Loading...
HomeMy WebLinkAbout25-1397 264 South Hills Rd-HARDCASTLE GARAGE ADDITON plans-City Approve Job Site Plans 44FRIDCASTLE A*W% 517E FL,4N 204 SOUTH HILLS RD, TWIN FALLS, IDAHO LOT SIZE: 2.001 AC SCALE:I' IS'-0' CODE COMPLIANCE: 2010 IRC NEW CONSTRUCTION GENERAL FLOOR HEIGHT IS'MIN.ABOVE CURB RAL NOTES: SINGLE FAMILY DWELLING 22'-0— HE� ATTACHED PERSONAL RV GARAGE ADDITION = I(oOO SF k SOUTH HILLS R D 2, ALL WORK PERFORMED SHALL MEET CURRENT ADOPTED CODES OF BUILDING BUILDING DIST.(INCASE OF CONFLICTING NOTES,THE MORE STRINGENT REQUIREMENT SHALL APPLY). SHEET SCHEDULE: 3. VERIFY ALL UTILITIES BEFORE DIGGING. (DIG LINE DIAL 811 OR I-000-342-1525 Al - COVER SHEET, SITE PLAN 4. SITE AND STRUCTURE SHALL BE KEPT A2 - FOUNDATION PLAN 25' ROAD EASEMENT CLEAN.ALL DDI TRACTOR TO ,43 - FLOOR PLAN, FRAMING NOTES AND DETAILS VERIFY LL MENSION.IN casE of -----------------------+--------------------------------------------------------------------- - --------------------------------------- ----------------------------- ------------------------------ ERRORS OR DISCREPANCIES A4 - BRACED WALL PLAN CONTACT OWNER OR OLJNER'S A5 - ROOF PLAN REPRESENTATIVE,BEFORE PROCEEDING.DO NOT SCALE. Ado - ELEVATIONS 5. DO NOT DRAIN STORM WATER ONTO ADJACENT LOTS. 6. STRING LINES SHALL BE PROVIDED OVER PROPERTY PINS SLOPEGRADE AWAY ----------------------------- ------------------------------ ----------------------------- ------------------------------------------------------------------------------- --------------------------------- AT TIME OF INSPECTIONS. FROM FND. (o" IN 10' MIN. 1. FINAL SIZE AND LOCATION OF SEPTIC SYSTEM BY FINAL GRADING TO BE CENTRALO BE DEDISTRIICTDUPON SOUTH MAINTAINEp AFTER m LANDSCAPING NA EXISTING INS ECTION OF TEST HOLES PROVIDED BY D SOLID SURFACE DR. EXISTING 67fRUCTI-IfR5 DRAINAGE WATER m11 RETENTION AREA ! Z - (D " AS NECESSARY M DO NOT RAIN STORM ! Z WATER INTO ADJACENT LOTS BERMS / SWALE TO 5E r MAINTAINED AFTER FINAL INSPECTION Z USE BEST MANAGEMENT m PRACTICE TO RETAIN C.F. NORTH OF STORM WATER ON PROPERTY A fully visible2'-�3° 1— e temporary address Lb sign shall be posted NO dwelling allowed Q W on all construction N I W � W sites and remain in Q = N (y place until the 4'-3�'�Ig'-83" _ _________ .OL NI,.9'ONd WOUJ Z N H "VMV 9aVU0 3dOIS r0 W 0 0 ~ Ilk permanent address ____________ Q N 0 N W is in place. ° 1, � m 0 I: Z ?I Z See attached structural engineering � 1- Buildings shall have approved address numbers,or approved building p p o Identification placed /� u All buildings shall have a permanently posted address,which