTU-2 100,101 NECK SIZE Y t TYPICAL RETURN OR EXHAUST GRILLE. RTU-3 101 I I %4 CFM yr RTU-4 102,103,104,105,107,108,109,110 n, 440 -G AIRFOIL TURNING VANES,TYPICAL FOR ALL SQUARE TURNS. NOTE: 4 22x22 MECHANICAL CONTRACTOR SHALL STENCIL 300 ? see"ewre THE ROOFTOP UNITS.STENCIL SHALL 12"0 12"0 12"0 o3/z4/zols INDICATE STORE NAME,SPACE NUMBER AND 1 500 1 500 1 440 oH'N 1onv2ols EQUIPMENT DESIGNATION IN LETTERING A e.po-elw"Dale v MINIMUM OF 2 INCHES N HEIGHT. -i ♦_ -4 0 {I 1 1 r! 2 _ iNAi THE: iuNSln NEN PRE. N uY 9UPERVIS10x ANO THATTO THE BEST �� �- YNNOt5tE0GE THESANECONPLYWTHAL ULES, N L_O E ITSTINIBU E "DO, AND ORDINANCES OF TWw Lai, Q BUILDINGS iixGTO STRUCNRESAND 12 0 1 a BUI I EXISTING CONDITIONS NOTES q 22x, LN 0 ❑ 500 NEG. THE CONTRACTORS ARE REQUIRED TO VISIT THE SITE AND FULLY 300 300 5 LL ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS AND THE ` 1. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD SURVEY AND DOCUMENTING OF Drawn By Checked By DIFFICULTIES INVOLVED IN ACCOMPLISHING THE NEW WORK. EXISTING SYSTEMS.THESE CONTRACT DRAWINGS SHALL SERVE AS GUIDANCE AK DH PROBLEMS,DISCREPANCIES OR INFORMATION NEEDED SHALL BE ECUH-1 FOR THE CONTRACTOR ALONG WITH FIELD SURVEY INFORMATION TO INSTALL THE Scale Date SUBMITTED TO THE ARCHITECT/ENGINEER IN WRITING PRIOR TO DISTRIBUTION SYSTEMS REQUIRED FIELD S NEW Y INFORMATION DEVICES. U. SUBMITTING A PROPOSAL.THE SUBMISSION OF PROPOSAL WILL (9 1/8"=V-0" OT06/15 e INDICATE THAT THE CONTRACTOR HAS FULLY UNDERSTOOD AND 2. REFER TO THE ARCHITECTURAL DRAWINGS FOR WALLS,CEILINGS,ETC.THAT ARE Job No. HAS INCLUDED ALL COSTS FOR THIS PROJECT. BEING REMOVED.ALL EXISTING SYSTEMS INCLUDING PIPING,WIRING,ANCHORING, ETC.THAT ARE EXPOSED SHOULD BE REMOVED OR RELOCATED,COORDINATE NORTH �lI WITH LANDLORD. u MECHANICAL PLAN Sheet 0Y/8 0 SCALE: 1/8"-1'O" PLAN NOTES ' 0 CONNECT 26/16 SUPPLY DUCT TO DUCT DROP FROM LANDLORD PROVIDED ROOFTOP UNIT,RTU-3 PROVIDE TURNING VANE ELBOW AT BOTTOM OF RISER. 0 CONNECT 26/16 RETURN DUCT TO DUCT DROP FROM LANDLORD PROVIDED ROOFTOP �■ UNIT,RTU-3 PROVIDE TURNING VANE ELBOW AT BOTTOM OF RISER. OCONNECT 26/16 SUPPLY DUCT TO DUCT DROP FROM LANDLORD PROVIDED ROOFTOP UNIT,RTU-4,PROVIDE TURNING VANE ELBOW AT BOTTOM OF RISER. 4O CONNECT 26116 RETURN DUCT TO DUCT DROP FROM LANDLORD PROVIDED ROOFTOP UNIT,RTU-4,PROVIDE TURNING VANE ELBOW AT BOTTOM OF RISER. OPROVIDE SMOKE DETECTOR PER CODE.INSTALLATION BY MECHANICAL CONTRACTOR, WIRING BY ELECTRICAL CONTRACTOR. PROVIDE EXTRA SMOKE DETECTOR HEAD FOR REPLACEMENT INSTALLATION AT SUBSTANTIAL COMPLETION FOR ALL DUCT SMOKE DETECTORS. O18"0 CONNECTION W/V.D.IN NECK. PROVIDE VOLUME DAMPER,DUCTWORK FITTINGS, FLEXIBLE DUCTWORK,AND AIR DEVICE. O7 TEMPERATURE SENSOR LOCATION FOR RTU,TAG NUMBER INDICATED ON THE DRAWINGS. SENSOR FURNISHED WITH RTU AND INSTALLED BY EMS CONTRACTOR. EACH REMOTE SENSOR TO BE LABELED WITH ZONE SERVED. DO NOT LOCATE COLUMN MOUNTED SENSORS FACING THE FRONT OF THE STORE,LOCATE THE SENSORS ON 0 THE SIDE OR BACK OF THE COLUMN WHEN VIEWED FROM THE FRONT OF THE STORE. O8 CONNECT TO 18/18 DUCT DROP FROM EF-1,PROVIDE TURNING VANE ELBOW AT BOTTOM OF RISER. �} O9 CONNECT TO LANDLORD PROVIDED 10"0 TOILET ROOM EXHAUST DUCT "'---------------------------- S UC UP THROUGH r ._.........--_..-'-_.- � ROOF TO GOOSENECK TERMINATION.FIELD VERIFY EXACT LOCATION. I I -•- -••- .•-.. ^- •• •"""" . 00 10 FAN SPEED CONTROLLER MOUNTED ON SIDE OF FAN HOUSING FOR BALANCING M O PURPOSE ONLY. ®� Q 0 000NNECT TO LANDLORD PROVIDED DRYER EXHAUST TO GOOSENECK ON ROOF. •`"•/ W 0 PROVIDE DRYER BOOSTER FAN,FANTECH MODEL DBF4XLT-705 UL LISTED DRAFTAM ER.CONNECT 4"0 DRYER EXHAUST TO BOOSTER FAN.FURNISH I ANDTH ACK I i" +r.- "� U I �J OINSTALL LINT TRAP STER FAN ACCORDING TO OE E IN STALLATION L DBLT4 IN DRYER LLA ION INSTRUCTIONSXHAUST DUCT UPSTREAM . O LINT TR Fr p Z TO BE INSTALLED ABOVE DRYER IN VERTICAL DRYER DUCT WHICH IS EASILY ry 11 - -------_..._._ �..__I.__...___.. -._._ -_......_.. .. ...... Ilf= '_.'`�:'___""_:1IL........__73.�.F"'T �1y"'""m....___._.ITI'. ..__ jI_. .___. ..._._. _.,.._....«._IL__ _._._m�."'""""V..___ __. ..ry_ a J lL a� ACCESSIBLE TO THE DRYER USER.DRYER EXHAUST DUCTWORK SHALL HAVE A / - - --"- ----- ' —'---- "---"-""-'----------" -- cLOSEr --- - - r�_ SMOOTH INTERIOR FINISH WITH JOINTS RUNNING IN THE DIRECTION OF THE AIRFLOW. - "' `--"' """"'""""""' '""'" �� """'"'""""" "`"'"""" ""'""" """"""""""' """""" " -- __ , - G I 1 1 1rm _ __.... .r.._ 2"0 SHALL OTHER FASTENERS THAT WITH WILL OBSTRUCT THE FLOW. LENGTH OF 8 FEET.TERMINATION DUCT SHALL BE RA -' "' -"" ��',,, �; 565 12 �'�IY"."I' P•.,„I 1 109 v, __.,I ._ _._..... .._.__........_..__...._... _._._ ..._....._. .._.... ...._.._ ..._....__.. DUCTS SHALL NOT BE CONNECTED OR INSTALLED WITH SHEET METAL SCREWS OR MINIMUM OF 10'-0 FROM OUTSIDE AIR INTAKE LOUVERS.MINIMUM HORIZONTAL DUCT ^, ,;, •,..', � ELEVATION TO BE 9-8. ..:.:.___._._':..:_: ..........._./ ._ f .. ! f.+. .0.. ...._....... , �f m:_ 10/10 4 CONNECT TO RD DED 10"0 UCT UP THRU ROOF 12 THE OPENING SALLOTERMRNATIE BELOW TDHE CEILING AND SHALLONOTOEXTENTDION AIR. _ .....�.:�_._:...._.... -" 000 3 1 a 18 0 UCD 1'UCD _I NI EXCESS OF 12"BELOW THE CEILING.MECHANICAL CONTRACTOR TO PROVIDE Ait MOTORIZED DAMPER THAT IS INTERLOCKED WITH THE BURNER OPERATION ON WATER 585 -' '"-"'-`-"'"" -'-" -'-" '- -"-"-'---- 1� __ ..... ._... _ SHPMPO DRYING'„ ;/ 10X10 sNL u n .. � i i MENS HEATER WHEN BURNER IS FIRING DAMPER SHALL OPEN.WHEN BURNER IS NOT FIRING ...._........ _._.....,_._.._31ACI _ 1 I Im C,"u, r w DAMPER SHALL REMAIN CLOSED.DAMPER SHALL FAIL IN THE OPEN POSITION. INTERLOCK AND WIRING TO BE PROVIDED BY THE MECHANICAL CONTRACTOR. _._._. -_- .,,,, _,,,_ - 1 - ---- _,_.,__ _.-._-..- -_. -_ Id ll-4 3 100 I' 3 .- z�'" 50 Wycn COORDINATE WITH STRUCTURE.LANDLORD PROVIDED ROOF TERMINATION IS A _ .. _. ._._. .__ ...._.. _ 06 GREENHECK ROOF CAP MODEL _ THE10 f0 qlI 16" �.... _ .. _ ... S .,......_, 6,0 5 10x10 _ ]1D/a _ ._..._._..__...2 1 Q.c 0�1 13 CONNECT TO LANDLORD 0 TYPE B VENT UP HRUOROOF.FIELD VERIFY EXACT 22x 2 1 Ol4 900 3 7 G ^ C� LOCATION.PROVIDE B VENT TO WATER HEATER. _ _.._..._p .........._ tas „_....._- _.-___.._.... ......._...._,._. rl wor�N3y1II ` i$$ / ..._......, ......._ ... 6ALON ]5....,. l"L I Ii� Cn6DETAIL 6 ON SHEET M3 SHALL BE CUT OUT,PLACED IN A FRAME,AND HUNG IN THEMANAGERS OFFICE.COORDINATE EXACT LOCATION WITH ARCHITECTURAL ITEMS. 18/18sCO2 SENSOR FURNISHED AND INSTALLED BY EMS CONTRACTOR,SEE EMS DRAWINGS ._ - -- - -- 26/6 2FOR MORE INFORMATION 16 HUMIDITY SENSOR OFURNISHED AND INSTALLED BY EMS CONTRACTOR,SEE EMS 1205 m 1 14 0 +111 1 "0 1 !10 _ � 10"0 DRAWINGS FOR MORE INFORMATION. INSTALL SENSOR AT 75"AFF ADJACENT TO OR - 10 6 420 EF 2 17 PROVIDE TITUS 35ORL-SS STAINLESS STEEL.10/6 NECK,3'-O"AFF.COORDINATE Revleione LOCATION TO BE 6"ABOVE TOP OF ADJACENT TABLE. ROUTE DUCTWORK INSIDE WALL - -"'_.. _. _..__. _...__ „_. ._ _..,._....._ .......... ._ _.._.._.__1._12.,C __. ...__..._.__....__. 15- �, I .._._....._.... m.._. . ... .., ...___...._.__ __._..1........_._., ._ ___ ..._ __.... __ _ ISSUE FOR CLIENT/U.REVIEW BETWEEN JOISTS. PROVIDE FITTINGS AS NECESSARY. �J �� ""I 420 8 4 �;.E �03106115 EF 1 I ISSUE FOR BIDIPERMIT 03/06115 1 f7/14 PER CITY NOTE: �03/24/15 MECHANICAL CONTRACTOR SHALL .._. ____.` ..._._._ -241 T'-_. STENCIL THE ROOFTOP UNITS. STENCIL SHALL INDICATE STORE I 1 12 0 Q NAME,SPACE NUMBER AND N r 400 EQUIPMENT DESIGNATION IN LETTERING A MINIMUM OF 2 INCHES )'-"', 1--'1 �•^J '1 INHEIGHT. ___....__._._-..._.._.._--...------ ._..__..._..... ............_�__ .............. _.. 12 0 I 12" 12"15 v i 1 35 I 35 I .. 1 12"0 I RTU 3 R U-4 --- -- -- ( 9852 - - E L1 7 I I 4 I I L 11 L.1 I �Fy,�DF1f��� 4 12/14 6/16 RTU-3 S 20/1 61�6 22x22 �_-J 0(D 2 5 I-- LI -t .., _ -- - ....... - - - __.._..--- 1 10131/2015 _... _ ._ _. _ c xR relioN Dare O ` 26/1 J' ' I N I TINT S PLA i ER-CEST FY MESN—E BEEN PRE I CJ Ll L� Y 1 I.1 m 11 G.. x O1 MY KNOWLEDGE SAME COMPLYY WITH I ' _._..._._..__.__ _.__.__._...,... —.__. __.._... _._____ __ ___. .. .............. ......m-.«,.._ .,.. ......—_, �.._.,.. __.._......._ _. _ ........ .._'L. __.. O��B SALES NELATINGTOBTRUC L.ANDELONOB. t f07 1 L i Cl I CxNECi ------ ..__....... +I _......_ ._._.__ __. ..... __.....__.. ..._ ..__......._._,. ,._.....,,1' ......_._._. .._........_........__ .-.. .__..._.. .L-. _.. _.... _-.. _ _ rI _._ ...._ _. -...___...-_ Drawn By Checked By ..,._ .. .. .... .. .. .. I AK DH 12"0 Scale Dale .. 99 ... .............._.. ....._._._..... JJ___. ! ..._......_ .._�__.._...___..L. ..... .._``.._. _..._. _..__.. ....._........._.._. _--___.. �. .,.... ......rr_....__ q-ry { 12 0 1/4'=1'-0" 03106115 _......,._. t 375 L 1 L...$ 375 1..� �-1 8 5 '..1 1 J -. I I 375 1 Job N_o.oq�( 2 .............1 ....1._0 1 12 0 1 2 _- ...«.,...,........__...._...._ ...... .... ff5vcc ENLARGED MECHANICAL PLAN Sheet No. SCAT EF 114" 1'0" ®2 ROUND,RIGID DUCTWORK 22m NOTE.A II OOK INSULATED f BRANCH T ALL DUCTWORK CONSTRUCTED IN ACCORDANCE WITH ASHFUS BRANCH DUCTWORK HAND BAND PRODUCT DIRECTORY 169E EQUIPMENT ( 11N4SLOPE MAIN DUCT VOLUME,CHAPTER NO.1. B" MAIN, Elx/ s Y 2, ALL CONTRACTOR FABRICATED AND MANUFACTURER as.'-� AIRFLOW FABR CATED COMPONENTS OF THE OUTSIDE AIR SUPPLY AIR, AIRFLOW tj � �~ RE TURN AIR AND E%HALIBT SYSTEMS SHALL BE CONSTRUCTED �� �� NOTE-A AND IN9TPL.EDNR-TIGHT.REFERTODUCTWOWEEALANT BRANCH TPRE OFF �1 <DETA LS ON THt99HEET.PPE OPEN NGS N9TBTEM 4E• TWINBTON FTT NGCOTAILS0 THISALL SHEEAVESHEPE INGS IN SYSTE 9ETMNOTE:SEAANT TO PREVENT LEAKAGE. MAINDucr s ro MANSHALL eEt LEs N a SLOPE THE ROUND BRANCH DUCTWORK LOCATED ABOVE CEILING IN MANUALVOLUME DUCT STRAP FASTENER MINIMUM STRAIGHT SECTION BRANCH Ducr CONCEALED SPACES SHALL BE INSULATED WITH 1"THICK FIBERGLASS -�� ENTRY INTO DIFFUSER SHALL"""��' c° - SLEEVE WITH FOIL JACKET AND ALL JOINTS AND TERMINATIONS DAMPER. (TYP.) Is BRANCH oucT J BRANCH NOTEI BE EQUAL TO BRANCH SIZE NOTE.p DIMENSIon. SEALED WITH FOIL OR DUCT TAPE,EXCEPT IF DUCTWORK IS OF INSULATED FLEXIBLE DUCT,J '� � FIBERGLASS CONSTRUCTION. '. 5'MAXIMUM LENGTH TYPICAL DOUBLE BRANCH TYPICAL SINGLE BRANCH ,I I, 4 III �.:" -- ART � TAKE-OFF TAKE-OFF -CZONEvTmff -- SUSPENDED CEILING NOT T0SCALE NOT TO 9CKE { D. TRANSITION FITTING FOR DIFFUSER IF REQUIRED. DRAWINGS. BRANCH DuOi DIFFUSE R,SEE I L� I IlEQUIRE TURNING OOTAIINEFISOFTHESAM RGAUGE 3 DUCT CONNECTION TO CEILING DIFFUSER DETAIL I I, y��I, I IJ .(...Y•J- I�i DUCT NECK VANES E GAUGE 1' D'DIMENSION R tIJW RADIUS-1-12w PROVIDE O'LONGON� TO POP OCK NNECTIOFFUSER OAT METAL 19W ANOTIING, NOT II 'XY J I I J FI-,,.,.. / MA%IMUM FLE%IBLE GRILLE. L•tOW(wINOT LESS THAN 3") • S SCALE NOT TO SCALE I' CONNECTION. BREIDERTTYPE'L'GAS �W4 1. DU CT BRANCH AND DUCT NECK SHALL BE RGID SHEET METAL TURNNOVANES W VENT CAP,SAME SIZE AS NE1 CONSTRUCTION' GAS VENT 1FD¶IHJ'II fr"4e'{Iry` I':' 1 I I L 3. FABRIC ECONNECTON FLALLBEMEMINUM E DUCT.TON FABRCORTR PLE-LOK FLE%BLE ALUMINUM AIR DUCT I TYPICAL 311T0 90 Y2ADIUS TYPICAL TOP CONNECTION TO TYPICAL 30TO 89° GAS VENT,SEE ELL TURN FITTING DIFFUSER OR GRILLE DETAIL NOT TURN FITTINGS DRAWINGS FOR SIZES J�LI FT NOTTOSEA TO SCALE NOT TO SCALESTORM COLLARVANE. AIRFOIL TURNING VANES NOTE MINIMUM T-0"OR AS I III - 1 (SEE sMALwANe DETAIL) (SEE LARGE VANE DETAIL) METALBESTOS TYPE'B GAS VENT UP THRU REQUIRED BY LOCAL 4 11 I:. III I !' 1eRANCHDucT P ISMALLEa B.asuLLER ROOF WITH ROOF SUPPORT ASSEMBLY, BUILDING CODES. l f I 'I MAIN DUCT �pF y TALL CONE FLASHING,STORM COLLAR, -- X 2'+,3' suR• 2'1N AND ROOF THIMBLE;SEE PLANS FOR TALL CONE FLASHING ROOF CONSTRUCTION, Q - 1 Er tr „G AIRPLow Ducr TYPICAL TTPIGu aw us SIZES. `SEE ARCHITECTURAL r 1 1�'IrTII C �I... !( t' ��' AIRFLOW TURNING " VANES SIZE AND BD- DRAWINGS O t RADIUS �pp I SPACING SAME"90" ILAuI (� ZO�NE-, BRANCH DUCT J TURN FITTING OF 2 b us \ j`0 H co ZONE I RTI,J G(`) �) ((( EQUIVALENT SIZE. gfYe RAO US pp 1 I SMALL DOUBLE ~'^� �J n TURNING VANE LARGE DOUBLE AIRFOIL ® I j I I I I'- I ruRNINc vANE ROOF THIMBLE GAS VENT,SEE DRAWINGS FOR •Q o SUPPORT FROM ROOF / - SIZES WORK BY LANDLORD �W- a -I TYPICAL DOUBLE 90 TYPICAL 90'TURN FITTING- TYPICAL 90°'TURN FITTING,9 ////// _ Q s CAL STRUCTURE _./ ' CONTRACTOR 0 TURN FITTING ^"D M LaH 24" , 1 ALLER AND 1 `✓` II EouALCFm sPEre"oYm. NormscuE NOT To SCALE ASSEMBLY BUPPORT O J uNEOuucFM SPLTSMUR, I WORK BY ULTA a NOT TO SCALE ASSEMBLY ` CONTRACTOR I _j a Q a 6 t l NII MASTIC SEALANT IMPORTANT NOTE RECTANGUTAR,SQUARE.ROUND TYPICAL GAS VENT THRU ROOF DETAIL(FURNISHED AND INSTALLED BY LANDLORD) Q I+-LLno SEALANT eEALANTBHALL BE APPLIED TO DUCTWORK r AND OVAL DUCTWORK 2 _ 1 DRIVEAPPLI SLIP NDER 9D WITH / II- r DRIVE BLIP ASSEMBLY / 1I �J _ FOLDOVER EXCESS SOLVENT MASTIC ERSHALL DUCE REMOVED WITH A.- SCALE'.NOT TO SCALE � z SEALANT PROPER 80LVENT WHEREVER DUCTWORK 19 E%PoSEU IN OCCUPIED AREAS. F DRIVE SLIP NOTE:GENERAL I L NO TH I SEALANT SEALANT sEALnr.I I. - -DUCTHANGEROUTLINE ELECTRIC CABINET UNIT HEATER SCHEDULE CONTRACTOR TO CUT L... sEgLANr PLACE IN FRAME,,AND B THICK(B LB.DENSITY)BY T WIDE BY LENGTH OF ALONG DASHED LINES, DRIVE SLIP FARING SURFACE WITH FSK FACING,PROVIDED BY SEALANT AIRFLOW SHEET METAL CONTRACTOR AS THE INSTALLATION C HANG IT IN THE ELECTRICAL MANAGER'S OFFICE gfiLIC PROCEEDS. AREA MFG'R TOTAL PITTSBURGHLOCK POCKETLOCK DESIGN. TYPE BTU/HR REMARKS 0 DETAIL OF INSULATION SERVED MODEL NO. WATTS PHASE VOLTAGE DUCTWORK SEALANT DUCTWORK SEALANT 0 N DETAIL NO,1 DETAIL NO.2 AT DUCT HANGER QMARK CEILING LTAMPER RESISTANT BUILT-IN THERMOSTAT,RECESSED .,� p rvoT To SCALE NOT TO SCALE Nor To ecuE ECUH-1 VESTIBULE 13,640 4,000 1 208 C .'4 i$ CDF-RE-548-NW MOUNTED FACTORY NORTHERN WHITE. RTU ZONES DUCTWORK DETAILS E ° �9N 6 4 EXHAUST FAN SCHEDULE � r- . ALL SCALE:NOT TO SCALE SCALE:NOT TO SCALE M�_m MFG'R. STATIC ELECTRICAL •_ /W 0a ; ROOF BACKDRAFT "•� DESIGN. TYPE CFM PRESSURE DRIVE Hp REMARKS U MODEL NO. (WATTS) PHASE VOLTAGE CURB DAMPER SUPPLY AND RETURN RISERS WITH 1"THICK,3 PCF P''WC) WATTS 1"THICK OWENS-CORNING NO.475-FR FIBERGLASS FLEXIBLE DUCT LINER;DUCT DIMENSIONS SHALL BE DUCT BOOT(CONTRACTOR FABRICATED) DUCT SUPPORT FULL SIZE OF ROOFTOP UNIT CONNECTIONS LOREN COOK ROOF 14 IN. LANDLORD FURNISHED AND INSTALLED L_ I W RAILS EF-1 150 ACES MOUNTED 2,000 0.8 BELT 1l2 1 115 HIGH GRAVITY ROOF MOUNTED EXHAUST FAN WITH FLEXIBLE CONNECTOR m ROOF OPENING 1/2"LARGER THAN ACCESSORIES UNDER SEPARATE PERMIT. DUCTWORK ALL AROUND 3"THICK,6 PCF EF•2 GN-RIGID DUCT LINER; LOREN 720 COOK INSTALL TO ROOF IN ALL OPEN IN-LINE 200 0.5 DIRECT (323 W) 1 115 NONE INTEGRAL PROVIDE FAN SPEED CONTROLLER. 18"(MIN.) SPACES INSIDE ROOF CURB NOTE: ELECTRICAL CONTRACTOR SHALL INTERLOCK EF-1 WITH RTU4 SUPPLY FAN.COORDINATE WITH ELECTRICAL DRAWINGS AND GENERAL CONTRACTOR. ROOF CONSTRUCTION PROVIDE BURGLAR BARS AT ROOF PENETRATION FOR EF-I. 22 GAUGE STRUCTURAL STRUCTURAL MEMBER GALVANIZED MEMBER WORK BY LANDLORD PROVIDE OPPOSED BLADE DAMPERS IN GYP.BOARD CEILINGS ONLY NO ALTERNATE IRON COLLAR I CONTRACTOR WHERE DUCT MOUNTED VOLUME DAMPER IS NOT ACCESSIBLE. DIFFUSER AND GRILLE SCHEDULE MANUFACTURERS. Revisions ROUTE DUCTWORK TIGHT 51LINGCONSTRUCTION TO STRUCTURAL MEMBER - -- - 0 ISSUE FOR CLIENTILL REVIEW WORK BY ULTA PLAN MOUNTING MOUNTING MODEL J L I CONTRACTOR MARK SERVICE MODULE TYPE LOCATION FASTENING FRAME MATERIAL FINISH MFG'R NO REMARKS �03106115 ISSUE FOR BID/PERMIT SUPPLY AIR DUCTWORK; ROUTE DUCTWORK TIGHT A03106115 SEE PLANS FOR SIZES TO STRUCTURAL MEMBER SUPPLY 24"x 24" PERFORATED CEILING LAY-IN TYPE-3 ALUMINUM #26-WHITE TITUS PAS-AA SEE PLAN FOR NECK SIZE, PER CITY 1&03/24/15 - 12"x12"SQUARE TURN TRANSITION RETURN AIR DUCTWORK; LAY-IN/ TYPE•3/ SEE PLAN FOR NECK SIZE.PROVIDE PFA\\ ELBOW WITH TURNING VANES RETURN 24"x 24" PERFORATED CEILING ALUMINUM #28-WHITE TITUS PAR-AA SEE PLANS FOR SIZES SCREW TYPE-1 MOUNTING FRAME FOR GYP.CEILING.GRILLE FASTEN GRILLE TO 24"X 12"COLLAR WITH POP 3"THICK,6 PCF RIGID DUCT LINER;INSTALL TO UNDERSIDE 12"x 12" PROVIDE PFA RIVETS,6"ON CENTER DUCT TO COLLAR OF ROOF CONSTRUCTION WITH FULL COAT OF ADHESIVE Q EXHAUST 24"x 24" PERFORATED CEILING LAY-IN/ TYPE-3/ ALUMINUM #26-WHITE TITUS PAR-AA SEE PLAN FOR NECK SIZE. Q WITH SHEET METAL AND MECHANICAL FASTENERS;SEAL ALL AROUND 24"X 12" SCREW TYPE-1 MOUNTING FRAME FOR GYP.CEILING. SCREWS,6"ON CENTER OPENING WITH SILICONE BASED SEALANT 12 x 12' - Q TRANSFER 24"x24" PERFORATED CEILING LAY-IN/ TYPE-3/ ALUMINUM #26-WHITE TITUS PAR-AA SEE PLAN FOR NECK SIZE,PROVIDE PFA Q 24"X 12" SCREW I TYPE-1 MOUNTING FRAME FOR GYP.CEILING. 5 ROOFTOP UNIT DUCT DROP DETAIL(FURNISHED AND INSTALLED BY LANDLORD) 24"x12" SEE PLAN FOR NECK SIZE.PROVIDE PFA 5 SUPPLY 12"x 12" PERFORATED CEILING SCREW TYPE-1 ALUMINUM #26-WHITE TITUS PAS-AA MOUNTING FRAME FOR GYP.CEILING. 7 TYPICAL RETURN TRANSFER DETAIL SCALE:NOT TO SCALE SCALE:NOT TO SCALE ROOFTOP UNIT SCHEDULE (BY LANDLORD) - -1/4"THICK NEOPRENE FABRICATED CURB CAP,18 COOLING CAPACITY HEA I ING CAF'AL;ITY CONDENSER E.A.T. ELECTRICAL ss,52 GASKET GAUGE GALVANIZED IRON MANUFACTURER NOMINAL SUPPLY MIN. E.S.P. --- "-_-"- ----- DESIGN STATUS E.A.T. TOTAL SENSIBLE E.A.T. L.A.T GAS INPUT HEAT OUTPUT AMBIENT MIN.AMBIENT SUPPLY FAN APPROXIMATE 9T �' co (MIN)ME NTBASE;FASTEN OR AND MODEL NO. TONS CFM O.A. W.C. PHASE VOLTS MCA MOCP E.E.R. WEIGHT(LBS) REMARKS U'�Ay OF 1f`SP EQUIPMENT BASE;FASTEN TO CFM ("F DB/WB) (MBH) (MBH) (°F IDS) (°F DB) (MBH) (MBH) (°F) (°F) B.H.P. WOOD NAILER WITH SCREWS 6"ON CENTER RTU-1 LENNOX LGHO92H4 7.5 NEW BY LIE 3000 900RO 80/67 93.0 67.9 58 102.4 180 144 95 40 3 3 208 48 60 12.5 1400 SEE NOTES FOR OPTIONS WOOD NAILER RTU-2 LENNOX LGH092H4 7.5 NEW BY LIE 300 600 80/67 93.0 67.9 58 102.4 180 144 95 40 3 3 208 48 60 12.5 1400 SEE NOTES FOR OPTIONS _.._14"HIGH MINIMUM slgnetureRTU-3 LENNOX LGH092H4 7.5 NEW BY LL 300 900 80I67 93.0 67.9 58 102.4 180 144 95 40 3 3 208 48 60 12.5 1400 SEE NOTES FOR OPTIONS _. - __-o3nusDls PREFABRICATED deie-���- . INSULATED GALVANIZED RTU-4 LENNOX LGH092114 7.5 NEW BY LIE 300 850 1.0 80/67 93.0 6T9 58 102.4 180 144 95 40 3 3 208 48 60 12.5 1400 SEE NOTES FOR OPTIONS ._.___-.............-......._..._1�112015 ROOF CURB WITH 18 NOTES:PROVIDE THE FOLLOWING OPTIONS E%PirBll°O Oele GAUGE GALVANIZED ROOF INSULATION •2'HIGH ROOF CURB 1 • ATTACH ROOFTOP UNITS TO CURB FOR EARTHQUAKE OR HURRICANE ZONE PER THE LENNOX NATIONAL ACCOUNTS CUSTOMER SERVICE:ULTA SALON,COSMETICS 8 FRAGRANCE,INC. SHEET METAL LINER FACTORY PROVIDED DIFFERENTIAL ENTHALPY OUTSIDE AIR ECONOMIZER, LOCAL CODES. FOR QUOTATIONS AND ORDERS CONTACT:NATIONAL ACCOUNTS,PHONE 800-367-6285 OPTION 1 EXT 6784,FAX 972497-5112, I HEREBY CERTIFY THAT THESE PUNS HAVEBEEN PRS •FACTORY PROVIDED POWER EXHAUST FAN. SMOKE DETECTOR TEST STATIONS. FOR EQUIPMENT WITH FACTORY INSTALLED ACCESSORIES PLEASE ALLOW 6-8 WEEKS LEAD TIME, PARED UNOERMY SweHVISIaNAND THAI TOTHESEST 'o ROOF MYKNOWLEDOE,THE SAME COMPLY WITH ALL RULES, CONSTRUCTION •HIGH STATIC DRIVE KIT. • INSTALL FACTORY FURNISHED ITEMS SHIPPED LOOSE FOR FIELD INSTALLATION. UTIONS AND ORDINANCES OF TWw FAjU •BACNET MODULE WITH MODEL REMOTE SENSOR#94L60. • FOLLOW MANUFACTURERS PUBLISHED PROCEDURE FOR TEMPORARY OPERATION OF FOR TECHNICAL SUPPORT CONTACT:NATIONAL ACCOUNT TECHNICIAN CONSULTANT,PHONE 800.367.6285 OPTION 2(HOLD FOR NEXT IIINC TO STRUCTURES AND BUILDINGS. DAMPER LOCATION •LOUVERED CONDENSER COIL HAIL GUARDS. RTU'S TO MAINTAIN WARRANTY. AVAILABLE CONSULTANT),FAX 800-053-7290 •FACTORY WIRED AND FACTORY INSTALLED NON-FUSED DISCONNECT. • BURGLAR BARS AT DUCT DROP CONNECTION TO CURB, SHEET METAL SCREWS, •FACTORY INSTALLED UNPOWERED GFI WEATHERPROOF CONVENIENCE OUTLET. + STRUCTURAL REINFORCEMENT AS NECESSARY. FOR PARTS ORDER CONTACT:COMMERCIAL PARTS CUSTOMER SERVICE,PHONE 800-453-6689,FOR IN-WARRANTY PARTS PROCEDURES ARCInTBcr LL MOUNTING FLANGE 6"ON CENTER •SMOKE DETECTORS,FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR AND CONDENSATE PIPE ROUTED AND TERMINATED PER CODE, CONTACT:EMAIL INDWARRANTY@LENNOXIND.COM Drawn By Checked By 18 GAUGE GALVANIZED DUCT RISER WIRED BY ELECTRICAL CONTRACTOR.SMOKE DETECTOR TO BE MOUNTED IN SUPPLY 8 • ENVIRON CONDENSER COIL. ' v IRON RETURN AIR DUCT OR AS REQUIRED BY LOCAL CODE. FOR CREDITIBILLING ISSUES CONTACT:JIM HANSEN,CUSTOMER FINANCIAL SERVICES ADMINISTRATOR,PHONE 972497.6046,FAX AK DH f •FACTORY START-UP 972-097-6151,EMAIL JIM.HANSEN@LENNOXINTL.COM Scale Date NOTES: "EACH UNIT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S AS SHOWN 03106/16 1. CUT AND PATCH EXISTING ROOFING AS REQUIRED FOR NEW CURB INSTALLATION. INSTALLATION INSTRUCTIONS. FOR GENERAL ACCOUNT NEEDS IF ABOVE MEMBERS CAN'T ASSIST YOU,CONTACT:KATIE SCHMITTER,NATIONAL ACCOUNT MANAGER, Job No. 2. CURB SHALL BE TAPERED TYPE AND MATCH THE PITCH OF THE ROOF. 3. SECURELY INSTALL CURB TO ROOF;USE FASTENERS AS REQUIRED BY ROOF "FACTORY INSTALLED CORROSION PROTECTION(EPDXY COATING)WHEN LOCATED PHONE 773-852-2175,EMAIL KATIE.SCHMITTER�LENNOXIND.COM n o CONSTRUCTION. WITHIN 10 MILES OF COASTLINE OR AS REQUIRED BASED ON LOCAL CONDITIONS. _ './VII _ $ TYPICAL PREFABRICATED EF ROOF CURB DETAIL(FURNISHED AND INSTALLED BY LANDLORD) HVAC SCHEDULES 11 Sheet No. = SCALE,NOT TO SCALE SCAI.L NOT TO SCALE '-"e 3 SECTION 15050 3.D5 ARRANGEMENT AND ALIGNMENT 3.03 INSTALLATION,GENERAL-COLD PIPING 2.00 FIRE DAMPERS BASIC MATERIALS AND METHODS A ALL PIPING SHALL BE ARRANGED AND ALIGNED IN ACCORDANCE WITH 1'HE DRAWINGS.ELEVATIONS AS GIVEN MUST BE A PROVIDE FIRE DAMPERS PER DRAWING SCHEDULE,PLANS,BE AND WHERE REQUIRED BY CODE. PART 1-GENERAL HELD.FLOOR ELEVATIONS WHERE GIVEN ARE TO HIGH POINTS OF FLOOR.DIMENSIONS MUST BE HELD AS CLOSELY AS A.ALL SURFACES MUST BE CLEAN AND DRY AND PIPE LINES TESTED BEFORE APPLYING PIPE INSULATION.IF COVERING IS Y POSSIBLE.ALL DIMENSIONS ARE TO BE FIELD CHECKED FOR ACCURACY BEFORE PIPE IS FABRICATED. APPLIED AT THE PIPE COVERER'S OPTION PRIOR TO TESTING,AND DEFECTS IN COVERED WORK APPEAR AT OR BEFORE THE 2.09 CURBS 7.01 DESCRIPTION B.INSTALL ALL PIPING STRAIGHT AND DIRECT AS POSSIBLE,GENERALLY FORMING RIGHT ANGLES WITH,OR RUNNING PARALLEL TIME OF INSPECTION AND TESTS,THE COVERING MUST BE REMOVED,AND AFTER DEFECTS WAVE BEEN CORRECTED,MUST A,PROVIDE CURBS FOR ALL ROOF OPENINGS. WITH,WALLS OR ADJACENT PIPING.ALL PIPING SHALL BE NEATLY SPACED WITH RISERS AND DROPS RUNNING PLUMB AND BE REINSTALLED WITHOUT EXPENSE TO THE OWNER, B,CERTAIN ITEMS OF EQUIPMENT SHALL HAVE CURBS FURNISHED BY THE EQUIPMENT MANUFACTURER. A.THIS SECTION DEFINES THE GENERAL PROVISIONS WHICH ARE COMMON TO ALL SECTIONS OF ETDIVISION L TRUE, C.ALL OTHER OPENINGS SHALL HAVE INSULATED,PREFABRICATED CURBS OF GALVANIZED STEEL CONSTRUCTION,PATE OR B.FURNISH ALL LABOR,MATERIALS,TOOLS AND EQUIPMENT;FABRICATE,AND INSTALL COMPLETE AND IN PLACE,ALL THE C.RUN PIPING IN WALL CHASES,PIPE SHAFTS,HUNG CEILINGS,RECESSES,ETC.,WHERE SAME ARE PROVIDED.DO NOT FIXTURES EOVIPMENTANGNSTALLBIO SHOWN ON THE DRAWINGS.SPECIFIED HEREIN,AND AS REQUIRED FORA RUN SERVICE PIPING IN FLOOR SLAB FILL UNLESS SPECIFICALLY SO NOTED ON DRAWINGS,PIPING SHALL NOT BE COVERED OR S.CO BRINGSHALL SHALL BE SMRY OOTH, EVENINSTA AND SUB AND BEFOREANDUSHINGTHEJACENT PIPE OVERTF MY FINISH.SURFACES OF LESSSHA COMPLETE AND OPERABLE INSTALLATION. CLOSED UNTIL TESTING IS COMPLETED. COVERING SHALL BE SMOOTH,EVEN ANU BUBSTPNTIALLY FLUSH W I'fH ADJACENT PIPE COVERING. D.CURBS SHALL BE SIZED TO FIT EQUIPMENT BASE. C.THE CONTRACTOR SHALL PAY FOR ALL PERMITS,FEES AND CHARGES REQUIRED FOR THIS WORK. 0.DRAWINGS,IN GENERAL,ARE MADE TO SCALE,ALL DIMENSIONS SHALL BE CHECKED IN THE FIELD BY THE CONTRACTOR C,MANUFACTURER'S APPLICATION INSTRUCTIONS FOR ALL MATERIALS SHALL BE FOLLOWED. 2.10 FLEXIBLE DUCTWORK w 1.02 DRAWINGS AND SPECIFICATIONS BEFORE FINAL CONNECTIONS ARE FABRICATED A,PROVIDE FLEXIBLE DUCTWORK PER DRAWING PLANS AND DETAILS. A.DESIGN DRAWINGS:THE DRAWINGS ACCOMPANYING THESE SPECIFICATIONS ARE GENERALLY DIAGRAMMATIC.ANY E.DRAWINGS FOR SMALL PIPING ARE,IN GENERAL,DIAGRAMMATIC AND THE EXACT LOCATION OF THESE LINES SHALL BE D.INSULATION SHALL NOT BE APPLIED OVER PIPE PLUGS,BLIND NIPPLES,NAMEPLATES,INSPECTION STAMPS,OR IDENTIFICATION B,FLEXIBLE DUCTS SHALL CONFORM TO Uf-181 AND WITH A FLAME SPREAD RATING NOT OVER 25 AND A SMOKE CHANGES FROM THE GENERAL ROUTING SHOWN ON THE DRAWINGS SUCH AS OFFSETS,BENDS OR CHANGES IN ELEVATION DETERMINED BY THE CONTRACTOR FROM FIELD MEASUREMENTS TAKEN BY HIM.THE ACTUAL ARRANGEMENT OF THE SMALL TAGS. DEVELOPED RATING NO HIGHER THAN 50.MMIMUM LENGTH SHALL BE B-M WHEN FULLY EXTENDED. DUE TO COORDINATION WITH THE WORK OF OTHER TRADES AND THE BUILDING CONSTRUCTION SHALL BE DONE WITHOUT SIZE PIPING,WHEN ERECTED.SHALL FOLLOW THE GENERAL LOCATIONS SHOWN ON THE DRAWINGS AS FAR AS PRACTICABLE. E.INSULATOR MUST EXERCISE EXTREME GAD nON IN THE a'FORAGE OF FLAMMABLE ADHESIVES AND DURING THEIR APPLICATION. C.ACCEPTABLE FLEXIBLE DUCTWORK CONNECTORS ARE AS FOLLOWS: ADDITIONAL CHARGE TO THE OWNER. THE INSTALLATION MADE IN THIS WAY SHALL BE NEAT IN APPEARANCE AND CONVENIENT TO OPERATE,AND SHALL PROVIDE FLEX ASTER MODEL NO.TL-M; FOR PROPER EXPANSION AND DRAINAGE. B.SHOP DRAWINGS:SHOP DRAWINGS SHALL BE SUBMITTED FOR EACH AND EVERY ITEM OF MANUFACTURED MATERIAL 3.041NSULATION OF PIPING-COLD PIPING FLEXMASTERMODELNO.M- F.INSGHT Fl ITU OF PIPING SYSTEMS SHALL NOT INTERFERE WITH WITH OTHER WORK TO AVOID BLOCKING BUILDING OPENINGS, THERMAFLEX MODEL N0,M-KC AND DRAWINGS: LIGHTFIXTUYS.ETC.PIPINGSHALLTALLED TO ACCESST LEA ANCEFVES or R OPERATANAND MAID SHALL NrENANCOT 08 DUCT C..THE CO DRAWINGS: PASSAGEWAYS.PIPING SHALL BE INSTALLED TO PROVIDE WORKING CLEARANCE FOR OPERATION AND MAINTENANCE. A BUTT JOINTS OVERLAP ON6-ETHER.OVERLAP SEAM SHALL BE DOWNWARD ON SIDE OF PIPE,SEALED TIGHT AND SMOOTH. TECHNAFLEX MODEL N0.5TN 1.THE CONTRACTOR SHALL KEEP AN ACCURATE RECORD OF ALL CONCEALED PIPES,DUCTS,VALVED,CONDUITS,ETC.IN 5'rAPLIE OVERLAP ON 6"SPACING, AE ITTO,HE GNDRAWINGS THARECTRD, OCCURRED NA SPECIAL SET EI CONTRINSTALCT LATION OF INGS,THE ALL CHANGES AND DEVIATIONS FROM THE 3.0 6 MODIFICATIONS ANDSHALL CAREFULLY 2.11 FA PROVIDE BC DONS DESIGN DRAWINGS THAT OCCURRED DURING TMERATIN LAHAN E THE WORK A.CONTRACTOR SHALL CGS AND DETAILS. AND MAKE NOTE AL LOCATIONS THE WHERE WALLS,PARTITIONS, ELECTRICAL STRUCTURAL B.INSTALL BUTT STRIPS WITH 2-OVERLAP DOWNWARD STAPLE ENO OF OVERLAP. PREFABRICATED LB,DENSITY LOADED VINYL FLEXIBLE CONNECTORS FOR ALL ITEMS OF ROTATING FAN EQUIPMENT. 2.AT COMPLETION OF THE JOB,THESE DRAWINGS ILLUSTRATING CHANGES ET DEVIATIONS SHOWING BY DIMENSION AND MECHANICAL DRAWINGS AND DETAILB,AND MAKE NOTE OF ALL LOCATIONS WHERE WALLS,PARTITIONS,CEILINGS,STRUCTURAL C.INSULATION SHALL BE FASTENED WITH 9I18"FILMS TYPE STAPLES. 2.12 PREFABRICATED DUCTWORK LOCATION THE EXACT POSITION OF ALL CONCEALED PIPES,VALVES,ETC.,SHALL BE DELIVERED TO THE ARCHITECTIENGINEER. MEMBERS.ETC..ARE SPILLS FOR TO BE FURRED OR CLOSED-IN. A.PROVIDE PREFABRICATED ROUND AND OVAL DUCTWORK WITH SPIRAL OR LONGITUDINAL SEAMS. D.SPECIFICATIONS-REFER TO THE FOLLOWING GENERAL SPECIFICATIONS A9 THEY PRE A PART.FALL SECTIONS OF B.MODIFICATIONS TO THE ARRANGEMENT R THE PIPING SYSTEM MAY T REQUIRED SH SHALL SUIT FURNISH ALL OFF CONDITIONS,OR DUCT CUNSTUCTION FOR 2"W.C. DIVISIONIS. TO AVOIDINTERFERENCEWITHTHEWORK CONDITIONS WHETHER ETCONTRACTOR SHALL DRAWINGS OR POETS,ADDITIONAL FITTINGS, O.SEAL OVER STAPLES WITH VAPOR-BARRIER MASTIC,CHILDERS NO.CP321WHITEj. 1.OIVI81UB ITTAS,CO STRUCTION REQUIREMENTS: AND BUT TEMPORARY LIMITEDCONTROLS,CLEATING PROJEDURING CONSTRUURES,CTION N QUESTIONABLE D TOEINF MEET INSTALLATION CONDITIONS OR ON HE DAILED ONWINGS SHALL BE CAGED TO TH. DUCT DIAMETER SPIRAL SEAMGAUGE GA V.STEEL SEAM GAUG ALUM. SUBMITTALS CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS,CLEANING DURING CONSTRUCTION,AND PRODUCT C.ANY QARCHITECT ANCHOR ENGINEER OR CILACIFICAIONB FORE THE PROCEEDING WITH FA RICAION OR ERECTION THE (INCHES) 26 STEEL ALUM. GALV.9TEEL ALUM. OPTIONS AND SUBSTITUTIONS. 3.tl5INSULATION OF FITTINGS,VALVES,ETC.-COLD PIPING UP T014' 26 .025" 24 .032" 2,DIVISION 2-SITEWORK:REGARDING BUT NOT LIMITED TO:SELECTIVE DEMOLITION,EARTHWORK,EXCAVATION AND THE ARCHITECT AND/OR ENGINEER FOR CLARIFICATION BEFORE PROCEEDING WITH FABRICATION OR ERECTION OF THE PARTS BACKFILLING. THEM AT OINTHEENSE,TOGETHER WITH ALL BILLS ANY MATEINNALDETAILDRAWINGS ARE NECESSARY,HE SHALL PREPARE 15"T028' 22 .NO 22 .040' 3.DIVISION 3-CONCRE FE;REGARDING BUT NOT LIMITED TO:CAST-IN-PLACE CONCRETE,FORMWORK AND THEM ATHIS OWN EXPENSE,TOGETHER WITH ALL BILLS OF MATERIAL. A.VS CURING WITH NGS JUTE WINE.ND PREFOLBEINSULDED PVC WRAPJACKS r COVER SHALL PRE-CUTBE FIBER GLASS ERTHBLANKET BOONKATIONAND 20"To SO- 22 ... 20 O03. REINFORCEMENT. THE LAC E FASTENED ED WITH STAIN LESS STEEL EL TACKS COVER STRIPS OINS'LALLEDUVNTO THE LANKET INSULATION. 30"T050' 20 .050" 16 .083" pn 3.Oi PIPE CLEARANCES THE JAl ION A VA BE FASTENED WITH STAINLESS STEEL TACKS(WHITE) BUTT HALL B STRIPS TO SEAL ME THROAT AN PIPE 52"To 60' 1B .003" 18 .Oi1' 0) E.IT IS THE INTEN THE OF MIS GSFOSPECIFICATION CHSECTIONSECTION SHALL ALL ITEMS EDBYTHECOF MATERIAL NT EQUIPMENT THAT EREIN SECTION, SPECIFIED A.INSTALL PIP IIT IN S,VALES,MINIMUM ALLOWING FOR INS OF LATI LEAST ONE INCH SIONBETWEEN THELIKE. PROJECTIONS OF PIPING, INSULATION.AVAPE INSULATION MASTIC,CHILDERS NO.CP-32AND RIP INS INSTALLATION. BE USED TO SEgI'fHE JACKET THROAT AND B.SLEEVES,COLLARS,FITTINGS,ETC.SHALL BE OFF A WALL THICKNESS NOT LESS THAN THAT SPECIFIED FOR LONGITUDINAL OR ON THE DRAWINGS FOR EACHSECTIONSHALLBE FURNISHED THE CONTRACTORFOR THATSECTION,AND FLANGES,FITTINGS,VALVES,ALLOWING FOR INSULATION,PIPE EXPANSION AND THE LIKE. JACKET TO THE PIPE INSULATION PRIOR TO TACK AND BUTT STRIP INSTALLATION. SEAM STRAIGHT DUCT UNLESS CERTIFIED TESTING DATA INDICATES SUITABILITY AND IS SUBMITTED TO ENGINEER FOR REVIEW. INSTALLED BY THAT CONTRACTOR,UNLESS IT IS SPECIFICALLY STATED IN THE SECTION SPECIFICATION,OR SHOWN ON THE DRAWINGS,THAT ANY ITEM OF MATERIAL OR EQUIPMENT IS TO BE FURNISHED BY THE CONTRACTOR OF A SECTION ANU 3.08 DRAINAGE ANO VENTING S.FLANGES SHALL BE INSULATED WITH NESTING PIPE INSULATION,THE FLANGE INSULATION SHALL EXTEND NOT LESS THAN 2- 2.13 OFF USER PLENUMS INSTALLED BY THE CONTRACTORS OF OTHER SECTIONS,OR FURNISHED BY OTHER SECTION CONTRACTORS AND INSTALLED BY THE A.WHERE LINES ARE PURPOSELY PITCHED FOR DRAINAGE OR VENTING,AN ACCURATE GRADE SHALL BE MAINTAINED,LINES OVER THE ADJACENT PIPE INSULATION ON EACH SIDE OF THE FLANGE.INSULATION ON PIPES IS TO BE STOPPED SHORT OF A.PROVIDE DIFFUSER PLENUMS AS SHOWN ON DRAWING PLANS AND DETAILS. o CONTRACTOR OF THE SECTION. SHALL BE SUPPORTED IN SUCH A MANNER AS TO PREVENT DEFLECTION OF THE PIPING SUFFICIENT TO POCKET THE LINES. FLANGES TO PERMIT REMOVAL OF FLANGE BOLTS.THE FLANGE INSULATION SHALL BE APPLIED IN SUCH A MANNER THAT IT 1.03 CHASES AND RECESSES MAY BE REMOVED WITHOUT DAMAGE TO THE ADJACENT PIPE INSULATION. 2.14 DUCT LINING A.ALL CHASES,RECESSES AND MAJOR MASONRY OPENINGS AS SHOWN ON THE DRAWINGS WILL BE PROVIDED BY THE 3.09 PIPE AND FITTINGS A,PROVIDE DUCTWORK WITH FIBERGLASS LINING WHERE INDICATED ON THE DRAWINGS PER THE SYMBOL INDICATOR. ARCHITECTURAL TRADES. A.ALL PIPE SIZES REFERRED'f01N THESE SECTONS SHOULD 0E INTERPRETED AS IRS(IRON PIPE SIZE)UNLESS C.UNIONS SHALL BE COVERED WITH Has FINS PIPE INSULATION AS SPECIFIED FOR FLANGES. B.UNING SHALLBE 1.5INCH THICK,2.0 POP DENSITY,FLEXIBLE,WITH FIRE RESISTANT COATING TO BOND THE AIR SIDE SPECIFICALLY DESIGNATED OTHERWISE,SUCH AS"O.D"FOR TUBING. SURFACE OF THE FIBERS, 1.04 LUBRICATION S.FULL LENGTHS OF PIPE SHALLBE USED WHEREVER POSSIBLE.SHORT LENGTHS OF PIPE WITH COUPLINGS WILL NOT BE D.STRAINERS SHALL BE INSULATED AS DESCRIBED ABOVE FOR SMALL VALVES AND FITTINGS.CLEAN-OUT PLUGS SHALL BE LEFT C.LINING SHALL HAVE MINIMUM 3.B FT2 HR FIBTU THERMAL RESISTANCE. ��y e A.PRIOR TO TESTING,ALL EQUIPMENT SHALL BE PROPERLY LUBRICATED IN ACCORDANCE WITH THE MANUFACTURERS PERMITTED. ACCESSIBLE SO THAT THE INSULATION IS NOT DAMAGED BY THEIR REMOVAL. D.FIRE HAZARD CLASSIFICATION-AETM E-84-70 TEST METHOD,25 FLAME SPREAD,SO SMOKE DEVELOPED, V C.ALL PIPE SHALL BE CUT TO EXACT MEASUREMENT TO BE INSTALLED WI'THOV'r FORCING(EXCEPT WHERE COLD SPRINGING E.LINING SHALL BE SUPPLIED BY OWENS-CORNING,CERTAINTEED OR KNAUF. _ A L UNITS SHALL ONE BET OF TOOLS NECESSARY FOR LUBRICATION SHALL BE DELIVERED I T E OWNER AFTER PROPER LUBRICATING, E.WHEREVER NESTING SIZE SECTIONAL COVERING IS USED,IT SHALL BE CUT TO FIT IN A NEAT WORKMANLIKE MANNER WITH ALL ALL UNITS SHALLBE STARTED AND SUCCESSFULLY OPERATED BY THE CONTRACTOR IN THE PRESENCE OF THE ARCHITECT IS SPECIFICALLY CALLED FOR).AFTER CUTTING,ENDS SHALL T REAMED AND CLEANED TO LELIMINATE FOREIGN MATTER. JOINTS BUTTED AND HELD SECURELY IN PLACE WITH JUTE OR GLASS FIBER TWINE JOINTS SHALL BE POINTED UP WITH 2.15 VIBRATION ISOLATION 6 lie AND/OR ENGINEER. 0.CUTTING N OTHER WEAKENING OF THE BUILDING STRUCTURE ER FACILITATE PIPING INSTALLATION WILL NOT BE PERMITTED. B.EXCEPT FOR SMALL ELECTRICAL MOTORS WHICH UNDER GENT STANDARDS ARE EQUIPPED L WITH LIFETIME LUBRICATION,ALL E.ALL PIPE AND STANDARDS TO SHALL BE MARKED IS THE MANUFACTURER IN ACCORDANCE WITH THE MARKING SECTIONS OF INSULATING CEMENT PRIOR TO RECEIVING SURFACE FINISH. A.PROVIDE VIBRATION ISOLATION FOR ALL FAN EQUIPMENT PER DRAWING PLANS AND DETAILB. 1nI 1n1�n BEARINGS ON LARGE MOTORS AND MECHANICAL EQUIPMENT SHALL BE EQUIPPED WITH LUBRICATOR FITTINGS EXTENDED TO THE THENGS,FLANGES AND CH UNIONS FTCE HE ANUFA MADE 1NTHISSPECIFIARDIZ MANUAL.SOCIETY DARDOF VALVE AND FOR VALVES, r luul EXTERIOR OF THE HOUSING. FITTINGS, SIZE AND OECTIONFPIPINU ERSWITH STANDFITTINGS. 00NOT SOCIENDS.THEVALVE ANU FITTINGS INDUSTRY. F.FA PLISVALVE ANDCOILOR STRAINERS, VAPO-BARRIERSHALL JACKET EDAND CLOTH BEEN CHILDERS NO.R.32(WRITE)ATD PARTS-EXECUTION .? F.MAKE ALL CHANGES IN SIZE AND DIRECTION LD PIPING WITH FITTINGS.00 NOT USE BENDS.MflER FITTINGS,FACE OR APPLIC F nONS,AND COLOR DAMAGED JACKETS SHALL BE SEALED AND PAINTED WITH CHILDERS NO.CP-32(WHITE)AT THE 0. 105 PA.MOT.RIrvG FLUSH BUBHINOS STREET NOT E BE PERMITR D:USE ONLY SHED OULDER REDUCERS, kA'rE OF BS-iW 9Q.FT.PER GALLON. 3.01 HVAC UNIITS SHALL BE MOUNTED ON STRUCTURAL 0 0) A.MOTORS S AL AND UILUOINGI0VOLS,00 H BE EF120 VOLT,BHASE Z.LESS THADE ANO MOTORS 2RDAWI G.CLOSE NIPPLES L'SHAL BEOFHEAVY WD;USEONLYSHOUHAVING PPLES.SHOUL ER LENT OF1.1IPPLE WITH SHOULDEGREATER LENGTHSHALL BE A.L PREFABRICAT MOUNTED ON UPPOR ,SEE EEDRAWI DRAWINGS DETAILS AND LEGENDS, THE BUILDING STRUCTURAL SYSTEM OF � � F%d LESS MESCHEDULEA S BEOFHEAVY WALL PIPE;NIPPLES HAVING SHOULDER LENGTH OF I.IY1"ORGREATERSHALLBE 5.00 INS'TALLA'TION-REFRIGERANT PIPING PREFABRICATE BE TTEDEPONSINT SUPPORTS,CONTRRAWINGB DETAILBCTIONT ENDS. LARGER SHALL BE BUILT FOR 480 VOLTS,BO HERTZ,THREE PHASE',UNLESS OTHERWISE INDICATED PER DRAWING SCHEDULES, B.IT SHALL BE THE RESPONSIBILfTY OF THE CONTRACTOR OF THIS SECTION TO PROVIDE CERTIFIED DIMENSIONS ON EACH ��M PLANS ANO DETALS. OF SAME SCHEDULE AS CONNECTED PIPE. UNIT TOTHE STRUCTURAL CONTRACTOR FOR PROPERDESIGN S THESTRUCTURALMOUNTING. In1 A.INSULATION SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS FOR 40EF PIPING. � �J B.T THREE PHASELOONTRACTOR AND VNFLPRD IDE DISCONNECTS SON MAGNETIC STARTERS WITH HASENO.&SWITCHEQUIPMENT FOR EXCEPT ITEM OF 3.10 REDUCING FITTINGS C.UOREXT SHALL L SEPARATE TORS FROM THE BUILDING STRUCTURAL SYSTEM WITH 95%EFFICIENT ISOLATOR5EITHER BY INTERNAL STARTERS AS UNFDBEFWIRED QUIPMEOREACHITEMOFSINGLEPHASEEQUIPMENT,E%CEPTWHERE a Q STARTERS ARE FURNISHED PART OF WIRED EQUIPMENT. A. ECCENTRIC REDUCING FITTINGS OR ECCENTRIC REDUCING COUPLINGS WHERE REQUIRED TO PREVENT POCKETING OF B,PROVIDE ENDATONS, OF WEATHER RESISTANT PAINTFOR EXTERIOR INSTALLATIONS IN ACCORDANCE WITH MANUFACTURER'S OR EXTERNAL ISOLATORS. C.THE ELECTRICAL CONTRACTOR SHALL DO ALL POWER WIRING INCLUDING CONNECTIONS TO THE MOTORS FURNISHED BY THE LIQUID. RECOMMENDATIONS. � W Btil 3.02 FILTERS T/� �J CT 90F THIS DIVISION. HL CONTRA OR A.INSTALL FILTER HOUSINGS IN SYSTEM PLENUMS AND PROVIDE TRANSITIONS OR BAFFLES`0 PREVENT AIR BY-PASS. 3.11 CONNECTIONS TO EOUIPMENTAND SPECIALTIES 3.U%INSULA'fEO DUCT SYSTEMS ��A/� O.REFER T I SECTION ACT FOR THEY WIRING TO O PERFORMEDPETURE CONTROLS TEMPERATURE CONTROL CONTRACTOR AND THE O AA/ A.PIPING SYSTEMS SHALL BE INSTALLED COMPLETE TO EQUIPMENT CONNECTIONS OR TERMINAL USE POINTS. B.INSTALL FILTERS BEFORE ANY SYSTEM IS PVT IN OPERAYION. ELECTRICAL CON'fRACTORA9 THEY RELATE TO TEMPERATURE CONTROLS. J B.PIPING TCE pPELL BE FABRICATED CAREFULLY AND ACCURATELY TO MEET CONNECTIONS ON EQUIPMENT WITHOUT SPRINGING A.PROVIDE INSULATION ON THE SUPPLY AND RETURN DUCTWORK SYSTEMS,EXCEPT WHERE DUCTWORK IS INDICATED TO BE LINED. 