HomeMy WebLinkAbout2024-05-14 IDEQ SSO Report City of Twin Falls
ID0021270
Idaho Pollutant Discharge Elimination
System
Wastewater Treatment Plant
Sanitary Sewer Overflow Inspection
Report
City of Twin Falls WWTP
Permit Number: ID0021270
Inspection Date: May 1 , 2024, and May 6, 2024
Prepared by
Brandi Lowe — IPDES Compliance Officer
Twin Falls Regional Office
650 Addison Avenue West, Suite 110
Twin Falls, ID 83301
Report Date: May 14, 2024
City of Twin Falls
ID0021270
Table of Contents
1 Facility Information..................................................................................................................1
1.1 Facility Details...................................................................................................................1
2 Inspection Chronology..............................................................................................................5
2.1 24-Hour Report Review ....................................................................................................5
2.2 Previous Inspection Report................................................................................................5
3 On-site Inspection.....................................................................................................................5
3.1 Opening Conference..........................................................................................................6
3.2 Site Inspection (May 1, 2024) ...........................................................................................6
3.3 Site Inspection (May 5, 2024) ...........................................................................................5
3.4 Sampling............................................................................................................................7
4 Closing Conference ..................................................................................................................8
4.1 External Agency Communications....................................................................................8
ii
City of Twin Falls
ID0021270
Table of Figures
Figure 1. Rock Creek Lift station, sewerage pipe from small residential community, and Rock
Creek................................................................................................................................. 5
Figure 2. Sampling locations from the May 1, 2024, site visit....................................................... 5
Table of Tables
Table 1. Sample locations and results from May 1, 2024, sampling by DEQ................................ 8
Table of Photographs
Photograph 1. Collection system pipe where wastewater exited during the SSO, red arrows
indicating holes in the pipe, facing north. ........................................................................ 6
Photograph 2. Collection system pipe, red arrows indicating holes in the pipe, facing
northeast. .......................................................................................................................... 7
Photograph 3. Collection system pipe, red arrows indicating holes in the pipe, facing
northwest. ......................................................................................................................... 7
Photograph 4. Untreated wastewater in field prior to discharging to Rock Creek, facing
southeast. .......................................................................................................................... 8
Photograph 5. SSO discharge location to Rock Creek. .................................................................. 8
Photograph 6. Rock Creek upstream sample location, facing west................................................ 9
Photograph 7. SSO discharge sampling location and Rock Creek downstream sampling
location, facing northwest. ............................................................................................... 9
Photograph 8. Collection system pipe and temporary plugs, facing north..................................... 5
Photograph 9. Pipe replacement(green)to the collection line, facing northeast. .......................... 6
Photograph 10. Removed pipe and wastewater flooding the field, facing northeast...................... 6
Photograph 11. Discharge location to Rock Creek, brown plume indicated by red arrows........... 7
iii
City of Twin Falls
ID0021270
1 Facility Information
Facility Name: Twin Falls, City of—Twin Falls WWTP
Permit Number: ID0021270
Permit Status: Effective November 1, 2009; Expired October 31, 2014
Administratively Continued
Facility Type: Sewage Treatment Plant - Major
Classification: Class IV
SIC Code: 4952—Sewerage Systems
NAICS Code: 221320—Sewage Treatment Facilities
Facility Location: West of the Rock Creek Lift Station
42.563337°, -114.495169°
Mailing Address: PO Box 1907
Twin Falls, ID 83301
Facility Contact(s): Nathan Erickson—Environmental Engineer
Office: (208) 735-7272
Cell: (208) 358-5731
neickson@tfid.org
1.1 Facility Details
One collection system line originates from a small residential community to the west of the Rock
Creek Lift Station. The collection line slopes down from the west canyon wall, suspends across
Rock Creek, before eventually descending into the ground of a privately owned field
immediately to the west of the Rock Creek Lift Station(Figure 1). Details on the connection to
the lift station, as well as the previous Sanitary Sewer Overflow(SSO)that occurred in this
location can be found at EDMS File 2024FAU107.
1
• �11 I 1
Rock Creek Lift Station • - —--_,_ _ - -
od
ti mil'"`• T♦ —�i` :i�+► _ .�
,` �__•rt `. eta ' •
ck Creek
Lift Station iq
Suspended pipe
•�Y. 1 •r
Lift Station
influent and
comminutor
♦ + 1 Z'
�♦ ,ram r•'���• `
5u u
Goo arth N•
h.g-Lends opsrni— - I 200 tt
City of Twin Falls
ID0021270
2 Inspection Chronology
2.1 24-Hour Report Review
Two 24-Hour Noncompliance Reports were recorded on the IPDES Noncompliance Hotline by
Nathan Erickson for the occurrences of the SSOs. Both SSOs were caused due to a blockage and
wastewater exited the collection system through open holes present in the conveyance pipe. At
the time of the first noncompliance report for the SSO that occurred on April 30, 2024, no
wastewater was reported to have entered Rock Creek(EDMS File 2024FAP 1248). The second
noncompliance report for the SSO that occurred on May 5, 2024, indicated that the operators
were unsure if wastewater entered Rock Creek (EDMS File 2024FAP 1283).