shall be placed V J at each driveway entrance and be visible from both directions of travel along _� eM m the road.Buildings shall have approved address numbers,or approved a M 0 building Identification placed in a position that is plainly legible,visible from Q the street or frontage road fronting the property and of a contrasting color(IFC ---------------- - -_ -- 3 505.1). �a Address size is based on distance from the street:up to 50 ft.is 4 in.,51 to 0 100 ft.is 6 in.,101 to 150 ft.is 8 in.,151 to 200 ft.is 10 in.and greater is 12 in 2 O' S,B. MIN p PAGE #: WHILE EVERY EFFORT HAS BEEN MADE TO PERFORM A COMPLETE AND ACCURATE PLAN REVIEW,IT DOES NOT EXEMPT THE DESIGNER OR BUILDER FROM CODE REQUIREMENTS OMITTED FROM DRAWINGS THAT AREIRV CAUGHT DURING FIELD INSPECTIONS. CITYV APPROVED PLANS M<oa.<wnPlw.n PLANS MUST BE ON JOB SITE FOR ALl INSPERIONS 1 OF E.AADRAWINGS\AA CURRENT 2024\AAA MISC HOMEOWNER 2024\K HARDCASTLE\HARDCASTLE.dwg, 1/20/2025 5:02:23 PM,AutoCAD PDF (High Quality Print).pc3 . _Z1 FOUNDATION NOTES: I. VERIFY BOTH GARAGE DOOR BLOCK OUT SIZE WITH MANUFACTURER/SUPPLIER. 2. PROVIDE EXPANSION JOINTS IN ALL FLATWORK A5 NECESSARY. 31 ALL FLAT WORK TO BE 4'./-ABOVE COMPACTED GRAVEL SLOPE J'PER 12'TO GARAGE DOORS OR AWAY FROM FOUNDATION WALLS. 4. ALL SINGLE STORY FOUNDATION WALLS TO BE MIN.6'X 12'W/(6)-4 BARS SPACED EQUALLY, RUNNING CONTINUOUS. FOOTINGS ARE 16'X 6"W/ (2)•4 BARS RUNNING CONTINUOUS. S. VERTICAL"4 BARS-4'-0"OC,IN STEM WALL AS SHOWN IN DETAIL. 6. ALL FOUNDATION WALLS SHALL BE MIN 3,000"/5Q IN COMPRESSIVE STRENGTH-25 DAYS.ANY PORCHES,PAWING SLABS,STEPS AND GARAGE FLOOR SLABS SHALL BE MIN.3,S00"/5Q IN COMPRESSIVE STRENGTH a 25 DAYS. -1 J'4XIO'A.B.-4C"O.G.MAX.EACH SECTION OF SILL PLATE MUST HAVE MIN.(2)ANCHOR BOLTS. MAX DISTANCE FROM END OF ANY SILL PLATE SECTION TO ANCHOR BOLT SHALL BE 12'. S. ANY NAILS THAT PENETRATE CONCRETE OR PRESSURE TREAT LUMBER TO BE HOT DIPPED GALVANIZED OR EQUAL. S. COORDINATE EXACT LOCATION OF SIDEWALKS AND CONCRETE PADS WITH OWNER. HD3 HD3 HD3 1/2'DRYWALL 2x6 STUDS s I6'OC, I R-IS INSULATION 1/16'OS.B.SHEATHING VAPOR BARRIER SIDING I I I I 2X6 P.T.SILL PLATE W I/2'DIA ANCHOR BOLT 4'O.C. I I I I I I I I I I I I I I I I I I I I 48„ I I I I I I I I 4'CONCRETE FLR X 12'CONCRETE FOUNDATION WALL 9 B COMPACTED GRAVEL = Z 16 x a FooTlrG � B (- — _ — (2)"4 REBAR HOR CONT. W c' Z I I J w O GAR,4GE WALL. DETAIL. o p N.T.S. z LL a = O I I a I I I I o � 111 2 a z Nz � Z H o W Lu N 0 W U -E .1 U m I I I I Lu I I I I I I I I Zug 4 EL g ` o � � u a — ug 0T �b 6 0m 10 s� M9 to — CITY APPROVED PLANS aw Reviewedfor Code Compliance PAGE q: PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS NE Page 2 of 3 H OF# E. INGS\AA CURRENT 2024\AAA MISC HOME^`"�o R 2024\K HARD ACT1 nuARD ACT1 E.d PM, CsARAGE AREA ir000 soft GENERAL NOTES: I. DESIGNER ASSUMES NO RESPONSIBILITY FOR STRUCTURAL INTEGRITY,VERIFY ALL STRUCTURAL SPECIFICATIONS W/MANUFACTURER TRUSS VENDOR OF ENGINEER. 