3.03 PLENUM LINING J Q 1.08 FLUSHING WAND WATER STINGRPIP C.PROVIDE UNIONS OR FLANGES AT ALL PIPING CONNECTIONS TO EQUIPMENT,ETC.,AT ALL LOCATIONS AS SHOWN ON THE B.PROVIDE.INSULATION ON THE OUTSIDE AIR DUCTWORK OF ALL SYSTEMS FROM THE PLENUM Oil HOOD INTAKE TO THE HVAC A.ADHERE LINER WITH A FULL COAT OF ADHESIVE AND MECHANICAL FASTENERS. _I< A.ALL NEWEASY STEMS.CONDENSATENG SYSTEMS DRAINAGE,L BE SHALL BE TEST DRAWINGS,AND GENERALLY AS REQUIRED TO DISCONNECT PIPING FROM EQUIPMENT AND APPARATUS.ARRANGE CONNECTIONS UNIT,EXCEPT WHERE DUCTWORK IS INDICATED TO BE LINED. B.EXPOSED EDGES SHALL BE FINISHED WITH TROWEL APPLIED MASTIC TO PREVENT ANY POSSIBILITY OF EROSION.MASTIC -j B.ALL OPEN SYSTEMS.FLOROENSATEDRAINAGE,ETC.,SHALL BE NESTED WITH WATER,ATA HEAD OF FIVE(5)FEET TO HAVE CAME FIRE HAZARD CLASSIFICATION AS LINER. Q u' SO THATTHEEQUIPMENTSERVED MAYBE OR FLANGES SHALL FLOC TEE THE PIPING WHEREVALVESSERVE TO ISOLATE q� AND THE SYSTEM RETESTED. GRADE. UNUIPMEIONSS ALLGENERLYSPECIALTIES,USED HE PIPE FIZESZ NGSMALLR AND FLANGES NVALVE ANDEQUIPMENT2.112. LARGER. TO C.PROVIDE INSULATION PLENUMN THE OR rD DISCHARGRK OF E. T SYSTWHEEMSFROMTHESYSTEMEXHAUs DTOBf AIR CONTROL DAMPER IL_ �' v C.ALL PIPING SYSTEMS SHALL BE TESTED.IF LEAKS OCCUR.THE PIPE OR FITTING SHALL BE REMOVED AND REPLACED3.D4 EXHAUST FANS Ify AND THE SYSTEM RETESTED. UNIONS SHALL GENERALLY BE USED FOR PIPE SIZES 2"AND SMALLER AND FLANGES FOR PIPE SIZES 2-t12"AND LARGER. TO THE EXHAUST AIR PLENUM OR HOOD DI9GHARGE,EXCEPT WHERE OVCTWORN IS INDICATED TO BE LINED. n D.PIPING SHALL NOT BE BACKFILLED OR INSULATED UNTIL TES FED.TESTS MUST BE OBSERVED BY THE A.NOUNrFASTEN ROOF MOUNTED FANS TO KWIT VIBRSIX ATION TIONINC IS LA IO NHERSUSING HEX HEAD SCREWS AND WASHERS. J to 3 ML ARCHITECTIENGINEER. 3.12 DIELECTRIC CONNECTIONS D,PROVIDE INSULATION ON THE OUTSIDE AIR INTAKE AND EXHAUST AIR DISCHARGE AIR PLENUMS. B.NOUN IN-LIME FANS TO DUCTWORK WITH VIBRATION ISOLATION SUPPORTS. �w F p A.PROVIDE DIELECTRIC FITTINGS BETWEEN FERROUS AND COPPER PIPING. C�9l- 3.D0IN9TALLgTIUN,GENERAL-DUCTS 3.U4 GR E DAMPERS 1.07 GUARANTEE A.WHERE GRAM fY DAMPERS ARE INSTALLED THIS CONTRACTOR SHALL LUBRICATE THE HINGES AND BE RESPONSIBLE FOR A.IN ADDITION TO GUARANTEE PROVISIONS OF THE GENERAL CONDITIONS,ALL REFRIGERANT COMPRESSORS SHALL HAVE AN 3.13 PIPE SLEEVES WHERE EXTENDED WARRANTY OF FOUR(4)YEARS BEYOND THE FIRST YEAR FOR REPLACEMENT OF PARTS AND LABOR TO REPAIR. A.PROVIDE ALL PIPE OPENINGS THROUGH WALLS,PARTITIONS AND SLABS WITH SLEEVES HAVING AN INTERNAL. AT A NO INSULATION SHALL BE APPLIED UNTIL THE DUCTWORK HAS BEEN TESTED AND PROVEN TIGHT. OPERA IN USE. LEAST 1"LARGER THAN THE OUTSIDE DIAMETER OF THE PIPE FOR UNINSULATEO AGES OR OF THE'fHiCKNE33 OF 0F THE THE INSULATION FOR INSULATED SERVICES. B,ALL DUCTWORK SHALL BE CLEANED OF OIL,GREASE,LOOSE DIRT,AND OTTHER FOREIGN MATTER BEFORE THE INSULATION IS APPLIED. 3.06 GRILLES ANO DIFFUSERS 1.00 SUPPORTS B.INSTALL SLEEVES THROUGH INTERIOR WALLS AND PARTITIONS FLUSH WITH FINISHED SURFACES;SLEEVES THROUGH OUTSIDE A.INSTALL ACCESSORY DAMPERS IN THE FULL OPEN POSITION. r��_+ A.CONTRACTOR OF SECTION.WHETHER ALL ANGLES,ON THE DRAWLS,PLATES,OR SEAMS REQUIRED FOR THE SUPPORT OF THE C.E%POSED ENDS OF INSULATION SHALL BE BEVELED TO THE INSULATED SURFACE,AND THE JACKET ANUIOR VAPOR BARRIER S.IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO ASSURE'I'HAT ALL DAMPERS ARE FULL OPEN BEFORE AIR '4`° U"'� WALLS ARE TO PROJECT 112"ON DO-SIDE OF ME FINISHED WALL.FLOOR SLEEVES ARE TO PROJECT 2-ABOVE FINISHED 1r��A EQUIPMENT IN EACH SECTION,WHETHER SHOWN TU THE DRAWINGS OR NOT. SHALL BE SEALED TO THE SURFACE. BALANCING IS PERFORMED, 0)C V B.FURNISH AND INSTALL ALL RODS AUXILIARY STRUCTURAL STEEL FRAMES,ATTACHMENTS,BRACKETS AND PLATFORMS FLOORS. C.SET SLEEVES IN PLACE BEFORE POURING CONCRETE OR SECURELY FAS'!EN AND GROUT IN WITH CEMENT. BEQCALPIPE FOR SHALL EQUIPMENT FROM DMIDWAY OF THEIR CONSTRUCTION FOR HE RESPECTIVE SEC D.CANDR5IN THE INSULATIONANDITIONFOR NAMEPLATES AND EQUIPMENT TAGS SHALL HAVE ALL EDGES TAPERED TO THE SURFACE, 3.07 ACCESS DOORS J4)"0-ua O.SLEEVE CONSTRUCTION: C.VER X114IPE RISERS ATTACHETO PIPES RHEIGHT,OR SHALL BE SUPPORTED AT EACH FLOOR BY 1,INTERIOR MASONRY NWLL 22 GAUGERS:GALVANIZED SCHEDULE 0GALANIZEDHTOLDEREUJ0INT. pND'THEJACKET AND/OR VAPOR BARRIER SEALED. A.CR)AUL ACCESS DOORS CCESSONCEALED THE EQUIPMENT. CONSTRUCTION WHERE SHOWN ON'rHEDRAWING PLANSAND WHERE REQUIRED Aa �-'O 1 irz"%114'BAR CLAMPS ATTACHED TO PIPES AND RESTING ON THE FLOOR CONSTRUCTION. 'TO ACCESS CONCEALED EQUIPMENT. W 2.INTERrERI RWM SNRYWALLSPACE BETWEEN SCHEDULE 40 PIPE OR STEEL E. a � v D.HORIZONTAL PIPING SMALL BE SUPPORTED BY ADJUSTABLE,WROUGHT,CLEVIS TYPE RENDERS,FEE 8 MASON,ELCEN,OR B.COORDINATE INSTALLATION WITH THE GENERAL CONTRACTOR. Aed E.IN WALLS:FILL THE SPACE BETWEEN OV'fSIUE OF PIPE OR INSULATION AND THE INSIDE OF THE SLEEVE OR ESPECIAL CARE MUST ACCESS DOORS, IN APPLYING INSULATION AROUND SUCH ACCESSORIES A9 REHEA!COILS,FLEXIBLE SHALL COO.RATEWHER IN THE JOINTLLEL USE FSUCRE HANGALLED ATTHESAANME ERS SHALL BE OF SIZE TO SUIT PIPE COVERITHE NG TRADES FARMED OPENING WITH FIBER ITHOALAS6. OR EAKING HEVAPSR SEAL.ETC.,TO ALLOW REMOVAL OF THESE ITEMS WITHOUT IN ANY WAY REMOVING THE INSULATION ^ 0--"� SHALL COOPERATE IN THEJOINTUSEOFSUCH HANGERS.PIPE HANGERS SHALL OEOFSIZET03UITPIPE COVERING F.EXTERIOR WALLS:PACK WITH OAKUM,SEAL WITH LEAD AND WATERTIGHT MASTIC OR ASPHALT. OR BREAKINGTHEVAFORSEAL. 3.08FLUES i. _ �y PROTECTION SADDLES, G.PROVIDE ESCUTCHEONS ON BOTH SIDES OF THE PENETRATION THROUGH THE STRUCTURE FOR ALL PIPES EXPOSED TO VIEW A.SUBMIT DRAWINGS FROM THE MANUFACTURER OF THE FLUE SYSTEM INCLUDING CONNECTIONS TO'ME EQUIPMENT,FLUE TS V°` X E.PIPES SHALL BE SUPPORTED ONLY FROM THE STRUCTURAL MEMBERS OF THE BUILDING.THEY SHALL BE SUPPORTED AT PASSING THROUGH WALLS,FLOORS,CEILINGS,AND PARTITIONS,WHETHER OR NOT INSULATED.FOR PIPES PASSING THROUGH 3.09 INSTALLATION-DUCTS SUPPORTS,ROOF PENETRATION AND FLUE CAP. V ` �C �v.. SUCH INTERVALS AS WILL PREVENT SAGGING,AND 80 THAT EXCESSIVE LOADS WILL NOT BE PLACED UPON ANY ONE SUPPORT. B.DO NOT ORDER FLUES UNTIL DRAWINGS ARE APPROVED, N v aQQ SPACING AND ROD SIZES SHALL BE AS FOLLOWS: FLOORS,ESCUTCHEONS SHALL FIT OVER THE SLEEVES. _ jd H.FIRE STOPPING SHALL BE PROVIDED AT ALL OPENINGS TO INCLUDE THE ANNULAR SPACE AROUND TOUTS,PIPING, A.INSULATION WRAP SHALL BE APPLIED TO THE DUCT WITH 6"WIDE BANDS OF ADHESIVE ON I2'CENTERS.THE ADHESIVE _ �l " PIPE SIZE MAXIMUM SPACING MINIMUM ROD SIZE 3.08 MOT OPERATED DAMPERS //�� A-' SUBMIT CONDUITS,ETC,AND SHALL ATIONP RATED PROTECTION LS FOR ALL FIR RAER TED ASEMBLIIES RALTO THE LOCAL NBECTIS S.AN SHALL HAVE lW'INW FLAME DPREADEF X OF 25 FASTENERS SHALL.WELDING XIMUMOFASTENCENTER SHALL AN APPLIED To CLOSE BOTTOM OF A.DAMPERS,WHETHER FURNISHED BY THIS CONTRACTOR OR THE CONTROL CONTRACTOR,SHALL BE INSTALLED SQUARE TO THE i �,IA" NO�m, ill" 6'-0"AND AT ALL TURNS 310" ARCHITTHROUGHPENETR REVIEW. PROTECTION SYSTEMS FOR ALL FIRE RATED ASSEMBLIES TO THE LOCAL AUTHORITIES AND THE EDUCT NDSOFVEft INSNWIOHH.THE FASTENERS SHALT OFF FLUSH WITH ON CENTERS WASDPLACEDCLOSE TO BUTT DUCT OR CONSTRUCTION. « LL 3I4",1" 7'-0"AND AT ALL TURNS Lis' ARCMITECTIENOINEER FOR REVIEW. ENDS OF THE INSULATION.THE PINS SHALL BE CUT OFF FLUSH wITM THE FASTENER WASHER. ^^ LJ�'�'� �,'�GH� B.DAMPERS SHALL BE MANUALLY TESTED ASSURE FREE AND EASY MOVEMENT. i 4m 1-114,1.12",Z. 9'-0"AN DA AL TURNS 310' 1 71 G❑ 3 C.ADJUST DAMPER BLADES FOR FULL CLOSURE. O 2-1""'T' 10'A'AGO AT ALL TURNS 112' 3.145CREWED JOINTS B.ALL JOIN'f9,CRACKS AND BREAKS,INCLUDING HOLES FOR THE FAR TENERS,IN'THE VAPOR BARRIER SHALL BE SEALED WITH �.,�,� CO 3 F,HANGER RODS SHALL BE FULL-DIAMETER STEEL WITH THREADED ENDS FOR FIELD CUTTING AND THREAD EXTENDING AS A.CUT THREADS FULL AND CLEAN WITH SHARP DIES. VAPOR BARRIER MASTIC,CHILDERS NO.CP-32(GRAY)AND VAPOR BARRIER JACKET MATERIAL.BREAKS IN THE VAPOR 3ASFIREDAMPERS �+�5,Q ; REQUIRED.WHERE THREADED ROD IS SHORTER THAN WIT SHALL BE DIPPED IN RUST RESISTANT PAINT PRIOR'rO B.REAM ENDS OF PIPE AFTER THREADING AND BEFORE ASSEMBLY,TO REMOVE BURRS. BARRIER CAUSED BY THE ATTACHMENT'OF TUBING OR OTHER EQUIPMENT SHALL ALSO BE SEALED.VAPORSARRIERIAPS A.INSTALL DAMPERS IN SLEEVE PER DRAWING NOTE. A4� C' 3� INSTALLATION. C.LEAVE NOT MORE THAN THREE PIPE THREADS EXPOSED AT EACH CONNECTION. 9HIALL BE SEALED WITH ADHESIVE,CHILDERS NO.CP-02,NO STAPLES SHALL BE USED'CO SECURE'ME VAPOR BARRIER LAPS. B.RELEASE DAMPER LINKAGE AND TEST FOR FREE FALLING CLOSURE BEFORE AND AFTER INSTALLATION. I �LY I; G.AT THE CONTRACTOR'S OPTION,HANGER RODS SHALL BE CONTINUOUS THREADED S'FEEL WITH GALVANIZED FINISH. D.USE JOINT SEALANT OR TAPE ON MALE THREADS ONLY, C.RECONNECT LINKAGE. H.HANGER RODS SHALL NOT BE BENT OR ALTERED IN ANY MATTER AND SHALL BE INSTALLED PLUMB AND TRUE.THE ROD C,WHERE PINS ARE USED,APPLY VAPOR SEAL PATCHES USING ADHESIVE OVER THE PINS. SUPPORTING THE HANGER SHALL BE NO LONGER THAN 112'BELOW THE LOWER NUT, 3.11 CURBS TI SECTION 15250 3.10 INSULATION-AIR SYSTEM COMPONENTS A.CURBS SHALL BE TAPER TYPE AND MATCH THE PITCH OF THE ROOF.COORDINATE INSTALLATION OF CURBS WITH THE I- 1.09 EQUIPMENT IDENTIFICATICN GENERAL CONTRACTOR. A.ALL MECHANICAL EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH 2-HIGH STENCILED LETTERS,PAINTED ON THE INSULATION A.PROVIDE INSULATION ON THE EXTERIOR SURFACES OF SUPPLY SYSTEM COMPONENTS CONVEYING MECHANICALLY COOLED AIR B.INSTALL STEEL PLATES AND ACCESSORIES AS REQUIRED FOR DUCTWORK OR EQUIPMENT CONNECTIONS. "g EQUIPMENT(I.E."RTU-1").THIS INCLUDES EXTERIOR EQUIPMENT WHERE THE PAINT SHALL BE WEATHER RESISTANT. EXCEPT WHERE SUCH COMPONENTS ARE INDICATED TO BE LINED. C.GENERAL CONTRACTOR WILL PROVIDE SHIMMING LEVEL OF CURBS,FASTENING OF CURBS TO ROOF CONSTRUCTION AND ROOF FLASHING. PART 2-PRODUCTS PART 1-GENERAL B.INSULATED COMPONENTS SHALL INCLUDE FILTER SECTION,SUPPLY FAN,RETURN FAN,DISCHARGE CONE,COIL SECTION AND ATTENUA'FOR SECTION. 3.12 DIFFUSER PLENUMS 2.01 DESCRIPTION 1.01 RELATED DOCUMENTS A.PLENUMS WILL BE RECEIVED WITH FACTORY APPLIED FINISH.IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO A THIS PART DEFINES THE PIPE AND FITTINGS TO BE USED FOR ALL SERVICES INSTALLED UNDER DIVISION 15. 3.11 INS TALLATION-AIR SYSTEM COMPONENTS PROTECT'THAT FINISH. B.REFER TO THE DRAWING LEGENDS AND SYMBOL SCHEDULES FOR DEFINITION OF THE DESIGNATORS USED IN THE A.SECTION 15050,'EASIC MATERIALS AND METHODS",APPLIES TO THE WORK SPECIFIED IN THIS SECTION. 8.IF IN THE OPINION OF THE ARCHITECT'S SITE INSPECTOR THE FINISH IS NOT ACCEPTABLE WHEN READY TO BE FORMED FOLLOWING SPECIFICATION. A.BOARDS SHALL BE APPLIED USING MECHANICAL FASTENERS.FASTENERS SHALL BE LOCATED NOT LESS THAN S'FROM EACH OVER TO THE OWNER,THE DAMAGED PLENUM SECTIONS WILL BE REMOVED AND REPLACED. EDGE OR CORNER OF THE BOARD.PIN SPACING ALONG THE PANELS NO GREATER THAN 12-ON DEN rare. RBVISIDRS 2.02 PIPE AND FITTINGS RELATED TO SECTION 15800 PART 2-PR000CT5 3.13 FLEXIBLE DUCTWORK A CONDENSATE DRAIN PIPING: B.APPLY ROUND VAPOR SEAL F9K PATCHES USING ADHESIVE OVER THE PINS. A.APPLY MASTIC DUCT SEALANT TO RIGID DUCT AND DEVICE TO WHICH CONNECTION IS BEING MADE BEFORE INSTALLING ISSUE FOR CLENTILL REVIEW 1.PIPING RESCHEDULE 40,ASTMHEDU E 0, PIPE Al2UGALVANIZEDPIPEAND FITTINGS. 2011NSULATION-COLD PIPING FLE%ISLE DUCT. 0316&1$ 2.POLYVINYL CHLORIDE(PVCj,SCHEDULE 40,PIPE AND FITTINGS,ASTM 02865;WITH PRIMER lW030LVENT CEMENT C.ALL INSULATION EUOES AND BUTT JOINTS ARE TO BE SEALED WITH JOINT SEALING TAPE,TYPE FSK,5'WIDE,USING B.FASTEN ALUMINUM TYPE FLEXIBLE DUCTWORK WITH 48 SCREWS MINIMUM 6"ON CENTER.COAT SCREWS WITH MASTIC JOINTS MAY BE USED IF ACCEPTABLE TO LOCAL AUTHORITIES HAVING JURISDICTION. A.INSULATION FOR DRAINAGE PIPING SYSTEMS(COOLING COIL CONDENSATE)SHALL BE t"THICK GLASS FIBER. ADHESIVE,CHILDERS NO.CP-02. SEALER AFTER TIGHTENING. ISSUE FOR BIDIPERMIT A.NO CELLULAR CORE OR FOAMED PIPING WILL BE PERMITTED. G.FASTEN REINFORCED VINYL TYPE FLEXIBLE DUCTWORK WITH DRAWBAND TYPE COMPRESSION FASTENERS. '03106115 B.GLASS FIBER INSULATION SHALL BE UL RATED,NONCOMBUSTIBLE,SECTIONAL PIPE INSULATION OF HEAVY DENSITY GLASS FIBER D.FINISH PINS WITH PLASTIC CAPS D,APPLY TWO LAYERS OF NASHAUN357 DUCT TAPE OVER JUNCTURE OF FLEXIBLE DUCTWORK TO DEVICE OR RIGID 2.03 ACCESS DOORS WITH ALL SERVICE JACKET HAVING A COMPOSITE RATING NOT TO EXCEED 25 FLAME SPREAD AND 50 SMOKE DEVELOPED, DUCTWORK,AND THE INSULATION SLEEVE TO DEVICE,RIGID DUCTWORK OR BUTTING TO TO OTHER INSULATION. Q A.PROVIDE 24'X 24-ACCESS DOORS MANUFACTURED AS AN INTEGRAL UNIT COMPLETE WITH ALL PARTS AND READY FOR INSULATION SHALL BE AS SUPPLIED BY CERTAINTEED,OWENSICORNING,Oft KNAUF. INSTALLATION AS MANUFACTURED BY ONE OF THE FOLLOWING: SECTION 15800 3.14 FLEXIBLE CONNECTIONS Q 1.BIRMINGHAM ORNAMENTAL. C,EVERY PACKAGE OR STANDARD CONTAINER OF COVERING,ADHESIVE AND COATING DELIVERED AT T'HE BUILDING FOR USE MUST AIR OISTRIBV'TON A.APPLY MASTIC DUCT SEALANT TO RIGID DUCT AND DEVICE TO WHICH CONNECTION IS BEING MADE BEFORE INSTALLING 2.KARP. HAVE THE MANUFACTURER'S STAMP OR LABEL ATTACHED,GIVING NAME OF MANUFACTURER AND BRAND. FLEXIBLE DUCT. 3.MILORD,DIVISION OF INRYCO. PART 1-GENERAL B.APPLY CLAMPS,BOTH ENDS,OF THE SCREW DRIVE TIGHTENING TYPE. Q B.PROVIDE FLUSH PANEL DOORS,EXCEPT PROVIDE RECESSED PANEL DOORS WHERE ACCESS DOORS OCCUR IN PLASTER OR D.JACKET LAPS AND BUTT STRIPS SHALL BE SELF-SEALING"RE. C.COAT CLAMP AND JUNCTURE WITH MASTIC SEALER AFTER TIGHTENING. ACOUSTICAL TILE GLUED TO GYPSUM LATH. 1.01 RELATED DOCUMENTS C.PROVIDE UL"B"LABELED UNITS WHERE ACCESS DOORS OCCUR IN HOUR RATED-CONSTRUCTION. A.SECTION 15050 BASIC MATERIALS AND METHODS APPLIES TO THE WORK SPECIFIED IN THIS SECTION. 3.15 PREFABRICATED DUCTWORK E.PROVIDE HALF ROUND GALVANIZED IO GAUGE SHEET METAL HANGER SHIELDS.SHIELDS SHALL BE I2'LONG FOR PIPE SIZES S. ADDITION,THE FOLLOWING SECTIONS APPLY;15250,15M AND IN90, Q D.PROVIDE SCREW DRIVER OPERATED CAM LOCKS OF NUMBER REQUIRED BY SIZE OF DOOR. UP TO 3',f 0'FOR PIPE SIZES OVER 3"AND UP TO 8",AND 24'LONG FOR PIPE 912E3 OVER a". A.WHERE CONNECTIONS IN OVAL AND ROUND DUCTS ARE NOT MADE UP WITH FLANGES,A MALE END COUPLING SHALL BE E.PROVIDE ANCHORAGE APPROPRIATE TO CONSTRUCTION. USED."UNITED'DUCT SEALER,OR APPROVED EQUAL,SHALL BE APPLIED TO THE MALE END BEFORE INSERTION OR 2.02 REFRIGERANT-SUCTION PIPING 1.02 AIR PROVIDE IMMEDIATELY AFTER IT IS STARTED,APPROXIMATELY 1/2INCH,PUSH FITTING OR PIPE TO COUPLING BEAD STOP DRILL Q PART 3-EXECUTION A.PROVIDE HEATING AND COOLING Sys rams. AND INSTALL SOLID POP RIVETS,AS REQUIRED,A MINIMUM OF il2 INCH FROM THE COUPLING BEAD STOP.AFTER OTHER B.PROVIDE VENTILATING SYSTEMS. END OF COUPLING IS INSERTED,SEALED AND RIVETED AS ABOVE,APPLY DUCT SEALER IN A MINIMUM OF Z'WIDE BAND, 3.01 CUTTING AND PATCHING A.INSULATION SHALL BE 1/2'THICKNESS OF FLEXIBLE FOAMED PLASTIC. C.PROVIDE EXHAUST SYSTEMS. A.ALL CUTTING,REM FITTING AND REFINISHING OF IN PLACE CONSTRUCTION REQUIRED FOR THE INSTALLATION OF THE MAKING SURE RIVET HEADS AND THE JOINT GAP ARE COVERED.APPLY A SINGLE WRAP OF E AN0.2.03 INSULATION-AIR SYSTEM COMPONENTS 1.03 CMUP DRAWINGS APPROVED EQUAL,DUCT TAPE OVER THE war SEALER.DO NOT APPLY SEALER OVER THE WTAPE. NO.SAMPLES OFF THE DUCT WORK OF A SECTION SHALL BE DONE AT THE EXPENSE OF THE CONTRACTOR OF THE SECTION.EXCEPT AS SPECIFICALLY A.PROVIDE 114-SCALE SHOP DRAWINGS FOR ALL DUCT SYSTEMS. SEALER AND TAPE,INCLUDING SPECIFICATION SHEETS,SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. SHOWN AL THE PERFORMED OR HEREINAFTER KILLEDIEO. B.WHERE DUCTWORK IS EXPOSED IN OCCUPIED AREAS,IT SHALL BE INSTALLED NEAT AND CLEAN.FRAGMENTED ENDS, A.INSULATION SHALL 0E 2"THICKNESS OF SEMI-RIGID BOARD,3 PCF DENSITY,FOIL REINFORCED KRAFT FACING. B.WORK SHALL BE PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE'TRADES. PART'2-PRODUCTS I.E.,FIELD CUTS WILL NOT BE ACCEPTED.ALL SUCH DUCTWORK SHALL BE FIELD MEASURED AND FACTORY CUT TO LENGTH. R(,tyVJ�QI�JU.Fr��.?, 3.02 OPERATING INSTRUCTIONS S.BOARD SHALL BE UL RATED,NONCNMBUSTIBLE GLASS FIBER,25 FLAME SPREAD,50 SMOKE DEVELOPED,AS MANUFACTURED RSEALANT WILL BE EMOVEDWTHTHEPLIED ONLY TO SOLVENT. INTERIOR SURFACES OF CONNECTING PIECES.ANY SEALANT EXPOSED SHALL BE I'll n�YJ.ov k.\�" A.THE CONTRACTOR FOR THE SECTION SHALL,WHEN DIRECTED BY THE ARCHITECTIENGINEER,PROVIDE THE OWNER WITH A BY CERTAINTEED,OWEN&CORNING AND KNAUF. 201 HVAC UNITS(LANDLORD PROVIDED) Y .j . A.PROVIDE PACKAGE HEATING,COOLING AND VENTILATING UNIT AND ACCESSORIES PER DRAWING SCHEDULE,PLANS,AND COMPETENT TRADESMAN TO INSTRUCT THE OWNER'S PERSONNEL IN THE PROPER OPERATION AND MAINTENANCE OF THE SA6 SHOP FABRICATED DUCTWORK C.EVERY PACKAGE OR STANDARD CONTAINER OF COVERING,ADHESIVE AND COATING DELIVERED AT THE BUILDING FOR USE DETAILS. 9852 y p c�•� EQUIPMENT HE HAS INSTALLED. A.DUCTWORK SHALL BE INSTALLED AND SEALED ONLY IN ACCORDANCE WITH THE NOTE ON THE DRAWINGS.ANY OTHER JCJ J.uC MUST HAVE THE MANUFACTURER'S STAMP OR LABEL ATTACHED,DIVING NAME OF MANUFACTURER AND BRAND. 0.HEATING SECTION SHALL BE GAS BURNER. 1 B.PROVIDE COPIES OF OPERATING INSTRUCTIONS,EQUIPMENT MANUALS,AND CONTROL DIAGRAMS PER DIVISION-1 PROCEDURE WHETHER RECOMMENDED BY THE MANUFACTURER OR NOT IS UNACCEPTABLE J C.COOLING SECTION SHALL BE SELF-CONTAINED REFRIGERATION SYSTEM WITH DIRECT-EXPANSION COIL. CONTRACT GRAMS UT. B.SEALANTSHALLBE APPLIED TO JOINTS ANDUPI SEAMS DURING FABRICATION.NOT AT THE SITE INSTALLATION. 4 C.CONTROL DIAGRAMS AND WRITTEN INSTRUCTIONS SHELL BE FRAMED UNDER GLASS, 2.04INSULATION-DUCTWORK ?' U 2.02 AIR FIL'fEf45 C.WHERE DUCTWORK IS EXPOSED IN OCCUPIED AREAS,IT SHALL BE INSTALLED WEPT AND CLEAN.FRAGMENTED ENDS,I. 9 .). [,a A.PROVIDE EACH SYSTEM CENTRAL AIR FILTERS AND ACCESSORIES PER DRAWING SCHEDULES,PLANS AND DETAILS. E.,FIELD CUTS WILL NOT BE ACCEPTED.ALL SUCH DUCTWORK SHALL BE FIELD MEABURE0 AND SHOP CUT TO LENGTH. lSN+,. 0,1C `^' 9.03 CODES AND STANDARDS A,INSULATION SHALL BE 2-THICKNESS OF FLEXIBLE INSULATION,I PCF DENSITY,FOIL REINFORCED KRAFT FACING,HAVINGA SEALANT WILL BE APPLIED ONLY TO THE INTERIOR SURFACES OF CONNECTING PIECES.ANY SEALANT EXPOSED SHALL BE C�`pF �� A.PIPING AND APPURTENANCES INSTALLED UNDER THIS DIVISION OF THE SPECIFICATIONS SHALL COMPLY WITH THE COMPOSITE RATING NOT TO EXCEED 25 FLAME SPREAD AND SO SMOKE DEVELOPED.INSULATION SHALL BE AS SUPPLIED B.PROVIU['fW0I2)SETS OF FILTERS FOR EACH SYSTEM. REMOVED WITH THE PROPER SOLVENT. `+,�I ` / REQUIREMENTS OF THE FOLLOWING,WHERE APPLICABLE: BY OWEN&CORNING,CERTAINTEED OR KNAUF. ANSI CODES FOR PRESSURE PIPING 2.U3 PLENUM LINING 3,17 DUCT LINING y` ANSI STANDARDS FOR PIPE AND FITTINGS B.EVERY PACKAGE OR STANDARD CONTAINER OF COVERING,ADHESIVE AND COATING DELIVERED Af THE BUILDING FOR USE A.PROVIDE SYSTEMS PLENUMS WITH FIBERGLASS LINING WHERE SHOWN ON THE DRAWING PLANS AND ELEVATIONS. B.LINER SHALL BE 2"THICK,3 POP OR 6 POP DENSITY AS INDICATED,SEMI RIGID BOARD BONGED WITH A.LINING SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS FOR 2000 FPM. B.IN ADDITION,THE WORK SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODES AND ORDINANCES. MUST HAVE THE MANUFACTURER'S STAMP OR LABEL ATTACHED,GIVING NAME OF MANUFACTURER AND BRAND. THERMOSETTING RESIN AND COATED ONE BIDE WITH FIRE RESISTANT COATING. S.A FULL COAT OF ADHESIVE SHALL BE USED WHETHER RECOMMENDED OR NOT.EDGES SHALL BE FINISHED WITH TROWEL APPLIED MASTIC. 77 3.04 WORK CLEANLINESS C.REFER TO SECTION 15SM FOR LINED DUCTS. C.LINER SHALL HAVE MINIMUM 9.0 FT2 HR F/BTU THERMAL RESISTANCE. Slg".1'. A.CONTRACTOR SHALL KEEP STORED MATERIALS,STORAGE AREAS,AND INSTALLED SYSTEMS FREE OF DIRT AND DEBRIS. G.LINER SHALL BE SUPPLIED BY OWENS-CORNING,CERTAINTEED OR KNAUF. .. _0312412015 B.ALL E%POSED ENDS OF INCOMPLETE OR UNCOVERED WORK SHALL BE TEMPORARILY PLUGGED AS EACH PHASE OF PIPING O WORK AND OUCTNORK IS COMPLETED. PART 3.EXECUTION 2.04 EXHAUST FAN 1901/2015 C.PIPING,DUCTWORK AND EQUIPMENT TO BE PAINTED(EXPOSED TO VIEW IN COMPLETED STRUCTURE)SHALL BE CLEANED A.PROVIDE ROOF MOUNTED FANS WITH ACCESSORIES PER DRAWING SCHEDULE,PLANS AND DETAILS E P IRRII Gate BY REMOVING RUST,PIASTER,AND DIRT BY WIRE BRUSHING.GREASE,OIL AND SIMILAR MATERIALS SHALL BE REMOVED BY 3.01 INSULATED PIPING SYSTEMS B.PROVIDE IN-LINE DUCT MOUNTED PANS WITH ACCESSORIES PER DRAWING SCHEDULE,PLANS AND DETAILS. WIPING WITH CLEAN RAGS AND SUITABLE SOLVENTS. 77 0.MOTOR,PUMPS,FANS AND OTHER ITEMS WITH FACTORY FINISH SHALL BE REMOVED OF GREASE AND OIL AND LEAVE A PROVIDE INSULATION ON PIPING SYSTEMS AS FOLLOWS: 2.05 GRILLES AND DIFFUSERS WITH ALL SURFACES CLEANED AND POLISHED. 1.REFRIGERANT SUCTION PIPING. A.PROVIDE GRILLES AND DIFFUSERS PER DRAWING SCHEDULE,PLANS AND DETAILS. I HEREBY CERTIFY THATTHESE RAHSHAVE BEEN PRE 2.CONDENSATE DRAIN PIPING,AS PER COLD PIPING. PAREOUNCER MY SUPERVISIONAMITHFTTOTHE SEST 10 2.06 FLUES OF MYMMLEDGE,THE SAME COMPLYWIIHALL RULES, O 3.02 PIPE HANGER SHIELDS APROVIDEFLUESAND ACCESSORIES FOR THE DOMESTIC WATER HEATERS OF SECTION 15400, MS ORDINANCES ar'14VINFALs N B.FLUES SHALL BE OF THE CLASS,MODEL AND WITH THE ACCESSORIES AS DESCRIBED IN LEGENDS ON DRAWINGS LASTNO TO DLICRES AND BNLDING9. N A.EACH CONTRACTOR INSTALLING HOT OR COLD PIPING SHALL SET THE PIPING UP ON WOOD BLOCKING AT EACH HANGER. RELATING TO THE ABOVE SECTIONS. i3 B.THE WOOD BLOCKING THICKNESS SHALL BE THE SAME AS THAT OF THE PIPE INSULATION. 2.OT MOTOR OPERATED DAMPERS J A PROVIDE MOTOR OPERATED DAMPER PER DRAWING SCHEDULE,PLANS AND DETAILS, j C.THIS CONTRACTOR SHALL REPLACE THE WOOD BLOCKING WITH A FULL SECTION OF HEAVY DENSITY PIPE INSULATION AND A 10HLCT UL HANGER SHIELD. Drawn By Checked By AK DH Scale Date .1NONE 03106/16 `Iv Job No. 9g 13-5549 PR Sheet No. /�/�� /[�� S ITV R-4 3.18 DUCTWORK A.PROVIDE DUCTWORK SYSTEMS PER DRAWING PLANS AND DETAILS. Mc nON 15900 B.ELECTRIC MOTORS FOR ALL WAG EQUIPMENT: TEST AND BALANCE CORPORATION B.THE FOLLOWING DUCT SYSTEMS SHALL BE CONSTRUCTED FOR 2"W.C. A.MANUFACTURER i 1.ALL SUPPLY AIR DUCTWORK. TEST AND BALANCE MECHANICAL SYSTEM SPECIFICATIONS B.MODEUFRAME START-UP VERIFICATION CHECKLIST 2.ALL RETURN AIR DUCTWORK. C.HP/BHP AND KW i 3.ALL EXHAUST DUCTWORK. D.PHASE,VOLTAGE.AMPERAGE:NAMEPLATE,ACTUAL,NO LOAD , C.DUCT CONSTRUCTION FOR 2"W.C. PART 1-GENERAL E.RPM 1.ALL DUCTWORK SHALL BE NEAT.ACCURATE.MECHANICALLY TIGHT AND RIGIDLY CONSTRUCTED.OFFSETS OF EXPOSED F.SERVICE FACTOR DUCTWORK SHALL BE MADE ON SIDE OPPOSrIF TO WALLS AND CEILINGS,UNLESS OTHERWISE SHOWN OR SPECIFIED.ALL 1.01 SUMMARY G.STARTER SIZE,RA LING,HEATER ELEMENTS STORE#: DATE: < UNINSULATED PANELS WIDER THAN 12INCHES SHALL BE CROSS-BROKEN, H,SHEAVE MAKEISIZGBORE LOCATION: r 2.DUCTWORK SHALL BE CONSTRUCTED OF NEW SHEETS OF LOCK-FORMING QUALITY.ENDS OF ALL SHEETS WHICH ARE NOT A.SECTION INCLUDES TESTING,ADJUSTING,AND BALANCING OF AIR,WATER,AND REFRIGERATION SYSTEMS AND PERFECTLY SQUARE SHALL BE SO TRIMMED IN SHOP BEFORE LAYOUT IS BEGUN.GAUGES SHALL BE NOT LESS THAN THOSE MEASUREMENT OF FINAL OPERATING CONDITION OF HVAC SYSTEMS. T.V-BELT DRIVE: SHOWN AS FOLLOWS: A.REQUIRED DRIVEN RATION LARGEST DIMENSION(INCHES) GALV.STEEL GAUGE ALUM.GAUGE 1.02 REFERENCES B.REQUIRED DRIVEN RPM EQUIPMENT MECH. ELEC. CONTROLS READY FOR TESTING UP 28 .02T` C.DRIVEN SHEAVE,DIAMETER AND RPM DESIGNATION CHECK CHECK CHECK DATE INITIAL 1 T0 3 0 Z4 .ASS' A.AABc(ASSOCIA'TED AIR BALANCE COUNCIL)-NATIONAL STANDARDS FOR TOTAL SY9'TEM BALANCE. O.BELT,SIZE AND QUANTITY 31 TON 22 .043' E.MOTOR SHEAVE DIAMETER AND RPM RTU-1 61 TO SO 20 Oe- S.NEBB(NATIONAL ENVIRONMENTAL BALANCING BUREAU)-PROCEDURAL STANDARDS FOR TESTING,ADJUSTING,AND F.CENTER TO CENTER DISTANCE,MAXIMUM,MINIMUM,AND ACTUAL A.ALL CASINGS AND PLENUM CHAMBERS SHALL BE CONSTRUCTED OF 18 GAUGE MATERIAL,WITH STANDING SEAMS, BALANCING OF ENVIRONMENTAL SYSTEMS. 8.COOLING COIL DATA: RTU-2 AND FRAMED WITH I.10"X 1.1 S'X ire'GALVANIZED ANGLES. S.ALL DUCTWORK EXPOSED TO OUTSIDE WEATHER SHALL BE AN 18 GAUGE REGARDLESS OF DIMENSIONS, 1.03 Sum rTP15 A.IDENTIFICATIONINUMBER 3.LONGITUDINgL SEAMS OF RECTANGULAR OUCTWORK SHALL BE EITHER PITTSBURGH LOCK,DOUBLE OR GROOVED.ONLY B.LOCATION RTU-3 ONE TYPE OF SEAM SHALL BE USED IN EACH RUN OF DUCT.LONGITUDINAL SEAMS OF ROUND DUCT SHALL BE GROOVED. A.TEST REPORTS:THE TAB REPORT SHALL BE IN THE FORMAT OF"HE AABC NATIONAL STANDARD REPORT OR THE C.SERVICE BUTTON PUNCH SNAP LOCK SEAMS MAY BE USED WHEN INSTALLED WITH SEALANT IN JOINT AND SHEETMETAL SCREWS NEED CERTIFIED REPORT FORMS AS PUBLISHED IN THEIR MOST CURRENT EDITIONS. D MANUFACTURER RTU-4 INS PALLED THRU JOINT PER SMACNA STANDARDS. E.AIR FLOW,DESIGN AND ACTUAL 4,TRANSVERSE JOINTS OF RECTANGULAR DUCT SHALL BE AS FOLLOWS: S.FURNISH FOUR COPIES OF REPORTS,COMP LE TE WITH TABLE OF CONTENTS PAGE AND INDEXING TABS AND WITH F ENTERING AIR DB TEMPERATURE,DESIGN AND ACTUAL EF-1 A.LESS THAN 18 INCHES POCKET,BAR OR 3 SLIP AND DRIVE SLIPS. COVER IDENTIFICATION AT FRONT,IDENTIFIED TO CORRESPOND WITH DATA SHEETS,ANDINDICA'TING THERMOSTAT G.ENTER ING AIR WB TEMPERATURE,DESIGN AND ACTUAL 0.19 T024 INCHES-BA INCH POCKET OR BAR SLIP AND DRIVE SLIP. LOCATIONS. LEAVING AIR UB TEMPERATURE,DESIGN AND ACTUAL EF-2 5,DRIVE SLIPS SHALL BE USED ON SHORT SIDES OF TRANSVERSE DUCT JOINTS IF SIDE IS LESS THAN 24 INCHES.METAL I. LEAVINGAIR WE TEMPERATURE,DESIGN ANDACTUAL AND GAUGE OF S SLIPS AND DRIVE BLIPS SHALL BE SAME AS DUD T.ENDS OF DRIVE SLIPS SHALL BE BENT OVER AT C.INCLUOE A COPY OF AASC NATIONAL PROJECT PERFORMANCE GUARANTY OR COPY OF NEBB CERTNECATE OF J.WATERFLOW,DESIGNANDACTUAL LEAST 10 INCH AT CORNERS.BAR SLIPS SHALL BE FASTENED WITH SHEET METAL SCREWS ON 121NCH CENTERS. CONFORMANCE CERTIFICATION. K.WATER PRESSURE DROP,DESIGN AND ACTUAL THIS CERTIFIES THAT THIS PROJECT IS FULLY INSTALLED AND OPERATIONAL AND CORNERS OF ALL BAR SLIP JOINTS SHALL BE FOLDED OVER AND RIVETED.POCKET SLIPS SHALL BE RIVETED TO DUCT ON 6 L.ENTERING WATER TEMPERATURE,DESIGN AND ACTUAL INCH CENTERS,AND CORNERS SHALL BE OVERLAPPED AND RIVETED, 1.04 QUALITY ASSURANCE M.LEAVING WATER TEMPERATURE,DESIGN AND ACTUAL READY FOR INDEPENDENT TESTING AND BALANCING AGENCY TO BEGIN TAB WORK. Wd 6.ALL FASTENERS,SUCH AS SHEET METAL SCREWS,MACHINE SCREWS.OR RIVETS SMALL BE CADMIUM-PLATED FOR N.SATURATED SUCTION TEMPERATURE,DESIGN AND ACTUAL GALVANIZED DUCT. A.PERFORM WORK IN ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION, 0.AIR PRESSURE DROP,DESIGN AND ACTUAL T.ALL DUCTS OVER 18 INCHES WIDE SHALL BE PROVIDED WITH TRANSVERSE STIFFENERS OF EITHER JOINT SLIPS OR BRACING TOTAL SYSTEM BALANCE OR NEEB PROCEDURAL STANDARDS FOR TESTING,BALANCING,AND ADJUSTING OF ANGLES ON CENTERS OF NOT OVER 4'C"FOR DUCTS UP TO W WIDE ON THE LONG SIDE AND NOT OVER 2'-0'FOR ENVIRONMENTAL SYSTEMS, 9.AIR MOVING EQUIPMENT: DUCTS WITH LONG SIOE EXCEEDING 60'WIDTH. A.LOCATION O S.FITTINGS SHALL BE CONSTTRUCTEO AS DETAILED ON THE DRAWINGS. 1.05 QUALIFICATIONS B.MANUFACTURER MECHANI CAL CONTRACTOR REPRESENTATIVE DATE �m 9.WHERE IT IS NECESSARY BECAUSE OF STRUCTURAL REASONS TO CHANGE SHAPES OF DUCTS,THE ARCHITECT WILL BE BAL C.MODEL NUMBER (COMPANY) (NAME) NOTIFIED IMMEDIATELY FOR RES2ING OR REROUTING.EQUIVALENT AREAS MUST BE MAINTAINED. A.THE TESTING,ADJUSTING,AND ANCING(TAB)OF ALL WORK SHALL BE PERFORMED BY AN INDEPENDENT D.SERIAL NUMBER 10.WHERE RADIUS ELBOWS OR'rAKEOFF3 ARE INDICATED,THE INSIDE RADIUS SHALL NOT BE LESS THAN CONTRACTOR THAT IS CURRENTLY LICENSED III OR FEES.THE COMPANY SHALL SPECIALIZE IN TAB OF E.ARRANGEMENTICLASSIOISCHARGE THREEAUARTERS OF THE WIDTH OF THE DUCT ORTAKEDFF.WHERE DIVERGING CHANGES ARE MADE INDUCT SIZES IN THE SYSTEMS SPECIFIED IN THIS SECTION AND SHALL HAVE A MINIMUM THREE YEARS DOCUMENTED EXPERIENCE CERTIFIED F.AIR FLOW,SPECIFIED AND ACTUAL DIRECTION OF THE AIR FLOW,THEY SHALL BE AT SLOPE OF 1 IN 4. BY AABC OR NEBB. G.RETURN AIR FLOW,SPECIFIED AND ACTUAL INSTRUCTIONS 11.ALL TRANSVERSE JOINTS SHALL BE SEALED.USE LIQUID SEALANTON FLAT SURFACE H.OU'TSIDE AIR FL OW,SPECIFIED AND ACTUAL B.PERFORM WORK UNDER SUPERVISION OF AABC CERTIFIED TEST AND BALANCE ENGINEER OR NEBB CER'NFIED TESTING, I. TOTALSTATICPkE33URE(IOT EXTERNAL),SPECIFIED AND ACTUAL COMPLETION OF THIS START-UP VERIFICATION CHECKLIST BYTHEAPPRGPRIATE BALANCING,AND ADJUSTING SUPERVISOR EXPERIENCED IN PERFORMANCE OF THIS WORK AND LICENSED AT PLACE J.INLET PRESSURE INSTALLING CONTRACTOR,IS REQUIRED TO ENSURE THAT ALL EQUIPMENT AND WHERE PROJECT IS LOCATED, K.DISCHARGE PRESSURE SYSTEM COMPONENTS ARE COMPLETE,CORRECTLY INSTALLED,IN OPERATION AND SECTION 15950 L.SHEAVE MAKEISIZEISORE p p p AUTOMATIC TEMPERATURE CONTROLS 1.98"TIMING M.NUMBER OF BELTSIMAKIIs2E FULLY READY FOR TESTING AND BALANCING WORK TO PROCEED. V_ Iuul N.FM RPM ^8 P FO PAftTi-GENERAL A.THE CTRUCTIfNENDD REPORTS SHALL BE PROVIDED TO THE OWNER NO LATER THAN ONE(1)WEEK PRIORTO 10.RETURN AIRIOUT9IDE AIR DATA: lUltl M co coesraucnoN END DATE. THE COMPLETED CHECKLIST SHOULD BE SUBMITTED TO ULTRA'S PROJECT MANAGER m'o 1.01 RELATED WORK SPECIFIED ELSEWHERE A.0 SIGFICATIONILOCATION A.IN ADDITION,THE FOLLOWING SECTIONS APPLY:15050,AND i5B00. B.CE9IGNAIR FLOW VIA FAX.THIS NUMBER CAN BE FOUND ON THE COVER PAGE OF THE CONSTRUCTION (h PART2-PRODUCTS C.ACTUAL AIRFLOW DOCUMENTS. 1.020A.SEQ ENCEOWORK D.DESIGN RETURN SIR FLOW vI A.SEQUENCE OF OPERATION IS HEREBY DEFINED NT AS THE MANNER AND METHODS WHICH CONTROLS FUNCTION, NOT USED E.ACTUAL RETURN AIR FLOW REQUIREMENTS FOR MELT,DE TYPE AOF ND SYSTEM SYSTEM COMPONENTS REQUIRED ARE FOR IONTR THIS SECTION. F.ACTUAL OUTSIDE AIR FLOW IL W B.OPERATING EQUIPMENT,DEVICES AND SYSTEM COMPONENTS REQUIRED FOR CONTROL SYSTEMS ARE SPECIFIED IN OTHER G.ACTUAL OUTSIDE AIR FLOW Ir DIVISION-15 CONTROLS'SECTIONS OF THESE SPECIFICATIONS. PART 3-EXECUTION H.RETURN AIR TEMPERATURE TAB CONTRACTOR TO COMPLETE THE FOLLOWING m y C.THISSECTION DEFINES THE INSTALLATION OF THE AUTOMATIC TEMPERATURE CONTROLS REQUIRED AS SHOWN ON THE I. OUTSIDE AIR TEMPERATURE CHECKLIST AS PART OF TAB WORK AND INCLUDE O J Z DRAWINGS AND AS HEREINAFTER SPECIFIED, 3.01 HVAC CONTRACTOR RESPONSIBILITIES J,REQUIRED MIXED AIR'TEMPERATURE K.ACTUAL MIXED AIR TEMPERATURE THIS DATA AS PART OF THE TAB REPORT 1.03 DEFINITIONS A.THE HVAC C THE CONTRACTOR SHALL VERIFY$HALLTHAT BTHEHVACS USING ARE COMPLETE ADJUSTING, OPERABLE LACING OF WORK IS 1 J 0.ATCIS AUTO MATIC TEMPERATURE CONTROLS. STARTED.TM HVAC TANCET THEPRESENT TACONURCTOR.TEE QUIREMNTSTNODEAND THEFLLOWINGTHE it.A.RCOOLED CONDENSER'' VERIFIED BY TAB TAB CONTRACTOR TO INDICATE WHICH J B.OPEN FOR MOTORIZED DAMPERS,THE POSITION OF THE BLADES THAT CREATES THE MAXIMUM FREE AREA POSSIBLE OF HVAC SYSTEM TO PROVIDE ASSISTANCE TO THE TAB CONTRACTOR.REQUIREMENTS FOLLOWING: A.IDENTIFICATIONINUMBER EQUIPMENT OA DAMPER LL' THEDAMPERWHICHA00MISPASsgGEOFAIR. S.LOCATION CONTRACTOR RTUEF-1ISINTERLOCKEDWITH IL C.CLOSE FOR MOTORIZED DAMPERS,THE POSITION OF THE BLADES THAT PRE VENTS ANY PASSAGE OF AIR, 1.SYSTEMS ARE STARTED AND OPERATING IN SAFE AND NORMAL COND ITION. C.MANUFACTURER DESIGNATION POSITION%OPEN DATE INITIAL DATE INITIAL z C.MAXIMUM FOR MOTORIZED DAMPERS,THE POSITION OF THE BLADES OTHER THAN OPEN WHERE THE BLADES ARE 2.TEMPERATURE CONTROL SYSTEMS ARE INSTALLED COMPLETE AND OPERABLE. 0.MODEL NUMBER m ADJUSTED TO GIVE THE REQUIRED MAXIMUM CFM. 3.ALL BALANCING DEVICES AND HVAC EQUIPMENT ARE ACCESSIBLE. E.SERIAL NUMBER RTU-1 E.MINIMUM FOR MOTORIZED DAMPERS,THE POSITION OF THE BLADES OTHER THAN CLOSE WHERE THE BLADES ARE A.PROPER THERMAL OVERLOAp PROTECTION IS IN PLACE FOR ELECTRICAL EQUIPMENT. R ENTERING OB AIR TEMPERATURE,DESIGN AND AC TUAL CD` ADJUSTED TO GIVE THE REQUIRED MINIMUM OEM. S.NEW AIR FILTERS ARE INSTALLED JUST PRIOR TO AIR BALANCE AND IMMEDIATELY AFTER PROJECT 15 COMPLE'TE. G.LEAVING DB AIR TEMPERATURE,DESIGN AND ACTUAL r r F.ENABLED SHALL BE THE CONDITION WHERE THE EQUIPMENT IS ENERGIZED AND/OR OTHERWISE ACTIVATED TO A 6.DUCT SYSTEMS ARE CLEAN OF DEBRIS. H.NUMBER OF COMPRESSORS RTU-2 STAND-BY STATE AWAITING CONTROL SIGNALS FROM THE ATC SYSTEM. T.FANS ARE ROTATING CORRECTLY. RTU-3 G.DISENABLED SHALL BE THE CONDITION WHERE THE EQUIPMENT IS DE-ENERGIZED. 8.FIRE AND VOLUME DAMPERS ARE IN PLACE AND OPEN. 12.EXHAUST FAN DATA: H.ON SHALL SE THE CONDITION WHERE THE EQUIPMENT IS OPERATING AND PRODUCING THE DESIRED EFFECT. 9.AIR COIL FINS ARE CLEANED AND COMBED. A.LOCATION I.OFF SHALL BE THE CONDITION WHERE THE EQUIPMENT IS NOT OPERATING AND IS STANDING BY IN AN IDLE STATE. 10.ACCESS DOORS ARE INSTALLED AND CONNECTED. 8,MANUFACTURER RTU-4 11.AIR OUTLETS ARE INSTALLED AND CONNECTED. C,MODELNUMBER PART 2-PRODUCTS 12.DUCT SYSTEM LEAKAGE IS MINIMIZED. D.SERIAL NUMBER v ,o 13.DUCT SYSTEMS ARE FLUSHED,FILLED,AND VENTED. E.AIR FLOW,SPECIFIED AND ACTUAL TAB CONTRACTOR TO PROVIDE A COMPLETE TAB REPORT 2.01 CONTROL SYSTEMS 14.PUMPS ARE ROTATING CORRECTLY. F.TOTAL STATIC PRESSURE(TOTAL EXTERNAL),SPECIFIED AND ACTUAL TO EMS CONTRACTOR PRIOR TO EMS COMMISSIONING •H ry 15.PROPER STRAINER BASKETS ARE CLEAN AND INPLACE OR IN NORMAL POSITION. G.INLET PRESSURE AL �� A.AUTOMATIC TEMPERATURE CON TROL COMPONENTS SHALL BE ELE CTRIC AND ELECTRONIC AS SHOWN ON THE DRAWING, 16.SERVICE AND BALANCING VALVES ARE OPEN. H.DISCHARGE PRESSURE W an B.THE ATC SYSTEM SHALL NT CONSIST OF ALL NECESSARY THERMOSTATS, DAM PER IJ SHEAVE MAKEISIZE BORE a OPERATORS,RELAYS,CONTROL PANELS,THERMOMETERS,GAUGES,TIME CLOCKS.AND ALL ACCESSORIES AND ELECTRIC WIRING B.IF THE TAa CONTRACTOR DETERMINES THAT A FAN SHEAVE OR BELT REPLACEMENT IS NEEDED TO MEE I'THE NUMBER OF SELTSIMAKEIBIZE TO FULFILL THE INTENT OF THIS SPECIFICATION. BALANCING REQUIREMENTS,THEN THE HVAC CONTRACTOR SHALL REPLACE THE FAN SHEAVEIBELT AS REQUIRED.THE K.FAN RPM HVAC CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING OF THE REPLACEMENT WORK,202 CONTRACTOR 13. PROCESSPROCEDURE: �v..P ( �/ ��e A.THE CONTROL SYSTEM SHALL BE SUPERVISED AND INSTALLED BY COMPETENT CONTROL MECHANICS AND ELECTRICIANS 3.021NSTALLATION TOLERANCES k A.TABTAB CONTRACTOR SHALL PROVIDE INITIAL REPORT NO GENERAL CONTRACTOR �r- a REGULARLY EMPLOYED BY THIS CONTROL CONTRACTOR. FOR REVIEW.IF ANY ITEMS ON TAB REPORT ARE NOT WITHIN PLUS OR MINUS 10% >5F A.ALL AIR SYSTEMS MUST BE BALANCED WITHIN PLUS OR MINUS 10%OF DESIGN. OF DESIGN,TAB AND GENERAL CONTRACTOR SHALL MAKE THE APPROPRIATE G_2 203 WORKTOBEPERFORMEDBYOTHERTRAOE3 CHANGES TO MEET DESIGN SPECIFICATION.IF DESIGN SPECIFICATION CANNOT �z A.THEFOLLOWING INCIDENTAL WORK SHALL BE PROVIDED BY THE MECHANICAL CONTRACTORS UNDER THE SUPERVISION OF 3.03 ADJUSTING BE MET,SUBMIT A DEFICIENCY REPORT TO ULTA,INC FOR REVIEW. GENERAL a uU„n 4) THE ATC CONTRACTOR AND ELECTRICAL CONTRACTOR. CONTRACTOR TO SUBMIT FINAL TAB REPORT TO ULTA,INC.WHEN ALL ITEMS ARE m d Dpo3 1.THE MECHANICAL CONTRACTOR SHALL: A.VERIFY RECORDED DATA REPRESENTS ACTUAL MEASURED OR OBSERVED CONDITIONS. WITH SPECIFICATION. UKC�n. ( COm$m3 A.INSTALL ALL AUTOMATIC DAMPERS. l •C n�m; B.ASSEMBLE MULTIPLE SECTION DAMPERS WITH REQUIRED INTERCONNECTING LINKAGES AND EXTEND REQUIRED B.PERMANENTLY MARK SETTINGS OF VALVES,CAMPERS,AND OTHER ADJUS TMENT DEVICES ALLOWING BE TTINGS TO BE NUMBER OF SHAFTS THROUGH DUCT FOR EXTERNAL MOUNTING OF DAMPER MO TORS. RESTORED.SET AND LOCK MEMORY STOPS. B.TESTING ADJUSTING,AND BALANCING REPORT MUST BE COMPLETE AND TURNED o 8 DPROVIDENECESSARY SHEET METAL BAFFLE PLATES TO ELIMINATE STRATIFICATION AND PROVIDE AIR VOLUMES OVER TO THE G.C.'S CONSTRUCTION MANAGER WEEK PRIOR TO MERCHANDISING r_ W SPECIFIED.LOCATE BAFFLES BY EXPERIMENTATION AND AFFIX AND SEAL PERMANENTLY IN PLACE ONLY AFTER C.AFTER ADJUSTMENT,TAKE MEASUREMENTS TO VERIFY BALANCE HAS NOT BEEN DISRUP TEA.IF DISRUPTED,VERIFY DATE,THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING THEIR STRATIFICATION PROBLEM HAS BEEN ELIMINATED. CORRECTING ADJUSTMENTS HAVE BEEN MADE. WORK AND THE WORK OF THEIR SUBCONTRACTORS WITH THE G.C.TO ALLOW _ 0.PROVIDE ACCESS DOORS THROUGH DUCTS FOR SERVICE TO CONTROL EQUIPMENT. ADEQUATE'TIME FOR TABC TO COMPLETE THEIR WORK. M E.INSTALL DUCTSTATS. D.LEAVE SYSTEMS IN PROPER WORKING ORDER,REPLACING BEL I GUARDS,CLOSING ACCESS DOORS,CLOSING DOORS F.INSTALL SMOKE DETECTORS. TO ELECTRICAL SWITCH BOXES,AND RESTORING THERMOS TATT TO SPECIFIED SETTINGS. C.THE HVAC CONTRACTOR SHALL COMPLETE THE AIR BALANCE REVIEW START-UP VERIFICATION CHECKLIST BELOW AND FAX A COPY AS NOTED TO TABC.A COPY 2.04 ELECTRICAL WIRING E.AT FINAL INSPECTION.RECHECK RANDOM SELECTIONS OF DATA RECORDED IN REPORT.RECHECK POINTS OR AREAS BALL ALSO BE PROVIDED'TO THE G.C.SUPERINTENDENT AT THIS TIME.IF ALL A.ALL ELECTRIC WIRING AND WIRING CONNECTIONS REQUIRED FOR THE INSTALLATION OF THE ATC,HEREIN SPECIFIED,SHALL AS SELECTED AND WITNESSED BY OWNER. SYSTEMS ARE NOT OPERATIONAL AT'1'HE TIME OF BALANCING,IT SHALL BE THE BE PROVIDED BY THE ATC CONTRACTOR UNLESS SPECIFICALLY SHOWN ON THE ELECTRICAL DRAWINGS OR CALLED FOR IN HVAC CONTRACTOR'S RESPONSIBILITY TO PAY ALL COSTS ASSOCIATED WITH THE THE ELECTRICAL SPECIFICATIONS,ALL WIRING SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 16000-ELECTRICAL 3.04 AIR SYSTEM PROCEDURE ADDITIONAL TESTING AND BALANCING INCLUDING ALL LABOR,TRAVEL EXPENSES, OF THE SPECIFICATION. MEALS,HOTEL COSTS ETC,INCURRED BY MC. A ADJUST AIR HANDLING MID DIS TRIBURON SYSTEMS TO 08 rXN REQUIRED OR DESIGN SUPPLY,RETURN,AND EXHAUST 2.05 SHOP DRAWINGS AIR QUANTIT198(AT SITE ALTITUDE), U.THE HVAC CONTRACTOR SHALL BE PRESENT FOR AIR MLANCE TO VERIFY A.SHOP DRAWINGS OF THE FOLLOWING ARE REQUIRED: ACCESSIBILITY TO ALL DEVICES,VERIFY ALL OPERATING SEQUENCES AND INSTALL 1.ALL TO CONTROL COMPONENTS. B.MAKE AIR QUANTITY MEASUREMENTS IN MAIN DUCTS BY PI'I'Or TUBE'TRAVERSE OF ENTIRE CROSS SEC TIONAL AREA OF RBVISIORS 2.ATC SYSTEM DIAGRAMS COORDINATED TO INCLUDE PROVISION FOR FUTURE INTERFACE WHERE SPECIFIED. DUCT. NEW FILTERS IN ALL UNITS JUST PRIOR TO THE MR BALANCE.HVAC CONTACTOR 3.CONTROL CRAWINGS WITH DETAILED COMPONENTAND WIRING DIAGRAMS,INCLUDING BILL OF MATERIAL AND SHALL INSTALL A NEW SET OF FILTERS AFTER PROJECT IS COMPLETE. ISSUE FOR CLIENTILL REVIEW DESCRIPTION OF OPERATION FOR ALL SYSTEMS.DRAWINGS SHALL BY 22`X 3C STANDARD SIZE AND SMALL BE C,MEASURE AIR QUANTITIES AT AIR INLETS AND OUTLETS. �03106115 MADE FROM 2T X 34`REPRODUCIBLE MYLARS. ISSUE FOR BIDIPERMIT 4.PANEL LAYOUTS AND NAMEPLATE LISTS FOR ALL LOCAL PANELS,WITH PANEL DIMENSIONS. 