Loading...
HomeMy WebLinkAbout17-2533 801 Pole Line Rd W IR Remodel Plans PROJECT TEAM IDRAWINO INDEX UI TM A➢FHrtEct AR1f'i,r9" ARCHITECT: INTERIOR DE516N: COVER 5HEET IN51GHTarchitects ST.LUKE'S CONSTRUCTION DEFT. 2255 5.BROADWAY AVE. 1221 SHORELINE LANE AO.1 COVER 5HEET g•3o•I"t\�I, BOISE,ID 55'106 BOISE,ID 53106 TELE:20b-33b-90a0 TELE:205-351-699a 1 FAX:209-33a-9061 FAX:20b-344-9002 ARCHITECTURAL - dana2insightarohiteats.Com WILSONDIA@5LH5.ORG DAw.b� .t�v CONTACT:DANA KAUFFMAN CONTACT:DIANE WIL50N A1.1 DEMOLITION PLAN ATE r_4ahi MECHANICAL 8 PLUMBING: 5TRUGTURAL: A2.0 OVERALL PLAN A2.1 FLOOR PLAN ENGINEERING INC. AXIOM PLLG AS.O REFLECTED CEILING PLANS 2222 5.BROADWAY AVE. 121 N.9TH 5T.-401 It shall be the responsibility of the general BOISE,ID a3106 BOISE,ID 83-102 A9.0 DOORANINDOW 5CHEDULE5/DETAIL5 N TELE:205-343-3669 TELE:206-639-4520 contractor to insure that all deferred submittals FAXmiahae0oengin9625 FAX: re�nruired b the fire department have been INTERIOR DESIGN St L ke michaelg�engineeringinc.com MBLAKE0AXIOMPLLG.GOM M y p CONTACT:MICHAEL GREFEN50N CONTACT:MATT BLAKE approved by the state prior to the installation of a I01.0 FINISH PLAN ELECTRICAL: fire alarm and/or fire sprinkler system. It shall also EIDAM 8 ASSOCIATES be the responsibility of the general contractor to 5TRUCTURAL '120501 PARK BLVD.,SUITE#250 verify that all appropriate testin and/or inspections BOISE,ID b3lia �Y 9 p 50.01 STRUCTURAL COVER SHEET TELE:205-545-5510 have been performed before covering or calling for 51.01 FRAMING PLAN mike®ei dam-assoC.com CONTACT:MIKE MILLER afinal inspection. ss.s1 DETAILS MAGIC \/ALLEY IR ROOM UPORAPE MECHANICAL MO.O MECHANICAL COVER SHEET 551 POLE LINE RID. TWIN FALLS, ID 83301 M0.1 LEVEL 1 -FL FLOOR ABBREVIATIONS M21 LEVEL 1 -FLOOR PLAN-HVAG M2.1 LEVEL 1 -FLOOR PLAN-HVAG PIPING PLUMBING d AND P1.1 LEVEL 1 -FLOOR PLAN-PLUMBING ANGLE AN JAN OR GENERAL NOTES SYMBOL LEGEND e AT JT JOINT P2.1 LEVEL 1 -FLOOR PLAN-MED GAS CENTERLINE LAM LAMINATED DEGREE LAV LAVATORY FIRE PROTECTION m DIAMETER LEM) POUND(5) If PLATE im LF LINEAR FEET FLUE oR MINUS LT LIGHTING PANEL FP1.1 LEVEL 1 -FIRE PROTEGTION POUND,NUMBER LT(G) LIGHT(INS) ADOPTED GORES-CITY OF TWIN FALLS 11 A/C AIR CONDITIONING LTWT LIGHTWEIGHT tL ACOU5 ACOUSTICAL MAS MASONRY INTERNATIONAL BUILDING CODE,2012 EDITION ROOM NAME 8 NUMBER Q DJ MAX MAXIMUM ACT ACOUTICAL CEILING TILE MAT MATERIAL INTERNATIONAL ENERGY CONSERVATION CODE,2012 EDITION 0 ELECTRICAL Q ADDN ADDITION `■■ A ADJACENT INTERNATIONAL MECHANICAL GORE,2012 EDITION AFF ABOVE FINISHED FLOORS MECH MEGHANIGAL AHU AIR HANDLING UNITS HIED '"EDIT"" INTERNATIONAL FIRE CODE,2012 EDITION tot DOOR NUMBER E1.0 ELECTRICAL COVER SHEET ALT ALTER MTL METAL ALTERNATE IDAHO 5TATE PLUMBING GORE,2009 EDITION E2.0 LIGHTING COMP CERTIFICATE o ANG ANGLE MFR MANUFACTURER APPROX APPROXIMATE MIN MINIMUM NATIONAL ELECTRICAL CODE,2012 EDITION E4.0 OVERALL ELECTRICAL PLAN o M15C MI5GLL EANEOUS EQUIPMENT TAG Y ARCH ARCHITECT E5.0 ELECTRICAL DEMO PLAN MO MO OPENING ASSOG ASSOCIATED MTD MOUNTED E5.1E ELECTRICAL PLANS Z M N PRNORrH E5.1F FIRE ALARM PLAN O BOG BOTTOM WINDOW NUMBER ERG BEARING 13 NIG NOT N CONTRACT E5.1 L LIGHTING PLAN 0 GAB CABINET NO. NUMBER OM CD N NOMINAL CEILING DIFFUSER R , COLUMN GRID O O GG CORNER GUARD Nrs NOT TOSGALE "`../// E5.1M MECHANICAL POWER PLAN m PROJECT DESCRIPTION E6.1 MED EQUIP.ELECTRONIC PLAN y M coy �ILJIJNMN 0/ OVER GORE D�tTP� E6.1 MEDICAL EQUIP.DETAILS Q o CON5T CONSTRUCTON OG ON CENTERS) CONT CONTINUOUS OFF. OFFICE REVISION n/ S E'7.0 ELECTRICAL SCHEDULES LI a a CPT CARPET OFGI OWNER FURNISHED Al CR CEILING REGISTER CONTRACTOR IN5TALLED 0 (p w CSK COUNTERSINK OFOI OWNER FURNISHED OWNER } C2 IR p INSTALLED OGGUPANGY TYPE -2 co GENERAL DATA: Q 7 eo GTR CENTER OPG OPENING BUILDING CONSTRUCTION 1-B PA PROJECT ARCHITECT ZONING C-1 TH15 PROJECT CON515T5 OF REMOVING FINISHES AND LIGHTING W IN R� ALL TYPE J 0 DEPT DEPARTMENT C DET DETAIL FED PARTICLE BOARD AN EXISTING TRAINING ROOM. THE SPACE WILL BECOME AN LR. J w 2 DIA DIAMETER FGF POUNDS/CUBIC.FOOT AREA OF REMODEL: 110 SOFT. ROOM w/ALL REQUIRED EQUIPMENT AND LEAD PROTECTION TO THE Q z DIM DIMENSION PL PLATE INCREASED AREA OF BUILDING: O SO.FT. SURROUNDING AREAS. �• DN DOWN PLAM PLASTIC LAMINATE CO DR DOOR PLBG PLUMBING View Name � Lu J � DWG DRAWING PLYWD PLYWOOD TITLE W J PROJ PROJECT OCCUPANT LOAD: O OWNER ST.LUKE'S CONSTRUCTION _ m E EAST PT PAINT/POINT Q L.L pp EA EACH FTD PANTED GONSTRUGTION(TBL.503 6 6DU: DEVELOPER: BOISE, E.BAAHOGK ST. Oil PV PLUMBING VENT BOISE,IDAHO a3112 1 z W EB EXPANSION BOLT STRUCTURAL FRAME 2HRcul EJ EXPANSION JOINT TELE:208-351-4146 EL ELEVATOR OTY QUANTITY BEARING WALLS ELEV ELEVATION EXTERIOR WALLS O TELE:20b-432 2494 ELEC ELECTRICAL RGP REFLECTED CEILING PLAN INTERIOR WALLS O MAIL:KINGTONA@5LH5.ORG Aa.1 BUILDING ELEVATION EMERG EMERGENCY REFERENCE NON-BEARING PARTITIONS O CONTACT:.05 KINGTON ENGR ENGINEER RE REFRIGERATOR SHAFT ENCLOSURES O EP ELECTRICAL PANEL REF REINFORCE(D)(ING) FLOORS--I ILINGS/ROOF 2 HR CONTRACTOR: ST.LUKE'S CONSTRUCTION J L St Luke s EQ EOUAL REINF REQUIREDON5,REVISED 1 \/ EQUIP EQUIPMENT REO REVIS ROOF 8 CEILING 1-1/2 HR 19O E.BANNOGK ST. Y I G I N I TY MAP EXH EXHAUST REV ROOM 5015E,ID 55,112 1 F17-535 (E) EXISTING RM ROUGH OPENING TELE:2095-351-4146 At O1 INTERIOR ELEVATION EXT EXTERIOR RO RE5TROOM FIRE SUPPRESSION SYSTEM: YES,FULLY SPRINKLED MOBILE:205-432-2494 ` RR FIRE ALARM SYSTEM: YES MAIL:KIN(STONA@SLHS.ORG FA FIRE ALARM FRCP FA CONTROL PANEL 5 SOUTH CONTACT:AMOS KINGTON PROJECT DATE 3 FD FLOOR DRAIN SAG SUSPENDED ACOUSTICAL 17026 Issue Date FDN FOUNDATION CEILING h' FE FIRE EXTINGUISHER SCHED SCHEDUL DRAWN CHECKED w FEC FIRE EXTNGUISHER CABINET SECT SECTION ' 1 SIM FF FINISHED FLOOR 5F 5OUARE FEET ' 1 E:�] Author DK FG FINISHED GRADE 5G SAFETY GLASS FIN FINISHED) SHTHG SHEATHING ' A701 DETAIL FU(T FIXTURE SIM 51MILAR KEY MAP p SITE W FLR(G) FLOORING) SPEC SPECIFICATIONS AREA OF ❑ REVISE F FLUORESCENT SO SQUARE FOGLUOR FADE OF CONCRETE STD STANDARD WORK .� H00❑ ❑❑ FOF FADE OF FINISH 5TOR 5TORAG U E / SIM 0❑❑❑❑0 FOM FACE OF MATERIAL 5TRUCT STRUCTURAL )%/ 1 SECTION 00000 0 F05 FADE OF 5"UD SUSP SUSPENDED A101 00110. C�a+e'�� FP FIREPROOF 5YM SYMMETRICAL ---- fn FPR FIRE PROOF SYS SYSTEM ` 1 IL FT FOOT,FEET o❑o❑o❑ (� HqiII ❑ ❑❑❑❑ ❑ o o o❑ o 09❑oo ❑ o loO J FURN FURNISHED) To TOP OF _ 00 0 ❑ ❑ ❑ ❑ ❑ ❑ 0 O ❑ SHEETT�E THREE THRESHOLD Name N GB GRAB BAR TPD TOILET PAPER DISPENSER LEVEL �o he GG GENERAL CONTRACTOR TYF TYPICAL r _ Elevation GFI GROUND FAULT INTERUPTER TV TELEV1510N GYP GYMPSUM MO UNO UNLESS NOTED OTHERWISE _ 11, `.' o HDWR HARDWARE UNFIN UNFINISHED N HGT HEIGHT •1 W HM HOLLOW METAL VENT VENTILATION APPROVAL STAMP NHwOt HORIZ HORIZONTAL VERT VERTICAL •�O HOUR VIF VERIFY IN FIELD / a HR HEIGHT HVAG HEAT,VENT,A/C A J HT tl co ID INSIDE DIAMETER WG WATER CL05ET SHEET C> IN INCH WD WOOD INLAND INGANDE5CENT AN WINDOW ABsp 5 INGL INCLUDE(D)(INS) IN5UL INSULAT(ED)(ION) d INT INTERIOR INV INVERTLU 1 of 28 IZ■ 9/25/17 GENERAL NOTE5: 1. EXISTING CONSTRUCTION SHALL REMAIN AND BE PROTECTED UNLESS OTHERWISE NOTED. I:C JLtiJ 2. ALL EXISTING EXPOSED TO VIEW FIN15HED ne:r;iarc G9 WALL SURFACES DAMAGED DURING ANY GON5TRUGTION PHASE OF THIS PROJECT SHALL BE REPAIRED TO MATCH EXISTING WALL SURFACE AND CONDITION. ENTIRE SURFACE OF REPAIRED WALL(FLOOR TO CEILING AND V CORNER TO CORNER)SHALL BE REPAINTED. COLOR AS DIRECTED BY INTERIOR DESIGNER. 3. DIMENSIONS ARE FROM FACE OF STUD Siai UNLESS OTHERWI5E NOTED. 4. ALL EXISTING GYP.BD.WALLS SHALL BE SANDED,RE-TAPED AND MUDDIED AS 2 NEGE55ARY,SANDED SMOOTH,PRIMED,AND N PAINTED. 5. FINISH ON ALL GYP.BD.WALL5 SHALL BE SMOOTH UNLE55 OTHERWISE NOTED. b. INSTALL BLOCKING IN WALLS AT LOCATIONS OF BASE WALL MOUNTED CABINETRY.FIRE EXTINGUI5HER CABINETS,ALL WALL-MOUNTED MEDICAL/HYGIENE EQUIPMENT,ETC. T ALL WALLS SHALL EXTEND TO UNDERSIDE OF DECK ABOVE UNLE55 OTHERWI5E NOTED. WALL5 NOT AGAINST EXISTING MA50NRY WALLS SHALL BE BRACED WITH 3 1/2"METAL 5TUD5 AT 4'-0"O.G.EXTENDING AT A 45 DEGREE ANGLE FROM TOP OF WALL TO UNDERSIDE OF ROOF DECK. 8.FIRE SPRINKLER HEAD LAYOUT BY OTHERS. FIRE SPRINKLER HEADS TO BE RELOCATED OR ADDED AS REQUIRED AND TO MEET CODE. NOTE: 9. MECHANICAL LAYOUT BY OTHERS. GRILLES, 1.EXISTING FLOOR FINISH VENT5,ETC TO BE RELOCATED OR ADDED A5 TO BE REMOVED. REQUIRED AND TO MEET CODE. 2.EXISTING GYP WALLS S RUBBER BASE TO BE 10. ELECTRICAL LAYOUT BY OTHERS. REMOVED. OUTLET5,5WITGHE5,ETC TO BE RELOCATED 3.EXISTING GRID CEILING OR ADDED AS REQUIRED AND TO MEET CODE. TO BE REMOVED. 4.EXISTING DOOR 8 HARDWARE TO BE REMOVED. DEMO NOTES: 1. INFORMATION SHOWN ON PLANS 15 BASED ON ui ORIGINAL BUILDING DRAWINGS SUPPLIED TO THE DESIGN TEAM. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO < CONSTRUCTION. CONTACT ARCHITECT WITH ANY DISCREPANCIES. Il 2. PATCH EXISTING WALLS WHERE D15NRBED BY �J o ^ � m REMODELING TO MAKE UNIFORM IN APPEARANCE (COLOR,TEXTURE,AND FINISH). W M \ L [i \ 3. WHERE EXISTING WALLS ARE FILLED IN OR m m EXTENDED,REMOVE EXISTING BASE AND O 13 N �� REPLACE WITH NEW ON ENTIRE WALL. NEW BASE O Q + o t= TO MATCH EXISTING STYLE,SIZE AND COLOR. n 4. PAINT NEW WALLS AND ENTIRE AREA OF ly Q m EXISTING WALL5 AFFECTED BY DEMOLITION AND = o LEXISTING DOOR 8 INFILL. U5E PRIMER AND 2 GOATS OF PAINT. a WALL TO BE DEMO'ED WALL TEXTURE TO MATCH EXISTING. PAINT TO v MATCH EXISTING COLOR AND SHEEN. ` p f!! w AS REQUIRED. r 5. REMOVE EXISTING FIN15H MATERIALS PRIOR W co m TO INSTALLATION OF NEW FINISH MATERIALS. J C0 b. PRIOR TO BID,VERIFY LOCATION OF EXISTING J Lu Q ELECTRICAL SWITCHES AND/OR CONTROLS IN Q Z r ALL WALL5 TO BE DEMOL15HFP OR REMODELED \ J J TO VERIFY IF EXISTING ELECTRICAL ITEMS ARE / vq REQUIRED TO AL50 BE REWORKED OR J (' LU REMOVED. INCLUDE COST FOR REWORK OR v J Q m REMOVAL IN BASE BID. O Li M 1 FLOOR PLAN - EXI5TIN6/DEM0 REPLACE EXISTING CEILING TILE DAMAGED Q � z ccu u 1/4"=V-0" NORTH DURING REMODELING. 8. FIELD VERIFY EXISTING DIMENSIONS. t)D 9. REMOVE EXISTING DOORS,FRAMES,AND HARDWARE AND SALVAGE FOR OWNER. EF17-535 1 uke7s 10. MECHANICAL CONTRACTOR SHALL RELOCATE AND RECONNECT ALL EXISTING CONTROLS DISTURBED BY CONSTRUCTION. 11. VERIFY WITH GENERAL CONTRACTOR WHAT PROJECT DATE DEMOLISHED ITEMS MAY BE SALVAGED BY 17026 Issue Date OWNER. o: DRAWN CHECKED w 12. LOCATE AND RELOCATE FIXTURES AS SHOWN. Author DK p PROVIDE CONDUIT,WIRING,DUCTS,AND OTHER MATERIALS NECESSARY FOR PROPER COMPLETE REVISED Y INSTALLATION. 13. GENERAL CONTRACTOR SHALL COORDINATE ELECTRICAL,MECHANICAL,AND STRUCTURAL U WORK WITH ARCHITECTURAL. 14. ALL FIRE EXTINGUISHERS ARE EXISTING- m REMOVE/RELOCATE AS INDICATED,RETAIN AND PROTECT FOR RE-INSTALLATION. SHEET TITLE DEMO PLAN 0 M 00 o t W LSHEET d C o / \ 1 . 1 Cw D_ A�CHfitiGl DApT/l�1-111,i \ a — WORK ------- --- --- --- — D _ 0 1 0 Fri 0; 0 0 / ° I � I V A o o, i o I vv o, e W o; �® 0 om M — L Li I � 10 00 I _ O N Ag 7 0 J 0, 0 W dl _ Q z 0 /ER�LL PLAN � J /1 1., 4i-0 NORTH LLJ J a J Q E _ < m r 4 > Q N 5 � 011 I > I rir StLuke's 17-535 PROJECT DATE 17026 Issue Date r DRAWN CHECKED Author DK � Y REVISED w J O y / SHEET TITLE OVERALL FLOOR PLAN o M 06 o F— t W U) m SHEET d C o A2 .0 PRIVACY GENERAL NOTE5: CURTAIN 9" 11'-9" 5" EXISTING WINDOWS 1, EXISTING CONSTRUCTION SHALL REMAIN GLAZING TO HAVE 3M BLACK AND BE PROTECTED UNLESS OTHERWISE LEADED GLASS FILM ADDED TO WINDOW OBSCURE VIEWS FROM NOTED. L•LJi3£D Ai.CHIitiC'7 LEAD-LINED WALL, PROVIDE BLOCKING IN WALL EXTERIOR 2. ALL EXISTING EXPOSED TO VIEW FINISHED REF.INT.FOR FINISHES AS REQUIRED BY EQUIPMENT MANUF. EXT WALL SURFACES DAMAGED DURING ANY EXT CONSTRUCTION PHASE OF THI5 PROJECT SHALL BE REPAIRED TO MATCH EXISTING WALL \ ' EXISTING WINDOW (OPEN TO (OPEN TO SERFAGE AND CONDITION. ENTIRE SURFACE OF BEYOND) BEYOND) PLASTIC LAMINATE EQUIPMENT OPENINGS TO BE REPAIRED WALL(FLOOR TO CEILING AND / DESK H 1590G FRAMED IN AND CORNER TO CORNER)SHALL BE REPAINTED. f/ '--- COMPUTER SCREEN INSULATED. TROUGH,FINISH COLOR AS DIRECTED BY INTERIOR DESIGNER. MATERIAL TO MATCH MANUAL HORTON TYPE -- v DESK VERTICAL CHASE 3 3 OR 3. DIMENSIONS ARE FROM FACE OF STUD ATr I^h'dD .o BOTHDOPOAIRS SLIDES UNLESS OTHERWISE NOTED. HAVE ABILITY TO a iv WALL-MOUNTED CONTROL PIVOT,GLAZING TO BE 4. ALL EXISTING GYP.BD.WALLS SHALL BE ROOM DISTRIBUTOR, SMOKED SANDED,RE-TAPED AND MUDDIED AS u¢~i RUBBER BASE,REF. COORDINATE LOCATION W/ NECESSARY,SANDED SMOOTH,PRIMED,AND ID1.0 MANUF.PROVIDE BLOCKING - - VERTICAL CHASE PAINTED. AS REQUIRED. H 1590A - NORTH ELEVATION _ _ _ _ _ _ _ _ BREAKAWAY SLIDING 5. FINISH UNLESS ALL GYP.BD.WALLS SHALL BE 1 m 2 - - - - - - - - -2 SMOOTH UNLESS OTHERWISE NOTED. GLASS DOORS 84"x84" 1/4"=1 O" 1r OVERALL ROUGH 6, INSTALL BLOCKING IN WALLS AT LOCATIONS O \ S9OB \ Ii,590 2 OPENING OF BASE WALL MOUNTED CABINETRY.FIRE ------- EXTINGUISHER CABINETS,ALL WALL-MOUNTED 2 A 1 A SST SCRUB SINK W/ MEDICAL/HYGIENE EQUIPMENT,ETC. 8" 'I'-2 1/2" 1'-8" T 2 \ --� KNEE OPERATOR. RIM m - q ' OF SINK TO BE 2'-11" T ALL WALLS SHALL EXTEND TO UNDERSIDE jt1 OF DECK ABOVE UNLESS OTHERWISE NOTED. EQUIPMENT TRACKS, i NOTE:I.R.EQUIPMENT NOTE:EXISTING STEEL A.F.F. WALLS NOT AGAINST EXISTING MASONRY REF.MANUF. r TO BE INSTALL w/ 5 -A2.1 3 PAN 8 CONCRETE HUMIDIFIER,REF.MEGH/ WALLS SHALL BE BRACED WITH 3 1/2"METAL CLEARANCES AS J STRUCTURAL FLOOR ELEG/MANUF. KNEE OPERATOR MED GAS REQUIRED BY MANUF.y ' F 4__ TO REMAIN OMNI-CELL DEGREE ANGLE FROM TOP OF WALL TO UNDERSIDE OF ROOF DECK. �, t SST SCRUB SINK, RZOM1 It �r� � 8.FIRE SPRINKLER HEAD LAYOUT BY OTHERS. REF.PLUMB. U1 H15 OB k� - FIRE SPRINKLER HEADS TO BE RELOCATED OR `p EXISTING WALL TO ADDED AS REQUIRED AND TO MEET CODE. HAVE A LAYER OF -4 EXISTING WALL TO n n LEAD ADDED TO 9. MECHANICAL LAYOUT BY OTHERS. GRILLES, HAVE A LAYER OF ../ry STUDS S NEW GYP. VENTS,ETC TO BE RELOCATED OR ADDED AS ry f LEAD ADDED TO H REQUIRED AND TO MEET CODE. K STUDS S NEW GYP. TO BE MUDDED, TO BE MUDDED, lei L_. TAPED,AND PAINTED. 10. ELECTRICAL LAYOUT BY OTHERS. O ) REF.INTERIOR SHEET � TAPED,AND PAINTED. i �� 1 OUTLETS,SWITCHES,ETC,TO BE RELOCATED REP.INTERIOR SHEET �\SF, (' FOR FINISHES OR ADDED AS REQUIRED AND TO MEET CODE. REMOVABLE PANEL FOR FINISHES. x 24"x32"x84"STORAGE RUBBER BASE,REF.ID1.0 \� >�'� CABINETS CEILING MOUNTED r 10'-11 1/2" MED-GAS NFPA 72 W _ H 1590B - NORTH ELEVATION PRIVACY CURTAIN, 2 REF.INTERIOR r;-o" 2'-tt' 3'-o" The Alarm system shall be Q 1/4"=1,-0„ SHEET FOR FABRIC. METAL R OF extended,altered or e PROVIDE CURTAIN ® augmented as necessary to Q C TIE®WALL ON FAGS OF STUD continue protection. TOWARDS EQUIP. T.O. UNEVEN DOUBLE -- ®® ® WALL TO END®GLG w/ SST.SCRUB HUMIDIFIER,REF. STEP IN FACE OMNILELL DOOR(LEAF ONE- OfJfN7KQ STRAPS TO CONNECT SINK,REF. MEGH/PLUM/MANUF. OF WALL 4'S LEAF TWO-27 H15gOA TO UNDERSIDE OF METAL LL Y PLUMB. '12"x 84' DECK ABOVE. COORDINATE 1 O Iu/MEGH TO AVOID REQUIRED W M EQUIPMENT CLEARANCES. REF.INTERIOR SHEET o A2.1 FOR FINISHES O N 90A Q + 0 O to N 500"DEEP DESKTOP n/ t LL a v WALL,FLOOR,8 CEILING 9"RECESSED DESKTOP O y w ry Z FINISHES TO BE SPEG'ED FOR COMPUTER MONITOR M N 'o BY INTERIORS W 0 co � m 72"x48"LEADED GLASS WINDOW J � o PROVIDE PROTECTIVE KNEE ansE,rsff. 00 z — Q PIPES INSULATION AROUND OPERATOR 2'_8" 2'-8" 2'-8" ioip — J U UjQ H 15ciOB - EAST ELEVATION — O LL 3 1/4"=1'-O" FLOOR PLAN - PROPOSED < z N 6 1/4"=1'-O" NORTH 00 EQUIPMENT TRACKS,REF. - STRUGT S MANUF. LEADED GLASS WALL TYPES - N.G. METAL t Luke's WINDOW I F17-535 (OPEN OPEN PROJECT DATE TO \ro( PRIVACY CURTAIN PLAN VIEW RATING UL DESIGN DE5GRIPTION(TOP TO BEYOND) BEYOND) BOTTOM) 17026 Issue Date 0 w ? DRAWN CHECKED r3 W.A.G.OUTLET 7 1 HR. 5/5"FIRE CODE GYPSUM BOARD Author DK A ovAw 1❑ _m N.G. U465 3 1/2"20 MSG METAL STUDS®16"O.G.WITH SOUND BATT INSUL 7 MED GAS ° NON-BEARING 5/5"FIRE CODE GYPSUM BOARD REVISED ___ RUBBER BASE, I.R.ROOM F LAYER OF LEAD TO RUN A.F.F.TO UNDERSIDE OF FLOOR ABOVE '------ REF.ID1.0 O ALL JOINTS 5TA(5&FRFP AND TAPED H 15gOB - SOUTH ELEVATION 1 HR. 5/5"FIRE CODE GYPSUM BOARD y 1/4° 1-O° a U465 3 5/8"25 M56 METAL 5TUD5®16"O.G.WITH SOUND BATT IN5UL x 4'-O" N.G. NON-BEARING -V ALL JOINTS STAGGERED AND TAPED SHEET TITLE Q W.A.G.OUTLET ur PRIVANY MED ° FLOOR PLAN O O o - WINDOW ? M 3 1/4"25 M56 METAL STUDS®16"O.G.WITH SOUND BATT INSUL x 3❑ N NON.C.-BEARING U465 5/5'FIRE CODE GYPSUM BOARD r ALL JOINTS STAGGERED AND TAPED o I.R.ROOM -m 0 PAINT BOTH R.AND WINDOW SIDES OF IN-FILL WALL ~ W w ovn CORRIDOR co L SHEET 3 EXISTING WALL w/LAYER OF LEAD TO RUN A.F.F.TO UNDERSIDE U `r NOG. U465 OF FLOOR ABOVE. G 4 NON-BEARING G 5 1/2"25 MSG METAL STUDS®ib"O.G.WITH SOUND GATT INSUL 2 O 5/5'.FIRE CODE GYPSUM BOARD 5 H 1590E - WEST ELEVATION RUBBER BASE, R. ALL-1 OINTS STAGGERED AND TAPED A2 . 1 w REF.ID1.0 I .ROOM 1/4"=1'-0" �0 m O GENERAL NOTE5: 1. EXISTING CONSTRUCTION SHALL REMAIN AND BE PROTECTED UNLE55 OTHERWISE NOTED. 2. ALL EXISTING EXPOSED TO VIEW FINISHED t6ENSED WALL SURFACES DAMAGED DURING ANY AP.CHREM CONSTRUCTION PHASE OF THIS PROJECT 6H-1G59 SHALL BE REPAIRED TO MATCH EXISTING WALL SURFACE AND CONDITION. ENTIRE SURFACE OF REPAIRED WALL(FLOOR TO CEILING AND $O•I-1\ '�� CORNER TO CORNER)SHALL BE REPAINTED. COLOR AS DIRECTED BY INTERIOR DESIGNER. 