2. WINDOWS MARKED AS EGRESS SHALL MEET REQUIREMENTS OF THE 2015 IRC.MIN.SIZES= (45"X 4S"SINGLE VENT OR SLIDER)(36"X CO'SINGLE HUNG)(30"X 40"CASEMENT). 3. COORDINATE ALL INTERIOR AND EXTERIOR FINISH, MATERIALS,COLORS,AND QUALITY WITH OWNER. 4. COORDINATE KITCHEN DESIGN AND LAYOUT WITH OWNER. 5. BATH AND RANGE HOOD FANS INDICATED SHALL VENT TO OUTSIDE AD MEET ALL REQUIREMENTS OF THE 2010 IRC.AND BE SMOOTH PIPING WITH MIN 50 CFM. 6. VENT DRYER EXHAUST TO DUCT IN WALL AND VENT OUTSIDE. T. THE UPC REQUIRES A CRAWL SPACE ACCESS WITHIN 20 FEET OF ALL UNDER FLOOR CLEANOUTS. am'-m• 5. J"TYP'X'SHEETROCK ON CEILINGS AND WALLS BETWEEN GARAGE AND LIVING SPACES INCLUDING BONUS ROOMS. 9- ALL WINDOW AND EXTERIOR DOOR HEADER ARE (2)2XIO'5 OR EQUIVALENT UNLESS OTHERWISE NOTED. 10.ALL EXTERIOR AND BEARING WALLS STUDS, HEADERS,RAFTERS AND POSTS TO BE DOUGLAS FIR LARCH•2 OR BETTER U.N.C. II. WALL HEIGHTS: I�� JOO4 Cb'3Hb3A0,L X,ZI it I NOOC 4'C3M�!3AO,8 X,91 I I I I II I-------------------------------- I I I I I I I I I I I I 89mf I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I � I — 0 0 z s Q y io MIN 36'LANDING S W W v I-�cll-�• o J Mt.HDR LL W J N � � MI, Yk4 NAILER ALCNG LL�'N RU F 2 I-J'STAIR (y 5TRINGER U= N A I�5 MIN 36'LANDINGU W 0 0 ~ 0 N 0 W STAIR DETAIL N-TS- U = Q U m ZQ7 g � OO a � w Ny g w9 an � oc2 u a O m �aL9 0� w NrJ L9 S m ma 'A — d W PAGE #: A 3 CIT/V AaaPPROVED PLANS M<oa.<wnPlwnn PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS tFOF ff f E. �9/ (3)2x6 STUDS SPLICE HEADER @ CENTER HOLD-DOWN PER PLAN PLAN VIEW STRAP W/CS14 @ TOP& (4 TYP SIMPSON C8I4 MIN.ON INTERIOR&EXTERIOR,TYP. BOTTOM BOTH SIDES OF (8 @ EA.WING WALL/BRACE,CS14's TO STUDS ABOVE WALL W/16"END LENGTH IF HEADER NOT DIRECTLY AGAINST TOP PLATE) 3'x11Y"HEADER(MIN) FASTEN SHEATHING TO HEADER 16 40'-0' W/Bd NAILS @ 3"GRID PATTERN 4'-0' -0 12'-0' EXTEND HEADER TO OUTSIDE OF FRAME I6'-0' 4' ' 4'-0' 4'MIN. TRUSS BRACE FRAME DETAIL EXTEND HEADER FOR TRUS BRACE FRAME,SEE DETAIL Xi-1 SHEATH BOTH SIDES W/7/i6"OSB AND NAIL OFF 8 �� bOOC]OV3Fib3/�O,LI X,L W/Bd NAILS @3-O.C.ALL MEMBERS(FURR OUT INTERIOR OF WALLS TO FLUSH OUT FRAME) NOOC C'C3HNEA0 8 X.91 DBL HORIZ.BLOCKING 0 B W/(4)STUDS IN PERP.WALL(ONLY