0.ADJUST DISTRIBUTION SYSTEM TO OBTAIN UNIFORM SPACE TEMPERATURES FREE FROM OBJECTIONABLE ORAFTS. 03/06I15 S.DATA SHEETS FOR ALL CONTROL SYSTEM COMPONENTS, E.USE VOLUME CONTROL DEVICES TO REGULATE AIR QUANTITIES ONLY TO EXTENT ADJUSTMENTS DO NOT CREATE Q ZOBCONTROLCAMPERS OBJECTICABLE AIR MOTION OR SOUND LEVELS.EFFECT VOLUME CONTROL BY USING VOLUME DAMPERS LOCA'rEO IN A.REFER TO THE DAMPER SCHEDULES ON THE DRAWINGS FOR CAMPERS TO BE FURNISHED BY THE CONTRACTOR OF THIS DUCTS. Q SECTION. B.DAMPERS SHALL BE LOW LEAKAGE,OPPOSED BLADE,GALVANIZED STEEL CONSTRUCTION. F.VARY TOTAL SYSTEM AIR QUANTITIES BY ADJUSTMENT OF FAN SPEEDS,PROVIDE SHEAVE DRIVE CHANGES TO VARY 2.0I CONTROL DEVICES FAN SPEED.VARY BRANCH AIR QUANTITIES BY DAMPER REGULATION. A.ELECTRONIC PROGRAMMABLE THERMOSTAT: 3,05 REPORTS 1.THE ELECTRONIC PROGRAMMABLE THERMOSTAT SHALL CONSIST OF THERMISTOR TYPE OF RESISTANCE TEMPERATURE DETECTOR WITH A HIGH REFERENCE REENE DIBICE AND BUILT-IN RECALIBRATION MEANS,OR THE THERMOSTAT SHALL CONSIST A.REFER TO PLANS FOR EQUIPMENT DESIGN DATA SCHEDULES Q OF SOLID-STATE PLATINUM RESISTANCE TEMPERATURE DETECTOR WITH A HIGH REFERENCE RESISTANCE.THE THERMOSTAT SHALL BE PROGRAMMABLE AT THE FACE AND HAVE MINIMUM TWO(2)SETTINGS PER DAY,SEVEN(T)DAY PROGRAMMING S.REPORT FORMS, Q STEPS AND SKIP-A-DAY FEATURES,THE PROGRAMMABLE INFORMATION SHALL BE MAINTAINED INCEFINi r:LY,AND THE TIME 1.TI"rLE HAD E: OF DAY AND DAY OF WEEK SHALL BE MAINTAINED FOR MINIMUM EIGHT(8)HOURS DURING POWER FAILURE.EACH A.NAME OF TESTING ADJUSTING,AND BALANCING AGENCY THERMOSTAT SHALL ALSO HAVE AN INTEGRAL 5 MINUTE TIME DELAY BETWEEN STAGING TO THE REFRIGERATION SYSTEM B.ADDRESS OF TESTING,ADJUSTING,AND BALANCING AGENCY COMPRESSORS. C.TELEPHONE AND FACSIMILE NUMBERS OF TESTING,ADJUSTING,AND BALANCING AGENCY D.AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF CONTRACTOR 2AS CONTROLLED DEVICES E.PROJECT NAME A.DAMPER OPERATORS FOR ALL AUTOMATIC DAMPERS SHALL BE UNIDIRECTIONAL SPRING RETURN TYPE.PROVIDE ALL F.PROJECT LOCATION gg14NA! DAMPERS FOR NORMALLY CLOSED POSITION.CAMPER OPERATORS SHALL BE INSTALLED OUTSIDE OF THE DUCTWORKANU G.PROJECT ARCHITECT CONNECTED TO AN EXTENDED SHAFT.VOLTAGE SHALL BE 24 VOLTS,I PHASE. H.PROJECTENGINEER I.PROJECTCONTRACTOR 2.09 SUPERVISION J.PROJECT ALTITUDE A,THE AUTOMATIC TEMPERATURE CONTROL INSTALLER SHALL SUPERVISE THE COMPLETE INSTALLATION OF ALL TEMPERATURE K.DATE'rAS WAS PERFORMED 9852 ?C ry CONTROL DEVICES. 8 JG 2.SUMMARY COMMENTS: Ul 2.101N.UPON IONSCOPY 0FOR .+ O A.UPON COMPLETION OF THE PROJECT,THE ATC COMRACTOR SHIALL, A.ACTUAL CERTIFICATE NATURESCONFORMANCE W CORRESPONDING OSTAT(AABC OTS FOR EACH PROJECT (O 9 �, h 1.COMPLETELY ADJUST,READY FOR USE,ALL THERMOSTATS,CONTROLLERS,VALVES,DAMPER OPERATORS,RELAYS,TIME B,ACTUAL SPACE TEMPERATURES WITH CORRESPONDING'THERMOSTAT SET POINTS FOR EACH UNIT LSR OFCLOCKS,ETC,PROVIDED UNDER THIS SECTION.IN ADDITION,CALIBRATE EACH INSTRUMENT AND CONTROL LOOP, C.DESIGN VERSUS FINAL PERFORMANCE {'p.. INDICATE THE SETTINGS FOR EACH CONTROLLER ON THE'ASBUILT`DRAWINGS. D.NOTABLE CHARACTERISTICS OF SYSTEM -T✓ 2.FURNISH MINIMUM TWO(2)MANUALS CONSISTING OF COMPLETE APPROVED SUBMITTAL DATA COVERING THE E.DESCRIPTION OF SYSTEMS OPERATION SEQUENCE FUNCTION AND OPERATION OF THE ENTIRE ATC SYSTEM ON THE PROJECT FOR THE USE OF THE OWNER'S OPERATING F.SUMMARY T OUTDOOR AND EXHAUST FLOWS TO INDICATE BUILDING PRESSURIZATION G.NOMENCLATURE USED TMROUGHOV'T REPORT PERSONNEL.A TEMPERATURE CONTROL TECHNICIAN SHALL BE PROVIDED FOR INSTRUCTION PURPOSES CURING THE H.TEST CONDITIONS GUARANTEE PERIOD,AFTER AN INITIAL.SESSION OF B HOURS. 3.THE ATC CONTACTOR SHALL PROVIDE THE SERVICES OF A QUALIFIED TECHNICIAN FOR THE SYSTEM START-UP AND 3.INSTRUMENT LIST: Slgneture AIR BALANCING PERIODS, A.INSTRUMENT 0309I2015 - B.MANUFACTURER Date .. Date 2.11 GUARANTY C.MODEL NUMBER _ _ _ 1013.1/2015 < A.THE AUTOMATIC TEMPERATURE CONTROL CONTRACTOR SHALL GUARANTY ALL MATERIALS AND LABOR TO BE FREE OF D.SERIAL NUMBER Expireii.,Oats ---- - -- N DEFECTS OF ANY KIND FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE BY THE ENGINEER AND OWNER.ANY E.RANGE DEFECTS FOUND DURING THIS PERIOC SHALL BE REPAIRED OR REPLACED BY THE ATC CONTRACTOR AT NO EXPENSE TO THE F.CALIBRATION DATE OWNER. _ 4.AIR DISTRIBUTION TEST SHEET: NEREBTCERTIFY iHNt MESf PIANSH4VE BEEN vBt RII N PART 3-EXECUTION A.AIRTERMINALNUMBER OF S.ROOM NUMBERILOCATION uxDERNYS B,TIFEBEC MPL wTNNALLRs1 3.01 TEMPERATURE CONTROL C.TERMINALTYPE V A.PROVIDE A COMPLETE SYSTEM OF TEMPERATURE AND OPERATING CONTROLS,WIRING.CONDUIT,PIPING AND OEVICE3 AS D.TERMINAL SIZE TNa T0sT8uciu6fs AN0 swunxcs. N REQUIRED FOR THE SEQUENCES DESCRIBED IN SEQUENCE OF OPERATION, E.AREA FACTOR �j F.DESIGN VELOCITY 3.02 SEQUENCE OF OPERATION C.DESIGN AIR FLOW A.HVAC UNITS PROVIDE MATERIALS AND LABOR TO INSTALL PROGRAMMABLE WALL THERMOSTAT WITH REMOTE H.TEST(FINAL)VELOCITY nRCHITECi LL TEMPERATURE SENSORS. I. TEST(FUME AIRFLOW 1,PROGRAMMABLETHERMOSTAT SHALLBE CONFIGURABLE PROGRAMMABLE COMMERCIAL THERMOSTAT J.PERCENT OF DESIGN AIR FLOW Drawn By Checked By WITH ON-AUTO FAN CONTROL,AND MEAT-OFFCOOL-AUTO SYSTEM SWITCHING SWITCHES. 2.INSTALL THERMOSTAT WHERE SHOWN ON PLANS,W'MOVE FLOOR GRAS REQUIRED BY LOCAL CODES ANDIORADA. 5.DUCT TRAVERSE: AK OH 3.INSTALL REMOTE TEMPERATURE SENSORS WHERE SHOWN ON PLANS,BIZ ABOVE FLOOR OR AS REQUIRED BY LOCAL A.SYSTEM ZONFJBRANCH CODESANDIORADA. E.DUCT SIZE Is Dale 4.PROVIDE INITIAL SETTING AND PROGRAMMING OF WALL THERMOSTAT IN ACCORDANCE TO THE OWNER'S BUSINESS C.AREA NONE 03106115 �V SCHEDULE. D.DESIGN VELOCITY t> S.THERMOSTAT SHALL CYCLE HVAC UNIT HEATING AND COOLING SYSTEMS. E.DESIGN AIR FLOW d T 8.HVAC U F.TES VELOCITY Job No. DO IT FAN SHALL RUN CONTINUOUSLY LURING OCCUPIED PERIODS. /� T.HVAC UNIT FAN NANO HEATING SYSTEM THRALL CYCLE TO MAINTAIN NIGHT SET BACK TEMPERATURES. G.TEST AIR FLOW e 5 5 4 9 B.EXHAUST FANS H.OUC'T STATIC PRESSURE 1.INTERLOCK EXHAUST FAN MOTOR WITH SUPPLY FAN MOTOR IN ASSOCIATED HVAC UNIT.HVAC UNIT SUPPLY I. AIR TEMPERATURE FAN ON,EXHAUST FAN ON;HVAC UNIT SUPPLY FAN OFF,EXHAUST PAN OFF. J.AIR CORRECTION FACTOR 2.PROVIDE CONDUITS,WIRING,RELAYS,ETC.AND LABOR TO ACCOMPLISH THE INTERLOCK. Sheet No.� PLAN NOTES PLAN NOTES M1 CONNECT NEW SANITARY PIPING TO �j CONNECT NEW 2"DOMESTIC COLD WATER LINE TO EXISTING 2" O THIS SPACE IS RESERVED FOR ELECTRICAL EQUIPMENT.NO O CONNECT NEW 1-1/4"GAS PIPING TO EXISTING GAS STUB Y EXISTING LANDLORD PROVIDED SANITARY COLD WATER LINE.WATER METER,PRESSURE REGULATOR PIPING SHALL PASS BELOW.ABOVE,OR AROUND ELECTRICAL PROVIDED BY LANDLORD SERVING 199,00o B'rUH HWH-i, PIPING,FIELD COORDINATE EXACT AND BACKFLOW PREVENTER FURNISHED AND INSTALLED BY EQUIPMENT.PROVIDE CODE REQUIRED MINIMUM CLEARANCE VERIFY EXACT LOCATION OF EXISTING GAS STUB PRIOR TO h LOCATION,SIZE,INVERT ELEVATION AND LANDLORD AND LOCATED IN ACCESSIBLE LOCATION FIELD ABOVE ELECTRICAL EQUIPMENT ACCESS SPACE. CONSTRUCTION. 7 DIRECTION OF FLOW OF THE EXISTING VERIFY THE EXACT LOCATION AND SIZE OF THE EXISTING SANITARY PIPING PRIOR TO CONSTRUCTION WATER SYSTEM PRIOR TO CONSTRUCTION,ADJUST THE NEW 6 1/2"FLEXIBLE CONTINUOUS TYPE"K"COPPER TUBING BELOW 10 CONTRACTOR SHALL RUN VENT TO ONE SIDE OF CHASE IN '4 WITH LANDLORD.ADJUST THE NEW WATER LAYOUT AS REQUIRED TO ALLOW FOR CONNECTION TO GRADE FROM TRAP PRIMER TO FLOOR DRAIN.NO FITTINGS OR SHAMPOO WALL TO ALLOW ROOM FOR ELECTRICAL CONDUIT SANITARY PIPING AS REQUIRED TO ALLOW THE EXISTING WATER SYSTEM. SPLICES ARE ALLOWED BELOW GRADE. INSTALLATION. m FOR CONNECTION TO THE EXISTING r SANITARY PIPING SYSTEM, 2 MIXING VALVE LOCATED BELOW COUNTERTOP.SEE SHEET P-4 7 PIPE WATER HEATER RELIEF TO THE NEAREST FLOOR DRAIN 11 THERMOSTATIC MIXING VALVE AT FIXTURE.TMV SUPPLIED BY FOR SCHEDULE.SET TEMPERATURE AS REQUIRED BY O BELOW THE WATER HEATER.PROVIDE A CODE APPROVED AIR O SHAMPOO BOWL SUPPLIER,SET TEMPERATURE AS REQUIRED LEGEND AUTHORITIES HAVING JURISDICTION. GAP ON THE DISCHARGE OF THE WATER HEATER RELIEF. BY AUTHORITIES HAVING JURISDICTION. OCONNECT TO LANDLORD PROVIDED VTR. REFER TO DETAILS SHEET FOR ADDITIONAL INFORMATION. INSTAL TRAP PRIMER IN THE WALL.PROVIDE AN ACCESS 3 -- EXISTING O O HAIR TRAP BELOW EACH SINK.PROVIDED BY SINK VENDOR L NEW PANEL AS NECESSARY TO MAINTAIN EQUIPMENT. I 4"UP TO.(a 4"FCO-1 TP-i q g EWC-1 pn 2"VUP �/,U® 2"W UP „ MB 1 I a 8 11 (gICAL OF 3) 3 In7l11n1Jpp 2 W UP _ I 4 UP TOED 5 F HWH-1 7 g 1 u EXISTING 2 S Ir--'--Y y J'-'1 .. I� E(UO ASH RY L ,. -T��.♦'�"' I ?T" CORRIOOR 1 I R M f - _ 1 _ it N 2'WUP 1 p- J J 1 i, 1 SH4MPOONRYINO 110 WWB-1 R I fi N it 1 F'.�— 3"UP TO MIS it LjJ_._ _ •___ _ _ IL I . ..,� 4� 2"VUPTp-1 4 g IUP TO FD T _ ' <R' -- 4"UPTO CO I III Ili I. �i� 'OO�._. LA 2 V (J- 1. n 4'UP O wG — STAGING M NS EXISTING 4"SAN IOP :1 I' ,I I :: FD IN O L I I\ I' I II f88 y U Z- 3.. ® I iSi i�i II 1 F 1 "1 V uF' L OFFICE -W UP '2'W UP 4"UP TO I I I I WC-1 2'WUP j..WUP J " " 10 1 w �I 4 0 J/ I 4 UP T¢c�jc 1 A CO-1- / I I O J t ' SK 211 } /� 2 "+,>_K i SK-2 SK 2 I W�-1 lh Q .._ _J 'I r(y� 2"W OF 2'W 11F� 2"VUP _ I _.., �'__.. I 1 SK-5O R�0°"W' �I�ff � �I I 4"UP TO F� 4UP IU111- , 2'WUP O � 1 �1-�GnLON 2 LAV-1 ___ ____—L2"VUPJ"V Ur+ 105 12 5)P•1,Gas Me aq Impact Protection I P- 4 6a.Above-ground gas meters end piping shelf ba protected by a barrier in an approved 8 4 TF O 0 manner complying with IFC Section 312. Fld' N�J . IFC 312.2 Posts,Guard posts shall comply with all of the following requirements. r...11 i)Conahuctlon of steel not less than 4lnchea In diameter and concrete filed. II I it 2)Spaced not more than 4 feet between posts on center _J LL 3)Set not less than 3 feet deep fn a concrete tooting of not less than 15-inches in i, ILL diameter. { z IC 4)The fop of the posts not less than three leaf above ground. 5)Posts shall not be located less than 3 feet from the protected object. ' Response:Gas Meter impact protection Is to be provided by the landlord under the F " 1- Gluier with Woodbury Corporation,d alazierPwoodburvcora com hitecl Dustin landlord shell building permit.Please refer comments to landlord arc i G ' E Q w on i J v a y t o r; C t I I I� ����3� SALES ,�mR I Ij Revisions ISSUE FOR CLIENT/U.REVIEW 03I08115 t ! ISSUE FOR BIDIPERMIT I' �03/06115 .,_I _..,,I• I,' A03/24/15 PER CITY I f , I ama1 � I_. I n�9852 OF I 024n01e DRUB ,I �,�II 1 EHPlretbn CRIB 10/31/2016 I ..HI;_.3--_ .....__ L ( ,. ,w ..... _ ...... .. �`•..,,� / 1\7;— I HERE BY CERTFY THU THESE PUNS HNYE BEEN PNE III, EXISTING -'' PM WDERMY 6UPERVSON AND Te1TM THE BEST N " "•"," LJ - VESTIBULE CF MYNNON WE,THE SAME COMPLYRYTHALL RULES. REGUUTNSNSANDORD1f ANCESOFTWNFNLL3.0 REIATINGTOSTRUCTUREBAND UULUNG6ARCHITECT a LL Drawn By Checked By 3 I AK DH Scale Date Job No. 9 NORTH NORTH 13®5549 _ UNDERGROUND PLUMBING PLAN rPLUMBING FLOOR PLAN Shee1No. II� = SCALE: 1/8'=1'-0" - -- _- - -- SCALE: 1/8"=1'-0" u SEE PLUMBING GENERALNOTES ON P-4. ~ EXISTING 4"VTR ` NC --I, r�1 r� 4Irr G��vlirrrj �2„ 1 I� 4"FCO-1 err / MB 1 . CID co EXISTING 4"VTR Lu NC 4 o w ��=K 1 0 � i / v A`�,.� a"`;,... `'`;... r.; 2 SK-Lr ,..`\`�\- �.,\ 4. <*rl } 1i1/2' J U. ' / r -2 G� �� I LL � y \J? q y h r� r "Eu.ti ?, .flw y 2 r I tir 21, 2" I r I SK-4 _ !°+ 1-1/2 'L. I �/I car �-1/ 1� I �'^•\� 2" \ I /r 2 \ I 1-1/2" Y 1' it �/ 2 r u V 4' / - c� \ 4" 4 ` � JJ WC 4" `'` ��,�• �' '`;.r^.., �'"": A. �•� � LAV-1 4�, I. JA ? ,. - 2 i EXISTING CO-1 F SAN I SK-5LNIC Lu 411 : ,, �„ .•"e; .��, ram, �, y ''. �. V % ,w Rev10slons y . SUE FOR CUENTILL REVIEW QISSUE FOR BID/PERMIT R CITY9310611 PE 1 03124/15 ^ ,.r r r ,i'. 7`"ti` r 11„, '`a. �•`,, �G>�-' � "' /r (• .._.. r" ,. tag ._ .:\,, ' `t.^''. � lotvaL�¢` , ' L]�`) 9 Q" CO OF VC! �• I ., l f ,y �`&' r_.f_ _I i ..✓ `may... *,,, �`f�// "slpnewro.._.__... .____ -- C / 0I01n01s � `�., l ,,, \ e'✓'"`:.,\ K' ,y�^ I"a�".-'" i // Exp rel on Dere (HEREBY CERTIFY THAT THESE PIPNS H4VE BEEN PRE PAREOF MyHNGWLEDGE THE—COMPLY ITH AL RULES. \.� \___./ `�4y„ ~ w`Y E ✓ < ,; REGULAT BANG INANCESOFTWH L&LI.OATTOTHE BEST l RELATING iOSiflIICiURE9 PNOBU LdHGS. ARCHirecT Drawn By Checked By AK DH Scale Dale NOT TO SCALE 03/06/15 Job No. . 13-5549 SANITARY ISOMETRIC Sheet No. = SCALE: NOT TO SCALE r 'J PLAN NOTES , �~ O PROVIDE TMV-1 AT FIXTURE,SET TEMPERATURE AS REQUIRED BY AUTHORITIES HAVING JURISDICTION. SEE PLUMBING / d r GENERAL NOTES ON P-4. 1/2" P=1 r. 1 2 ti 4 y, ry r c lie 1 FD 2 /2 \ �.� •^,. r'w,"- "a, / ,,.._ 1 SK1 1/2' 2" NC '��EXISTING 2 CWS M tea: r �3/41' / SK_z j�2�, ` 1 m��q ®W� �/ Ir `Y nos, ts' 0— v� '..3 ^ J s. .'� �-" ^ ,•"w,,. �' !"• W, -"r -i`tiF'� .' w. O1 jK-2 Y EW C-1 �� �. Q ^ SK 2� ^ ILL U. r /'� A'^\.,,,s"..- w.r�' `"•��'^ , .,i '`.� *• „ �w � -�4 1-112" SK4 1 ~ f t \ L_r r r, LLLyyy r' . J`.. •,,�,1,• ..., ,(""1� �v' ASa;,'� �I,LAV, ir r h ` \ ,i ~' ``-\�`>.� '��. �.., ��,. r," n.1`~' �� \�'•� FD-1 V FD r" "�WWB-1 r / „ LAV iJ Q,1 tU {! r �sK s� ��wc-1 , ti g r , r� _ / � .w'U`3' ,• `\. \. -�'..wl✓rr `�,\ `.�'` .r / \ r \ �l ✓�J �;~o/�\ °bfr"�-"%.^'ram" �I h",8^.'b' � , � „fiP_... �,-.• � r , a, Revisions ` .%'"•, Q ISSUE FOR CLIENT/LL REVIEW ~"`\ �...s'�`'7, „�"' '• "'^ .✓ aw, -r'ys>cy `"9q;, " "'d� 03106/15 r ISSUE FOR BID/PERMIT d / 03106115 °a-`..`. / PER CITY 03/24/15 , R .l 0 �2w \ ` r ah 9852 CD ^ " `� —__'t'�\ f, I L:. _.I_....1 :''n,r", "�T`'�.. `�,. r�`""✓ ,.... "" ""''a i/' (?�y�,,``�OF t�P'?,S\�� Q \ y \ ,.,` �*..-_e� ~~'tea'` !' r f HEREBYCERi PARED UNDER MY SUPERBISBA AND—T TO THE BEST ,\\ / �,. YTXAi iHEBE PIANS HAVE BEEN PPE OEMY HNOKl[oGETHESMECOMRYWTHAll _ TRiXTU EBAN B UILD—ALIS N ~�. "•.,, \ / `•n aTNDi06TRUDTURE6µDBULONOS LL / Drawn By Checked By AK OH a \:�"`•'s, Scale Date NOT TO SCALE 03106/15 Jo13-5549 a WAT oER ISOMETRIC Sheet = SCALE: NOT TO SCALE 3 DRAIN SCHEDULE FIXTURE CONNECTION SCHEDULE VALVE SCHEDULE FIRE PROTECTION GENERAL NOTES PLUMBING GENERAL NOTES SOLDERED/ 1. PROVIDE ALTERATIONS AND MODIFICATIONS AS NEGESSARY TO DESIGNATOR TYPE SIZE MANUFACTURER MODEL NO. TOP FINISH REMARKS FIXTURE CW HW WASTE VENT 'I BREADED/FLANGED PIPING A. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE RULES AND REGULATIONS OF BRAZED PIPING FURNISH AND INSTALL COMPLETE FIRE PROTECTION SYSTEM PER ► NFPA k13.THE SYSTEM SHALL COMPLY WITH ALL REQUIREMENTS LOCAL AUTHORITIES. ------- TYPE MFR'R. 2"AND 2-1/2"AND 3"AND OF LOCAL,STATE AND FEDERAL AUTHORITIES AND LANDLORD'S ~ B. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST THREE WORKING DAYS FLOORDRAIN STRAINER NICKEL VANDAL-PROOF SCREWS;GALVANIZED BODY;4" SMALLER LARGER SMALLER INSURING AGENCY. FD-1 4" SMITH LAV 1/2" 1/2" 2" 1-1/2" PRIOR TO COMMENCEMENT OF WORK. DRAIN 5"0 STRAINER BRONZE DEEP SEAL'P'TRAP. JENKINS 47-C 651-C 1242-C 2. ALL WORK SHALL BE IN ACCORDANCE WITH THE RULES AND FLOOR GALVANIZED GALVANIZED BODY;4"DEEP SEAL'P'WITH TRAP REGULATIONS OF THE LOCAL FIRE PROTECTION DISTRICT AND C. ALL PIPING SHALL BE ROUTED IN THE SUSPENDED CEILING SPACE UNLESS OTHERWISE FD-2 DRAIN 4" SMITH 2350-P050 CASTIRON PRIMER EWC 1Y2" -- 2" 1-1/2" GATE MILWAUKEE 148 2885 115 WATER DEPARTMENT. INDICATED.ALL PIPING EXPOSED TO VIEW SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT STOCKHAM B-100 G-623 B-108 TO THE UNDERSIDE OF THE STRUCTURAL STEEL. ■ 3. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT FCO-1 FLOOR SEE SMITH 4020 NICKEL VANDAL-PROOF SCREWS;GALVANIZED BODY. WC 1-1/2" '- 4" 2" JENKINS 901A --- 902A LEAST THREE 3 WORKING DAYS PRIOR TO COMMENCEMENT OF D. EXPOSED PIPING IN FINISHED AREAS SHALL BE CHROME PLATED WITH CHROME PLATED CLEANOUT PLANS BRONZE BALL MILWAUKEE BA100 - BA150 WORK. () ESCUTCHEON AT PIPE ENTRY TO FINISHED AREA -- STOCKHAM 5-215-BRl-R-T --- 5-216-BR1-R-S E. SLEEVE OR CORE-DRILL FLOOR SLABS,WALLS,ETC.AS REQUIRED FOR PIPING AND FIRE-STOP FD --- - 4" 2' 4. PROVIDE AN AUTOMATIC WET PIPE SPRINKLER SYSTEM PLUMBING SYMBOLS THERMOSTATIC MIXING VALVE SCHEDULE JENKINS 4092 624-C 4093 INCLUDING PIPING,HANGERS,VALVES,ALARMS,SUPPORTS AND OPENING AROUND PIPE.VERIFY LOCATION OF STRUCTURAL BEAMS,JOISTS,ETC.BEFORE -W- WATER SERVICE TMV-1 WATTS THERMOSTATIC MIXING VALVE MODEL:LFUSG-B MOUNT CHECK MILWAUKEE 509 F2974 1509 SPRINKLER HEADS,NECESSARYANDAS REQUIRED FOR DRILLING. UNDER FIXTURE. SK i/2" 1/2" 2" 1-1/2" STOCKHAM B-319 G-931 B-309 INSTALLATION OF COMPLETE AND APPROVED FIRE PROTECTION F. ALL OPENINGS IN DRAINAGE AND/OR VENT SYSTEMS AS A RESULT OF INSTALLATION ROUGH-IN -CWS- COLD WATER SUPPLY PIPING SYSTEMS. SHALL BE PROTECTED WITH A TEST PLUG THAT IS SECURELY LOCKED IN PLACE UNTIL FINAL AUTONATIC HAYS 43-45-2510-0.50-PR N.A. N.A. FINISHED CONNECTIONS ARE INSTALLED. -HWS- HOT WATER SUPPLY PIPING MB 3/4" 3/4" 3" y� BALANCING 5. WORK SHALL BE PERFORMED BY AN APPROVED AUTOMATIC FIRE NOTES: PROTECTION SPRINKLER CONTRACTOR,SHOP DRAWINGS AND G. ALL PIPING SHALL BE CONCEALED IN WALLS AND BEHIND FIXED FURNISHINGS UNLESS -TWS- TEMPERED WATER SUPPLY PIPING 1.VALVES MATERIAL(BODIES,DISC,GASKETS,LININGS,PACKINGS, CALCULATIONS SHALL BE ENGINEER.PREPARED BY REGISTERED THE OTHERWISE INDICATED. ETC.)SHALL BE APPROVED FOR THE SERVICE IN WHICH THEY SANITARY DRAINAGE&WASTE PIPING/SEWER ARE INSTALLED. CONTRACTOR'S REGISTERED ENGINEER SHALL BE LICENSED H. WHEREVER FOUNDATION WALLS,OUTSIDE WALLS,ROOF,ETC.ARE PENETRATED FOR __V__ SANITARY VENT PIPING 2. VALVES SHALL BE LINE SIZE UNLESS OTHERWISE INDICATED. WITH THE PROPER AUTHORITIES FOR THE LOCATION OF THIS INSTALLATION OF SYSTEMS,THEY SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION AND 3. VALVES SHALL BE EQUIPPED WITH ACCESSORIES AS REQUIRED. PROJECT. SEALED WEATHER TIGHT.WORK SHALL BE PERFORMED BY CRAFTSMEN SKILLED IN THEIR -G- GAS PIPING 6. PROVIDE A COMPLETE WET PIPE SPRINKLER SYSTEM FOR ALL RESPECTIVE TRADES. ----CD- CONDENSATE PIPING AREAS,UNLESS OTHERWISE INDICATED OR REQUIRED FOR 1. ALL PIPING SHALL RUN PARALLEL TO BUILDING LINES AND SUPPORTED AND ANCHORED AS PUMP SCHEDULE FREEZE PROTECTION. REQUIRED TO FACILITATE EXPANSION AND CONTRACTION.ALL PIPING SHALL BE CONCEALED CB CAST BRONZE EXCEPT IN UNFINISHED SPACES.INSTALL AS REQUIRED TO MEET ALL CONSTRUCTION 7. SPECIAL CONSIDERATION SHALL BE GIVEN TO AREAS CONDITIONS AND TO ALLOW FOR INSTALLATION OF OTHER WORK INCLUDING DUCTS AND J(� CP CHROME PLATED HEAD ELECTRICAL THROUGHOUT THE BUILDING SUCH AS DROPPED SOFFITS, ELECTRICAL CONDUIT.AT ALL CONNECTIONS BETWEEN FERROUS PIPING AND NONFERROUS DESIGNATOR SERVICE LOCATION MANUFACTURER MODEL NO. TYPE GPM MOTOR HP VOLTS PH CYC. RPM REMARKS LIGHTING SOFFITS AND RECESSED STORAGE RACKS THAT PIPING,PROVIDE AN ISOLATING DIELECTRIC UNION. � Iuui �d (FT.) CO CLEANOUT NECESSITATE ADDITIONAL SPRINKLER HEADS. d ETR EXISTING TO REMAIN HOT WATER BELL& 8. RUN PIPING HORIZONTALLY AND AT RIGHT ANGLES TO WALLS AND J. PROVIDE ALL FITTINGS,ACCESSORIES,OFFSETS,AND MATERIALS NECESSARY TO FACILITATE V P-1 RECIRCULATION STAGING 101 GOSSETT NBF-12F/LW IN-LINE 2 10 1I20 115 1 60 2800 CEILINGS.CENTER SPRINKLER HEADS IN BOTH HORIZONTAL THE PLUMBING SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND THE EQUIPMENT FCO FLOOR CLEANOUT INDICATED. DIRECTION WITH RESPECT TO CEILING COMPONENTS,SUCH AS > _ CEILING GRID,LIGHT FIXTURES,HVAC DIFFUSERS AND SPEAKERS FD FLOOR DRAIN K. PROVIDE A COMPLETE SYSTEM COPPER STEEL(OR DWG PVC IF ALLOWED BY CODE)VENT pp�pp O Q ALTERNATE MANUFACTURERS:BRADFORD-WHITE,LOCHINVAR,STATE, OR AS DIRECTED BY OWNER'S REPRESENTATIVE. RISERS ABOVE FLOOR.ALL VENTSTS C SHALL BE CARRIED THROUGH THE ROOF WITH FLASHING. Iuui M GALV GALVANIZED WATER HEATER SCHEDULE RHEEM OR RUDD.ALTERNATE TO BE OF GREATER OR EQUAL QUALITY, M 9. FIRE PROTECTION SYSTEM SHOP DRAWINGS SHALL INCLUDE NC NEW CONNECTION _ _ -___-_-___ PROVIDE SUBMITTALS TO ULTA AND ARCHITECT SEPARATE AND COMPLETE REFLECTED CEILING PLANS L. CONDENSATE AND INDIRECT DRAIN PIPING SHALL BE TYPE"M"COPPER TUBING. ® 'a n n STORAGE GAS RECOVERY INDICATING LOCATION OF EACH SPRINKLER HEAD AS WELL AS V�d LS S SANITARY DESIGNATOR TYPE LOCATION MANUFACTURER MODEL NO. GALLON AT 100'F REMARKS PIPING LAYOUTS. M. PROVIDE CLEANOUTS AT THE END OF EACH HORIZONTAL RUN,AND AT THE BASE OF ALL Il-�0 p CAPACITY MBH RISE VERTICAL WASTE AND DRAIN PIPES.CLEANOUTS SHALL BE OF THE SAME SIZE AS THE PIPES I� @-/J V VENT STORAGE 10. PROVIDE MAIN DRAINS AND AUXILIARY DRAINS WHERE THEY SERVE. (!J O Cd J f� HWHA STAGING 1.1 1 A.O.SMITH --IS. 100 1W 193 GPH SEE DETAIL NECESSARY. N. HOT AND COLD WATER PIPING SHALL BE TYPE L COPPER PIPING ABOVE GRADE AND TYPE"K" I J VTR VENT THRU ROOF TANK COPPER PI e PE BELOW GRADE,FITTINGS AS REQUIRED BY LOCAL AUTHORITIES.PROVIDE WATER -1 _-- --_-- _-_- ------ -------- 11. PROVIDE TEST CONNECTIONS AT MOST REMOTE POINT OF MAIN W WASTE '•SET THERMOSTAT TO AN OUTPUT TEMPERATURE OF 140-F. PORTION OF EACH SPRINKLER SYSTEM. HAMMER ARRESTORS WADE URER.INSTALL MODEL V VE THROUGH ACCESSIBLE SIZE AND LOCATION J LL AS INDICATED BY MANUFACTURER.INSTALL STOP VALVE IN AN ACCESSIBLE LOCATION IN EACHIL ��B� LINE SIZE BALL VALVE(2"&SMALLER)OR LINE SIZE WATER SUPPLY TO EACH FIXTURE.CHECK EXISTING WATER PRESSURE AND PROVIDE PRV BUTTERFLY VALVE(2-1/2"&LARGER) 12. LAYOUT THE SPRINKLER PIPING SO THAT THERE IS A MINIMUM WHEN WATER PRESSURE EXCEEDS 80 PSI. SEPARATION OF 12"BETWEEN THE CEILING HEIGHT AND THE 3 BALANCING VALVE EXPANSION TANKS BOTTOM OF THE SPRINKLER PIPE OR ROUTE PIPING AROUND 0, INSULATE ALL HOT AND COLD WATER PIPING BOTH VERTICALLY AND HORIZONTALLY,IN CEILING W ---------- - ---- --- ---- - LIGHT FIXTURES TO AVOID CONFLICTS. BELOW ALL HANDICAPPED FIXTURES AND CONCEALED IN WALLS COMPLETELY.PROVIDE 1" MARK LOCATION I SERVES CAPACITY WORKING SIZE(APPROX) MANUFACTURER MODEL REMARKS PREFORMED FIBERGLASS ASJ-VB,FLAME SPREAD 25,SMOKE DEVELOPED 50,ASTM C-547. (GALLONS) PRESS(PSI) 13. FIRE PROTECTION CONTRACTOR SHALL FIELD VERIFY EXACT --- - - -- -_-----_ ET-1 STAGING 101 1 DOM.HW REQUIREMENTS FOR BUILDING REGARDING PIPE SIZES,4.4 150 11"0z15" AMTROL ST-12 P. PIPING ROUTED IN EXTERIOR WALLS SHALL BE ROUTED ON WINTER WARM SIDE OF BUILDING o w a ADEQUATE PRESSURES,SERVICE LOCATIONS,ZONING AND WALL INSULATION. SUBMIT SHOP DRAWINGS TO THE AUTHORITIES FOR APPROVAL a PRIOR TO FABRICATION OR INSTALLATION OF FIRE PROTECTION Q. ACCESS PANELS SHALL BE PROVIDED WHERE CONCEALED CONTROL DEVICES,VALVES,ETC. PLUMBING FIXTURE SCHEDULE WA TER SERVICE AND SYSTEMS. ARE CONCEALED WITHIN WALLS,WHERE ACCESS FOR ADJUSTMENT AND MAINTENANCE IS - _ POSSIBLE THROUGH LAY-IN SUSPENDED CEILINGS,ACCESS PANELS ARE NOT REQUIRED. W„.°v MOUNTING SUPPLY STOP 14. AUTOMATIC SPRINKLERS SHALL BE OF THE OPERATING DESIGNATOR FIXTURE SIZE TYPE MANUFACTURER MODEL NO. COLOR TRAP CARRIER HEIGHT FITTING VALVE REMARKS TEMPERATURE AS REQUIRED BY THE LOCATION WITH SPECIAL a. a°-w 2 -- REGARD FOR HEATING UNITS.SPRINKLER PIPING SHALL ROUTE R. TEST WATER SYSTEM UNDER ICA PSIG HYDROSTATIC PRESSURE,FOR FOUR(4)HOURS C+- _ _ AROUND,PROVIDE PROPER CLEARANCES,AND AVOID CONFLICT MINIMUM.WHEN TESTING INDICATES MATERIALS TA WORKMANSHIP I DEFICIENT,REPLACE OR a U a o HCP WATER FLOOR AMERICAN RIM 17-1/4" SLLAN ROYAL SEMIS N0,1955-SSC,OPEN FRONT,SELF SUSTAINING CHECK HINGE REPAIR AS REQUIRED,AND REPEAT TEST UNTIL STANDARDS ARE ACHIEVED. 4/ V WC-1 ELONGATED 3043.001 WHITE INTEGRAL NONE --- WITH BUILDING EQUIPMENT AND SYSTEMS. G v.m 9 CLOSET MOUNTED STANDARD ABOVE FLOOR 111-YO SEAT HANDICAPPED ACCESSIBLE S. PROVIDE A COMPLETE NATURAL GAS PIPING SYSTEM AS NOTED ON THE DRAWINGS.PIPE AND mm MCGUIRE NO.155A STRAINER WITH TAILPIECE,PROVIDE WATER-CONSERVING 15. ALL PIPING SHALL BE ROUTED IN THE SUSPENDED CEILING �. N m�LL. MCGUIRE SEE ARCH. AMERICAN STANDARD MCGUIRE PRESSURE COMPENSATING VANDAL RESISTANT AERATOR FOR FAUCET.INSULATE FITTINGS SHALL BE AS REQUIRED BY LOCAL AUTHORITIES.PROVIDE ALL UNIONS,SHUT-OFF - • m IP LAVA LAVATORY --- COUNTERTOP ELKAY RLLVRI2 -- NONE SPACE,CONCEALED IN WALLS AND BEHIND FIXED FURNISHINGS, u C8802F DWG. 1340.825 H2167CCLK HOT WATER SUPPLY AND DRAIN PIPING;HANDICAPPED ACCESSIBLE FAUCET UNLESS OTHERWISE INDICATED,ALL PIPING EXPOSED TO VIEW VALVES AND DIRT LEGS REQUIRED BY NFPA-54 AND GOVERNING LOCAL CODES,PROVIDE ALL FURNISHED AND INSTALLED BY G.C. SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO THE TESTS,METERS,INSPECTIONS,HANGERS AND EQUIPMENT CONNECTIONS REQUIRED FOR A °' Mg.: COMPLETE AND OPERATING SYSTEM.PAINT PIPING ON ROOF WITH TWO COATS OF RUST '""'" 'Fill i g� SALON MCGUIRE SEE ARCH. GROHE EUROSMART MCGUIRE FURNISHED AND INSTALLED BY G.C.,SUPPLY FITTING LAVATORY CENTERSET UNDERSIDE OF THE STRUCTURE. SK-1 '- COUNTERTOP ELKAY BCR15 -- NONE RESISTANT OUTDOOR PAINT. SINK C8912F DWG. 32643 CHROME FINISH H2167CCLK LESS DRAIN. YI i6; 16. REFER TO ARCHITECTURAL DRAWINGS OR CONSULT ARCHITECT SHAMPOO FURNISHED SEE ARCH. --- MCGUIRE FURNISHED BY ULTA AND INSTALLED BY G.C. FOR EXACT LOCATION OF FIXTURES,EQUIPMENT,ETC.AND FINAL T. THE DOMESTIC WATER SYSTEM,DRAINAGE SYSTEMS,AND GAS PIPING SYSTEM SHALL BE ' n' SK-2 SINK COUNTERTOP --- '- --- NONE DWG. H2167CCLK FLUSHED AND PRESSURE TESTED.THE DOMESTIC WATER SYSTEM SHALL BE PURIFIED. BY ULTA THERMOSTATIC MIXING VALVE BY SHAMPOO SUPPLIER. FINISHED ELEVATIONS PRIOR TO ANY INSTALLATION WORK. SK-3 NOT USED '- '- - -- -- -- -- --- -- "' - 17. EXISTING SYSTEMS THAT REQUIRE RELOCATION AND SERVE U. DRAINAGE PIPING ABOVE AND BELOW FLOOR SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE EXISTING FIXTURES OR EQUIPMENT OR AREAS THAT MUST REOUIRED BY CODE,PROVIDE CAST IRON OR OTHER APPROVED MATERIAL ONLY WHEN REMAIN ACTIVE,SHALL BE RELOCATED DURING OWNER REQUIRED BY JURISDICTION.CONTRACTOR SHALL CLEARLY IDENTIFY WHAT MATERIAL WAS BID GROHE3986EUROSTYLE AT THE TIME OF BID SUBMITTAL, SK-4 COFFEE BAR --- COUNTERTOP ELKAY RLLVRI2 - MCGUIRE NONE SEE ARCH. 33988001 CHROME MCGUIRE FURNISHED AND INSTALLED BY G.C. SCHEDULED SHUT-DOWNS.TEMPORARY CONNECTIONS AND SINK C8912F DWG. FINISH H2167CCLK EXTENSIONS OF REQUIRED SYSTEMS SHALL BE PROVIDED AS V. ALL FLOOR DRAINS SHALL BE CONNECTED TO THE SANITARY SEWER SYSTEM. GROHE EUROSMART NEEDED AND AT THE CONTRACTOR'S EXPENSE. __ MCGUIRE SEE ARCH. MCGUIRE FURNISHED AND INSTALLED BY G.C.,SUPPLY FITTING LAVATORY CENTERSET ' SK-5 C-45 --- COUNTERTOP ELKAY BCR75 C8912F NONE DWG 32643 CHROME H2167CCLK LESS DRAIN. 18. CONTRACTOR SHALL VISIT THE SITE AND DOCUMENT EXISTING W. ALL SANITARY LINES AND PLUMBING FIXTURES ON THE PROJECT SHALL HAVE AN APPROVED FINISH MEANS OF SEWAGE BACKFLOW PREVENTION. Revisions CONDITIONS WITHIN THE LIMITS OF DEMOLITION,PRIOR TO START ISSUE FOR CLIENTILL REVIEW MB-1 mop I..x 24„ FLOOR FIAT MSB-2424 WHITE 3"CAST NONE SEE REMARK CHICAGO FAUCET INTEGRAL MOUNT SUPPLY FITTING 36"ABOVE FLOOR,ROUGH CHROME OF ANY WORK.FORWARD TO ARCHITECT/ENGINEER,FOR X. THE EXISTING CONDITIONS ARE BASED ON"AS-BUILT"DRAWINGS AND/OR LIMITED FIELD BASIN MOUNTED IRON 897-CCP FINISH WITH INTEGRAL VACUUM BREAKER. REVIEW,ONE(1)COPY OF EQUIPMENT AND SYSTEMS BEING VERIFICATIONS.THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO �03/06115 REMOVED BY DEMOLITION WORK AND NEW INSTALLATION WORK. ADDITIONAL EXPENSE TO THE PROJECT.NO ADDITIONAL COMPENSATION WILL BE PROVIDED ISSUE FOR BIDIPERMIT ELECTRIC WALL STANDARD MCGUIRE SMITH OF BUBBLER MCGUIRE HANDICAPPED ACCESSIBLE 10-120V. LIMITS OF DEMOLITION AREA SHALL BE AS INDICATED ON �03/06115 EWC-1 --- ELKAY EZSTLBLC ORIFICE 36"&41" INTEGRAL FOR ANY EXTRAS DUE TO THE CONTRACTOR'S FAILURE TO VISIT THE PROJECT SITE AND/OR WATER COOLER MOUNTED FINISH C8872F 834 ABOVE FLOOR H2167CCLK PROVIDE OPTIONAL LKAPREZL APRON. DRAWINGS PREPARED BY THE ARCHITECTURAL CONSULTANT. PREDETERMINATION OF EXISTING CONDITIONS PRIOR TO SUBMITTING THE BID,ANY Q 19. CARFULLY REVIEW THE INTERIOR DESIGN,ARCHITECTURAL, DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE ARCHITECT/ENGINEER FOR WASHER WALL 2"CAST IRON RIM 42" 1/2"BALL VALVE STRUCTURAL AND ELECTRICAL DRAWINGS AND SPECIFICATIONS RESOLUTION. Q WWB-1 GUY GRAY CO. 8-200 GRAY -" INTEGRAL FINAL CONNECT CLOTHES WASHER SUPPLIES AND LINES. WALL BOX RECESSED 'P'TRAP ABOVE FLOOR (ABOVE CEILING) FOR ADDITIONAL ITEMS TO BE REMOVED,RELOCATED,OR PRODUCTS V. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE INCIDENTAL DEMOLITION WORK PRIOR Q PRECISION ACCOMMODATED;INCLUDE ALL COSTS IN BASE BID FOR THIS TO BIDDING AND COMMENCEMENT OF WORK.THE CONTRACTOR IS RESPONSIBLE FOR ' TRAP _ MOUNTED IN _ 18"ABOVE WORK. TP-1' PRIMER WALL PLUMBING P1-500 NA NA FINISHED FLOOR NA 1/2"BALL VALVE PROVIDE CHROME PLATED ACCESS PANEL AND AG-500 AIR GAP CONNECTION. DEMOLITION OF ALL EXISTING EQUIPMENT AS REQUIRED FOR INSTALLATION/CONSTRUCTION OF Q PRODUCTS - 20. NEW OR EXISTING EQUIPMENT SHALL NOT BE LOCATED ABOVE NEW WORK. `PROVIDE TRAP PRIMER PROTECTION ON ALL FLOOR DRAINS AS REQUIRED BY LOCAL AHJ. INACCESSIBLE CEILINGS.PROVIDE LOCATION OR RELOCATION OF Z. COORDINATE ALL SLAB PENETRATIONS WITH GENERAL CONTRACTOR PRIOR TO CONSTRUCTION. Q EQUIPMENT TO AREAS ABOVE ACCESSIBLE CEILINGS AND MAINTAIN A MINIMUM OF 2"CLEARANCE FROM THE EDGE OF THE SLAB OPENING TO ANY RECONNECT EQUIPMENT TO SYSTEMS. STRUCTURAL MEMBERS AND PIPES. 21. DRAINING AND REFILLING OF SYSTEMS AS REQUIRED FOR AA,PIPE SIZES INDICATED ON THE PLANS ARE MINIMUM.THE CONTRACTOR SHALL PROVIDE PIPE DEMOLITION AND/OR NEW INSTALLATIONS WORK,SHALL BE THE SIZES EQUAL TO OR GREATER THAN THE SPECIFIED SIZES.THE CONTRACTOR MAY INCREASE gg1UNA1 Si;`., RESPONSIBILITY OF THIS CONTRACTOR. PIPE SIZES AS REQUIRED AT NO ADDITIONAL EXPENSE TO THE PROJECT. QQQF (}4ST�p 22. REROUTE FIRE SPRINKLER PIPING IF REQUIRED FOR THE NEW G AS.THE CONTRACTOR SHALL OBTAIN A COPY a74JC, THE LANDLORD'S TENANT CRITERIA MANUAL PRIOR SUPPLY AND RETURN AIR DUCTWORK LAYOUT. ry�7r+9 TO BIDDING.THE TENANT CRITERIA MANUAL REQUIREMENTS SHALL BE INCLUDED IN THE 23. ALL SPRINKLERS IN CEILINGS SHALL BE CONCEALED TYPE WITH CONTRACTOR CONTRACT.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH - ,r C, THE LANDLORD REQUIREMENTS AT NO ADDITIONAL EXPENSE TO THE PROJECT. WHITE COVER PLATE TO MATCH COLOR OF CEILING TILE.EXACT Uy'9%�, 1F?'�.� LOCATIONS OF EACH AND EVERY SPRINKLER WILL BE APPROVED OP(� 1 BY INTERIOR DESIGNER AND OWNER.SUBMIT PRODUCTS AND AC.PROVIDE TEMPORARY COVERS,CAPS,OR PLUGS ON SANITARY SEWER SYSTEM THROUGHOUT �(,1i SPRINKLER LOCATIONS A INTERIOR DESIGNER AND OWNER FOR THE DURATION OF CONSTRUCTION.RAG WADS,DUCT TAPE,OR OTHER SIMILAR METHODS OF APPROVAL PRIOR TO SHOP DRAWING PROCESS. TEMPORARY COVERS SHALL NOT BE UTILIZED.UPON COMPLETION OF CONSTRUCTION, COMPLETELY REMOVE ANY AND ALL OBSTRUCTIONS INSIDE THE ENTIRE SYSTEM BY SNAKING, 24. CONTRACTOR TO PROVIDE BID ALTERNATE FOR ANY ROVING,OR JETTING THE SYSTEM IMMEDIATELY PRIOR TO PROJECT TURNOVER TO THE OWNER. sieeewre----'"--"""-- T' MODIFICATIONS NEEDED,DUE TO LOW SPRINKLER BRANCH AD.ALL BELOW GRADE SANITARY LINES SHALL BE A MINIMUM OF 2"OR IN ACCORDANCE WITH LOCAL hab - LINES/STRUCTURE HEIGHTS.MODIFICATIONS TO SPRINKLER CODE REQUIREMENTS. BRANCH LINES NEED TO BE TIGHT TO STRUCTURE AS POSSIBLE. 10/31Y2015 N AE.SANITARY TEE FITTINGS SHALL NOT BE INSTALLED IN DRAIN WASTE,AND VENT(DWV)SYSTEM. 25. PROVIDED MEANS FURNISH AND INSTALL. N AF.INSTALL SANITARY PIPING 2"OR SMALLER ATASLOPE OF I/4"PER FOOT AND SANITARY PIPING mexmrcexnrrmnrmessPUNS nnw BEEN Pxs ' LARGER THAN 2"AT A SLOPE OF 1/8"PER FOOT. N N AG.ALL PUBLIC USE LAVATORY FAUCETS SHALL HAVE AN AUTOMATIC SAFETY WATER MIXING a LNG TO sr-sssnND BUoincs. v DEVICE IN ACCORDANCE WITH ANSI/ASSE 1016 OR 1017. N_ AH.ALL HANDICAPPED ACCESSIBLE WATER CLOSETS SHALL HAVE THE FLUSHING HANDLE ON THE WIDE SIDE OF THE HANDICAPPED ACCESSIBLE STALL AS REQUIRED BY ADA REQUIREMENTS. urcnxscT a Al. HARD 80 DEGREE ELBOW WILL NOT BE PERMITTED ON SANITARY LINES. Drawn By Checked By AK DH AJ.SUPPORT ALL PIPING AND DUCTWORK,EQUIPMENT,ETC.FROM TOP CHORD OF ROOF/FLOOR a Scale Dale JOISTS,OR PROVIDE STRUCTURAL CALCULATIONS INDICATING BOTTOM CHORD ATTACHMENT IS ml ACCEPTABLE. NO SCALE 03106115 AK.PLUMBING CONTRACTOR SHALL VERIFY EXISTING WATER PRESSURE AND PROVIDE PRESSURE Job No REDUCING VALVE ON WATER SERVICE IF PRESSURE EXCEEDS 80 PSI. 13-5549 0 AL.PROVIDED MEANS FURNISH AND INSTALL. Sheel No. pe4 SEE HVAC PLANS FOR NUT TOP AND ROD FLUE SIZE AND COLD WATER REQUIREMENTS BOTTOM HOT WATER CIRC. s INSULATION RELIEF VALVE PIPE ROD INSULATION GLOBE VALVE ",,—HOT WATER <F ROD MAXIMUM O CIRC.PUMP I- ?_-_ GAS -c 1/2'BELOW NUT o /N PROVIDE GLOBE VALVE SEISMIC - - III_ - D STRAP PER tj SUPPORT OR AP SUSPEND H CPC,,SECT, 1 I BRACKET OR SUSPEND FROM F- _ 508.2;SEE J PIPE CEILING WITH THREADED ROD. ARCH.BRAIDS. L SHEETMETAL HANGER SHEETMETALHANGER CHECK VALVE VENT ROD SHIELD SHIELD (TYP.) PIPE _.......... WATER HEATER NOTE 1 EXPANSION TANK NUT TOP AND ROD MAXIMUM 1/2" ROD / REMOVABLE FLEXIBLE STAINLESS STEEL BOTTOM \ BELOW NUT l R00 NOTE-1: STEEL PIPE BRAIDED HOT AND COLD GC TO FURNISH AND INSTALL SAFETY SUPPLY LINES RAILING GC TO PROVIDE FLEXIBLE PVC STEEL PIPE SAFETY RAILING. DRAIN LINE TO HAIR TRAP WHEN CLEVIS INSTALL PER MANUFACTURER'S r F --- III - - 7 GAS COCK ALLOWED BY AHJ HANGER BOTTOM AND _/ PIPE BOTTOM -� � ���= SPECIFICATION. DIRT LEG •.M UNION(TYP.) FC'I---_ -V`I- q. SHEETMETAL / GC TO PROVIDE PVC DRAIN LINE HANGER J TO DRAIN WHEN ALLOWED BY AHJ SHIELD NOTE•1 INSULATION SHEETMETAL HANGER ,j. u HAIR TRAP SUPPLIED BY ULTA SHIELD EQUIPMENT PAD BY GC.PAD TO EXTEND 6"BEYOND PERIMETER \ FLOOR ROD MAXIMUM 1/2"BELOW NUT OF WATER HEATER \ �_ NOTE:KEEP ALL PLUMBING(VENT,DRAIN,AND SUPPLY LINES) AS TIGHT TO A 6"CIRCLE AS POSSIBLE. $ TYPICAL HANGER DETAIL 5 DOMESTIC WATER HEATER DETAIL-GAS SHAMPOO SINK DETAIL d� NOT TO SCALE NOT TO SCALE NOT TO SCALE V HOT OR COLD IF HORIZONTAL BRANCH IS LESS TURN-DOWN LEAD FLASHING WATER SUPPLY THAN 20'LONG,PROVIDE ONE PROVIDE GALVANIZED STEEL SHIELD FOR ALL INSULATED PIPE, r INTO TOP OF VENT PIPE INSTALL PER PDI WHA AT END OF LINE IF BRANCH 2"AND LARGER VERIFY INSULATION THICKNESS WHEN SIZING ROOF p n p C SEALAN"f BEAD IS GREATER THAN 20'LONG, HANGERS&SHIELDS. ruin M Ir STANDARDS& PROVIDE ANOTHER WHA IN _ R? (h STAINLESS STEEL MANUFACTURER'S MIDDLE,EACH SIZED FOR HALF - _ w Du PIPE CLAMP SHEET LEAD FLASHING BOOT INSTRUCTIONS. THE FIXTURE UNITS. /�` ®y MIN.4LB./S.F AND 24"SQ. // \ \\ MOLDED PIPE BOOT !� 11 L - �4l!/�\\ W (f� FURNISHED BY PDI SIZE Q rR1 -\ M J ROOFING CONTR. pr f41 /�] O LS `BUILT-UP i. rli_. .,.nLF EE - ._.J/ — __.__ - _-: MEMBRANE ROOFING 12 ROOFING SING rl PLUMBING SPECIFICATIONS ' J b b b b J LE FIXTURE MULTIPLE FIXTURES W COVER VALVE BODIES WITH PROVIDE A V-0 LENGTH OF If—r 5 FIXTURE UNIT TABULATION INSULATION BUT NOT UNIONS NONCOMPRESSIBLE INSULATION 10 PDI PIPE FIXTURE AT ALL PIPE HANGERS FOR PIPES SIZE SIZE UNIT LOAD FIXTURE COLD HOT TAPE ALL JOINTS OF 2"AND LARGER M W F FIBERGLASS INSULATION A 12" 1-11 VALVE WATER CLOSET 10 - PROVIDE ELASTOMERIC OR FIBERGLASS _ `—CUT OPENING OR B 314" 12-32 TANK WATER CLOSET 5 - INSULATION ON DOMESTIC COLD&HOT WATER `- SLEEVE ROOF PIPES IN WALLS&CHASES.SEAL ALL JOINTS WITH - FLOOR U c ROOF CONSTRUCTION CONSTRUCTION ADHESIVE.PER SPECS r o a C 1' 33.60 URINAL 10 -- I WORK BY LANDLORD D 1-114' 61-113 LAVATORY/SINK 0.7611,5 0.7511.5 CONTRACTOR - "-- -"--- --- Qj y I E 1.12' 114.154 JANI fOR'S SINK 2.25 2.25 PROVIDE FIBERGLASS INSULATION WITH ALL-SERVICE JACKET WITH VAPOR BARRIER ON ALL COLD/HOT WATER g L w WORK BY ULTA PIPING AND CONDENSATE DRAIN PIPE.REFER TO SPECIFICATIONS FOR FURTHER INFORMATION REGARDING CONTRACTOR F 1 2" 154-330 SHOWERIBATHTUB 2 2 INSULATION.INSTALL ALL ITEMS PER SPECIFICATIONS AND MANUFACTURERS INSTRUCTIONS.MAINTAIN VAPOR ,v' ` N o BARRIER ON COLD PIPING BY MEANS OF SEALANT AND TAPE.FLAME-SPREAD AND SMOKE-DEVELOPED INDEXES _ �`+� a. VENT STACK SHALL NOT EXCEED 25150,SEAL EXPOSED ENDS OF FIBERGLASS INSULATION WITH ADHESIVE MASTIC. 7)°+',", I..: - C �' PC TO PROVIDE WATER HAMMER ARRESTERS BY SIOUX CHIEF,PRECISION PLUMBING PRODUCTS,WATTS OR `7 INCREASER, APPROVED EQUIVALENT WITH PISTON&0-RING CONSTRUCTION,HAVING PDI#WH-201,ABBE#1010&ANSI IF REQ'D. pA112.26.1M CERTIFICATION.INSTALL IN HORIZONTAL OR VERTICAL POSITION,BUT NEVER UPSIDE DOWN. INSULATE IN UNCONDITIONED SPACE. /OR INSTALL IN LINE WITH WATER FLOW DIRECTION.SIZE THE UNITS AS SHOWN ON THE DRAWINGS AND PER . DO NOT INSULATE IN CONDITIONED SPACE. THE TABLES SHOWN ABOVE. po0 3 r c�3N3 W os 9 VENT THRU ROOF DETAIL(EXISTING) 6 WATER HAMMER ARRESTERS 2 �;_PE INSULATION DETAIL F NOT TO SCALE NOT TO SCALE T TO SCALE J ° NOTES: PROVIDE 12x12 ACCESS PANEL IN PLUMBING WALLS FOR DIMENSIONS SERVICING OF TRAP PRIMER VALVES. EQUIPMENT W L D' E' �1/2"BRANCH WATER LINE NOTE:IF DEPTH OF PAD EXCEEDS 4" _�� REINFORCE W/#4 @ 10"/EA.WAY HWH-1 30" 30" 4" 4' USE DEBRIS LOOP Revisions 'IF D=E THEN BASE MAY BE POURED ON TO PREVENT TRAP PRIMER ISSUE FOR CLIENTILL REVIEW W TOP OF FLOOR SLAB. FOREIGN MATTER �0SSUE F L FROM ENTERING ///---TRAP SEAL PRIMER DISTRIBUTION ISSUE FOR BID/PERMIT O DIRECTLY INTO / UNIT,MIFAB MODEL#MI-DU.