3. DIMENSIONS ARE FROM FACE OF STUD ~ :s UNLE55 OTHERWISE NOTED. �ST'A7�:�r•,.tto EXISTING GRID 8 DASHED LINE LAY-IN CEILING DEPICTS THE 4. ALL EXISTING GYP.BD.WALLS SHALL BE a TILES TO BE ` BORDER OF SANDED,RE-TAPED AND MUDDIED AS 2 REMOVED VINYL COVERED NECESSARY,SANDED SMOOTH,PRIMED,AND ua~i i ■ GYP.CEILING TILES PAINTED. i 5. FINISH ON ALL GYP.BD.WALLS SHALL BE VINYL COVERED SMOOTH UNLE55 OTHERWISE NOTED. GYP.CEILING TILES TO LAY IN A GRID 6. INSTALL BLOCKING IN WALLS AT LOCATIONS MATCHING THE OF BASE WALL MOUNTED CABINETRY.FIRE r L .� `�J L-'_.. `.J '_.. `.J _ SURROUNDING GRID EXTINGUISHER CABINETS,ALL WALL-MOUNTED MEDICAL/HYGIENE EQUIPMENT,ETC. EXISTING LIGHT - - 2'X4'LAY-IN LIGHT T. ALL WALLS SHALL EXTEND TO UNDERSIDE +---+---+---+---+---+ FIXTURES TO BE r FIXTURE,REF, OF DECK ABOVE UNLESS OTHERWISE NOTED. REMOVED O ELEG. WALLS NOT AGAINST EXISTING MASONRY i. WALLS SHALL SE BRACED WITH 3 1/2"METAL +---+---+---+---+---+ -i-1 �`_ \\° STUDS AT W-O"O.G.EXTENDING AT A 45 — DEGREE ANGLE FROM TOP O WALL TO i DE F UNDERSIDE OF ROOF DECK. r` - F\ +I ITI LE GRID 8.FIRE SPRINKLER HEAD LAYOUT BY OTHERS. e ACOUSTICAL S S ——— S ——— -- --I FIRE SPRINKLER HEADS TO BE RELOCATED OR `J L�•_�' `J L'_'-�'_�`J EQUIPMENT TRACKS, ADDED AS REQUIRED AND TO MEET CODE. -�- REF.MANUP.8 5TRUCT. 0. MECHANICAL LAYOUT BY OTHERS. GRILLES, +---+---+---+---+---+ r VENTS,FTC BE RELOCATED OR ADDED AS O REQUIRED AND TO MEET CODE. +---+---+---+---+---+ 10. ELECTRICAL LAYOUT BY OTHERS. CAN LIGHTS, OR ADDED AIS REOUEREDTC TO 13E AND TOE LOCATED RAN MEET CODE. r� �l I'- CEILING MOUNTED 7 I CURTAIN,REF. 0 00 DEMO NOTE5: L� �J L� �J L� �J INTERIOR SHEET ——— ——— FOR FABRIC MECHANICAL GRILLES, REF.MEGH. 1. INFORMATION SHOWN ON PLANS IS BASED ON W ORIGINAL BUILDING WINGS SUPPLIED TO THE DRAWINGS ———+———+———+———+——— DESIGN TEAM. FIELD VERIFY EXISTING 0 CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. CONTACT ARCHITECT WITH ANY DISCREPANCIES. �I� 2. PATCH EXISTING WALL5 WHERE DISTURBED BY �+ m REMODELING TO MAKE UNIFORM IN APPEARANCE 10 p (COLOR,TEXTURE,AND FINISH). Y W M 3. WHERE EXISTING WALLS ARE FILLED IN OR EXTENDED,REMOVE EXISTING BASE AND 13 00 REPLACE WITH NEW ON ENTIRE WALL. NEW BASE O N TO MATCH EXISTING STYLE,SIZE AND COLOR. Q + 0 4. PAINT NEW WALLS AND ENTIRE AREA OF EXISTING WALLS AFFECTED BY DEMOLITION AND LL Q m "ALL USE PRIMER AND 2 GOATS OF PAINT. — = o WALL TEXTURE TO MATCH EXISTING. PAINT TO a MATCH EXISTING DOLOR AND SHEEN. 9 5. REMOVE EXISTING FINISH MATERIALS PRIOR 0 m TO INSTALLATION OF NEW FINISH MATERIALS. W ❑ co J Co b. PRIOR TO BID,VERIFY LOCATION OF EXISTING J w Q ELECTRICAL SWITCHES AND/OR CONTROLS IN ALL WALL5 TO BE DEMOLISHED OR REMODELED Q Z a@@ CO RGP - EXISTING/DEMO REFLEGTED GEILING PLAN n TOVERIDTOAISOBEREGTRKEVOEMSARE > J J REQUIRED TO ALSO BE REWORKED OR vq 1 1/4"=1'-O" rvoRrH =1'-0° NORTH REMOVED. INCLUDE COST FOR REW W J ORK OR (' 1/4" P REMOVAL IN BASE BID. v O < m T. REPLACE EXISTING CEILING TILE DAMAGED V UL Coll) 0- z cd N DURING REMODELING. Q 8. FIELD VERIFY EXISTING DIMENSIONS. 0 9. REMOVE EXISTING DOORS,FRAMES,AND Suspended Ceiling Seismic Provisions from CISCA 0-2 for Design Glass G HARDWARE AND SALVAGE FOR OWNER. J L 1. Each individual fixture and attachments with a combined weight of 56 lbs.or less 10. MECHANICAL CONTRACTOR SHALL St Luke's shall have two No.12 gauge wire hangers attached at diagonal corners of the RELOCATE AND RECONNECT ALL EXISTING r 17-535 fixture. These wires must be slack. Any fixtures and attachments with a combined CONTROLS DISTURBED BY CONSTRUCTION. A.RIIN& weight greater that 56 lbs.must be independently supported from the structure.2. The main runner/cross runner intersections and all grid splices must have an 11. VERIFY WITH GENERAL CONTRACTOR WHAT4+ average ultimatetest strength of 60 lbs.or more in both tension and DEMOLISHED ITEMS MAY SE SALVAGED BYPROJECT DATE compression. The tensile test must allow for a 5"offset of the connection in OWNER. 17026 Issue Date any direction.3. The actual average weight of the ceiling system,including grid,panels or tile,light12. LOCATE AND RELOCATE FIXTURES AS SHOWN. DRAWN CHECKED fixtures, and air terminals must be2.5 psf or less. All other services must be PROVIDE CONDUIT,WIRING,DUCTS,AND OTHER Author DK supported independently from the ceiling system. For ceilings that have an MATERIALS NECESSARY FOR PROPER COMPLETE average weight greater than 2.5 psf,the ceiling may be installed as specified in INSTALLATION. REVISED GISGA Zone 3-4 provisions,taking into account the design lateral force factor appropriate for Zone 2. Other deviations or variations must be substantiated by15. GENERAL CONTRACTOR SHALL COORDINATE verifiable engineering data. ELECTRICAL,MECHANICAL,AND STRUCTURAL WORKWITH ARGHITEGTURAL. 4. The ceiling system cannot be used to provide lateral support for walls orpartitions. Walls or partitions may be attached to the ceiling grid provided they llow the ceiling membrane to move laterally to accommodate the required14. ALL FIRE EXTINGUISHERS ARE EXISTING- clearance as specified below. REMOVE/RELOCATE AS INDICATED,RETAIN AND Allperimeter closure angles or channels must provide a support ledge of PROTECT FOR RE-INSTALLATION. SHEET TITLE approximately -1/8 in.or greater. A terminal end of a grid member(or tile)must rest on the ledger or molding with at least 3/8 in.clearance from an edge or wall REFLECTED For perimeter closure angles that provide a support ledge of less than noted above, the terminal ends of each cross runner or main runner shall be CEILING MIN.4 independently supported within 8 in.from each wall or ceiling discontinuity. This PLANS TURNS IN 1 1/2"o BOTH GENERAL NOTE: support may be a No.12 gauge hanger wire or other support that prevents the x ENDS OF ACOUSTICAL SUSPENDED grid from falling. This wire does not need to be vertical but should not have a o kNIKE TMP CEILINGS TO AL50 BE slope greater than 1 in b out- of-plumb. A 5/5 in.grid end clearance from a wall INSTALLED PER should be maintained. W MANUFACTURER'S All ceiling penetrations(columns,sprinklers,etc.)and independently supported '^ RECOMMENDATIONS,IBG fixtures or services are to be considered as perimeter closures that also must v l m 2006,AND A5TM G 635 AND allow the noted clearances by using suitable escutcheons or closure details. SHEET H ASTM G 636. b. At wall closure ledges,the cross runner and main runner ends shall be prevented ti from spreading apart from each other. Permanent attachments(i.e.pop rivets)for C grid alignment purposed shall not be permitted. A8.0G o Q_ HOLLOW METAL FIXED WINDOW w/TEMPERED GLASS, 2 gA9.0 110EIa5EJ ACOUSTICAL d E 7 A7.ChfRGi INSULATION ARAW HOLLOW METAL FIXED WINDOW, 1 FER w/TEMPERED PLAN GLAZING m pq'0 Level 1 '00 WINDOW HERD/51LL- DETAIL WINDOW JAMB - DETAIL Ar I-r<w 1 1/2"=1'-0" a WINDOW SCHEDULE t- m TYPE R•O• HEAD HEAD JAMB SILL GLAZING EE WALL MARK WIDTH HEIGHT HEIGHT TYPE MATERIAL DETAIL DETAIL DETAIL TYPE COMMENTS T'PE 1/2" DOOR 5/8"GYP.BD. SEE SCHEDULE p 6'-O" 4'-O" 'I'-O" 5-Fixed-0 METAL 5/A0.0 4/A0.0 5/A0.0 PROTECTIVE LEAD LAYER ON GLAZING METAL FRAMING HOLLOW HOLLOW METAL ���ccc METAL KNOCK-DOWN KNOCK-DOWN DOOR HARDWARE SCHEDULE DOOR FRAME DOOR FRAME -2 1/2 SEE SCHEDULE EQ EQ 4'-O" 2'-O" 5ET No 1 METAL FRAMING 3 DOOR:590A 3 A9.0 A9.0 2 CONTINUOUS HINGES MGK-FM300 EFT US26D MK SEE AAL 5/,GYP. D. 2 EXIST DEVICES 12 55 56 N56110 ETL LG U552D 5A TYPE 1 AUTO OPERATOR 5W2001 DUAL PU5H/FULL 689 BM 2 KIGKPLATE5 K1050-10 U552D RO 1 DOOR STOP 415 U526D RO DOOR HERD - DETAIL DOOR JAMB - DETAIL 4 4 1 GASKET S PE 1 ASTRAGAL 544B-nir IPE A9.0 A9.0 2 ELEC.POWER TRANSFER EL-GEf 51) p O 1 1/2"=1'-0" 2 FRAME HARNESS QG-G1500 MK 2 DOOR HARNESS QG-G(LENGTH AS REQ'ED) MK 2 ACTUATORS 505 NO 1 POWER SUPPLY BPS-24-2 SU Level-O" V n '- 590E S 590G 590A 100 HORTON TYPE 510 DOOR SCHEDULE w DOOR FRAME Q MARK TYPE DETAIL HARDWARE FIRE Q WIDTH HEIGHT MATERIAL FINISH MATERIAL FINISH HEAD JAMB SILL SET RATING DESCRIPTION fv� 590A A 6'-0" T-O" WOOD STAINED METAL PAINTED T/A9.0 6/A9.0 N/A 1 590E B T' all WOOD STAINED METAL PAINTED 'f/A9.0 6/A9.0 N/A None Single Slide Tracked Y Door W M 590G B T' all WOOD STAINED METAL PAINTED '7/A9.0 6/A9.0 N/A None Single Slide Tracked t M Door 10 00 O oN O Q + ro o 51DE SOAP LL 2 m WALL OF - o STALL REAR DISPENSER t TOILET WALL OF TOWEL a v PAPER STALL DISPENSE DISPENSER R OM N c 1'-O" 1 3/5" NAPKIN 3'-6" TOWEL ' 0„ t I Q M m DISPOS DISPENSER J_/y_ LLJ00 AL 5'-4" /WASTE J REGEPTAG _ _$_&_ _ _ _ _ _ _ _ _ _ _ HANDLE J LLI 2 LE— Q z_ m a, j/ _ LLoo I > J JLLJ v a v Xm N ° moo " " ro Q m o ° — 0LL Z r N "KANGA" CHILD SANITARY TOILE . ill FIRE in m p 6„ a in f m I in 7 m in m ROBE TOWEL TOWEL WALL SPECIMEN CHANGIN, SAFETY NAPKIN SEAT m DRINKING LIGHfa MOP EXTINGUISH �N `! 0- Z a m ry ry - HOOK BAR RING SHELF PA55 TABLE ry SEAT DISPENSE COVE URINAL FOUNTAIN SWITG HOLDE ER ELEGTRICA Q > N HRU R CABINET L 2 coB.O. LAVATORY FO�REACH�° BATHROOM REFLECTIVE ACCESSORIES ACCESSORIES TYPICAL FIXTURE 1 NOTES: RFAGE HEIGHTS SCALE:1/4"-1'-0" J L St 1. DIMENSIONS SHOY4N ARE TO FINISHED WALL Luke s 2. NOT ALL FIXTURES MAY BE USED ON THIS PROJECT I 17-535 PROJECT DATE 17026 Issue Date o: DRAWN CHECKED w Author DK REVISED Y Q U (7 Q y x SHEET TITLE DOOR/ WINDOW M HARDWARE/ ap t DETAILS W co SHEET f.> C o A9.0 ARCWrEM A,662 EQUIPMENT H 15900 g•3o•Il\/�� i � I DJlgr'✓!IJI�'iU a FINISH SCHEDULE FLOOR FINISH: xl� l\' -ARMSTRON6 LINORETTE, _ saoB I _ COLOR:BAMBOO TAN-L5010 \ � II \ It,SaoG II RUBBER BASE: > -JOHN5ONI7 E,TRADITIONAL COVE, COLOR:63 BURNT UMBER 4-1/4" \ \ MALLS: -FIELD COLOR:BENJAMIN MOORE, HG-35-POWELL BUFF -TRIM COLOR:BENJAMIN MOORE, EC -38-DECATUR BUFF ------ -ACCENT HC-161 COLOR: N GRAIN MOORE, HG-161-TEMPLETON GRAY � I.R. LAMINATE: ROOM � VERTICAL SURFACE IH15qOB WILSONARTE,COLOR:SHAKER CHERRY#1935-60 HORIZONTAL SURFACE FORMICA,COLOR:FLAX GAUZE#-7-108-58 r' CEILING TILES: -REPLACE GEILIN6 TILES AND GRID AS REQUIRED. FINISHES OF TILES AND GRID TO MATCH EXISTING. EXISTING FINISH:LINORETTE,13AME00 i! TAN PRIVACY CURTAIN: MOMENTUM W PATTERN-VINEA COLOR-TEA REPEAT 26"L X 24-1/2"W O NON-RAILROADED F e FINISHED CURTAIN LENGTH TO BE Z.fNI�'ROL 2"AFF. CURTAIN TAG:5LH5 MAGIC VALLEY H15gOA m a INTERVENTIONAL RADIOLOGY. Y C ao m co1 o 40A O [� ---- + 0�y � - LL N Q M _ m - 22 _ O t W a } o co - J 00 J ui 2 a J J FLOOR FLAN - INTERIOR FINISHES U J Q 1/4"=1'-O" NORTH V z N Qto 00 J L St Luke's I F17-535 PROJECT DATE 17026 Issue Date o: DRAWN CHECKED w Author DK REVISED Y Q U (7 Q y x SHEET TITLE INTERIOR FINISHES o M 06 o t W LSHEET d C ID1 .0 a STRUCTURAL ABBREVIATIONS SHEET INDEX GENERAL NOTES # NUMBER NTS NOT TO SCALE SHEET CURRENT CURRENT GENERAL REQUIREMENTS(CON TESTSAND INSPECTIONS & AND OC ON CENTER NUMBER SHEET NAME REVISION REVISION DATE @ AT OD OUTSIDE DIAMETER S0.01 STRUCTURAL COVER SHEET SITE VERIFICATION:THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND INSPECTIONS:SPECIAL INSPECTIONS AND TESTING SHALL BE DONE IN ACCORDANCE FESS\EN I EN�iy 0DIAMETER OPP OPPOSITE 51.01 FRAMING PLAN CONDITIONS AT THE SITE.CONFLICTS BETWEEN THE DRAWINGS AND ACTUAL SITE THE STATEMENT OF SPECIAL INSPECTIONS PER IBC SECTIONS 1704 AND 1705 AS FF ALT ALTERNATE OSB ORIENTED STRAND BOARD 55.01 DETAILS CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER APPLICABLE.FOR SPECIFIC SECTIONS: * BEFORE PROCEEDING WITH THE WORK.THE CONTRACTOR SHALL INVESTIGATE THE 1705.11(SEISMIC SPECIAL INSPECTIONS) 1 a56 ARCH ARCHITECT PERP PERPENDICULAR SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILLED EXCAVATIONS OR 1705.12(SEISMIC SPECIAL TESTING) cnT 08/30/17 0 ARCHITECTURAL PL PLATE BURIED STRUCTURES SUCH AS CESSPOOLS,CISTERNS,FOUNDATIONS,UTILITIES,ETC. "9j9rF pF\OP�P� BOD BOTTOM OF DECK PT POST TENSION IF ANY SUCH STRUCTURES ARE FOUND,NOTIFY THE STRUCTURAL ENGINEER SPECIAL INSPECTORS:SPECIAL INSPECTORS SHALL BE EMPLOYED BY THE OWNER TO THfyy a 0� BPL BASE PLATE POST TENSIONED IMMEDIATELY. PROVIDE SPECIAL INSPECTIONS FOR THE PROJECT.SPECIAL INSPECTORS SHALL BE CI CONTROL JOINT PRESSURE TREATED GENERAL NOTES QUALIFIED PERSONS WHO DEMONSTRATE COMPETENCE TO THE SATISFACTION OF THE CL CENTER LINE REINF REINFORCE AUTHORITY HAVING JURISDICTION PER 1704.1. ADJACENT UTILITIES:THE CONTRACTOR SHALL DETERMINE THE LOCATION OF ALL REINFORCED GENERAL REQUIREMENTS o. CLR CLEAR ADJACENT UNDERGROUND UTILITIES PRIOR TO EARTH-WORK,FOUNDATIONS, STATEMENT OF SPECIAL INSPECTIONS:SPECIAL INSPECTIONS AND TESTING ARE REINFORCEMENT F CMU CONCRETE MASONRY UNITS REINFORCING GOVERNING CODE:THE DESIGN AND CONSTRUCTION OF THIS PROJECT IS GOVERNED BY SHORING,AND EXCAVATION.ANY UTILITY INFORMATION SHOWN ON THE STRUCTURAL REQUIRED BY 1704 AND 1705 FOR THE FOLLOWING: N CONC CONCRETE REQD REQUIRED THE"INTERNATIONAL BUILDING CODE(IBC)",2012 EDITION,HEREAFTER REFERRED TO DRAWINGS AND DETAILS ARE INTENDED FOR REFERENCE ONLY AND NOT FOR CONN CONNECTION AS THE IBC,AS ADOPTED AND MODIFIED BY THE LOCAL BUILDING DEPARTMENT WITH CONSTRUCTION. POST INSTALLED ANCHORS TO CONCRETE AND MASONRY:SHALL COMPLY WITH SCHED SCHEDULE AUTHORITY HAVING JURISDICTION. IBC SECTION 1705.INSPECTIONS SHALL BE IN ACCORDANCE WITH THE CONT CONTINUOUS SHTHG SHEATHING ALTERNATES:ALTERNATE PRODUCTS OF SIMILAR STRENGTH,NATURE AND FORM FOR REQUIREMENTS SET FORTH IN THE APPROVED ICC EVALUATION REPORT AND AS DF DOUGLAS FIR SIM SIMILAR REFERENCE STANDARDS:REFER TO CHAPTER 35 OF IBC.WHERE OTHER STANDARDS ARE SPECIFIED ITEMS MAY BE SUBMITTED WITH ADEQUATE TECHNICAL DOCUMENTATION TO INDICATED BY THE DESIGN REQUIREMENTS SPECIFIED ON THE DRAWINGS.REFER DIA DIAMETER NOTED IN THE DRAWINGS,USE THE LATEST EDITION OF THE STANDARD UNLESS A THE ARCHITECT/ENGINEER FOR REVIEW.ALTERNATE MATERIALS THAT ARE SUBMITTED TO THE POST INSTALLED ANCHORS SECTION OF THESE NOTES FOR ANCHORS ` SPEC SPECIFICATION �s€ El EXPANSION JOINT SPECIFIC DATE IS INDICATED.REFERENCE TO A SPECIFIC SECTION IN A CODE DOES NOT WITHOUT ADEQUATE TECHNICAL DOCUMENTATION OR THAT SIGNIFICANTLY DEVIATE THAT ARE THE BASIS OF THE DESIGN.SPECIAL INSPECTOR SHALL VERIFY ANCHORS "a STD STANDARD EL ELEVATION RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH THE ENTIRE STANDARD.ALL FROM THE DESIGN INTENT OF MATERIALS SPECIFIED MAY BE RETURNED WITHOUT ARE AS SPECIFIED IN THE POST INSTALLED ANCHORS SECTION OF THESE NOTES OR ELEC ELECTRICAL STRUCT STRUCTURAL SPECIFICATIONS AND CODES NOTED SHALL BE THE LATEST APPROVED EDITIONS AND REVIEW.ALTERNATES THAT REQUIRE SUBSTANTIAL EFFORT TO REVIEW WILL NOT BE AS OTHERWISE SPECIFIED ON THE DRAWINGS.SUBSTITUTIONS REQUIRE APPROVAL �6 T&B TOP AND BOTTOM REVISIONS BY THE AUTHORITY HAVING JURISDICTION OVER THIS PROJECT. REVIEWED UNLESS AUTHORIZED BY THE OWNER. BY THE SER AND REQUIRE SUBSTANTIATING CALCULATIONS AND CURRENT IBC EMBED EMBEDMENT T&G TONGUE AND GROOVE RECOGNIZED ICC ESR REPORT.SPECIAL INSPECTOR SHALL DOCUMENT IN THEIR _$ EQ EQUAL THRU THROUGH OTHER DRAWINGS:REFER TO THE ARCHITECTURAL,MECHANICAL,ELECTRICAL,CIVIL MECHANICAL.PLUMBING AND ELECTRICAL ANCHORAGE:ANCHORAGE AND SUPPORT OF SPECIAL INSPECTION REPORT COMPLIANCE WITH EACH OF THE ELEMENTS REQUIRED EQUIP EQUIPMENT TOB TOP OF BEAM AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION INCLUDING BUT NOT MECHANICAL AND ELECTRICAL EQUIPMENT,PIPING AND DUCTWORK IS TO BE DESIGNED WITHIN THE APPLICABLE ICC ESR REPORT. f EXIST,(E) EXISTING LIMITED TO:DIMENSIONS,ELEVATIONS,SLOPES,DOOR AND WINDOW OPENINGS, BY OTHERS.SEE ASCE 7-10 SECTION 13.2 AND TABLE 13.2-1.USE ISOLATORS, ^_ EXT EXTERIOR TOC TOP OF CONCRETE NON-BEARING WALLS,STAIRS,FINISHES,DRAINS,WATERPROOFING,RAILINGS,CURBS, FASTENERS AND BRACING APPROVED BY ICC-ES CAPABLE OF TRANSMITTING CODE STRUCTURAL STEEL FABRICATION:PER IBC SECTION 1705.2:SPECIAL INSPECTOR ffi TOCP TOP OF CONCRETE PIER DEPRESSIONS,MECHANICAL UNIT LOCATIONS,AND OTHER NON-STRUCTURAL ITEMS. REQUIRED LATERAL LOADS.ALL SUSPENDED EQUIPMENT IS TO BE SECURED WITH SHALL REVIEW THE FABRICATION SHOP'S QUALITY CONTROL PROCEDURES FOR GA GAGE OR GAUGE TOF TOP OF FOOTING LATERAL BRACING.SEE THE LATEST EDITION OF"GUIDELINES FOR SEISMIC RESTRAINTS COMPLETENESS AND ADEQUACY RELATIVE TO AISC 360 CHAPTER M AND N,OF THE a m GC GENERAL CONTRACTOR TOM TOP OF MASONRY STRUCTURAL DETAILS:THE STRUCTURAL DRAWINGS ARE INTENDED TO SHOW THE OF MECHANICAL SYSTEMS"BY THE SHEET METAL AND AIR CONDITIONING AISC CODE OF STANDARD PRACTICE,AWS D1.1-2004 STRUCTURAL WELDING CODE a GLB GLU LAM BEAM GENERAL CHARACTER AND EXTENT OF THE PROJECT AND ARE NOT INTENDED TO SHOW CONTRACTORS NATIONAL ASSOCIATION. AND IBC CODE REQUIREMENTS FOR THE FABRICATOR'S SCOPE OF WORK. _ TOS TOP OF STEEL GT GIRDER TRUSS ALL DETAILS OF THE WORK.USE DETAILS MARKED"TYPICAL"WHEREVER THEY APPLY.IF TOW TOP OF WALL LOCATIONS ARE FOUND WHERE NO TYPICAL DETAIL,TYPICAL SCHEDULE,OR SPECIFIC OBSERVATION VISITS:OBSERVATION VISITS(SITE VISITS)BY REPRESENTATIVES OF INSPECTION SUBMITTALS:SPECIAL INSPECTION REPORTS SHALL BE PROVIDED ON A HORIZ HORIZONTAL TRANS TRANVERSE DETAIL APPLIES,NOTIFY THE ARCHITECT/STRUCTURAL ENGINEER. ARCHITECT/STRUCTURAL ENGINEER DO NOT INCLUDE INSPECTION OF CONSTRUCTION WEEKLY BASIS.FINAL SPECIAL INSPECTION REPORTS WILL BE REQUIRED BY EACH ID INSIDE DIAMETER TYP TYPICAL MEANS AND METHODS.SITE VISITS DURING CONSTRUCTION ARE NOT CONTINUOUS SPECIAL INSPECTION FIRM PER IBC 1704.2.4.SUBMIT COPIES OF ALL INSPECTION A LONG LONGITUDINAL LINO UNLESS NOTED OTHERWISE STRUCTURAL RESPONSIBILITIES:THE STRUCTURAL ENGINEER(SER)IS RESPONSIBLE AND DETAILED INSPECTION SERVICES(WHICH ARE TO BE PERFORMED BY OTHERS). REPORTS TO THE