WHEN NOT y - HD3 HD3 HD3 - - @ OSB ETHAN IC !THIN BACK TO BACK) I I I I MORE THAN!'WITHIN i MID HEIGHT) AD -STUDS HORIZONTALS&DIAGONALS B90£ 0 y j - - (3)2x6 STUDS �o I I I I HOLD-DOWN PER PLAN I I I (1)KING STUDS AND(1)TRIMMERS ��� x\\ (2)2x P.T.SILL PLATE @ EA.END OF OPENINGS U.N.O. --------------�y a I I 6-CONCRETE STEM WALL @FRAME I I I I I I I I I I I I I I I I a TRUSS BRACE FRAME DETAIL F! ---------------------- a N.T.S 12.66T TALL WALLS: 2x6 DF#2 STUDS @ 16"O.C. (3)KING STUDS AND(1)TRIMMERS @ EA.END OF OPENINGS U.N.O. a WO e PROVIDE 2X4 PANEL EDGE BLOCKING m ALL DESIGNATED BRACED WALL PANEL LOCATIONS Wo (ALL'RIP'SHEETS MU5T BE 12'MIN.) Q z v � � Q r Q U Q � N O n 0 af W LU d) U F J N = m�m/ 0 W 2 7 w J LU H a a U N O N F X21 w LU LU O LU TABLE R602.10.30U 0 p 0 m 1: BRACING REQUIREMENTS BASED ON WIND SPEED U = Q U v) (D W W (EXPOSURE CATEGORY B) 00 BASIC BRACED MIN.TOTAL LENGTH 6 WIND STORY WALL LINE FEET)OF BRACED z 0 SPEED LOCATION SPACING WALL PANELS REQ'D ZE CITY APPROVED PLANS a (MPH) (FEET) METHOD METHODS Reviewed for Code Compliance GB CS-WSP,CS-G CS-PF E PLANS MUST BE ON JOB SITE 20 6.0 3.0 NH 0 FOR ALL INSPECTIONS BO 6.5 4.5 V9 m 40 115 55 C- 6 0 S 115 50 14.0 1.0 Q2 - 60 16.5 8.0 pgj .9 Q M9 TABLE R602.10.4 BRACING METHODS a METHOD MATERIAL MINIMUM CONNECTION CRITERIA dw THICKNESS (1)CS-WSP WOOD STRUCTURAL PANEL 3/6, So!COMMON(2.5'X 0.131 0 6'SPACING PAGE #: EDGES)AND AT 12'SPACING(INTERMEDIATE SUPPORTS) STAPLE(16 ga.1i'0 3'SPACING EDGES) AND AT 6'SPACING(INTERMEDIATE SUPPORTS) x (2) PFH CONTINUOUS PORTAL FRAME PER SECTION SEE FIGURE R602.10b3 WITH HOLD DOWNS R602.10.6.2 l3)GS-PF CONTINUOUS PORTAL FRAME PER SECTION SEE FIGURE R602.10.6.4 R602.10.6.4 H of E. «WINGS\AA CURRENT 2024\AAA MI HOMEOWNER 2024\IF-HARDCASTI E\ A°DCASTLE.d AD PDF (High Quality Print).pC3 t-oaae D D wau Wall 27 — TOP Plate 26 — Top Plate ROOF FRAMINrg NOTES: I I. TRUSS DESIGN AND LAYOUT SHALL BE PROVIDED AT FRAMING INSPECTION. 2. PROVIDE MEANS TO RESIST UPLIFT AT EACH LOCATION SHOWN ON TRUSS DESIGN DETAILS, msmu tllagonally ProauLts Lan he on the tz 3. PROVIDE COLLAR TIES FOR HAND FRAMED ROOF RAFTERS. frame "other eara�� orae�o elhe w°Srs°Idea they minimum 2x truss. gured a hown. 4. COORDINATE EXACT LOCATION OF ATTIC ACCESS WITH AVAILABLE HEADROOM IN ATTIC ABOVE HATCH. PROVIDE MIN 30"HEADROOM ABOVE HATCH PER 2010 IRC. 5. TRUSSES TO BE DESIGNED TO: e wau 30- TOP CHORD LIVE LOAD 128 Top Plate D T" TOP CHORD DEAD LOAD 3 10• BOTTOM CHORD DEAD LOAD 1IS MPH WIND 6, 16"OVER HANG TYP I I I FOP 1. GIRDER TRUSS: —__ __— S. 4 PITCH = 3 Ib'HEEL H2.5T S. ROOF VENTING I sgft VENTING PER 300 sgft OF ATTIC?FROM UPPER ROOF a0 0 ualsln9le tl b2.tru.ss of AND 7 FROM SOFFIT OR INTAKE VENTS. L.Llse the ywooa to spUt.y F1 I II I II I I I I ocE ao ]w ov� I I A II II r-- D I\ I \ II II 1 1 I I I \\ II II II II II II / vALLEr PATE ]w FLAT I p I� IIRr�cwol�o I \`II II II II II I/ / M I I I I I F2 .