(4)3/8' ISSUE 5F PRIMER / OUTLET CONNECTIONS(MAX). O THE PRIMING VALVE MUST HAVE 1/2"FLEXIBLE"K"COPPER(TYP.) A MINIMUM ELEVATION OF 12 Q O INCHES ABOVE THE FINISHED PVC SLEEVE FLOOR DRAIN FLOOR FLOOR SLAB Q O D 1/2"EXPANSION JOINT ''!• ••1. y# FRAMED SLAB 3/4"CHAMFER E ' CONNECT TO FLOOR DRAIN (TYP.) goNk I ,.. TRAP WATER LEVEL g4CS4 G$Y I r'-- �G r� 9852 EQUIPMENT BASE DETAIL 6 TRAP PRIMER DETAIL `p y °�o NOT TO SCALE NOT'f0 SCALE Ay 0— V4"TEST CONNECTION sq WITH BALL VALVE uau AND CAP 10/31/2015 SECONDARY PRESSURE LINE SIZE UNION <2 REGULATING VALVE FURNISHED WITH TTxssE f�a T.ITE EENFRs- EQUIPMENT LINE SIZE SHUT Nvisiory arvo rNnTTGTe OFF VALVE euI11GA.E coNPxrw ALLHE ucs. N RELATING iG EiRUCi NIWCE9 GF TWW fug J, unEsorvoemraxcs. N G. {h L/ SEE PLANS FOR PIPE cxirecr u. SIZES 3 Drawn By Y Check DH h DIRT LEG,FULL 0- WITH MENT REDUCER EDUCER IF REQUOIRED Scale Date SIZE AND MINIMUM 8"LONG NO SCALE 03106/15 a Job No. 13®5549 Sheet No. 4 TYPICAL GAS PIPING CONNECTION DETAIL ne� x Ir NOT TO SCALE SECTION TW50 2,02 PIPE AND FITTINGS RELATED TO SECTION 15400 3,11 DRAINAGE AND VENTING PART 2-PRODUCTS SECTION 15350 BASIC MATERIALS AND METHODS A.Pipingd Eig0e,CWS,HWS HWR,and TWS. A.WHERE LINES ARE PURPOSELY PITCHED FOR DRAINAGE OR VENTING,AN ACCURATE NATURAL GAS PIPING SYSTEMS 1.PIPINGSHALL OE TYPE'L'HARD COPPER TUBING MADE UP WITH WROUGHT GRADE SHALL BE MAIN'OMNED.LINES SHALL BE SUPPORTED IN SUCH A MANNER AS TO 2011NSULATION-HOT PIPING PART 1-GENERAL COPPER FITTINGS USING 95-5(LEAD FREE)SOLDER. PREVENT DEFLECTION OF THE PIPING SUFFICIENT TO POCKET THE LINES. A.INSULATION FOR DOMESTIC WAFER PIPING SYSTEMS SHALL BE V THICK GLASS FIBER. PART 1-GENERAL 2.CWS AND HWS PIPING UNDER FLOOR SHALL BE TYPE'K'HARD COPPER WITH B.GLASS FIBER INSULATION SHALL BE ILL RATED,NONCOMBUSTIBLE,SECTIONAL PIPE 101 DESCRIPTION FINSEFITTINGS. 3.12 PIPE AND FITTINGS INSULATION OF HEAVY DENSITY GLASS FIBER WITH ALL SERVICE JACKET HAVING A 1.01 RELATED DOCUMENTS F A.THIS SECTION DEFINES THE GENERAL PROVISIONS WHICH ARE COMMON TO ALL B A.ALL PIPE SIZES REFERRED TO IN THESE SEC(IONS SHOULD BE INTERPRETED AS IPS COMPOSITE RATING NOT TO EXCEED 25 FLAME SPREAD AND 50 SMOKE DEVELOPED. A.THE FOLLOWING SECTIONS APPLY TO THE WORK OF THIS SECTION:SECTION 15050. ALTER MAIN:REFER TO DIVISION 25PECIFICATIONS SECTIONS ANDIOR CIVIL B.IN ADDITION:THE FOLLOWING APPLY:15900,AND 15800. <� SECTIONS LABOR. MATERIALS. WENGINEERINGDRAWINGS AND COMPLY WITH AUTHORITIES HAVING JURISDICTION. (IRON PIPE SIZE)UNLESS SPECIFICALLY DESIGNATED OTHERWISE,SUCH AS"O.D."FOR INSULATION SHALL BE AS SUPPLIED BY CERTAINTEED,OWENSICORNING,OR KNAUF. B.FURNISH MLETALL LABOR,MATERIALSHEFOU AND EOUIPMENNT FABRICATE.AND INSTALL TUBING. OE VERYPACKAGEORSTANUARD CONTAINER OF COVERING,ADHESIVE AND COATING 1.02DESCRIPTION C.SANITARY AND STORM BELOW GRADES INSIDE BUILDING. COMPLETE AND IN PEACE.ALLTHE,AND AS SEQUIRED FOR A SYSTEMS AND OPERABLE 1.PI PING SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE,ASTM A74;WITH LEAD B.FULL LENGTHS OF PIPE SHALL BE USED WHEREVER POSSIBLE.SHORT LENGTHS OF PIPE DELIVERED AT THE BUILDING FOR USE MUST HAVE THE MANUFACTURER'S STAMP OR LABEL 0.THI3 SECTION PROVIDER FOR THE INSTALLATION OF NATURAL GAS PIPING SYSTEMS. THE DRAWINGS,SPECIFIED HEREIN,AND PS REQUIRED FOR A COMPLETE AND OPERABLE WIT COUPLINGS WILL NOT BE PERMITTED. ATTACHED,GIVING NAME OF MANUFACTURER AND BRAND. ANO OAKUM JOINTS. INSTALLATION. C.ALL PIPE SHALLBE CUT TO EXACT MEASUREMENT TO CE INSTALLED WITHOUT FORCING T.JACKET LAPS AND BUTT STRIPS SHALL BE SELF-SEALING TYPE. W C.THE CONTRACTOR SHALL PAY FOR ALL PERMITS,FEES AND CHARGES REQUIRED FOR THIS A.PREFORMED JOINTS MAY BE USED IF ACCEPTABLE TO THE LOCAL AUTHORITIES 1.035HOP DRAWINGS HAVING JURISDICTION. (EXCEPT WHERE COLD NED DELI ISSPEFDREILLY CALLED FOR).AFTER CUTTING.ENDS SHALL E.PROVIDE HALF ROUND GALVANIZEDI&GAUGE SHEET METAL ESIZESOV SHIELDS.SHIELDS A,PROVIDE-SCALE SHOPDRAWINGS FOR ALL PIPING SYSTEMS. r WORK. BE REAMED AND GLEANED TO ELIMINATE FOREIGN MATTER SHALL BE iT'LONG FUR PIPE SIZES UP TO 3',18'FOR PIPE SIZES OVER 3'AND UP TO 2.POLYVINYL CHLORIDE(PVC),SCHEDULE 40 PIPE AND FITTINGS,ASTM EPIC D,CUTTING OR OTHER WEAKENING OF THE BUILDING STRUCTURE TO FACILITATE PIPING WITH PRIMER AND SOLVENT CEMENT JOINTS MAY BE USED IF ACCEPTABLE TO THE LOCAL 6',AND 24-LONG FOR PIPE SIZES OVER U'. PART 2-PRODUCTS 1.02 DRAWINGS AND SPECIFICATIONS INSTAL LATION WILL NOT BE BE MARKS AUTHORITIES HAVING JURISDICTION. A.DESIGN DRAWINGS:THE DRAWINGS NYCHAN ES FROM ACCOMPANYING THESE SPECIFICATIONS ARE E.ALL PIPE THTHE AND FITTINGS SHALL BEF THEEU BY THE ANDARD TO IN ACCORDANCE2.02 INS ULA'fION-COLD PIPING GENERALLY DIAGUCH AS OFFSETS, ,BENDS JGESFRGES IN GENERAL-NONROUTING TOSHOWN ON THE O.SANITARY AND STORMING ABOVE SHALLGRACE INSIDE BUILDING, WITH THEMARKINGSECTIONS OF THE SI'ANDAHOS TO WHICH REFERENCE IS MADE INTHIS 2.01 PROVIS GAS ASCOCKS AN UNIONS.PRODUCES DRAWINGS SUCH AS OFFR TRAES AD THE BUIDI IN CONSTRUCTION TO COORDINATION 1.2-CANDDTT LARGER S,ASTING,WITH BE SD VICE AND OAKUM T CASTJOINTS. ON BOIL PIPE SPECIFICATION MANUAL.STANDARD MARKING SYSTEM FOR VALVES,FITTINGS,FLANGES AINSULATIONFOROOMES'TLC WATER PIPING SYSTEMS SHALLBE I"THICK GLASSFIBER. q.GAS COCKS AND UNIONS. WITH UTA DIKOF OTHERGEO THE NEBUILOING CONSTRUCTION SHALL BE DONE gNDRON NGS ASTMAI4,FITTINGS, AOANDDAKUM JOINTS. AND UNIONS OF THE MANUFACTURERS S f-DARDiZATION SOCIETY OF THE VALVE AND B.INSULATION FOR DRAINAGE PIPING SYSTEMS SHALL BE V THICK GLASS FIBER. B.PIPE,FITTINGS AND PIPING SPECIALTIES. A CART IRON NO-HUB PIPE,FITTINGS,AND JOINTS.GISPI301,MAY BE USED C.GLASS FIBER INSULATION SHALL BE UL RATED,NONCOMBUSTIBLE,SECTIONAL PIPE C.PROTECTIVE COATINGS. WITHOUT ADDITIONAL CHARGE TO THE OWNER. FITTINGS INDUSTRY. D.PRESSURE REGULATORS. IF ACCEPTABLE TO THE LOCAL AUTHORITIES HAVING JURISDICTION. INSULATION OF HEAVY DENSITY GLASS FIBER WITH ALL SERVICE JACKET HAVING A B.SHOPMANUFACTURED MATERIAL EQUIPHALL MENT. 2. FOR EACH AND EVERY ITEM F.MAKE ALL MITER FITTINGS, &,FACE OR FT ION OF PIPINGLUSH WITH FITTINGS,DO NOT USE COMPOSITE RATING NOT TO EXCEED 25 FLAME SPREAD AND 50 SMOKE DEVELOPED. OF MANUFACTURED MATERIAL AND EQUIPMENT. 2.T'AND ORAST TZ0 PIPING A"CAST IRON GE FITTINGS. ASTM 53 BENDS,MITER FITTINGS,FACE OR FLUSH BUSHINGS.STREET ELBOWS OR FIELD-FABRICATED E GAS SERVICE METER AND APPARATUS SUPPORT. OR ASTM 120,WITH BEACK CART IRON DRAINAGE FITTINGS. INSULATION SHALL BE AS SUPPLIED BY CERTAINTEED,OWE-ORNING,OR KNAUF. C.RECORD DRAWINGS: REDUCERS. 1.THECONT,VALVE,SHALL CONDEEPATC.IN ADDI RECO TION,HE SHALL PIPES, A.CAST RONNO-HOACCEPTABLE PIPE,FITTINGS AND JOINS.CISPI HAVING JURISDICTION, USEDN, G.CLOSE NIPPLES SHALL NOT BE PERMITTED:USE ONLY SHOULDER NIPPLES.SHOULDER OE VERY PACKAGE OR STANDARD CONTAINER OF COVE RING,ADHESIVE AND COATING PART3-EXECUTION DUCTS,VALVES,CONDUITS,ETC.IN ADDITION,HE SHALL RECORD,IN A SPECIAL SET OF ACCEPTABLE TO THE LOCAL AUTHORITIES HAVING JURISDICTION. DELIVERED AT THE BUILDING FOR USE MUST HAVE THE MANUFACTURER'S STAMP OR LABEL NIPPLE WITH SHOULDER LENGTH LESS'fHAN 1-112"SHALL BE OF HEAVY WALL PIPE; CONTRACT DRAWINGS,ALL CHANGES AND DEVIATIONS FROM THE DESIGN DRAWINGS THAT 3.POLYVINYL CHLORIDE(PVC),SCHEDULE 40,PIPE AND FITTINGS,ASTM 02665: NIPPLES HAVING SHOULDER LENGTH OF I-t 'OR GREATER SHALL BE OF SAME SCHEDULE ATTACHED,GIVING NAME OF MgNUFACTURERANO BRAND. 3.01 COD E COMPLIANCE OCCURRED DURING THE INSTALLATION OF THE WORK. WITH PRIMER AND SOLVENT CEMENT JOINTS MAY BE USED IF ACCEPTABLE TO LOCAL AS CONNECTED PIPE. E.JACKET LAPS AND BUR STRIPS SHALL BE SELF-SEALING TYPE. A.CURRENT NFPA k54NATIONAL FUEL GAS CODE. 2.AT COMPLETION OF THE JOB,THESE DRAWINGS ILLUSTRATING CHANGES OR AUTHORITIES HAVING JURISDICTION. H.UNLESS OTHERWISE SHOWN ON THE DRAWINGS,INSTALL ALL SUPPLY PIPING TO COILS, F.PROVIDE HALF ROUND GALVANIZED 18 GAUGE SHEE T METAL HANGER SHIELDS.SHIELDS B.UNDERWRITER'GLABORATORIESTNC. DEVIATIONS SHOWING BY DIMENSION AND LOCATION THE EXACT POSITION OFPII A.No CELLULAR CORE OR FOAMED PIPING WILL BE PERMITTED. PUMPSANDOTHEREQUIPMENT INCLUDING VALVES AND STRAINERS THEREIN,AT LINE SIZE. SHALL BE 12-LONG FORPIPE SIZES UP T03",ls'FOR PIPESIZESOVER 3"AND UPTO C.AMERICAN GAS ASSOCIATION. CONCEALED PIPES.VALVES,ETC.,SHALL BE DELIVERED TO THE ARCHITECTIENGINEER. IFARE UCTION IS REQUIRED AT A PUMP OR CON TROL VALVE.THE REDUCER SHALL BE 6'.AND 24'LONG FOR PIPE SIZES OVER 0. 0.ALL CURRENT LOCAL,STATE AND FEDERAL APPLICABLE, O.SEE CIF ICATIONS-REFER TO THE FOLLOWING GENERAL SPECIFICATIONS AS THEY AREA 2.03 PIPE AND FITTINGS RELATED TO SECTION 15350 INSTALLED ABUTTING THE INLET AND/OR OUTLET OF THE PUMP OR VALVE PART OF ALL SECTIONS OF DIVISION 15. A.GAS PIPING: PART 3-E%ELUTION 3.02 NATURAL GAS SERVICE 1.DIVISION 1-GENERAL REQUIREMENTS;REGARDING BUT NOT LIMITED TO: L GAS PIPING ABOVE THE FLOOR SHALL BE BLACK,SCHEDULE 40,ASTM A120 STEEL A THE GAS UTILITY WILL PROVIDE A GAS SERVICE AND METER, 3.13 WELDING FITTINGS AND GALVANIZED,MALLEABLE CAST IRON FOR PIPING 2'AND SMALLER T AD AND STEEL PIPE STANDSIPLATFORMS FOR METER PER gONROLS,CLEANING PROCEDURES,CONSTRUCTION,AND PRODUCT OR IONS SUBSTuTIORARY PIPE FITTINGSSMALLBEG A.BUTT-WELTING PH EDITION). SMALL BE MOINT ELBOWS AND FIELDNGTOCTEDNDUCE 3.011NSULATEDPIPSUI-AN NON B.PROVIWINGS, CREEP CONTROLS CLEANINGGARDING BUT NOT LIMITED O:SELF PRODUCT OPTIONS AND SUBSTITUTIONS. ANDNGSIS-G FITTINGS FOR LBEPIPINGZ K,SC EOULE R. NET P ILATESTERMITTED. EDITION).MITERED JOINT ELBOWS AND FIELD FABRICATED REDUCERS ARE APROVIDEINGULATION ON PIPING SYSTEMS AS FOLLOWS: DRAWINGS. 2._,CONTROLS, -ION,HARK;REGARDING BUT NOT LIMITED FIL SELECTIVE 2.GAS PIPING BELOW GRADE SHALLBE BLACK,SCHEDULE M ASTM A1E0,ALL 1.HOT PIPING. NOT PERMITTED.EMOLITION,EARTHWORK,EXCAVATION AND BACKFILLING. WELDED CONSTRUCTION.WRAPPED W I'fH ASPHALT IMPREGNATED KRAF'f PAPER,FINISH 2.COL D PIPING. 3.03 NATURAL GAS DISTRIBUTION co 3.DIVISION3-CONCRETE;REGARDING BUT NOT LIMITED TO:CAST-IN-PLACE JOINTS WITH BITUMASTIC q50 AND PAPER, B.MAKEALL BRANCH CON NE CTIONSWITHTEES,EXCEPT THAT ONSTEEL PIPING, 3.SANITARYDRAINAGE LINES RECEIVING COLD CONDEN SATE,AS PER COLD PIPING. A.PROVIDE AGAS DISTRIBUTION SYSTEM FROM THE METER TO WE GASFIREO CONCRETE FORMWORK AND REINFORCEMENT. STEEL"WELDOS NTs-OT AS LARGER E-BY B THE SIZE MAY BE USED WHERE THE 4.HOT WATERSUPPLY AND WASTE LINES AT LAVATORIES INTENDED FOR HANDICAPPED EQUIPMENT AND APPLIANCES,PER DRAWINGS. z BRANCH PIPE IS NOT URGER THAN ONE-HALF THE SIZE OF THE MAIN PIPE(NOMINAL E.IT NDEQ EQUIPMENT HOF EREIN SSPEGIEDORSHSECTIONTE DRAWINGS ITEMS OR MATERIAL 2.04 ACCESS DOORS ACCESSIBILITY. SHALL B FURNISHED HED BY SPECIFIED ACTOR FOR T THE SECTION.AND FOR EACH SECTION A.PROVIDE A L PARTS AND RE DOORS FOR MANUFACTUREAU_A`NNAS MAN FACTORED BY COMPLETE SIZES). -NATURAL D VENT LNG INS PRESS ON GO SHALL BE UNLESS I THE CONTRACTORSTATED SE SECTIANSINSTALLEDBY THAT WITH ALL PARTS AND READY FOR INSTALLATION AS MANUFACTURED BY ONE OF THE 3.02 PIPEHANGER SHIELDS A.EXTEND VENTS FROM PRESSURE REGULATIONS TO THE OUTSIDE WITH SCREENED VENT CONTRACTOR UNLESS IT IS ANY ITEM FMA MATERIAL OR WE EQUIP EQUIPMENT IS SPECIFICATION OR SHOWN FOLLOWING: 3.14 REDUCI ECCENTRIC A.EACH CONTRACTG INSTALLING HOTAT EACH OR COLD PIPING SHALL SET THE PIPING UPON CAP. TON HETHE CONTRACTOR DRAWINGS.THAT ITEMDIMATERIAL OR EQUIPMTRCOSE FURNISHED EC 1.BIRMINGHAM ORNAMENTAL. A.USE COINED TOREDUCING VENTPFCKETIS OR NG OECCENTRIC REDUCING COUPLINGS WHERE WOOD BLOCK NG EACHNESS SHALL B.ROMERIBASICMATERIAQUIRE METHODS SECTION FORCLEANING,TESTING AND OR FURNISHED BY OTHERSE SECTION INSTALLED BYTHE STALLED BY THEFONTRACT BONS, 2.KARP. HEQUIREC ECCENTRIC REDUCERS ARE LIQUID, O.THE WOOD BLOCKING THICKNESS SHALL BE THE SAME AS THAT OF THE WIPE OTHER INSTALLATION REQUIREMENTS. THE SECTION. BY OTHER SECTION CONTRACTORS AND INSTALLED BY THE CONTRACTOR OF 3.RMILO OVIDE,LUSHDIVISION OF PANEL DOORS. B.AHERTOP FOR PUMP SUCTION AND ARE USED THESTRAIGHTTH SIDE SHOULD BE INSTALLED ON INSULATION. Q THESECTION. B.PROVOE FLUSH PANEL DOORS EXCEPT ORAcoua rICLTILEp PANEL DOORS UM LA TOP FORPUMPSUCNON AND ON THE BU'TfOM FOR ALL OTHER LINES. C.THIS CONTRACTORL SHALL ION ANDREPLACE HANGWOOD BLOCKING WITH AFULL SECTION OF HEAVY 14 a ACCESS L'D LABELED IN PS WHERE AC C S S OOR TILE OW ED TO GYPSUM LATH. DENSITY PIPE INSULATION AND A HANGER SHIELD. SECTION 15400 1.03 CHASES AND RECESSES C.PROVDE C•B"LABELED UNITS WHERE ACCESS DOORS OCCUR IN HOUR 3.15 CONNECTIONSTOEQUIPMENT AND SPECIALTIES PLUMBING A.ALL CHASES,WILLRECESSESPROVIDED BY T MASONRY HE ARGHIOPENINGS AS RADES. NON THE ROVIDLCREWDRIVER A PIPING TERMINLUSE SHALL BE INSTALLED COMPLETE'fOEQUIPMENT CONNECTIONS OR 3.03INSTAL SURFACES BEOT CLPIPING gp DRAWINGS WILL BE PROVIDED BY THE ARCHITECTURAL TRADES. D.PROVIDE SCREW DRIVER OPERATED CAM LOCKS OF NUMBER REQUIRED BY SIZE OF TERMINAL USEBE POINIs, ApLL SURFACES MUS IF COVERIN AND IS APPLIED PIPELINES TESTED OVEIRSSEE OPTREAPPLYING PRIOR PART 1-GENERAL D - DOD R. B.PIPING EQUIPMALL BE WITHOUT LNG TH PI MID ACCURATELY TO MEET CONNECTIONS ON TPIPE ESTING DEFECTS I COVERED IS APPLIEDAT NTHEPIPE COVERERE IRE TIME OF TO 's7 NN�I� 1.04 LUBRICATION E.PROVIDE ANCHORAGE APPROPRIATE TO CONSTRUCTION. EQUIPMENTNSOR _ANGE AT THE PIPE. TESTING,NA DEFECTS I THE COVEDNGRKAPPE RE AT OR MOVE,ANDATHE DEFEC 1.01 RELATED DOCSOSS.B IL ), A.PRIOR TO TESTING,ALL EQUIPMENT SHALL BE PROPERLY LUBRICATED IN ACCORDANCE C.PROVIDE UNIONS S,PRESSURE REDUCING V LVES,S CONNECTIONS TO COILS,EQUIPMENT, BEENINSPECORRECT ED,MUST BE REINSTALLS WI HE THOUT EX REMOVED, TO AF TER NEE,fS HAVE A.SECTION SECTION. BASIC MATERIALS AND METHODS,APPLIES TO THE WORK SPECIFIED Q v" WITH THE MANUFACTURER'S INSTRUCTIONS.ONE SET OF TOOLS NECESSARY FOR LUBRICATION PART3-EXECUTION CONTROL VALVES,PRESSURE REDUCING VALVES,S'fEAM TRAPS,ETC.,AT ALL LOCATIONS AS BEEN CORRECT'EO,MUST BE REINSTALLED WITHWTE%PENSETOTHE OWNER. IN THIS SECTION. 011 LI � I�� SHALL BE DELIVERED TO OWNER.AFTER PROPER LUBRICATING,DLL UNITS SHALL BE STARTED SHOWN ON THE DRAWINGS,AND GENERALLY AS REQUIRED TO DISCONNECT PIPING FROM B.COVERING SHALL BE DRY WHEN INSTALLED AND BEFORE AND DURING THE APPLICATION B.IN ADDITION,ME FOLLOWING APPLY:15250 AND 153SCL luul u AND SUCCESSFULLY OPERATED BY THE CONTRACTOR IN THE PRESENCE OF THE ARCHITECT SHOW INGANDPATCWNG EQUIPMENT AND APPARATUS.ARRANGE CONNECTIONS SO THAT THE EQUIPMENT SERVED OF ANY FINISH.SURFACES OF COVERING SHALL BE SMOOTH,EVEN AND SUBSTANTIALLY cc 1"' AND/OR ENGINEER, A.ALLCUTTING,REPAIRING,FITTING AND REFINISHING OF IN PLACE CONSTRUCTION MAY BE REMOVED WITHOUT DISTURBING THE PIPING.WHERE VALVES SERVE TO ISOLATE FLUSH WITH ADJACENT PIPE COVERING, -DESCRIPTION '^ 'n EQUIPMENT OR SPECIALTIES,THE UNIONS OR FLANGES SHALLBE LOCATED BETWEEN VALVES A.THISSECTION PROVIDES FOR THE INSTALLATION OF PLUMBING SYSTEMS,FIXTURES, ®co co B.EXCEPTFOR SMALL ELECTRICAL MOTORS WHICH UNDER NEMA STANDARDS ARE REQUIREDFORTHEINSTALLATION OFT HE WORK OFASECTIONSHALLBEDONE AT THEWNON C.MAWUFACTURHAL APPLICATION INSTRUCTIONS FOLLOWED. AND EQUIPMENT OR SPECIALTIES.UNIONS SHALL GENERALLY BE USED FOR PIPE 512E32" EQUIPMENT AND ACCESSORIES. EQUIPMENT SHALL LLBEEELUBRICATION,WITHALL BEARINGS ONFITTINGS EXTENDED THE MECHANICAL EXPENSE OFTHECONAFTER SPECIFIED. SECTION,EXCEPT AS SPECIFICALLY SHOWN ON THE D.IN STAMPS, BE APPLIED OVER PLUGS,BLIND NIPPLES,NAMEPLATES, THE HOUSING. LBE EQUIPPED WITH LUBRICATOR FITTINGS EXTENDED TO THE EXTERIOR OF DRAWINGS OR PERFORMED BY CRAFTSMEN AND SMALLER AND FLANGES FOR PIPE SRE32-1/2'AND LARGER. IMPACT MUST RCISE ENTIEMECTAG3. I�W^ 0 THE HOUSING. B.WORK SHALL BE PERFORMED BY CRAFTSMEN SKILLED IN THEIR RESPECTIVE TRADES. E.INADLATOES AND EXERCISE THEIR APPLICATION, ECAUOON IN THE STORAGE OF FLAMMABLE 1.035h,OPOVIDE VES 'I'^�I 1i c6 3.10 DIELECTRIC CONNECTIONS ADHESIVES AND DURING THEIR APPLICATION. A.PHOVHEIIB'SCALE SHOP DRAWINGS FOR ALL PIPING SYSTEMS. G O z i.05 POWER WIRING 3.02 EXCAVATING A.PROVIDE DIELECTRIC FITTINGS BETWEEN FERROUS AND COPPER PIPING. J A.MOTORS AND MOTORS INCLUDING D LRE.SHALL BE ARGER SHALL B0 VOLT,fiO R 2OR SINGLEVOLTS, U A.THE CUNTRACTOR OF EACH SECTION SHALL DO ALL EXCAVATING AND BACKFILLING AS 3.04 INS ULATION OF PIPINGFIRMLY TOGETHEPIPINR, PART 2-PRODUCTS ' _j J PHASE AND MOTORS S H.P.AND LARGER SHALL R BUILT FOR 208 VOLTS,60 HERTZ, REQUIRED FOR THE INSTALLATION OF HIS WORK. 3.11 PIPE SLEEVES q.BUTT JOINTS EIRMLY TOGETHER.OVERLAP SEAM SHALL BE DOWNWARD DN SLUE OF THREE PHASE;UNLESS OTHERWISE INDICATED PER DRAWING SCHEDULES,PLANS AND B.THE WORK SHALL BE PERFORMED IN ACCORDANCE WITH DIVISION 2SPECIFICATION A.PROVIDEALL PIPE OPENINGS THROUGH WALLS,PARTI'fIONS AND 5lABS WITH SLEEVES PIPE,SEALED TIGHT AND SMOOTH.STAPLE OVERLAP ON B"SPACING. 2.01 PLUMBING FI%TURESANT ACCESSORIES J DETAILS. SECTIONS AND AS HEREINAFTER SPECIFIED. HAVING AN INTERNAL DIAMETER AT LEAS T I"LARGER THAN THE OUTSIDE DIAMETEROFTHE T INSTALL BUTT STRIPS WITH 2'OVERLAP DOWNWARD STAPLE END OF OVERLAP. A.PROVHE PLUMBING FIXTURES AND ACCESSORIES AS SCHEDULED AND NOTED. < J LL B.THE ELECTRICAL CONTRACTOR SHALL PROVIDE COMBINATION MAGNETIC STARTERS WITH C.EXCESSEARTH FROM THE EXCAVATIONS SHALL BE DEPOSITED ON THE SITE WHERE PIPEFORUNINSULATED LINES OR OF THE THICKNESS OF THE INSULATION FOR INSULATED C.INSULATION SHALL BE FASTENED WITH BUT FLARE TYPE STAPLES. H.O.A SWITCH FOR EACH ITEM OF THREE PHASE EQUIPMENT AND UNFUSED DISCONNECTS DIRECTED. SERVICES. 202VACUUMBREAKER3 .y cl FCREACHITEM OF SINGLE PHASE EQUIPMENT,EXCEPT WHERE STARTERS ARE FURNISHED D.ALL EXCAVATIONS SHALL BE BACKAULED AS FOLLOWS: R INSTALL SLEEVES THROUGH INTERIOR WALLS AND PARTITIONS FLUSH WITH FINISHED 3.05 INSULATION OF FITTINGS,VALVES,ETC.-HOT PIPING A.PROVIDE VACUUM BREAKERS FOR PLUMBING FIXTURES AND SUPPLY FITTINGS HAVING 9�i cJ AS A PART OF WIRED EQUIPMENT. 1.WITHIN THE BUILDING WALLS AND UNDER ALL HAVE AREAS:BANK RUN GRANULAR SURFACES;SLEEVES THROUGH OUTSIDE WALLS ARE TO PROJECT TWON OUTSIDE OF THE A.FITTINGS AND VALVES 3'AND LESS SMALL BE INSULATED BY WRAPPING WITH PRE CUT SUBMERGED OUTLET OR HOSE ENO. 11 to 3: �-II 11 C.THE ELECTRICAL CONTRACTOR SHALL DO ALL POWER WIRING INCLUDING CONNECTIONS TO FILL COMPACTED TO 95%MODIFIED PROCTOR. FINISHED WALL FLOOR SLEEVES ARE TO PROJECT 2-ABOVE FINISHED FLOORS, FIBER GLASS BLANKET INSULATION AND SECURING WITH JUTE MINE.APREFORMED, cJ 3 THEMOTORSFURNISPED BY THE CONTRACTORS OF THIS DIVISION. 2,UNDER CONCRETE AREAS AND PAVED AREA3,FILL AS WITHIN THE BUILDINGS. C.SET SLEEVES IN PLACE BEFORE POURING CONCRETE OR SECURELY FASTEN AND GROUT 2SS CLEARKUTS �W P ZIT 3.INGRASSY AREAS,FILL WITH BANK RUN GRANULAR FILLTOADEPTH OF 12 INCHES MOLDED HALL BE FASTENED SHALLBEINSTALLEDLTACK AND auET INSULATION, A.PROVIDE CLEANOUTS FOR SANITARY SYSTEMS AS SCHEDULED DR NOTED. �S D.REFER TO SECTION C ­00ONTRACTOR FOR THE WIRING IC BE PERFORMED BY THE TEMPERATURE IN WITH CEMENT. JACKET SHALL BE FASTENED WITH STAINLESS STEEL TACKS AND BUTT STRIPS OVERLAPPING CONTROL CONTRACTOR AND ME ELECTRICAL CONTRACTOR AS THEY RELATE TO TEMPERATURE OVERTHE HIGHEST PART OF THE PIPING AND FINISH WITH ACCEPTABLE EXCAVATED p.SLEEVE CONSTRUCTION: ON fGTHEADJOINING NDITA PIPE INSULATION, 2.04 DRAINS AND ACCESSORIES CONTROLS. MATERIAL 1.INTERIOR PARTITIONS:NO.22 GAUGE GALVANIZED SHEET STEEL WITH SOLDERED B.FITTINGS 4"IPS AND LARGER SHALL BE INSULATED WITH NESTED AJDIOR MI fEREO A,PROVIDE FLOOR DRAINS AND ACCESSORIES AS SCHEDULED,NOTED AND DETAILED. JOINT. SECTIONAL PIPE COVERING OF THE SAME MATERIAL AND THICKNESS AS THE ADJACENT 1.06 FLUSHING ANO TESTING 3.030PERATING INSTRUCTIONS 2.INTERIOR MASONRY WALLS AND FLOORS:SCHEDULE 40 GALVANIZED STEEL PIPE. PIPEINSULATION.INSULATION SHALL THEN RECEIVE ONE COAT OF FINISHING CEMENT WITH 2.05 FIASHINGS A.ALL NEW WATER PIPING SYSTEMS SHALL BE FLUSHED USING WATER,LOW POINT A.THE CONTRACTOR FOR THE SECTION SHALL,WHEN DIRES OEU BY THE E.INTERIOR WALLS:FILL THE SPACE BETWEEN DO(SIDE OF PIPE OR INSULATION AND THE C GLASS FIOEH REINFORCING CLOTH APPLIED TO FORM ASMDOTH FINISH IN ACCORDANCE WITH A.PROVIDE 4 POUND SHEET LEAD FLASHING&FOR VENTS,OR MOLDED PIPE GRAINS SHALLSYSTEMS, S,OPERATING ATINGU SYSTEMS PROVED SURE,STCBEDRANED, ARCHITECTIENGINEER,PROVIDE THE OWNER WITH ACOMPETENT TRADESMAN TO INSTRUCT INS DEOF THE WALL,PACK WITH AVED KUM,BE LmING WITH FIBER GLASS, MANUFAC PUREE'S RECOMMENDATIONS. Ud'du' B.ALL CLOSED SYSTEMS,OPERATING UNDER PRESSURE,SHALL BE TESTED,WITH WATER, HE OWNERS PERSONNEL IN THE PROPER OPERATION AND MAINTENANCE OF THE F.EXTERIOR WALLS:PACK WITH OAKUM,SEAL WTfH LEAD AND WATERTIGHT MASTIC OR BOOT4LASHINGS.REFER TO ARCHITECTURAL DRAWING DETAILS. AT 1 112 TIMES THEIR OPERATING PRESSURE. EQUIPMENT HE HAS INSTALLED. ASPHALT. C.VALVES 4"IPS AND LARGER SHALL HAVE BODIES UP TO THE BONNETS INSULATED C.ALL OPEN SYSTEMS,SEWERS,ETC.,SHALL BE TESTED WITH WATER,AT A HEAD OF B.PROVIDE COPIES OF OPERATING INSTRUCTIONS,EQUIPMENT MANUALS,AND CONTROL G.PROVIDE ESCUTCHEONS ON BOTH SIDES OF THE RENE NATION THROUGH THE WITH NEST ED ANDIOR MITERED SECTIONAL PIPE COVERING OF THE SAME MATERIAL AND 2,06 TRANSITION COUPLINGS _ DIAGRAMS PER DIVISION-1 CONTRACT CLOSE-OUT. STRUCTURE FOR ALL PIPES EXPOSED'ro VIEW PASSING THROUGH WALLS,FLOORS,CEILINGS, THICKNESS AS THE ADJACENT PIPE INSULATION.INSULATION SHALL RECEIVE ONE COAT OF 0.PROVIDE TRANSITION COUPLINGS BETWEEN CHANGE OF MATERIALS OF PIPING SYSTEMS. .�.. FIVE IS FEET ABOVE FINISHED FLOOR OR GRACE C.CONTROL DIAGRAMS AND WRITTEN INSTRUCTIONS SHALL BE FRAMED UNDER GLASS. AND TCHEONSS,WHETHER OR NOT INSULATED.FOR PIPES PASSING THROUGH FLOORS, FINISHING CEMENT WITH GLASS FIBER REINFORCING CEO TH APPLIED TO FORM A SMOOTH `U 'oa D.GAS PIPING SHALL BE AIR TESTED T 5 PSIG USINGGCOMPR SGEARAFTERMENTS OF FINISH IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.PACKING NUTS OF 2.OT THERMOMETERS AND GAUGES PIPING SHALL FIRST N AIR TESTED AT 5 PSIG USING GAUGES WITH INCREMENTS OF NO ESCUTCHEONS SHALL FIT OVER THE SLEEVES. -" % MORE THAN I"W.G.AND FINAL TESTED WITHAMERCURY MANOMETER AT fi"W.G.THE 3.01 CODES AND STANDARDSAPPURTENANCES H.FIRE-STOPPINGOUND ALL BEDUSTS.PROVIDED ING,CAT ALL S.ETC,AND TO INCLUDE THE TE.MAANNULAR VALVES SHALL NOT SULATED WIT q.PROVIDE LLTHERMOMETER ARABLEAND SGAUGES JUSTABLE DRAWING ANGLLEGENDS, To_ , A.PIPINGMIDAPPURTENANCES INSTALLEDUNDER THIS DIVISION OF THESPECIFICATIONS SPACE AROUNDDUGTS.PIPING,CONDUITS.ETC.ANDSHALLBEU.L.RATED MATERIALS D.FLANGES SHALL HE INSULATED WITH NESTED PIPE INSULATION.THE FLANGE INSULATION B.THEY SHALLHESEPARARIESOCKET,MARSHALLEANGLE TYPE. „�.,_ _ FIRST TEST SHALL U APPLIED FOR A MINIMUM OF ONE(t)HOUR,THE SECOND TEST FOR C.MANUFACTURERS:TRERICE,MARSH,MARSHALLTOWN. A PERIOD OF 15 MINUTES. SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING,WHERE APPLICABLE: A METHODS PER THE ARCHITECTURAL SPECIFICATION SECTIONS.SUBMIT THROUGH SHALL EX'fENO NOT LESS THAN PIPES OVER THE ADJACENT PIPE INSULATION UN EACH SIDE OF C3 F E ALL PIPING SYSTEMS SHALL BE TESTED.IF LEAKS OCCUR,THE PIPE OR FITTING SHALL ANSI CODES FOR PRESSURE PIPING PENETRATION PROTECTION SYSTEMS ALL RATED ASSEMBLIES TO THELOCAL THE FLANGE.INSULATION ON PIPESSWILLBESTOPPED SHORT OFFLANGES TO PERMIT `� D`` ( �V ��oS BEREMOVEDANDREPLACEDAND THESYSTEM RETESTED. ANSI STANDARDSFOR PIPE gNDFITTINGS AUTHORITIES ANDTHEARCHITECtIENGINEERFOR REVIEW. REMOVAL OF FLANGE BOLTS.THEFLANGE INSULATIONSHALL BE APPLIED IN SUCH 2.p8 HOT WATERGENERATORS (O,y r dq°LM AS MECODE FOR UNFIRED PRESSURE VESSELS MANNER THAT IT MAY BE REMOVED WITHOUT OHMAGE TO THE ADJACENT PIPE A.PROVIDE HUT WATER GENERATORS pERDRAWINGLEGENO. -:--- �� S�ro F.PIPING SHALL NOT BE BACKFILLED OR INSULATED UNTIL TESTED,TESTS MUST BE B.FLUES PROVIDED UNDER SECTION 1ES00. �y OBSERVED BY THE ARCHITECTIENGINEER. FACTORY WATT WORKCE SOCIATI IA 3.iB A CUT THREADS FULL INSULATION. /y _ AN ADDITION, NWATHE WOW SHALL ASSOCIATION A.CUTT ENDS OF PIP AFTERND AN WITHTHREADING LAND DIES ESTRAINERS t-1VQIGN LARGER SHALLMENTA DESCRLATED DABO ABOVE 4'AND OARPIPE GULATION E u�L Vl ism B,IN ADDITION,THE WORK SHALL CONFORM TO ALL APPLICABLE STATE AND LOCAL CODES B.REAM ENDS OF PIPE AFTER THREADING AND BEFORE ASSEMBLY,TO REMOVE BURRS. AND FILLING VOIDS WITH CEMENT DESCRIBED FOR 4"qND LARGER FITTINGS AND 2.OBCI.PROVIDE PUMPS ��++ u6a 1d" LL 1.OTSUPPORTS AND ORDINANCES. C.LEAVE NOT MORE THAN THREE PIPE THREADS EXPOSED AT EACH CONNECTION. VALVES.CLEAN OUT PLUGS SHALL BE LEFTACCESSIBLE SO THAT INSULATION WILL NOT BE A.PROVIDE HOT WATER RECIRCULATION PUMP PERORAWING LEGEND. y /0 4.3: A.CONTRACTOR SHALL FURNISH AND INSTALL ALL ANGLES,CHANNELS,PLATES,OR BEAMS D.USE JOINT SEALANT OR'TAPE ON MALE THREADS ONLY. DAMAGEDBY THEIRREMOVAL.STRAINERS SMALLER THAN TV2"SHALL NOT BE U K ^- - Co U REQUIRED FOR THE SUPPORT OF THE EQUIPMENT OF EACH SECTION,WHETHER SHOWN ON 2.f0 BACKFLOW PREVENTERS x.,ci- i3 3.05 WORK CLEANLINESS INSULATED. 3 ; THE DRAWINGS OR NOT. A.PROVIDE BACKFLOW PREVENTERS WHERE SHOWN AND WHERE REQUIRED BY CODE. + •C NN3 B.FURNISH AND INSTALL ALL RODS,AUXILIARY STRUCTURAL STEEL FRAMES.ATTACHMENTS. A.CONTRACTOR SHALL KEEP STORED MATERIALS,STORAGE AREAS,AND INSTALLED 3.19 FLANGED JOINTS F.WHEREVER NESTING SIZE SECTIONAL COVERING USED,IT SHALL BE CUT TO FIT IRA SYSTEMS FREE OF DIRT AND DEBRIS, A.USE STEEL BOLTS WITH SQUARE HEADS AND NARD-PRESSED STEEL HEXAGON NUTS NEAT REVERESTIN LIKE MANNER SECTIONAL ALL JOINTS IS USEO gNSHEL BE CUT PLACE. - C O,I BRACKETSlWD PLATFORMS REQUIRED FOR SUPPORT OF EQUIPMENT FROM OVERHEAD B.ALL EXPOSED ENDS OF INCOMPLETE OR UNCOVERED WORK SHALL BE TEMPORARILY 2.11 FLOW CONTROLS CONSTRUCTION FOR THE RESPECTIVE SECTION. (THREADED HOES THE ANSI STANDARD COARSE THREAD SERIES K2 FIT). G.UNIONS SHALL NOT BE INSULATED. A.PROVIDE WATER CONSERVATION FLOW RESTRICTORS IN THE SUPPLIES FOR ALL FIXTURES TO I_ WW PLUGGED AS EACH PHASE OF PIPING WORK AND DUCTWORK IS COMPLETED. B.ALL BOLT HOLES ARE TO BE SPOT-FACED. H.FIT/INGS,VALVES,S TRAINERS,UNFINISHED ENDS OF SECTIONAL INSULATION.AND COLOR m C.VERTICAL PIPE RISERS SHALL BE ANCHORED MIDWAY OF THEIR HEIGHT,AND SHALLBE C.PIPING AND EQUIPMENT TO BE PAINTED(EXPOSED TO VIEW IN COMPLETED C.FLANGE DIMENSIONS AND DRILLING ARE TO CONFORM TO ANSI STANDARDS FOR THE DAM AGED JACKE IS SHALL BE SEALED AND PAINTED WITH CHILDERS NO.CP35(WHITE) COMPLY WITH FEDERAL.STATE.AND LOCAL CODE SUP PORTED AT EACH FLOOR BY I-1ITXV4"BAR CLAMPS ATTACHED TO PIPES AND STRUCTURE)SHALL BE CLEANED BY REMOVING RUST,PLASTER AND DIRT BY WIRE BRUSHING. PRESSURE CLASSES INVOLVED. AT THE RATE OF 65-10O SQ,FT.PER GALLON. B.PROVIDE PRESSURE REDUCING VALVE FOR MAXIMUM WATER PRESSURE OF SO PSIG. F RESTING ON THE FLOOR CONSTRUCTION. GREASE,OIL AND SIMILAR MATERIALS SHALL BE REMOVED BY WIPING WITH CLEAN RAGS D.WHERE A CAST IRON,FLAT-FACED FLANGE JOINS A STEEL FLANGE,THE STEEL FLANGE D.HORIZONTAL PIPING SHALL BE SUPPORTED BY ADJUSTABLE.WROUGHT,CLEVIS TYPEULL 2.12 THERMOSTATIC MIXING VALVES HANGERS,FEE BMASON,ELCEN,OR CRAWFORD.WHERE PARALLEL PIPE S AEG INSTALLED MOTORAND, PUMPS,ITABLE SOLVENTS. MERAISUSTA OHAVED FLANGES FACE.USEFACED.USE RINET. 3.O61NSTALLATION,GENERAL-COLD PIPING A PROVIDE THERMOSTATIC MIXING VALVES WHERE SHOWN AND REQUIRED BY CODE. AT TIE SAME LEVEL,PROVIDE TRAPEZE HANGERS;THE VARIOUS TRADES SHALL COOPERATE D.MOTOR,PUMPS,AND OTHER ITEMS WITH FACTORY FINISH SHALL BE REMOVED OF E.MATE RAISED-FACED FLANGES TO RAISED-FACED.USE RING TYPE GASKET. A ALL SURFACES MUST BE CLEAN AND DRY AND PIPE LINES TESTED BEFORE APPLYING IN THE JOINT USE OF SUCH HANGERS,PIPE HANGERS SHALL BE OF SIZE TO SUIT PIPE GREASE AND OIL AND LEAVE WITH ALL SURFACES CLEANED AND POLISHED. PIPE INSULATION.IF COVERING IS APPLIED AT THE PIPE COVERERS OPTION PRIOR TO PART3-EXECUTION COVERING PROTECTION SADDLES. 3.20 SOLDERED AND BRAZED JOINTS TESTING,AND DEFECTS IN COVERED WORK APPEAR AT OR BEFORE THE TIME OF E.PIPESSHALL BE SUPPORTED ONLY FROM THE STRUCTURAL MEMBERS OF THE BUILDING. 3,06 ARRANGEMENT AND ALIGNMENT A.ALL SOLDERED MNOJOR BRAZED JOINTS SHALL BE MADE IN ACCORDANCE WITH GOOD INSPECTION AND TESTS,THE COVERING MUST BE REMOVED,AND AFTER DEFECTS HAVE 3.01 SEWER SYSTEMS u I THEYSHALL BE SUPPORTED AT SUCH INTERVALS AS WILL PREVENT SAGGING,AND SO THAT A ALL PIPING SHALL BE ARRANGED AND ALIGNED IN ACCORDANCE WITH THE DRAWINGS. PRACTICE.TUBE ENDS SHALL BE SQUARE CUTAND REAMED,STRAIGHTENED AND BEEN CORRECTED,MUS'f BE REINSTALLED WITHOUT EXPENSE TO THE OWNER. A.PROVIDE SANITARY AND STORM SYSTEMS PER THE DRAWINGS. H T EXCESSIVE LOADS WILL NOT BE PLACED UPON ANY ONE SUPPORT.SPACING AND ROD ELEVATIONS AS GIVEN MUST BEHELD.FLOOR ELEVATIONS WHERE GIVEN ARE TO HIGH ROUNDED WITH STRAIGENING TOOLS AS NECESSARY. e.COVERING SHALL BE DRY WHEN INSTALLED AND BEFORE AND DURING THE APPLICATION B.PROVIDE CLEANOUTS IN THE SANITARY AND STORM SYSTEMS PER THE DRAWINGS. SIZES SHALL BE AS FOLLOWS: POINTS OF FLOOR.DIMENSIONS MUST BE HELD AS CLOSELY AS POSSIBLE.ALL O.FITTING AND TUBE SURFACES SHALL BE PROPERLY CLEANED WITH STEEL WOOL OR OFANYFINISH.SURFACES OF COVERING SHALL BE SMOOTH,EVEN AND SUBSTANTIALLY C,PROVIDE CLEANOUTS AT THE BASE OF RISERS,ENDS OF HORIZONTAL MAINS,CHANGES DIMENSIONS PRE TO BE FIELD CHECKED FOR ACCURACY BEFORE PIPE IS FABRICA FEU. EMERY CLOTH AND A SUITABLE FLUX SHALL BE USED IN ACCORDANCE WITH FLUSH WI H ADJACENT PIPE COVERING, IN DIRECTION AND MAXIMUM OF FIFTY(50)FEET CENTERS IN MAIN RUNS. PIPE SIZE MW(IMUM SPACING MINIMUM ROD SIZE B.INSTALL ALL PIPING STRAIGHT AND DIRECT AS POSSIBLE,GENERALLY FORMING RIGHT MANUFACTURER'S RECOMMENDATIONS.UNIFORM HEAT SHALL BE APPLIED BY THE USE OF C.MANUFACTURER'S APPLICATION INSTRUCTIONS FOR ALL MATERIALS SHALL BE FOLLOWED. ANGLES WITH,OR RUNNING PARALLEL WITH,WALLS OR ADJACENT PIPING.ALL PIPING SHALL BLOWTORCH,ELECTRIC JOINT HEATER,OR OXYACETYLENE TORCH.ADEQUATE COOLING TIME D.INSULATION SHALL NOT BE APPLIED OVER PIPE PLUGS,BLIND NIPPLES,NAMEPLATES, 302 TRAPS Revisions TO B'-0'ANDATALL TURNS 3I8• RE NEATLY SPACED WITH RISERS AND DROPS RUNNING PLUMB AND TRUE. SHALL BE ALLOWED BEFORE WASHING OR QUENCHING.APPURTENANCES THAT ARE FRAGILE INSPECTION STAMPS,OH IOENTIFICAfION TAGS. A.PROVIDE TRAPS FOR EACH FIXTURE AND GRAIN. 3l4',1" T'-O'ANDAT ALLTURNS 3I8' C.RUN PIPING WALL CHASES,PIPE SHAFTS,HUNG CEILINGS,RECESSES,ETC.,WHERE OR HEAT SENSITIVE SHALL BE PROTECTED AGAINST OVERHEATING,OR THE SENSITIVE PARTS E.INSU LA MU ST EXERCISE EXTREME CAUTION IN THE STORAGE OF FLAMMABLE G TRAP SHALL BE SAME SIZE AS FIXTURE OF CHAIN OUTLET. ISSU E FOR CUENTILL REVIEW 1-N."112",2" 9'-0•AND AT ALL TURNS 3,6' SAME ARE PROVIDED.DO NOT RUN SERVICE PIPING IN FLOOR SLAB FILL UNLESS SHALL BE REMOVED DURING THIS APPLICATION OF HEAT. ADHESIVES AND DURING THEIR APPLICATION. �63/G6/15 2-1SI,3" 1B-0-ANDATALLTURNS 1n" SPECIFICALLY SO NOTED ON DRAWINGS,PIPING SHALL NOT BE COVERED OR CLOSED UNTIL C.ALL SOLDERED JDINTS SHALL BE MADE USING 95-5 SOLDER. 3,03 FLASHINGS ISSUE FOR BID/PERMIT 4",W 14'4-AND AT ALL TURNS SIB" TESTING IS COMPLETED. D.ALL BRAZED JOINTS SHALL BE MADE USING SILFOSS OR SILVER SOLDER. 3.07 INSULATION OF PIPING-COLD PIPING A PROVIDE 24 INCH SQUARE FLASHING FOR VENTS, 6" 16'-0"MID AT ALL TURNS 3l4" C.DRAWINGS,IN GENERAL,ARE MADE TO SCALE.ALL DIMENSIONS SHALL BECHEGKED A BUTT JOINTS FIRMLY TOGETHER.OVERLAP SEAM SHALL BE DOWNWARD ON SIDE OF B.TURN VENT FIASHINGS DOWN INTO VENT PIPE. OSSUEF 0,10',12' 18'TY AND AT ALL TURNS TIB" IN THE FIELD BY THE CONTRACTOR BEFORE FINAL CONNECTIONSAREFAORICATED 321 WELDED JOINTS PIPE,SEALED TIGHT AND SMOOTH.STAPLE OVERLAP ONE'SPACING. Q E.DRAWINGS FOR SMALL PIPING ARE,IN GENERAL,DIAGRAMMATIC AND THE EXACT A.IN GENERAL.ALL WELDING ON CARBON STEEL PIPE AND FITTINGS SHALL BE DONE BY B.INSTALL BUTT STRIPS WITH 2-OVERLAP DOWNWARD STAPLE END OF OVERLAP. 3.04 COLD WATER SYSTEM F.HANGER RODS SHALL BE FULL-DIAMETER STEEL WITH THREADED ENDS FOR FIELD LOCATION OF THESE LINES SHALL BE DETERMINED BY THE CONTRACTOR FROM FIELD THE METAL ARC PROCESS. C.INSULATION SHALL BE FASTENED WITH Wls'FLARE TYPE STAPLES. A.PROVIDE A COLD WATER DISTRIBUTION SYSTEM,INCLUDING METER,AS SHOWN, CUTTING AND THREAD EXTENDING AS REQUIRED.WHERE THREADED ROD IS SHORTER THAN MEASUREMENTS TAKEN BY HIM.TIE ACTUAL ARRANGEMENT OF THE SMALL SIZE PIPING, B WELDING OPERATIONS SHALL CONFORM TO CHAPTER V,OF THE CODE FOR PRESSURE D.SEAL OVER STAPLES WITH VAPOR-BARRIER MgSTLC,CHILDERS NO.CP-35(WHRE). SCHEDULED AND DE EA1LED. Q 6-IT SHALL BE DIPPED IN RUST RESISTANT PAINT PRIOR TO INSTALLATION, WHEN ERECTED,SHALL FOLLOW THE GENERAL LOCATIONS SHOWN ON THE DRAWINGS AS FAR PIPING.ANSI 831.3,LATEST EDRION. G.AT THE CONTRACTOR'S OPTION,HANGER RODS SHALL BE CONTINUOUS THREADED STEEL AS PRACTICABLE.THE INSTALLATION MADE IN THIS WAY SHALLBE NEAT INAPPEARANCE C.WELDERS AND WELDING PROCEDURES SHALL BE CERTIFIED WHERE REQUIRED BY SECTION AND CON VENIENT TO OPERATE,AND SHALL PROVIDE FOR PROPER EXPANSION AND DRAINAGE. IX OF THE ASME BOILER AND PRESSURE VESSEL CODE,LATEST EDITION. 3.06 INSULATION OF FI'fTiNGS,VALVES,ETC.-COLD PIPING 305 HOT WATER SYSTEM WIGER ROD SHALL F.INSTALLATION OF PIPING SYSTEMS SHALL BE COORDINATED WITH OTHER WORK TO AVOID D.TACK WELDS USED IN ASSEMBLY PIPE,FITTINGS,ETC.,SHALL BE MADE BY A A.FITTING8 AND VALVES 3"AND LESS SHALL BE INSULATED BY WRAPPING WITH PRE-CUT A.PROVIDER HOT WATER SUPPLY AND RETURN DISTRIBUTION SYSTEM A53HOWN. Q H.HANGER RODS SHALL NOT U BENT OR ALTERED IN ANY MATTER AND SHALLBE BLOCKING BUILDING OPENINGS,LIGHT FIXTURES,ETC.PIPING SHALL NOT INTERFERE WITH FIBER GLASS BLANKET INSULATION AND SECURING WITH JUTE TWINE.A PREFORMED, SCHEDULED AND DETAILED. INSTALLED PLUMB AND TRUE THE ROD SUPPORTING THE HANGER SHALL BE NO LONGER QUALIFIED WELDER E SHALL WHICH WELDS, ARE NOT THAN 12'BELOWTHELOWERNUT. ACCESS TO VALVESOREQUIPMENT AND SHALL NOT OBSTRUCT PASSAGEWAYS PIPING BE MADE WITH AN ELECTRODE WHICH IS SAME OR EQUIVALENT TO THEELECTRODE JACKET MOWESHALLD PVC BE FA COVERSHAL STAINL BE ESS STEELLED ELKS AND BLANKET INSULATION.THE 3. AIRCHAMOERS Q SHALL BE INSTALLED TO PROVIDE WORKING CLEARANCE FOR OPERATION AND MAINTENANCE. TO BE USED FOR THE FIRST PASS.TACK WELDS MUST BE THOROUGHLY CLEANED,GROUND JACKET SHALL BE FASTENED WffH STAINLESS STEEL"PACKS AND BUTT STRIPSOVERIAPPING SMOOTH,CAREFULLY EXAMINED FOR CRACKS,ANDALLCRACKS REMOVED BEFORE ADDITIONAL ONTO THE ADJOINING PIPE INSULATION.AVAPOR-BARRIER MASTIC,CHILDERS NO.CP-35 0.PROVIDE MINIMUM 12'LONG AIR CHAMBERS FOR HOT AND COLD WATER 1.00 VALVES 3.OT MODIFICATIONS AND INTERFERENCES METAL MAY BE DEPOSITED.NO META.SHALL BE TACK-WELDED INSIDE PIPE FOR (WHITE).SHALL BE USED TO SEAL THE JACKET THROAT AND JACKET TO THE PIPE CONNECTIONS TO A SUPPLY FITTING. Q A.ALL CONNECTIONS SHALL BE PROPERLY VALVED:INSTALL VALVES IN THE DOMESTIC A.CONTRACTOR SHALL CAREFULLY CHECK AND BECOME FAMILIAR WITH THE ARCH TfEC UNRAL, ALIGNMENT PURPOSES. INSULATION PRIOR TO TACK AND BUTT STRIP INSTALLATION. COLD WATER SUPPLY,HOT WATER SUPPLY,HOT WATER RETURN,AND NATURAL GAS SUPPLY STRUCTURAL,ELECTRICAL AND ALL MECHANICAL DRAWINGS ANDDETALS,ANDMAKENOTEOF B.FITTINGS 4"IPS AND LARGER SHALL BE INSULATED WITH NESTED ANOJOR MITERED S.OT DISINFECTION OF DOMESTIC WATER PIPING AND ALL OTHER LOCATIONS AS MAY BE NECESSARYTOSHOTOFFAPORTIONOFASYSTEM ALL LOCATIONS WHERE WALLS,PARTITIONS.CEILINGS,STRUCTURAL MEMBERS,ETC.,ARE 3.22 CAULKED JOINTS SECTIONAL PIPE COVERING OF THE SAME MATERIAL AND THICKNESS AS THE ADJACENT 0.THE DISINFECTING AGENT SHALL BE ONE OF THE FOLLOWING:SODIUM HYPCCHLORITE WHETHER SHOWN ON THE DRAWINGS OR NOT,AND SPECIFICALLY WHERE HEREINAFTER CALLED FOR TO BE FURRED OR CLOSED-IN, A.JOINTS IN CAST IRON BELL AND SPIGOT PIPING SHALL BE FIRMLY PACKED WITH OAKUM PIPE INSULATION. SOLUTION(COMMERCIALLY AVAILABLE BLEACH),CALCIUM HYPOCHLOHITE GRANULES OR SPECIFIED. B.MODIFICATIONS TO THE ARRANGEMENT OF THE PIPING SYSTEM MAY BE REQUIRED TO TABLETS,OR CHLORINE GAS.THE CHOICE FOR A PARTICULAR JOB WILL DEPEND ON THE SUIT STRUCTURAL CONDITIONS,OR TO AVOID IN TRFERENCE WITH THE WORK OF OTHER ANU SHALL BE FILLED WITH PURE LEAD,MINIMUM 1'DEEP.JOINT SHALL THEN BE C.VALVES 9'AND LARGER SHALL HAVE BODIES UP TO THE BONNETS INSULATED W TH _ B.ALL VALVES SHALL COMPLY WffH THE SCHEDULE OR LEGEND ON THE DRAWINGS. CONFIGUkgTION OF THE SYSTEM TO BE TREATED,THE CONVENIENCE AND SAFETY FACTORS CAULKED. NESTING PIPE INSULATOR ADJACENT APPROPRIATE 512E AND OF THE SAME MATERIAL AND ,,0, .--,� THEREVALVES ARE NOT SCHEDULED OR SHOWN IN THE LEGENO,THEY SHAI BE RATED FOR TRADES.CONTRACTOR SHALL FURNISH ALL ETHER SETSgDDITIONE DRA IN SOR NO.REQUIRED THICKNESSLL BE INSULATEDPIPE INSULATION. INVOLVEDETC. T�S' 1L. TY DOMEHE IC TOMEET INSTALLATION CONDI'(TONS WHETHER DETAILED ON THEDRAWINGSORNOT. 3.23 PRE FORMED JOINTS D.FLANGES SHALL BE INSULATED WITH NESTING PIPE INSULATION.THE FLANGE BPRO VENT NIPPLES AIR AND TO CHAINTIE SOLUUT REQUIRED ION,WHHETHER OR NOT THESE CONNECTONS ARE qR, I�G�(,6,�SF f�I. C.ANY DOMESTIC HOT WATER SUPPLY OR COLT WATER SERVING TWO OR MORE C MY QUESTIONABLE INFORMATION IN THE SPECIFICATIONS OR ON THE DRAWINGS SHALL A.WHERE ASTM C425 JOINTS ARE USED THEYSHALLBEYVIPEDGLEANANDTHE INSULATION SHALL EXTEND NOT LESS THAN T OVER THE ADJACENT PIPE INSULATION ON k\L1 FIXTURES SHALL BE SEPARATELY VALVED IN ADDITION TO THE SHUT OFF VALVE REQUIRED AT SHOWNOS THE EM DRAWINGS. 