ARCHITECT/ENGINEER AND THE AUTHORITY HAVING JURISDICTION LT WT LIGHT WEIGHT FOR THE STRENGTH AND STABILITY OF THE PRIMARY STRUCTURE IN ITS COMPLETED VERT VERTICAL OBSERVATIONS ARE PERFORMED SOLELY FOR THE PURPOSE OF DETERMINING IF THE FOR REVIEW. y MAX MAXIMUM FORM.THE STRUCTURAL DRAWINGS DO NOT INDICATE THE METHOD OF CONTRACTOR UNDERSTANDS DESIGN INTENT SHOWN IN THE CONTRACT DRAWINGS. VIF VERIFY IN FIELD CONSTRUCTION.THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO OBSERVATIONS DO NOT GUARANTEE CONTRACTOR'S PERFORMANCE AND ARE NOT TO PREFABRICATED CONSTRUCTION:ALL PREFABRICATED CONSTRUCTION SHALL CONFORM MECH MECHANICAL � o WP WORK POINT PROTECT THE STRUCTURE DURING CONSTRUCTION. BE CONSTRUED AS SUPERVISION OR VERIFICATION OF CONSTRUCTION. TO IBC SECTION 1703. MFD MANUFACTURED w � MFR MANUFACTURER COORDINATION:THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DETAILS AND SHOP DRAWINGS:SHOP DRAWINGS SUBMITTED TO THE STRUCTURAL ENGINEER FOR POST-INSTALLED ANCHORS(INTO CONCRETE) Q MIN MINIMUM ACCURACY OF THE WORK;FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND REVIEW SHALL CONSIST OF(1)MARKUP SET(FOR OUR RECORDS)AND(1) MISC MISCELLANEOUS DIMENSIONS;FOR SELECTING FABRICATION PROCESSES;FOR TECHNIQUES OF REPRODUCIBLE SET.NO MODIFICATIONS OR SUBSTITUTION OF DRAWINGS AND DESIGN STANDARDS:POST-INSTALLED ANCHORS INTO CONCRETE FOR THIS PROJECT 0 cc ASSEMBLY;AND FOR PERFORMING WORK IN A SAFE AND SECURE MANNER. SPECIFICATIONS WILL BE ACCEPTED VIA SHOP DRAWING REVIEW. ARE DESIGNED IN ACCORDANCE WITH AMERICAN CONCRETE INSTITUTE,ACI 318-11, rn APPENDIX D SPECIFICATIONS. V STRUCTURAL UNITS DIMENSIONS:DO NOT SCALE THE DRAWINGS.THE CONTRACTOR SHALL VERIFY ALL 1. CONTRACTOR SHALL REVIEW AND STAMP SHOP DRAWINGS PRIOR TO SUBMISSION FT-LB FOOT POUND DIMENSIONS PRIOR TO STARTING CONSTRUCTION.THE ARCHITECT SHALL BE NOTIFIED TO THE ARCHITECT/STRUCTURAL ENGINEER.CONTRACTOR SHALL REVIEW FOR POST-INSTALLED ANCHORS:ALL ANCHORS AND THREADED RODS INSTALLED IN a!K KIP(1000 LBS) C th OF ANY DISCREPANCIES OR INCONSISTENCIES.STRUCTURE NOTED IN THE DRAWINGS COMPLETENESS AND COMPLIANCE WITH CONTRACT DOCUMENTS. EXTERIOR OR DAMP ENVIRONMENTS SHALL BE GALVANIZED OR STAINLESS STEEL TO W ap M AS EXISTING SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND ANY DISCREPANCIES 2. SUBMIT SHOP DRAWINGS TO THE ARCHITECT/STRUCTURAL ENGINEER AS INDICATED PROTECT AGAINST CORROSION.INSTALL ONLY WHERE SPECIFICALLY SHOWN IN THE KSI KIPS PER SQUARE INCH SHALL BE REPORTED TO THE ARCHITECT/STRUCTURAL ENGINEER. OR SPECIFIED FOR REVIEW PRIOR TO FABRICATION.REVIEW WILL BE FOR GENERAL DETAILS OR ALLOWED BY SER.ALL POST-INSTALLED ANCHORS TYPES AND LOCATIONS 2 13 N LB POUNDS CONFORMANCE WITH DESIGN INTENT CONVEYED IN THE CONTRACT DOCUMENTS. SHALL BE APPROVED BY THE SER AND SHALL HAVE A CURRENT ICC-EVALUATION SERVICE O PCF POUNDS PER CUBIC FOOT MEANS,METHODS AND SAFETY REOUIREMENTS:THE CONTRACTOR IS RESPONSIBLE FOR 3. WHEN AN ENGINEER IS REQUIRED TO SIGN AND STAMP SHOP DRAWINGS AND REPORT THAT PROVIDES RELEVANT DESIGN VALUES NECESSARY TO VALIDATE THE O Q t PSF POUNDS PER SQUARE FOOT THE MEANS AND METHODS OF CONSTRUCTION AND ALL JOB RELATED SAFETY CALCULATIONS,ENSURE SEAL INDICATES ENGINEER AS BEING REGISTERED IN THE AVAILABLE STRENGTH EXCEEDS THE REQUIRED STRENGTH.SUBMIT CURRENT O. STANDARDS SUCH AS OSHA(OCCUPATIONAL SAFETY AND HEATH ADMINISTRATION)AND STATE OF THE PROJECT SITE. MANUFACTURER'S DATA AND ICC ESR REPORT TO SER FOR APPROVAL REGARDLESS OF PSI POUNDS PER SQUARE INCH DOSH(DEPARTMENT OF OCCUPATIONAL SAFETY AND HEALTH).THE CONTRACTOR 4. SHOP DRAWINGS ARE NOT A PART OF CONTRACT DOCUMENTS.THEREFORE, WHETHER OR NOT IT IS A PRE-APPROVED ANCHOR.ANCHORS SHALL BE INSTALLED IN t SF SQUARE FEET IS TO PROVIDE ADEQUATE EXCAVATION PROCEDURES,SHORING,BRACING AND ARCHITECT'S/STRUCTURAL ENGINEER'S REVIEW DOES NOT CONSTITUTE AN STRICT ACCORDANCE TO ICC-ESR AND MANUFACTURER'S INSTRUCTIONS.NO a v ERECTION PROCEDURES COMPLYING WITH NATIONAL,STATE AND LOCAL SAFETY AUTHORIZATION TO DEVIATE FROM TERMS AND CONDITIONS OF THE CONTRACT. REINFORCING BARS SHALL BE DAMAGED DURING INSTALLATION OF POST-INSTALLED } �p ORDINANCES. 5. SHOP DRAWINGS WILL BE REJECTED FOR INCOMPLETENESS,LACK OF ANCHORS.SPECIAL INSPECTION SHALL BE PER THE TESTS AND INSPECTIONS SECTION. $ STRUCTURAL ORGANIZATIONS COORDINATION WITH OTHER PORTIONS OF CONTRACT DOCUMENTS,LACK OF ANCHOR TYPE,DIAMETER AND EMBEDMENT SHALL BE AS INDICATED ON DRAWINGS. W ❑ M O ACI AMERICAN CONCRETE INSTITUTE TEMPORARY SHORING AND BRACING:THE CONTRACTOR IS RESPONSIBLE FOR THE CALCULATIONS(IF REQUIRED),OR WHERE MODIFICATIONS OR SUBSTITUTIONS ARE J 0, 00 �9 AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION STRENGTH AND STABILITY OF THE STRUCTURE DURING CONSTRUCTION AND SHALL INDICATED WITHOUT PRIOR REVIEW PER PARAGRAPH ABOVE. 1. EXPANSION ANCHORS: J W 9 a PROVIDE MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. 6. SUBMIT SHOP DRAWINGS AND CALCULATIONS TO GOVERNING CODE AUTHORITY A. HILTI KB-TZ ANCHORS-ICC ESR-1917 FOR ANCHORAGE TO CONCRETE ONLY Z AISI AMERICAN IRON AND STEEL INSTITUTE ANSI AMERICAN NATIONAL STANDARDS INSTITUTE SUCH MEASURES SHALL INCLUDE(BUT ARE NOT LIMITED TO):BRACING AND SHORING WHEN SPECIFICALLY INDICATED OR REQUESTED. > J I6 J FOR LOADS DUE TO HYDROSTATIC,EARTH,WIND OR SEISMIC FORCES,CONSTRUCTION 7. MAINTAIN A COPY OF ALL SHOP DRAWINGS REVIEWED BY THE APA AMERICAN PLYWOOD ASSOCIATION EQUIPMENT,ETC. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH THE ARCHITECT/STRUCTURAL ENGINEER AT SITE DURING CONSTRUCTION PERIOD. U J Q ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS WORK REQUIRED IN THE CONSTRUCTION DOCUMENTS AND THE REQUIREMENTS FOR 8. STRUCTURAL ENGINEER REQUIRES 10 WORKING DAYS AFTER RECEIPT OF SHOP ��—I� O L- w AWS AMERICAN WELDING SOCIETY EXECUTING IT PROPERLY.THE CONTRACTOR SHALL AT HIS DISCRETION EMPLOY A DRAWINGS AND CALCULATIONS FOR PROCESSING. V 0- z 03 N REGISTERED PROFESSIONAL ENGINEER FOR THE DESIGN OF ANY TEMPORARY BRACING 9. REPRODUCTION OF ANY PORTION OF THE STRUCTURAL CONTRACT DRAWINGS FOR AND SHORING. RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED.SHOP DRAWINGS PRODUCED IN CONSTRUCTION LOADS:CONSTRUCTION LOADS AND MATERIALS SHALL BE SPREAD OUT SUCH A MANNER WILL BE REJECTED AND RETURNED. 00 GENERAL SYMBOL LEGEND WHEN PLACED ON FRAMED FLOORS OR ROOFS.LOADS ON THE STRUCTURE DURING CONSTRUCTION SHALL NOT EXCEED THE DESIGN LOADS AS NOTED IN DESIGN CRITERIA AND LOADS BELOW OR THE CAPACITY OF PARTIALLY COMPLETED CONSTRUCTION AS l�St Luke s �--SLOPE DIRECTION(DOWN) DETERMINED BY THE CONTRACTOR'S PROFESSIONAL ENGINEER FOR BRACING/SHORING. rOW Il@r o DESIGN CRITERIA AND LOADS CHANGES IN LOADING:THE CONTRACTOR HAS THE RESPONSIBILITY TO NOTIFY THE SER SPAN DIRECTION OF ANY ARCHITECTURAL,MECHANICAL,ELECTRICAL,OR PLUMBING LOAD IMPOSED PROJECT DATE El RISK CATEGORY OF BUILDING N ._ ONTO THE STRUCTURE THAT DIFFERS FROM,OR THAT IS NOT DOCUMENTED ON THE 17026 2017-08-14 XX._XXll ORIGINAL CONTRACT DOCUMENTS(ARCHITECTURAL/STRUCTURAL/MECHANICAL/ SEISMIC DESIGN-ASCE7-10 CHAPTER 11 AND 13 DRAWN CHECKED MISCELLANEOUS ELEVATION ELECTRICAL OR PLUMBING DRAWINGS).PROVIDE DOCUMENTATION OF LOCATION,LOAD, SIZE AND ANCHORAGE OF ALL UNDOCUMENTED LOADS IN EXCESS OF 300 POUNDS. -SEISMIC DESIGN CATEGORY(SDC) C Po Ms 3 SITE CLASSIFICATION C A ELEVATION REFERENCE PROVIDE MARKED-UP STRUCTURAL PLAN INDICATING LOCATIONS OF ANY NEW -SEISMIC IMPORTANCE FACTOR(Ip) 1.5 REVISED EQUIPMENT OR LOADS NOT PREVIOUSLY DOCUMENTED.SUBMIT PLANS TO THE -MAPPED MCE: Ss=0.205 Si=0.080 ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. -DESIGN ACCEL: SDs=0.164 Soi=0.090 NOTE PRIORITIES:PLAN AND DETAIL NOTES AND SPECIFIC LOADING DATA PROVIDED ON -COMPONENT AMPLIFICATION FACTOR(Ap) 2.5 a SECTION CUT INDIVIDUAL PLANS AND DETAIL DRAWINGS SUPPLEMENTS INFORMATION IN THE -COMPONENT RESPONSE MODIFICATION FACTOR(Rp) 2.5 > STRUCTURAL GENERAL NOTES AND PROJECT SPECIFICATIONS. -COMPONENT OPERATING WEIGHT(Wp) 2000 Ib SHEET TITLE DETAIL CUT DISCREPANCIES:IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES, rl— m SPECIFICATIONS PLAN/DETAILS OR REFERENCE STANDARDS,THE ARCHITECT/ENGINEER STRUCTURAL SHALL DETERMINE WHICH SHALL GOVERN.DISCREPANCIES SHALL BE BROUGHT TO THE DESIGN LIVE LOADS-ASCE7-10CHAPTER 4 C) = ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. COVER SHOULD ANY DISCREPANCY BE FOUND IN THE CONTRACT DOCUMENTS,THE AREA LIVE LOADS(PSF)UN O REMARKS AND NOTES SHEET AA 0 REVISION CONTRACTOR WILL BE DEEMED TO HAVE INCLUDED IN THE PRICE THE MOST EXPENSIVE 2nd FLOOR 80 psf (FROM EXISTING DRAWINGS) OO WAY OF COMPLETING THE WORK,UNLESS PRIOR TO THE SUBMISSION OF THE PRICE, = THE CONTRACTOR ASKS FOR A DECISION FROM THE ARCHITECT AS TO WHICH SHALL w 1. Il 0.-011 FINISH FLOOR GOVERN.ACCORDINGLY,ANY CONFLICT IN OR BETWEEN THE CONTRACT DOCUMENTS co ELEVATION SHALL NOT BE A BASIS FOR ADJUSTMENT IN THE CONTRACT PRICE. LEEET 0 CHANGE(STEP) CC IN ELEVATION G UNISTRUT BRACE SYMBOL a VERTICAL UNISTRUT GENERAL NOTES A. ALL DIMENSIONS AND ELEVATIONS ON THE STRUCTURAL PLANS SHALL BE VERIFIED BY THE CONTRACTOR WITH THE LATEST ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION.ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE �g5\ONAL E,yF ARCHITECT AND ENGINEER IMMEDIATELY. �pF y�pEN�S` dF� B. CONTRACTOR SHALL FIELD VERIFY EXISTING STRUCTURAL 1 a56 CONDITIONS.IF ANY DISCREPANCY OCCURS BETWEEN EXISTING N 08/30/17 CONDITIONS AND PROPOSED ALTERATIONS,CONTRACTOR SHALL q T9T P-Z' l Fp \O CONTACT ARCHITECT AND STRUCTURAL ENGINEER BEFORE Th,FW FiL g�F PERFORMING ALTERATION WORK. 19 20 C. FOR GENERAL NOTES: S0.00 SERIES SHEETS 30'-0" a I I N I I I I I I �s€ g AA - —-—-—-—-—- -- -------------- (E)W21x44 65.01 J� }� ELL a �z - VERTICAL STRUT Mat � LOCATION,TYP a a (E)W16x3L, 1 -- - - MAX g �n v ft u1 u1 85.01 �� __ �• � o ni � �tiU i m --'(6W16x31 m SIEMENS CEILING C cq SUSPENDED EQUIPMENT j� W 1 PER ARCH. q.OF EQUIPMENT O G N UNISTRUT P1001 SUPPORT O W r, TYP COORDINATE LOCATION UNISTRUT P1000 HS LATERAL (Y G a WITH ARCH AND EQUIPMENT BRACE,TYP WHERE SHOWN - c MANUFACTURER _ a BB - ---------- - -- (E)W16x31 -- -------------- W ❑ M p 7 a8 J � °o I I J Lu 5 J J U JQ oLi- M zZ N Q 00 ��St Luke's' TRUE LEVEL 2 FRAMING PLAN Owner E SCALE: 1/4"=V-0" PROJECT DATE 17026 2017-08-14 tj DRAWN CHECKED PO MB REVISED SHEET TITLE N FRAMING PLAN o M 06 co SHEET H C S1 .01 g TYP. EXISTING FLOOR DECK 3 TYP EXISTING FLOOR DECK NN1eN�,y OF 4 I I EW R I,I 55.01 S5.01 I I Illelll J 1 T,,P lol lal ;I J 1 TYP. to I 1=1 I I I I I VERTICAL SUPPORT PER 3 S5.01 2 UNISTRUT BRACE lie ^II VERTICAL SUPPORT PER 3/55.01 °II ^II UNISTRUT LOCATION SEE PLAN N WHERE OCCURS,SEE LOCATION SEE PLAN I hell SUPPORT,SEE UNISTRUT BRACE WHERE OCCURS pLpry UNISTRUT I I PLAN ;I SEE PLAN SEE PLAN I I I 1= � � � ICI SPF200-050 . . I I . . . . I II SPF200-050 ADJUSTABLE ADJUSTABLE ---- ---------------------------------------- �- I Ld CONNECTOR,TYP AT EACH y CONNECTOR,TYP AT ----- ____J END OF BRACE s EACH END OF BRACE MAIN CARRIAGE RAIL AND NOTES: =a ATTACHMENT TO UNISTRUT 1. COORDINATE ANCHORAGE WITH BUILDING OWNER AND EQUIPMENT MANUFACTURER. (2)1/2"A325N DIA BOLTS E BY MANUFACTURER 2. THE LENGTH OF THE BRACE SHALL NOT EXCEED 9'-0"• TYP EACH END AND (2)1/2"DIA A325N 1.NOTES: 3. ANCHORAGE WITH BUILDING OWNER AND EQUIPMENT MANUFACTURER. 3. SEE DETAIL 1/55.01 FOR BALANCE OF INFORMATION. �� P1010 CHANNEL NUT 4. COORDINATE HANGER AND KICKERS WITH MEP PRIOR TO INSTALLATION. 8 BOLTS TYP EACH END 2. THE LENGTH OF THE BRACE SHALL NOT EXCEED 9'-0". 5. BRACE MAY BE SKEWED 100(MAX)IN ANY DIRECTION FROM ORIENTATION SHOWN IN THIS DETAIL. 1/2"A325N DIA BOLT AND AND P1010 CHANNEL NUT 3. BRACE MAY BE SKEWED 100(MAX)IN ANY DIRECTION FROM ORIENTATION SHOWN IN THIS DETAIL. P1010 CHANNEL NUT f MAIN CARRIAGE RAIL AND 6 z ATTACHMENT TO UNISTRUT BY ffi MANUFACTURER TYPICAL UNISTRUT ELEVATION LONGITUDINAL TYPICAL UNISTRUT ELEVATION TRANSVERSE 1 SCALE:NTS SCALE:NTS °u Je PLI/2"A36 SEE rE EXISTING FLOOR DECK DETAIL:5/55.01 o w . .. � m' cc f 1/2"x 3 1/4"EMBED 1/8 j j 0 HILTI KB-TZ,TYP r n O ' o (4 TOTAL) -'1/2" 1/2"DIA x 1/2"LONG A325N BOLT UNISTRUT a WITH FLAT WASHER,LOCK ADJUSTABLE -EXISTING FLOOR DECK UNISTRUT P9200 g WASHER AND HEX NUT CONNECTOR AND Y a TELESTRUT TUBE ? BOLTS,SEE 1/55.01 G f m UNISTRUT P9000 - od M N TELESTRUT TUBE - - —_ _ _ O a t z O r- n I 1/B - - C) o / o 1 1 2"TYP 1/2"DIA.HILTI KB-TZ WITH iv SEE NOTE 1 � 3 1/4"MIN EMBEDMENT 0 co 7 a8 1/2"DIA A36 THREADED ROD UNISTRUT RAIL PER PLAN UNISTRUT BRACE SEE PLAN .. NOTES: J 0, 00 0 x 4"LONG WITH(2)JAMBNUTS 1. COORDINATE ANCHORAGE WITH BUILDING J W r� AND(1)HEX NUT,TYP(2)PLACES PL 1/2x3x0'-7"A36 OWNER AND EQUIPMENT MFR. a5 WELDED TO TELESTRUT z (n 2. MEDICAL EQUIPMENT RAIL PROVIDED BY MFR UNISTRUT P1010 NUT NOT SHOWN FOR CLARITY. J J 3. F�INDICATES ALLOWABLE AREA FOR U LLJJ Q PLACEMENT OF VERTICAL UNISTRUT. _ o Li- NOTES: M 1. COORDINATE ANCHORAGE WITH BUILDING OWNER AND EQUIPMENT MFR. Q W z> N 2. MEDICAL EQUIPMENT RAIL PROVIDED BY MFR.NOT SHOWN FOR CLARITY. 3. ®INDICATES ALLOWABLE AREA FOR PLACEMENT OF VERTICAL UNISTRUT. D0 3 TYPICAL UNISTRUT TELESTRUT ANCHOR TO DECK 4 BRACE TOP CONNECTION DETAIL 5 PLATE DETAIL St Luke's' SCALE:NTS SCALE:NTS SCALE:NTS E Owner PROJECT DATE E 17026 2017-08-14 tj DRAWN CHECKED PO MB REVISED SHEET TITLE N DETAILS 0 M 06 co SHEET H C C S5.01 SAV BOX SCHEDULE MECHANICAL LEGEND PLAN OPERATING NORMAL DESIGN MINIMUM CONNECTION HEATING COIL SYMBOL DESCRIPTION CODE MFR MODEL LOCATION RANGE OPERATION CFM CFM SIZE COD) REMARKS (CFM) EWT LW7 GPM WPD APD MBH EAT EAT NEW TO EXISTING CONNECTION 5AV- THER15-H5 CONSTANT 1143 PHOENIX VAt12M-AL H1590B 90-1500 OWN VOLUME 1200 1200 IL84" 160 III 2 1 S' 035" 36 55 85 ---------------- TYPICAL DEMOLITION ITEMS NOTES: TYPICAL EXISTING ITEMS 1.BALANCE TO MATCH NEW DE51GN CRITERIA CFM'S 4 GPM, N 2.EXISTING 5AV BOX p4';•'J i PIPE BREAK � p R �— PIPE RISE VENTILATION CALCULATIONS c PIPE DROP IMC 2012 FGI HEALTHCARE GUIDELINES 2014 Rra-D qc VALVE IN RISER CEILING IN �'ND REQ'D DESIGN DESIGN rn ZONE ROOM NAME ROOM" PEOPLE AREA HT SPACE TYPE TOTAL CA II TOTAL MI IN EXH GFM CFM EXH CFM STATUS ¢❑MA.Rl:S _,p,_ REDUCER RIP Ra Vbz E. Voz ACH ACH PRESS. EXH CFM SAV- INTERVENTIONAL FLOW ARROW 1143 RADIOLOGY HI590 3 465 9.0 PROCEDURE I5 0.00 45 0B 56 15 3 POSITIVE - 1046 209 --- 1200 --• CO'-9PL1E5 _ • VENT TNRU ROOF NOTES: I.DESIGN MINIMUM OUTSIDE AIR(MIN OA)15 BASED ON 20%OUTDOOR AIR MINIMUM POSITION AT THE AIR HANDLER. W GATE VALVE --i61 BALL VALVE w - ioe,u, FAN COIL UNIT SCHEDULE (CHILLED WATER) Fa CIRCUIT SETTER(2"AND SMALLER LINES) 3 a M o9MM PLAN COOLING L>'7 CIRCUIT SENSOR(2","AND LARGER LINES) MFR MODEL TYPE LOCATION HP ELEC. MCA MOCP CFM ESP WEIGHT SEE NOTES N N CODE 5C MBH EAT EAT EWT LWT GPM WPD PRESSURE-REDUCING VALVE FCU-41 DAIKIN I LAP004A HORIZONTAL 141"015 1 IS 208/3m - - 1,400 0.15" 32b 80/62 55/54 45 54 $.0 l,2 430 1,2 Y NOTES: QT THERMOSTAT OR TEMPERATURE SENSOR Z 1.PROVIDE WITH 4"MERV-8 FILTER SECTION,BAG-NET CONTROL INTERFACE,DIRECT DRIVE FAN WITH MATCHED vFD,',TV FURNISHED WITH FUSED DISCONNECT SWITCH. "'- 2.UNIT SIZED WITH 40%GLYCOL SOLUTION. �■ FIRE/SMOKE DAMPER L E O -� SPIN-IN FITTING WITH HAND DAMPEER 47 aid 2 G' ,a, 3d-,.T'..^ ^�,r <_`'' (FUtU ) ® SUPPLY DUCT(UP OR DOWN) •� COMcheek Software Version 4.0.5.] ._ .. - 0 ElRETURN DucT(uP oR DOWN) W '� O EXHAUST Mechanical Compliance Certificate = AUST DUCT(UP OR DOWN) ® a - U -_. .. �NJJJJJ- FLEXIBLE DUCT W d Project Information --� CEILING 5UPPLl'DIFFUSER E 0yG P. 2012€FCC i L : c J f2J AN-, rrgect Tale. St Lukes Magic Valley-1R Room Upgrade - - ._ I "s r + El W 1 S$ ��-+- CEILING RETURN GRILLE .. ---- ----.... --.--. ......_...... , T In Falls,Idaho -+- CEILING EXHAUST GRILLE a -1 cl g zn=e so j1 Fo :Type: Addizlan iY.3 GRILLE & REGISTER SCHEDULE �� $IDE WALL GRILLE OR LOUVER non5ae. or—Aw.t. oesglce:G trader. ec fls..role Une Goad Insight Ar<nrtects M cr c tensors PLAN O MECHANICAL EQUIPMENT(PLAN VIEW) Fe11s 1083301 2238 aroaoway Avg ai e RE Bois o,r,lo—poraced CODE DESCRIPTION MFR MODEL FINISH MARKS O y e,W 8370E .222 Broadway Ave 208-338-908C Maize.IC 837M O ` 208,343-3663 II Nj-ACTURER6 SEE x MECHANICAL EQUIPMENT IDENTIFICATION CD CEILING DIFFUSER TITUS 'DGA S`ANr NOTE5 ?cl, d� Mechanical Systems List S.DEWAL'_SUP=�Y MA'v F4C-i RER'S SEE HW5— HEATING WATER SUPPLY "2RL 0uantl 55G TITUS 2 ty System 7ypo80esar Description GRILLE s A11DARD NOTES � 1 I c c1 yH z — —HWR— — HEATING WATER RETURN u 0 n rya i. pa y 33 xn N Exanomlzer Ecommzer axcogmn-r+nrre RG R-"JN GRILLE TTJ W NOTES S 50= ^^ANJFAC`URER'S SEE W � }���f y oa��em t R S ANDARD esN/ � , F Sy 4 mV FC d F4t3 C�+p the.or._m ms-:,NP meuhodl'Pa�ex J LL 30d G Es J W tgaaS FAN t Sopp3y-Co 1a mm 14„o CFM.lsmomrrameplalanp CCNT CTOR S:JALL VERIFY EXACT BU LDIN'G CONSTRUCTION 4 CEILING Q Z '= 5 a PROVIDE CORRECT FRAMES FOR ALL AIR DIFFUSION PRODUCTS \ U� 8wt r Mechanical Compliance Statement s REG !RED VERIFY ALL COLORS 4 FIN15HE5 L,'I-W ARCHITECT PRIOR TO MECHANICAL ABBREVIATIONS / J J pY� .. i JBM T T-E FOLLOWING MANUFACTURER'S ARE ACCEPTABLE W -J ur c st t:T F p -d t d y p e led i.