HomeMy WebLinkAbout2024-02-13 Wastewater spill Rock Creek Lift Station 5day report 5-Day Letter Jacobs Date: February 19,2024 IPDES Program Manager IDEA Twin Falls Office 650 Addison Ave W Twin Falls Idaho 83301 RE:Twin Falls SSO,Permit#ID-002127-0 On Tuesday,February 13th, 2024,a Twin Falls Wastewater Collection employee observed an active Sanitary Sewer Overflow(550)at the Rock Creek Lift Station.The Jacobs maintenance team was promptly notified at 10:00 am,and they responded swiftly to the site.Equipment was reset,and the 550 ceased by approximately 10:15 am.A sample was collected and processed for pH,temperature,and E.coli analysis. Our investigation indicated the following: 1 Previous Rounds:On Wednesday, February 7th, rounds were conducted at the Lift Station,during which no issues were identified.The station appeared to be functioning correctly. 2. Alarm Light Discovery.Subsequently,we learned that a neighbor had noticed the alarm light activated since Friday, February 9th.Based on this information,we assume that the SSO persisted from Friday, February 9th,through Tuesday,February 13th. 3. Estimated Volume:The total volume of the SSO is estimated to be approximately 12,000 gallons. Most of this flow likely entered Rock Creek. 4, Response Actions:On Wednesday the 14th,City crews applied a disinfectant to the affected field areas.Additionally,grab samples were taken both upstream and downstream from the point of entry into Rock Creek.The E.coli results were as follows: Sample from Active Spill(2/13/2024):>2419.6 MPN/100 ml Upstream(2/14/2024):21.8 MPN/100 ml Downstream(2/14/2024): 143.9 MPN/100 ml S. Equipment Failure:The lift station experienced a failure of the in-line comminutor.Simultaneously, the call-out alarm system failed to activate.This malfunction resulted in flow backing up into the collection lines and discharging into a horse pasture adjacent to the lift station.Upon inspection,it was determined that the comminutor requires replacement Our technician investigated the alarm system failure but found no specific reason.After rebooting the dialer system,alarms resumed functioning.The Rock Street Lift Station PLC will be connected to the wastewater plant SCADA to provide a backup ability for a dialer system.A high-level float will be installed on the inlet side of the comminutor to allow for alarms.Damaged piping feeding the Lift Station will be repaired.The comminutor is currently bypassed and all flow is running through a manually cleaned bar screen.This bar screen will be inspected and cleaned 5 times a week until the new comminutor and upgrades are completed. Dan Black,Project Manager Twin Falls WWTP Dan.blackoiacobs.com 208-734-9933 !Ghent name)