•�L�r v TERs \\� II II p/i �*oc SieLc,EREo I I I r FlStrong-Driv I I I TRUSS Screw I . SDWC15600 I PE.TWU99E5•]4"OL.PER PLMI I I I I I I I I as SPEC O. I I w FLAT Tu ]s'00.T.v LEr SATE 8E1vEEw OP<u0�5 AT RIp6E Poei9 PE.TRbEE6 w]a"OG iR88E8•]a"OG PER PER LArWi LArdJi u✓b1EATUING LLNi. OVER F:RAMINCs DETAIL UNLESS NOTED OTILERIIJISE e � e Z w - Q J Ijj � N Q LL � E0' N _J IL Q = F T w Q W w t7 W U o � L 0 w Rm Eli Z� <11 � 1 � a M�9 > OT am �Q s� 0 ASPHALT SHINGLES WM5 FELT 1/16 O.S$.SHEATHING '- .E.TRU55E5 m24'O.G. dw R-35 MIN.INSULATION EAVE VENT BAFFLE 2-H2SA EACH END 2x6 SUB FACIAL CERTIFICATION STAMP PACE ON EACH TRUSS DOUBLE 2X6 TOP PLATE ALUM FA5CIA AND SOFFIT Jxx( 2-I/2 GONT ALM SOFFIT VENT DRYWALL WALL EYE DETAIL 5 2.6 STUDS m 16'O.C.FIRST FLOOR CITY APPROVED PLANS R-20 MIN INSULATION r.•<wa.<.,wpu.n N.T.s. l/6'O.^J.B.6HEATHING PLANS MUST BE ON IOB SITE SIDING FOR ALl INSPECTIONS /p� E c� 12 4-------------------------------------------------------------------------------------- ro �� FLOOR BEHIND 00 DODO 00 DODO EXISTING NATURAL GROUND r�' 00 DODO ' Q v m X w REAR ELEVATION Code compliant guards required. 17 FLOOR BEHIND 0 V � EX15TING NATURAL GROUND N W W O J u a � RIGHT SIDE ELEVATION W N W J J Q = Ilk S N ~ w 0 w _0 ~ Q N 0 a W � 0 _> � m ZC�7 g � OO � � u O Maw am � sQ FLOOR BEHIND QQ VY a0o 0� EXISTING NATURAL GROUND d W PAGE #: LEFT SIDE ELEVATION CITYV APPROVED PLANS M<oa.<wnPlwnn PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS GF �/ E. , Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Tall Wall and Tall Wall Lateral Calculations For Hardcastle Project 264 South Hills RD Twin Falls , Idaho PE Job #: 2025-16812 SS\ONAL FN \STFR�O onlY Fo a @tie G ST P g14EY S-� Expiration: 113012026 CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 7 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Design Criteria Governing Code: 201818C Snow Criteria Wind Criteria Roof Snow Load (Pf) Wind Speed M) Ground Load (P9) Wind Exposure Open Terrain Exposure Factor(Ce) Partially Wind Importance (1w) Thermal Factor(Ct) Typical Building Category Importance (Is) Seismic Criteria Design Seismic Wall Response Site Class Stiff Soil Material Base Coefficient, Shear R Ss Fa S1 Fv ]G� Typ @ Ext