[h d v t i t qh the o-ld y plans SCB T_5 FR ✓DitiG THEY MEET THE REQUIREMENTS AS SCHEDULED: U _J Q c'1e pe + r d en c I z 6 tt a tN rr p ppaca[ TI.p npn d h :cal y t _n e Deers NA_..R�ApNES KRUEGE METAL AIRE,TUTTLE 4 BAILEY,AND TITUS. O LL d y w c F d 2072 EPC q L,menu m CDMcn x v mn 0 51 and to comply M0,an R SYMBOL MEANING SYMBOL MEANING y appl bl mandatory 1 d tt<<sP k" Che kl GR L REG ST.R 4 DIFFUSERS INSTALLED IN ALL CEILINGS SHALL BE Z .. AUTHORITY HAVING mkloael>­,feosv,P.E;__- �d��`L_ SEc R` N�oR JPPORIED IN ACCORDANCE WITH INTERNATIONAL AHJ MAX MAXIMUM >> P Ham •"' - �^y? � y^^,_.:.-. BJ L IN Goc TANDARD9 FOR SEISMIC DESIGN. JURISDICTION 3.FRG✓r, Ex oNDED LINKAGE FROM HAND DAMPER TO A FLUSH CUP BTU BRUTISH THERMAL UNIT MBH ONE THOUSAND BTU PER GPN,CF ALED DAMPER REGULATOR IN ALL HARD CEILING LOCATIONS HOUR NACCt 5 BLE GEILING5).PROVIDE SECURITY SCREWS TO SECURE CFt,. CUBIC FEET PER MINUTE MIN MINIMUM tl LL15 r TO CEILING REFER TO ARCHITECTURAL REFLECTED CEILNr- +'3 1�111=A~+� CLANS FOR ALL GE:L'NC-TYPES. i!:,3>LukeS GEG F DEGREES FAHRENHEIT N/A NOT APPLICABLE FINDOWN NO. NUMBER N 17-535 ENERGY CODE COMPLIANCE NOTES EAT ENTERING AIR TEMPERATURE NTS NOT TO SCALE PROJECT DATE -- 1.HVAC HEATING 4 COOLING LOADS ARE CALCULATED IN ACCORDANCE ENTERING WATER 17026 0813012017 WITH THE ASHRAE FUNDAMENTALS HANDBOOK EWT TEMPERATURE OD OUTSIDE DIAMETER 2.REFER TO CONTRACT DOCUMENTS(DRAWINGS 4 SPECIFICATIONS)FOR PRESSURDRAWN CHECKED _ MORE DETAILED INFORTIATION ON THE FOLLOWING ITEMS: FLA FULL LOAD AMPS PE) DIFFERENCE DROP OR AS MG SEQUENCES OF OPERATION,INSULATION THICKNESSES AND R-VALUES, SEALANT MATERIALS AND INSTALLATION,AND SPECIFIC EQUIPMENT F-M FEET PER MINUTE TAB TEST,ADJUST 4 BALANCE COMPONENTS. GPM GALLONS PER MINUTE T-STAT THERMOSTAT 191[Eel HW HOT WATER TYP TYPICAL KW KILOWATT VAR VARIABLE EAT LEAVING AIR TEMPERATURE VOL VOLUME SHEET TITLE -- LUli LEAVING WATER TEMPERATURE W/ WITH MECHANICAL COVER SHEET � M DRAWING INDEX SHEET NUMBER DESCRIPTION 'W'^ i. moo MECHANICAL COVER SHEET V J MO] MECHANICAL SPECIFICATIONS SHEET L M-I LEVEL 01-FLOOR PLANS-HVAC (� M2.1 LEVEL Ol-FLOOR PLANS-HVAC PIPING LEVEL 01-FLOOR PLANS-PLUMBING P21 LEVEL 01-FLOOR PLANS-MED GAS n A W FPi.I LEVEL 01 FLOOR PLANS FIRE PROTECTION I``(,' ^ ■ j j- 15010-BASIC MECHANICAL REQUIREMENTS 15100-VALVES 159M-CONTROLS AND INSTRUMENTATION GBNEltAL GENERAL Revision to exist-._.g ing conb'oI system. All work shall conform to latest adopted versions of IBC,SMACNA,UPC,IMC,NFPA,IFC,IFGC and all other General duty valves common to most mechanical piping systems. SAV box with reheat coils: applicable codes enforced by the authorities havingjurisdiction. Comply with ASME B31.9 far building services piping. Occupied mode:On call for heat from space thermostat SAV shall be at minimum position. The reheat valve fhe scope of the work included under this Division of the Specifica.ions shall include mechanical systems as shown on Comply with MSS Standard Practices referenced. shad modulate as required to maintain room setpoint.B'valve is]00°5,open and space mntperaunc to drop,SAV drapers the plans.The Ccormicto shall provide all supervision,labor,material,equipment,machinery,plant and any andall other to modulate open to increase airilow.On a call for cooling the SAV damper shall modulate open as required to maintain items of equipment as indicated on the drawings and as required la,complete and opc.ti...I systems. PRODUCTS setpoint On call for cooling,reheat valve shall be closed. Contractor shall give all necessary notices;obt an u o ain d pay fix all ponds;pay all go.. ment sales Laces,fees and other Ball Valves:MSS SPA 10,full port,class 150,600 psi cwp,bronze body,stainless steel trim. com - costs incurred in connection with the work;file all necessary plans;prepare all documents and obtain all required Gme Valves(2 1/2"and smaller):MSS SP-80,class 125,200 psi cwp,bronzet Inocculed ing On a call fur heat w maintain setback tomerasure,the reheat vole shall modulate as required body. P - P certificates of inspections for his work and deliver same to the Engineer befom request for acceptance and final payment Swing Cheek Valves(2 1/2"and smaller):MSS SP-80,class 125,200 psi cwp,bronze body. to maintain reduced space temperature.SAV m be at minimum position. fir the work. Swim Check Valves'3"and large,):MSS SP-71,class 125,200 i-, cast iron hoed On a call fix uouling,SAV dannper to modulate open as required to maintain space set up temperature. g ( l r• Y Np All materials installed shall bear the UL label and.}tall be new,full weight,and of best quality with the same brand or Provide graphic of SAV box with the following: ntmfacturer used for each class of material or equipment. Occupied/Unoccupied setpoint The Contractor shall follow drawings in laying out work,check drawings of other trades and verify on-site conditions in 15326-WET-PIPE SPRINKLER SYSTEMS I ke.pied4lnuceupied temperature �.. which work will be installed. GENE R AL Space temperature The Contractor shall protect all work,material and existing fimnishings from damage by his work or workmen and shall Comply with requirements of Authority Having Jurisdiction. Discharge air temperature de-..lW rL be Liable for all damage thus caused. Comply with requirements of Owner's insurmice underwriter. All equipment,unless shown otherwise,shall be securely attached to the building structure in an approve rin ad d maintain. Licensed Technician:Submit drawings, culatims n and installation inspection reports. Rcbcat valve position, Two complete sons of blueline as-bail/mechanical drawings will be provided for the buihfng structure in:m approved Include seal and signature of registered NICF-T Lcvcl HI Technician licensed in jurisdiction. SAV damper position a, manner. luabillee.Qualifications:Firms licensed by Slane Fire Marr lal qualified to install and alter fire prole farm in compliance Box CFM `a with the requirements ofth,Authority Having Jurisdiction. I R Ram Humidifier t l-I: m re i Provide three sets of MECHANICAL SU BMI I PALS for the Architect and Engineer's review,identifying the folletwin g Y 8 8 A spas¢nmunrtd sensor anId I en or shall at Italian clean v.ilve on I I outmant uuii t- l t nidity. I.Supplier and Come actor ,name,comsp ny and all eament info rmation PIPE AND TUBES: Do.sensor limit lrt valve preventcondensation in duct A duct high hint shall edema DOC.and atop Humidifier 2.Schedule an list of all equipment,including make,type,manufac mar's name,and trade designation of all materials Steel Pipe.ASTM A 53,Schedule 40 with thouaded nr mil gmnveat lotinga - and equipment to be used and furnished. Steel Pipe:ASTM A 135,Schedule 10 with roll grooved finings. on high limit A rmontun•senwr in duel down.tarn of hum-didrr shall alarm UDC water in duct. 3.Include a complete list ofall accessories and options provided. Provide graphic of Humidifier with the following: 4.Equipment perfixmanec,ratings and capacities-include tin curves,blower chaos,manufacturer print outs,air and SPRINKLER APPLICATIONS(QUICK RESPONSE) Room KIT water pressure drops,RPM values,sound pressure values,equipment construction,fish guarantees and color Rmmm without Ceilings:Upright sprinkler.,char,,plated I our.RH net plant selections. Rooms with Suspended Ceilings:Scmi-recessed sprinklers,chrome Nate High limit set point 5.List all dimensions of equipment,as are necessary to check space requirements. Wall Momdi.g:Sidewnli sprinklers- High limit alarm Spaces Subject to Freezing:Upright,pendent dry-type and sidewall dry-type sprinklers. W met in duct Provide two sets of OPERATION AND MAINTENANCE MANUALS for the Owner to be submitted through the � in Architect and Engineer for review,identifying the following: 15411-WATER DISTRIBUTION PIPING a o m ry 1.Equipment model and size. PIPES AND TUBES Note ATC to provide I lumidisms,high Limit and water sema.t. 012.1 2.Equipment suppliers with addresses and telephone numbers. hard Copper Tube:ASTM B 88,Type L,water tabs,drawn tcmnper with wrought copper solder fittings. a 0 m b" 3.Replacement pans. 15910-ConttWs o v 4.Service requirements. JOINT MATERIALS Equipment R m` $a Solder:ASTM B 32,Alloy S.95,Sn94 or F;lead free. FC U-4I Space sensor modulates 2 way chilled water valve to maintain satpomt Fan shall ran continuously. rr as All work under this section shall be guaranteed in writing to be free of defective rock,materials or parts for a period of �o t g UNDERGROUND PIPING ATC to provide controls interface and.pernro Fun Coil,cuoolmale with unit manufustomr. in ca. one year after acceptance of the contract. A.uncut in drain n chat I fflannn DDC and Close chilleA watt vM1lve. 3-1/2"NPS and Smaller,Hard copper tube,Type X.copper solder-joint pressure fittings and solden joints.Provide with Pa' 2 SELECTIVE DEMOLITION two layers al-Sm wra tch p. Disconnect,demolish and remove mechanical systems,equipment and components indicated to be removed. If pipe, Contacts Contractor-Provide system grythic with the following: insulation of equipment to remain is damaged in sppearnnce or is unserviceable,--dom.ged m ans—taxable CLEANING . hCll smrr/smp,'stawx •L�' ortions and.Place 1 th new rid t .,'equal uv and quality. Use purging and disinfecting procedures prescribed by Authority(laving Jurisdiction or,if method is not prescribed, S t t p p aco wi pro uc s o'oqu capacity q y. pace sc poi, I.Piping or duct no be maramid: Remove portion of piping or duct system medicated.n Drawings and cop an plug procedure described in either A W W A C:651 or AW WA C652. •Space temperature re manning piping or duct withsame or compatible material. .Chilled water v-nlve position �`Ig 2.Piping or duel to be abandoned in place:Drain piping and cap piping.,duct with.erne orcompalible material. 15420-DRAINAGE AND VEN•F PIPING D 3-Equipment m be romrved:Disommeol and rap....inns;munwo equipment PIPE AND TUBES •Filter change alarm I 0� 4.Fgnipment to be removed and reinstalled:Disconnect and cap services;mom�e,clean and store equipment;reinstall. Hubless cast-iron Soil Pipe:ASTM A888 and CISPI 301 with heavy duty no hub compact banded filings and •Drain pa.alarm C - reconnect and make equipment operational. rxapimgs. W W S.Equipment to be removed and salvaged.Disconnect and cap services;remove equipment and dcliver to Owner 15990-TESTING,ADJUSTING AND BALANCING 0 15510-HYDRONIC PIPING GENERAL 15lar -PIPING IDENTIFICATION PIPE AND TUB]roper o MATERIALS "■! provide self'adhesiveon piping identification,labels with Row arrows in direction of flow,and,mntmtts on all piping and Drawn Temper Copper Tubing:ASTM B 88,Type L. The regwnd cols aW procedures for natal....mccllut systems testing,adjusting and balancing(TAB)include Color code JAW ANSI munsudng.it ref tabllshing the fluid quantities of mechanical systems as required to meet design sPecitications i i d U J a Domestic: PIPE APPLICATIONS cording and repining the results cold water.CW Pot pipe sizes 2"and smaller,use Type,L,drawn capper robing with wrought capper finings. ttTest,adjust and balance the following mechanical systems. Q hot water.HW 1.Supply air systonts,all prcsa acre ranges. hot water ream:HWIL ADJUSTING AND CLEANING 2.Bet=air systems. <�/ Medical gases: Clean and air hydrome piping systems. 3.Exhaust r systems. LL cleaning- medical air.MA Chem treatment Chemical Treatment:Provide a water analysis and initial treent after completion of system testing and cleaning. d.Hydrome systems : oxygen:02 5.Verify temperature control system operation. vacuum:VAC - LL Vent:VEN'['1'IPING Waste:WASTE PIPING a - _ ___ QUALITYASSURANCE - - _ - - - Test and Balance Enb ce Qualifications:An independent cos,,diu t igistered m the state m which the services _ llydronic - - f successful TAB p i n projects w th 1 ements,a y ms chilled w",crrcturre CHWR " .�. .....-... ...�. .... - years o sac c c.c.m be perConnd ad)rn- m least 3 yea1 s sic e, - chilled wnlei supply:CHWS similmmthose specified for this project. O tw= rj r Steam. ;: ...:,-,. .,it s.:a., Codes and Standards. ex er• �-onrequirements in'tino steam:STEAM - - a" """" �- i.AABC"National Standards for Total System Balance." condensate:CONDENSATE m " 15763-INDOOR FAN COIL 15016 DUCT IDENTIFICATION Fan cal zeal FCU41 PERFORMING TESTING,AUJUSTING AND BALANCINGse Provide stenciled labels on all supply,room andexhaust ducts with flow armws. Dunkin package indoor horizontal air broader,LAN series or al,ceiling mounted with chilled water coil,direct drive Perform TAB procedures on each system rdemit d in accordance with the detailed procedures ou[lined in the gy - pp y, pat equal, g moon referenced standards LL VFD blower and motor,2 way chilled water valve,duct Ranges,condensate pan with overflow switch,1"double wall � 1'. 15060 HANGERS AND SUPPORTS panel constmctiou,factory wiring,contactorahm rters,etc. � M - G Tha Coordinate with cnnlmis com actor for unit central and integration into facility BMS system(Yamas Controls). RECORD AND REPORT DATA 11 age"and supports for mechanical systems piping and equipment including seismic restraints per IBC in accordance Record all dam obtained during TAB d,t gathering m, cordance with,and on the forms recommended by,the with SMACNA Seismic Design Guide for service zones as identified by current IBC. avenfle 2"pleated air filter MERV 8 is rack with gaskmed door seals,condensate pump,lusted disconnect,dram pan refer coved standards ad as approved on sample report forms.tic W co verflow,and rod hangers with rubber isolamrs. PRODIjCfS DEMONSTRATIONJ W Manufactured Units Han ers,Supports and Components:Facto fabricated accordin to MSS SP-58. 15815-METAL DUCTS 8 upp. P Factory g Training:Train the Owners maintenance personnel oa trouble shooting procedures and TAB procedures. Q Z SHEET METAL MATERIALS \ EXECUTION Sheet metal in thickness per SMACNA,packaged and marked as specified in ASTM A 700. n p' Hanger and support applications and installation shall comply with MSS SP 69 and SP-89. Install Tangent,supports, LU _I clamps and attachments as required to properly supp ngort piping from buddi structure DUCT LINER U J Q ingisaw. Equipment support requires fabricated structural steel stands to suspend equipment from structure above or support �L 7tU Comply with NFPA Standard 90A,1,1 1/24 density- equipment equipment above floor. Materials:ASTM C 1071,with coated surface exposed to airstream to prevent erosion of glass fibers. Z LfS ' 15081-DUCT INSULATION 'i GENERAL SEALING MATERIALS When installed indoor..,insulation shall have a flames read ratio f 25 or less and a smoke developed f 50 or Joint and Seam Sealant:One- ivenl-release-curio 1 zed butyl.tenant J i'"` ui P g o f ed raring o putt,coming,so g,po 1'men Y I.. less INSULA FION MATERIALS FIRES STOPPING PING ; Insulation materials shalt be Mineral-Fiber Blanket Thermal Insulation:Glass fibers bonded with a thermosetting resin. I -R tat Sealant: U.L. listed for application one-part elastomeric sealant formulated for use in a Lukens" Comply with ASTM C 553,Type 11,without facing and with all-service jacket monufactmed from Kom paper,reinforcing lhromgh penctrntion fire-slop system. ?" searina,and aluminum foil. .l DUCT FABRICATION ,. 1 7-535 y: ACCESSORIES AND ATTACHMENTS Galvanizd sheet steel in accordance with SMACNA" VAC Duct Construction Standards-Metal and Flexible." z t� Weld-Attached Anchor Pins and Washers:Copper-coated steel pin for capacitor-discharge welding and galvanized Fabricate duct to 6"W.G.upstream of VAV Boxes and 2"W.G.downstream.Ramp and Exhaust dorms 2"W.G. PROJECT DATE speed washer. 17026 08/30/2017 Adhesive-Attached Anchor Pins and Speed Washers:Galvanized steel plate,pin and washer manufactured for HANGERS AND SUPPORTS t„ attachment to duct and plenum with adhesive. Support sys tems indicated in SMACNA"HVAC Duct Concoction Standards-Metal and Flexible." DRAWN CHECKED DUCT SYSTEM APPLICATIONS AS MG '? insulate the following plenums and duct systems: 15820-DUCT ACCESSORIES Supply-air ductwork DAMPERS REVISED iv Round and rectangular supply and moon r ducts,concealed and exposed. Low-pressure manual dampers,single-blade spin-in with locking operator. Material:Mineral-fiber blanket,2"thick-75H/cfdmsiry one layer,foil and paper jacket with joints taped. FIRE AND SMOKE DAMPERS 15083-PIPE INSULATION Fire/Smoke Dampens:Casings of 1 t gauge galvanized steel,f ible link rated al 160"P lac 165"F,spring-loaded leakage GENERAL seals in sides of casing.120 V,power-open/spring-closed motor,Class 2. W hen installed inclusion,insulation shall have a flame spread rating of 25 or less and a smoke developed rating of 50 or ('i less. TURNING VANES Fabricaterni tung vanes in accordance with SMACNA"HVAC Duct Consnuction Standards-Metal and Flexible." SHEET TITLE < INSULATION MATERIALS Mineral fiber insulation shall have glass fibers bonded with a thermosetting resin cornptying with ASTM C 547,Type 1, DUCT ACCESS DOORS MECHANICAL with factory-applied all-purpose vapor retarderjacket. Provide same or ductwork,use insulated d,wns for insulated ductwork. Q greats gauge as FIELD APPLIEDJACKETS SPECIFICATIONS Cl? +Y Provide standard PVC timing covers. FLEXIBLE CONNECTIONS 00 Neopecu ecomed flameproof fabric crimped into duct Ranges for attachment to duct and equipment to GENERAL APPLICATION REQUIREMENTS Flex Duct:Insulated flex for 6"w-.g.with liner.Maximum length of 5'-W with no sharp bends. - L ^.' Apply insulation continuously through hanger:,walls and Boras in accordance with mmnufacturets written instructions. W I INSULATION APPLICATION SCHEDULE INSTALLATION OF DUCTWORK ACCESSORIES L�//J� ill Domestic cold comer;steam;condensate and heatingester.Provide I"thick insulations rem or IECC whichever is Install ductwork accessories in accordance with manufacturcls installation inspcctions,with applicable portions of v) w system Per details of construction as shown in SMACNA Standards and in accordance with recognizedto ensure SHEET greater,mineral fiber insulation with PVC fitting covers. industry practices H Chilled water Provide l"thick,mineral fiber insulation with PVC fitting and retarder. thaPeLc serveintended tunaimu_ piping: g covers an apor e LU M0 . 