Loading...
HomeMy WebLinkAboutGeotechnical proposal Atlas 22 �TrTG�T�1 484 Eastland Drive South, Suite 103 Twin Falls, ID 83301 (208)733-5323 1 oneatlas.com May 13, 2022 Proposal No. 22-06414 Kiley Gardiner Stack Rock Group 404 South 81" Street, Suite 154 Boise, ID 83702 (208) 345-0500 kiley@stackrockgroup.com Subject: Geotechnical Investigation Proposal Preserve Park Eastland Drive and Pole Line Road Twin Falls, ID 83301 Latitude: 42.591539, Longitude: -114.439256 Dear Kiley Gardiner: In accordance with your request, Atlas Technical Consultants LLC (Atlas) is pleased to submit this proposal for a geotechnical investigation for the Preserve Park project located east of the intersection of Eastland Drive and Pole Line Road within Twin Falls, ID. The subsurface investigation will be conducted to provide information needed in design of the proposed project. The project is expected to consist of a new restroom structure, an expanded parking lot, and a community park area. The site to be developed is approximately 2.4 acres. In addition, paved areas will be developed for the project. Retaining walls are not anticipated. Drainage is expected to be directed to onsite infiltration facilities. Location and size of the infiltration facilities are unknown at this time. Revisions may be required based on final design requirements. This proposal contains our proposed scope of work, fee, and schedule. SCOPE OF WORK Exploration and recommendations will be prepared under the supervision of a registered professional engineer. Qualified personnel will perform all field work. In accordance with your request, our proposed subsurface exploration will include the following services: Pagel1 mom I Subsurface Soils Investigation • Underground public utility locate services will be contacted prior to commencement of field work. The client, property owner, and/or developer are responsible for private utility locates as Atlas cannot be held responsible for the cost of replacement of utility services. • Test pits (3) will be advanced on the site. Test pits will be backfilled at completion of exploration. Surfaces will be left in a rough and somewhat mounded condition. Costs can be determined if additional surface restoration is necessary. • Soil will be classified in the field in accordance with applicable standards, including ASTM D2488. • Representative soil samples will be collected and transported to our laboratory for additional testing, per ASTM or other recognized standards. • Two infiltration tests will be performed. Geotechnical Engineering Report • Information regarding regional geology will be provided. • Recommended Site Class and Seismic Design Parameters will be provided. • Results of field and laboratory testing will be included. • Final logs will be provided based on field classification, laboratory test data, and classification of soils per ASTM D2487. These logs will incorporate all subsurface soil and/or rock profile properties that may affect engineering conclusions. • A summary of soil conditions encountered will be provided. • Approximate exploration locations will be provided on a site map. • Hydrology o A review of localized groundwater conditions will be included. o Estimated soil infiltration rates will be provided based on soil classification. o Design infiltration rates will be reported based on site specific infiltration testing. • Foundations and Floor Slabs-on-Grade o Bearing capacity for applicable foundation types will be provided. o Recommended frost embedment depths will be included. o Foundation and floor slab subgrade preparation and drainage recommendations will be presented. • Applicable pavement section recommendations will be provided. • Fill material type and placement recommendations will be presented. • Recommendations for construction activities will be included. Proposal 22-06414 Page12 COST INFORMATION The fees outlined in this proposal are based on review of the provided project details and/or documents, as well as our experience on similar projects. The outlined scope of work will be billed on a lump-sum basis for a total fee of $4,605.00. The cost of services may exceed this proposed fee if unanticipated conditions are encountered that would warrant additional investigation or analysis, or if the proposed plans are changed from the previously stated understanding of the project. Atlas will notify the client and obtain approval prior to incurring any additional fees on the project. All subsequent services and communications with design consultants or contractors will be charged in accordance with the attached fee schedule. SCHEDULE Atlas will proceed with the work on the basis of verbal authorization; however, please sign and return a copy of this proposal. Public underground utility locate services will be notified as required by law once notice to proceed is received. Utility locate services require 2 full business days before subsurface exploration can commence. Atlas anticipates issuing our findings and recommendations within 10 business days from the last date field work is performed or soil samples are obtained. The attached Protect Data Sheet provides us with values used in our design calculations. Please consult the project design team, complete the sheet to the fullest extent possible, and return at your earliest convenience. Unless otherwise noted, Atlas will provide only a PDF copy of the final report. CLOSURE This proposal is valid for 90 days from the date initiated. If you have any questions regarding this document or if we may be of further service, please contact our office at (208) 733-5323. Atlas sincerely appreciates this opportunity to provide professional services to you on this project. We look forward to working with your team. Respectfully submitted, ATLAS TECHNICAL CONSULTANTS LLC <�kv_ Ethan Salove, PE Geotechnical Engineer Attachment: Fee Schedule Project Data Sheet Distribution: Kathryn Wright, Stack Rock Group Proposal22-06414 Page13 mom I It is proposed that the cost of these services be invoiced on a lump sum basis as outlined below. Unit Rate Units Subtotal FIELD • Atlas Field Investigation Fees $1,495.00 Excavation Subcontractor Fees $950.00 REPORTING Final Report Fees $1,840.00 LABORATORY Sieve Analysis (ASTM C117/C136) $150.00 1 $150.00 Atterberg Limits (ASTM D4318) $170.00 1 $170.00 MISCELLANEOUS Meetings/Consultation, per hour(if needed) $110.00 0 $0.00 PROJECT TOTAL: . 1 11 The individual signing below represents and warrants that he/she has full authority to enter into this Agreement on behalf of CLIENT. By signing below, CLIENT is acknowledging and agreeing to Atlas Technical Consultants, LLC Terms and Conditions (or available upon request). If the individual below lacks such authority, he/she shall be personally responsible for payment of obligations under this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the date indicated below. Atlas Technical Consultants LLC Stack Rock Group Signature: Signature: Name: Name: Title: Title: Date: Date: Proposal22-06414 Page14 PROJECT DATA SHEET GEOTECHNICAL INVESTIGATION & RECOMMENDATIONS If known, please provide the following when returning this data sheet: 1. Project Name: 2. Project Manager: Phone Number: 3. Site Contact: Phone Number: 4. Description of Project: Maximum Wall Loads (klf): Maximum Isolated Column Loads (kips): Multi story building? If yes, how many stories? Basement and/or retaining walls planned? If yes, provide depth. Onsite disposal of stormwater? If yes, provide type of facility. Planned finished floor elevation compared to existing grade? Pavement section required? 10 or 20 year design? Daily truck traffic? Separate truck access areas? What local jurisdiction will govern the following? Pavements: Stormwater Facilities: klf= kips per linear feet; kips = kilo pounds (1,000 Ibs) 5. Distribution of Reports (if paper copies are required, indicate quantity): ... Paper Copy ❑PDF Copy ... Paper Copy ❑PDF Copy To: To: Attn: Attn: Email: Email: ... Paper Copy ❑PDF Copy ... Paper Copy ❑PDF Copy To: To: Attn: Attn: Email: Email: 6. Invoice Physical Address: 7. Invoice Email Address(es): Page 5