4- N' r'(J F BE CALLED TO THE ATTENTION OF THE ARCHITECT AND/OR ENGINEER FOR CLARIFICATION SOLVENT APPLIED IN ACCORDANCE WITH ASTM PROCEDURES. EACH 310E OF THE FLANGE.INSULATION ON PIPES G TO BE STOPPED SHORT OF FLANGES '3J EACH FIXTURE C.FILL THE SYSTEM UNIFORMLY WITH A DISINFECTION SOLUTION OF 100 PPM AVAILABLE BEFORE OF T PROCEEDING WITH FABRICATION O ERECTION OF THE PARTS AFFECTED.Y.IN THE TO PERMIT REMOVAL OF FIANCE BOLTS.THE FLANGE INSULATION SHALL A APPLIED IN G.MAKE PROVISIONSNTHERAWINGS OR NLOW POINTS OF INGALOE VALE AND IRON PIPE OPINION OFCONTRACTOR ANY ENSE,TOGETHER WITH DRAWINGS OF MATERIAL. Y.HE SHALL 3.24 MECHANIC AL JOINTS SUCH A MANNER'fHAT IT MAY BE REMOVED WITHOUT DAMAGE TO THE ADJACENT PIPE CHLORINE THEDISINFEC OF 30CTANTSHALL BE RETAINED NOT LESS THAN 24 HOURS.AS AN 985" HOSEINDICATEDTHREAD ADAPTS WITHC P.DRAINS ALLNOT BE D THAN THREAD TO PREPARE THEM AT HIS OWN EXPENSE.TOGETHER WITH ALL BILLS OF MATERIAL. ACLEAN SPIGOT AND BELL WITH ANDWIREGAUSH.BRUSH SURFACESOR FACES AND INSERT TOWITHBE INSULATION. ALTERNUDINGPERIOD, RIOD, TESTF PPM HELD LCHLORURS IS ALSOMADE ABLONREIS 47 HOSE THREAD ADAPTER WITH CAP.DRAINS SHALL NOT BE lE55 THAN 3l4'. THEHOLDIN SYSTEM SHALLBFDR INEDAAL THE DISIN E HIGH PROCEDURE UREREPE tD SOAPY WATER.WITH GLAND AND GASKETIN PLACE ON SPIGOT,INSERT INTO BELL.SEAT E.UNIONS SHALL BE COVERED WITH NESTING PIPE INSULATION AS SPECIFIED FOR FOUND,THE SYSTEM SHALL BE DRAINED ANO THE DISINFECTION PROCEDURE REPEATED. L"' Q 3.08 PIPE CLEARANCES SPIGOT IN BELL AND PRESS GASKET IN TO BELL AND PULL GLAD AGAINST BELL.INSTALL FLANGES. WHEN A POSITIVE RESIDUAL CHLORINE TEST I3 ACCOMPLISHED,THE SYSTEM SHALL BE 'Iy-�" x to 1.09 VALVE TAGS AINSTALL PIPING TO PROVIDE MINIMUM CLEARANCE OF AT LEAST ONE INCH BETWEEN BOLTS AND NUTS FINGER TIGHT.FINISH WITHq TORQUE WRENCH,RANGE 60 To SO FOOT F.STRAINERS SHALLBE INSULATED ASDESCRIBED ABOVE FOR SMALL VALVES AND lj`' '[- A EACH VALVE ON EVERY PIPELINE SHALL BE PROVIDED WITH A NUMBERED BRASS TAG FLUSHED WITH POTABLE WATER AND PUT INTO OPERATION. �( ()(J ID WHICH SHALL BE FASTENED TO THE VALVE OR LINE WIT/NON-RUSTNG WIRE.WHEN ALL EXTREME PROJECTIONS OFPIPING,FLANGES.FITTINGS.VALVES, INSULATION, POUNDS. FITTINGS.GLEAN-OUT PLUGS SHALL BE LEFT ACCESSIBLE SO THAT THE INSULATION IS NOT D.WORK SHALL COMPLY WITH REQUIREMENTS OF STATE AND LOCAL AUTHORITIES. PIPE EXPANSION AND ME LIKE. DAMAGED BY THEIR REMOVAL. N I WORK IS COMPLETE,DELIVER TO THE ARCHITECTIENGINEER A FRAMED(UNDER GLASS( C WHEREVER NESTING SIZE SECTIONAL COVERING IS USED,IT SHALL BE CUT TO FIT IN A 308 THERMOMETERS '�--- CHART WHICH SHALL INDICATE THE SERVICE AND LOCATION OF EACH VALVE.VALVES USED 3.09 PIPINGE%PANSION SECTION 15250 NEAT WORKMANLIKE MANNER WITH ALL JOINTS BUTTED AND HELD SECURELY IN PLACE WITH A.PROVIDE THERMOMETERS AND GAUGES PER DRAWING DETAILS. LATI FOR LOCAL SHUT-OFF MAY BE OMITTED FROM THIS LIST. A,SPECIAL ATTENTION SHALL BE GIVENTDTHEINSTALONOFHOTAND COLD LINES INSULATION JUTE OR GLASS FIBER TWINE.JOINTS SHALL BE POINTED UP WITH INSULATING CEMENT WHICH HAVE AN APPRECIABLE MOVEMENT$O THAT THEY WILL NOT HIT OTHER PIPES, PRIOR TO RECEIVING SURFACE FINISH. 3 HE HOT WATER GENERATORS __ 1.10 EgUIPMENTIDENTIFICATION STRUCTURAL MEMBERS AND THE LIKE WHEN THEY HEAT UP OR COOL. PARTI-GENERAL H.FITTINGS,VALVES,STRAINERS,WHERE VAPOR-BARRIER JACKET OR CLOTH TAPE HAS ---- ---'-' '- ------- A ALL MECHANICAL EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH 2'HIGH STENCILED B.INSTALL ANCHORS WHERE SHOWN ON THE CH OV INGS AND WHERE REQUIRED. A.PROVIDE GENERATORS,ACCESSORIES AND TRIM PER DRAWING DETAILS. Sig-e BEEN FITTED FUNNE WINE/TILDE APPLICATIONS,AND COLOR DAMAGED SHALL BE 03/2412015 LETTERS.PAINTER ON THE EQUIPMENT(LE.WEATHER ).THIS INCLUDES EXTERIOR C.GUIDES ARE TO BE FURNISHED ON EACH SHE WHETHER AL EXPANSION LOOPS,OFFSETS, 1.01 RELATED DOCUMENTS SEALED AND PAINTED WITH CHILDERS NO.CP-35(WHITE)AT THE RATE OF 05-100 50. ----'----"'- ---'-'----13_-- EQUIPMENTWHERETHEPAINTSHALLBEWEATHERRE313TANT. ING JOINTS ERE REQUI ED SH LLBEDONE WNHANCHORS,r DETAILED ON THE DRAWINGS. A.SECTION SECTION. MATERIALS AND METHODS",APPLIES TO THE WORK SPECIFIED FT.PER GALLON, 310 CIRPROVID GPUMPS Oate 0.COLD SPRINGING WHERE REQUIRED SHALL BE DONE WITH ANCHORS,HANGERS qN0 IN THIS SECTION. q.PROVIDE PUMPS PER DRAWING. 10131!20!'i Q Ex Irzlidn Deia - ------� SLIDINGSUPPORTSINPLACE. B.IN ADDITION,THE FOLLOWING APPLY:SECTION 159W. 300METAL JACKETING B.ELECTRIC WIRING BYELECTHICAL CONTRACTOR TO E%IENT SHOWNON ELECTRICAL p PgRT2-PRODUCTSPVIDE ALUMINUM JACKETING FOR PROYEECTON OF In3.10 LOCATION OF VALVES,ETC. B.AW MINUM JACKETING SHALL 0E FIT FED OVER PIPE AND FORWHERE DRAWINGS.ALL OTHER WIRING BY THIS CONTRACTOR. (! 2.01 DESCRIPTION A.SYSTEM COMPONENTS WHICH REQUIRE OBSERVATION,OPERATION OR MAINTENANCE- UP TO 8b'ABOVE FLUOR OR MEZZANINE LEVELS. 3.11 INS ULATON A THIS PART DEFINES THE PIPE AND FITTINGS TO BE USED FOR ALL SERVICES INSTALLED SUCH AS VALVES,GAUGES,CONTROLS,STRAINERS,DIRT POCKETS,CLEMIOUTS,UNIONS AND iTHESE HANS HAVE SEEN SHE- UNDER DIVISION I& FLANGES,ETC.-SHALL BE LOCATED WHENEVER POSSIBLE SO AS TO BE READILY A PROVIDE PLUMBING PIPING AND EQUIPMENT INSULATION PER SECTION 152150. N B.REFER TO THE DRAWING LEGENDS AND SYMBOL SCHEDULES FOR DEFINITION OF THE ACCESSIBLE.THEY SHALL NOT BE CONCEALED IN CHASES OR ABOVE CEILINGS WITHOUT SMIE MY C-LEDGE,THE COMPLY MUH LRLINA DESIGNATORS USED IN THE FOLLOWING SPECIFICATION. PRO VISIONFORACCESS.VALVES WHICH REQUIRE FREQUENT OPERATION,OR WHICH MAY 3.121NTEPEACE CONNECTIONS REGULATIONSANOOHpNNICE90F1 INFus N REQUIRE EMERGENCY OPERATION,AND WHICH ARE NOT ACCESSIBLE FROM NORMAL WORKING A.PROVIDE INTERFACE CONNECTIONS TO THE WORK OF OTHER TRADES PER DRAWINGS. IATING TO STRUCTURES AND BUILDINGS. V LEVEL,SHOULD BE INSTALLED WITH APPROPRIATE PROVISIONS SUCH AS CHAIN WHEELS OR EXTENSION STEMS. � B.INSTALL ALL VALVES WITH STEMS IN EITHER AN UPRIGHT(PREFERRED)OR HORIZONTAL POSITION.CONTROL VALVES SHALL BE INSTALLED WITH TOP WORKS UPWARD UNLESS ARCHITECT SPECIFICALLY SHOWN OTHERWISE, LL C.GLOBE VALVES SHOULD BE INSTALLED TO SEAT AGAINST THE DIRECTION OF FLOW, Drawn By Checked By 3 AK DH Sca16 le Date al NO SCALE 113106/15 A Job No. 5 549 Sheet No. /� a ' V p- 3.13 PIPING IDENTIFICATION PARTS-EXECUTION A.ALL NEW PIPING,INSTALLED UNDER THIS CONTRACT,SHALL BE IDENTIFIED AS TO THE TYPE OF SERVICE,AND THE DIRECTION OF FLOW,USING A SYSTEM CURRENTLY IN USE BY 3.DI HYDRANT FLOWTEST THE OWNER. A HYDRANT FLOW TEST EXISTING SITE FIRE LOOP PIPING PRIOR TO MAKING ANY y B.WHERE PIPING IS INSULATED.PIPE IDENTIFICATION MARKERS SHALL BE INSTALLED AFTER CONNECTIONS.NOTIFY ARCHITECT IF FLOW TEST IS UNSUCCESSFUL.SCHEDULE TESTING TO THE INSULATION HAS BEEN INSTALLED. ALLOW SUFFICIENT TIME FOR REPAIRS TO BE MADE OR IF FIRE PUMP IS REQUIRED TO p C.PIPE IDENTIFICATION MARKERS SHALL BE INSTALLED AT EACH EQUIPMENT CONNECTION SUPPLEMENT THE REQUIRED PRESSUREAND DESIGN FLOW RATE. AND ON TWENTY(20)FOOT CENTERS FOR RUNS OF STRAIGHT PIPING. 3.02 TESTING OVERHEAD PIPE 3.14 ACCESS DOERS A.TEST ALL SPRINKLER PIPINGTI ACCORDANCE EPRENNP IREQUIREMENT[.NOTIFY t A.INS TALL ACCESS DOORS IN THE BUILDING CONSTRUCTION WHERE SHOWN ON THE ARCHITECT'S REPRESENTATIVE.OWNER'TIMES REPRESENTATIVE STSLOCAL FIRE DEPARTMENT. DRAWINGS OR WHERE REQUIRED TO ACCESS VALVES AND CLEANOUTS. 72 HOURS IN ADVANCE REGARDING TIME AND DATE OF ALL TESTS.OWNER SHALL ALSO B.COORDINATE INSTALLATION WITH THE GENERAL CONTRACTOR. ARRANGE WI rH INSURING AGENCY AUTHORITIES FOR THEM REPRESENTATIVE TO BE PRESENT. i 3.15 BACKFLOW PREVENTERB 3.03 DRAINS A.INSTALL PRE TERS COMPLETE WITH DRAIN.ALL PIPING IN ACCORDANCE WITH 0.PROVIDE ALL MAIN AND AUXILIARY DRAINS WHERE NECESSARY.PROVIDE MEANS FOR MANUFACTURER'S LITERATURE. DRAINING ENTIRE SYSTEMS,DOWN STREAM OF ALL SHUT-OFF VALVES AND ALL LOW POINTS. 3.04 CEILING AND WALL PLATES SECTION 15500 0.INSTALL CHROME FINISHED CEILING AND WALL PLATES WHEREVER EXPOSED SPRINKLER AUTOMATIC SPRINKLER SYSTEM PIPING PASSES THROUGH CEILINGS AND WALLS. PART1-GENERAL 3.05 SLEEVES A SE I SLEEVES IN PLACE FOR ALL PIPES PASSING THROUGH FLOOR AND WALL OPENINGS. 1.01 GENERAL CONDITIONS AND SPECIAL CONDITIONS A SECTION I-.BASIC I-ERIALS AND METHODS,APPLIES TO THE WORK SPECIFIED 3.06 WELDING IN THIS SECTION. A NO FIELD WELDING OF SPRINKLER PIPING SHALL BE PERMI TIED. 9,GENERAL AND SPECIAL CONDITIONS APPLY TO THE WOW UNDER THIS SECTION, e.JOIN ALL INSIDE PIPING BY MEANS OF SCREWED,FLANGED OR FLEXIBLE GASKETED C.A PRE.CD-TRUCTION MEETING BEFORE THE SHOP DRAWING PROCESS.A MEETING JOINTS OR OTHER ACCEPTABLE FITTINGS. WILL BE HELD TO DISCUSS THE SENSITIVITY OF THE PIPING AND SPRINKLERS IN THE FACILITY AND ESPECIALLY THE SPECIAL CEILINGS.LOCATION OF AUTOMATIC SPRINKLES SHALL BE 3.01 INSPECTOR'S TEST APPROVED TEE ARGHITED RQWNER. A.PROVIDE TEST CONNECTIONS AT MOST REMOTE POINT OF MAIN PORTION OF EACH SPRINKLER SYSTEM WITH 1-INCH PIPE AND VALVE,TEST PIPE SHALL BE CONNECTED TO 1.02 SCOPE OF WORK SPRINKLER PIPE AT LEAST 1-t14"D I D SHALL DISCHARGE OUTSIDE BUILDING OR A.AUTOMATIC WET PIPE SPRINKLER SYSTEM AND COMPONENTS AS SPECIFIED HEREIN ADEQUATE FLOOR DRAIN THROUGH IU SMOOTH BORE BRASS OUTLETWHERE IT CAN BE AND AS MIGHT BE SHOWN ON DRAWINGS,INCLUDING PIPING,HANGERS,VALVES,ALARMS, EA BEY SEEN. SUPPORTS AND SPRINKLER HEADS,NECESSARYANDAS REQUIRED FOR INSTALLATION OF B.CONSULT WITH ARCHITECT'S REPRESENTATIVE AT JOB FOR EXACT LOCATION OF COMPLETE AND APPROVED FIRE PROTECTION SYSTEMS. INSPECTORS TEST CONNECTIONS. B.WORT(UNDER THIS SECTION SHALL BE PERFORMED BY AN APPROVED AND AUTOMATIC NJC FIRE SPRINKLER CONTRACTOR.SHOP DRAWINGS AND CALCULATIONS SHALL BE PREPARED BY 3.O8 EXTRA SPRINKLERS A REGISTERED PROFESSIONAL ENGINEER.APPROVED CON TRACTOR AND THE CONTRACTORS A.PROVIDE TWO SPARE SPRINKLER CABINETS COMPLETE WITH SPRINKLERS OF ASSORTED REGISTERED ENGINEER SHALL BE LICENSED WITH THE PROPER AUTHORITIES FOR THE 'TEMPERATURE RATINGS OF THE TYPE NECESSARY AND IN USE THROUGHOUT THE LOCATION OF THIS PROJECT. INSTALLATION,EACH CABINET SHALL BE EQUIPPED WITH TWELVE(12)SPRINKLERS AND A C.WORK SHALL BE DONE IN A FIRST CLASS AND WORKMANLIKE MANNER,COMPLETE IN SPECIAL SPRINKLER WRENCH FOR EACH TYPE OF SPRINKLER FURNISHED, ALLRESPECTSINCLUOING ITEMS OF WORK SPECIFIED HEREIN OR OUTLINED AND ILLUSTRATED B.INSTALLSERINKLER CABINETS ADJACENT TO THE RISER VALVES AND CONFER WITH RAWINGS AND NECESSARY TO ACCOMPLISH A COMPLETE,FULLY OPERATING, SA TISFAC TORY AND APPROVED INSTPllATON. ARCHITECTS REPRESENTATIVE FOR EXACT LOCATION OF CABINET. Q IGS APPLICABLE STANDARDS 3.09 SPECHALTY DEVICES �+ A.LOCALAND STATE FIRE MARSHAL CODES. A LL A.INSTALLA LION OF ALL SPECIALTY DEVICES SHA BE IN ACCORDANCE WITH THE V B.NATIONAL FIRE PROTECTI ON ASSOCIATION STANGARDS. MANUFACTURERS'INSTRUCTIONS.WHERE THE INSTALLATION OF THOSE DEVICES REQUIRE USE C.NFPA-I3-SPRINKLER SYSTEMS. OF A TORQUE WRENCH OR OTHERAPPLIANCE,THE CONTRACTOR MALL CERTIFY THAT THE T LL O.UNDERWRI TERB LABORATORIES STANDARDS. MANUFACTURERS'INSTRUCTIONS HAVE BEEN COMPLIED WITH. y, qqq l� E.OWNER'S OR TENANTS INSURANCE UNDERWRITER. f.MATERIALS AND EQUIPMENT SHALL BE U.L.INC.APPROVED AND LISTED AND M •_„ APPROVED BY FACTORY MUTUAL. uu u 1.04 SHOP DRAWINGS CO A UPON AWARD OF CON TRACT,FIRE PROTECTION CON'ERNO HER SHALL IMMEDIATELY ®'co CID PREPARE WORKING DRAWINGS,HYDRAULIC CALCULATIONS,AND MANUFACTURER'S DATA ' SHEETS FOR EACH AND EVERY ITEM OF EQUIPMENT AND MATERIAL:AND SUBMIT THE I1 SAME OR APPROVAL EVENTI TOO: I� 1.LOCAL FIREPBUREAU. (V'a` Lu (CI%11 2.OWNER'S OR TENANT'S INSURANCE UNDERWRITER, O 3.ARCHITECTIENGINEER. B.AFTER APPROVAL,FIRE PROTECTION CONTRACTOR SHALL SUBMIT APPROVED WORKING ' DRAWINGS BEARING SEAL OR STAMP OR APPROVAL FROM THE FIRE PREVENTION BUREAU AND THE OWNER'SRENANTS INSURANCE UNDERWRITER.IF REQUIRED.SUBMI'E ONE J< Lm Lm REPRODUCIBLE SEPIA AND THREE(3)BLUELINE PRINES OF COMPLETE SHOP DRAWINGS,AND LL SIX(6)SETS OF MANUFAC'EURER'S DATA ON DEVICES AND(4)BE ES OF CALCULATIONS. ILL C.CONTRACTOR SHALL SUBMIT COMPLETE PACKAGES.PARTIAL SUBMITTALS SHALL BE z D AVOIDED. 0.FIRE PROTECTION WORK,INCLUDING ORDERING OF MATERIALS,SHALL NOT BE DONE UNTIL to AFTER SHOP EDAPPROVALS INIMUM GALE OINEO. y� E.PREPARE SHOPDRAWINGSATMINIMUMSCALE IN LERS,HFORPLAIDS,AND Ewa il4OF C FOR DETAILS.SHOW ALL PIPING,SPRINKLERS,HANGERS,FLEXIBLE COUPLINGS, ROOFCONSTRUCTION OCCUPANCY OF EACH AREA,INCLUDING CEILING AND ROOF HEIGHTS AS REQUIRED BY BY O .WHEN WELDING IS PLANNED,SHOP DRAWINGS SHALL BE SHOP INDICATE THE SECTIONS TO BE SHOP WELDED AND THE TYPE OF WELDED FITTINGS TO BE USALLA Mp� o w F.N" TIONSHALLSEBASEDONTHEIATEST ARCHITECTURAL,STRUCTURAL,HEATING AJUVENTILATING,PLUMBING AND ELECTRICAL DRAWINGS, li1�u G.SPRINKLER SYSTEM CONTROLS,VALVING,DEVICES,PIPE ROUTING,SPRINKLER HEAD LOCATIONS AND SPACING IF SHOWN ARE A CRITERIA FOR CONTRACTOR TO PREPARE FINAL SHOP DRAWINGS.FIRE PROTECTION GUN TRACTOR SHALL FIELD VERIFY EXACT REQUIREMENTS �qq�� FORBUILDING REGARDING PIPE SIZES,ADEQUATE PRESSURES,SERVICE LOCATIONS,ZONING (D 'D" AND SUBMIT SHOP DRAWING TO THE AUTHORITIES FOR APPROVAL PRIOR TO FABRICATION OR A a� INSTALLATION OF FIRE PROTECT ION WATER SERVICE AND SYS'EEMS. a_u 1.05 A BUILT DRAWINGS A..MAINTAIN AT THE SITE AN OTEDUP40-DATE MARKED SET OFAS-BUILTARCHITECT DRAWINGS. WHICH SHALL BE CORRECTED AND DELIVERED TO THE ARCHITECT UPON COMPLETION OF THE Q3 v w m C om P WORK- B.FURNISH THE ARCHITECT WITH ONE(i)REPFtODUCISITE SEPIA PRINT OF EACH C/� =1 DRAW APPROVED SHOP INGS,REVISED TO SHOW CONDITIONS. ►i.0�Po `O�Hmc 1.0GVALVE DIAGRAM AND OPERATING INSTRUCTIONS Uo.`v A.AT THE COMPLETION OF THE WORK,PRE-A SMALL p SCALE PLAN OF EACH BUILDING yr" p1 (\ /I C„�oq� SYSTEM INDICATING THE LOCATIONS OF ALL CONTROL VALVES,LOW POINT DRAINS,AND INSPECTOR'S TESTS.THE PLAINS WALL-BE NEATLY DRAWN AND COLOR CODED TO INDICATE Ol"av+3 THE PORTION OF THE BUILDING PROTECTED BY EACH SYSTEM,FRAMED UNDER GLASS AND C PERMANENTLY MOUNTED ON THE WALL ADJACENTTO THE SPRINKLER RISER VALVES �W B.FURNISH ONE(1)COPY OF NFPA.25,'INSPECHON,TESTING AND MAIN IENANCE OF - WATER BASE PROTECTION SYSTEMS',AND BOUND SET(S)OF PRINTED OPERATING AND MAINTENANCE INSTRUCTIONS TO THE OWNER,AND ADEQUATELY INSTRUCT THE OWNER'S f MAINTENANCE PERSONNEL IN PROPER OPERATION AND LEST PROCEDURES OF ALL FIRE PROTECTION COMPONENTS PROVIDED. " 1.07 CHANGES A.MAKE NO CHANGES IN INSTALLATION FROM LAYOUTAS SHOWN ON DRAWINGS,UNLESS CHANGE IS SPECIFICALLY APPROVED BY THE ARCHITECT.THIS DOES No INCLUDE MINOR REVISIONS FOR THE PURPOSE OF COORDINATION, 6.ANY CHANGES MADE.OTHER RAN AS ABOVE STATED,ARE AT THE CONTRACTOR'S OWN EXPENSE AND RESPONSIBILTEY. 1.08 LEAK DAMAGE A.THE CONTRACTOR SHALL BE RESPONSIBLE DURING THE INSTALLATION AND TESTING Revisions PERIODS OF THE SPRINKLER SYSTEM FOR ANY DAMAGE TO THE WORK OF OTHERS,TO THE BUILDING,ITS CONTENTS,ETC.CAUSED BY LEAKS IN ANY EQUIPMENT,BY UNPLUGGED OR ISSUE FOR CLIENTILL REVIEW DISCONNECTED PIPES,FI TANGS,ETC.OR BY OVERFLOW.AND SHALL PAY FDR THE 03/015 NECESSARY REPLACEMENTS OR REPAIRS TO WORK OF OTHERS,DAMAGED BY SUCH LEAKAGE. ISSUE FOR BIDIPERMIT 1.09 PERMITS AND FEES 03/06/15 A.THE CONTRACTOR SHALL PAY FOR ALL PERMITS,FEES AND CHARGES REQUIRED FOR THIS WORK. PART2-PRODUCTS Q 2.01 GENERAL A Q .THE NAMING OF MANUFACTURERS IN THE SPECIFICATIONS SHALL NOT BE CONSTRUED AS ELIMINATING THE MATERIALS,PRODUCTS OR SERVICES OF OTHER MANUFACTURERS AND SUPPLIERS HAVING APPROVED EQUIVALENT ITEMS, Q B."LISTED'SHALL REFER TO MATERIALS OR EQUIPMEN f INCLUDED IN A LIST PUBLISHED Y A NATIONALLY RECOGNIZED TESTING LABORATORY THAT MAINTAINS PERIODIC INSPECTION Q OF PRODUCTION OF LISTED EQUIPMENT OR MATERIALS,AND WHOSE LISTING STATES EITHER THAT THE EQUIPMENT OR MATERIAL MEETS NATIONALLY RECOGNIZED STANDARD OR HAS BEEN TESTED AND FOUND SUITABLE FOR USE IN A SPECIFIED MANNER. 2.02 SPRINKLERS A.SPRINKLERS FOR THE PROPOSED EQUIPMENT SHALL BE NEW AND OF THE LISTED _ AUTOMATIC,CONCEALED WITH WHITE COVER PLATE OR APPROVED EQUAL,AND SHALL BE DISTRIBUTED THROUGHOUT TIE BUILDING,APPROXIMATE NUMBER OF SPRINKLERS �`p1UNJ.tii \ AND TYPE SHOWN ON CONTRACTOR'S SHOP DRAWINGS.IF THE NUMBER OF SPRINKLERS �"� (sT'�'l\ INDICATED IN THE SPRINKLER COUNT SUMMARY DIFFERS FROM ACTUAL COUNT ON PLANS, TIEACEUALCOUNTSHALLBEPROVIDED. 13 B.INSTALL SPRINKLERS OF PROPER DEGREE RATING WHEREVER NECESSARY TO MEET REQUIREMENTS OF NFPA-13. 9852 2.03 HOSE THREADS A.HUGE THREADS FOR HYDRANTS AND FIRE DEPARTMENT SIAMESE CONNECTION SHALL MATCH THOSE OF THE LOCAL FIRE DEPARTMENT. 2.04 VALVES AND DEVICES A.ALL SPRINKLER GON'EROL VALVES,DEVICES,CHECK VALVES,Al-ARM VALVES,ETC.SHALL BE OF THE APPROVED AND LISTED TYPE. 2.06 PIPING A PIPE SHALL BE SCHEDULE 40,ASTM 53,BLACK STEEL WITH 125&250 WORKING ------ PRESSURE CAST IRON FITHNGS,FW SH B16.4 OR 150&300 WORKING PRESSURE 03/24Y2015 MALLEAB LE IRON FITTINGS,ANSI B16.3.FITTINGS 2-&SMALLER SHALL BE STANDARD - - WEIGH"E AND 2-12'&LARGER SHALL BE EXTRA HEAVY-CAST IRON FLANGED FITTINGS, Dale QANSIBISA,MAYBE USED FOR PIPING 3'&LARGER.NO THINWALL TYPE PIPE WILL BE Lxgletlun Dale ---'- ---10/31/2015 PERMITTED. ry B.SCHEDULE 10,AS TM 135 BLACK S'EEEL THINWALL PIPE WITH MECHANICAL PIPE COUPLING AND ROLL-GROOVED JOINTS MAYBE USED FOR 2 W'AND LARGER PIPING. NO"XL'TYPE PIPE WILL BE PERMITTED. C.PIPING SHALL BE JOINTED BY THREADING ANDIOR GROOVED JOINT MECHANICAL PIPE COUPLINGS.GROOVED JOINT COUPLINGS SHALL BE FOR 2-11Z'&LARGER ONLY AND SHALL F BE EQUAL TO VIGTAULIC STYLE 75 OR TT,NO THREADED THINWALL PIPE IS PERMITTED. OROINNICES DTiwHN FA�s.L WELOING WILL BE ACCEPTED WHEN IN ACCORDANCE WI IH THE STANDARDS OF NFPA,AND uiINGT03rRUCNRESANDeullnw05. y WHERE APPROVED BY AUTHORITIES HAVING JURISDICTION;NO FIELD WELDING IS PERMITTED. N cNITEcr Drawn By Checked By 3 AK DH a Scale Date NO SCALE 03106115 a Job No. `[�� /LJ�L, 13-5549 Sheet N. pall LIGHTING FIXTURE SCHEDULE FEED TO ROOF TOP UNIT SYMBOL LIST (BY LANDLORD) SYMBOL DESCRIPTION LAMPS _ -- --_ TYPE SYMBOL DESCRIPTION VOLTS MANUFACTURER&CATALOG# REMARKS ROOF ~ WATTAGE TYPE TOTAL EfF K SINGLE POLE SWITCH-"K"DENOTES KEY OPERATED SNITCH WATTAGE - -- -"-- 120/ F25T8 MERCURY LIGHTING# SEE NOTES Gy 3W THREE WAY SWITCH G3 0 3'SURFALE MOUNTED FLUORESCENT STAGGERED STRIP -- 2-25W TL850 43W �W 277 ALTO ST-us-oc-ELB-uNl #1,3,5 wq T THERMAL OVERLOAD SWATCH-"P'DENOTES PILOT LIGHT 120/ F32T8 MERCURY LIGHTING# SEE NOTES ' G4 0 4'SURFACE MOUNTED FLUORESCENT STAGGERED STRIP 2-32W TL950 SSW � ARD 0-10V DIMMER SNITCH(LUTRON/NTSN-DV) 277 ALTO ST-232-OCT-ELB-UNI #1,3,5 -_.. 2 1 2"C.-4 3 0 ------ _-__ - _--_ -- M f.e. SIMPLEX NOTED ((+18"ABOVE FINISHED FLOOR) F32T8 MERCURY LIGHTING# &1 6 GROUND UNLESS NOTED OTHERWISE-IG DENOTES ISOLATED GROUND TYPE 4'SURFACE MOUNTED FLUORESCENT STRIP FIXTURE 120/ SEE NOTES 2 SETS OF 3 1/2"C.-4 600 KCMIL, , -- .--.-- G4A ® 1-32W 7LB50 30W MM-132-OCT-C-ELB-UNI , DUPLEX CONVENIENCE OUTLET(+18"ABOVE FINISHED FLOOR WITH WIRE GUARD 277 #1,3,5 1 �1 #1 GROUND SEE NOTE F� G ) ALTO W/WG-MM-1-32 &1 �1/0 ISOLATED GROUND � ______ _____ _ �1 L2&L6 _ UNLESS NOTED OTHERWISE-I DENOTES ISOLATED GROUND 71P 120/ F32T8 MERCURY LIGHTING# SEE NOTES ' DOUBLE DUPLEX OUTLET(+18"ABOVE FINISHED FLOOR) 54C l� 4'PENDANT MOUNTED FLUORESCENT STRIP FIXTURE WITH SOILD REFLECTOR 2-32W TL850 SSW SEE NOTE UNLESS NOTED OTHERWISE 277 MIE6-232-OCT-ELB-UNI #1,3,5 -- ----i M L4 DUPLEX CONVENIENCE OUTLET MOUNTED 8"ABOVE COUNTER TOP - - - ---._--_-.-. _- , � , � mill, UNLESS NOTED OTHERWISE F32T8 MM-232- CT--G# f---" 34D ® 4'SURFACE MOUNTED FLUORESCENT STRIP FIXTURE 120/ 2.32W TL850 SSW MM-232-OCT-C-ELB-UNI SEE NOTES HUBBELL RECTANGULAR NONMETAUC FLUSH FLOOR BOX WITH DUPLEX WITH WIRE GUARD 277 #1,3,5 �4 l ''PANEL, i PANEL' (PANEL i ''PANEL, 'PANEL ALTO W/WG-MM-1-32 F,'1oo RECEPTACLES,FLANGE&ALUMINUM COVER-1-GANG FLOOR BOX - - UTILITY COMPANY y MDP , A i B C D %PFBRG7,RECTANGULAR FLANGE N SA3083W,ADAPTER COLLAR F32T8 APPROVED MAIN 4� ' � PFBRAC.COVER&GASKET SA3826,RECEPTACLE DR20GRY G4N5 0 4'SURFACE MOUNTED FLUORESCENT STRIP FIXTURE 120/ 2-32W TL850 SSW MECURY LIGHTING# SEE NOTES 277 MM-232-OCT-GELS-UNI #1,3,5 ,___ ,____ _ ,, ALTO DISCONNECT, METER ; ;ao + .-- �- -- ---- (FLOOR OUTLETS WILL BE PROVIDED BY OWNER,CONTRACTOR SHALL - --__--- - AND C T CABINET INDICATE QUANTITY ON BID SHEET.) 120/ F25T8 MERCURY LIGHTING# SEE NOTES / ' '`Lc0 M '' SEE NOTE #L4 G6 c W SURFACE MOUNTED FLUORESCENT STAGGERED STRIP 4-25W TL850 84W �- -� ' _ ' ' HUBBELL RECTANGULAR NONMETAUC FLUSH FLOOR BOX WATH WAD Q 277 ST-225-OCT/6T-ELB-UNI #1,3,5 ---------------- ALTO i M!-�----F I RECEPTACLES,FLANGE&ALUMINUM COVER-2-GANG FLOOR BOX -- - - --- "-' -------------------- - i PFBRG2.RECTANGULAR FLANGE N SA3084W,(2)ADAPTER COLLAR e F25T8 I,�___�_ ________� G6N5 a V SURFACE MOUNTED FLUORESCENT STRIP FIXTURE 120/ 4-25W TL850 84W MERCURY LIGHTING# SEE NOTES III PFBRAC,(2)COVER&GASKET AI SA3826,(2)RECEPTACLES IIIDR20GRY 277 ALTO MM-225-OCT/6T-C-ELB-UNI #1,3,S i 2 1/2-C.-4#3/0 (FLOOR OUTLETS WILL BE PROVIDED BY OWNER,CONTRACTOR SHALL -- ------ --- - - --- ---- - -----F32T8 SERVICE GROUND PER i EE NOTE 1 #6 GROUND INDICATE QUANTITY ON BID SHEET.) G8 8'SURFACE MOUNTED FLUORESCENT STRIP FIXTURE 4-32W TL850 lOBW 120/ MERCURY LIGHTING# SEE NOTES NATIONAL AND LOCAL - S &1 #6 ISOLATED GROUND HUBBELL RECTANGULAR NONMETALIC FLUSH FLOOR BOX WITH DUPLEX - 277 ALTO 5T-232-OCT/BT-ELB-UNI #1,3,5 CODE REQUIREMENTS i III L2 &L7 RECEPTACLES,DATA OUTLET,FLANGE&ALUMINUM COVER- ' 2-GANG FLOOR BOX/PFBRG2,RECTANGULAR FLANGE/I SA3084W, 120/ F32T8 MERCURY LIGHTING# SEE NOTES ' �® (2)ADAPTER COLLAR/PFBRAC,(2)COVER&GASKET/I SA3826, p�p GBC ®B PENDANT MOUNTED FLUORESCENT STRIP FIXTURE WITH SOILD REFLECTOR 432W TL850 308W , FINISHED FLOOR RECEPTACLE DR20GRY,DECORATOR FRAME ISF2GY Q 277 MERCUYLIGHINELB-UNI E 3,5 - -- -- ----- ---- --- -- - / 6 luui ALTO (FLOOR OUTLETS WILL BE PROVIDED BY OWNER,CONTRACTOR SHALL F32T8 MERCURY LIGHTING# -- -- INDICATE QUANTITY ON BID SHEET.) m GBD L�8 SURFACE MOUNTED FLUORESCENT STRIP FIXTURE 120/ 4-32W TL850 lOBW MM-232-OCT/8T C ELB-UNI SEE NOTES TIy� ., ., . - ® L+S WITH WIRE GUARD 277 #1,3,5 `120/208V 3PH 4W HUBBELL RECTANGULAR NONMETALIC FLUSH FLOOR BOX WITH DUPLEX _. ALTO W/(2)WG MM 1 32 _ 800A INCOMING ELECTRICAL T RECEPTACLES,TILE FRAME&ALUMINUM COVER-1-GANG FLOOR BOX JLIII PFBRG1.TILE F32T8 MERCURY LIGHTING# GBDE ®8'SURFACE MOUNTED FLUORESCENT STRIP FIXTURE WITH 120/ 4_32W TL850 308W MERCUR LIGHTI-C-ELB-UNI-EMPKS SEE NOTES O® COVER&GASKET III SA3826,ORECEPTACLE(!DR 0GRY PFBRAC, � WIRE GUARD&EMERGENCY BATTERY PACK 277 #1,2,3,5 I� YlJ _ ALTO W/2 WG-MM-1-32 _ (FLOOR OUTLETS WILL BE PROVIDED BY OWNER.CONTRACTOR SHALL 8"SQUARE LED DOWNLIGHT WITH WHITE REFLECTOR&0-10V DIMMNG ELECTRICAL ONE-LINE DIAGRAM INDICATE QUANTITY ON BID SHEET.) ___---- _-_ ®� Ul 0 3,800 LED CON-TECH LIGHTING SEE NOTES I Lu- l� DRIVER 120 42W (U1D) LUMENS 4,000K RLSSQLED4OK72D #3 NO SCALE HUBBELL RECTANGULAR NONMETALIC FLUSH FLOOR BOX WITH QUAD cc z U1D"DENOTES WIRED FOR DIMMING__- - _- _- _ -.. T RECEPTACLES,TILE FRAME&ALUMINUM COVER-2-GANG FLOOR BOX J�0(6 UlE O 8"SQUARE LED OOWNLIGHTWITH WHITE REFLECTOR,0-lOV DIMMING DRIVER 3,800 LED CON-TECH LIGHTING# SEE NOTES �' . �,NL, /PFBRG2,(2)TILE FRAME A SA5017G,(2)ADAPTER COLLAR M PFBRAC, � (U1DE) 8'EMERGENCY BATTERY PACK ITHW"DENOTESWIREDFOR DIMMING) 120 42W �'TF (2)COVER&GASKET dl SA3826,(2)RECEPTACLES;DR20GRY 1 -j LUMENS 4,000K RLBSQLED40K12D-EBUS #2,3 L1. ALL WORK SHALL COMPLY WITH THE LATEST EDITION OF THE NATIONAL ELECTRIC (FLOOR OUTLETS WILL BE PROVIDED BY OWNER,CONTRACTOR SHALL J -C ILEX ARCHITECTURAL LIGHTING# SEE NOTES CODE AND ALL LOCAL CODES. COORDINATE EXACT CODE REQUIREMENTS AND INDICATE QUANTITY ON BID SHEET.) -i ILL V D INCANDESCENT PENDANT LIGHT 120 1-10OW INC. 1DOW LOCAL AMENDMENTS WITH LOCAL INSPECTOR PRIOR TO ANY INSTALLATION. ----""- U. QUA-BN-MO-WC #1,3,6,8 LEGEND: [M DUPLEX RECEPTACLE FLUSH MOUNTED IN CEILING a- j z L2. CONTRACTOR SHALL CONTACT EMS VENDOR FOR EXACT SYSTEM REQUIREMENTS � G 3 EX ® EMERGENCY LED EXIT LIGHT WITH BATTERY BACKUP 120/ LED LED 5w PATHWAY LIGHTING# SEE NOTES FOR EMS/LIGHTING CONTROL PANELS AND PROVIDE ALL EQUIPMENT FOR A FULLY I'O RECEPTACLE-RATING&VOLTAGE AS INDICATED ON DRAWINGS W 277 PEXUR-DL #3,7,to FUNCTIONAL SYSTEM. REFER TO SHEET CS-3 OR CONTACT ULTA PROJECT INSTALLED BYDENOTES NITENANT SHED AND F* DATA OUTLET. D T. E.C..CES BY PROVIDETELEPH B DATA AND D PLASTERVEM ENDOR. TRIM RING. P -- -- — ----------------- - - -- -_-------------------- MANAGER FOR EMS VENDOR INFORMATION. 120/ WEDGE PATHWAY LIGHTING SEE NOTES ELECTRICAL CONTRACTOR 4S TELEPHONE OUTLET. E.C.TO PROVIDE BACKBOX AND PLASTER TRIM E%3 SURFACE MOUNTED 2-HEAD EMERGENCY LIGHT WITH BATTERY BACKUP 25.4W SW 277 TUNGSTEN AP-2-DL - #3,L9 L3. LANDLORD SHALL PROVIDE GROUNDING IN ACCORDANCE WITH N.E.C. AND ALL RING. JACKS AND DEVICES BY TELEPHONE DATA SYSTEM VENDOR. -- -- - -- - -- - ---------- ----- -- DENOTES WORK TO BE LOCAL CODES. - COMBINATION TIRING. JACKS A DOUTLET.DEVICES E.C.TO PROVIDE DATA S X AND PERFORMED BY LANDLORD IC PUSTER TRIM RING. JACKS AND DEVICES BY TELEPHONE DATA SYSTEM L4. PANELS MOP, C AND D HAVE ISOLATED GROUND BUS AND ISOLATED GROUND UNDER A SEPARATE PERMIT VEN DOR, _ c o ., d LIGHTING SCHEDULE No1Es: CONDUCTOR TO POINT OF SERVICE GROUND. • "''•d ' x a a.. 1. LAMPS SHALL BE MANUFACTURED BY PHIUPS,FURNISHED BY ULTA AND INSTALLED BY ELECTRICAL WIRELESS ACCESS POINT CONTRACTOR. L5. LANDLORD SHALL OBTAIN AVAILABLE FAULT CURRENT RATING FROM LOCAL ,!� JUNCTION BOX-FLOOR,WALL OR COUNG MOUNTED 2. EMERGENCY BATTERY BACK-UP KITH A MINIMUM OF 677 LUMEN OUTPUT FOR LED DOWNUGH7 UTILITY COMPANY AND PROVIDE PROPER PROTECTION FOR MAIN CIRCUIT BREAKER 'tJ.OJ - AND ALL BRANCH DEVICES. FIXTURES AND 1300 LUMEN OUTPUT FOR LINEAR FLUORESCENT FIXTURE FOR 90 MINUTES []J NON-FUSED DISCONNECT SNITCH <rN0 3. FURNISHED BY ULTA,INSTALLED AND HIRED BY ELECTRICAL CONTRACTOR. L6. LANDLORD SHALL PROVIDE A SQUARE D POWERLINK G3 PANELBOARD, NEMA 1 - - � I I ENCLOSURE, GROUND BAR, 208Y/120V, MAIN LUGS ONLY, 225 AMPS, 42 CIRCUIT Ep FUSED DISCONNECT SWATCH 4. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF ALL LIGHT FIXTURES. CL INTERIOR (36 AVAILABLE), LEFT AND RIGHT 18 CIRCUIT CONTROL BUSSES, 2000 - _ 5. ELECTRONIC BALLASTS BY PHILIPS. LEVEL MASTER CONTROLLER WITH LCD MOTOR CONNECTION-H.P.AS NOTED ON DRAWINGS DISPLAY(NF2000G3), 16 PHYSICAL INPUTS, z3�m MODBUS ASCII/RTU, ASTROLOGICAL TIMECLGCK AND POWER SUPPLY. ELECTRICAL /III CONDUIT RUN CONCEALED IN CEILING OR WALLS U' P1 6. COORDINATE MOUNTING REQUIREMENTS WITH OWNER AND MANUFACTURER. CONTRACTOR SHALL PROVIDE NEW CONTROLLABLE BREAKERS(ECB-G3)IN PANEL T1�� Z 7. PROVIDE PROVIDED BY THE LANDLORD. /T'-E EXIT SIGNS AND EMERGENCY BATTERY PACKS PER LOCAL ORDINANCES. \ CONDUIT RUN IN FLOOR SLAB °D S. COORDINATE EXACT FINISH OF FIXTURE WITH INTERIOR DESIGNER. L7. LANDLORD SHALL PROVIDE A SQUARE D POWERLINK G3 PANELBOARD, NEMA 1 --{I— CONDUIT RUN EXPOSED 9. COORDINATE EXACT MOUNTING HARDWARE REWIRED WITH OWNER AND MANUFACTURER PRIOR TO ENCLOSURE, GROUND BAR, 20BY/12OV, MAIN LUGS ONLY, 225 AMPS, 48 CIRCUIT - ---'- BIDDING AND INCLUDE ALL COST IN BASE BID. INTERIOR(42 AVAILABLE), LEFT AND RIGHT 21 CIRCUIT CONTROL BUSSES AND / \ X DENOTES GROUND HIRE 10.PROVIDE DIRECTIONAL ARROWS AS SHOWN ON PLAN DRAWINGS AND AS REQUIRED BY LOCAL CODE SLAVE ID SELECTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE NEW AUTHORITIES.PROVIDE LETTER SIZE,COLOR AND TYPE AS REQUIRED BY LOCAL CODE AUTHORITIES. CONTROLLABLE BREAKERS(ECB-G3) IN PANEL PROVIDED BY THE LANDLORD. 3o JUNCTION BOX WITH FINAL EQUIPMENT CONNECTION 11. ALL FLUORESCENT LIGHTING FIXTURES WITH DOUBLE ENDED LAMPS SHALL BE PROVIDED WITH L8. ALL ROOF TOP UNITS AND ROOF MOUNTED RECEPTACLES FOR ROOF TOP UNITS FINAL EQUIPMENT CONNECTION BALLAST DISCONNECT SNITCHES IN COMPLIANCE WITH NEC. ARE FURNISHED, INSTALLED, AND WIRED BY LANDLORD. i-O CONDUIT SLABBED UP 12.REFER TO ARCHITECTURAL PLANS FOR EXACT MOUNTING REQUIREMENTS FOR EACH FIXTURE. L9. FIELD VERIFY AND COORDINATE ALL EXISTING EQUIPMENT AND CONDITIONS. - --- -- RelAelone 13.LIGHT FIXTURES MUST BE POSITIVELY ATTACHED TO THE CEILING GRID NTH AN ATTACHMENT ABBREVIATIONS '� CONDUIT SLABBED DOWN 0ISSUE FOR ULTA/LL REVIEW CAPABLE OF CARRYING IOOX OF THE WEIGHT OF THE LIGHT FIXTURE IN ANY DIRECTION. THIS L70. ULTA AND SQUARE D HAVE A NATIONAL AGREEMENT FOR PANELBOARDS. THIS - 03/06/15 ATTACHMENT SHALL CONSIST OF FOUR EQUALLY SPACED ATTACHMENT POINTS USING SCREWS, INCLUDES PANELBOARDS, POWERLINK PANELS, TRANSFORMERS AND CIRCUIT - CIRWIT BREAKER ISSUE FOR PERMIT RIVETS,BOLTS OR OTHER APPROVED POSITIVE ATTACHMENT DEVICES. VERIFY ALL REQUIREMENTS BREAKERS. THE ELECTRICAL CONTRACTOR SHALL CALL GRAYBAR AT SYMBOL DESCRIPTION �03/06/15 WITH BUILDING CODES AND LOCAL AMENDMENTS. 1-SDO-784-6059 TO REQUEST ULTA THE NATIONAL ACCOUNT PRICING. ooR-® SWITCH&FUSE ISSUE FOR BID L7 1. CONTRACTOR SHALL INSTALL EMS DEMAND METERS ON MAIN DISTRIBUTION A. DENOTES AMPERES _- _ e7G PANELBOARD --__-----�------ �03/06/15 PANEL MOP. REFER TO EMS DRAWINGS FOR RESPONSIBILITY AND INSTALLATION A.F.F. DENOTES ABOVE FINISHED FLOOR INSTRUCTIONS. _ _-___ Q DISTRIBUTION PANELBOARD Q B.P.S. DENOTES BOLTED PRESSURE SWITCH 1­72. ALL WIRE SHALL BE THW OR THWN COPPER. -- - L�• PUSH BUTTON FOR DOOR BELL_ C. DENOTES CONDUIT SPEAKER FLUSH MOUNT OSSEE MIRING DIAGRAM FOR TAP SETTINGS Q E DENOTE EXISTING TO REMAIN FURNISHED AND INSTALLED BY SOUND VENDOR PANEL A CIRCUIT BREAKER NOTES' EC DENOTE ELECTRICAL CONTRACTOR VOLUME CONTROL SWITCH FURNISHED AND INSTALLED BY SOUND VENDOR. Davis L. E.C.TO PROVIDE 1900 BOX AND SINGLE GANG TRIM PLATE EWC DENOTES ELECTRIC WATER COOLER SECURITY MONITOR Dickerson, • ALL ELECTRICAL PANELS, MAIN CIRCUIT BREAKERS AND QM SUBFEED CIRCUIT BREAKERS SHALL BE FURNISHED, - - - FURNISHED AND INSTALLED BY CCTV VENDOR PE INSTALLED AND WIRED BY LANDLORD. GFI DENOTES GROUND FAULT INTERRUPTER SOUND SYSTEM HEAD END LOCATED IN MANAGERS OFFICE -- - FA-MP-1 VERIFY LOCATION IN FIELD WITH GENERAL CONTRACTOR • BRANCH CIRCUIT BREAKERS AS REQUIRED TO POWER ORD. DEN07ES GROUND FURNISHED AND INSTALLED BY SOUND VENDOR LANDLORD PROVIDED EQUIPMENT SHALL BE FURNISHED, �S SAFE BOX ' INSTALLED AND`WIRED BY LANDLORD. M.LO. DENOTES MAIN LUGS ONLY • CONTRACTOR SHALL PROVIDE, INSTALL AND WIRE ALL N.I.C. DENOTES NOT IN CONTRACT BURGLAR ALARM SIREN BRANCH CIRCUIT BREAKERS AND ECB-G3 CONTROLLABLE --- CIRCUIT BREAKERS. NEC DENOTES NATIONAL ELECTRICAL CODE ALARM KEY PAD FIXTURE BE STEEL RIGHT WP DENOTES WEATHERPROOF JVC STAND ALONE DESKTOP SYSTEM ® VERIFY LOCATION IN FIELD WITH G.C. I KO min 1"TUBE STEEL FIXTURE GENERAL NOTE FURNISHED AND INSTALLED BY SOUND VENDOR a q A BASE THEMSELVES WITHCONTRACTORS ATHELL VIEX STING CSIT THE ION ITIONS AND TE AND FULLY ACQUAINT © VE IFCHIMFY PLOCATIIONINN FIELD WI SEE TH GGC DIAGRAM FOR CONNECTION 1 DIFFICULTIES INVOLVED IN THE WORK PRIOR TO SUBMISSION OF DRAWING INDEX FURNISHm AND INSTALLED BY SOUND VENDOR - Y� FIXTURE CABLE AY BY COVER PLATE, SHALL NOT BID. INCLUDE ALL COSTS FOR A COMPLETE AND OPERATING - ® FURNISHED AND INSTALLED BY CCTV VENDOR S( GV'�� SYSTEM IN THE BASE BID PROPOSAL. NOTIFY EO-1 SYMBOL LIST, ONE LINE DIAGRAM &LIGHTING SCHEDULE l \'" BE INSTALLED UNTIL THE ARCHITECT/ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. CAMERA FOR CCTV SYSTEM FURNISHED AND INSTALLED BY CCTV FLOOR BOX, SHALL BE CONCRETE SLAB WORK HAS _ --. ® VENDOR-SHOWN FOR REFERENCE ONLY - --�- - MOUNTED FLUSH WITH BEEN COMPLETE EO-2 PANEL SCHEDULES TOP OF CONCRETE CONDUIT ALTERNATE: ® DUCT MOUNTED SMOKE DETECTOR Od/14/201Ci, U /11.1 11 A11i SLAB EO-3 ROOF PLAN - POWER, DETAILS&ARCH LIGHTING r — r on re-- ELEVATIONS PROVIDE AN ALTERNATE COST TO THE BASE BID TO UTILIZE Drawn By Checked By SCHEDULE 40 PVC CONDUIT WHERE FLEXIBLE CONDUIT WHERE PERMITTED IN LIEU OF EMT CONDUIT E1-1 FLOOR PLAN - LIGHTING KIPDD/AH PERMITTED BY LOCAL CODE RECESSED FOR CONDUIT THAT IS RUN IN DRY AREAS WITHIN BUILDING, Scale Date FLOOR MOUNTED QUAD/DUPLEX THIS REVISED SPECIFICATION SECTION 16100-2.01-A. E2-1 FLOOR PLAN - ELECTRICAL DIMENSIONS AS NOTED 03/OB/15 RECEPTACLE AND DEVICE BOX. SEER. EE .. ELECTRICAL SYMBOL LIST FOR MODEL - E2-2 FLOOR PLAN - POWER Job No. NUMBER AND STYLE INFORMATION. LEVEL SPECIAL NOTE e g AND ADJUST TO FINISHED FLOOR MATERIAL E3-1 FLOOR PLAN - LOW VOLTAGE WIRING d FLOOR FIXTURE OUTLET DETAIL ELECTRICAL CUTTING AND P CHIINGROFHFALL LOOR SLABS TALL COSTS FOR O INSTALL NEW E3-2 FLOOR PLAN - VOICE/DATA & SECURITY Sheet N�oe� SCALE: NOT TO SCALE CONDUITS. COORDINATE EXACT SCOPE OF WORK WITH E4-1 ELECTRICAL SPECIFICATIONS E GENERAL CONTRACTOR PRIOR TO BID. 4'. too VA 1N:N:\1 10 113 FN:01 E01 SYM6._Iw FALLS.IU PANEL DATA SCHEDULE PANEL NAME: MDP PANEL DATA SCHEDULE PANEL NAME: B_ DEMAND LOAD FLUSH ❑ DEMAND LOAD FLUSH ❑ H° LOCATION_STAGING,__. _ KEY: L:LIGHTING 0.00 SURFACE ■ 13.22 CONNECTED LOAD DEMAND LOAD -KVA LOCATION STAGING KEY: L:LIGHTING _. ..KVASURFACE ■ t SERVICE _120 208V.,3PH.,4W. _- R:RECEPTACLES 0.00 ,.,KVA SERVICE 120/208V.,3PH.,4W. CONNECTED LOAD DEMAND LOAD R:RECEPTACLES 13.79..._....KVA MAIN BREAKER.8QDA-3P PHASE A 56.48 --KVA 47.04 .KVA M:MOTORS 8917 _.KVA MAIN BREAKER PHASE A 11,92 .KVA 8.70 KVA M:MOTORS 0,00 .,,KVA MAIN LUGS ONLY PHASE B 61,42"__.KVA 51.32 KVA P:PANELS 79.90 KVA MAIN LUGS ONLY 225A PHASE B 12.27 KVA 10.07 KVA P:PANELS 0.00 .KVA NEUTRAL BUS SODA_,._ -_ PHASE C 59.72-KVA 50.71 KVA T:TRANSFORMERS 0.00 -.KVA NEUTRAL BUS .225A PHASE C 10.59 KVA 8.24 KVA T:TRANSFORMERS 000 ...KVA °A1 GROUND BUS- YES _-_. TOTAL 17781--KVA 149.07 KVA E:EXTRA 0.00 ... KVA GROUND BUS... YES TOTAL 34.77 KVA 27.01 KVA E:EXTRA 0.00 ....KVA m SHORT CIRCUIT RATING BY LANDLORD,RMS SYM AMPS - A9.1,JQ.,,.."...AMPS 413.5. AMPS S&X:SPARE&SPACE 0,00 _-KVA SHORT CIRCUIT RATING BY LANDLORD.RMS SYM AMPS 96.5 AMPS 75.0 AMPS S&X:SPARE&SPACE 000 KVA NOTES: PROVIDED AND INSTALLED BY LANDLORD. PROVIDE WITH ISOLATED GROUND BUS AND GROUND BUS NOTES: PROVIDED AND INSTALLED BY LANDLORD. SQUARE D POWERLINK 03 PANEL-LIGHTING CONTROL PANEL-REFER TO ONE LINE DIAGRAM "DENOTES LOCK-OUT CLIP: "DENOTES GFI BREAKER: *"'DENOTES VIA TIMECLOCK: •.a.DENOTES VIA CONTACTOR *DENOTES LOCK-OUT CLIP: "•DENOTES GFI BREAKER: "**DENOTES VIA TIMECLOCK: ...•DENOTES VIA CONTACTOR SS- DENOTES SMART BREAKER CIRCUIT USE CONNECTED LOAD CCT. CIRCUIT CIRCUIT CCT. CONNECTED LOAD CIRCUIT USE CIRCUIT USE CONNECTED LOAD CCT. CIRCUIT CIRCUIT CCT. CONNECTED LOAD CIRCUIT USE A B C N0. BREAKER BREAKER N0. A B C A B C N0. BREAKER BREAKER N0. A B C P: PANEL J1_ BY LL 4,447 1 20OA-3P 20OA-3P 2 11,916 P: PANEL_B_ BY LL X: SQUARED CONTROLS CONTROLS X: SQUARE D P: 5,612 3 4 12,266 P: X: POWERLINK G3 CONTROLS CONTROLS X; POWERLINK G3 P: 6,801 5 6 10,588 P: X: POWER PACK CONTROLS CONTROLS X: CONTROL PACK P: PANEL_C_ BY LL 11.240 7 20OA-3P 20OA-3P 8 if P: PANEL_D_ BY LL L: ARCH LIGHTING 882 1 20A-1P-SE1 20A-1P 2 826 R: TILT LTG ELEC LTG EF-2 P: 12.680 9 10 7,803 P: R: CASE WORK 900 3 20A-1P-SI1 20A-1P-111 4 1.000 L: SALON PENDANT LTG P: 13.340 11 12 5,930 P: R: CASE WORK-TOWEL WAMER 360 5 20A-1P-SB 20A-1P-SB 6 800 R: ELECTRIC WATER COOLER _ M: RTU-4(BY ILL) 5,764 13 60A-3P 6OA-3P 14 5,764 M: RTU-3 BY LL) L: ARCH LIGHTING 988 7 2OA-1P-SB 20A-1P-SB 8 1,080 R: GONDOLA M: 5,764 15 HACR HACR 16 5,784 M: L: ARCH LIGHTING 988 9 2OA-1P-SB 20A-!P-SB 10 1.080 R: GONDOLA M: 5,764 17 RATED RATED 18 5.764 M: L; ARCH LIGHTING 1 1,095 11 1 20A-1P-SE1 20A-1P-SE1 12 1 900 R: GONDOLA M: R'N-1 (BY ILL) 5,764 19 60A-3P 60A-3P 20 5,764 M: RTU-2 BY LL L: ARCH LIGHTING 940 13 20A-1P-SB 20A-1P-SB 14 1,080 R: DERM POD M: 5,764 21 HACR HACR 22 5,784 M: L: ARCH LIGHTING 940 15 20A-1P-SB 20A-1P-S8 /6 1,440 R: GONDOLA M: 5,784 23 RATED RATED 24 5,764 M: L: ARCH LIGHTING 940 17 20A-1P-SB 20A-1P-SB 18 1,440 R: GONDOLA X: SPACE 0 25 26 0 X: SPACE R: CASE WORK _ 720_ 19 2OA-iP-SB 20A-1P-SB 20 720 R: GONDOLA X: SPACE 0 27 28 0 X: SPACE R: CASE WORK 900 21 20A-IP-SB 20A-1P-SB 22 720 R: GONDOLA X: SPACE 0 29 30 0 %: SPACE R: CASE WORK 720 23 2OA-1P-SB 20A-1P-SB 24 1,080 R: GONDOLA %: SPACE 0 31 32 0 X: SPACE R. GONDOLA 720 25 20A-1P-SB 20A-1P-SB 26 1,080 R: GONDOLA X: SPACE 0 33 34 0 X: SPACE L:ARCH LIGHTING 1,598 27 2OA-1P-SB 20A-1P-SB 28 720 R: GONDOLA X: SPACE 0 35 36 0 X: SPACE R: CASE WORK 720 29 2OA-iP-SB 20A-1P-SB 30 1,080 R: GONDOLA _ X: SPACE 0 37 38 0 %: SPACE R: CASE WORK 90'0 31 2OA-1P-SB 20A-1P-SE1 32 1,080 R: GONDOLA �s X. SPACE C 39 40 0 X: SPACE R: SHOW NtlNOOWS 1,080 33 20A-1P 20A-1P-SB 34 900 R: GONDOLA X: SPACE 0 41 42 0 X: SPACE R: HOT WATER RECIRC PUMP 450 35 20A-1P 20A-1P-SB 36 1,200 L: EXTERIOR SIGNAGE SUB TOTAL 27,215 29,820 31,669 29,264 31,597 28,046 SUB TOTAL R: CASE WORK 900 37 20A-iP-SB 20A-1P-SE1 38 0 S: SPARE Q ppnnpp S: SPARE 0 39 20A-1P-SB 20A-1P-SB 40 0 5: SPARE cr= Lu S. SPARE 0 41 20A-1P-SB 20A-iP-SB 42 0 S: SPARE w • DEMAND LOAD FLUSH ❑ SUB TOTAL 6,050 6,406 4,288 5,568 5,860 6,300 SUB TOTAL 0 PANEL DATA SCHEDULE PANEL NAME _A- w c w co LOCATION_STAGING __-„_- KEY: L.LIGHTING 16.98. KVASURFACE ■ SERVICE.