1 GENERAL NOTES A. ALL WORK WITHIN CONTRACTOR'S SCOPE SHALL COMPLY WITH ALL APPLICABLE STATE 4 LOCAL CODES 4 ALL REQUIREMENTS Or THE AUTHORITY HAVING JURISDICTION. Ib'de SSG 24x24 Rra 12xI2 56G B. CONTRACTOR TO REPAIR AND PATCH BACK ANY HOLES IN WALLS S50 OEM 450 CFM 45OVE CEILING THAT RESULT FROM DEMOLITION OR INSTALLATION -12"AFF -I;,,AFr OF MECHANICAL ITEMS -------- SHOWN IN A ............ C. ON THE NEW HVAC PLAN THE EXISTING HVAC WILL BE LIGHTER LJNII FOR CLARITI'AND THE NEW LvAr-WILL BE -12xI2 CD SHOWN 46 A DARK LINE, r vi-VA 400CFM TY,OF F D. PROVIDE SEISMIC RESTRAINTS FOR ALL EQUIPMENT,DUCTWORK 4 < I x PIPING AS RECOMMENDED IN THE LATEST EDITION OF 6MACNA h "SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL c EQUIPMENT." C FOR THE SEISMIC RATING OF CONSULT LOCAL CODES 0 1 THE BUILDING SITE. 1 12X12 Cc, 3 OCFM S WAY) E. VERIFY EQUIPMENT REQUIREMENTS 4 COORDINATE WITH ALL OTHER 77 I TRADES AS NEEDED TO ENSURE THAT SERVICE I OTHER MAINTAINED.-REQUIRED CLEARANCES ARE t (FUTURE) F. SEAL ALL PENETRATIONS Or FIRE-RATED ASSEMBLIES WITH U.L. FIRE-RAtTFD SYSTEM. Ii TO ARCHITECTURAL AffrROVrT:) G. DUCTWORKSIZES SHOWN ON DRAWINGS ARE NET FREE AREA DIMENSIONS. IT 15 THE GONTfi RESrON6115ILITY To ACCOUNT FOR ANY INSULATION OR LINING AS REQUIREP BY SPECIFICATIONS. Iro --- H. PROVIDEeNGLE-THICKNE55 TURNING VANES IN ALL OW L -PRESSURE MITERED 1.50-DEGREE FI15016.NO 5ULLIFEAD TEES ALLOWED.. 12XI2 CC) I. PAINT ALL VISIBLE DUCTWORK BEHIND GRILLES 4 REGISTERS FLAT (2-WAY) 13LACK, w �p r7iiyy J. PROVIDE FLUSH CUP CONCEALED OPERATORS ON ALL HAND DAMPERS LOCATED A50VE HARD OR INACCESSIBLE CEILINGS. K rLEXIELE DUCT R�.IN-OUT5 ARE LIMITED TO 5--o"MAXIMUM LENGTH. 12.12 L. VERIFY FINAL LOCATION Or DIFFUSERS,REGISTERS 4 GRILLES WITH 350 C ARCHITECTURAL REFLECTED CEILING PLAN$4 ELECTRICAL LIGHTING LAYOUT. n, M, VERIFY FINAL Ii OF T�bTATS,FILII AND SENSORS I2x24 RG I Ir __ •f�y IliWITH CIENERAL CONTRACTOR PRIOR 70 INSTALLATION. LL f- LU m ni 18.12- n, ILI 11 12 24x24 RG 0. IExlx ' �o� .... ... l'o, ................... ...................... ........... ............................................................- - ---------------------- --------- 0- ................. 75 0 0 cr- LEVEL 1 DEMO FLOOR PLAN HVAC 2 LEVEL 1 FLOOR PLAN HVAC elf CD 1/4" 114. 1/4"=1'-0" a co W 00 `N < w KEY NOTES I. REMOVE DUCTWORK,DIFFUSERS AND GRILLES AS SHOUN. < iHmt C) w 2. REMOVE PRE55URE SENSOR FOR RELOCATION IN NEW DUCTWORK. rrnn 0 ILL W 3- RELOCATE PRESSURE SENSOR z :d [) 311,419Z,� .09N� < "L 4. PROVIDE FLANGED 4'-C"DUCT SECTION FOR FUTURE 5TRAJG14T RUN Lr) OF 5TAINLE55 STEEL OR ALUMINUM DUCT FOR 5TEAM A155ORPTION. 00 5. COORDINATE LOCATION OF NEW FAN COIL WITH STRUCTURAL SUPPORTS FOR IMAGING EQUIPMENT. 'U Lukdt' 6. COORDINATE DUCT LOCATION WITH STRUCTURAL TIE RODS. 1. DROP SUPPLY DUCTS DOWN CHASES PROVIDE FOR EQUIPMENT 17-535 COOLING LOW AND RETURN HIGH IN EQUIPMENT CLOSET. fj 8. BALANCE ROOM TO POSITIVE PRESSURE 0.02"WC, 'PROJECT DATE 17026 08130/2017 S. REMOVE THERMOSTAT AND REPLACE WITH SIMILAR STAT WITH 0 HUMIDITY MONITORING CAPABILITY. 51-16 TO MONITOR HUMIDITY DRAWN CHECKED LEVELS. AS MG 2 10, THROUGH WALL BALL TYPE ROOM PRESSURE INDICATOR. REVISED 'SHEET TITLE LEVEL 1 FLOOR C) PLAN HVAC cy) o6 w U) 'SHEET w M1 . 1 GENERAL NOTES ................ ............. ...... ------__. -- ;�2't" A. ALL WORK WITHIN CONTRACTOR'S SCOPE SHALL COMPLY WITH ALL •' APPLICABLE STATE t LOCAL CODES<ALL REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. B. ITEMS BEING DEMOLISHED ON THE HYDRONIC DEMOLITION PLANS •-- YPE AND UNLESS ----- WILL BE SHOWN AS A DARK DASHED LINEi NOTED OTHERWISE ARE TO BE REMOVED. .......... ••a••- �.-'i' ' � G. CONTRACTOR SHALL CARE FOR,STORE,AND MAINTAIN IN j I L A ORIGINAL CONDITION ALL EQUIPMENT NOTED TO BE RELOCATED. ' PRIOR TO RE-IN5TALLATION THE CONTRACTOR TO CLEAN N O f ' ! RELOCATED FIXTURES, nQY w.dk1F" t _ tP D. ALL DEMOLISHED EQUIPMENT THAT ARE NOT 5HOWN TO BE RELOCATED ARE TO BE TURNED OVER TO CWNER'S STOCK- Q I (FUTURE) - ' 7-: IS I , I KEY NOTES ")'" `� •.,�..... ;._._:: ........:... ........... G__ I, CONNECT I"GHW9 i GHWI@ TO EXISTING AND PIPE TO NEW FAN COIL. m a FIELD VERIFY SU PLT AND RETU�i PIPE. COORDINATE CHW � SYSTEM SHUTDOWN WITH PCT CT OPERATION. �1 Z I = Q 2. ROUTE CHW54R ABOVE EQUIPMENT ACCESS. L�� O 41 3, MAINTAIN 42"CLEAR. �� V r' ....�_��- n ........... �'..A3.......... ............... Q -K - QJ ar rUd .•{ i W )� 1- _... .. ... , ...: , I I Q 7 r r 1 LEVEL 1 — FLOOR PLAN — HYD liik M2.1 1/4"=1'0" — — O PO') (') Of 00 J z df sq Q Ui J 17 W p U � Q Ell U az L0 :.'. 00 �- REDUCER(TYP.) II NOTE: SHUTOFF VALVE TO BE A ""' Luke's" MANUAL AIR VENT BALL VALVE FOR PIPE i€6 =a' SIZES 2"AMC)SMALLER -� ,.1 PETE'S PLUG(TYP.) PROVIDE A BUTTERFLY s � 17-535 y COOi I FLEX GONN.CTYP.) VALVE FOR LARGER SIZES. / `\� 6ECT DATE 1702 08/30/2017 }r' CIRCULATING SETTER DRAWN CHECKED I }. BALANCE0 GPM AS MG UNION(TYP.)— SETTO SHUT-OFF VALVE(TYP.) REVISED 2-WAY MODULATING CONTROL VALVE 1 STRAINER VI, OWljl , _ NOTE: 1\J OHu'' VERIFY COIL VALVE PIPING 1 WITH ATG CONTRACTOR. SHEET TITLE :r LEVEL 1 -FLOOR CHILLED WATER COOLING COIL PLAN HVAC o PIPING PIPING DETAIL (2-WAY VALVE) 0L6 SCALE NONE 1� w i SHEET G M2, 1 In GENERAL NOTES A. ALL WORK WITHIN CONTRACTOR'S SCOP€SHALL COMPLT WITH ALL APPLICABLE STATE t LOCAL CODES t ALL REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION, B. COORDINATE PLUMBING FIXTURES AND RELATED PIPING WITH ALL OTHER TRADES AS REQUIRED, c, ITEMS ElE ON THE E OR PLUM15ING .. _ ._ _ # .__. -._ -_ - -- DEMOLITION pEAMOL SLE BE SHOWN ASTA DARK DASHED LIN€TYP€ - s - -- _ "�"""'""--•' -------`- ---= AND UNLESS NOTED OTHERWISE ARE TO BE REMOVED. N �f I O D. CONTRACTOR SHALL CARE FOR,STORE,AND MAINTAIN IN ORIGINAL CONDITION ALL EQUIPMENT NOTED TO BE RELOCATED- �p RELOCATED FIXTURES. ION THE CONTRACTOR TO CLEAN PRIOR TO RE-INSTALLATION LAT R E. ALL E I-TOLISHEZI EQUIPMENT AND FIXTURES THAT Ali NOT TO E 'S RELOCATED ARE TO BE TURNED OVER TO OWNER 5TOCK. WV 3 .....................1 -^ j' PROTECT LOWER LEVEL AS REQUIRED FOR DEMOLITION AND - I. -- F_ INSTALLATION OF WASTE PIPING. � G. ALL EXISTING FLOOR PENETRATIONS REMAINING AFTER REMOVAL EX FIXTURES AND PIFIINr�AIRE TO B ISTING FINISHED SURFACES ANDTO REESTABLISH FIRE RATING. H. CONTRACTOR TO PROVIDE FOR REPAIR AND PATCHING BACK .(FUTURE) ANY HOLES IN WALL ABOVE CEILING THAT RESULT FROM DEMOLITION AND/Oft INSTALLATION OF PLUMBING ITEMS. I_ SEAL ALL PFNFTRATIONS OF FIRE-RATED ASSEMBLIES WITH U.L. I i APPROVED FIRE-RATED SYSTEM. REFER TO ARCHITECTURAL i I I (� DRAWINGS. a f ro mw°l J. E ON THE NEW WASTE OR NEW PLUMBING i ANS TI-4r rxiSTIN6 I �a I: i W WN ILL BE 5HO IN IA LIGHTER LINETYPE FOR CLARITY AND THE INry a a m m 1 4Ei- I NEW PIPING WILL BE SHOWN AS A DARK LINE, •s 'I I 1 . ( r - �s4" IC REFER TO ARCHITECTURAL FLOOR PLANS FOR EXACT FIXTURE ...._�._ .._._._......_ i: / "` -GD _j LOCATIONS AND MOUNTING HEIGHTS. s•: { `• m° __________ __________ ,,,._, CAP }' . -- ------� -__----GAP------_-- -- FOR L. LOCATE WATER PIPING IN HEATED AREAS ONLY. DO NOT LOCATE mow.a I (-r' ......... FOR FUTURE PIPING IN NON-INSULATED ATTIC,CEILING d WALL SPACES. -i ........................1 .. i I FUTURE o o M, ACCESS PANEL LOCATIONS MUST BE COORDINATED WITH EITHER �p o - -�-.�� (/ ARCHITECT OR GENERAL CONTRACTOR. ,�L 1FUTURE PIPING 1 n L TO SUPPORT t' +�i .. N_ REFER TO FIXTURE SCHEDULE FOR SIZES OF Eli VENT,HW AND I ,.C.W..__.... I 1 +l :. ! .--- PRa�WI�NGUTAKESFPREGEDENGE PIPE LIB LABELED ON DRAWING, If1' - wL"IIDIFIER -� ---... ._._-.. i .... v i \ ...... ---- IIJ a ~'t J -I _.. .... ., ....... u. .._-- ._........_ ... _ "........, i ; E.... 1 r i I -_-� _...1. ��t ..._._.._.............. __.._...._ ......._..._._.. .... ..«.._.r .. ___..._........._ _....._.�.._ ................ � KEY NOTES ........ ....._... .__..._....... ....._.............. ...C;4,,.,.._ ......_,._.....,. ........... ................. .. .,_..,......._...... _...._.._......... I_ REMOVE SECTION OF PIPE FOR LOOP EXTENSION. ---,. - 2. CONNECT lie"HW TO EXISTING AND EXTEND HW LOOP SYSTEM AS C `....-._...,. - SHOILi G 3 3"WASTE RUN IN WALL TO EXISTING 4"WASTE RI5ER IN CHASE, O FIELD VERIFY WASTE RISER IN CHASE PRIOR TO FIXTURE OR EQUIPMENT INSTALL. 4. CONNECT'/2"CW TO EXISTING AND RUN DOWN IN WALL TO -1-1 1 LEVEL 1 - DEMO FLOOR PLAN - PIPING 2 LEVEL 1 - FLOOR PLAN - PIPING SCR B SINK. "— ---- --- 5. CONNECT 7"CW TO EXISTING AND RUN DOWN IN WALL TO C) P� 1/4°=1'•0" F1 1/4°=i'-0° Z HUMIDIFIER. CONNECT PER MANUFACTURERS RECOMMENDATIONS. M 6. 34"CONDENSATE DRAIN DOWN IN WALL TO OPEN HUB P=2- W ' J W a Q Z & 34"CONDENSATE r W J `A DRAIN J Una ilp U a Z J: LO i 3 00 PLUMBING FIXTURE SCHEDULE I sY" DESCR PT ON HOT COLD J45TE VENT - :,row QR b Luke s ' r-' r.. "�4t^?aP SGRJB SINK 2 17-535 ... .. '. 16 xl6 i III _J AND COVER PLUMBING PROJECT DATE VER G FIXTURE SPECIFICATIONS nozs oWaonon '- Stainless Scrub 51nk: Elli EW5-3120. 14 gauge Type 304 stainless steel 1.. P I scrub sirdc package FLmished with LK3S5A goosenecc spout with laminar flow DRAWN CHECKED outlet,LK39lC knee action mixing valve with wall mount bracket, LK18B AS MG strainer,tallplece,trap and angle stops. Open Hub= Provide(2)4"1 open tubs where shown. Provide 16"1 OPEN - - P-T stainless steel wall access door and wall box. REVISED OPEN HUB $'. 2" �: ---2"VENT ni SHEET TITLE t� LEVEL 1 FLOOR O 2„ PLAN—PLUMBING CY) 06 if, f° U) b WALL BOX DETAIL SHEET SCALE:NONE nG P1 . 1 GLL Lu GENERAL NOTES A. ALL WORK WITHIN CONTRACTOR'S SCOPE SHALL COMPLY WITH ALL APPLICABLE STATE 4 LOCAL CODES 4 ALL REQUIREMENTS OF THE "- AUTHORITY HAVING JURISDICTION. B. CONTRACTOR TO COORDINATE AND VERIFY REQUIREMENTS WITH OWNER AND CONSTRUCTION MANAGER WHEN MEDICAL GAS SERVICE IS INTERRUPTED FOR DEMOLITION THE EXISTING MEDICAL GAS ICE OR CONNECTION TO r SERV ' C. CONTRACTOR TO INSTALL ALL MEDICAL GAS PIPING IN _ ACCORDANCE WITH ADOPTED UPC AND NFPA SS. N� >�1t - -- D. CONTRACTOR TO COORDINATE REQUIREMENTS WITH MEDICAL GAS �O SUPPLIER,GENERAL CONTRACTOR AND OWNER FOR EXACT ROUGWAN LOCATIONS- ___ -_ - E. MEDICAL GAS PIPING SHALL BE LISTED Tl-PE A5TM Ebl9'K'OR'L' _ COPPER MEDICAL GAS TUBE. ASTM B$I 9 SHALL BE IDENTIFIED BY M THE MANUFACTURER'S MARKINGS PER NF.PA.98. i Q (' V�Mh F. ALL PIPING,VALVES AND FITtINGS SHALL BE GLEANED rn AC y - INTERNALLY TO REMOVE GREASE,OIL AND OTHER OXIDIZABLE O/AG�; - MATERIALS PRIOR TO DELIVERY TO SITE. G. BRAZING OF ALL JOINTS SHALL BE PERFORMED IN ACCORDANCE WITH ADOPTED UPC.AND NFP.A.SS. ---- . H- WHILE BEING BRAZED,JOINTS SHALL BE CONHNUOUSLT-PURGED IY' b"MA WITH OIL FREE DRY NITROGEN TO PR€V€NT THE FORMATION OF c 4�. COPPER OXIDE ON THE IN51DE SURFACE OF THE JOINT, THE FLOW t OF PURGE GAS SHALL BE MAINTAINED UNTIL THE JOINT IS COOL TO THE TOUGH. - r ' p. I Ta 1[: -r i I i I. MEDICAL GAS TESTING SHALL BE PERFORMED IN ACCORDANCE :`v, i; _ ' -- WITH ADOPTED IDAHO STATE PLUMBING CODE,U.P.C.AND NF,PA, r v jj. 1: yg J. MAXIMUM PIPE HANGER SPACING SHALL BE PREFORMED IN N n ' �m I a;¢T - .----. ACCORDANCE WITH NF.PA.SS. k 't PIPE =6 FEET P PIPE -S FEET "PIPE .10 FEET K LABEL PIPINGS IN CEILING SPACE AT 20'INTERVALS. O 9 j L. PROVIDE 20"CLEARANCE BELOW WALL MOUNTED MEDICAL GAS an t OUYLETS AND 10"ABOVE EACH OUTLET. =' ' {! M. LABELING OF ALL MEDICAL GAS LINES TO BE PER NF.P.A.99. N. MEDICAL GAS LINE BALL VALVES LOCATED ABOVE CEILING W 1�4"VAG - - yqC SPADE TO BE LOCKABLE TYPE. Vj Hd • 4'°MA02 Q - - - ------ �---J Irt"02 O- MINIMUM VACUUM SYSTEM PIPE SIZE TO ALL OUTLETS 19 P. 4 l P. SEAL ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES WITH U.L. W -- _ 2 6 g C I APPROVED FIRE RATED SYSTEM. REFER TO ARCHITECTURAL DRAWINGS. --- �..� ;;, _-, � Q. ON THE MEDICAL GAS REMODEL PLAN,THE EXISTING MEDICAL - V V GAS PIPING WILL BE SHOWN IN A LIGHTER LINETYPE FOR CLARITY ti.---+J; ----p2-- AND THE NEW MEDICAL GAS PIPING WILL BE SHOWN AS A DARG LINE. ^ _y I j R REFERENCE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATION OF ALL WALL MOUNTED MEDICAL GAS OUTLETS AND THE j ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION C OF ALL CEILING MOUNTED MEDICAL GAS OUTLETS. G S. T, HAVE MEDICAL GAS PIPING CERTIFIED BY APPROVED AGENCY O FOR CROSS CONTAMINATION AFTER COMPLETION. f 1 LEVEL 1 - FLOOR PLAN - MED GAS KEY NOTES P2.1 114"=l-V } O !� O I. FIELD VERIFY EXISTING CAPPED MEDICAL GAS LINES IN CEILING Z SPACE. REMOVE EXISTING CAPS AND CONNECT NEW MEDICAL GAS LLI C) M F; LINES TO EXISTING MEDICAL GAS LINES. REMOVE HANDLES PER J 00 II CODE. Lij Q 2. DROP 2"OXYGEN,1/2"MEDICAL AIR,I"VACUUM AND 34"WAG DOWN Q z T `-' TO NEW MEDICAL GAS ZONE VALVE BOX. > J J `4 3. DROP MEDICAL GAS '1�"OXYGEN LINE,II,"MEDICAL AIR,I" W J VACUUM LINE AND 34"WAG DOWN IN THE WALL TO THE NEW J ¢ ^r MEDICAL GAS WALL OUTLET FOR EACH MEDICAL GAS TYPE. (n 0 L JJ VERIFY AND MATCH THE EXISTING HOSPITAL'S MEDICAL GAS lJ z n. SYSTEM AND OUTLETS. REFERENCE ARCHITECTURAL ELEVATIONS ?i FOR LOCATION AND MOUNTING HEIGHT OF THE MEDICAL GAS WALL Q Lo ti OUTL€T5. VERIFY WITH OWNER REQUIREMENT FOR A VACUUM co e� BOTTLE SLIDE FOR EACH VACUUM WALL OUTLET AND PROVIDE h - SLIDE PER OUIER'S DIRECTION. IRECTIO. T.REFER TO THE ARCHITECTURAL ELEVATIONS FOR MO 4. NEW MEDICAL GAS ZONE VALVE BOX LOCATED IN CORRIDOR. Lukds t> PROVIDE AN AMIGO MULTIPLE ZONE VALVE BOX WITH VALVES ANDt=-i-i MONITORING GAUGES THAT CONFORMS TO N.F.PA SS OR EQUAL. 3. 17-535 NEW ZONE VALVE BOX TO MATCH THE EXISTING ZONE VALVE !r - BOXES WITH VALVES AND GAUGES THAT ARE LOCATED IN I FACILITY. CONNECT TO MONITORING SYSTEM AS REQUIRED,VERIFY PROJECT DATE WITH SUPPLIER 17026 08/30/2017 Xi!f 5. NEW AREA ALARM PANEL LOCATED IN CONTROL ROOM. PROVIDE DRAWN CHECKED . AN AMICO ALARM PANEL THAT CONFORMS TO NF.P.A.SS OR AS MG EQUAL. NEW ALARM PANEL O MATCH H EXISTING AREA ALARM PANEL THAT ARE LOCATED N FACILITY. VERIFY VER AND COORDINATE POWER WITH ELECTRICAL. CONNECT TO MONITORING REVISED ,Ir SYSTEM AS REQUIRED,VERIFY WITH SUPPLIER J } 6. PROVIDE NEW REMOTE SENSOR INSTALLED IN EACH MEDICAL GAS n LINE(I IN THE OXYGEN,i IN MEDICAL AIR,1 IN THE VACUUM,I IN WAG)DOWN STREAM OF THE NEW MEDICAL GAS ZONE VALVE BOX. CONNECT<5, - CONTROL ROOMR IVERFY PANELNG TO NEW AREA ALARM THE AND COORDINATE RNGT WITH r; ELECTRICAL AND SUPPLIER. SHEET TITLE �1 �I. LEVEL 1 -FLOOR PLAN-MED GAS oC) 00 H LIJ '^ SHEET v J c� G P2, 1 w GENERAL NOTES A. MODIFY EXISTING FIRE SPRINKLER SYSTEM IN WATCHED AREA IN ACCORDANCE WITH NF.P.A.PAMPHLET 13 AND ALL APPLICABLE - - - �- CODES. REFER TO ARCHITECTURAL DRAWINGS FOR COMPLETE ROOM NAMES,SECTIONS,DETAILS 4 BUILDING PLANS. B. COORDINATE FIRE PROTECTION LINES 4 EQUIPMENT WITH ALL ,r __. ....... _._ TRADES A6 REQUIRED. C- STATE FIRE MARSHAL 4 LOCAL FIRE DEPARTMENT MUST BE NOTIFIED TO WITNESS THE TESTS FOR THE FIRE SPRINKLER SYSTEM 4 THE FIRE ALARM SYSTEM. d+ h o� Mao a I r ? Q(p NOTES I. EXISTING SYSTEM IS A WET PIPE FIRE SPRINKLER PIPING SY6TEM. m°a - 2. CONTRACTOR TO MODIFY EXISTING PIPING AND HEAD LAYOUT5 Z AND PROVIDE DROPS FOR NEW SPRINKLER IN NEW CEILING GRID. SEE ARCHITECTURAL DRAWINGS FOR NEW WALLS,ETC, s 6 3_ REFER TO EXISTING CORE AND SHELL DE5113N CRITERIA TO o,Q HYDRAULICALLY CALC PIPING MODIFICATIONS A5 REQUIRED. 4. COORDINATE PIPING WITH HYAC,ELECTRICAL CABLE TRAYS,ETC. _. ' -- --- _--_ 5. REVIEW CEILING MOUNTED EQUIPMENT WITH CEILING PLANS AND CM_ F- 31 y W a t ............................_..._....................... -- FIRE ZONES NEW T.I.SPACE TO BE ® MODIFIED AS REQUIRED CD !„ {ki L.L LEVEL 1 - FLOOR PLAN - FIRE PROTECTION FPi.1 1/4"=1'4' M I ' &: W co 00 J W _ < J J J q'^e U � a o Z Q a - 00 Sk Luke's = 17-535 PROJECT DATE 17026 08130/2017 DRAWN CHECKED AS MG REVISED SHEET TITLE LEVEL 1 -FLOOR PLAN-FIRE o M PROTECTION ap W Cn SHEET C� C FP1 . 1 ELECTRICAL SPECIFICATIONS ELECTRICAL ABBREVIATIONS ELECTRICAL SYMBOLS LIST ELECTRICAL SHEET INDEX 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE,THE STATE OF IDAHO,AND SYMBOL DESCRIPTION SYMBOL DESCRIPTION SHEET NUMBER SHEET NAME THE CITY OF TWIN FALLS.INSTALL ALL EQUIPMENT PROVIDED IN ACCORDANCE WITH MANUFACTURER'S ACH ABOVE COUNTER,HORIZONTAL MOUNT,CENTERED IN BACKSPLASH $a SINGLE POLE SWITCH,SUBSCRIPT INDICATES LIGHTS CONTROLLED,+46"UON E1.0 ELECTRICAL COVER SHEET REQUIREMENTS. ACV ABOVE COUNTER,VERTICAL MOUNT,6-ABOVE COUNTER OR 3-ABOVE BACKSPLASH $3 $4 THREE WAY AND FOUR WAY SWITCH,+4W UON E2.0 LIGHTING COMPLIANCE CERTIFICATE 2. ALL WIRINGREQUI SHALL E IN EMT CONDUIAND T. S SHALL BE METAHE L CONDUIT SHALLLITY E USED FTR EQUIP AFC AVAILABLE FAULT CURRENT $P PILOT LIGHT TOGGLE SWITCH E4.0 OVERALL ELECTRICAL PLAN E� N 3. ALL WIRING SHALL BE IN EMT CONDUIT.FLEXIBLE METAL CONDUIT SHALL BE USED FOR EQUIPMENT E OJ, CONNECTIONS.FLEX LENGTHS SHALL NOT EXCEED 6 FEET.PVC CONDUIT SHALL BE UTILIZED IN AFF ABOVE FINISHED FLOOR CAPPED CONDUN E5.0 ELECTRICAL DEMOLITION PLAN -��� 0 2y UNDERGROUND INSTALLATIONS. AIC AMPERES INTERRUPTING CAPACITY E5.1E ELECTRICAL PLANS 4. CONDUCTORS SHALL BE COPPER,TYPE THWNITHHN.MC CABLE MAY BE UTILIZED FOR DEVICE TO DEVICE C CEILING MOUNT ______ SPECIFIC-USE RACEWAY ROUTING:SOLID-OVERHEAD,DASHED-UNDERROUND E5.1F FIRE ALARM PLAN CONNECTIONS.HOME RUNS AND MECHANICAL EQUIPMENT CONNECTIONS SHALL BE IN CONDUIT. 