2.2 Previous Inspection Report
During the previous IPDES Sanitary Sewer Overflow Inspection on February 13, 2024, DEQ
identified two violations. One violation was identified for discharging untreated wastewater to
WOTUS and the other violation was identified for improper operation and maintenance of
equipment at the Rock Creek Lift Station and the collection system line to the west of Rock
Creek Lift Station.
3 On-site Inspection
Date and Time: May 1, 2024, at 1:00 p.m. and May 5, 2024, at 1:30 p.m.
Inspectors: Brandi Lowe—IPDES Compliance Officer, DEQ, Twin Falls Regional
Office
Sean Woodhead—Surface Water Manager, DEQ Twin Falls Regional
Office
Facility
Representative
(May 1, 2024): Nathan Erickson—Environmental Engineer
Office: (208) 735-7272
Cell: (208) 358-5731
nerickson@tfid.org
Facility
Representative
(May 5, 2024): Elmer Freeman—Wastewater Collection Supervisor
Cell: (208) 308-7393
efreeman@tfid.org
Weather
(May 1, 2024): Windy, cloudy, —50°F
Weather
(May 5, 2024): Windy, cloudy, —55°F
5
City of Twin Falls
ID0021270
Purpose: To follow up on the noncompliance report for each SSO that occurred and to
determine compliance with the facility's IPDES Permit ID0021270 and IDAPA
58.01.25, "Rules Regulating the Idaho Pollutant Discharge Elimination System
Program".
3.1 Opening Conference
Both site visits were announced inspections. When Sean Woodhead and I, Brandi Lowe arrived
on-site on May 1, 2024, we were met by Nathan Erickson. When Mr. Woodhead and I arrived on
site on May 5, 2024, we were met by Elmer Freeman. During each site visit, we were not denied
access to any areas of the property. A phone call conversation was conducted with Mr. Erickson
after each reported SSO to coordinate the site visits.
3.2 Site Inspection (May 1, 2024)
Mr. Erickson, Mr. Woodhead, and I inspected the field to the west of the Rock Creek Lift Station
from the fence bordering the lift station to Rock Creek. We walked along the collection line and
along the west border of the private property along Rock Creek. During the site visit, wastewater
was not actively exiting the collection system as the line had been cleared prior to our arrival.
Much of the collection conveyance line had holes and the ground surrounding the line was
saturated(Photograph 1, 2, and 3).
",
il
� dg^
s�
Photograph 1. Collection system pipe where wastewater exited during the SSO, red arrows
indicating holes in the pipe, facing north.
6
City of Twin Falls
ID0021270
l
_
Photograph 2. Collection system pipe, red arrows indicating holes in the pipe, facing northeast.
V
W�'G7ns .
�yy Y
Photograph 3. Collection system pipe, red arrows indicating holes in the pipe,facing northwest.
Along Rock Creek, no fish kills or sediment deposits were observed. Along the border of the
property to Rock Creek, a dirt berm was present. Much of the wastewater collected along the
berm and was not observed to be moving during the site visit. On the northwest corner of the
property the berm flattens, and the standing wastewater connected to a discharge location into
Rock Creek(Photograph 4 and 5). Mr. Erickson explained that the property owner also flood
irrigates the pasture, so it was unknown if all the standing water was due to the SSO or if some
of the irrigation water was combined with the wastewater.
7
City of Twin Falls
ID0021270
6 f
a
rTM .
Photograph 4. Untreated wastewater in field prior to discharging to Rock Creek, facing southeast.
G
Photograph 5. SSO discharge location to Rock Creek.
Due to the location of the standing wastewater in the field, its connection to Rock Creek, and the
unknown amount of wastewater that was discharged, the group discussed the probability that the
wastewater was discharged to Rock Creek. Due to these findings, DEQ conducted an E. coli
8
City of Twin Falls
ID0021270
sample upstream, downstream, and at the suspected discharge location to Rock Creek
(Photograph 6 and 7, Figure 2).
fi
I
Upstream
Sampling
Location
z
o-
i .ly. �S y•y, INK Zv.MY9 ,F i-
Photograph 6. Rock Creek upstream sample location, facing west.
l - j
Downstream
Sampling
Location
'k
All
kip
Y b11W u} Ri
Discharge
Sampling
G
Location
Photograph 7. SSO discharge sampling location and Rock Creek downstream sampling location,
facing northwest.