__120r208V,3PH14W CONNECTED LOAD DEMAND LOAD R:RECEPTACLES 0.00 KVA MAIN BREAKER PHASE A 4.45 KVA 5.56 KVA M:MOTORS 4.00 KVA •� ---- MAIN LUGS ONLY 225A PHASE B 5.61 KVA 6.52 KVA P:PANELS 0.00 KVA PANEL DATA SCHEDULE PANEL NAM _C_ DEMAND LOAD FLUSH ❑ w NEUTRAL BUS 225A PHASE C 6.80 ._,KVA 8.00 KVA T:TRANSFORMERS 0.00. KVA SURFACE ■ ® o� LOCA PION STAGING KEY: L:LIGHTING 000 -...KVA 6Hd• GROUND BUS_. _. - - -- TOTAL 16.86_",_KVA 20.08 .KVA E:EXTRA 0.00_.-..KVA SERVICE 120/208V.,3PH.,4W. CONNECTED LOAD DEMAND LOAD R:RECEPTACLES 20.67 .,KVA SHORT CIRCUIT RATING BY_LANDUQB4".RMS SYM AMPS �8..._._AMPS 55.7 AMPS S&X:SPARE&SPACE 0.00 KVA PHASE A 11.24 KVA 6.41 KVA M:MOTORS 1.00 KVA - n MAIN BREAKER 1J NOTES: PROVIDED AND INSTALLED BY LANDLORD. SQUARE D POWERLNK G3 PANEL-LIGHTING CONTROL PANEL-REFER TO ONE LINE DIAGRAM MAIN LUGS ONLY 225A PHASE a 12.68 KVA 7 23 KVA P:PANELS 0.00 ...KVA � •DENOTES LOCK-OUT CLIP: *•DENOTES GFI BREAKER: *•DENOTES VIA TIMECLOCK: *. DENOTES VIA CONTACTOR SB-DENOTES SMART BREAKER 13.34 8.03 0.00 Q LL A PHASE C 25 KVA KVA T:TRANSFORMERS . .KVA NEUTRAL BUS 2. CONNECTED LOAD A 103.4 60.1 0.00 CIRCUIT USE C D CCT. CIRCUIT CIRCUIT CCT. CONNECTED LOAD CIRCUIT USE GROUND BUS YES TOTAL KVA -. - KVA E:EXTRA _.. .....KVA L� A B C N0. BREAKER BREAKER NO. q B C SHORT CIRCUIT RATING BY LANDLORD RMS SYM AMPS 1034 AMPS 60.1 AMPS S&X:SPARE&SPACE Q-00 KVA X: SQUARE D CONTROLS CONTROLS X: SQUARE D NOTES: PROVIDED AND INSTALLED BY LANDLORD. PROVIDE WITH ISOLATED GROUND BUS AND GROUND BUS �i X: POWERLINK G3 CONTROLS CONTROLS X: POWERLINK G3 "DENOTES LOCK-OUT CLIP: "DENOTES GFI BREAKER: •••DENOTES VIA TIMECLOCK: "...DENOTES VIA CONTACTOR �- X: POWER PACK CONTROLS CONTROLS X. CONTROL PACK CIRCUIT USE CONNECTED LOAD CC'r. CIRCUIT CIRCUIT CCT. CONNECTED LOAD CIRCUIT USE L: STOREFRONT LTG 338 1 20A-iP-SB 20A-1P-SB 2 1,187 L: ACCENT LIGHTING A B C N0. BREAKER BREAKER N0. A B C L: SALES LIGHTING 1,218 3 20A-1P-SB 20A-1P-SB 4 640 L: ACCENT LIGHTING R: HAIR DRYER OUTLET 1,200 1 20A-iP 20A-1P 2 1,200 R: HAIR DRYER OUTLET L: SALES LIGHTING 1,092 5 20A-IP-SB 20A-lP-SB 6 11280 L: ACCENT LIGHTING R: HAIR DRYER OUTLET _ 1,200 3 20A-1P 2OA-1P 4 1,200 R: HAIR DRYER OUTLET _ L: SALES LIGHTING 924 7 201-11-SB 2OA-1P-SB 8 1,135 L: COVE LIGHTING R: HAIR DRYER OUTLET 1,200 _ 5 20A-!P 20A-1P 6 11,200 R: HAIR DRYER OUTLET ' U L: SALES LIGHTING 672 9 20A-1P-SB 20A-1P-SB 10 1.082 L: COVE LIGHTING R: HAIR DRYER OUTLET 1,200 7 20A-1P 20A-1P 8 1,200 R: HAIR DRYER OUTLET Pc: L: SALES LIGHTING 588 11 20A-!P-SB 20A-IP 12 1613 L: OFFICE STAGING+ R: HAIR COLORING 1.000 9 20A-1P 2OA-1P 10 1,200 1 R: HAIR DRYER OUTLET L: SALES EM• 855 13 20A-IP-S9 20A-1P-SB 14 0 S: SPARE R: HAIR COLORING 11000 11 20A-!P 20A-!P 12 11,200 R: HAIR DRYER OUTLET L: EM BREAKER -SEE NOTE#P1 0 15 EM 20A-1P-S9 16 0 S; SPARE R: HAIR COLORING 1,000 13 20A-1P 20A-1P 14 1,200 R: HAIR DRYER OUTLET a L: SALES EM* 1 1,028 17 20A-1P-SI3 20A-1P-SB 18 0 S: SPARE R: HAIR COLORING 1,000 15 20A-1P 20A-1P _ 16 1,200 R: HAIR DRYER OUTLET L: (EM BREAKER -SEE NOTE PI 0 19 EM) 2OA-1P-SB 20 0 S: SPARE R: HAIR COLORING 1,000 17 20A-1P 20A-1P 18 1,100 R: HAIR DRYER S: SPARE 0 21 20A-iP-SB 20A-iP-SB 22 0 S: SPARE R: HAIR COLORING 1,000 19 20A-1P 20A-1P 20 1,100 R: HAIR DRYER S: SPARE 0 23 20A-!P-SB 20A-!P 24 0 S: SPARE R: HAIR COLORING 1,000 21 20A-1P 20A-1P 22 1,100 R: HAIR DRYER �Z ��oo S: SPARE 0 25 20A-IP 20A-iP 26 0 S: SPARE R: HAIR COLORING 1,000 23 20A-1P 20A-1P 24 540 R: SHAMPOO OUTLETS S: SPARE 0 27 20A-IP 30A-2P 28 2000, M: CUH-1 S: SPARE 0 25 20A-1P 20A-1P 26 540 R: TOILET SINK CONV RECEPT. �=�i S: SPARE 0 29 20A-iP 30 2,000 M: SPARE S: SPARE 0 27 2OA-iP 20A-1P 28 1,500 R: HAND DRYER U•+C.: 3^a S: SPARE 0 31 20A-1P i5A-3P 32 0 R: EMS METER S: SPARE 0 29 20A-1P 20A-1P 30 1,500 R: HAND DRYER (' 5: SPARE 0 33 20A-1P 34 0 R: REFER TO EMS-1 DRAWING S; SPARE 0 31 20A-1P 20A-!P 32 0 S: SPARE v fvvvvyffff S; SPARE 0 35 20A-1P 36 0 R: R: COLUMN RECEPT. 360 33 20A-iP 20A-iP 34 0 S: SPARE Awalilikk 6208 SUB TOTAL 2015 1,B90 2,708 2,332 3,722 4,093 SUB TOTAL R: HAIR DRYER OUTLET 1,200 35 20A-1P 20A-1P 36 200 R: WATER HEATER R: HAIR DRYER OUTLET 1,200 37 20A-1P 20A-1P 38 400 R: ROOT TOP UNIT LTG BY ILL) R: HAIR DRYER OUTLET 1,200 39 20A-iP '20A-iP 40 720 R: ROOF TOP UNIT RECP(BY LL R: HAIR DRYER OUTLET 1,200 41 20A-iP 20A-iP- 42 1,000 M: EXHAUST FAN EF-1 BY''7 L TAL 5,740 PANEL DATA GSCHE 0~N C5,760 6,600����•,.G D 5,640 6,920 DEMAND LOAD SUB TOTAL FLUSH ❑ W4G r •WAG. KEY: L:LICH'nNG 0.00 KVASURFACE ■ LOCATION STAGING -- CONNECTED LOAD DEMAND LOAD SERVICE 120/208V,3PFI„4W.. _ R:RECEPTACLES 11.15 KVA MAIN BREAKER PHASE A 5.82 KVA 3.32 KVA M:MOTORS 0.00. KVA Revlelons MAIN LUGS ONLY 225A PHASE B 7.80 ...KVA 4.45 KVA P:PANELS 0.00 _ _KVA ISSUE FOR ULTA/LL REVIEW NEUTRAL BUS -225A PHASE C 5.93 Kyq 3.38, KVA T:TRANSFORMERS 0.00,_ .KVA �03/06/15 GROUND BUS YES TOTAL 19,55 KVA 11.15. KVA E:EXTRA 0.00 _.KVA ISSUE FOR PERMIT SHORT CIRCUIT RATING BY LANDLORD RMS SYM AMPS 54.3 AMPS 30,9 AMPS S&X:SPARE&SPACE 0.00 KVA �03/06/15 NOTES: PROVIDED AND INSTALLED BY LANDLORD. PROVIDE WITH ISOLATED GROUND BUS AND GROUND BUS ISSUE FOR BID "DENOTES LOCK-OU'f CLIP: r+DENOTES GFI BREAKER: i+a DENOTES VIA TIMECLOCK: ..."DENOTES VIA CONTACTOR �03/06/15 CIRCUIT USE CONNECTED LOAD CCT. CIRCUIT CIRCUIT CCT. CONNECTED LOAD CIRCUIT USE Q A B C _NO. BREAKER BREAKER NO. A B C R: OFFICE-COMPUTER (IG) 180 1 20A-1P 20A-IP 2 540 R: BURGLAR ALARM(IG)* ILR: OFFICE-COMPUTER (IG 360 3 20A-1P 20A-IP 4 360 R: TELEPHONE SYSTEM IG " R: OFFICE-MONITOR/ IG 180 5 20A-1P 20A-IP 6 1 360 R: DATA CABINET kIG2 Q R: OFFICE-MUZAK IG 360 7 2OA-1P 20A-1P 8 2'00 R: EMS PANEL" R: OFFICE-CONVENIENCE 1,080 9 20A-1P 20A-IP 10 200 R: SECURITY POWER PACK* Q R: MANICURE STATION 360 11 20A-1P 20A-1P 12 500 R: SCANNER CHARGER SiSPARE 0 13 2OA-1P 20A-IP 14 720 R: SERVICE DESK RECEPT. IG) Davis L. R: STOCK OOM DOOR BELL 380 15 20A-iP 20A-iP i6 720 R: SERVICE DESK RECEPT. IG R: HAIR COLORING 1180 17 20A-1P 20A-1P 18 720 R: SERVICE DESK RECEPT. IG Dickerson,: ER R: HAIR COLOR COMPUT IG 360 19 20A-1P 20A-1P 20 360 R: SERVICE DESK R: DRYER BOOSTER FAN 83 Z1 20A-1P 20A-1P 22 1180 1 R: SERVICE DESK E R: WASHER 1,000 23 20A-!P 20A-1P 24 360 R: CCTV AT SERVICE DESK °90° R: ELECTRIC DRYER 2,200 25 30A-21P 20A-1P 26 0 S; SPARE R: 2,200 27 20A-1P 28 0 S: SPARE R: SECURITY ANTENNA 200 29 20A-1P 20A-1P 30 0 5: SPARE S: SPARE _0 31 20A-1P 20A-1P 32 0 S: SPARE S: SPARE 0 33 2OA-1P 20A-1P 34 540 1 R; CONCERGE RECEPTS. S: SPARE 0 35 20A-1P 20A-1P 36 0 S: SPARE R: COFFEE MAKER 900 37 20A-iP 20A-1P 38 0 S: SPARE R; COFFEE MAKER 800 39 20A-iP 20A-IP 40 800 1 R: REFRIGERATOR R: U C REFRIGERATOR 720 41 1 20A-1P 1 20A-IP 1 42 1,350 R: MICROWAVE ;'SVONAI 6N 4,000 5,003 2,640 1.820 2,800 3,290 SUB TOTAL 05��GEPIS C SUB TOTAL FQ,,,iy�A� L OF f US("�4/loi 1201y PANEL NOTES: DArr. ,.vurAnoe DATE P1. PROVIDE SQUARE D ECB-G3EL CIRCUIT BREAKERS FOR CONTROL OF Drawn By Checked By EMERGENCY LIGHTING FIXTURES, REFER TO SHEET IIIE1-1 FOR ADDITIONAL KID DD/AH INFORMATION. Scale Date P2. PROVIDE HANDLE TIES AS REQUIRED FOR MULTIVARE BRANCH CIRCUITS AS NOTED 03/06/15 WITH COMMON NEUTRALS PER NEC 210.4. Job No. 13-55 '9 Sheet No. COo-2 sn RECEPTACLE FOR CHIME PUSH RECEPTACLE FOR BUTTON +18" CREDIT CARD DATA CCTV+18" CCTV+30" +30' RECEPTACLE+30" RECEPTACLE+6 TELEPHONE +6 TEL " --- TRECE XRECEPTACLE +30" RECEPTACLE+30' RECEPTACLE +30" RECEPTACLE+30"COMPUTER DATA+30' COMPUTER DATA+30" COMPUTER DATA +30" COMPUTER DATA+30" E+30' COMPUTER DATA +30" CASHWRAP ROUGH-IN ELEVATION E0� NO SCALE NOTE CZ INSTALL OUTLETS ON INSIDE FACE OF BACK PANEL OF CASHWRAP UNLESS INDICATED OTHERWISE. REFER TO DETAIL#1 SHEET F1.18 FOR ADDITIONAL INFORMATION. OWP SEE NOTE d � 1 3 3 3 O NP T EL= 11'-0" d� a ohi `a d� a EXHAUST FAN EF-1 TEXHAUST FAN EF-2 1�fiJ TOP OF FlXNRE w -OS— w - 1/2HP., 120V., 1PH. SEE NOTE#'11PH. `t - - INTERLOCKED WITH RTW-4 � L�LiI SEE NOTE#4 ®_ I I I I I I I I I dl II II II WP fL m GFI WP M 1 II II II II II II SEE NOTE#3 _ GFI 1 II II II (TYPICAL FOR Lu EL= 0'-0" D ___ __.. _ _.. __. ........_ _- _... --EXISTING Ir _ FIN FLOOR �J � IF Q w �' I� aQ EXISTING RN-3 ®� 4., 4.. A-� 4" 4" A-4-S-4 4 1/2" 4 1/2 A-v RTU-4 I � J � TYP. TYP. TYP. TYP. TYP. TYP. J< �+ <L 3 3 Loz a, D W ad EL- 11'-0" d�- b .� TOP OF FIXTUREw 5 GB d I- j .91 dj I J II 1 T--r-r a, FIN FL -;4OOR �� � �3^ 4" 4' A-9 4" 4, A-3 = m TYP. TYP. TYP. TYP. EXISTING ROOF TOP UNIT TO WP REMAIN (TYPICAL GFI a s XNR w w FOR 4 RN'S) -v - .... SEE NOTE#2 TOEL= 11 -- ® P FlE d — (TYPICAL FOR 4 RTU' ) EXISTING EXISTING RN-2 RTU-1 ReNalona &0SUE FOR ULTA/LL REVIEW ISSUE FOR PERMIT �D3/D6/15 ISSUE FOR BID 003/06/15 --_.--_..--r— EFL 0 R" o F 4 1/2" 4 1/2" Q 4 1/2" 4 1/2" 4„ 4' Z-2-A TYP. TYP. X-�VD-W TYP. TYP. X-27• -•�W TYR TYP. Q CABINET HEATER L;u 0 4KW.,208v.,1PH. (IN VESTIBULE BELOW) avis L.Dickerson, ARCH LIGHTING ELEVATION A-(28,30) E0-3 3/4"C.-P to E NO SCALE _._.__ _ _&1-.#..10GROUN -----__. GENERAL NOTES: 30A _ 1• REFERENCE POWER SHEETS E2-1 AND E2-2 FOR POWER CONNECTIONS -2P FOR ALL ARCH LIGHTING FIXTURES (��------ - -- --- FAN TO PRODIGY CONTROL �- TONAL FAN SPEED CONTROLLER EXHAUST 1 2 3 VERIFY EXACT LOCATION M TERMINAL BLOCK NTH MECHANICAL DRAWINGS RELAY 24V COIL/ O m _ 120V., 18A. CONTACTS. a: m (LENNOX#31960 OR - APPROVED EQUAL)—�_1ul N ROOF PLAN - POWER _ SCALE: 1/8"=1'-O' 9LS OF. RESTROOM .�� LIGHTS ium 0' 8' 16, 24' 32' NORTH ' (TYPICAL) 120V ars e e a DPST SWITCH �- O /)4/201L OLD/31/Y0V, (TYPICAL) N—> a EXHAUST NOTES: t xPIRATItlN Daif. 120V - 120V., 1HP., NEMA 0 STARTER WITH FAN 1. EXHAUST FAN TO BE POWERED FROM LIGHTING CIRCUIT THAT SERVES 3. ROOF TOP UNIT DISCONNECT, FINAL CONNECTION, WEATHERPROOF GFCI Drawn By Checked By HOA., AND PILOT LIGHT W/ENCLOSURE RESTROOMS ROOMS AND CONTROLLED VIA DOUBLE-POLE SWITCHES IN SERVICE RECEPTACLE AND ASSOCIATED BRANCH CIRCUIT ARE EXISTING KP DD/AH WOMEN'S RESTROOM MEN'S RESTROOM - (EATON #ECN-05-0-1-A-H-A EACH ROOM AND FAN SPEED CONTROLLER. SEE SHEET Ei-1 FOR TO REMAIN. OR APPROVED EQUAL) `` CIRCUIT DESIGNATION AND DETAIL ON THIS SHEET FOR WIRING Scale Date TOILET EXHAUST FAN REF-2� a SALON EXHAUST FAN (EF-1) DIAGRAM. 4. ERTU BY THIS XISTING ROOF EXHAUST FAN EF-1 TO BE IN MECHANICAL DRAWINGS,TERLOCKED WITH EXISTING AS NOTED 03/OB/15 2 4 2. DUCT SMOKE DETECTOR AND SHUT-DOWN RELAY SHALL BE EXISTING TO REFER TO DETAIL 4/EO CONTRACTOR3.ACOORDINATEE ON REQUIREMENTS WITH Job No. J�1r� � Eo-9 CONTROL DIAGRAM iEo-a CONTROL DIAGRAM REMAIN. COORDINATE RELOCATION OF EXISTING REMOTE INDICATOR TEMPERATURE CONTROLS/MECHANICAL CONTRACTOR. ��®NJ NJ�N/ LOCATIONS WITH ULTA'S CONSTRUCTION MANAGER AND LOCAL CODES. NO SCALE NO SCALE Sheet No. E0-3 LIGHTING PLAN NOTES: 1. PROVIDE FINAL CONNECTION TO SIGNAGE. COORDINATE LOCATION AND REQUIREMENTS WITH SIGN CONTRACTOR. PROVIDE LOCAL DISCONNECT SWITCH MOUNTED IN AN INCONSPICUOUS LOCATION. EACH SIGN CIRCUIT SHALL HAVE SEPARATE NEUTRAL AND SEPARATE EQUIPMENT GROUND CONDUCTORS. SIGNAGE TO BE FURNISHED AND INSTALLED BY ULTA, WITH FINAL CONNECTION BY ELECTRICAL CONTRACTOR. VERIFY NUMBER AND LOCATION OF SIGNS WITH OWNER'S REPRESENTATIVE PRIOR TO ROUGH-IN. 2. CONNECT THE EXHAUST FAN SERVING THIS ROOM TO THE SWITCHED SIDE OF THE LOCAL LIGHTING CIRCUIT SERVING THIS ROOM. SEE SHEET EO-3 FOR CONTINUATION. LOCATION OF EMS SEE DETAIL ON SHEET EO-3 FOR ADDITIONAL INFORMATION. PANEL AND LIGHTING 3. CONDUIT PENETRATIONS THROUGH MILLWORK FOR VALANCE LIGHTING SHALL BE MADE CONTROLS/SNATCHES IN-UNE MATH FIXTURES TO CONCEALED CONDUIT. FOR SALES FLOOR LIGHTING W/INDICATOR LIGHTS SHAMPOO DRYING/ a p5 CORRIDOR OC A-3,5.7 110 GENERAL LIGHTING NOTES: 12a A. EXISTING CONDITIONS SHOWN ARE BASED ON AS-BUILT DRAWINGS PROVIDED BY THE ./ -- WASHER/12 A-12 OWNER. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL li 7 7 17 G4A DRYER 2c toa EXPENSE TO THE OWNER. G8DE 12,12a 12a� 17 ---�7 a B. ALL CONDUIT AND JUNCTION BOXES SHALL BE SUPPORTED INDEPENDENTLY FROM 12. 12a -07 ACOUSTICAL CEILING. STAGING 1 MEN 12a GBDE /212b 12a 17 7 r MS1 ipy _ � I 2b�d 2a. tm C. CONTRACTOR SHALL LAYOUT BRANCH CIRCUIT WIRING AND ARRAGEMENT OF HOME RUNS 12a OFFICII � t2y III .' FOR MAXIMUM EFFICIENCY. INCREASE HARE SIZE IF VOLTAGE DROP EXCEEDS 2% OR 100 2b 20 FEET IN LENGTH. 12a _ GB G4 G3 -2 SEE NOTE 2 a A-2,4,6 MS 1 4 4/ 4 17' 2b �' # D. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF ALL LIGHTING z 0pQC 12 V �- ----- WOMEN FIXTURES. 2 12a 12b -. t7 17 G4 G8 toe A-1317 - S - V 7 V 4 4 E. ALL UGHT FIXTURES SHOWN (p,v)SHALL BE WIRED TO EMERGENCY LIGHTING CIRCUIT g REFER TO G8 J4 TI V V 4 V 4 UNLESS NOTED OTHERWISE. 0 DETAIL 1/El-1 4 4 G6 F. ALL LIGHT FIXTURES SHOWN (®) SHALL BE TYPE "G4D" UNLESS NOTED OTHERWISE. �I� 13 5 B-4 3 7 ros 3 3 6 G4 13 5 G. ALL LIGHT FIXTURES SHOWN (®) SHALL BE TYPE "G8D-UNLESS NOTED u CM 1 2 GO z 13 `' ' 1V 17 OTHERWISE. rx Is 4 4 4 4 4 17 6 H. ALL LIGHT FIXTURES SHOWN ( ) SHALL BE TYPE"U7" UNLESS NOTED OTHERWISE. ®� 5 3 5 7Lu G28 3 3 7 3 7 I LIGHTING IGHT CIRCUIT LESSSHOWNOTED OTHERWISE. REFER TO D SHALL BE TYPE 1 TAILN�E WIRED TO EMERGENCY co®(6 0- 8 J. ALL LIGHT FIXTURES SHOWN(H8 e)SHALL BE TYPE"EX" UNLESS NOTED OTHERWISE. I G8 13 5 13 5 17 7 17 17 3 17 K. ALL LIGHT FIXTURES SHOWN ( � )SHALL BE TYPE"EX3"UNLESS NOTED OTHERWISE. � ILL2 A-810 A-9,11 L. MAINTAIN CONTINUITY OF CIRCUITS SERVING FIXTURES, DEVICES, OR EQUIPMENT NOT BEING REMOVED. W - 10 8� GBC 8 , _ _ G4C 6 M. ALL FIXTURES INSTALLED IN SUSPENDED CEILINGS SHALL BE DIRECTLY SUPPORTED FROM 3 5 3 5 c —= 8 THE BUILDING STRUCTURE PER BUILDING CODES AND LOCAL AMENDMENTS. IF STEEL RODS 9 9 9 EJ 7 3 7 ARE UTILIZED FOR THIS PURPOSE, NO LESS THAN 2 SEPARATE RODS SHALL BE USED. THESE RODS MUST EXTEND FROM OPPOSITE CORNERS OF THE FIXTURE WITH EACH ROD G8 11 INDEPENDENTLY SUPPORTED FROM STRUCTURE. ATTACH RODS WITHIN 3 INCHES OF EACH 2 Q8C CORNER OF EACH FIXTURE. ALL LIGHTING FIXTURES SHALL BE ATTACHED TO CEILING GRID. 10 it it 8 G3 VERIFY ALL REQUIREMENTS WITH BUILDING CODES AND LOCAL AMENDMENTS. 5 5 6 N. BRANCH CIRCUIT WIRING IS SHOWN AS A GUIDE ONLY, EXACT QUANTITIES OF CONDUITS AND 13 13 3 9 17 17 3 17 64 CONDUCTORS ARE NOT INDICATED. CONTRACTOR SHALL PROVIDE BRANCH CIRCUIT HIRING w G8 11 11 AS REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM. c o< 2 z a^N� GBC GBC G6 0. SIGNAGE,INTERIOR AND EXTERIOR LIGHTING SHALL BE CONTROLLED BY THE EMS SYSTEM 3eo 3 10 8 8 VIA THE LIGHTING CONTROL PANELS, REFER TO SHEET EO-1 FOR ADDITIONAL INFORMATION. e SEE NOTE 3 5 3 5 9 7 ❑7 3 7 LOCAL LIGHTING OVERRIDES WALL BE AT LIGHTING CONTROL PANELS AND SECURITY STATIONS z �Orn. THROUGHOUT THE BUILDING. COORDINATE EXACT LOCATIONS AND REQUIREMENTS WITH (TYPICAL) 9 11 ENERGY MANAGEMENT COMPANY AND SECURITY VENDOR. V G26NS G8C 77 G8C G6 P. REFERENCE DETAIL ON SHEET#EO-3 FOR ARCH LIGHTING DETAILS. m=0<- 13 10 17 8 6: Q. CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS FOR ELECTRICAL POWER SYSTEMS WITHIN 13 5 5 13 9 17 3 17 30 DAYS OF SYSTEM ACCEPTANCE. G6NS 3 5 G8C 11 11 .,_ R. CONTRACTOR SHALL FURNISH OPERATION &MAINTENANCE INSTRUCTIONS FOR SYSTEMS AND G8C 6 --- 2 � EQUIPMENT TO THE BUILDING OWNER OR DESIGNATED REPRESENTATIVE. 3 5 10 B S. CONTRACTOR SHALL PROVIDE WRITTEN VERIFICATION WITH COPY TO ENGINEER THAT O 7 3 7 LIGHTING SYSTEMS HAVE BEEN TESTED TO ENSURE PROPER CALIBRATION, ADJUSTMENT, G4 9 7 PROGRAMMING AND OPERATION. 11 3 G6 „ e G4 LIGHTING ZONE SCHEDULE RedISSU eE FOR ULTA/LL RENEW 003/06/15 SQUARE D POWER 2 5 13 13 5 9 17 3 17 6 ISSUE FOR PERMIT 13 SIGNAGE, INTERIOR AND EXTERIOR LIGHTING IS CONTROLLED AUTOMATICALLY BY THE EMS LINK G3 LIGHTING p,ll c, SYSTEM VIA THE UGHTING CONTROL PANELS NATH SMART/CONTROLLABLE BREAKERS. 03/06/15 CONTROL PANEL A AC 11 11 G6 CONTROL/OVERRIDES WALL BE AT EMS PANELS AND CONTROLLED VIA SECURITY STATION L ISSUE FOR BID BALLAST ���-� G8C GBC 6 KEY PAD. REVISION PERCITY EMS SYSTEM G8 3 3 10 9 8 � 3 7 ZONE CIRCUITS CONTROLLED REMARKS Z03/24/15 CONTROLLED HOT C ...-.-.__._ 0 a g 7 1 A-5,7 EMPLOYEE LIGHTING- AREA 1 HOT BATTERY G6 PACK/EXIT 6 2 A-11 EMPLOYEE UGHTING- AREA 2 SIGNS/BATTER 228 G8C 11 11 8 A-2,4,6 NEUTRAL LIGHTS 10 13 5 5 13 9 17 17 3 G61 3 EMPLOYEE LIGHTING VALENCE &RECEPTACLES avis L. SQUARE D ECB-G3EL 13 17 6 8-5,6,16,18,20,22 -— -- ---- ickerson, .,.,,...: 20A-1P CCT. BREAKER G8C OC GBC A-1,3 E _ V° EMERGENCY LIGHTING 26 4 B-1.3,7,8.9.10,11,12,13, CUSTOMER LIGHTING- AREA 1 ' 24.25 FIXTURE WIRING DIAGRAM 3 5 3 5 13 7 17 7 3 7 G3 26,2728,29.30,31 32,34,37 _-- NO SCALE G4 5 A-9 CUSTOMER LIGHTING- AREA 2 3 1 7 6 6 A-8,10 B-4 CUSTOMER LIGHTING- COVE&PENDANTS 13 5 13 5 17 3 14 17 G6 7 A-13,17 ENTRY LIGHTING - A-1 1 6 yNONAI 6 1 1 1 8 B-36 EXTERIOR SIGNAGE 13 1�GENSF��_k, g - SPARE �a 1kAA� OCCUPANCY SENSOR NOTES: E WP E OCCUPANCY SENSOR SCHEDULE OS1. FURNISH AND INSTALL A POWER PACK FOR EACH CIRCUIT/SWATCH LEG THAT IS E 36 TYPE MANUFACTURER REMARKS CONTROLLED BY A OCCUPANCY SENSOR. DESCRIPTION & MODEL NUMBER OS2. PLAN CRANING LOCATIONS OF OCCUPANCY SENSOR ARE DIAGRAMATIC ONLY. 8-36 `\\ 360'MOTION SENSOR CONTRACTOR SHALL LOCATE OCCUPANCY SENSOR PER MANUFACTURER'S #10 AWG THROUGHOUT `SEE NOTE#1 LOW VOLTAGE- PASSIVE INFRARED SENSORSWITCH #CM-10 RECOMMENDATIONS. SEE NOTE #1 M1 360'MOTION SENSOR SENSORSWITCH #CMR-10 NOT USED p B Chocked B OS3. CONTRACTOR SHALL COORDINATE OCCUPANCY SENSOR SETTINGS WITH OWNER AND FIELD LINE NE VOLTAGE - PASSIVE INFRARED W Y ADJUST AS REQUIRED. -- - - ---- ---- KP DD/AH OS4. RESTROOM WALL MOUNTED OCCUPANCY SENSORS SHALL TURN ON WHEN OCCUPANCY IS PP MOTION SENSOR POWER PACK SENSORSWITCH #PP-20 Scale Date DETECTED AND TURN OFF AFTER NO OCCUPANCY HAS BEEN DETECTED FOR 30 MINUTES. - --- -_ AS NOTED 03/06/15 IF, SWITCH IS MANUALLY TURNED OFF AND NO OCCUPANCY HAS BEEN DETECTED AFTER 109. 3-WAY WALL MOUNTED CEILING SENSORSWITCH# Job No. BRIEF GRACE PERIOD, SENSOR SHALL DEFAULT TO OCCUPANCY DETECTION ON. FLOOR PLAN - LIGHTING OC SENSOR INTERFACE SWITCH SPODM-SA-3X 1 3®g 5 /I 9 SCALE: 1/8"=1'-O" WALL MOUNTED MOTION SENSOR SENSORSWITCH #WSD OS5. OCCUPANCY SENSORS SHALL BE MANUAL ON AND TURN OFF AFTER NO OCCUPANCY //�,I \ -- / U��J)) 169- HAS BEEN DETECTED FOR 30 MINUTES. MS Sheet Hopp 0' 8' 16' 24' 32' NORM PROVIDE HANDLE TIES AS REQUIRED FOR MULTIWIRE INf 2 CIRCUIT WALL MOUNTED MOTION I���� BRANCH CIRCUITS WITH COMMON NEUTRALS PER NEC 210.4. M51 SENSOR SENSORSUTCH #WSD-2P Illb!=I Yu YYY PANEL A _.,._ „PANEL.B RECEPTACLE LOCATION TO BE DiSfR16Uf1ON_PANFL MDP PANEL C COORDINATED TO SEE NOTE PLAN NOTES: - - - --- ------ "- a PANCL D HOT WATER BE HIDDEN BY #11 1. ALL MOUNTING HEIGHTS SHALL BE ABOVE EMS PANEL RECIRC. PUMP ELECTRIC WATER UNDERCABINET ~ ----- ---- - -- ^^•^-^-^ FINISHED FLOOR. TELEPHONE HOT WATER COOLER REFRIGERATOR 9 PLYWOOD BACKBOARD " COFFEE 1 t 2. COORDINATE WITH MILLWORK MANUFACTURER \ SEE NOTE HEATER +22 9 &15 COFFEE MAKER H PRIOR TO ROUGH-IN. SEE ARCHITECTURAL EWC }4g• �` INTERIOR ELEVATION FOR ADDITIONAL ,f j _.-___ -- __. - ° - - -- --- _ WASHER/ D-9 INFORMATION. -- +136" GFI SIIAMP00/ SEE NOTE �. DRYER / �` -- SEE NOTE M ON7 IG - r. +18" DRYING +18" toa 3, REFER TO ARCHITECTURAL DETAIL 3/F 1.iW FOR FINAL CONNECTION ,lr�'0,. /8 IG IG J �+42" GFI tos K CORRIDOR GFI 18" FICE : 1 EXACT LOCATION OF RECEPTACLES TO EMS PANEL 0 CE� IG to3 3 (4. )ALL BEMOUNTEDZON InCIrJ(> IG - - +18" GFI GFl SE1GF1°� 42" HOR to13 18" D-1,3 IN BACKPANEL OF MILLWORK AT+28" A.F.F. SEE PART PLAN Ulf ICL - GFI - IG ---'- -+39 10" MEN -SEE NOTE/f QN6 18" 5. PROVIDE FNALSCONNECTION FOR ARCH ISTRIP ALLY -I -- +42 OMLN 107 SEE NOTE IG l l 1 THIS SHEET U �_ TYPICAL FOR 18. III NO +36" +18" LSEE +39" +12" IG 9 5 LIGHTING. MOUNT JUNCTION BOX 12" BELOW TOP i' Ic•z +36" I os' I +18" SEE NOTE [ ] �+42" M 18 5 +24" GFI j GFl __..... 18" OF ARCH IN ACCESSIBLE CONCEALED LOCATION _ Ah A,1n� rtA GFI SEE NOTE - - _- ..... BEHIND MILLWORK. PROVIDE CONDUIT AND WIRING ]L._]L ][ __ 2'-0' NOTE SEE NOTE/ON5 D-5,7 9 AS REQUIRED FOR CONNECTION OF FLUORESCE14T SEE NOTE 5 111 5 +24"+24"+24"+24�+42` !„ AG N T --__-- SEE NOTE B 5 GFl STRIP LIGHTS. REFER TO ARCHITECTURAL rrTT SEE NOTE IG DRAWNG FOR DETAILS OF ARCH LIGHTING AND _- -- s6--to IGFl GFl CFI GFI FI GFl GFl I s'-a" x �3'-3" {�ON4 76" DRAWNG EO-3 @ E2-2. I 'n T 18 9 FLUSH IN FLOOR- GFl GFl FI GFI I � - - 6. REFER TO ARCHITECTURAL DETAIL 2/F-1.18 FGR GFl. GFI 11 EXACT LOCATION OF RECEPTACLES. 2_g T Wd 7, PROVIDE JUNCTION BOX AT 18" AFF FOR FINAL SALON ALL GF1'S HORIZONTAL CONNECTION OF ILLUMINATED SHELVES AND LIGHT REFER TO CONCIERGE 105 MOUNTED. SEE NOTE /fi +28"' lie SPECIAL SYSTEM BOX WITHIN FIXTURE WITH 24"FLEXIBLE CONDUIT. DESK - POWER AND ___ +28" POWER PLAN COORDINATE EXACT ELECTRICAL REQUIREMENTS SPECIAL SYSTEMS PLAN WITH FIXTURE MANUFACTURER, PRIOR TO ANY ON SHEET E2-2, ' n'-a" co 8L MOUNTING HEIGHTS WIRING LAYOUT ROUGH-IN INSTALLATION. SEE NOTE#3- FOR y I ® ppJ REFER TO ARCHITECTURAL INTERIOR ELEVATIONS I _ I � +26" EXACT LOCATION AND MOUNTING HEIGHTS. B. EAS SECURITY ANTENNA, REFER TO SHEET N ° -- J P E3-1 FOR RISER DIAGRAM. SEE NOTE#13 PARTIAL FLOOR PLAN OFFICE 103 - ELECTRICAL 9. CONTRACTOR SHALL VERIFY TIMING OF TELEPHONE (TYPICAL) rr N +28" X I SCALE: 1/2"=1'-0" COMPANY CONNECTION WITH ULTA. RECEPTACLES L +28• 0)CID Z ® Z _i -'- NEED TO BE INSTALLED PRIOR TO TELEPHONE I _ 0' 2' 4' 6' 8' NORTH COMPANY CONNECTION COMPLETION. #E5 NOIE MOUNTED HORIZONTALLY IN o ._p -0 +28•, co� Clr 6 10. TYPICAL FOR ALL FLOOR RECEPTACLES: SEE BACKPANEL O+58" A.F.F. c - r ", �- �®� OFFICE NOTES: SHEET EO-1 k E4-1 FOR ELECTRICAL SEE NOTE #2 I Ix SPECIFICATIONS ON FLOOR RECEPTACLES TO BE I I. SEE NOTE 0 ON1. COORDINATE EXACT LOCATION OF VOICE/DATA OUTLET WITH ULTA"IT" ONS. TELEPHONE OUTLET MOUNTED AT 48" A.F.F. INSTALL 3/4" CONDUIT USED. I ,I ta'-11" Q-9A. DEPARTMENT AND ARCHITECT. REFER TO ARCHITECTURAL ELEVATION INTO ACCESSIBLE CEILING SPACE. REFER TO SHEET#E3-2 FOR LOW I tt-2 _ L6 FOR ALL DEVICE LOCATIONS AND MOUNTING HEIGHTS. VOLTAGE WIRING. 11. REFER TO ARCHITECTURAL INTERIOR ELEVATIONS +28" FOR EXACT RECEPTACLE LOCATIONS. I - -- -_.•q,� LA n1 Fa' I ON2. REFER TO SHEET#E3-2 FOR LOW VOLTAGE WIRING. ON6. 4`z4`JUNCTION BOX FOR TEMPERATURE SENSOR, WITH SINGLE GANG 12 RECEPTACLES SHALL BE MOUNTED HORIZONTALLY I .I 2'-g.• o 7'-0' +28" D W_ &' I� uj COVER,MOUNTED AT WITHIN 16"OF WALL LIGHT SWITCH AT SAME AT 44 I , " AFF MATH GRAY DEVICES AND STAINLESS° 1 ON3. PRIOR TO ROUGH IN OF ALL OUTLETS, CONTRACTOR SHALL FIELD HEIGHT AND IN SAME STUD POCKET(SPACE). INSTALL 3/4` CONDUIT <'-Y' 13'-n" +28" VERIFY EXACT EQUIPMENT LOCATIONS WITH OWNER'S REPRESENTATIVE FROM JUNCTION BOX INTO ACCESSIBLE CEILING SPACE. STEEL COVERPLATE. AND EQUIPMENT VENDOR. 13. REFER TO COLUMN DETAIL ON SHEET A-2.0 FOR SEE NOTE ON7. VOICE/DATA OUTLET MOUNTED AT 18" A.F.F. INSTALL 3/4"CONDUIT EXACT MOUNTING REQUIREMENTS._-- - -� .7 0 ON4. PROVIDE 3-GANG JUNCTION BOX(FOR MUZAK SOUND SYSTEM VOLUME INTO ACCESSIBLE CEILING SPACE. REFER TO SHEET#E3-2 FOR LOW #5 g 7" n 5" - +28" !-SEE NOTE SOUND OSYSTEM AMP) MOUNTED 8 A A.F.F. N TH FROM TO INTERIOR ELEVATION FOR EXACT RECEPTACLE 1 � � N a _4 VOLTAGE WIRING. 14. COORDINATE WITH MILLWORK MANUFACTURER I. MILLWORK AND ADDITIONAL INFORMATION. a 7 ro `° - Q) tll BOX INTO ACCESSIBLE CEILING SPACE. PROVIDE JUNCTION BOX(AT PRIOR TO ROUGH-IN. SEE ARCHITECTURAL li LOCATIONS, ROUTING OF CONDUIT IN BASE OF w VOLUME CONTROLS JUNCTION BOX AND COVER PLATE WITH 7/8" C ROUND OPENING. REFER TO SHEET E3-1 FOR LOW VOLTAGE r O n$rn WIRING. SEE NOTE -, - 13' 2 +28" 0 a NH 1"C. FOR CCTV 15. TELEPHONE BOARD SHALL BE(3) 3/4" (4'X6') N 5-­_ -I �'� ler' 1"C. TO MAIN FIRE RATED PLYWOOD, REFER TO DETAIL 1/A-8.3. s' +28" TELEPHONE 3/4"C. FOR CHIME I I - - ta'-2" - 2,_6„ W" TERMINAL CABINET 16. COORDINATE EXACT MOUNTING HEIGHT OF --- �� SEE NOTE �3 � 2 1"C. FOR DATA t-s. O RECEPTACLE FOR DRYER BOOSTER WITH I I T T 3 4"C FOR SAFE MECHANICAL CONTRACTOR. RECEPTACLE SHALL 7' 3" 6 5" 6' s _ o N 5 (.� ,,...aI / 3/4"C. FOR I -- 1 -- ..._.. -_- n 3 - 'miF� FUTURE USE BE BELOW CEILING. I - a 10" s 7 - ----- _ _ 2 1"C. FOR POWER I i-_ _I--. _.I 4,-5„ - O O O I I .. __ .. a ___r s 6" n T:� T to SEE NOTE 3"3"3' 3" SALES a.. T PROVIDE HANDLE TIES AS REQUIRED FOR MULTIWIRE MOUNTED HORIZONTALLY IN I to 2-10" 3. t' 5'-0 BRANCH CIRCUITS WITH COMMON NEUTRALS PER NEC 210.4. LOWER ACCESS PANEL O I i --- +11 1/2" A.F.F. I I T T e T 'n 2-6 SEE NOTE SEE NOTE p 14 I _ _ 5 15 F I5._t., - I +28" Revisions 1 t'-5" ISSUE FOR ULTA/LL REVIEW '6_3" 3" 1'-5• I I 22'-g" -----. -_-- _-_ _..--__--.-- - e tt• a• +28" SEE NOTE AIS O6 O -._____-. - I -- { ----- --_--. --_---- � ---- t 4 ISSUE FOR PERMIT --------------------- L___------------- I (TYPICAL) �03/O6/15 O O O O SEE NOTE #10 REFER TO DETAIL ON i ISSUE FOR BID i -pq I (3)-3/4"C, I I SHEET TION FOR 003/06/15 VISION (6)-1"C. STUBBED I I (TYPICAL) =i CONTINUATION .I 2„ +28" A03/24/15PER CITY INTO ACCESSIBLEI CEILING SPACE �i' STUB CONDUITS 3" SEE NOTE a r ;I' SEE NOTE I I REFERTH S SHEET ( li ABOVE FINISHED _ M 5 0 SAFE- VERIFY EXACT - 5 -`FLOOR ti p LOCATION VAT" MILLWORK _.. -, a__ ) _^ --.- - VENDOR AND OWNER 3/4"C. FOR SAFE I�-------- 2-5" Q rr ' ' _�I I (TYPICAL) it i -E NOTE avls L. - 7 Dickerson, i i I •i E I I (2)-3/4`C. FOR Qp #ES NOTE I! FUTURE USE -. ---_-_ -__-_ f p 72"MAX. ON r I CENTER (TYPICAL) -- STOREFRONT WINDOW RECEPTACLE, -- -- - "' - yI RUSH MOUNTED IN CEILING Sg�pENs eyC� - ab WINDOW, R IS MORE THAN 16• "WAVE FLOOR PLAN - ELECTRICAL DIMENSIONS - lf� WIDOW, RECEPTACLE SHALL BE WALL SCALE: 1/8`=1'-0` MOUNTED LESS THAN +18" ABOVE a 1 Al -- - - -- - WINDOW) (TYPICAL) O / 0' 8' 16' 24' 32' NORTH GENERAL NOTES: -' /\//%/���!\/� A. EXISTING CONDITIONS SHOWN ARE BASED ON D. FLOOR BOXES SHALL HAVE A TAPERED EDGE OR H. ALL CONDUIT ROUTED IN FLOOR SLAB SHALL BE ENLARGED ROUGH-IN PLAN (CASHWRAP) "v AS-BUILT DRAWINGS PROVIDED BY THE OWNER. BE RECESSED INTO TILE. 3/4" SCHEDULE PVC CONDUIT WITH GROUND WIRE 51 ELECTRICAL DIMENSIONS CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD WHERE ALLOWED BY LOCAL CODE AND UNLESS DS/>a/20t /SIl'01:i CONDITIONS AT NO ADDITIONAL EXPENSE TO THE E. MAINTAIN CONTINUITY OF CIRCUITS SERVING SPECIFICALLY NOTED OTHERWISE. OWNER. FIXTURES, DEVICES, OR EQUIPMENT NOT BEING SCALE: 1/2"=1'-O" NORTH REMOVED. I. RECEPTACLES MOUNTED IN WALLS MATH WC-5 Drawn By Checked By B. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT WALL COVERING SHALL BE GRAY DEVICES WITH A KP DD/AH 0' 2' 4' 6' 8' LOCATION OF ALL ELECTRICAL DEVICES. F. SEE ARCHITECTURAL DRAWINGS FOR TRENCHING STAINLESS STEEL COVERPLATE, REFER TO CONTRACTOR SHALL COORDINATE ALL DEVICE DETAIL. ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS. Scale Date LOCATIONS AND MOUNTING HEIGHTS WITH AS NOTED 03/06/15 SERVICE DESK NOTES: ARCHITECTURAL ELEVATIONS PRIOR TO ANY G. GFI RECEPTACLES SHALL BE GRAY DEVICES WITH INSTALLATION. STAINLESS STEEL COVERPLATE. SEE Job No. St. ELECTRICAL CONTRACTOR SHALL FURNISH, INSTALL AND MARE ALL S2. COORDINATE STUB UP LOCATIONS NTH EXACT SAFE ARCHITECTURAL INTERIOR ELEVATIONS FOR /I DEVICES AND BOXES WITHIN RECEPTION/SALES COUNTER. COORDINATE LOCATION TO AVOID ALL INTERFERENCES. C. ALL CONDUIT AND JUNCTION BOXES SHALL BE ADDITIONAL INFORMATION. �iI u e 50 49 EXACT LOCATION AND ROUTING IN FIELD MATH MILLWORK AND MILLWORK INDEPENDENTLY SUPPORTED FROM STRUCTURE VENDOR PRIOR TO ROUGH-IN. AND NOT FROM ACOUSTICAL CEILING OR CEILING Sheet No. SUPPORTS. E 2-1 SF: I,DU VA , .i....i� III.A.TWIN(ALL,ID �C u SHAMPOO/ PANEL_A ...� PANfL.a DRYING CORRIDOR DISIRIBUIION PANEL MDP ___ PANfi C 106 tip , GENERAL POWER NO PLAN N NOTES, "" - -- - - _ PANEL 0 Y' I � A. EXISTING CONDITIONS SHOWN ARE BASED ON 1. CHIME PUSHBUTTON. PROVIDE SHOO BOX WITH EMS PANEL WASHER/ I TELEPHONE SEE NOTE#11 DRYER AS-BUILT DRAWNGSSHALL PROVIDED BY THE OWNER. SINGLE GANG BOX. REFER TO SHEET#REFER SEE NOTE#5 PLYWOOD BACKBOARD SEE NOTE #10 704 CONTRACTOR HALL ADJUST FOR ACTUAL FIELD FOR FOR ADDITIONAL INFORMATION. REFER TO REFER TO �e CHIME PUSHBUTTON CONDITIONS NOTE CONDITIONS AT NO ADDITIONAL EXPENSE TO SEE NOTE#6 DETAIL 3/F-1.1B FOR EXACT CHIME LOCATION. C-18,20,22,24 6 DETAIL#4 W MOUNTED INTHE OWNER. _ GFl THIS SHEECONCIERGE t DESK _ _ F _._._ 2. CONTRACTOR SHALL ROUTE FEEDERS FROM o_ = 15 - IG L... I - DETAIL#3 Z) 1 B. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT WIiWYl1/) SEE NOTE# _-_� LOCATION OF ALL ELECTRICAL DEVICES. SALON STATION THROUGH FLOOR MOUNTED STAGING K I I JUNCTION BOX AND OVER TO NEAREST COLUMN. --$FI- -�,r 8 r Z-2-A F� ,L THIS SHEET ---- I 3g3434 CONTRACTOR HALL COORDINATE ALL DEVICE J ' �8 4 G IG 1 102 D-8 IG IG IG 2 38 GFI EO-3 29 B-6 WOMEN I LOCATIONS AND MOUNTING HEIGHTS WITH 3. NEMA 14-30R RECEPTACLE FOR ELECTRIC B-35 20 D-29 K - ARCHITECTURAL ELEVATIONS PRIOR TO ANY �. 30 toa DRYER. VERIFY MATH EQUIPMENT SUPPLIER FOR GFl INSTALLATION. EXACT ELECTRICAL REQUIREMENTS PRIOR TO D-15 D-2,4,8 24 '�— #7 ' OFFICE C-36 22 24 GFI SEE NOTE 1•C. 3/4•C' J , FLOOR MOUNTED ROUGH-IN. REFER TO SHEET# �_______ ________� J C. ELECTRICAL CONTRACTOR SHALL INSTALL �------- -- "' to3 I_,...f� �I GFI GFl 24 O C-26 _________ _ _ S (TYPICAL FOR 3) RECEPTACLES AND BOXES WITHIN CONCIERGE INFO FOR ADDITIONAL D-40,42 28 4. REFER ARCHITECTURAL DETAIL#3 ON SHEET INFORMATION — SEE -� MEN --- ------------ MILLWORK COUNTER. COORDINATE EXACT .SEE NOTE IG r 1 C. LOCATION AND CONDUIT ROUTING WITH LOCATIONS. FOR EXACT RECEPTACLE AND DATA I - -... _IG NOTE 26 6 LOCATIONS. ��- #9 - 17 7 --SEE MILLWORK CONTRACTOR. \\ 42 15 ID-�1,1/7 #9 — GFINOTE I "--- - -. ... _HW -- {' - ' U. 3/4'SCHEDULE ALLOWED CONDUALL CONDUIT ROUTED IN IT AL OGRO ND SLAB SHALL BE MODEL#156G-4AM. PROVIDE AN EDWARDS } - ti -9 9 IG D-17,19 , 3'-. 3 3 126 #9 5. PROVIDE AN EDWARDS GENERAL PURPOSE BELL, .GFI I B 7 3/4"SCHEDULE PVC CONDUIT Wi1H GROUND GFI ii GFII&,GFI -SEE NOTE#9 GFl D-34 EDWARDS CLASS 2 SIGNALBTRANSFORMER,ANE9 NO 11 'GFI 15 -1,3,5 UNLESS SPECIFICALLY NOTED OTHERWISE. MODEL#590. PROVIDE #10 WIRING BETWEEN SEE NOTE . 11 13 '15 GFI. 14 14 8-14,16,18 0 CONCIERGE DESK PUSH BUTTON AND TRANSFORMER. -11 E. ALL CONDUIT AND JUNCTION BOXES HALL BE #9 )� /17 A-2 1q.. SUPPORTED INDEPENDENTLY FROM ACOUSTICAL 6. DOUBLE GANG JUNCTION BOX FOR SECURITY ���}}} ' GFl GFl 19 A9 21 i 23 23 --'' POWER 8i SPECIAL SYSTEMS COUNG. SYSTEM KEY SNATCH. MOUNT ON RIGHT SIDE OF A-3 /� 17 GFl �FT QFT FI GFI GFI EO-3 16 T DOOR. IF ROOM IS NOT AVAILABLE THEN MOUNT E0-3 C-9,11,13,15 y C 17,19,21,23 8-19,21, '37 I 23,25,37 SCALE: 1/4"=1'-0" F. CONTRACTOR SHALL LAYOUT BRANCH CIRCUIT ON THE LEFT SIDE OF THE DOOR. SEE'NOTE#2 �I SEE NOTE#2 - iIx % WIRING AND ARRANGEMENT OF HOMERUNS FOR ` REFER TO 116 Lu 0' 4, 8' 12' 16' MAXIMUM EFFICIENCY.INCREASE WIRE SIZE IF 7, PROVIDE FINAL CONNECTION TO HAND DRYER SALON PART PLAN 3 VOLTAGE DROP EXCEEDS 2%OR 100 FEET IN ias #1 THIS NORTH (12OV., 1,500W). VERIFY ALL REQUIREMENTS E� LENGTH. B-8,10,12 r I SHEET FOR WITH EQUIPMENT VENDOR PRIOR TO ROUGH-IN.HAIR 37- PROVIDE LABEL MATH CIRCUIT NUMBER FOR HAIR 28,30 ADDITIONAL ' P G. SEE DETAIL ON SHEET EO-3 FOR ADDITIONAL DRYERS. PROVIDE CIRCUIT BREAKER WITH PAD L_-1 INFORMATION i 16 � REQUIREMENTS FOR HVAC UNIT WIRING. '� 3 F' LOCK OUT CAPABILITIES. SEE NOTE#9 3 H. MAINTAIN CONTINUITY OF CIRCUITS SERVING C-33 ; ` C0 1 8. WIRE EACH OUTLET OF THE QUAD FLOOR BOX 9 _ _ FIXTURES, DEVICES, OR EQUIPMENT NOT BEING TO A DEDICATED CIRCUIT, PROVIDE A HANDLE � 9 - �."- 30 �16 19.._ ��� REMOVED. TIE FOR CIRCUITS TO THE SAME RECEPTACLE. CD z 1. SEE ARCHITECTURAL DRAWINGS FOR TRENCHING 9. PROVIDE FINAL CONNECTION FOR ARCH 6 C-2,4, LLI DETAIL. `, ;' 17 1 ((/f�Ex LIGHTING. PROVIDE CONDUIT AND WIRING AS 4 6,8 REQUIRED FOR CONNECTION OF FLUORESCENT `. / 8-13,15, J. BRANCH CIRCUIT WIRING IS SHOWN AS A GUIDE STRIP LIGHTS. REFER TO DETAIL ON SHEET -4-5- 2 ,3l%30 , p 9 --- ONLY, EXACT QUANTITIES OF CONDUITS AND ; J CONDUCTORS ARE NOT INDICATED. EO-3 FOR ADDITIONAL INFORMATION. EO-3 8 12 ' 1 U/C CONTRACTOR SHALL PROVIDE BRANCH CIRCUIT C'__ , ' SEE a�of 19 NOTE LL COFFEE MAKER 10. PROVIDE FINAL CONNECTION TO RECIRCULATION ` WASHING MACHINE FRIDGE WIRING AS REQUIRED FOR A COMPLETE AND ;7— T `` "' 18 S8 D-21,23 GFI - OPERABLE SYSTEM. PUMP(120V., 1PH 55W). VERIFY EXACT C-,,3, ; 19 #9 23 ELECTRICAL CONNECTION WITH PLUMBING SEE 5 5,7 i 30 1g DRYER BOOSTER _- _ CONTRACTOR. , ILJL, (12OV., 1PH., 83W) 3 21 !., GFl 11. PROVIDE FINAL CONNECTION TO GAS WATER NOTE 1 i c¢ A-6 D-(25,27) GFI I G 1 37 HEATER. VERIFY EXACT ELECTRICAL CONNECTION #9 35, 12 / X�28 21 EO-3 3/4•C. 3#10 i _. SEE NOTE#3 39 WITH PLUMBING CONTRACTOR PRIOR TO 9 3337, ' ' ' &1 #10 GROUND ROUGH-IN. (120V., 1PH.) # 149, '14,12 - '° C-35,37,39,49 ' ' SEE NOTE 8 ,. I `� 18 17 —SEE " D-37,39,4 12, SEE DETAIL ON SHEET EO-1 FOR ADDITIONAL ___ -_- __ ` INFORMATION. TYPICAL FOR ALL FLOOR i 28 21! g w RECEPTACLES ' al 13. CONDUIT AND WIRING FOR ARCH RECEPTACLES C-10,12,14,16 12 � 78 SHALL BE ROUTED IN CHASE WTHIN BASE SEE SEE NOTE�8 SACKOF THE COFFEE BAR MILLWORK FIXTURE. CONDUIT SHALL ENTER AT NOTE i 21 a^n _ BACK OF VERTICAL ARCH SECTION BEHIND # 27 8-27,29,31 DETAIL VERTICAL PANEL(WISH LIGHT FIXTURES). 9 15 21 Q. = F.. HOUSE DETAIL CONDUIT TO BE INSTALLED PRIOR TO SEE €z NORTH INSTALLATION OF ARCH. THERE SHALL BE NO NOTE 3 u _ NORTH SCALE: 1/4"=1'-0" 31 32 22 22 13 '-SEE SCALE: 1/4"=1'-0" EXPOSED CONDUIT. #,3 ``�' Ta # NOTE V S o}yl"x 0' 4' 8' 12' 18' � 0' 4' 8' 12' 16' _---' -- ; T"� `-- m z e 1 CJ - 31 � 40..- � lt5i'/ B-32,34 32� 33 32 Q3�2 3Qp2,' 24,2622 9 31 10 10: � ,.Q)• _ ,''" T i%� 25 XE0-3W i T 34 ..gpg�20 2tl IG IG IG ® .. 31 ,�-� JT , 13. -14,16,18 20 +30" 22 ilG IG IG IG i6 IG 3U16 IG IG30"18 IG` IG ,8 ' 34 34 i 34 34 ' 0--F�fl-3AE-- T® ®TT IG i 30" +30" CCTV 31 f l% --'yam •�`�.,' `• NOTE IG +30" +30• IG IG '�- A-9 �� T 26 23- #9 Revisions IG / - +18" 20 EO-3 ISSUE FOR ULTA/LL REVIEW 24 +6• 29 23 1 003/06/15 - -- ----- - ------- i 8 AISSUE 03/06FOR PERMIT ------ -- ----. _. .. _ 29 /15 26 23. ISSUE FOR BID ----'------------------------- SEE NOTE#S1 SEE NOTE#12/1' 23. NEE OTE �REVVIISIIONSPER CITY (TYPICAL) 29 (TYPICAL)- SALES 003/24/15 SEE tot -15 #9 Q "-*tD-20,22,24 NOTE 2924 Q SEE NOTE #9— -i6D- #S3 0-10J2 E0-3 Q SEE NOTE 27 ' #Sa zs11 Davis L. B-33 24 15 EE ICi<2ESOf1, "F ,..�. it 10 SEE NOTE 33 33 33 33 33 #OTE 9 E 12 .� 0/1 _. TO SECURITY STOREFRONT WINDOW RECEPTACLE, FLUSH MOUNTED IN CEILING POWER SUPPLY ANTENNA _ //'�� /�� - CHECK POINT (WINDOW,IRECEPTACLE HALL BE WALL FLOOR PLAN �' POWER !�-r.l 1 TONAL ® SERVICE COUNTER PART PLAN " MOUNTED LESS THAN +18• ABOVE SCALE: 1/8"=,'-0" WINDOW)(TYPICAL) a A POWER & SPECIAL SYSTEMS D 8 6 _ 2431 mom � � SCALE: 1/2"=1'-0" NORTH I ,�S ,,OF GY„0 o�/:�a/zo1�, ns;sl/zols - 11P1E' Lt I,.n..,,M1 SATE SERVICE DESK NOTES: Drawn By Checked By SS. CONDUIT SHALL BE ROUTED IN BASE OF MILLWORK. ELECTRICAL S3. SINGLE RECEPTACLE MOUNTED 12" ABOVE BASE SHELF OF KP DD/AH CONTRACTOR SHALL FURNISH,INSTALL, AND WIRE ALL DEVICES CABINET IN BACKWRAP AREA FOR CHECK-POINT SECURITY Scale Date AND BOXES WITHIN RECEPTION/SALES COUNTER. COORDINATE SYSTEM "POWER PACK". LABEL RECEPTACLE'SECURITY PROVIDE HANDLE TIES AS REQUIRED FORI BRANCH CIRCUITS MATH COMMON NEUTRALSS PER PER NECIRENE 250.4. AS NOTED 03/06/15 EXACT LOCATION AND ROUTING IN FIELD WITH MILLWORK. SYSTEM." ROUTE CONTROL WIRING IN CONDUIT. SEE SHEET Job No. E3-1 FOR ADDITIONAL INFORMATION. �iy� S2. SEE POWER ROUGH-IN PLAN, SHEET E3-2, FOR CONTINUATION e OF SECURITY SYSTEM CONNECTIONS. S4. RECEPTACLE MOUNTED 12" ABOVE BASE SHELF OF CABINET '55NJ 9 IN BACKWRAP AREA FOR HAND-HELD SCANNER CHARGER. Sheet No.LABEL DUPLEX RECEPTACLE"SCANNER CHARGER." E 2_2 TO ADDITIONAL CAMERAS BY CCTV VENDOR _ROOF TELEPHONE ~ CAMERA WIRING PLYWOOD SEE NOTE o o o FURNISHED AND \/ BACKBOARD rl CCTV CABLING INSTALLED BY }- r BY CCTV VENDOR CCTV VENDOR _- ACCESSIBLE CEILING (1 ❑ WASHER/ l ,ShIAMP00/ � DRYER STAGING DRYING EAS SYSTEM CORRIDOR 9;- R ioz 1oa CAMERA BY CCTV VENDO � TO PHONE FROM PHONE �1oel S ANTENNA no ✓' (TYPICAL) PANEL M-O-H. PANEL PAGE OUT l -SECURITY MONITOR SFOR CCTV f MEN HE ���EQUIPMENTHEAD END M BY CCTV VENDOR 2a- G S - -_--- ---- _ _ 107 L/ WOMEN # OFFICI 1"C. STUBBED INTO SEE NOTE 67 .3- S102 108 , COUNTER FOR CCTV CABLING -__ S _ -- r BY CCTV VENDOR FLOOR - -.r:_ --r V _____ --- ---- 3-GANG BACKBOX FOR VOLUME S701,5103 CCTV CAMERA WIRING DIAGRAM CONTROL SWATCH AT 48"(AT-10) NO SCALE SALON CCTV NOTES: S Lios S 1. REFER TO CCTV VENDOR DRAWINGS FOR EXACT LOCATION OF ALL EQUIPMENT. ALL CCTV EQUIPMENT AND WIRING SHALL iO3 BE FURNISHED AND INSTALLED BY VENDOR. -- - S Im iEMS NOTES EMS1. ELECTRICAL CONTRACTOR TO MOUNT 12"X12"JUNCTION BOX(PROVIDED BY SEE NOTE � EMS VENDOR) NEXT TO THE EMS PANEL BASEPLATE, COORDINATE EXACT LOCATION WITH EMS VENDOR. ELECTRICAL CONTRACTOR TO INSTALL 8 EAS3-� � 0 CONDUIT BETWEEN EMS PANEL BASEPLATE AND 12"X12"JUNCTION BOX. POWER PACK J @---------- lJ- - M 1 W EMS2. ELECTRICAL CONTRACTOR TO PROVIDE DEDICATED 120V. CIRCUIT FOR THE ACCESSIBLE CEILING CO z EMS PANEL POWER SUPPLY AND TERMINATE COMPLETE INSTALLED INSIDE 120V.REFER SHEET TO a' S ® Lu OF 12"%12"JUNCTION BOX). TERMINATION TO OCCUR ONCE THE EMS 1.0 120V. _ PANEL POWER SUPPLY IS INSTALLED BY VENDOR. REFER TO PLAN DRAWINGS REFET 1 TO SHEET E2-2 , EMS3. ELECTRICAL CONTRACTOR TO INSTALL SQUARE D FACTORY WRING #E2_2 p m J COMMUNICATION CABLE BETWEEN THE SQUARE D NF2000G3 MASTER EAS SYSTEM S 16 CONTROLLER LOCATED IN PANEL A AND THE SQUARE D NFSELG3 SLAVE POWER PACK ANTENNA -j CONTROLLER LOCATED IN PANEL B AND TERMINATE COMPLETE. IN BACKWRAP Q LL COMMUNICATION WIRE SHALL BE ROUTED IN CONDUIT. ANTENNA TO BE 3.1 1"C. WITH 1 J ROUTED TO FLOOR BY SECURITY l(a EMS4. ELECTRICAL CONTRACTOR TO MOUNT THE EMON CURRENT TRANSFORMERS 16 TWISTED EAS SYSTEM S SYSTEM VENDOR W i ON THE MAIN ELECTRICAL FEEDS IN THE MAIN DISTRIBU710N PANEL MOP. PAIR ANTENNA �w � ELECTRICAL CONTRACTOR TO MOUNT THE EMON ENERGY METER NEXT TO (TYPICAL FOR 2) THE PANEL MOP AND CONNECT IT TO THE EMS METER BREAKER IN PANEL FLOOR _ - FF�7 1 A. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL CONDUIT BETWEEN EMON METER AND EMS PANEL �-- -----' - 1"C. WITH 1 #16 AWG TWISTED PAIR w EMSS. ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL ALL CONDUIT AND INSTALLED BETWEEN ANTENNAE. A 9 _ _ c BOXES, WHERE NECESSARY FOR CONTROL WIRING, REFER TO MECHANICAL CONDUCTOR CABLE SHALL BE FURNISHED "ALES W w DRAWINGS FOR ADDITIONAL INFORMATION. THIS INCLUDES LENNOX ZONE AND INSTALLED BY EAS VENDOR TEMPERATURE SENSORS AND COMMUNICATION WRING. IF THE WIRE NEED I-, TO BE IN THE CONDUIT, THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO FRONT SYSTEM REAR SYSTEM g "� < PROVIDE AND INSTALL THE CONDUIT; ULTA'S EMS VENDOR WILL PROVIDE 10 I�} S AND INSTALL THE WIRING INSIDE THE CONDUIT. IF CONDUIT IS NOT G j 3 m rn REQUIRED, ELECTRICAL CONTRACTOR IS TO PROVIDE A CUT-IN RING AND EAS CHECKPOINT SYSTEM RISER S n PULL STRING FROM ABOVE THE CEILING TO THE CUT-IN RING. J NO SCALE EAS NOTES: } 3 Y w U EAST. PROVIDE 10' SLACK CABLE AT EACH END FOR TERMINATION BY EAS VENDOR. r So EAS2. ALL SECURITY SYSTEM WIRING SHALL BE FURNISHED AND INSTALLED BY VENDOR. ----- EAS3. PROVIDE 2'X 3'FIRE TREATED PLYWOOD FOR SECURITY ANTENNA. SCREW - � PLYWOOD INTO WALL STOPS AND MOUNT BOTTOM OF PLYWOOD 6" ABOVE ----- CEILING. COORDINATE LOCATION WITH ARCHITECTURE DRAWINGS AND VENDOR I IN FIELD. VERIFY EXACT CONNECTION REQUIREMENTS OF SECURITY ANTENNA TO SECURITY POWER PACK WITH SECURITY VENDOR IN FIELD. S S Revisions ISSUE FOR ULTA/LL REVIEW 003/06/15 0ISSUE FOR PERMIT 03/06/15 S ISSUE FOR BID �03/06/15 CHIME PUSHBUTTON SOUND SYSTEM WIRING NOTES: Q ENCOMPASS MV2 SEE NOTE �3 MUSIC SOURCE PASO MUDMS3040 1 REFER 1' 9 S1. MANAGER'S OFFICE, LOUNGE&DM OFFICE VOLUME RISER 0 POWER AMPLIFIER FOR 3/4"C. CONTROL IS LOCATED IN THE MANAGER'S OFFICE. SKIN FOR CHIME RJ-45 TREATMENT AREAS' VOLUME CONTROL LOCATIONS WILL ---- ETHERNET .+ VARY FROM SITE TO SITE BUT IS LOCATED IN EACH vy '� EAS SYSTEM Q CONNECTION AUX 1 IN AREA. VERIFY THE EXACT LOCATION OF EACH AREA (�-- - - �4} - - -- - -- -i( M ANTENNA - ---- FROM IT RCA TO RCA JACK 1 RACK -4 LEFT VOLUME CONTROL NTH G.C. ON SITE. _________ �� I' Davis L. S2. INSTALL THE CHIME MODULE INTO THE MODULE PORT. FOR 1 C' (2)3/4"C. FOR FEO AUX 1 IN 70V BLK INTERNAL JUMPER SW221 WALL NEED TO BE SET TO FOR CCTV FUTURE USE ICk2F50f1, 120V POWER -4 RIGHT OUTPU ® 'VOX 1'. LABEL MODULE VOLUME CONTROL ON FRONT W '- -------- - - - --- -..- -- .. - -- -- E OF UNIT AS'CHIME VOLUME'. SET CHIME VOLUME TO A POWER IN -- -- o nFnno.vs3 LEVEL JUST ABOVE THAT OF THE MUSIC. - --- --- TOA S-04S CHIME � BACKWRAP ---- \ MODULE S3. ALL SOUND SYSTEM WRING SHALL BE FURNISHED AND • INSTALLED BY VENDOR. 0 • S4. REFER TO VENDOR DRAWINGS FOR VARIABLE DUCKING IN FROM PHONE WIRING DIAGRAM. ADJUST DUCKING VOLUME TO HALF OF _ BOARD, CABLE OUT TO PHONE BOARD, THE NORMAL LEVEL. REMOTE VOLUME CONTROL PROVIDED BY PHONE CABLE PROVIDED BY LOCATED IN OFFICE. VENDOR LABELED M-O-H PHONE VENDOR FLOOR PLAN - LOW VOLTAGE WIRING "PAGE" OUTPU ® BLK LABELED "MUSIC" S5. SOUND SYSTEM TO BE 100%BY THE BEGINNING OF SCALE: 1/8"=1'-O" CHIME PUSH CHIME 120V POWER SUBSTANTIAL COMPLETION WEEK. 0' 6' 16, 24' 32' NORTH 0. BUTTON CONTACT PUSH NOTES: 9 .�j CLOSURE® BUTTON i rF ��Q SERVICE COUNTER CONTACT SPKR TYPE MTAP AREA 1. ALL CONDUIT AND BACK BOXES SHALL BE FURNISHED AND 5. ALL CONDUIT AND JUNCTION BOXES SHALL BE SUPPORTED CLOSURE® INSTALLED BY ELECTRICAL CONTRACTOR. ALL CABLING, DEVICES INDEPENDENTLY FROM ACOUSTICAL CEILING. _ CONCIERGE 5101 v S HS-1 1 1W OFFICE AND TERMINATIONS SHALL BE FURNISHED AND INSTALLED BY - ULTA'S SOUND VENDOR. PROVIDE 10 FEET OF SLACK CABLE AT 6. DUCT MOUNTED SMOKE DETECTORS SHALL BE EXISTING TO REMAIN r AT-10 EACH DEVICE. (BY LANDLORD). MAINTAIN CONTINUITY OF SERVICE TO EXISTING O5/�4/201 O„r/.31/lOtfi HS-1 17 1W RETAIL DUCT DETECTORS AS REQUIRED. RELOCATE EXISTING REMOTEonir- 2. INSTALLATION OF VOLUME CONTROL STATIONS SHALL BE BY SOUND INDICATING DEVICES TO NEAREST COLUMN AS REQUIRED. SYSTEM VENDOR. PROVIDE SINGLE GANG BACKBOX WITH 3/4" Drawn By Checked By 5103 v S HS-1 1 1W LOUNGE CONDUIT STUBBED INTO ACCESSIBLE CEILING SPACE. 7. IT CABINET TO BE FURNISHED BY ULTA AND INSTALLED BY KIPDD/AH GENERAL CONTRACTOR. SOUND SYSTEM WIRING DIAGRAM "T-'° 3. CHIME PUSHBUTTON. ELECTRICAL CONTRACTOR TO PROVIDE 1 Scale Date � 80% MATH SINGLE GANG TRIM PLATE. SEE SOUND SYSTEM WIRINGING 8. CAMERA LOCATIONS SHOWN ARE FOR REFERENCE ONLY. AS NOTED 03/08/15 NO SCALE DIAGRAM THIS SHEET FOR ADDITIONAL INFORMATION. SEE DETAIL 1/F-1.1B FOR EXACT CHIME LOCATION. 9. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL Jo No. b �o ELECTRICAL DEVICES. CONTRACTOR SHALL COORDINATE ALL DEVICE (NNNUJJJI 4. ALL LOW VOLTAGE CABLING/HARING SHALL BE RUN ADJACENT TO LOCATIONS AND MOUNTING HEIGHTS WITH ARCHITECTURAL THE PERIMETER SOFFITS NOT MORE THAN 3'-0" OFF DEMISING ELEVATIONS PRIOR TO ANY INSTALLATION. Sheet No. WALLS. E 3 SF: 1.00 vn JN,FI:\1300+.56 FN:07 E31-LV_.m FALLS.ID 2" CONDUIT STUB TO LANDLORD TELEPHONE ROOM WITH PULL STRING (BY LANDLORD), VERIFY EXACT LOCATION WITH LANDLORD IN THE FIELD, COORDINATE EXACT ° REQUIREMENTS WITH UTILITY COMPANY. (3) 4 PAIR CAT 3 CABLES Ej TO PLYWOOD BACKBOARDIT CABINET, FIRE RATED TELEPHONE (2) CAT 5 CABLEPLYWOOD BACKBOARD WASHER SEE NOTE BACKBOARD DRYER [,I(NTO _._. __-__ # S8 - ioaTO IT CABINET (1) CAT 5 CABLES) 4 PAIR CAT 3 CABLES (1) 4 PAIR IT CABINET RCOr ° SS2 El PLYWOOD BACKBOARD CAT 3 CABLE - --- (2) CAT 5 CABLE m mTO IT CABINET TO PLYWOOD 1" CONDUIT WITH (1) CAT 5 SN RM ING) 2"CONDUITS STUBBED BACKBOARD CABLE TO IT CABINET A ACCESSIBLE CEILING SEE NOTE ACE FOR DATA WIRING 1" CONDUIT $SS4 /1 STUB 3/4" EMPTY SEE NOTE$SS7J (2)3/4" - I TO CEILING --.FOR DSAFEri ACCESSIBLE SEE NOTE CONDUIT FOR mrimrcELING SPACE # BURGLAR ALARM __ �I - -__ - VOICE/DATA - -----. - -- - - _- CONTROL PANEL -- 1"CONDUIT WITH (1) 4 PAIR --- N ( ! MI N CAT 3 1" CONDUIT 1 CONDUIT STAGING I +18" =- --- - -_� WOMEN TO CAT 5 CABLE I- FF-- I ion 4I PAIR CAB ES C L�TO IT CABINET PHONE CABLE WITH (5) CATCAT iaz OFFICE _ AF.F. ioa REFER TO IT CABINET TO PLYWOOD 5 CABLES TO ios tI SHEET BACKBOARD IT CABINET FOR TO PLYWOOD SEE NOTE WIRELESS \ +54" - --, 10 WIRELESS 3/4" BACKBOARD l A.F.F. $ $E2-2 2" CONDUIT ELESS CONDUIT REGISTER ONE ACCESS -� +48" I STUBBED INTO ACCESS 3/4"CONDUIT THRU FIVE —= POINT ACCESSIBLE POINT STUB (2) 4 STUB r 3/4" CONDUIT SEE SHEET.$ PROPOSED LJ CEILING SPACE PAIR CAT 3 , STUBBED INTO E2-1 FOR WIRELESS ACCESS FOR TELEPHONE PHONE CABLES ACCESSIBLE CEILING ADDITIONAL POINT LOCATION T (- INFORMATION SEE NOTE 12 r WIRING TO PLYWOOD i r SPACE WITH (1) CAT 5 $ L r , BACKBOARD i i CABLE FOR SALON -- �' "j �+", Lu —FIRE RATED PLYWOOD ' i 3/4" RECEPTION DESK TO BACKBOARD (�) i l S CONDUIT - - IT CABINET r (REFER TO DETAIL +54" ���-=-= STUB SALON 12/A-8.2) -1" CONDUIT -==a== -3/4" CONDUIT STU 1 ACCESSIBLE ISOLATED GROUND CABBLES ANDDOUBLE DUPLEX 4 PAIR CAT (TELEPHONE) S ACE N�THT(E)LING I �I F�;i:c � -'I � � ..... III, � ( �1 NTH ( ) STAGING PTACLES NTH CAT 3 CONCIERGE DESK (2)CAT 5 CARD BACKBOARD LE TO ADDITIONAL 12F0RA1ATI0N I DD DEDICATED CIRCUIT DATA CABLES 1" CONDUIT STUB WITH I�_ PLYWOOD REFER T$0 PAR FOR T PLAN ON 1-- J I, ®� AIR CAT 3 III 2Tp JUNCTION BOX FOR �MANAGER'S CABLEPAND (2) CAT 5 JUNCTION BOX FOR . w D CREDIT j_ iSHEET VOICE DATA WIRING DATA CABS FOR MANAGER'S PHONE, WIRELESS, CONCIERGE DESK I ►�li-�-X233 CUSTOMER COUNTER I' Q I ILL ® W FAX, POS, CREDIT CARD AND OFFICE AT FRONT DOOR OPTONAL/TRAINING ROOM - - --- -- - ----.-__ -. ------ --.. --------- -- --- ------- -- --- - n 9? ® CO ��' odd VOICE/DATA CABLING NO SCALE 9 VOICE/DATA CABLING NOTES is a c a aonN 1. ALL VOICE CABLING SHALL BE RUN WITHIN THE ACCESSIBLE CEILING SPACE 7. ALL CABLING SHALL BE FURNISHED, INSTALLED, TAGGED AND TERMINATED AND STRAPPED USING TIE WRAPS TO THE BUILDING STRUCTURE. DO NOT BY ULTA TELE DATA VENDOR. VENDOR SHALL FURNISH AND INSTALL ALL STRAP CABLE TO SPRINKLER PIPES, CEILING GRID PENCIL ROD OR FACE PLATES,JACKS AND PATCH PANELS. Q p_ CONDUITS t _ g o3na 2. ALL CABLE SHALL BE ROUTED PARALLEL AND PERPENDICULAR TO BUILDING 8. COORDINATE EXACT LOCATION OF DEVICES WITHIN MILLWORK WITH MILLWORK STRUCTURE UTILIZING 90'ANGLES IN CEILING SPACE. VENDOR. IpgQQQQS5 'o�vs 3. ALL LOCAL BUILDING CODES MUST BE FOLLOWED AND A SEPARATE LOW 9. ELECTRICAL CONTRACTOR SHALL LABEL ALL CONDUITS FOR SPECIFIC VOLTAGE PERMIT SHALL BE OBTAINED IF REQUIRED BY LOCAL CODE VENDOR USE. AUTHORITY. 10. MOUNT DEVICES AT 24"ABOVE FINISHED FLOOR IN BACK PANEL OF - 4. CABINET. / _ ALL LOW VOLTAGE CABLE/WIRING SHALL BE RUN ADJACENT TO THE � ,.�� �- -- -(�i -. - PERIMETER SOFFITS NOT MORE THAN 36"FROM DEMISING WALLS. 11. VERIFY EXACT MOUNTING REQUIREMENTS OF DATA CABINET WITH 5. ALL BACKBOXES, PLASTER RINGS,CONDUITS AND CONDUIT BUSHINGS SHALL ARCHITECTURAL PLANS AND ULTA'S IT DEPARTMENT. BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. ALL CONDUITS, CABLING, HARING, AND JUNCTION BOXES SHALL BE SUPPORTED 12. WIRELESS ACCESS POINT. VERIFY EXACT MOUNTING REQUIREMENTS WITH SALES �I INDEPENDENTLY OF THE ACOUSTICAL CEILING AND SUPPORTS. LOW ARCHITECTURAL PLANS. VOLTAGE CABLING AND CABLING SUPPORTS SHALL BE FURNISHED AND Lloi Revlslons INSTALLED BY CABLING VENDOR. 13. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL 0ISSUE FOR ULTA AL REVIEW ELECTRICAL DEVICES. CONTRACTOR SHALL COORDINATE ALL DEVICE 03 O6 15 6. PROVIDE 15' SLACK CABLE AT EACH DEVICE AND BACKBOARD LOCATION. LOCATIONS AND MOUNTING HEIGHTS WITH ARCHITECTURAL ELEVATIONS PRIOR ISSUE FOR PERMIT TO ANY INSTALLATION. �03/06/15 AISSUE FOR BID 03/06/15 A 3/4" CONDUIT STUBBED INTO 0 ACCESSIBLE CEILING SPACE (TYPICAL) ROOF PROPOSED I,. PRODCOCOUNTER)USTOMEEXACT Q 1" CONDUIT WIRELESS ACCESS LOCATION OF JUNCTION ACCESSIBLE POINT LOCATION_ BOX WITH EQUIPMENT Q CEILING SPACESEE NOTE VENDOR [ kSEE SEE SEE 3/4"C. STUBBED 6" CREDIT CARD-7 Davis L. IL E NEE ACCESSIBLE / X233 Dickerson, NOTE S8 $SS2 /r SAFE. r SS7 E NOTE NOTE A 558 CEILING FOR S --- WIRING BY 0 El E] BURGLAR ____- 1"C. $SS7 (0) ICI �I -- SEE NOTE ALARM EMS (�) (�) REAR J FRONT (�) (52) ---- J SEE NOTE CONTROL PANEL +54" +10' DOOR DOOR +54" +10' A SEE NOTE $SS8 PANEL SEE SEE JUNCTION SEE SEE 11$SS4 ... SAFE _.-_ _. --_ _.__._._._._-SE - -- NOTE NpTE NOTE NOTELj #SS4 #SS1 #SS4 #SS1 FINISHED FLOOR SEE NOTE _ BOX AT #HE2i2 $SS3 ; -_-- -REFER TO #ESSNOTE I,7.1 `. BONA L P ��j�0-NI,�G SECURITY SYSTEM WIRING DIAGRAM NO SCALE FLOOR PLAN - VOICE/DATA SECURITY SYSTEM NOTES, `y�l�X AND SECURITY I � SS1. PROVIDE DOUBLE GANG BOX AND TRIM RING WITH 3/4" SSS. ALL SECURITY SYSTEM WIRING AND DEVICES SHALL BE SCALE: 1/8"=1'-O" NORM ` CONDUIT STUB INTO ACCESSIBLE CEILING SPACE AT DOOR. FURNISHED, INSTALLED AND WIRED BY SECURITY SYSTEM ar ALL BURGLAR ALARM DEVICES SHALL BE BY BURGLAR ALARM VENDER. 0' 8' 16' 24' 32' " VENDOR. O5/'14/201': W SS6. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL SS2. INSTALL SINGE GANG JUNCTION BOX AT INSIDE OF DOOR ALL BACKBOXES, TRIM RINGS, CONDUIT STUBS TO FRAME ON LATCH SIDE WITH 3/4"CONDUIT TO ACCESSIBLE ACCESSIBLE CEILING SPACE AND CONDUIT BUSHINGS. Drawn By Checked By CEILING SPACE CONCEALED IN WALL FOR DOOR CONTACTS AT KP DD/AH EGRESS DOOR. ALL WIRING SHALL BE CONCEALED IN CONDUIT SS7. PROVIDE A 4"X4"JUNCTION BOX FOR "EMS SECURITY Scale Date OR DOOR FRAME. RELAY" ADJACENT TO SECURITY PANEL NTH 3/4" AS NOTED 03/OB/15 CONDUIT STUB TO SECURITY PANEL SS3. SINGLE GANG JUNCTION BOX AND PLASTER RING WITH 3/4" Job No. CONDUIT STUBBED INSIDE BAGKWRAP COMPARTMENT FOR SS8. INSTALL(2)SINGE GANG JUNCTION BOXES 6"FROM CENTER {I e /I SECURITY SYSTEM. OF DOOR WITH 1/2"CONDUIT INTERCONNECTION BETWEEN u 4 AND 3/4"CONDUIT TO ACCESSIBLE CEILING SPACE SS4. PROVIDE DOUBLE GANG BOX AND TRIM RING WITH 3/4" CONCEALED IN WALL FOR DOOR CONTACTS AT EGRESS DOOR. Sheet No. CONDUIT STUB INTO ACCESSIBLE CEILING SPACE. ALL WIRING SHALL BE CONCEALED IN CONDUIT OR DOOR 0� FRAME. 3m JDIVISION 15-ELECTRICAL 1.D5 EXAMINATION OF THE SITE 3.07 SLEEVES 3. Spacial Receptodes and Floor Boxes As Indicated on 10. Unlus otherwin noted an the Drawings,the following PART 2-PRODUCTS SECTION 16010 A All Contractors wlemitting proposals for this work are A. Provide coring In wells and floor Nabs for the passage of Drawinga. shall apply. 2.01 MATERIALS GENERAL PROVISIONS requested to visit the existing site. Failure to Welt the all conduits,pipes and duel.Installed. 4. Color of receptacle.to match switches(white),unless a. Convenluoe outlets shall be plocad an.spste A. All lighting fixtures.hall be furnished by Omar. existing.Its will In no way relieve the successful bidder B. Cored hale.in floor.hall be provided with Weewe noted otherwise. Color of Isolated Ground receptacle* circuits from motor and lighting outlet.. B. All lamps shall be furnished by Owner. PART 1-GENERAL from the necessity of furnishing any materials orextended one Inch above finished floc lewl and made .hall be orange. b. Mots shell be placed on..Perot.circuit.ham ► performing my work that may be required to complete work watertight. 5. Ground fault circuit Interapler to be provided for lighting ouUat.. PART 3-EXECUTION s" 1.01 RELATED DOCUMENTS In accordance with Drawinge and Specification.without receptacles outdoors.In toilet rooms,and within 6' c. Convenienc.outlet.shall not be Installed back 3.01 INSTALLATION A. The Guard Conditions,Supplementary Conditions,and additional coat to the Owner. 3.08 PAINTING of sinks. to back A. Fixtures: An outlet is to be provided for each fixture. n G°nrd Requirements apply to the Work spwmed In this A. All equipment,Danatboard.,switchboards,etc.,shall be K. Switch and Rwoplad.Plate.: 11. Provide lull size ground wire In all conduits,PVC r NI fixtures shall be located to wit the Archltecturol Section. 1.07 PRODUCT DELIVERY,STORAGE,AND HANDUNG factory finished In baked enamel or lacquer,or as 1. Plain In finished areas for switches and receptacles Metallic. Where the drawings do not Identify the size details of the areas Involved Unpack,assemble,sake and < A Exercise core In transporting and handling to avoid damage .Peclfled Standard factory Miehes shall be approved. shell be white finish or stainless steel plate,as Indicated of the equipment ground wire,It shall ba the same install all fixtures at the proper location.Indicated on 1.02 DESCRIPTION to fixtures, qulpmmt and material.. Any scratch.. .hall be neatly touched up by the lr,tallinq n the drawings, size as the phase conductors. the Drawinga. 'E A This Section define the General Provisions which are B. Store moterlata on the site se a.to prevent damage. Cantoractor. 2. Provide multigong r combination Plates for devices B. Motor and Equipment Wiring: B. Recessed Fixture Installation: Recessed fixtures shall be : common to all Sections of Dhlelon 16. C. Keep fixtures,equipment and materials dean,dry and free B. All metal work Installed by this Contractor exposed to the group.In gong r combination. 1. Unless Indicated r specified elsewhere perform the of type suitable for mounting In the type of celllnq a° B. Th.information In the Specification.and the Pion Drawings from delelrloue condition.. weather and not factory finished shall be painted with two 3. Provide In plated steel plates In unfinished following: edioduled an the Drawings. Varlet we to catalog numbers re basic focte to follow In determining a reasonable and D. Where time of Nectrle.l equipment and/or material.ore coats of all paint of color selected by Architect. roue, Connect and wire to each motor and piece of Indicated shall be made to assure proper mounting and espetltiw price for the disciplines Intended. The furnished by others for Installatim by Electrical C. All shish paintingg shall comply with th.Pa.-.Section 4. Identify all dedicated circuits with a loser printed c Neetrically operated equipment shown an the fitting amongamenta,prior to/aDrieatlan.Changges to be Dawingn and Specifications do not necessarily Indicate or Contractor.Electrical Contractor will be held respmdbla of the Spwolflcatl... adhesive label Indicating panel and circuit number. Drawinga or.s specified In than Specifications made by thls Divlalan Contractor must haw prior written describe each Item necessary for the full performance and for the unloading of such equipment and/or materials from L Cirwit Br .a: b. Furnish,(natal]and connect all.torten@, approwl from the Architect. completion of the particular work the contractor may be the delivery truck. He shall check equipment and/or 3.09 CUTTING AND PATCHING pp 1, Circuit breakers shall be as maanarnufactured by controller selector switch.°,pilot light.. C. Supports g blddng. Then tlocummta proNtle lM general Intent material.upon receipt and rattly prlyy fumlehing Item of A. PWorls,exclptuwhari anspeciflcdly gshroeqnulrr the Arto mchltecturd 'nlf iyp°ana manufaeturr to mare D. latchc or azietbig fora Nachkally operated equlpmwt Mown onuttona�station.for each motor d piece of 1 Ne bulldinq fixture conalructlonl be. Provide soaplorr orted fr� necessary to Inform the contractor of the Owner's desire any damaged or missing equgmmt. Ha shall coardinat° or for the eyeteme required for Electrical. Contractor shall Installation with Contractor providing equipment. or Structural Dmwnge. exiting ponds. Drawinge,or ad specified In the Specifications, hanger., tams and extra stool work for fixture vhlt the aNe prior to bidding to became Be llar with the B. Refer to Section 010 0 for additional requirements. M. Motors,Control Panel°,Etc.,Furnished by Ochre: M..otherwln Indicated. nuDDorl where required. existing conditime under which the work shall be 1.08 GUARANTEE END OF SECTION 1. Check the Drawings and Sp=d.tim.cowrinq all a Fumish and install all wiring from the current 2. Confer with Coiling Contractor to detmmln. performed. Failure to Inapsct th.site will not be A Provide one year qpuz ro toe far al fixtures,equipment, branches of the work to awrtaln what equipment I. source to all starts and from starts to m dlficatlon required to make fixtures w[table for c eidered justiflcotlon for an adju.1ment in contract mstries antl workmanMlp,upon find acceptance by Owner. SECTION 16100 furnished by others. It will be this Contractor's motors,excel In the can of factory Installed Iling.e Inalalled. price or!allure to perform the work under this contract. BASIC MATERIALS AND METHODS responsibility to fumlsh the nicessary,labor and wiring packaged.qulpmmt. sun to the line.Ida 3. Whore r...and fixtures are called for,each hall be C. Work for PART 2-PRODUCTS abide to receive and wire sold equlpmwt.Check f all pro.lred equipment. provided with the proper pia.ter from.or suitable I. All mlectried work herein specified and/w shown on 2.01 MATERIALS PART i-GENERAL the Plumbing a d Mechanical Drawinge and Division 15 d. Furnish d Install a decmnact switch ah.ad o1 adaptor to rwoelw the finished ceiling construction. Drawinga union noted otherwise. A, It far te IndWduol Sections of Division 16. 1.01 DESCRIPTION f the Spedflcotions carefully for wiring by the all prewlred package equipment. Coordinate with 4. Whore wspwdb acoustic cite ceilings on.test 2. Installation hall be complete from lotion A This.wit-define.the Basic Materlal and Method.which Electrical Contractor. Mechanical Trade.Contractor. channel°ocwr,outlet`and fl.tiam shall be designated by the Electric Utility Company o.point of PART 3-EXECUTION are common to all Sections of Division 16. e. Install all roughing-In pertaining to each item supported an members resting an the channel framework. Q^ Ncs.- Ilan,to the final onnection 01 mots, 3.01 INSTALLATION/APPLICATION/PERFORMANCE/ERECTION PART 3-EXECUTION of equlpmwt famished under other Sections of In no see shall fixtures be supported from plaster r (JJdt fixtures,device.,apparatus r piece.of equipment, A. Excavating and Bwkflllln PART 2-PRODUCTS 3.01 PREPARATION NSTALLATON/APPLICATION the SDaciflcatlana or by the Owner. Location°of aeou.tic material. y� lees modifled b Drowln s r these Speclflcotbns. q q' 2.01 MATERIALS declriwl outlets for this equlpmwt an 5. SuaDmd.fixtures shall be hung on wpmnlon hangers CS Y 1. The Elwtrlcol Contractor Mall do all exeawthq and A. Conduit: 3. Th. Electrical pawing,on Specifications shall be backfillinq required fr the installation of any and A Condult: 1. Installation-All conduit shall be sized in Indicated the Drawinge in their approximate furnish.by the fixture manufacturer and shell be understood to cover complete Aeratingg.ywtam. Tha all parts of his work requiring excawtlon. He shall 1. Elwtrkd Metallic Tubing: EMT,"Thlnw.11"condull a«rdmee per local codes: loc tion.. The supplier furnishing the equlpmwt ad)uet.as necessary during installation to Insure Drawings end Spedflcotlons ore to be token together. also do all sheathing and broeing required for the shall In general be utilized whore parnittad by Code a. Conduit to be run exDned in unfinished arsaa will furnish dimmalonol drawings..ur.tMy that all flxlurea In the sum.roam or area we at a Work pacified and not shown, Work shown and not Installation of his work.He shalt provide and parole .xept whore dearlbed herein. Minimum size conduit wen as mechanical,alsotrlcul room,and locating all roughing-In requlmd for him uniform height from the floor. Mounting height.hall specified shall be performed or furnished as though pumping equipment,If required,to kep the trenches shall be 3/4",unlna otharwlu apeclflcdly noted janitors'closets used..'electrical clouts. equipment. tea es specified detailed or noted an th.Drawinge. mentioned In both Drawnge and SpedO«dons. free a1 atwdlnq water. All work shall comply with otherwise. All other conduit shall be concealed. 1. Receive,set and align motors which are shipped S. My electrical lighting fixture which wel;.more than 4. Minor Items and acce°arles reawnably Inferred a° a iremts Icon In Section 02200. 2. Heavy-wall ataoi cmduit and I.M.0 Mall be either hot b. All conduit and wirin loose if Iee.l union or trade jurisdiction -pounds Mall be supported Independently of the zap� m.cesaory to the canplem and proper r qu q g shall be concealed g `N operatlm of any 2. The above shall Include all ezcovotlm of awry dipped galwnizw a herardizw. wherever possible When cmduit and wire cannot reacts.req.lres dole w. tlet box. �s _ I- . ahall be provided by this Contractor or character,IndudInq rock,if meounter.. Contractor 3. Flexible eondult shall be heavy duly steal Greenfield be wnual.,oblate direction from<he q• fQrovide W contend circuit and interlock wlrhq G Fixture Wiring: VI SLL UDcmtraclor for wen systems. ,hell Nalt the premises and determina for himself,by type except,whore r at to oil,grwa0.or water- Mchitwt. No wrtau mounted dondult,wiremold and emnectbno for all mwhen equlpmwt as 1. Fixturss shall be wired with white wire for the D. Description of System°: actual observations,boring,or other mean°,the then emdWt shall be Sealtita. or power.Palen well be o«aptabla,unlaaa Indicated and whedul.d on the Drawinge. neutral and colored wire for phase wlrea,see Section 1. Complete power wiring from existing panalbow a to nature of the soil conditions. The coat of all much 4. Plntb condzit+hall be PVC Schedule 40. .Pedfkally Indicated m the drawinge 2. If a dleeonneet switch la required by the enforcing 16100. motorized equipment,motors.equipment eabinete,and Inepwtione,Daring,etc.,shall be borne by the 5. Conduit Fltlinga: c. Run porallN or perpendicular to exterior walls code and not Indicated on the Drawings or In Ns 2. Houehq of all fixtures moat be grounded to conduit p n n n iscalloneoua outlets. Contractor. a. Rl &IMC: Threaded. of Dulding. Speciflcotlons,It shall be furnished and Installed. system. W8 0 sou 2. Genrol wiring for power,lighting•and mlecdloneoua 3. All excavation.are to be w conducted that no walls b. Thin-Wall: Compreaelm Type. d. Locate to avoid equipment.fixtures,ductwork, 3. Whore mpeclflc I«atlme of switches and torten s 3. Each fl.tun to D.compl.te with holders,ac PV Yet-.. feelings shall be disturbed or In)urod In any way. c. Fle.lbla: Connwlor°MNI be compatible with piping,ate. of shown an the Drawings,them shall be placed now sockets. 1r. lamps,etc.,as Is necessary for a n n n 0 �s 3. Materials and equipment for electrical work. 4. Remove all surplus worth not needed for flNlny and flexible conduit send. e. Layout and h,tdl work in advance of the laying the motor. plate inwiallatim. W 'Y/lydZ' 4. Motor and equipment wiring. dispose of sane as pecified under Section 8221X1 0! 6. Conduit.hail be as monuloclurod by Allied,National of flo.re,walla etc.,and advan and the la E. Operation and Controls: try 5. General and ernergmcy lighting ond power eptama. the Spwlfla.ttan@. Electric,Republic or Triangle. II deevsa that may tea required for opminpe C. Conductors,Cable`: 1. L«al.wit as shown d wired. 2 8. Wiring of equipment fumlehed by other.. 5. All backfNlinq`hall be lnsughly tamped and settled 7. Flexble Ilquls tight conduit a°manes/actured Dy through flows,walls,etc. 1. Except where otherwise Mown on the drawings all 2. Exit and direction al nobe constantly on,and 7. Moir and equipment,Including Starters It requlr.. In.manner ae le proper for the particular type of M. canda,Slmplew,or 1. land Metal Hue. i. Whre conduit Is tobe run exposed,furnish and wising°hall n Icabin h conduit. wired oe Mown. e. Empty conduit stub.and backbone for telephone work. & Provide an Ineulatin bushing for all carduIta Install II Inserts and clamps for the supporting 2. Conductors and cable shall not b.Installed In END OF SECTION I� yet-. 6. Where it 1,nsceeaory to install work in or arose contalnhg d'4 end orgy wire as wall an all conduits f conduit. conduit r raceways until same are free tram maleture Ir� p qy 9. Reconnection of all relocated electrical equipment road.,pawmmlm,curbs,sidewalks,etc.,this 1'and larger regard me of the elze wire they q. If contractor don rat prap.y install all and debris. SECTION 16620 �✓J elsevn and inowt.he call be required to do the EMERGENCY LIGHT AND POWER (samara applicable). noel.pavements, shall restore the present.metructim to contain. 3. Lwow a minimum of six Inch(6')length of cable and ®CO 10. Power and empty conduit system and backbone for Its art .1 or better condition 11 disturbed by his S. Wires and Cable,: neeeesar tong and patching later at hie own conductor Week at each outfit. Own-eeourity.yet-. io y cut 4. All wire shall be type THW or THYM copper. PART 1-GENERAL f _j I� IT prat n l no addlllmcl ant to the Owner. 1. All wire shall be type TMW b 7HWN copper. expense,and to the satisfaction of the D. Expansion Fittings: 1.01 DESCRIPTION J� Ir 11. Power and empty conduit system and backbo.ea for B. ApplkcUm,Inat.11atlm: 2. Wire amdler than�B shall be wild; /B and forger, Architect. A. Install all exit.I ns end batter senor a If to a. .�I LL Owners computer system. 1. In the event that conflicts,if any,cannot be settled .trend d. h. Do not obstruct openings or passageways. 1. Expansion fittings shall be Installed In all andulte r y Deny gh �LL p 12. All other equipment,material,devisee,acuearin rapidly and amicably between the affected trades,with 3. Where light fixtures are wired In continuous rows. 1. Where condult pame through flacn or through orn.ing expansion pints. Refr to Areldteetural shown the Drawings and required by all gowming `E�' required and/or shown on the Drawin a work .ding Ina workmanlike manner,than the wire lled throes fixtures shall bat a SF2. drawhgn for Iocallme. authoritesm having yrl.dktlan. q per«s Pu qh yap airs and fire walla,pace between eondzit end l� i uh 13. Arrange for sources of temporary construct Architecl/Englnamr shall decide which work la to be 4. find cmneetim.N hooting equipment where shown, floor or well shall tea fill.with cement grout E. fire and Smoke Partition Penetrations: 1.02 SUBMITTALS _9 Z 3.services. Such services Mall be nominally 120/208 ref«clad and his judgement shall be final and binding type SF2• j Radius of bend.shall be not less than six 6 1. The Contractor shall familiarize himself with oil fire phase,3 wire from which to a tam of n this Contractor. 5. Cable and wire shall be as manufactured b Alcoa, () rated emeWctlan red Install hla work so as to A. Requkemente of Regulatory Agency. Obtoln any and all plan ��ii w DU n� salt,1 pla ye Y times Internal diameter. My run of conduit a rovd.as a Ira b th.outhwitle.which haw �J P(- temporary power and lighting shall be Installed for 2. No measurements of a Drawing by wale shall be used as Anaconda,General Cable,Triangl.,Slmplu,Hatfield, Moll not Include more than the equiwlmt of maintain the Integrity of the fire code rating. pP qu Y all construction nnds and ae required by the a dimmelon to work by. The Drawinga are not Intended Bell,Alpha,and Coleman Cable and Wlre. four(4)quarter bend°. Maintain rating of fire rated and smoke rated }zriwktion over this Project,prior to start of work. occupational fat d health departments. OSHA to show complete or accurate detail.of the building 8. Unless.peclflcally noted otherwin,all wiring shall construction.9 shall be°tail o y an ap (OSHA) 9 k. Provide onpa int.. flttlngs for all conduits at PART 2-PRODUCTS Temporory service shall be removed wpm completion of In y upset Exact to«tlonm and rdatlona era be Installed in c dWL expanoion Joints .for b m piper h Nsewa similar to Pipe floors. model Inc. ° and aman for bare I through 2.01 MATERIALS AND FIXTURES cork, to be defined in the fold and shall be satisfactory 7. Layout branch circuit wiring gomml of home pee q fire walla and floor,model y economy efflcimc ,nor wire 2. Cuttng Conduit: 11F8,DFB or DDFB. For plastic pipe,us.t WEB with A. Can Basis flttlnga.wire,etc.,Mall be In accordance with 14. Cutting,patching.excavation and backfill and to the Ar .measurements ants an Thh Cmlractar Mall take rvns for maximum y. cut YPe size if-ta s drop exceed°"'or 100 ft In Im th. a. Measure and win conduit from job site condlllone, one Inch thick tddum two fast b.ulatlm a ofir In appllan Seaton of thlm Spedfkatlon. concrete work required to comphts lh.work of this all field me.auremmte and.hall be rnponsibh D p g not ham Drawing.. e. Exit and Direction Slqnr .eetim. B.deflll Mall be cspeetad to w95Xork of therefore. C. Color Coding: Cdr coslhg shall be used throughout the metal Nnw.xtmslon two hat.�ther side of fin •)�' mtln electrical system: b. Conduit.hall be cut equre and butted edidiy rated all.or floor. Seal annular pace around 1. Shall be U.L approved. d o atondartl campwtim. All asi.tin surfaces shall tea S. Compare Drawings and Speelfkallons,checkhg all Yo Into flttinga. eandulh. For fin antl smoke rates flcore,walla and 2. Colored kitten on whit background.(Color per the o�'" patches or replaced to'Uke New conditions. meawremmte and determine Intent of Contact 1. 'A"Phan-Black-all gauges. c. On rigid condult.cut ondult full d clan with y.G E. Related war,to ba cam let.b other.: Documents. Discrepancies shall be brought to the 2. "8"Phase-Red-through . Larger black with phase M dies.Ream and.o/pipe after cutting Partition*,use UL Ilelw material that malnlaln.tics Ideal Code Authorlty). �,) p y o e9h q rap D p 9 and oraled ell and flacr integrity,similar to RTV foam, 3. Directional rrow.a.required by local Fir. W�_•^ 1. Telephone system wiring. Architect/Engineer's ottmUon for Interpretation marks. before asnmbly to remove burro Dow Comin "Flre St r Pipe Shields,Inc. madN Protection Bureau.2. Computer system wiring. prior to any In.ldlatlon. 3. C"Phan-Blue-through y6. Larger black with d. Ream thin-wall conduit(EMT)after it is cut. g ap P 4"1 v"'; 3. Temperature controls and thermostat wiring. 4. The right 1,reserved to make any reasonable change in phase merkera 3. Li uid TI ht and Fl..ible Conduit: WFB,DFB,or ODFB. For non-rated walls and L. Color of trim ae aNaet.by ArMil.at. x� L. Flora alarm system b vendor. location of outlets and equipment for to rou himy h 4. Neutral-White-through Larger block with q q partitions,us.mineral or gloss fiber Inwlatlon. y p o p ys y owner equlpm per g g gh/B. 9 phase a. Liquid tight flexible cmduit shall be Installed END OF SECTION PART 3-EXECUTION = o--aa F. Do Ilion-As used within the Contract Documents: without Involving additional epmse. Any change from markers. In such a manner that liquids tend to run off the a I a a q 3.01 IN. Furnish 1. The trm"Contractor"shall be al Subcont to mean the the Electrical Drawinge as Is neue..ry to make the 5. Gentraing Win-Green.Inwthan surfaces and not drain toward the flttinga S'� ;$00 Electrical Contractor or EI.eVlcol Subcontractor. work of this Contractor cmform to the building as 8. Central Wire-Colors other than.bow. b. All rvns of flexible cmduit shall be.e short ae SECTION 16400 A. Fumhh and Install all yanN0.condulb,hwaro,branch b l SERVICE AND DISTRIBUTION circuit.king,etc.,with gram ground win required by y e u 2. 'Circuitry"shall mean on electric work(not limited constructed and to fit tiro work of other trades shall D. Wks Pulling Lubricant: Use of wire pulling lubricant la aetide L, :- men 5 m a y per (maximum of B'),of the same size as to light and power distribution)which co^aimte of be included In Contractor'.Contract and install. apt but,If needed to prevent damage to the the condult R extends and with mou h slack to Code erg a.shown on the ..steal.. I-z without extra cost Y dun the affects of vibration. A m nlmum of 24 PART 1-GENERAL B. All emergency spacer branches shall be installed In conductors.It must be listed b Underwrite Laboratories 30 sakes,sables,r«°ways,and/or nDecblty wiring and be of each coneletmc that It will leave no }sill RELATED DOCUMENTS s.Porata candulb. . . m meth.assemblies taken all together,complete with y Inches of flezibla condull shall be Intalled• A The rd or Contlltlona,Suppl.mmtr Condlllana and END OF SECTION U �.. 3.02 FIELD QUALITY CONTROL obstructlm fee In-that wll prey t pulling out old c. inhere the fittIn s are brow ht Into on wol.aure y m qvx cowl led junction boxes,pull boxes,outlet boxes, Ire.or pulling in new wires or additional wires. q t General Requirements apply to the Work specified h this �.7 A. Testing: Pu 9 with a knockout,an Insulatetl throat type fitting Sections SECTION 18720 JdnN.couplings,pike.and ring byma, apt E. Electrlcal Corrections,Terminals and llcln shall be In whore Iknit.to o laser meanies b Ilk 1. Altar wires are in place and connected to devices and a SP y with Ilqub asalIng"0'rim Mall D.see.. B. Section 16010."General ProNebna-Electrical',applies ALARM AND DETECTION SYSTEMS q y°p1C equipment the a tam shall oa test.for shorts and dams with Swtlan 110-14 of the NEC. Connection DD description eq p y8 materials and Ipmmi must D.yIcon d. Flexible metal dull.hd tea Installed for all to the work*pacified In this Section ground.. equ p y special ottentlm findequipment cann etlons to transformers, PART 1-GENERAL S. 'Wiring'shall mean the some as Circuitry. 2, All hot wires.If shorted or dad mhdl be when using dieelmilor metal conductra,etc. 4. "Package Unit"shall mean an Rem of equipment having groun light fixtures(lay-In type)and all other 1.02 DESCRIPTION 1.01 DESCRIPTION removed and replaced. P. Outlet,Pull and Junction Boxer. devices where ma required. Maximum of 6') A. Work Included: A. Work Included: on.r more motors or other electric energy consuming y, q each 7q Mt shall be made at the last outlet on 1. Boxes shall be 12 gouge or heavier steal,`hercrdlzed qu r :he Integrally factory mounted an a.Ingle ban, each ckwit If drop in potential le excessive, or galvanized to prevent rusting and shall haw 4. Type of Conduit: I. Existing current tranefmme cabinet shall remain. I. Provide necessary cmduit and Dower for alarm and complete with all associated control davlces and Contractor will be required to correct the condition readily removable knockouts, a. The following shall be galvanized steal 2. All enargu by the Local Utility Company for detwtlon.yet.me. This shall only Include the following: interconnecting wiring. by locating partly grounded conductor or high 2. Pullbozes and pull flttings shall be accessible with heavy wall condull: cmmlructiw related work. Owner charges will be paid a. Dedicated 20 Amp.,120 Volt circuit(e). 5. "Normal Electric Work Cwdltims"means locations nsislone*Alice. removoble covers secured with broom machine crew*. 