5. DISCONNECT SWITCHES SHALL BE HEAVY DUTY,SPECIFICATION GRADE,IN ENCLOSURE TYPES AS INDICATED CO CONVENIENCE OUTLET LP E5.iL LIGHTING PLAN BRANCH CIRCUIT PANELBOARD,SURFACE OR FLUSH MOUNTED,DASHED LINE DENOTES MINIMUM WORKING SPACE W' ON THE DRAWINGS.PROVIDE FUSES WHERE SHOWN. EC EMPTY CONDUIT WITH PULL LINE J L_P� REQUIRED E5.1M MECHANICAL POWER PLAN 6. RACEWAY IN FINISHED AREAS SHALL BE CONCEALED ABOVE CEILINGS AND IN WALLS WHERE POSSIBLE. GFI GROUND FAULT INTERRUPT E6.0 MEDICAL EQUIPMENT ELECTRICAL PLAN 7. SUPPORT RACEWAY DIRECTLY FROM THE BUILDING STRUCTURE. DENOTES INSTALLATION IN KNEESPACE OF MILLWORK.DEVICE SHALL BE CENTERED IN KNEESPACE.KNEESPACE � TERMINAL CABINET,SURFACE AND FLUSH MOUNTED E6.1 MEDICAL EQUIPMENT DETAILS 8. WIRING DEVICES SHALL BE FEDERAL SPECIFICATION GRADE,WHITE IN COLOR.RECEPTACLES SHALL BE NEMA KS LOCATIONS TO BE COORDINATED WITH MILLWORK ELEVATIONS PRIOR TO ROUGH-IN E7.0 ELECTRICAL SCHEDULES 5-20R CONFIGURATION UNLESS NOTED OTHERWISE.COVERPLATES SHALL BE WHITE STAINLESS STEEL TYPE. MLO MAIN LUGS ONLY DUPLEX RECEPTACLE,+18"UON 9. ALL WORK SHALL BE GUARANTEED BY THE ELECTRICAL CONTRACTOR IN WRITING FORA PERIOD OF ONE O DOUBLE DUPLEX RECEPTACLE,+18"UON YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. ON CENTER SPECIAL PURPOSE RECEPTACLE OR EQUIPMENT CONNECTION,CEILING OR WALL MOUNTED,CONNECTION OR DEVICE 0. PROVIDE OPERATIONS AND MAINTENANCE MANUALS AND AS DRAWINGS AT THE COMPLETION OF WORK. S SURGE SUPPRESSION ® PER EQUIPMENT REQUIREMENTS 1 F 11. INSTALL LUMINAIRES AND LAMPS IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. UON UNLESS OTHERWISE NOTED y 12, FIRE ALARM DEVICES SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 72,THE INTERNATIONAL FIRE CODE, Wqp WIRELESS ACCESS POINT Q Q Q{ JUNCTION BOX,CEILING OR WALL MOUNTED,B-BLANK;+1W UON AND THE LOCAL AUTHORITY HAVING JURISDICTION.FIRE ALARM DEVICES SHALL BE COMPATIBLE WITH EXISTING SIMPLEX 4010 ADDRESSABLE FIRE ALARM SYSTEM.REVISE ALL VOLTAGE DROP AND BATTERY a MOTOR OUTLET CALCULATIONS TO ACCOUNT FOR NEW DEVICES ADDED TO THE SYSTEM.PROVIDE ADDITIONAL BATTERIES ® DOOR ACTUATOR aka WHEREBATTERY CALCULATIONS INDICATED THE EXISTING ARE INSUFFICIENT FOR SYSTEM OPERATION. M 13. PROVIDE NEW NURSE CALL DEVICES TO MATCH EXISTING HILLROM NURSE CALL SYSTEM.DOME LIGHTS AND ® CIRCUIT BREAKER DUTY STATIONS SHALL MATCH EXISTING.INSTALL ALL DEVICES AND WIRING CONNECTIONS IN ACCORDANCE LIGHTING SYMBOLS ELECTRICAL RACEWAY AND CABLING GENERAL INSTRUCTIONS m tl z WITH MANUFACTURER'S REQUIREMENTS.WHERE EXISTING SYSTEM POWER SUPPLY IS NOT SUFFICIENT TO N OUTLET BOX FOR NURSECALL DOME LIGHT DEVICE. 2=- OPERATE NEW DEVICES,PROVIDE ADDITIONAL POWER SUPPLY(S)TO ACCOMMODATE NEW ADDITIONS TO THE SYMBOL DESCRIPTION I--O 1. ALL ELECTRICAL SYSTEMS SHALL BE INSTALLED IN LISTED RACEWAY SYSTEMS COMPLYING WITH THE REQUIREMENTS WALL SET FORTH IN THESE DRAWINGS AND SPECIFICATIONS. 3=`S SYSTEM. CB OUTLET BOX FOR NURSECALL CODE BLUE SYSTEM DEVICE. RECESSED SQUARE LIGHTING OUTLETAND FIXTURE N 2. ALL ELECTRICAL CONDUCTORS SHALL BE LISTED AND SUITABLE FOR THE ENVIRONMENT AND APPLICATION WITHIN �+ w 14. ALL CIRCUIT BREAKERS SHALL BE BOLT-ON,MOLDED CASE TYPE WITH AIC RATING TO MATCH THE O WHICH THEY ARE INSTALLED.PANELBOARD.HALF-SIZE BREAKERS SHALL NOT BE USED.REFER TO DRAWINGS AND PANEL SCHEDULES (0-1 RECESSED ROUND LIGHTING OUTLET AND FIXTURE TELECOMMUNICATIONS OUTLET,18-UON,411/16"SQUARE OUTLET BOX,EXTRA DEEP WITH A SINGLE GANG EXTENSION O FOR MOUNTING PANELBOARDS. 3. CONDUCTORS FOR SYSTEMS OPERATING AT GREATER THAN OR EQUAL T0120 VOLTS NOMINAL TO GROUND SHALL sae FLUORESCENT LIGHTING OUTLET AND FIXTURE,RECESSED OR SURFACE MOUNTED,X-DENOTES RING,B-BLANK,WAP-WIRELESS ACCESS POINT,W-WALL MOUNT(+46"UON),T-ANALO TELEPHONE;NUMBER IN UTILIZE NOT LESS THAN#12 AWG(AMERICAN WIRE GAUGE).CONDUCTORS SHALL BE INCREASED IN SIZE RELEVANT TO a E 15. DEMOLITION WORK SHALL REMOVE ALL OBSOLETE RACEWAY AND WIRING ASSOCIATED WITH THE REMOVED ® EMERGENCY OPERATION SYMBOL DENOTES QUANTITY OF CABLES AND CONNECTORS VOLTAGE DROP OR WHERE RACEWAY FILL RATIOS REQUIRE REDUCTION IN AMPACITY LISTINGS.WHERE NEUTRAL w ®= s EQUIPMENT.OUTAGES OF CIRCUITS STILL IN USE SHALL BE KEPT TOA MINIMUM.ALL OUTAGES SHALL BE r-1 GRID MOUNTED RECESSED LIGHTING OUTLET AND FIXTURE,X-DENOTES EMERGENCY OPERATION CONDUCTORS ARE REQUIRED,THE NEUTRAL CONDUCTOR SHALL BE CONSIDERED A CURRENTY-CARRYING COORDINATED WITH THE OWNER. R J iO KEYNOTE NUMBER CONDUCTOR. 16. TELEPHONE/DATA CONDUCTORS SHALL BE CATEGORY 6 TYPE,PLENUM RATED WHERE REQUIRED.INSTALL ALL EXIT LIGHTING OUTLET AND FIXTURE,WALL MOUNTED;DIRECTIONAL ARROWS AS REQUIRED OR AS NOTED;HATCH 4. AMPACITY OF ELECTRICAL CONDUCTORS SHALL BE BASED ON 75 DEGREE CELSIUS TEMPERATURE RATING. ��$ TELEPHONE/DATA CABLING IN ACCORDANCE WITH ST.LUKE'S STANDARDS AND REQUIREMENTS.ONLY ® DENOTES ORIENTATION OF FACE DETAIL REFERENCE 5. THE USE OF MULTI-WIRE BRANCH CIRCUITS THAT SHARE NEUTRAL CONDUCTOR(COMMONLY REFERRED TO AS AN CB ""S NETCLEAR CERTIFIED INSTALLER,ADVANCE CABLE TECHNOLOGIES,QUALITY COMMUNICATION AND SYSTEM 'EDISON'CIRCUIT ARE PROHIBITED.DEDICATED NEUTRAL CONDUCTORS SHALL BE INSTALLED FOR ALL LINE-TO- U� w LIGHTING CONTROL SENSOR,CEILING OR WALL MOUNTED,INSTALL PER MANUFACTURER'S RECOMMENDATIONS,SEE ) TECH,MAY PULL AND PUNCH DOWN CABLES ON IT RACK.COORDINATE INSTALLATION WITH LAVE NIZNIK L® 2®-I SCHEDULE FOR ADDITIONAL REQUIREMENTS;OS-OCCUPANCY,VS-VACANCY EF MECHANICAL EQUIPMENT DESIGNATION GROUND BRANCH CIRCUIT CONNECTIONS. N c m R (381-3446)WITH ST.LUKE'S IT DEPARTMENT. 1 6. ALL FEEDER AND BRANCH CIRCUITS SHALL BE EQUIPPED WITH A DEDICATED EQUIPMENT GROUNDING CONDUCTOR.IN y'm 17. EXISTING FINISHES SHALL NOT BE DISTURBED OR DAMAGED.WHERE DAMAGE OCCURS DUE TO NO CASE SHALL RACEWAYS BE UTILIZED AS THE ONLY EQUIPMENT GROUNDING CONNECTION. Q L ;:LL ELECTRICAL SYMBOLS LIST GENERAL NOTES: CONSTRUCTION ACTIVITIES,PATCH AND REPAIR SS MATCH EXISTING FINISHES. 7. BRANCH CIRCUITS DERIVED FROM THE SAME SOURCE MAYBE COMBINED IN SINGLE RACEWAY WHERE PRACTICAL.IN 1. HEIGHTS INDICATED ARE TO CENTER OF ITEM. 18. REMOVE CEILING TILES AS NECESSARY TO ACCESS ABOVE-CEILING LOCATIONS.REPLACE UPON COMPLETION NO CASE,UNLESS PART OF A LISTED FACTORY-BUILT WIRING SYSTEM,SHALL MORE THAN THREE(3)LINE-TO-GROUND c m ry M 2. EXISTING ELECTRICAL ITEMS INDICATED WITH SOLID SHADED LINES. _ OF WORK.WHERE CEILING TILES ARE DAMAGED DUE TO CONSTRUCTION ACTIVITIES,REPLACE DAMAGED TILES BRANCH CIRCUITS BE COMBINED INTO A SINGLE RACEWAY.BRANCH CIRCUITS AND FEEDER CIRCUITS FOR DEDICATED = =m 3. NOTE:ALL SYMBOLS IDENTIFIED MAY NOT BE USED ON PLANS. FROM OWNER'S STOCK OR PROVIDE AND INSTALL NEW TO MATCH EXISTING. EQUIPMENT CONNECTIONS ORLINE-TO-LINEAND POLYPHASE CONNECTIONS SHALL BE IN RACEWAY DEDICATED TO � B EACH CONNECTION. U q 8. INSTALLED BRANCH CIRCUIT ROUTING,COMBINING,AND DEVICE-TO-DEVICE CONNECTIONS AS INSTALLED IN THE FIELD w SHALL BE DEPICTED ON CONTRACTOR'S AS-BUILT DRAWINGS.AS-BUILT DRAWINGS SHALL BE CONTINUALLY UPDATED AS THE CONSTRUCTION PROGRESSES. GENERAL ELECTRICAL INSTALLATION REQUIREMENTS I \ 1. FURNISH AND INSTALL ALL MATERIALS AND EQUIPMENT AND PROVIDE ALL LABOR REQUIRED AND NECESSARY TO LUMINAIRE SCHEDULE COMPLETE THE WORK SHOWN ON THE DRAWINGS AND/OR SPECIFIED IN ALL SECTIONS OF DIVISION 26 AND ALL OTHER WORK AND MISCELLANEOUS ITEMS,NOT SPECIFICALLY MENTIONED,BUT REASONABLY INFERRED FOR A COMPLETE ILLI TYPE DESCRIPTION MOUNTING LAMPS WATTS I VOLTAGE EMERGENCY MANUFACTURER CATALOG NUMBER ALTERNATE NOTES INSTALLATION INCLUDING ALL ACCESSORIES AND APPURTENANCES REQUIRED FOR TESTING THE SYSTEM.IT IS THE LUMINMRE MANUFACTURERS INTENT OF THE DRAWINGS AND SPECIFICATIONS THAT ALL SYSTEMS BE COMPLETE,AND READY FOR OPERATION.ALL CHAIN HUNG AT LED 3387 UM SPECIFIED PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH ALL MANUFACTURERS'INSTRUCTIONS AND Q C BLf BARE LED,d',WITH FROSTED DIFFUSER,CHAIN HANGERS 33VA 120 NIA LITHONIA ZLIN-L48-2500LM FST-35K-8DCRI-WH COOPER,WILLIAMS REQUIREMENTS. Y-0'AFF 3500K !V (0 CEILING LED 3I WLM 2. DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT AND WIRING.MOST L.I� GL1 GRID LEO,2k4',TWO CURVED REFRACTIVE LENSESWITN OVERLAY 31VA in NIA LITHONIA ZRTL4.30LEZ1-LP8W COOPER r- RECESSED 350oK DIRECT ROUTING OF CONDUITS AND WIRING IS NOT ASSURED.EXACT REQUIREMENTS SHALL BE GOVERNED BY M1 ROUND RECESSED 6",LED,CLEPR PI7AK REFLECTOR CEILING LED 18 VA in NIA GOTHAM EV03S10.35�8AR.M0.LSSJAVaT JUNO,PORTFOLIO ARCHITECTURAL,STRUCTURAL AND MECHANICAL CONDITIONS OF THE JOB.CONSULT ALL OTHER DRAWINGS IN ^^ �7 RECESSED INCLUDED PREPARATION OF THE BID.EXTRA LENGTHS OF WIRING OR ADDITION OF PULL OR JUNCTION BOXES,ETC., LL 'XRAYON'LIGHT,LED,GREEN LETTERING WHITE THERMOPLASTIC, ASINDICATEDON LED Y W W SINGLE FACE PLANS INCLUDED 3VA tzB NIA LITNONIa LEP-1-RazN2n sw18 uGNTGUARO,SURE LITES 1 NECESSITATED BY SUCH CONDITIONS SHALL INCLUDED IN THE BID.CHECK ALL INFORMATION AND REPORT ANY APPARENT DISCREPANCIES BEFORE SUBMITTING BID. (aM LUMINAIRE SCHEDULE NOTES 3. SEQUENCE,COORDINATE AND INTEGRATE THE VARIOUS ELEMENTS OF ELECTRICAL SYSTEMS,MATERIALS AND C r 1. OR PRE-BID APPROVED EQUAL. EQUIPMENT. Z 4. COORDINATE ELECTRICAL SYSTEMS,EQUIPMENT AND MATERIALS INSTALLATION WITH OTHER BUILDING COMPONENTS. O N INFORM CONTRACTORS OF OTHER TRADES OF THE REQUIRED ACCESS TO AND CLEARANCES AROUND ELECTRICAL W + EQUIPMENT TO MAINTAIN SERVICEABILITY AND CODE COMPLIANCE. O 5. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS. 1p tn'1 6. ARRANGE FOR CHASES,SLOTS AND OPENINGS IN OTHER BUILDING COMPONENTS DURING PROGRESS OF a V, CONSTRUCTION TO ALLOW FOR ELECTRICAL INSTALLATIONS. = e 7. COORDINATE THE INSTALLATION OF REQUIRED SUPPORTING DEVICES AND SLEEVES TO BE SET IN POURED-IN-PLACE r LUMINAIRE TYPE;SEE CONCRETE AND OTHER STRUCTURAL COMPONENTS AS THEY ARE CONSTRUCTED. �_ a SCHEDULE 8. SEQUENCE,COORDINATE AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT O FLOW OF THE WORK.GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING IN THE BUILDING. M 7 m 9. WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED,INSTALL SYSTEMS,MATERIALS AND EQUIPMENT TO UJ 0 ce) PROVIDE THE MAXIMUM HEADROOM POSSIBLE.PREFERENCE SHOULD BE GIVEN TO ADA GOVERNING REQUIREMENTS J 00 FOR ACCESSIBLE AND OPERABLE COMPONENTS. J w Q 10. INSTALL SYSTEMS,MATERIALS AND EQUIPMENT TO CONFORM WITH APPROVED SUBMITTAL DATA,INCLUDING GLi COORDINATION DRAWINGS,TO THE GREATEST EXTENT POSSIBLE.CONFORM TO ARRANGEMENTS INDICATED BY THE Q Z r , CONTRACT DOCUMENTS,RECOGNIZING THAT PORTIONS OF THE WORK ARE SHOWN ONLY IN DIAGRAMMATIC FORM. \ J J ALL I I WHERE COORDINATION REQUIREMENTS CONFLICT WITH INDIVIDUAL SYSTEM REQUIREMENT,REFER CONFLICT TO THE GLi ARCHITECT. U Lu J Q GL1 11. INSTALL SYSTEMS,MATERIALS AND EQUIPMENT LEVEL AND PLUMB,PARALLEL AND PERPENDICULAR TO OTHER L_____J BUILDING SYSTEMS AND COMPONENTS WHERE INSTALLED EXPOSED IN FINISHED SPACES. Q Il I>o 12, INSTALL ELECTRICAL EQUIPMENT TO FACILITATE SERVICING,MAINTENANCE AND REPAIR OR REPLACEMENT OF M :L� HDP-2 EQUIPMENT COMPONENTS AND AS REQUIRED BY CODE.AS MUCH AS PRACTICAL,CONNECT EQUIPMENT FOR EASE OF Z N ALTERNATE LUMINAIRE DISCONNECTING WITH MINIMUM OF INTERFERENCE WITH OTHER INSTALLATIONS. CALLOUT 13. ALL ELECTRICAL ITEMS,EQUIPMENT,ETC.REQUIRING ACCESS AND MAINTENANCE TO BE PROVIDED WITH ACCESS � WHERE GROUPINGS OCCUR MANUAL CONTROL UNIT FOR PANELS BY ELECTRICAL CONTRACTOR WHEN LOCATED BEHIND HARD INACCESSIBLE FINISHED SURFACES.SEE ROOM.'DENOTES ARCHITECTURAL CEILING PLANS FOR CEILING AND WALL FINISH TYPES. PANEL CALLOUT 14. INSTALL ACCESS PANEL OR DOORS WHERE EQUIPMENT IS CONCEALED BEHIND FINISHED SURFACES.ACCESS PANELS ALTERNATE (E DENOTES EMERGENCY) ACCEPTABLE LOCATION AT AND DOORS ARE SPECIFIED IN DIVISION 8 SECTION"ACCESS DOORS'. ALL I L DOORS 15, INSTALL SYSTEMS,MATERIALS,AND EQUIPMENT GIVING RIGHT-OF-WAY PRIORITY TO SYSTEMS REQUIRED TO BE J r` CIRCUIT CALLOUT INSTALLED AT A SPECIFIED SLOPE. t Lukes 16. ONLY QUALITY WORKMANSHIP WILL BE ACCEPTED.HAPHAZARD OR POOR INSTALLATION PRACTICE WILL BE CAUSE FOR I I REJECTION OF WORK. Owner 17. PROVIDE FOREMAN IN CHARGE OF THIS WORK AT ALL TIMES. 18. WHERE THE SPECIFICATIONS CALL FOR AN INSTALLATION TO BE MADE IN ACCORDANCE WITH MANUFACTURER'S TYPICAL LIGHTING RECOMMENDATIONS,A COPY OF SUCH RECOMMENDATIONS SHALL AT ALL TIMES BE KEPT IN THE JOB PROJECT DATE SUPERINTENENTS OFFICE AND SHALL BETO THE OWNER'S REPRESNTATIVE. CIRCUIT CONNECTION CALLOUTS 19. WHERE AIR PLENUMS ARE ENCOUNTERED,ALLILABLE CABLNG AND CONDUCTORS NOT EN RACEWAYS SHALL BE RATED, 7026 8.30.17 NOT TO SCALE LISTED,AND SUITABLE FOR USE IN PLENUM SPACES. DRAWN CHECKED 20. PROVIDE A MEANINGFUL QUALITY ASSURANCE PROGRAM.TO ASSIST THE CONTRACTOR IN THIS PROGRAM,THE MKC JMM SPECIFICATIONS CONTAINED HEREIN ARE SET FORTH AS THE MINIMUM ACCEPTABLE REQUIREMENTS.THIS DOES NOT RELIEVE THE CONTRACTOR FROM EXECUTING OTHER QUALITY ASSURANCE MEASURES TO OBTAIN A COMPLETE _______________________________________________________ OPERATING FACILITY WITHIN THE SCOPE OF THIS PROJECT. REVISED CEILING/STRUCTURE 21, THE CONTRACTOR SHALL INSURE THAT ALL WORKMANSHIP,ALL MATERIALS EMPLOYED,ALL REQUIRED EQUIPMENT AND ABOVE THE MANNER AND METHOD OF INSTALLATION CONFORMS TO ACCEPTED CONSTRUCTION AND ENGINEERING PRACTICES,AND THAT EACH PIECE OF EQUIPMENT IS IN SATISFACTORY WORKING CONDITION TO SATISFACTORILY PERFORM ITS FUNCTIONAL OPERATION. 22. PROVIDE QUALITY ASSURANCE TESTS AND OPERATIONAL CHECK ON ALL COMPONENTS OF THE ELECTRICAL DISTRIBUTION SYSTEM,ALL LIGHTING FIXTURES,AND COMMUNICATION SYSTEMS. (WALL MOUNT) KB PANELBOARD I SHEET TITLE TERMINAL WALL MOUNTED O w V CABINET � z o --El o i CIRCUIT CALLOUT ELECTRICAL SB LL FA �� wo w qpAC PANELCALLOUT� COVER O o a WP $ ECS ADA LV CR OT // ® z w o w p w BACKSPLASH 06 112 awt zwi --- COUNTER L1A4 SHEET o o w o Z= ,� LOCATION DESIGNATOR;-AC F o Z :i o o AN o w z o m N (WHERE SHOWN) fGFI oo o f Tr '�AN a o DEVICE TYPE;J W i o a o SEE SCHEDULE ^' o vl FLOOR BASE MATERIAL SHEET FINISHED FLOOR 6"CONCRETE HOUSEKEEPING TYPICAL ELECTRICAL DEVICE AND EQUIPMENT TYPICAL ELECTRICAL PAD MOUNTING HEIGHTS(WALL MOUNT CONDITIONS) CIRCUIT CONNECTION CALLOUTS A� NOT TO SCALE NOT TO SCALE E1 .0 f1 Oc Software Version „ _ .:...:...:...:...........................................................................................................:r..,...........................:...................;.:....:....;....;....;..........................:....::....;....;.........;.:....;....;....;....., �8 �t�c#� �LT�� � � 4.0.6.2 ,,.s s,ry.;, :,v:;�:t":i,:::tt.3..sv>:ii',.•�:�.�..::tf",v..S..:u,F;^RCi':>'::>,>:i "'ii>iv a :1 0 J3 ..5.... 5fx( Interior Lighting Compliance Certificate , c , � _-N .. 9 9 p A(, I d5":2"2:3;Automatic contras to shut oFi all !]Comp)es g lighting ucces Not Yinlitdin li hGn rnsfagedin�I I[$l";' ;';; buildings. - :::::r,x:.:::;,xs! C]MatP li-able $ Q� Project information ---- -....._. _...-............-....--......-.....--........................ y� s GF 2. independent lighbnq=antrofs installed I]eompl es Energy Coce: 2012 IECC 11.3+ ;s;per approved lightbtg plans aid all LlnOee,Net Project Title MAGIC VALLET IR ROOM UPGRADE manual controls read:!•accessible and: 1[FI.X IYj.='('' y .pMot Otservatie. :;;^:;;r:,g as p ors able to occupants. :OMat Ppplicabte ProjeclTyP=: Alteration :::,ct.<,;,:..r. 1C405,2.1• Lighting controls nstalled to vnnormiy ocompl es a 2 redvcc tho lighting€oad by otleast OLces Net Construction She: OwnerlAgem; Desirner.Conlracto: HEL2511 :50%. 851 Pot LINE ROAD Mike Miler :oMot Observable: TWIN FALLS,FD 0330L Eidam and Associates E : :0Not PPPH:able -.. -._.__._..--..__.........___-__.__.. __...__._-__........ .......__.-.-._.......... ............._..........-......-....-..._.._I 408 E.Parkterter Slvc. �f:4D53':3"Daylight zones provided with ocampl es ; 3 991se,to 83706 "jt;:'S?i''=fs indivitluaE controls that ccnlrof the oCnes Net mike,Seldam- W r l 'rt:.`3a`:lights in of gene al area : mike`alEidam•d5504.ram :.*.r'- .2::::. p14at Observable. �. lighting. rz- I]Mvt PPPfcabte _.................--........- -.....-...--- ----- I =�1 o s-. w cgs, �s?ti55r eepin9 units have at least cx>n C7Cornpl es s Allowed Interior Lighting Powar jE13Y7 ;jf';l maser switch at:he main entry cool OC-Pes Nott a tots wired a=e e A 8 C D ^�!?}}>`1�.��,'swalchatlrre epta ljninaires and IoNot'Observable: a m Area Category Floor Area Allowed Allnwetl Watts `''[` zitc'i=v�__......-..-.__._. :C]Not Ppial.cable ..._....... w I[g (112) Watts'1112 (8 X C) 3@.405.2.2. Occupancy sensors?ns:al:cd in :Elcompl es ryy _.,_,_.- 72 :roquired spaces. :�cces Not 1•R ROOM(Healtncaro CliniclHespil.a0atl*gyAmaging) 620 •:,30 E06 i[ELIS{I : ---._.-.._...�._—._._... �-- _-•---.-_ _..._.__ _ ` 10Mat'Observable: `f Total Allowadyi'atts:< 806 : :r--� .