9
• �11 I 1
Rock Creek Lift Station SSO - -- - - - - un - -
■00 i - - - - - - - - - -
o. 1� Downstream
sampling location
Discharget�
sampling location
a
samplingUpstream
location
►• At,` f 'y
.4
i
Goo) Earth - N;
200ff
City of Twin Falls
ID0021270
3.3 Site Inspection (May 5, 2024)
Mr. Woodhead and I inspected the field to the west of the Rock Creek Lift Station from the fence
bordering the lift station to Rock Creek. We were greeted by Mr. Freeman at the collection line
halfway between Rock Creek and the Rock Creek Lift Station. At the time of the site visit, Mr.
Freeman was working on repairing and replacing portions of the collection line as a temporary
fix before the City Council is presented with the Cured in Place Pipe (CIPP)project (Photograph
8 and 9). Mr. Freeman explained that the pipe with the holes was installed in 1958 and that the
temporary fixes they are making should help until the City is able to secure funding for the CIPP
project.
j
Photograph 8. Collection system pipe and temporary plugs, facing north.
1
1
/ 1
® i�g.. .'"��Aec Wf• Sf `�{ka +iF� ,� Sss/'.+, A a'�. yq�"Ir.„ +"�"�:. �si.t,,�,W+rr r
5
City of Twin Falls
ID0021270
Photograph 9. Pipe replacement(green)to the collection line,facing northeast.
During the site visit, Mr. Woodhead and I walked along the private property's border to Rock
Creek. Again, there were no signs of a fish kill or sediment deposits but there was standing
wastewater along the berm. Additionally, the field under the line being replaced was saturated
and held standing wastewater(Photograph 10).
Photograph 10. Removed pipe and wastewater flooding the field, facing northeast.
At the sampling location from the May 1, 2024, visit, Mr. Woodhead and I again observed
standing water from the field and a connection to Rock Creek. At the location, a brown plume
prior to the Creek was evident and the surrounding water appeared turbid(Photograph 11).
6
City of Twin Falls
ID0021270
s� • 1 �lit�; �4� � 4�A®,,�
F6:'
c•
.r
h
Photograph 11. Discharge location to Rock Creek, brown plume indicated by red arrows.
3.4 Sampling
Samples were collected by DEQ during the site visit on May 1, 2024.
Jake Barnes, Water Quality Analyst, collected three grab samples for E. coli upstream and
downstream of the discharge location, and directly at the discharge location. Each bottle was
7
City of Twin Falls
ID0021270
labeled with the date, time, and location of the sample, and all samples were placed in a cooler
with ice for transport. A blank was collected by Brandi Lowe at the Twin Falls Regional Office
using deionized water and all samples were transported to Magic Valley Labs (210 Addison Ave.
Twin Falls, ID). A copy of the sample results and Chain of Custody are included in EDMS File
2024FAU415. Samples were analyzed according to EPA approved method SM 9223, following
DEQ Water Quality Sample QAPP (EDMS File 2019AJY1).
Table 1. Sample locations and results from May 1, 2024, sampling by DEQ.
Label ID: Description: Result:
RC Down Downstream from the discharge location 184 MPN/100mL
RC Up Upstream from the discharge location 179 MPN/100mL
RC DL Discharge Location 291 MPN/100mL
BLANK DI Water from the TFRO WQ Laboratory <1 MPN/100mL
4 Closing Conference
During the May 1, 2024, site visit I informed Mr. Erickson that I would follow up with him
regarding the SSO. I also told Mr. Erickson I would look into whether the property owner could
deny sanitization of the field that the SSO occurred on. The site visit was concluded at 2:15 p.m.
During the May 5, 2024, site visit I thanked Mr. Freeman for his time. The site visit was
concluded at 1:45 p.m.
4.1 External Agency Communications
On May 8, 2024, I emailed Josh Jensen with the South Central Public Health District and
informed him that the property owner was not allowing the land to be sanitized where the SSOs
occurred.
8
City of Twin Falls
ID0021270
Summary
Violations
1. SSO Discharge to WOTUS
Part LA of the Permit states: "During the effective period of this permit, the permittee
is authorized to discharge pollutants from the outfall specified herein to the Snake
River... "
It is a violation of the Permit that a sanitary sewer overflow discharged an
unknown amount of untreated wastewater to Rock Creek on the following dates:
• April 30, 2024
• May 5, 2024
9
City of Twin Falls
ID0021270
Prepared by:
;C-,W, Date: May 8, 2024
B ndi Lowe
IPDES Compliance Officer
Department of Environmental Quality
Reviewed by:
3� IcznL Date: May 9, 2024
Tim Beach
IPDES Compliance Officer
Department of Environmental Quality
12