1) In eth fill. by the Owner. D. 3/4'.do (empty)to each door contact,silent 0 within building conMse which are neither dump.wet. 4. All grounde,short°and high resistance.dose.hall 3. Junction bo.e.shall be minimum a square r oatogon, 2) Expand In wet areas. 3. Syslam Grounding par the load Utility Company and the duress dorm,camera and keypad. nor hazardous,and which ore not used for air be rectified. not lees than V deep,dseper If required by the 3) Ezpond outdoors(Provide watertight N.E.C. handling. 5. My wiring device,electrical apparatus or lighting number of wire.or conntructim,with appropriate fitting.k boxes). 4. Existing panelboards shall remain,by Landlord. PART 2-PRODUCTS (REFER TO OTHER SECTIONS OF THE SPECIFICATION) 6. Racowail shall mean any pipe,dual,extended flxtura furnished under this Contract,If ground.or .own. Provide with 3/8"stud where lighting fixture 4 Outside mownry,walla. 5. Provide new circuit breakers of type to match nlatlng en.wo) .condull a specified d for particular as required far complet.di.tributim system.refer to One PART 3-EXECUTION (+ D P short.an any Integral'live'PorC all be removed Is wpmdad from be.. S Within building confines run In concrete Diagram note°far additional Information. 3.01 RELATED DOCUMENTS Revisions system)which Ie used to contain wir-,and which le and th.trouble r.tlfied by replaoing all defect[- L. All°witch and reset«le outlets shall be equipped Nab. 6. Existing wo dory 120/208 volt.3 ph....4 wire.60 A. All conduit and wiring requirements shall conform with ISSUE FOR ULTA REVIEW of such nature u to require that the wires be part.or matrlal.u directed. with minimum 4"box. Gan bozo shall ba m,Idw 8 Ex osed In m.chanlcol rooms / / n-L Installed by a'pulling In"procedure. 6. Service round to be tested r Notional�ectricd where 9 ) D hertz service Section 16100,"Basic Maleriale and Method°"of this g p groups of switches occur. AlAll boxes shall be 7) Fudr cmduit for panNbcorda 7. Existing twont metering to remain,by Landlord. speclflcation. A03 06 15 7. *Canc-ceal.e(as aD011.to circuitry)mwona covered Code requlrement. Grounding pole of all receptacle@ .he ad wIN proper raised covers,mounted at hNghb Couplings for condull run in poured concrete END OF SECTION ISSUE FOR PERMIT completely by bull inq matertala,ucpI for to be tested. shown m Drawinga,r as directed. The opproxkna a shill be concrete tight. PART 2--PRODUCTS AD3/D6/15 pmalr.tione(b boxes r fittings)to c level flush 7. All motors MNI be teat.under load with star I«alien of ouG.t bozn h Mown on the Drawinge,but b. Conduit run in dry arms within building confines y g) 2.01 EQUIPMENT SECTION 16700 with the surface as necessitated by functlmal readings taken In each phase,and the RPM of motors cam.hall be taken to Install all outlets with proper shall be EMT. Dr In Ids ortitlanb, ISSUE FOR BID recorded al the time.All mots Moll be Nmtw for relation to y areas are D A. Llghtinq d Application Ponelboardm: COMUNICATIONS A03 O6 TS specified acceseibllit requirement.. Unless directed equlpmwt or material to be Installed by ceiling covilles and area.not suDJect to smogs. y raga 1. PanND«ends an NDIsh.and Installed byy Landlord. / / otherwise,all outlet Doxee in walla are to be correct direction tatlon. Electrical Contractor other trade,. Spwkil outlet..hall haw proper bo... Outside walla are not embed dry area.. 2. The Elwtriwl Contractor Mall balance oil circuit`. PART 1-GENERAL Q sled shall be responsible for testing running of all motors to accommodate special equipment. Outlet boxes In c. IMC may be used in.bow grade floor°lobs of All ductare shall be contlnuou.without splicing 1.01 DESCRIPTION G. F...and Parmlla: and shall rify that proper overload devices how ma°mry shell be or proper depth to allow onduit to size 3/4"only from last outlet to their terminal.in cabinet. All A. Work Ind.n.: 1. Obtain all its and II inspection fees team Installed. be Installed without cutting of shell of blocks,eta. d. Where permitted by local code.run conduits under circuit conductor In cabinet shall be Installed with 1. Empty conduit and boxes far wiringinstalled b Q p1R° pay o B. All matan,Instruments,cable eonnactime,equipment 5. outlet boxes shall be as manufactured b A Istm, floor slabs and In contact with earth may be sufficient amount of length to reach the most remote w y'e odor, y roquk-d for the complete Nwtricd system. equ D Y PP r.shed `necessary r for mt hislng all leate,shall be Stain City,11 ex or Crown iHinds. echedule 40 PVC. breaker connection from Its dnt o/entrance. 1.03 QUALITY ASSURANCE fumlM.by all Cmlractar at his owns pence. B. Boxes for all exterior conduit,or conduit mounted in P B. Work by Telphme UtUlty. 0 5. Supporting of Conduit: 3. Contractor shill provide a directory of circuits for 1. All wiring for tit hen.Instruments.A. Oudiflcollons: 9. Contractor shall submit Dracf of all tealm to the exterior walls,shall be wet Iran bozn,type"FS"or a. All conduits must be Inds endently supported from cabinet. Dlrectr .hall bet ewrlttm design g ep Architect before final acceptance of the work. D Y Yp 9 gg 2. All telephone Inatrvmmta. Q 1. Orely nes products call be accptabls unless otherwise "FD",as manufactured by Crouse-Hinds,Appletm,Pyle structure.Na condulte shall be wpporlot,from ram or equipment,circuit numbers and any uistlnq tea. Nallonol.Or Klllark and provld.with gaekatad the wntllating ducts, iling hangs, ciroults to remain. Directory frame are to be sever. .PART 2-PRODUCTS 2 The Electrical Contractor and his Subcontracts shell 3.03 ADJUST AND CLEAN tarlight coven. fittings shall be pull typ.with mach.nicd piping r their hangers. to innide of door anal trim In such a mmnw that 2.01 MATERIALS A. Cleaning Equlpmml,Completed Work and Premises: After the only employ workmen who are,killed In their completion of all Inwiallatbna each a tam Mall be guk.l d covers. b. All rface rvn conduit one Inch(}')and smaller screws,holes or welds,eta,ore not visible on the A. Cmdults,fitting., d outlet bane°shall be as ,,�� 1,-,I. mepeclhn bean. ° G. Disconnect Switches shall be supported y Flw feat with one hole door pond trim. helnbefre peclflw In Section 16100. DdV15 L.. 3. All equlDmmt,matrlal,fixtures,device.,articles, thoroughly cleaned to remove all pa[n of and other 1. Switch..shall meet NEMA molosed switch standards etrap.with clamp books. Perforaletl.trap 4. Where 2 or 3 pole breaker unit.ore cdlw!or,they B. Wall bozsa to tea flush,4"square,calm extension rim. accessories or product.Includes In the Contract shall foreign matrlal. Contractor Mall also clean all foreign KS1,current edition. Switches shall be quick-make, hung..will not be permitted. shall be me unit with common trip and not oingle pole qq Dickerson, �«,,,,,,., be of the exact make,modal or catalog number,size, point,green,all,dirt,label°and°tickers,etc.,from guide-break,o that operation of the contact°.hall e. Hong- an a shall De proportioned for the weight of unite with handle then. C Dell o/main busies MNI C. Telephone System Grounding Conductors: Furnish /B AWG, all fixtures,equipment,etc. Th.Contractor shall r ovs 9 D cps 9 ap Y ap q ring ductor from ch tat seMcs pE form and of the cheraclerl@tles specified. b not be capable,during normal operation of the esltch, the cmduit s)supported. All rode,damp. be as shown on the Drawin e. pp wMzais.ah.zn ioursv o B. Requirements of Re ulator Agencies: all rubbish,debris,etc.,accumulated from his aperaUme of bein restrained b the ratio handle aNar the ( q equpmat to re.pective dwotricd mrvfce grounding 9 Y 9 D Y operating antl/or hangs shall be golwnizw,bondriz., S. Branch circuit breakers shall b.proNdw by this ahctrod..ystrrt. 1. All electrical work shall bs h accordance with the from the tim: se. opening or closing f the contacts has started. I t d or 1 t d Where factor su II P Y National ElacMeal Code N.E.CJ,(check with local B. Dammelratim: Al the eonelu.bn of the work and before 2 All wfat Itches shall tea haav dent of voltage Pa a pane. y pD.d,with circuit for all anNboardm Wmishad b landlord. D. Telephone/Computer Cmddt System: Fumhh as Indicated on ( Anal contract pa ant h made dsmmNrote ands lain to y°W y of the bow rust me]'nl flnl,he.,all Ciroull Dnakere,monu}acturer,model numbers,AIC the Drawing.,Including the following: inewtor for edition),and other governing bodies yT° "p lchinq equipment arwd,NEMA 1 or Irdor use and field cute and threads ors to be Fainted and nth a andl be type to match landlord°provided go D th.UNnq Agmcyfe persannN,the Nnetlon,operation and NEMA aft for outdeer seas. Swilchen shall be oa q 1. Tdphone service conduits for underground sashes. hich have yrt.dicllon over this pm)wt. overed with a grey finishing P.I.int. .qulpmwt. 2. Other conduit.a.Indicated an the Drawin . Ace. mahtmance of all equipment and system°installed by this monufacturod by Wnlh house,S an 0,or Stemma g 2. Whore applicable,all fixtures,equipment and Y 9 W d. Trapeze type hen a may bs used where several ll14 AWG wit Irm pull wire or heavy aNm cord in Divhlon of the work and provide a copy of all test. H. Funs: FumIM and Install all tuna. Funs shill be PART 3-EXECUTION Irlala shall be.e approved or Ihl.by the artmm. condulta occur a the same elevation. The each cmduit far pulling the tetaphons debts to each following agencies D Buemman"Fu.etron",dud element,ourrent limiting type, .Pacing of each trapeze hanger Mall De 3.01 INSTALLATION termination point. a. Factor Mutual Laboratories. C. Prater all equipment and system.against harmful exposures union peclficoll not.otherwise. A. Croundln p y ^ Y delmminod by the elecMcal code spacing 9: S. Gullet boxes with a 3/4"conduit stubbed Into b. Natimd Flre Protection Association. to,or accumulation.of dust and moisture.flacdlnq, I. Switches: requirements for the mmallest conduit In the run. 1. Provide an electrically continuous ground arystem from e. Under 1 we Laboratories,Inc.(UL) corrosion or other farm.of damage and clan and restore 1. Except whore olherwlae+peclMd,wall.witches shill e. Approved type inaarls for wpprt of work h cast existing.rvlce ground to all points of utllizatkn. acceeelble celllnq apace with pullwlra for caNInq byy damaged finishes as may be required to place Installation. be mounted In sultoble outlet bowel In the walls, construction. In general,all pieces of electrical .the. Provide separate dedlcatw candulta for P.O. �"" ",.,, d. National Elm Manufacture A..«btlan or canasta equipment shall S. Iinee.(Do not.hare with other telephone or auto NONAL B In a"like-new"condition before acceptance by the prtltl.ns,or ae Mown m Drawings. f. Approved type steel beam clamps In the saes of be grounded as required by Federal,Slats and Local /9 r1' (NEMA) Architect. 2. Wall switches Mall be located am Indicated an the tee! P Codes and re ulation%but special attention is called lh°a) �y \GENSF.C/ Amaricons with Dla.bilitles Act(ADA) @Nit construction. q D 4. No Nectriwl condults or / C. Allowable Tdrances: Drawinge,a ged ingly or In gangs and of the 6. Whore hdss or recesses must be cut In wall.,floor, to the following Items to be grounded n Indicated: power wiring shall pace over 3.04 SCHEDULES height epeeifled Indicated d shall have a. Conduit and other metallic roeewa the tetecammunl.atl-.of...I and panel.,except for tY m 1. Review Architectural,Structural and Mechanical A. Equipment Schedules Sam Drawings for achwulea of proper eailing0.or any port of the building to admit Y+• Drawings for all d[mmsiono,locations.partitions and coven with finishes specified herein. Switches shall apparotua,cmduit or other work of this Contractor, 2. In general where grounding win h shown use green teleeornmunicotim.roe 119ht fixture.. a .y p ee lighting Postures,switchboard,pandbcoas,distribution be as follows unless otherwise called far an Drawings he mu.t haw Il done by a competent mechanic In a nwt color. 5. Contact Crolmt National Green town/Ult.Project 1 walla, trvctural details,and location of mechanical equipment.and related Item., r hereinafter.pwiflw. (Contractor Malt check and workmanlike manner. Ths.portions cut must be END OF SECTION Coordinator at(800)D33-D203 to fully coordinate O n pipes and ducts.o that the electrical Installation eta low v 33 Inat.o full. 9L. .hall be In harmony with that of the ether trades. 3.05 APPROVALS architectural drawing.far additional Information.) re.tored to their original condition at the expense of entire Tole/0 ga 2. Exact alze,location,and decVical requiremenh of A. Obtain all permits and a Is horn the In bodies a. Light.witches shall be toggle 20.mp,120/277 thla Dantr-I- ThI.Contractor.hall provide for SECTION 18500 is rF.OF� �Q- fum[shad by other trades and wired by this P op row Drojec gowning Volt Specification rods. II of his own cutting and patching. UGHTING SYSTEMS AND CONTROLS PART 3-EXECUTION Gy', equipmentwhich haw jurisdiction this t. yy ° _ Contractor shall be obtained from the Drawings of the b. SPST Hubbell`1221;P h S Y20AC1;L.Aton/1221 7. All conduits run h or below any grade dab shall be 3.01 INSTALLATION '..;,.- ',- Coother Contractor a. e. 3-way,Hubbell/1223;P&5/20AC3;lwNtm/1223 heavy wall card and entirely encased in 2"of PART 1-GENERAL A. Furnish and Install conduit system as shown.Cabling and ( � 3.06 IDENTIFICATION AND TAGGING }sill DESCRIPTON final cmnectbn to be by the owns subcontractor. The - A. Provide all distribution d. 30A-SPST Motor Dbconnict): Hubbell 031;P @ cmcrets. In no ease shall conduit be laid In fit ----- - -- --- 1.04 SUBMITTALS Itches and/or circuit breaker°, S/30AC1;(Motor /3031. Coordinate location below siab. Conduit.from ae plastic shall be A. Work Included: system Mall consist of telphona/data outlet.In locations s, :e. eve etc.whether IndiNdudl mounted In oneibeerds 1. Installin and wirin htin fixtures as shown on A. Shp al for all fl.tums,equipment,materials,etc., starter°' y p with mechanical trades. schedule 40. 9 9 l9 9 a`Indicated,branch conduits,and all accessories required I),5 �p 201 (l`, I 101.`i switchboards,.to.. with @ultabls kNntlflcatbn. The Drawings,Lighting Fixture Schadul0.and as famish. Dy the tNaphone company for cam lets Instellatlan. �' -- �'. shall be submitted an specified h Division 1. 3. Verily door swinge before in.lalllnq ewitchboxes and 8. 3/4"D.minfmum cmduit shall be provided in all p - -- B. Initiflatlon•mahtmance and operating manuals and designation,using proper nomenclature,shall Indicate the Install the Doses on th.latch Ida of the door unless an-acuesiDh construction ch e floc dabs, be the Owner. END OF SECTION '�n*r 1.11 ion riper,on err lead earwd. Provide all/ewer.with-[table 2. Refer to the Architectural Room Finish Schedules and Instructions for all equipment shell bs provid.as Identification as to chair designation h all Junction th°rwiw direst.by the Architect. earth,masonry,walls,partitions,etc. Mchitacturd and Structural details to determine apeclfiad In Division 1. boxes,pullboxes,gutter.Pace.through which they pas@, 4. Color of devices to be bid as white:however,final D. Provbs: conditions and d Stru affecting the Installation im of DFDWR By Checked By .election shall be by the Architect. a. Supplementary angles,channel.,plates,etc., and at their tmmind polite of connection. Idmtiflcatlan the work. Include,to the full Intent and meaning of KP DD/AH 1.05 APPROVAL DRAWINGS of distribution switches r circuit breaks In panelboards J. Recptadsa: hero supports are required between building's a these Specifications,all Items of labor and material. A. Prepare and submit for approval to local code authorities 1. Recptacle shall be located a Mown on the Drawings structural members,.panning the.pace and es gn, g or wJz.tmml of $CDIO Date hall be by mean.of panelboard dlrectoriea. cry for deal detailing each additional electrical drawings,diagrams,and Identification of dhtrlbutim s Itches or circuit brsakers and at the heights specified or Indicated. Receptacle attached to building otrvclur.l member.,by fixture.due to surrounding f[U..and con.truclim. epeciflwtione ae ore required by. and power outlets shall be of the grounding type and wNding,boiling or with concrete anchor.. AS NOTED 03/06/15 red at.rten Individually mount.r in awltchboarda shall y Seymour,or b. All rode,angles,rails, (ruts,brace plates.1. Local Flro Prawnlim Bureau be b f engraved lamocold nameplates mmanenll •manufactured b HUDDNI,P«°d:Sa 2. L«°I Building Department-Electrical Inepectim y meansp P Y LeNtm. platforms,etc.required far.up.Ian or Job No. Swtlm fastened the front feu of the housing,showhg 1/4' 2. Duplex Convenience Recptacles 20A.,2 Polo,3 Wire, support of conduit and equipment. ell ®� /f`1� 3. Local Utility Com Metering Department high hits lettering on a black background. Identification 12S VdL NEMA deal nation 5-20R ape,thraadw rode,tut. IUI \N:JhI y p°y of feed cables°hall be by morns of engraved fiber toga ( 9 )SpedNwtlon c. Straps,dam d suitably f.elmw to the cabin. Grade. arc ore,etc.,and all mieeoil.naous epeclaltles Pace&Sw7r/3362 far the attachment of hanger and supports to the b. L.Aton/5382 structure. Sheet No. e. Hubbell/5362 E 4 e Shy RECEIVED DECEIVED J.,, 45 AACHIITECT v D M•168Z CRT OF TWIN�FAi p JAN 0 7 2015 SHEET INDEX # NAME REY. 111712014 TWIN FALLS FIRE DEFT. LVNNsyA00"URY STATEOi I.10 1-GENERAL ` - APpR G000 COVER SHEET wih�a'I O��® G002 GENCODER REVIEW, RO AND ABBREVKEYNOTE ULTA PETCOl G002 CODE REVIEW,PROJECT KEYNOTE LEGEND CPWG100 OVERALL SITE PLAN (`IS-)5 S fore Dept G201 DOOR&FINISH SCHEDULES Dyyd G300 ENLARGED SITE PLANS G400 SITE DETAILS ~'J G800 ULTA PROPOSED FIXTURE PLAN 7 G801 I PETCO PROPOSED FIXTURE PLAN =Q sµµ+ i 3-LANDSCAPE LIDO LANDSCAPE NOTES&LEGEND I �/ L101 OVERALL SITE PLAN 0L L102 LANDSCAPE PLAN I o L103 LANDSCAPE PLAN I O < REFERENCE L104 LANDSCAPE PLAN I O a ��s L705 LANDSCAPE PLAN ONLY L105 LANDSCAPE PLAN I LL n/ 8 1.501 SITE DETAILS I �m I L502 CONCRETE DETAILS I O O ui L503 LANDSCAPE DETAILS ® 504 LANDSCAPE DETAILS f 1 Bow . 4-ARCHITECTURAL V _ A100 FOUNDATION PLAN 'I A101 18T FLOOR PLAN ' A110 1ST FLOOR RCP A120 ROOF PLAN — L{ A /�i % A200 BUILDING ELEVATIONS & A201 BUILDING ELEVATIONS d A J .� ® ® ✓ / r ®. ® / / / ,/ A211 STOREFRONT ELEVATIONS ® ® II r /� /'� /•� /� A300 BUILDING SECTIONS \ � A301 BUILDING SECTIONS A310 WALL SECTIONS A311 WALL SECTIONS A312 WALL SECTIONS A313 WALL SECTIONS k\ \. �� A314 WALL SECTIONS _ A400 ENLARGED PLAN VIEWS A401 ENLARGED PLAN VIEWS A500 DETAILS A501 DETAILS A502 DETAILS Z A503 DETAILS O A504 DETAILS A505 DETAILS A508 DETAILS &STRUCTURAL In .SNA STRUCTURAL NOTES S1 FOUNDATION PLAN 51.1 FOUNDATION DETAILS 43 51.2 FOUNDATION DETAILS S2 STEEL FRAME ELEVATIONS 8 DETAILS ----- _ S3 ROOF FRAMING PLAN S-3.1 BUILDING DETAILS S-3.2 BUILDING DETAILS - S4 WALL SECTIONS &MECHANICAL I rMECHANICAL LEGENDS AND SCHEDULES HVAC ROOF PLAN M201 I MECHANICAL SPECIFICATION 7— M301 I MECHANICAL COMCHECK 9-PLUMBING P001 PLUMBING LEGENDS AND SCHEDULES P101 1ST FLOOR PLUMBING PLAN o P200 I ROOF PLUMBING PLAN - •I� ''I � "I I 10-ELECTRICAL E200 ELECTRICAL —� RESUBMITTAL OF COMPLETE PERMIT SET TO REP SUBMITTED SET 9/29/2014 no. ';P 0 Be- 0 r la- 0 UJ LU > a. W J a 0o 0 06 = U) - DEFERRED SUBMITTALS ITEMS REQUIRING SUBMITTAL AND/OR SHOP DRAWINGS TO BE APPROVED BEFORE WORK IS TO SITE VICINITY MAP Q U) LLJ W START.WORK PERFORMED WITHOUT APPROVAL IS AT THE RISK OF THE CONTRACTOR(S)AND A/ Y J ITEMS REQUIRING SUBMITTAL AND/OR SHOP DRAWINGS TO BE APPROVED BEFORE WORK IS TO WILL BE ASKED TO REMOVE AND REPLACE WITH APPROVED SUBMITTALS AND/OR SHOP r w < START.WORK PERFORMED WITHOUT APPROVAL IS AT THE RISK OF THE CONTRACTOR(S)AND WILL DRAWINGS AT THE COMPLETE DISCRETION OF THE OWNER/ILL AT NO COST TO THE OWNER OR i J W J BE ASKED TO REMOVE AND REPLACE WITH APPROVED SUBMITTALS AND/OR SHOP DRAWINGS AT PROJECT.CONTRACTOR/SUB CONTRACTOR MUST HAVE PREAPPROVAL WHEN EQUAL OR SIMILAR \ w THE COMPLETE DISCRETION OF THE OWNER/LL AT NO COST TO THE OWNER OR PROJECT. MATERIALS AND/OR PRODUCTS ARE USED FOR BIDDING AND ORDERING PURPOSES THAT ARE ARCHITECT CONTRACTOR/SUB CONTRACTOR MUST HAVE PREAPPROVAL WHEN EQUAL OR SIMILAR MATERIALS DIFFERENT FROM WHAT IS ON THE BUILDING DOCUMENTS. WOODBURY CORPORATION ULTA&PETCO Q -) - AND/OR PRODUCTS ARE USED FOR BIDDING AND ORDERING PURPOSES THAT ARE DIFFERENT FROM _ J WHAT IS ON THE BUILDING DOCUMENTS. ITEM SHOP DRAWINGS SUBMITTAL 2733 EAST PARLEY'S WAY, SUITE 300 (.� pp ITEM SHOP DRAWINGS SUBMITTAL ROOF MEMBRANE x SALT LAKE CITY, UTAH 84109 ' =J ° N i AWNINGS X X PAINT X PHONE: (801)485-7770 LIGHTING x CONTACT: DUSTIN GLAZIER 1 V ROOF JOIST&TRUSSES x x LYNN WOODBURY ' ^ FIRE SPRINKLER SYSTEM X X DOORS&FRAMES X FIRE ALARM SYSTEM X X ROOF LADDERS X X METAL RAILINGS X X STRUCTURAL STRUCTURALSTEEL x x EHM ENGINEERS y ` DUMPSTER ENCLOSURE GATES x x 621 NORTH COLLEGE ROAD-SUITE 100 FLASHING COLOR&GAUGE x TWIN FALLS, IDAHO 83301 STANDING METAL SEAM x PHONE: (208)734-4888 CONTACT: GERALD MARTENS LOADING DOCK LEVELER X i LOADING DOCK SEAL&SHELTER X MECHANICAL OQ o INTERIOR STAIR&LANDING FINISH(SEE FINISH SCHEDULE) x CTA GROUP " U a SEALANT X 8000 WEST MAIN STREET, SUITE 800 F STOREFRONTS X X BOISE, IDAHO 83702 F ROOF HATCH x PHONE: (208)336-4900 METHOD OF CONSTRUCTION OF ARCHITECTURAL WALLS x CONTACT: SPENCER SHEPARD HOSE BIB X j Project number 990 Z ELECTRICAL Date 11l7/20 0 FLOOR FINISHES(SEE FINISH SCHEDULE) X CTA GROUP , / Building Plans have Drawn by D WALL FINISHES(SEE FINISH SCHEDULE) x 8000 WEST MAIN STREET, SUITE 800 been reviewed and appn ved Checked by CHECKS CEILING FINISHES(SEE FINISH SCHEDULE) X BOISE, IDAHO 83702 All construction SubjetG00o Tn Field Inspection BLDG TO BLDG VERT JOINT FLASHING(EXPAND-O-GARD) x PHONE: (208)336-4900 x 3 CONTACT: TYLER VICTORINO H ye Printed 11/10/201 Date 8:26:01 AM As indicated 1 2 3 4 5 6 7 8 9 ARCHITECT AR-1532 LICENSED 111712014 LYNN S VgDDRURY STATE OF IDAHO - >z L Igo dQ UX� F O O 4 N� o�Zo oO Q w O , I pYO14.psi / R w ,4 III 0 a s � N. 4 O qb� p an.e�s O o O � LP 91 + 0 1z o N ACRE9 9 V z N.A.P. •• 1 i5,1930 •4 ` .� AceesO o ' � � o '9y LP 7 r1F �S o O 0 q LP l➢1 -- o r.- lo oAcems.. a 0 o LP2 S.F. 79 fS\6cV"a�'$az,�at[sU'J T o• a a J Q lP 3 IMF, , � V5 w J ° ws" Q J PP➢4 J $0]9N Q R� —SF. O = J w Z � LL LP5 T ,..aoe.F. Ql)\c�° J — 4x� S P4 sF �$ O s (� 0 N.A.P. 41,M SFEll x.:s..tY,.%a ...:.:.raµ-".. •k.tiM:M..+,...fau:.sF...'.,,y•..kr:.+h:".�-,,.#.�.-K.4;.11'f:...r. rt-:FR�i><M1e:.a'amtlx�:a:�.MK.:'h-'tiF%i••n=.�raF>�k�fi.:=- ee ACRes O O U F W F Q w Y K 9907 ..ra...._.. .. ,.,F...,....a, Project number zo Date 11/7/2014 z Drawn by DLG Al SITE-OVERALL Checked by CHECKER W1"=80'-0" G100 ?+ _ Printed 1 6/2014 5:02:49 PM 1. 2 3 4 5 6 7 8 9 Sae 1„=80._0„ a 1 2 3 4 5 6 ARO 7 LICENITE07NSED 8 9 — SHEET REFERENCE KEYNOTES # DESCRIPTION 111712014 07 71 L SECONDARY EXTERIOR BRASS DOWNSPOUT NOZZLE 7-(r AFF LINO LYNN 8 W00oBU0.Y (SEE MECHANICAL/DETAILS FOR SIZING) aie1B OF lonko 1073A FABRICAWNINGS ' ) 10 73 DA METAL AWNING COVERING(SEE SPECS) 5 4 265800 EXTERIOR LIGHTING(SEE SPEC/ELECTRICAL) Ez Al ROOF LINE BEYOND 28 58 J EXTERIOR WALL PACK L ABpp 3OO - 32 06 AP 6"DIAMETER STEEL TUBE FILLED WITH CONCRETE BOLLARD;PLASTIC --, O G b COVER;SEE FINISH SCHEDULE _ WF-3 3350 AB NATURAL-GAS METERING eq �00 -10 q r 656J 2656J 2656J WF-3 Q� �>°' _ O 4 WF-4 C LOADING DOC WF 3 o N Y RAMP CURB O O 1ST FLOOR 07 71 L N 07 71 L 100'-0� U J N N$ -- --------- Z N ----- II 3206AP -- Z— — ------ T.O.LOADING -- ---_ 32 06 AP DOCK RAMP LINE 95 6" I 94'-6" 96'-0" 93'-4" w y III PETCO-LOADING DOCK E1 ELEVATION d 1/8 1 0 I Al C1 A7 A3 E1 A2 , � F I A300 A300 I A313 I � ? ROOF LINE MF-1 T.O.W.125'4' BEYOND ROOF LINE T 0 6 l WF-8 TOW 1260' : B OND — MF-1 TO 123'-4" MF-1 MF-1 e MF 1 ' ROOF LINE BEYOND WF_g WF_8 r e WF 8 4, WF-3 WF 6 WF 1 in q WF-3 _ _ r—_T �I IJ1� ' 656J m � L ,-2656J ...v WF 10 . 2656J, : 11F_4 1 L WF-3 `' - �,t_ I. �- _ _ „s WF- 4 07 71 L_ m T.O.F.95'-4" IT.O,F.94'4" — _—— WF_3 100-- GRADE — T.O.F.93'-4" — -- -- ——— I— --- — —"W:: EE CIVIL — GRADE— WF-5 T. U SEE CIVIL "5 T.O.F.97'-4" 33 50 AB C1 NORTH ELEVATION }a y O u t w L� � Ty Q J Q ( 7 J 3 m �I/ 5 0 ( `SIGNAGE .` �+ W I BY OTHERS " � � J w J Al A3 E1 C1A6� AS Al ` W Y J A300 T.O.W,135 2 ..: A300 300 I — Q ROOF LINE BEYOND WF-8 T.O.R.136-0" J JLL .../ LLB T.O.W.128'_0„ z T.O.W.128'-0" - T.O.W.123'�" WF-8 '. SIGNAGE T.O.W.123'-4" I J m F_1 WF 8 MF-1 BY OTHERS m - WF 8 WF 8 OOF LINE ND a _ _ r - ------------ --- T-A _1 MF-1 SIGNAGE R BEY WF-8 M BEAUTY WF-1 BY OTHERS I' T.O.M.115 0" J F1 F 6 1073A _ 10 73 A F e; L 10 73 DA 26 5 6 56 00 ✓ a a a di nr d s a ✓ i 00,� 26 56 00 26 56 00 AS 6 56 00 H a " 5600 6 56 00 Al WF-1 2 J 56 00 5 00 F-6 „r �r aQ i:� •r 'i „� A,�OS 05 .� �� - WF 6 26 6 : 265 OO J „i i •i p w T.O.C.102'-0' WF 6 1ST FLOOR 07 71 L WF-5 WF-1 — L i—:� (CANOPY T.O.F.9T-4" T.O.C. 00'-8" (CANOPY WF-5 T.O.C.100'-8" OVERFLOW) OVERFLOW) Y a 0 Project number 9903 11/7/2014 Al /SOUTH ELEVATION Date by DLG 1/8 1 0 Checked by CHECKER A 3 A200 1 2 3 4 Pdnled 11/6/2014 5 6 7 8 9 Sale 1:586:05 POM LICENSED ARCHITECT - 8 -. s AR-1532 SHEET REFERENCE KEYNOTES 1 r # DESCRIPTION 111712014 07 24 G EIFS-CUSTOM SHAPE/THICKNESS SEE DETAILS) LYTATENN S.OFIDAHODBURY ( STATE OFI0.NI0 ' 0783 GA 20GA,ALUMINUM FLASHING ANODIZED SIDE 101400 SIGNAGE(BY OTHERS) 23 70 A RTU(ROOF TOP UNIT)(SEE MECHANICAL PLANS) 28 55 J EXTERIOR WALL PACK - LL cco �� Wo dQ s�V tW- g pym o < � 0 O o 3 = ,� U �r�$ IIoo W A B MF-1 .Y MF-5 Al I. L23700A 301 ROOF LINE BEYOND A6 23 70 A WF-e lz 23 70A MF-1 23 0 A �t 1 � WF 10 F 10 WF-3w WF-8 I F3 WF.31 II __ F-4 F 4 ? WF 41 I WF 3' .•. GROUND LEVEL I;J W r l I T `I I I r t� _F s _ _ 1ST FL 100'-01, V — --------------- — ------------- --- ——— -- - a— -- --_—� GRADE SEE CIVIL WF-5 "F9r4'— F1 EAST ELEVATION a ^n Y V co t r B A 1L > O a > � Q T.O.W.135'_2,4 m Li .. ^. W — � � WF-8 Q J Y J Al W T.O.W.128'-0" �� . " { ° A301 J r^ Q Q 07 24 G MF-1 4Y Y` 10 14 00 �+ 07 63 GA A5 ¢ a- `s ROOF LINE BEYOND = w WF-8 m _ _ 1 Z WF-10 ,C - U I I WF 8 - I r - Wp_q 26 56 J .i. - r 1ST FLOOR ——————————— iG.,.ayi'�uEdi4. :A :4?+AdYt�'V.,rwl, ra+: Y�sa#.tb�aa�kaec+��4' a: •'s Aumr�-.:• str+reY r T.�,. �& ess,. :.r :,s �� 100,_0"U. . — --- --- ------------------ --------------- T.O.F.9Ta" ------ -------- ------------------- BUILDING FINISHES NOTES. a 1. ALL ARCHITECTURAL CONCRETE TO BE COMPLETLY SMOOTH WITH ALL HONEY .a .. COMB FILLED WITH CEMENT RUB 2. ALL ARCHITECTURAL CONCRETE FORM CONE TIES TO BE REMOVED 3. ALL STOREFRONT TO HAVE CONTINUOUS SEALANT BEAD BETWEEN MULLION AND N .Q ALL SURFACES U.N.O. w 3 Al WEST ELEVATION Project number 9903 z 0 Date 11f7/2014 Drawn by DLG Chocked by CHECKER A201 3 r Printed 11/6/2014 2 3 4 5 6 7 g 9 4:56:31 PM - - — Scale 1/8°=1'-0' sONGIN GIs eF l9yN 5 < Il0'-4' CF'4TPOFI0PNG a MARC q I : 1'-10 �_4• 22'-a' I'-S• 4,_6. 4'-6•LT,'S. . 1'4 6,-4, 1.1. 14-0' L 24' 20'-104' 8, r 14 10 I I z w TOP OF FOOTING 5-1.1 _ _ - - - - cc - ELEV..c3V-4' 11 r _ - - _ Q —� - TOP OF:FOOTING - - - c4 I r' - �. - - TOP OF FOOTING ELEv..9'1'-4' J o TOP OF FOOTING ELEY..96'-0' <r I : 1 1-- TOP OF FOOTING ELEV...94'-a' low o I TOPAF FOOTING 5-4 ELEV...93,_4.. I <�a ELEV. 9T-4 I � STEP FOOT'G 16'-o. 8IV-0' 0 O 4 /, P FOOT G 16-0 STEP FOOTING 32-0 •o : L I 11 11 11 '4 — — O oar I U. 8-LI S-LI - - - - - - - - - - - - - - - - - - L ` — - - - - - - — _ _ J — — H OOIV t- M¢� - - - - - - - - - 4 19'-a' I — i — -- -TOP OF FOOTING_ TOF OF FOOTING — -TOP OF FOOTING ELEV.=SV-4' ELEV.=94'-6' EL£V:.I sy,_�. TO.STEM WALL— in S_q _ELEv:.1m2'_0. I r, I I: _ _ I -� TOP OF FOOD T.O.STEM WALL 9--I.I I I I L - ;: I r ELEV. t ELEV..100'_0' : J I G - - - - - - - - - L - = - - - - - - - - - - G - - - - - - , - - - - - - s -� I 1 I I I L! s-Ia I I I _ w 13 I ( I I I I o I I I I I s-u TOP Or FOOTING I L a, I ELEV..9T'-4' — — — — Z a , 1 I I I I I I I I i I I I I I - I � I I I w a_4 O— I I I I I f — - — F_ o R U) I— r- —' L W � IP. L- -, TOP OF FOOTING : _- I - - J L - — — — — ELEV..91'-4' - DIAMOND DIA C�ATLOCK-O Sa. I I I — — — - 3 5-LI TYP rJ — _ — — — 1 I I � a-1.1 CRACK CONTROL 4'CONCRETE SLAB WITH . -. JOINTS ' L B 4 TYPICAL — :— COMPACTED FILL. SEE 1 — L —�ARCHI� 1�£FOR FINISH; J� - 8 m ,r � I I I 2 a-I.I I I I I— � � N - - - - - - GC Z i - 00 S-I.I TYP•— I, 2 0. J Q — — — _ — W TYP. 'METAL 6 � � � I � � � ELEv.�00'-0' ERR$WpAELL� I I I a �t 0 w AhC 0 RO TA.STEM WALLNt m 13 I1. 4 `:. I I. - 14'-6'X4'-6'.I1OOTING I S-LI WITH4'-6,44�66POOTMG T MAT .8. I I 1: L WITH"4•I6'.o.c.E.W. Q w_ DEPRESS STEM WALL OP AND% I I 8'FOR SLAB OVER I I I I o0 MAT OTTO 6 m 8' 1 I I z .. o.c.E.W. TTOM MAT oc.E.W.BO GIM MAT a-LI AT MAN DOORS TYP. . VERIFY LOCATION WITH I 9'-10' I — - — 9'-10' I 9 J — — _ ARCHITECTURAL _ I I I FOOTING FOOTING - S_4 W DRAWINGS :. T.O.STTEEMM WALL I 1 - _. ,I :-.4�.1 I 0... H I ELESU v..1100.8 1 12.5� /- 12,_ i'12 @_94....._.14"1. 0 : TA.9T£M WALL - — — _ t V to, .:. ELEV.•1102'-0' - _ _ - _ 9 _ �J T.O.STEM WALL _I 5-17 1 - - - - r - ELEV.-too'-0' 8 rl 2 2S'-2'' 1. I'2 :. 4� 0 04 T e 9 s 1 l o I 14 M. -m'g <.', r' 1- - - - - 0 9 -.- - ,r LL J ,ro.. S-LI S-LI 1 4'-T 14 _ 1 5 TA.STEM WALL I- - 5-12 I : a-LI L 4- 1 IS. -- S,ELEV..102'_0• 1 S-LIl0#• '.: Ira#' 0# . 5-12 8-L14� I- 5 II T 2 _ 6 II�' Si 4'-2- 22'-S•. 6'-4' 20'_0. b'_4• :I6'_g14• -9' �'-10' IV-54' T'-10•. T,_3. 181_S. l'_3• T'-loi. 12-54. -B'-0• ' 40'-0' 40,-0. . 45'-4' 4V-0' 2 3 q I Project number Date 612412014 • - Drawn by n EHM Engineers, Inc. Checked by S1 FOUNDATION PLAN 1/8"=V-0 BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE C-1 Engineers/ Surveyors/Planners J 621 North College Road,Suite 100 Twin Falls,Idaho 83301 Primed _ — P(208)-734-4888 fax(208)-734-6049 web:ehminc.com `' Sale 1/8"=1'_0" ���;ENGINfF9� y�0 QEGIS Fqqqq 9', GRID �Fq rFOF10 MARI 9'x12'xl'BASE PLATE- WITH(4)%'0 FOR(4) 34'xl6'x 4'/2'LEG. :I. ANCHOR BOLTS GRID LEVELING NUTS - o P SEE ARCHITECTURAL Q c=i ULTA CONCRETE REBAR -I• 9 GRID STEM WALL FOOTING STEM WALL 6'METAL-STUDS THICKNESS 'B' - L24' •16' 'A' LONGITUDINAL HORIZONTAL VERTICAL 'C' 'D' AP•SPLICES. TYPICAL PLAN VIEW :a w OR CMU BLOCK SEE ARCHITECTURAL 14'- 4'-8' (3)«4's Ea SPACING (5)«4'e•12'O.O. (2)«4'e•IT O.O. 63 8 Q a IV, 4'-8' (3)«4'8 Ea SPACING (5)«4'e+12'O.O. (2)«4'e•12'OA. 63 8 `` U SOLID GROUT .': 8'CMU SOLID GROUT `.`. Oa 3STEM WALL HORIZONTAL ELLS ALL CELLS (2).«4•W'oz.(SEE CHART) 8' 2'-0' (2)•4'a EQ.SPACING (3)«4'e a 12'O.O. (1)«4's+12'O.G. - 38 95 ,` " GR CMU OUT ALLID `: 24'LAP 0 SPLICES. TYPICAL CHAMFER EDGE(SEE N BOND BEAM H86 6x&xIr4'COL (2)«4 IN£>OND BEAM CELLS (2)•4 IN BGND BEAM O oaARCHITECTURAL) MAX SPACING +48'MAX SPACING ®48'MAX SPACING PETCO NON-SHRINK ,. (2)«4.16'oL. 100'-0' —— i . vi I VERTICAL '"- 24'LAP•SPLICES. TYPICAL LREINFORCING :. N GROUT CBEE CHART) CONCRETE : REBAR FF.ELEV• FF.ELEV• ITOP OF CONC. O � Oo `° NN —STEM WALL FOOTING STEM WALLFF.ELEV. THICKNESS 'B' • Oq0 Off, TOP OF FED. oro \ 'A LONGITUDINAL INAL HORIZONTAL VERTICAL 'G' 'D' °° `b 99'-6' —— — N. DE VARIES - ,O- 4 �� 13• V-4' (3)«4'e EQ.SPACING (4)«4's•12'O.O. (2)«4's•12'O.C. 4'I 8 / / rtr « r•- 5•IS, oL. ' o oO .O�,w "�/�/ - . ' e « : r� a., (2) 4STIRRUPS L I • -•, A. /r / ...„ 10 10, V-4' (3J 4a EQ.SPACING (4) 4s•12'O.G. (2) 4s s 12'O.G. 4T 8 _ _ 0 -TOP OF PIER _ « , 9' _ _FIN.GRADE — �/� - 8' 2'-0' (T)«4's EQ.SPACING (3)«4's+12'O.O. (1)•4's•12'O.C. 38 95 (2)•4 CONT:HORIL \ r • (2) 4 CONT.HORIZ \� • T' - TOP AND BOTTOM < «4 STIRRUPS °; " W>TOP AND BOT --� (6).5 VERT81G • •' ' TOP OF FOOTING :. L r TOP OF FOOTING ., £LEV..9�'-4' ;.., - ' •' i...:• _ 5e•10'oL. •:: ` ELEV..VARIER Q TOP OF FOOTING n EA WAY L, «4•16'oL.20' 0 ELEV.-9T=4.-'—— — — a4 a I6'oL.26' w (3)-4 CONT. a _ LENGTH W .. .. .` LENGTH .. .._, 9 3'CLR ':; ••is ••. 3•CLR F- ., 4:;0' 1 3'CLR t� "'. >.. g' g. 8• (2)«4 CONT. O L6 a, :AI g• FOOTING LONGITUDINAL _ 4'-0' 2_0• - Z FOOTING DETAIL 1 ECCENTRIC FOOTING DETAIL 2 ECCENTRIC FOOTING COL. 3 FOOTING DETAIL 4 °— 'SCALE::5/4' .I'-0' - 8-I.I SCALE:aw . I'-0' 5-LI SCALE:34' _ 1: S J.I ,. 3/4' 5-1.1 SCALE: I'-0' a iY 1 LU LU g' 4' SET :t 0 ' - SEE SHEET 5-2 FOR STEEL BRICK VENEERdWITk"F .�, �`".•,.°. n•r.r#'' -;... ; FRAME EL£YATIONS AND p I'AIR 9PACE'"BE•£k`) p'GROUT W - _ BABE PLATE DETAILS U ARCHI URAL'�• :cx ) ,aala 1.2 ,�;,`'="+•",� ALL:GELLS '.. ELEV..100'-0' .:F;h.. `• _ 5-LI < (2)"4 IN BOND B>=A^9 55 6x6x ia'COLUMN I L — ' a4.18' 9• rv,I B _ J O o ob O,oO o o.c. Z TOP OF WALL - 3.�i'o ER TO 'r,il'y m 48'MAX SPACING 5©O PSI - I'-0' ELEV. SHR NIZ L 2' g• 2' ELEV..100'-8'(AT SIM.COND.)... r - 24'LAP+SPLICES. TY"PICAL ROUT $'•. 9' T' NON 11 1u( I•, .TOP OF CONC _ FF.ELEV. /j .: •L•. v �, (2) 4 STIRRUPB•2. Y? '1, LEv.=100'-m'. a- _ .1m0'-0' G HSSbxbx]..COLUMN o r iv o o oz.-AT TOP . .. ,n t r`t•"'+',M.+ ,t` F r _ -- o°o oo TOP OF PED.- -. B p 04 9TIRRIJPB•10'oL. , 12'zi2'xl'BABE PLATE — •1=. o o FINISH FLOOR .,... :: ,.^S•' l2J O O °i W WITH(4)1''0 FOR(4) PIER — — 'b'x12Ui'ANCHOR BOLTS r ELEv..100'-0' .. .. ...„` '.. . .•'' (2)«4 CQNT".,Y-10RIZ,.'m: - FL a TOP OF _—'-- .WITH LEVELING NUTB BASE PLATE 80•0 00.0 - - 'TOP ANf`3,+BOTTo,. r "�� m iq 04 18* _... �Y". .. . «4•12•o.c.EA: Z14)STIRRUPS 51VEWS PIN.GRADE C4)K. RTIG - .- WAY - ¢ •„�,..:; ,�, - 2� - «4 a 12'oz. .r INBIR AF STI L - +. .. TOP S)F FOOTING m .EXTEND 3V2• ,... ., �.., -.... .:., °s •• - HSSbx6x�i'COLUMN 9, •"r1S -a .. J INTO SLAM - .. ° ro °ro° f 6,500 PSI NON-SHRINK CONC.SLAB d " — y IL `' ' -EA.WAY - ' al GROUT E TOP)OF�FOOTING, �% ,.x�,,?.:; :° £A 3'CLR - 5'e•12'oz. FIN.FLOOR J — — — — U F ; ELEV.-100'-0' . U ELEvk'ha9,1;4 wr..7, 4°<•Y� ,nr:^. _; . A.WAY IV �TOP OF FOOT'G_ b' r TOP OF FOOT'G Tj< w : .+ "*, I'-l}• 2_0• I' ' ELEv. 93'-4' !C ELEV. 99'-6' _ gr;'�?` �5r_0• 0 n F } a I •«4 1.:.°f 24'LENGTH . .. '° = `• <� ' ':: �' "' " � AWAY aTO AT e �'e s 8'oz. 3•CL :. .+ 1'_0• 1'_0' I'_0' !3J«4 CONT, 3'GLR = .e:.. WAY 1'-11, 6'*, RY ,4, 1'_4. N coL.;g ,SIM. SECTION I PLAN VIEW �/ 3'0• 4'-0' wr 4 0 EA'`WBO.TrOM MAT - I V/FOOTING DETAIL LOADING DOCK g ISOLATED FOOTINGDETA1� COL._ "CT DETA 7 FOOTING DETAIL g `� Q > _ SCALE:'/4. �.1'_0. S-LI SCALE:3/4' 1'-0' SCALE:Hai,,uI'0''a q S-LI SCALE:3/4' I'_0' S-LI r J Q MAN w W W m 0_ NY x •�. r Y Z W J aQJLL CONCRETE ARCHI'fECTUGRAL AP 8E£ Z Z - TOP OF CMU ;.. •, O � m ELOL— 'SEE ARCH. ELEV.—100'-0'. '.0• '" O I•:•— '�•O 0Ego mp Wlbx2b BEAM. THICKEN 4'CONC.SLAB '..Z 5•8'oL. /r AT SLAB OVER Q 16'MIN.LAP LENGTH WIbx26 BEAM FF.ELEV= ♦� «4 (4)N4'A325 BOLTS .."., (2)04 IN BOND BEAM r /�/ •48'MAX SPACING .•- '. V]'xbv]'xl2'TOP PLATE •. - (4)13/I6'0 - W - l4)3/i'A325 BOLTB _ II VERTICAL ASPHALT ROADWAY OZI SLOPWG G CL'REINFORCING 9 jL«4•12'.oL. a A6', CSEE CHART) N TOP OF STEM WALL .. •,, . ELEV..98-0•. —`—— —— 12• — OSB AT'HIGH SIDE'OF WALL WITH 5 SELF - o Oho .:• ,. LL. _ DRILLING BGI�WB•6'oz.•PANEL EDGES TOP or FOOTING TRUCK DOCK - 0 HS86x6xU'COLUINN AND 12'oz.FIELD. BLOCKING AND SCREWS• 6'z 1%1 FLANGE WITH Ir'LIP ELEV.•9l'-4' — .• 4 6'oL.REQ'D. AT PANEL JOINTS. 54 MIL.. ] «4•16'oz.20" .. ' (3)«4 HORIZ CONT.AT - L r o t H58 6'xb'xlr4'COLUMN 116ga.)WALL STUDS•24'MAX SPACING. 54 +24'o.o: LENGTH •„.:. 0 - TOP CENTER AND TOP OF POOT'G - i0 MIL.Clbga.)TRACK WITH POWDER ACTUATED _1 f BOTTOM OF STEM WALL ELEV. VARIES'—— — 4• o -.. FASTENERS(0.145'x1•)•12'oz. 16ga.TRACK 3'CLR ••' II'xll'x3/ BABE PLATE :9 WITH(4)T6'0.FOR(4) FOOTING LONGITUDINAL •4•12'oz. _ 3/Vxib'PLUS 4'LEG " ANCHOR BOLTS WITH BASE PLATE 8' 'A' 8' (SEE CHART) - 50'LENGTH- _ �:•.; •.: 6,500 PSI NON-SHRINK TOP( P007G' _ � «4•18'oL. 3'CL WASHERS LEVELING NUTB AND - GROUT Y .• ' ELEV...9S-4 ,. 24'LENGTH. T/ST£M .,".. (94'-0'SIM.COND> .: ._:,.: °. .'.- a 10' 8' 10' l2)«4 CONt ELEY..VARIE6. _,�yy .SPACING .; .. ;r .' (2)«4 CONT.AT THICKENED CONIC DETAIL AT STORE FRONT DOORS mS:e®8. - - ;-. i .... I - SLAB J 6 6' SCAL£.142'.1'-0' - 19�]' ; .• : .... : . - Prolect number Date9/24/2014 .. Drawn by Checked by - SCREENING WALL FOOTING DETAIL 10 FOOTING DETAIL LOADING DOCK 11 ENTRY COLUMNS @ W BEAMS 12 SHEAR WALL CONNECTION @ FLOOR 13 EHM Engineers, Inc. SCALE:3/4' • 1'-0' - S-IA SCALE:-/4'... 1'_0'. S-LI SCALE:a/4'•I'-0' 5-1.1 .SCALE; Ilr]' ,.P_0': 8-LI BUILDING THE FUTURE ON A FOUNDATION OF EXCELLENCE S.1.1 Engineers/ Surveyors/Planners 621 North College Road,Suite 100 Twin Falls,Idaho 83301 Printed p(208)-734-4888 fax(208)-734-6049 web:ehminc.com scale AS NOTED P�@NGINFF� A � ! b O}' cFy're OF toN a 10!4'XI0V4'XI'BASE PLATE 9��MA 0"0 WITH C4I lblq J BOLTS. I6' L MIN.EMBEDMENT r o o \. N O 'l5'4 J-BOLTS EMBED 16'MIN. UMOX33.COLUMN : 6500 PSI ¢� NON-SHRINK T.O.CONC. _ GROUT ELEV..•102'—O' — a¢ Q - C2J•4 STIRRUPS•2' oo.AT TOP L(4)K VERTB -4 STIRRUPS 10' ELEV.•IOm_0r4mh I TOP OF FOOTING ELEV..Sl'-4 �r. LU 0 FOOTING DETAIL 1 " 10 f SCALE:9;, I'-0' y t �W P w W - Kam: tY RE , H, N y 5 co M, � a � _ � Fla- -jQ ,.. W W m 0 o x „ co — n Y Q Y J s a Q J < LL ZGWZ o = m � z � a Date 9/24/2014 Drawn byN EHM Engineers, Inc. BUILDING THE FUTURE ON FOUNDATION OF EXCELLENCE C-1,2 Engineers/Surveyors/Planners 621 North College Road,Suite 100 Twin Falls,Idaho 83301 Printed, p(208)-734-4888 fax(208)-734-6049 web:ehminc.com scale' AS NOTED