� r w UNk7t Applicable e Proposed interior Lighting Power iCA05.2.2.:Prlsnary sidelightec ar¢as ors .C1Compl es y m RR A $ C D E 13 :equipped withrecidredlightne :OD:oesNet Qw`�LL [EL2011 'controls. Fixture ID:Descrliallon i Lamp y Wattage Per lamp i Ballast Lamps' #of Fixture (C X 0) 1 :C7MCC Observable: Fixture Fixtures Watt. : OMot PppHcabte ..._._._................._.__......_..._.__...W...:......__....._..... ------ ...._...._ _ _.._.__..._.... o��t 1H.5.QQS�LYkHa[tlL4clt�S•ci10(CitLD9Pi::di:&:diOigQyGmagl[tg„ Q„551,11.1 -- 4C405.2.2. Enclosed spaces wit-i daylight area .ocampi es LED 1:RL7:RARE LED:Other: 13 under skylights and rooftop moniiars i]L:ces Mct t U w 2 33 66 I[Et_211i :are equipped with requiredfight:r-g LED2;Gl.':GRID LED:OIhe% t g 31 248 I :f,Ontm15. :(]toot Observahle: LED3:FILI:ROUND FECESSED LED Clhar, t g SS 162 __ _ :oNot Applicable LED s:WL:WARN!MG LIGHT;Odter, i 1 3 Exempt ;1EL411 .3 lighting plans. c5n-�l'tl¢�•redr-- Nd Oo rvatac Exempton.Exil Signs,5are or•Emargend LighTng _ _- I[EL4ir specific usescnslal'er era ❑Mat Eitabie D p lighting P CS Total Proper=warts= 476 i 9• 9 P l d; WTIZIAM UJ y 05' ?+>:?Fluorescent lumilrares rrdh odd Ocomipl es Interior Lighting Compliance Statement CEL7:3.}?::.;,i,;numbered!ampcanOgirrat Ions tt:at OLcesMct 0 W Cororiance statement:the proposed irte:ior lighting aEterattdn project representedY: are tv:tfan i0 feet eerier:c center(if '� QbservarAe. P P P g P 1 in this document is consistent with the }f i!riza?N-hs;..recess mounted}or a-e within{root building Runs,specifications,and other calculatl fs submitted with this permit application.The proposed interior lighting ti�fi.+r Ss:t2 edge[o edge(if pendant of surface ❑M pPPr-i=abbe systems have been designee to meet the 2012 lFCC re-quiremencs inZ2& rsion 4.D. and to comply with an n�k's,,'^i:^i:'; : `-' y Y } moun[edy shall:be;andem wired- 7 appaca5lc mandatory requirements Isted in the Inspection-Ch G /5� ,.....a.::x {u;.-..._.._..-...._..-...._._..-.._.-......—.-......----.--......__._...---.----.—_.............---.-__._..._.__._..._.__.__.. --- Y .j 'C:40S.4 .Exit signs do not exceed S rvatfs per OCompl p, M.Saat d�1tlirar f/ 3-Zit—t"1 1(Eibl� face. �teesNct W M Name-Title tore iTa[e ; :I Not Otser.rabiead :01W Applicable . Q ---....----'-----'-----'-----'---------------------"----.......------ ..................... .._._._..__._._ ..._..._._........._.._...._...._..._........._........_........... N 1C405.2.3 :Arklitionatinteriofrightinapower OComPles i[ELSP �alrowed for special fi nctiors tier the 'Elopes Not + 1 :approved fighting pi a rs.,it Is O W n :automatIcally cortmi led and [3M-Obs ervable aIwo Iseparated general :OMet AppEjcabM = r from geneal lighting. __.._ a Additional Comments/Assurniotiorist COMcheck Software Version 4.0.6.2 w o M 3 m Inspection Checklist J d 'Lei W ,?4k:.: .:F'taai: ett81�`:. ,:>�rrNa effi7:.:::���:,:,..,�:::,::::•�.:�:,:>::,:::?:::;'•,C�nin�Er�; "S1s��" ;al'ts`:,}...,,,;:>~:�:rk� � Energy Code: 2©12 3ECC y� ';`,.:.:. . .. ft�. ,,(z:,.:;,. 11P Jiff �. �ixez�'t � J...,..,,,ter,,...,.s:,,.,.,.-.,>...,>.�.1, ,.,.. .,.;..:.,,.:_,,,.,,.,..::.,....:..:,.:::.,:.:.::,:::,...:::::•::,.:::,.::;:.:",' `i•2<, IX.� siti: .,,..,,.....,.,..,.r �.F..............,.....F.,>.,h.,. ..I.............................�....:..,..,......................:_,.::<.t+;+• ...:5'E'rvi)::"'.';.r'r P.e urernents: 0.00/were addressed directly'in the CQMcheck software ql t,',4g�,�y,$Yl lum shed as-bur}f drawings or oCampl es U J � Text in'the"CDnxr entslAss{lmptions"column is provided by the user in the COfdcheck Requirements screen.For each ii is {'s electric power systems within 30 Joys 0Daes Not requirement.the user certifies that a code requirement will be met and how that Is documented.or that an exception f l;Ytf)xk tM1of system acceptance. �r'y O t00ry .y Obsevable. V 0- a is being claimed.Where compliance is ltemlzed in a separate table,a reference to that tabu:is provided. �' ��yt%r:;• : Z a i`yf"4�wJ.ua '-._... _ Mak PPpEi.ahre Q ..._.:...... ..................................._......_.....-__-__-._......_..........__...-_._..._......._._.............. _ _ —..................................................................................... ....... i.. ,,.,,,_,..........,...,.,.. ,>..:>............................. ............. ...>s_,.,....r,_.....,,.,:...>.:,:.:....,...........,.." ("+ :: J=:f Furnished O&M ins-ructions'or Cam 1 es 00 ... acts ....,... ,.:._.. . .,..... ... ......., .. - P p E:,,:.-:: :,::-.,.>.,a.._,.,;>�r,.> , w.,,:•.,...,:ti.:-.><.,.. s.�>.�t. ;:;>.a:. s stemsande u'manttatha I]C M y 4 W ces ct _..!�,.,. ..,....>....�:<..,:i?�la .Rttyi�...=r<::..:,:<,..,., ...:>,.„Cain rrt>/;.: :..:.<..?. ,.�,r°:I�aroinri'mrilsf#�seiNt?'t�usws;t. •,r.',x r S. .. ........... ...t....,..,.....,,..).........,.........., ,.,......,. +1,:. ::.t.. r'tl builcling ownerar cescnated 'S!,IEr2.x(..µ�!;,��.<...x•_a.aw»...,:,w..,...,i:.,�,::.:<„_.»�,.w.��..::1,�.u,.u.�w.7.,..5....�:zf„,ta_;:i•:�:.:a7:::at.,x..,,u._..;.::u..,:a._.,>k:a�.,:�Mr`xiz,,.,�:",.:a�i�'sc.s;v.�;::�:�%::.�`ia::J representative, :OMctOtservaG3e: IC1.03.2 axons,specifications,ardl :� m or Cop'ies i ,,.<. _„_r>.aL:,y oMat Pprii:abta J L iiPR41 calcu'alions provide all information �OoesNot atiu:}w ._---.-----.--------------.------_.._----.._...---------- !—Sl :with whith compliance can be �NM Obsa:+able f 5 PP ... ....... .__..._._.._.__._._ _..._._...._ ____....._______det'ermined for the interior lighting C405, .2 :Interior installed lam and fbc:urg :Llcom I ES Sasthe'n[sror L grim FrA-sherx:fieM Lu r t IiF11811 :lighting power Is consistent with what .� I I andelett7ital5Y5[a'msandequipment_]NO{AppHcahte : GGezMCt OWner its She-an the apa'oved l.0 ht:ng sand doitwrient'where exceptions to i :plans.demonstrating proposed watts :C3".Olservable': i :the.standard are claimed information :are le36 than 0r Eq'J-af'ta allowed Oho'A:Piicable PROJECT DATE i :provided should include interior ; watts. 17025 a.30.17 :iigrtingpovvert:a!atations•s�atla9eof; i� 3 ---- ._.__._ .._.__._..._..._.__i 08. Ughhng systems hate been tzstedto IOCompi es aN11a5a.nC babas[;.Yan;forme.';and 1[F13311 ensure proper CalfhrallDn,adpJarn l7 ent. Coes Nut DRAWN CHECKED cortn0l devices. i ------- 1 programming,and operation. MKC JMM Additional Comments:Assumptions: 1 []Niel Observable. 'C]Mot Pppiicable .........................................__._...._................................................-_._____._-' REVISED Additional Comments/Assumptions: SHEET TITLE LIGHTING T7 COMPLIANCE M COMcheckNOTE: CERTIFICATE Qp LUMINAIRE QUANTITIES INDICATED WITHIN THIS REPORT ARE NOT TO BE USED BY CONTRACTORS,SUPPLIERS OR ANY OTHER ENTITY FOR w ESTIMATING OR TAKEOFF PURPOSES.REFER TO THE LIGHTING PLAN(S) FOR LUMINAIRE TYPES AND QUANTITIES. SHEET co G (Y E2 .0 w /1 \ (LOCATED STING IN BASEMENT)CHR(H2)' /// 0 \ EFL Nos EXISTING PANELBAND'lCOARDS / / /Q/� _� Os, 2y 'i NL6(Hi)'AND'iCLB(Hi)' \ O \� AREA OF WORK Fo dy GAO /6 /0 1 1 � 3�� Z i (E,-- _ _ _ _ Lai by 6 / 0.\ J �I o Nm U u o o I VA 4 0I t D Ur= 71�- LiL W II - 0 W � I IN Y m cmu EXISTING COMM.TELE/COM I ————_— O Q + m _ RACK AND NURSECALL —_ p HEADEND nN/ IR co Go p too a W m W / I Q LU z a U�II'D�� LL -i < ® J V z N V Q > N / CJ Lf7 OO O / - �r St Luke's rOwner PROJECT DATE 17026 8.30.17 / I DRAWN CHECKED MKC JMM ® / / REVISED / SHEET TITLE OVERALL ` ELECTRICAL _ PLAN op W SHEET OVERALL LEVEL 1 ELECTRICAL PLAN NORTH E4 .0 w SHEET KEYNOTES:O 1. DISCONNECT AND REMOVE LUMINAIRE;RETAIN CIRCUIT FOR RE-USE IN NEW PHASE OF WORK. 2. DISCONNECT AND REMOVE BOX,RACEWAY,AND ASSOCIATED CONDUCTORS BACK TO SOURCE. EEC No a SHEET GENERAL NOTES: 1. REMOVE ALL EXISTING DEVICES IN AREAS OF DEMOLITION SHOWN UNLESS G� OTHERWISE NOTED ON OTHER PLANS. 2. PROTECT EXISTING DEVICES AND CONNECTIONS TO REMAIN DURING CONSTRUCTION TO THE FURTHEST EXTENT POSSIBLE.WHERE EXISTING DEVICES THAT ARE TO REMAIN ARE DAMAGED BY CONTRACTOR,CONTRACTOR SHALL a REPLACE DEVICE AND/OR CONNECTION WITH NEW COMPATIBLE WITH EXISTING g SYSTEM($). F 3. WHERE EXISTING DEVICES AND CONNECTIONS ARE AFFECTED BY OTHER N DEMOLITION WORK,EXTEND CONNECTIONS TO EXISTING TO REMAIN DEVICES AND RECONNECT TO KEEP ACTIVE.EXISTING DEVICES IN AREAS OF NO DEMOLITION MAY BE AFFECTED BY DEMOLITION AND AS SUCH SHALL BE MAINTAINED IN OPERATION DURING AND AFTER CONSTRUCTION COMPLETION. a a 4. WHERE DEMOLITION IS INDICATED FOR DEVICES IN MASONRY WALL CONSTRUCTION,REMOVE DEVICE AND CONNECTIONS AND ABANDON BOX IN- w PLACE IN WALL.FURNISH AND INSTALL BLANK COVERPLATE ON ABANDONED BOX. 5. ALL UNUSED/ABANDONED CONDUCTORS INSTALLED ABOVE ACCESSIBLE CEILINGS .c¢ SHALL BE REMOVED IN ACCORDANCE WITH NATIONAL ELECTRIC CODE REQUIREMENTS. 6. WHERE ALL DEVICES AND CONNECTIONS ON A CIRCUIT ARE REMOVED,REMOVE w a z a HOMERUN CONDUCTORS BACK TO RESPECTIVE PANELBOARD.MAKE RESPECTIVE a a a CIRCUIT BREAKER/DISCONNECT SWITCH SPARE AND UPDATE DIRECTORY/LABELa =m 3 E AS NECESSARY. w ®a [s TYP 7. WHERE DEVICE DEMOLITION I$SHOWN IN WALLS TO REMAIN,REMOVE DEVICE �'V1 ACV V6 AND ALL RESPECTIVE CONNECTIONS AND ABANDON BOX/CONDUIT IN PLACE. N D-�_ FURNISH AND INSTALL BLANK COVERPLATE ON ABANDONED BOX.` r_________T_________� M 8. REFER TO ARCHITECTURAL DEMOLITION PLANS FOR DETAILED INSTRUCTIONS - k�WAP i i i RESPECTIVE TO WALL,FLOOR,AND CEILING SCOPE OF WORK. U 2 9 ________- ________-J 9. EXISTING ELECTRICAL INFRASTRUCTURE INSTALLATIONS TO REMAIN IN USE:ALL O°'__ ` y EXISTING ELECTRICAL WIRING,APPARATUS,FIXTURES,EQUIPMENT,ETC.IN N CLOSE PROXIMITY TO ALTERED OR NEW WORK SHALL BE UPGRADED,MODIFIED, WW LI LL S AND BROUGHT TO CURRENT ADOPTED CODE STANDARDS IN ACCORDANCE WITH Q i 1 NEC AND LOCAL ORDINANCES.CLOSE PROXIMITY SHALL BE DETERMINED BY THE m ti AUTHORITY HAVING JURISDICTION. - sa OYP.) 3 N Lu U u w S TYP.) F C 2 ¢ to W (TYP.) i i i I I I L.L m Q! L---------i L---------i L_________il W M CL5 C M Z p O oN yl ll�O aM a t,N e cl. S 'Lm _ v p W 1 I i i i i THIS PLAN REPRESENTS EXISTING DEVICE AND EQUIPMENT LOCATIONS AS M m T �_________ CLOSELY AS REASONABLY DISCERNIBLE AND IS PROVIDED FOR CONTRACTOR LJ J 0 ce) INFORMATION.CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN J 00 (TYPO VERIFICATION OF EXISTING CONDITIONS PRIOR TO BID. J Lu a ` Q Z_ = > J J t--- Lu J UJQ 0_ ZZ N Q Lf) 00 ELEGTRIGAL DEMOLITION PLAN NORTH ALL 1 St Luke Ow 1/4"=V-O" r w s ner PROJECT DATE 17026 8.30.17 DRAWN CHECKED MKC JMM REVISED SHEET TITLE ELECTRICAL DEMOLITION M PLAN op H LJJ co SHEET L E5.0 w SHEET KEYNOTES:O 1. ROUTE CONDUIT AND CONDUCTORS TO CABLE TRAY SYSTEM;CONDUCTORS TO CONTINUE TO TELECOM RACK.REFER TO OVERALL PLAN FOR RACK LOCATION. 2, FURNISH AND INSTALL PA SPEAKERS AND ASSOCIATED CONDUCTORS;ROUTE TO HEADEND PA SYSTEM AND CONNECT AS REQUIRED.REFER TO OVERALL PLAN 120V FOR HEADEND LOCATION. LINE VOLTAGE SWITCH 3. FURNISH AND INSTALL NURSECALL DEVICES AND ASSOCIATED CONDUCTORS; 9'� ROUTE TO HEADEND NURSECALL SYSTEM AND CONNECT AS REQUIRED.REFER O\��EFL N0 ROUTE COMMUNICATIONS TO OVERALL PLAN OR HEADEND LOCATION O sy CABLE TO CARD READER CONTROLLER POWER a ,� SUPPLY SHEET GENERAL NOTES: 1. RECEPTACLE LOCATIONS SHALL BE COORDINATED WITH MILLWORK,WALL G� FINISHES,WINDOW HEIGHTS,AND OTHER WALL MOUNTED EQUIPMENT PRIOR TO ROUGH-IN.NOTIFY ARCHITECT OF CONFLICTS PRIOR TO PROCEEDING WITH WORK, 2. MULTI-WIRE BRANCH CIRCUITS SHALL NOT BE UTILIZED FOR LINE TO NEUTRAL a LOADS.DEDICATED NEUTRAL CONDUCTORS SHALL BE PROVIDED FOR ALL g AUTOMATIC OPERATOR AUTOMATIC OPERATOR CIRCUITS. F 3. ALL JUNCTION BOXES LOCATED ABOVE ACCESSIBLE CEILINGS SHALL BE LOCATED N NO MORE THAN 36 INCHES ABOVE CEILING LEVEL. ELECTRICPOWER ELECTRIC POWER 4. REFER TO ARCHITECTURAL CODE PLANS FOR LOCATIONS OF FIRE-RATED TRANSFER TRANSFER ASSEMBLIES. HANDS FREE 5. PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE PERFORMED IN a a OPERATOR ACCORDANCE WITH ILL REQUIREMENTS AND DIVISION 7 SPECIFICATIONS. s= 6. FURNISH AND INSTALL ALL ELECTRICAL CONNECTIONS TO MOTORIZED DOOR ACTUATOR ==z; OPERATORS AND ELECTRIFIED DOOR HARDWARE AS DIRECTED BY DOOR HARDWARE INSTALLER.COORDINATE LOCATION OF CONTROLLER,POWER ¢ SUPPLY,SAFETY SENSORS,AND ALL INTERCONNECTIONS WITH DOOR HARDWARE HANDREE SUPPLIER P HANDS FREE RIOR TO COMMENCING WORK.REFER TO'S'ELECTRICAL SHEETS FOR OPERATOR ADDITIONAL INSTALLATION REQUIREMENTS. ACTUATOR 7. REVIEW AND COORDINATE ALL EQUIPMENT CONNECTIONS WITH SUBMITTALS, a aae SHOP DRAWINGS,AND MANUFACTURER'S INSTRUCTIONS FOR ALL ELECTRICALLY OPERATED EQUIPMENT SUPPLIED BY OTHER DIVISIONS OF WORK PRIOR TO w ®a [s COMMENCING WORK.NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES IN ELECTRICAL CONNECTIONS BASED UPON REVIEW. N 8. REFER TO ARCHITECTURAL CODE PLANS FOR LOCATIONS OF FIRE-RATED r f g NOTES: ASSEMBLIES. =�- 1. RACEWAYS,BOXES,SWITCH,LINE VOLTAGE CONNECTIONS TO POWER SUPPLYAND OPERATOR BY ELECTRICAL 9. LOCATE TELECOMMUNICATIONS OUTLETSWITHIN 6 INCHES OF NEAREST U 2 CONTRACTOR. RECEPTACLE.COORDINATE LOCATION WITH POWER PLANS PRIOR TO ROUGH-IN. m m 2. LOW VOLTAGE CONNECTIONS FROM POWER SUPPLY TO ALL EM DEVICES BY DOOR HARDWARE VENDOR. 10. MINIMUM CONDUIT SIZE FOR TELECOMMUNICATIONS CIRCUITS:1 INCH. cn - 11. ALL TELECOMMUNICATIONS CONDUITS TERMINATED IN OPEN AIR/ABOVE CEILINGS Q W F LL S SHALL BE FURNISHED WITH INSULATED THROAT BUSHINGS. i -Zyso ACCESS DOOR DETAIL , 0 1N$ NOT TO SCALE E5.1 E S W (� To vyl 9 7 m � Y � W M C C M Z p N 11 111CLS� }30 O Q + M - - - — - - - - - - - - - — - - - - - - = a l III II e \ la I I= l III \ II e I11 11 — C{k� ` l I) �` II 0 cM 3 m X,, iCLB(Hi)-3 (TYP.) �J _ -J J °0 iCLB(H1}30 �. � � \ (1v}� aWAP Q Z Q J Q (TYP.) 03 -T .R. � I.R. z N Ike .REOM / ROOM Q N PA � L_ St Luke's 1NLB(H1}22�� ,, r r F ri FOwner PROJECT DATE 17026 8.30.17 yl 1NLB(Hi}22 DRAWN CHECKED MKC JMM 1NLB(H1}22 I KS:& V4b KS 4 ACVa KS ACV& KS ACV REVISED 1CLB(Hi}24 1CLB(Hi}24 1CLB(H1)-26 1CLB(H1)-26 — I CONTROL 159 (TyPFiriePA CONTROL 1NLB(H1}22 1NLB(H1}22 SHEET TITLE M 1CLB(H1}28 "F N 3 ELECTRICAL PLANS 06 W POWER PLAN NORTH 5Y5TEM5 PLAN NORTH co 2 1/4"=1'-0" SHEET ~ G E5. 1 E FIRE ALARM DESIGN DATA SHEET KEYNOTES:O OCCUPANCV GROUP: 'I2 1. EXISTING F/S DAMPER TO REMAIN. OCCUPANCY LOAD: SEE ARCHITECTURAL CODE PLAN, 2. CONNECT TO NOTIFICATION APPLIANCE CIRCUIT WITH SPARE CAPACITY. 3, CONNECT TO INITIATING DEVICE CIRCUIT WITH SPARE CAPACITY. BUILDINGAREA: SEE ARCHITECTURAL CODE PLAN, SYSTEM TYPE: NON-CODED ADDRESSABLE TYPE. OCCUPANT NOTIFICATION: HORNISTROBE DEVICES. MECHANICAL EQUIPMENT: NIA \��E� N0S' RATED WALL ASSEMBLIES', SEE ARCHITECTURAL CODE PLAN, _� 0H6 dy FIRE SPRINKLER SYSTEM: SEE GENERAL NOTES. ¢� POWER SUPPLY: POWER SUPPLIES AND BATTERIES OVERSIZED FOR 25%ADDITIONAL -a'- DEVICES, o iB CIRCUIT CAPACITY', LOAD INDIVIDUAL CIRCUITS TO 50%MAXIMUM;CONDUCTORS SHALL BE SIZED FOR 100%LOAD. SHEET GENERAL NOTES: VOLTAGE DROP: CALCULATE AT 100%LOAD AT END OF LINE;VOLTAGE DROP SHALL NOT T. FIRE ALARM SYSTEM DEVICE CONNECTIONS SHOWN ON THIS PLAN ARE SHOWN .G EXCEED 10%ON EACH CIRCUIT. FOR BIDDING PURPOSES ONLY.FIRE ALARM CONTRACTOR SHALL PROPERLY SMOKE CONTROL: NIA DESIGN CIRCUIT LOADS TO BE COMPATIBLE WITH NFPA 72 AND MANUFACTURERS MANUFACTURER: SIMPLEX 4100 SPECIFICATIONS AND MODIFY CONNECTIONS AS NECESSARY.FIRE ALARM SYSTEM SHOP DRAWINGS AND DESIGN CALCULATIONS SHALL BE THE FINAL WORKING DRAWINGS FROM WHICH THE INSTALLATION IS IMPLEMENTED. 2, DO NOT BEGIN FIRE ALARM SYSTEM INSTALLATION UNTIL SUBMITTALS HAVE BEEN F APPROVED BY THE ELECTRICAL ENGINEER AND THE BUILDING OFFICIAL.ALL N COSTS AND CORRECTIONS OF WORK DUE TO LATE SUBMITTALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3. ALL FIRE ALARM SYSTEM WIRING SHALL BE IN RED-COLORED CONDUIT(314INCH MINIMUM SIZE).SEPARATE RACEWAYS SHALL BE UTILIZED FOR INITIATING a a CIRCUITS AND NOTIFICATION CIRCUITS.WIRING COLOR CODE SHALL BE - MAINTAINED CONSISTENT THROUGHOUT THE INSTALLATION. w 4. ALL OUTLET,PULL,AND JUNCTION BOXES SHALL BE LABELED"FIRE ALARM"AND aV m _ PAINTED RED. 5. CIRCUIT PROTECTIVE DEVICE(S)SERVING FIRE ALARM EQUIPMENT TO BE z a E 9 FURNISHED WITH INTEGRAL LOCK-ON DEVICES)AND BE PAINTED RED.EACH SYSTEM EQUIPMENT PANEL SHALL BE SERVED WITH A DEDICATED LINE VOLTAGE m azv CIRCUIT. a aap 6. FURNISH AND INSTALL APPROPRIATE QUANTITY OF SYSTEM POWER SUPPLIES, NAC PANELS,AND APPROPRIATE SMOKE DETECTION AND LINE VOLTAGE POWER w U l l s CONNECTIONS FOR PROPER SYSTEM FUNCTION AND SPARE CAPACITY REQUIRED, LOCATE ADDITIONAL POWER SUPPLY AND NAC PANELS IN LOCATIONS ADJACENT 4) r TO OTHER SHOWN FIRE ALARM EQUIPMENT.POWER SUPPLIES AND NAC PANELS MAYBE LOCATED IN OTHER AREAS OF THE BUILDING ONLY WITH THE WRITTEN C6 ti iz CONSENT OF THE ELECTRICAL ENGINEER. -U 12 7. SMOKE DETECTION DEVICES SHALL BE LOCATED AT LEAST THREE(3)FEET FROM O SUPPLY AND RETURN AIR DIFFUSERS. 9n 8. ALL VISUAL NOTIFICATION APPLIANCES SHALL BE SYNCHRONIZED. 9. EACH DEVICE SHALL BE LABELED WITH DEVICE DESIGNATION.LABEL SHALL HAVE Q ull i = 114 INCH HIGH BLACK LETTERS ON WHITE BACKGROUND.DEVICE DESIGNATION m ti SHALL INCLUDE DEVICE ADDRESS OR CIRCUIT IDENTIFIER. - sa 10. FURNISH AND INSTALL VINYL COATED SYSTEM DIAGRAM AT THE FIRE ALARM c :nt — CONTROL PANEL.SYSTEM DIAGRAM SHALL INCLUDE THE BUILDING FLOORPLAN, _ ALL INSTALLED DEVICES,AND ALL DEVICE ADDRESSES/IDENTIFIERS.LOCATE AN OVERALL SYSTEM DIAGRAM AT THE MAIN FIRE ALARM CONTROL PANEL WITH ALL S v l� BUILDING LEVELS/FLOORS ON SEPARATE DIAGRAMS.LOCATE EACH RESPECTIVE F FLOORPLAN DIAGRAM AT EACH NAC PANEL ON ALL OTHER FLOORS/LEVELS OF _ THE FACILITY. 30 OF -EH W 2 R. Q 9 H m CONTROL �1-3, 2 W M H1590A CL5 C M 5 Z O p i F F O Nm FIRE ALARM PLAN �►#�L/ N s woerr LL � v 1 1/5 =1'-0" M a J � 00 m Q Lu a Z J J U -iQ 11, 0- N Q Ln 2 ALL St Luke's Owner PROJECT DATE 17026 8.30.17 DRAWN CHECKED MKC JMM REVISED SHEET TITLE FIRE ALARM PLAN M 06 I— W co SHEET L G E5. 1 F SHEET KEYNOTES:O 1. CONNECT TO CRITICAL BRANCH LIGHTING CIRCUIT RECOVERED IN DEMOLITION PHASE OF WORK. EEC No HOT a MANUAL MODE OPERATION:SWITCHES ARE REQUIRED TO LINE TURN CORRESPONDING LOADS ON.LIGHTS TURN OFF WHEN 11` NEUTRAL SHEET GENERAL NOTES: SENSOR TIMES OUT OR WITH THE SWITCH. 1. REFER TO LUMINAIRE SCHEDULE ON SHEET E1.1 FOR LUMINAIRE TYPES AND AUTOMATIC MODE OPERATION:SENSOR TURNS ON BOTH DETAILED INSTALLATION INSTRUCTIONS. SWITCHPACKS.SWITCHES CAN BE USED TO TURN LIGHTS ON `"USE BLACK LEAD FOR 120VAC o w 2. REFER TO LIGHTING CONTROL DEVICE SCHEDULE ON E1.0 AND WIRING DIAGRAMS OR OFF.RECOMMENDED WIRE:18-3AWG STRANDED WIRE USE ORANGE LEAD FOR 277VAC ? 3 ON THIS SHEET FOR SENSOR TYPES,WIRING DIAGRAMS,AND INSTALLATION NON/SHIELDED. CAP UNUSED LEAD LOAD INSTRUCTIONS. a 1 3. MULTI-WIRE BRANCH CIRCUITS MAY BE UTILIZED FOR LIGHTING CIRCUITS AT g CONTRACTOR'S DISCRETION.WHERE MULTI-WIRE BRANCH CIRCUITS ARE USED, F RED(15 VDC) SWITCH INTEGRAL HANDLE TIES SHALL BE IMPLEMENTED ON OVERCURRENT PROTECTION N BLUE(CONTROL) PACK DEVICES IN ACCORDANCE WITH NEC REQUIREMENTS. BLACK(COMMON) BLUE 4. LOCATE LIGHT SWITCHES AND OTHER WALL MOUNTED LIGHTING CONTROL DEVICES NOT MORE THAN 12 INCHES FROM THE TRIM OF THE DOOR ON THE HOT LATCH SIDE,OR NOT MORE THAN 12 INCHES FROM THE DOOR SIDELIGHT(WHERE a a APPLICABLE,OR NOT MORE THAN 12 INCHES FROM OPEN POSITION OF DOOR WHERE INSTALLED ON OPPOSITE WALL;DO NOT INSTALL BEHIND DOOR SWING). w w LINE 5. LUMINAIRES DENOTED WITH SUFFIX W ARE EGRESS LUMINAIRES WITH NEUTRAL EMERGENCY CONNECTIONS.CONNECT BATTERYAND/OR EMERGENCY BALLAST ¢ TO UNSWITCHED LEG OF LIGHTING CIRCUIT. 6. COORDINATE LUMINAIRE PLACEMENT WITH ARCHITECTURAL REFLECTED CEILING RED "USE BLACK LEAD FOR 120VAC o PLANS AND MECHANICAL DIFFUSER PLANS PRIORTO INSTALLATION.COORDINATE a`s a BLUE USE ORANGE LEAD FOR 27NAC ? 3 CEILING GRID ORIENTATIONS WITH CEILING INSTALLER PRIOR TO INSTALLATION. a a ; O CAP UNUSED LEAD LOAD 7. ADJUST ALL SENSORS FOR TIME DELAY,SENSITIVITY,AND COVERAGE AREAS ='3 E BLACK 2 WITH OWNER UPON INSTALLATION.INSTALL SENSORS IN ORIENTATION TO w ®a [s YELLOW PROVIDE MAXIMUM COVERAGE IN AREAS SERVED AND SO AS TO MINIMIZE FALSE PURPLE LRED(15 VDC) SWITCH (WHERE OPERATIONS. N 8. LOCATE SENSOR POWER PACKS ABOVE ACCESSIBLE CEILINGS. E GRAY BLUE(CONTROL) PACK BLUE USED) 9. WHERE CONDUITS ARE SHOWN TO BE INSTALLED ABOVE EXISTING ACCESSIBLE ti ORANGE BLACK(COMMON) CEILINGS,REMOVE CEILING TILES IN THE AFFECTED PATH OF THE CONDUIT PRIOR U TO INSTALLATION.STORE AND PROTECT EXISTING CEILING TILES FOR o_ REPLACEMENT UPON COMPLETION OF CONDUIT INSTALLATION.WHERE DAMAGE cn �.� TYPICAL SENSOR(VS-L)WIRING DIAGRAM TO CEILING TILES OCCURS,FURNISH AND INSTALL MATCHING CEILING TILES TO QW NOT TO SCALE ES.iL REPLACE ALL DAMAGED TILES.OBTAIN MATCHING TILE INFORMATION FROM OWNER. m ti c §Nyl _m 0 U u Tx �1_ — — 1 4p) w_ _ S LU (TYP.) Qjd I \: - ' III _L , U 1 d Q \ O E GO c —GET c ^ W O D Y Ql - -- l0 M C M GLi GLi O N I.R. W RL1 RL1 O + p CQd �,(OO'jd a a �Ic I i «c m w 0 ce) I , � � � GLi .d GLi J Q c RL1 RL1 \Q z a l0-Jd i I /1 ___--_- I I lQd / J J (TYP. Lu J ,I ci L Jc (TYP.) �UL''� J Q D-D lJ z N 3 N a bcd--A b RL1 RL1(O'jb 33 RL1 00 a a CON ROL 1 ALL r St Luke's i (TYP.) Owner PROJECT DATE 17026 8.30.17 DRAWN CHECKED l MKC JMM REVISED LIGHTING PLAN NORTH 1 1/4"=V-0" SHEET TITLE LIGHTING PLAN CD M ui co SHEET L G E5. 1L SHEET KEYNOTES:O 1. ROUTE 1/2"E.C.TO ABOVE ACCESSIBLE CEILING. 2. COORDINATE EXACT LOCATION WITH MECHANICAL. MECHANICAL EQUIPMENT CONNECTION SCHEDULE EQUIPMENT VOLTAGE FLA DISCONNECT PANEL CIRCUIT# CONDUCTORS CONDUIT NOTES FCW1 Mo TO FURNISHED BY MECHANICAL 1CLB(X1( 13,15.17 3.1281.12(G) 34" MARE LINE VOLTAGE CONNECTIONS TO VFD;VFD BY MECH. H-1 20M 170 30AOP,NON-FUSED,NEMAT 1CL Hi 19,21.23 41261-12G 34" & 0 =�\y0 0 yi-0yyo SHEET GENERAL NOTES: 1. REFER TO MECHANICAL PLANS FOR DUCTWORK CONFIGURATIONS AND DUCT CONNECTIONS TO MECHANICAL EQUIPMENT.ELECTRICAL CONNECTIONS TO MECHANICAL EQUIPMENT SHALL BE PROPERLY COORDINATED WITH MECHANICAL AND PLUMBING CONTRACTORS TO MAINTAIN ACCESS TO AND WORKING CLEARANCE AROUND ALL MECHANICAL EQUIPMENT PRIOR TO COMMENCING a INSTALLATION. g 2. REFERTO CEILING MOUNTED MECHANICAL EQUIPMENT DETAIL($)FOR F CONNECTIONS TO ELECTRICAL COMPONENTS ASSOCIATED WITH MECHANICAL rn EQUIPMENT,DISCONNECTING MEANS MOUNTING LOCATIONS,AND WORKING CLEARANCE REQUIREMENTS.DETAIL($)ARE SHOWN ON SHEET_. 3. REFERTOARCHITECTURAL CODE PLANS FOR LOCATIONS OF FIRE-RATED ASSEMBLIES. a a 4. PENETRATIONS OF FIRE-RATED ASSEMBLIES SHALL BE PERFORMED IN ACCORDANCE WITH UL REQUIREMENTS AND DIVISION 7 SPECIFICATIONS. w 5. MULTI-WIRE BRANCH CIRCUITS SHALL NOT BE UTILIZED FOR LINE TO NEUTRAL LOADS.DEDICATED NEUTRAL CONDUCTORS SHALL BE PROVIDED FOR ALL CIRCUITS. 6. ALL JUNCTION BOXES LOCATED ABOVE ACCESSIBLE CEILINGS SHALL BE LOCATED NO MORE THAN 36 INCHES ABOVE CEILING LEVEL. 7. REVIEW AND COORDINATE ALL EQUIPMENT CONNECTIONS WITH SUBMITTALS, a aae SHOP DRAWINGS,AND MANUFACTURER'S INSTRUCTIONS FOR ALL ELECTRICALLY a 3 E OPERATED EQUIPMENT SUPPLIED BY OTHER DIVISIONS OF WORK PRIOR TO w ®a [s COMMENCING WORK.NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES IN ELECTRICAL CONNECTIONS BASED UPON REVIEW. r C6 ti i � E �a�LL Q w` m_ c Nm ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT AND OUTLET BOXES REQUIRED BY U u MECHANICAL CONTROLS CONTRACTOR FORCONTROL EQUIPMENTAND CONNECTIONS.REFERTO MECHANICAL �; 4 DRAWINGS FOR EQUIPMENT LOCATIONS INCLUDING PANELS,THERMOSTATS,AND CONTROL POINTS. T Fil Lij T _ l 1cLe(H1)-1s.21.23 E 4.OKVA H 2 V 9 s 208/3 9 O j�/ D Y m ad I p'Il --- Un cu E:l 0 k R. O Q + ROOM LH1590B wco s I can 3 IS W M 0 1CLB(H1)-13,15,17ui Qa. ® Fa u 2.5KVA \ J J i yl U -iQ l Z D_ z N a 00 I I I I I CONTROL Jr St Luke's FOwner I PROJECT DATE 17026 8.30.17 DRAWN CHECKED l MKC JMM REVISED MECHANICAL POWER PLAN NORTH 1 1/4"=1� SHEET TITLE MECHANICAL POWER PLAN o M W co SHEET 2 E5. 1 M MEDICAL EQUIPMENT AND CONNECTIONS MEDICAL EQUIPMENT CONDUIT AND CABLE INSTALLATION Label DesCfi €on MO M[n Heights FUmished Installed h See Deta€ LABEL CONDU!TSIZE CABLES SUPPLIED BY FROM TO CABLES/CONDUCTORS NOTES SHEET KEYNOTES:O PULL BOX;FURNISH WITH4 SLEEVE BELOWFINISHED 2" E.G. BCHRIHZ) MP 44/0&I-4AXG) 1. LOCATE ABOVE ACCESSIBLE CEILING. B110 BETWEEN PULL BOX TO FLUSH WITH E.C. E.C. 1 REFER TO ONE LINE DIAGRAM FLOOR El OQR 2 I1/2" E.C. MP PUl 342&IO2(6) REFER TO ONE LINE DIAGRAM 18"X8"BUSHED OPENING IN COVER OF 11/4" E.C. MP SGi 446&iB-6(G) CC ,VD1, AT FLOOR LINE E.C. E.C. ; REFER TO ONE LINE DIAGRAMn'O E.G. MP EPO 3412 O S'y 4 REFER TO ONE LINE DIAGRAM W=�p TOP OF 3/4" E.G. EPO EPO 3412 G rn CRF 3"BUSHED OPENING EN'HDI' E.L. E.C. S REFER TO ONE LINE DIAGRAM HORIZONTAL DUCT p� ««««PULL BOX;FURNISH WITH 4" FLUSH IN WALL AT 6 3/4" E.G. SGi WL 3412 CRB BUSHING IN CENTER OF COVER FOR E.C. EC. SHEET GENERAL NOTES: y p CABLE EXIT FLOOR LINE 7 3/4" E.G. SGi DS 3412 1. REFER TO RESPECTIVE SYSTEM PLANS FOR APPLICABLE GENERAL/NOTES G� «««PULL BOX;FURNISH WITH 3"SLEEVE FLUSH IN WALL AT INSTRUCTIONS. CUI « BETWEEN PULL BOX TO FLUSH WITH FLOOR LINE E.C. E.C. 8 3/4" E.G. MP XFI 3412 REFER TO ONE LINE DIAGRAM FINISHED FLOOR 9 3/4" E.G. 1GLB(HI) M% 3412 Q BOTTOM OF 10 3/4" E.G. MX SU 3412 49'MA% N D1 6"BUSHED OPENING EN'HDI' E.C. E.C. CEILING OUCT'CD2' 11 21/2" SIEMENS Pi GUL COOLING HOSE 77 MAX (2)3" SIEMENS SG(SLL) CRB ICRL) COORDINATE WITH a E 12 SIEMENS fit'MAX EMERGENCY POWER OFF MUSHROOM 13 3" SIEMENS SC Tl COO , SIEMENS WITH 4TMAX co EPO 18"AFF E.C. E.C. 2 BUTTON COORDINATE WITH 2" SIEMENS VOL(SCl) CUL Z 3-Es 14 SIEMENS 98'MA% w ese`s- IS 3" SIEMENS TI 6110 COORDINATE mw5 COORDENATEWITH ¢ '53E I6 3" SIEMENS CRB 6110 SIEMENS w ®3F 1/2" SIEMENS XFI SCI COORDENATEWITH N IS 5"BUSHED OPENING IN COVER OF'VD2' AT FLOOR LINE E.C. E.C. 17 SIEMENS 91'MAX O) E COORDENIATEWITH (B "'� 3/4" SIEMENS VD2 ICLB(HI) g 18 SIEMENS 118'MAXU N/A SIEMENS Pi PUI COORDENATEWITH XFi c m 19 SIEMENS 41'MAX 3 g 1] NIA SIEMENS Pi PUL Q COORDINATE WITH fn W w LL 1 20 SIEMENS 41'MAX COORDINATE WITH N/A SIEMENS Pi SGL SIEMENS IS —my o LDC SAME OPENING AS'IS' AT FLOOR LINE E.C. E.C. 21 COORDINATE WITH 3T MAX 2 VD1 CC SCi CUi VD 1g o Y4 22 N/A SIEMENS SC1 ES 28'MAX PU1III i U u COORDENATEWITH SIEMENS fit'MAX ( � 74 23 N/A SIEMENS SC2 of BCHR H2 26,28,30 N/A SIEMENS LS CRI GOORDENATEWITH T 24 SIEMENS 61'MA% SC REFER TO N/A SIEMENS UDC D1 COORDINATEWITH iRMAFN PANEL;480VOLT,125AMP MAIN 6'-6"AFFTOTOPOF 25 SIEMENS 79'MAXMP E.[. E.C. GIVE L[NE WITHSUBFEEDSANDSHUNTTRIP PANEL COORDINATEWITHWDIAGRAM N/A SIEMENS LOC SG1 26 SIEMENS 54'MA% _ ,,COORDENATEWITH 10 sIFMFNS1 �N Q OTTOMOF 27 N/A SEEMEIvs LDC VD3 118'MAX SUPS 6"BUSHEDOPENINGIN'CD2' E.C. E.C. CEILEM1IG DUCT[D2' J MX -- tt 1 F��- (LL� «"PULL BOX;FURNISH WITH 4" FLUSH IN WALL AT E f�W CD1 (D 9 PUl «« E.C. E.C. m BUSHING IN BOTTOM OF COVER FLOOR LINE W {� M "«PULL BOX;FURNISH WITH 4" FLUSH IN WALL AT G ROOM I I—�`� 5 C M 5[L « E.C. E.G. 1CLBIH1)-22 H ❑ ` 0 BUSHING IN BOTTOM OF COVER FLOOR LINE DD2 II I �� G N 6 S _J O Q 7 "PULL BOX;FURNISH WITH 6"SLEEVE Di C__ 0/�/ w � SC ««BETWEEN PULL BOX TO FLUSH WITH BELOWFINESHED E.C. E.C. 12 I LJ_ � co FLOOR FINISHED FLOOR ,PO t m E. a PULL BOX;FURNISH WITH 6 FOOT ABOVEFINISHED J I CD2 CD SU « E.C. E.C. ��I 15 7 m FIXTURE WHIP 3-N12'S CEILING I�" Cr) 1 } F 1 I I W 000 �J�B.11N J � yL Lu .««PULL BOX;FURNISH WITH 4"SLEEVE ��•` I I Q z Q Tl ««BETWEEN PULL BOX TO FLUSH WITH FLOOR BELOW FINISHED E.C. E.C. FINISHED FLOOR II U -iQ APPROXIMATE CRCR HDI�VDS EPEPO Q L- ih 750VA STEP DOWN TRANSFORMER, LOCATION 0 N %Fl 480V PRI1120V SEC INDICATED ON E.C. E.C. /___ i z_ N DRAWING VERIFY — CR1 Q Ln 31/2"X 18"CEILING DUCT WITH(3) ABOVE FINISHED OO CDL EQUALLY DIVIDED SECTIONS;CONNECT E.C. E.C. TO VERTICAL DUCT CEILING 312"%10"CEILING DUCT WITH(3) CONTROL ABOVEFENLSHED r St Luke's [D2 EQUALLY DIVIDED SECTIONS;CONNECT CEILING E.C. E.C. TO VERTICAL DUCT 33/2"%30"HORIZONTAL DUC7WITH(3) SURFACED ON Owner HDL EQUALLY DIVIDED SECTIONS CONNECT FINLSHEDWALLAT E.C. E.C. TO VERTICAL DUCT FLOOR LINE OS ----- WL PROJECT DATE FLUSH IN WALL 17026 8.30.17 31/2"%18"VERTICAL DUCT WITH(3) FROM FLOOR LINE VDl - EQUALLY DIVIDED SECTIONS. TO ABOVE 1- DRAWN CHECKED E.C. E.C. MKC JMM ACEESIBLE CEILING FLUSH IN WALL 31/2"X 10"VERTICAL DUCT WITH(3) FROM FLOOR LINE E.C. E MEDIC AFL EQUIPMENT ELECTRIC PLAN REVISED «I VD2,VD3 EQUALLY DIVIDED SECTIONS. TO ABOVE .C. AGEESIBLE CEILING WARING LIGHT;X-RAY ON.(REFER TO WL L ABOVE DOOR E.C. E.C. UMINIARE SCHEDULE) SHEET TITLE M% MAVIS TRANSFORMER:120VPRE/24VDC ABOVE DOOR SEEMENS E.C. MEDICAL EQUIPMENT cM ELECTRICAL op PLAN I--- W co SHEET �2 E6 .0 w LIGHTING POWER FROM WAIL ——————, I +SWITCH 100-•277 SIEMENS SYSTEM ALL CONDUITS AND WIRES I CABIN-'.T "SCI" IT j _ v VAC S17.E$ MAST BE DETERMINED I IBY :HE ELEC's'RICAL III I --+NEUIRA.L \SEER Nos FNGINiER OF RECORD PER 8c '4 ROOM LIGHTS a=�¢° oye 2yo MAIN BREAKER N,E.0 AND 1'0 MAINTAIN 62' I I I ROOM LIGHTS o =P0 CI7^CTTIT SIEMENS IMPEDANCE I I CONTROL RELAY I I 24 VDC HOSPITAL ss�y SP POWER SOURCE REOUIREMENIS, f 77 POWER POWER o 41 I I I sn0POWE VAC d 37' I SUPPLY WARN,NG f1O'fE #1 LIGHT POWER PROCEDURE 100-277 VAC X-RAY ONROOM WARNING LIGHT' NEUTRALCONTROL RELAY? 0EpO m _ S (30A) I I.. X-RAY ON" w m 3 L—� WARNING LIGHT m ; EOUIPMENT I 2 LC (15A) OPTIONAL TABLE ROOM CONTROL NOTES: OUTLET POWER FEED. ROOM 1. 24 VDC Rr•.IAri MUST INCLUDE A FREE^•WHEELING DIODE (P/N CONTACT SIEMENS 1N4002 OR EQUIVALENT). amfr PROJECT MANAGER. 2. ALL ITEMS PROVIDED BY CUSTOMER ELECTRICAL CONTRACTOR EXCEPT CONTACTS INSIDE SIEMENS "SC1" CABINET (ITEMS INSIDE DOTTEDF L_ n o LINES). ti_ co "� r-J_-10 [ �l 3. AllWIRING THAT CONNECTS TO SIEMENS "SCI" CABINET MUST EE o.�� 14-`:8 AWG STRANDED WIRE. i i'F1 I �LE�C IS CUT PU1 C., SC1 C s'T R1 L J Qw`�LL T 4. ONLY 3 WIRES LABELED "24 VDC", "ROOM LIGHTS" AND "X-RAY ON" 6' ——————45' (OPTION)-———— I SHOULD BE SENT TO SIEMENS "SC 1" CABINET, N g N o 16' 45' I 5. 24 VDC RELAYS ARE TO BE SELECTED BY ELECTRICAL CONTRACTOR TO y HANDLE THE VOLTAGE AND AMPERAGE OF LIGHTING CURCUT. �98 6. IF NEEDED. A SWITCH TO BLOCK RADIATION CAN BE INSTALLED IN '- SIEMENS•-SUPPLIED SERIES WITH THE DOOR CONTACT. MAXIMUM WIRE SsZE POLY. A100 SYSILM POWER CABLE 57 + THE SWITCH c4 VLC 20 MA) MUST BE PROVIDED ON SITE. FOR 3 FRM WG LUGS CABINET CABINET FOR TABLE OUTLET. (� / IS /0 A.WG =0R `' E-C. TO CONNECT TO 62 62 * CONTROL USING +24 V FROM THE SYSTEM CONTROL CABINET LU "PU?" CABINET. I TRANSFORMER. W 61 PLAN THE SWITCH SO 'THAT' UNINTENTIONAL OPERATION IS NOT 1cl PU 1 SC 1 POSSIBLE. W .� THE SWITCH MUST' BE PROVIDED WITH AN AI•PPROPKIAT'E SYMBOL (OR � 0 £ DESIGNATION) FROM WHICH THE FUNCTION CAN BE RECOGNIZED. WARNING LIGHT/ROOM LIGHT SCHEMATIC a Y POWER SCHEDULE DETAIL ARTIS Q/Q.ZEN/ZEE CEILING MAX CABLE LENGTHS DETAIL 2 LIGHTING DETAIL 3 c M NOT TO SCALE E6.1 NOT TO SCALE E6.1 NOT TO SCALE E6.1 O N O Q + w co a — a - a J De 00 U m Q LLI a Z J J U _j LL C7 CL Z N � 00F_ St Luke's Owner PROJECT DATE 17026 8.30.17 DRAWN CHECKED MKC JMM REVISED SHEET TITLE MEDICAL EQUIPMENT O co DETAILS ap I— LU U) SHEET E6. 1 W Branch Panel: (E)MLB(H1) Branch Panel: (E)1CLB(H1) Location: Volts:120/208 Wye A.I.C.Rating: Location: Volts:120/208 Wye A.I.C.Rating: Supply From: Phases:3 Mains Type: Supply From: Phases:3 Mains Type:MLO EFI Nos Mounting:Surface Wires:4 Mains Rating:100A Mounting:Surface Wires:4 Mains Rating:225A 0,1, 2y Enclosure:Type 1 MCB Rating: Enclosure:Type 1 MCB Rating: Label Type: Surge Protection: Label Type: Surge Protection: a -� Notes CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes Notes CKT Circuit Description Trip Poles t1200 Bj Poles Trip Circuit Description CKT Notes 1 EXISTING 20A 1 1220 1080 1 20A EXISTING 2 1 EXISTING 20A 1 1080 1 20A EXISTING 3 EXISTING 20 A 1 1725 500 1 20 A EXISTING 4 3 EXISTING 20 A 1 1 20 A EXISTING 4 5 EXISTING 20A 1 1500 540 1 20A EXISTING 6 5 EXISTING 20A 1 1080 1 20A EXISTING 6 7 EXISTING 20 A 1 900 540 1 20A EXISTING 8 7 EXISTING 20 A 1 1080 1 20A EXISTING 8 9 EXISTING 20 A 1 1500 720 1 20 A EXISTING 10 9 EXISTING 20 A 1 1 20 A EXISTING 10 11 EXISTING 20A 1 1080 540 1 20A EXISTING 12 11 EXISTING 20A 1 1060 1 20A EXISTING 1213 EXISTING 20 A 1 860 1800 1 20A EXISTING 14 2 13 FCU-41 20 A 3 842 1 20A EXISTING 14 15 EXISTING 20 A 1 1080 1600 1 20 A EXISTING 16 15 - - 1 20A EXISTING 1617 EXISTING 20A 1 500 1600 1 20A EXISTING 18 17 - 1020 1 20A EXISTING 18 19 EXISTING 20 A 1 300 0 1 20A EXISTING 20 2 19 11-1 20 A 3 1333 1080 11 1 20A EXISTING 20 21 EXISTING 20 A 1 1000 1 900 1 20A 1590A,1590B 22 1 1 21 - 1333 500 1 20 A MX 22 1 23 EXISTING 20 A 1 1080 0 1 20A SPARE 24 23 - - -- 1333 540 1 20 A 1590A 24 1 a a 25 EXISTING 20 A 1 720 0 1 20A SPARE 26 2 25 MD SHUNT 20 A 1 180 540 1 20 A 1590A 26 1 - 27 EXISTING 20 A 1 360 0 1 20 A SPARE 28 27 SPACE -- -- 0 1000 1 20 A 1590 DOOR OPERATOR 28 1 e ` 29 EXISTING 20A 1 360 0 1 20A SPARE 30 29 SPACE -- -- 0 540 1 20A 1590B 30 1 w w 31 EXISTING 20A 1 1080 0 311111 1 20A SPARE 32 31 SPACE -- -- 0 0 1 20A SPARE 32 ? frz# 33 EXISTING 20 A 1 900 0 1 20 A SPARE 34 33 SPACE - -- 0 0 -- -- SPACE 34 z a e E 35 EXISTING 20 A 1 1600 0 1 20A SPARE 36 35 SPACE - -- 0 0 -- SPACE 36 e e 37 EXISTING 20 A 1 570 0 -- -- SPACE 38 37 SPACE - -- 0 0 -- -- SPACE 38 - 39 SPARE 20A 1 0 0 - SPACE 40 39 SPACE - -- 0 0 - SPACE 40 41 EXISTING 20 A 1 720 0 SPACE 42 41 SPACE 0 0 SPACE 42 `-' 3E Total Load: 9070 VA 10285 VA 9520 VA Total Load: 9690 VA 8455 VA 7855 VA w ®a Total Amps: 76 A 86 A 80 A Total Amps: 82 A 71 A 65 A $ Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Load Classification Connected Load Demand Factor Estimated Demand Panel Totals r Equipment 12495 VA 100.00% 12495 VA Equipment 7706 VA 100.00% 7706 VA -U 9 Receptacle 16380 VA 80.53% 13190 VA Total Conn.Load:28875 VA Lighting 10955 VA 125.00% 13694 VA Total Conn.Load:26001 VA Total Est.Demand:25685 VA Receptacle 7340 VA 100.00% 7340 VA Total Est.Demand:28740 VA w m m aN Total Conn.:80 A Total Conn.:72 A Q W LL Total Est.Demand:71 A Total Est.Demand:80 A m ti g c §63 Notes: Notes: 0 q 1.CONNECT TO EXISTING SPARE CIRCUIT BREAKER. 1.CONNECT TO EXISTING SPARE CIRCUIT BREAKER. , 2.FURNISH NEW CIRCUIT BREAKER COMPATIBLE WITH EXISTING PANELBOARD. W 0 7 m � Y � W % CL5C M o Cu O M Q r, + 0 s m a s o C7 a J 00 m Q LU a P`U1 SV1 XF1 Z J J U -iQ 3 C D �lF''�� O LL pp V 0- >z N Q Lf� LIT 2 00 7 ALL St Luke's MP 100AI3P 30AI3P 15PJ2P 1CLB(H1)-25 �r rOwner • • • -] 125AJ3P PROJECT DATE 17026 8.30.17 8,812 AFC DRAWN CHECKED E,PO FEEDER SCHEDULE Q MKC JMM A DESIGNATOR CONDUCTORS RACEWAYS) NOTES REVISED (IN EACH RACEWAY) A 4-4I0&1410(G) 21YP -- B 342&1-#2(G) 11/4" C 446&1-#6(G) 1. D 2412&1-#12(G) We NOTES: SHEET TITLE 1. -- ,25N3P ELECTRICAL 400A BUS SCHEDULES o KEYNOTES 1. FURNISH NEW CIRCUIT BREAKER AND ASSOCIATED HARDWARE 00 COMPATIBLE WITH EXISTING SWITCHBOARD. EXISTING MAIN SWITCHBOARD SCHM112P LI J 480YI277V,30,4W,65,000 AIC SHEET PARTIAL ONE LINE DIAGRAM NOT TO SCALE E7 .0 w