SIDS SD1 Typ @ Int Risk Category Other Seismic Importance 00 Seismic Design Category (SDC) Live Loads Soil Bearing Typ Residential Typical_ Garage (P.V.) Frost Depth Roof Dead Loads: Floor Dead Loads: Deck Insulation Deck Roofing Joist Joist Ceiling Ceiling Flooring Misc Misc TOTAL 17 psf TOTAL 12 psf Exterior Wall Dead Loads: Interior Wall Dead Loads: Studs Studs Siding Gyp. Board Insulation - Gyp. Board - Sheating - Misc Misc TOTAL 12 psf TOTAL 8 psf CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 8 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S OSB SHEAR WALL SCHEDULE SIDES SHEET NAILING SHEET NAILING (UNO) MARK SHEATHING OF PERIMETER/FIELD STAPLING BLKG BOTTOM PLATE WALL PERIMETER/ INTO RIM 7/16"APA 16ga x 1 1/2" (2) 16d NAILS WO RATED 1 8d @ 6/ 12 OR @ 3/ 12 NO PER 16" BAY 7/16" APA 16ga x 1 1/2" (2) 16d NAILS W1 RATED 1 8d @ 6/ 12 OR @ 3/ 12 YES PER 16" BAY 7/16" APA 16ga x 1 1/2" (3) 16d NAILS W2 RATED 1 8d @ 4/ 12 OR @ 2 / 12 YES PER 16" BAY W3 7/16" APA 1 8d @ 3/ 12 YES (4) 16d NAILS RATED PER 16" BAY <W>47/16" APA 1 8d @ 2/ 12 (4x STUDS @ SHEATHING YES (4) SIDS SCREWS RATED PERIMETER) PER 16" BAY W5 7/16" APA 2 8d @ 3/ 12 YES (5) SIDS SCREWS RATED PER 16" BAY GYP. SHEAR WALL SCHEDULE WA 1/2" GYP. 2 5d COOLER @ 6/6 NO (2) 16d NAILS BOARD PER 16" BAY 1/2" GYP. 2 5d COOLER @ 6/6 YES (2) 16d NAILS <:W>B BOARD PER 16" BAY OR 1/2" GYP. 2 5d COOLER @ 4/4 NO (2) 16d NAILS BOARD PER 16" BAY LwC 1/2" GYP. 2 5d COOLER @ 4/4 YES (2) 16d NAILS BOARD PER 16" BAY TYP. NOTES: 1 ALL SHEATHING PANEL EDGES SHALL BE BLOCKED LINO 2 PROVIDE SAME NAILING PATTERN ABOVE AND BELOW OPENINGS AS ADJACENT SHEAR PANEL. 3 ALL EXTERIOR WALLS SHALL BE SHEARWALL "WO" UNO 4 FASTEN GABLE/RIM TO SHEAR WALLS BELOW W/ 10d TOENAILS @ 12" O.C. UNO 5 FASTEN TRUSS HEELS TO SHEAR WALLS W/ H2.5A AND (2) 10d TOENAILS @ EACH 6 PLATE WASHERS EQUAL TO 0.229"x3"x3" IN SIZE REQUIRED AT ALL ANCHOR BOLTS FOR ALL EXTERIOR OSB SHEAR WALLS. THE WASHER IS TO BE PLACED WITHIN 1/21, OF THE EDGE OF THE BOTTOM PLATE ON THE OSB SHEATHED FACE FOR W2 THRU W5 WALLS. PROVIDE STANDARD WASHER FOR ALL SLOTTED PLATE WASHERS. CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 9 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PER Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S HOLDOWN SCHEDULE STRAP #OF #OF MARK STRAP TYPE FASTENERS STUDS ANCHOR BOLT STUDS FASTENERS HD1 LSTHD8 OR (20) 16d 2 OR DTT2Z W/1/20x10" 2 (8) 1/4"x1-1/2" LSTHD8RJ W/ RIM SINKERS SDS STHD10 OR (24) 16d HDU2- SDS2.5 (6) 1/4"x2-1/2" HD2 STHD10RJ W/ RIM SINKERS 2 OR W/SB5/8x24 OR PAB5 2 SDS @ INT. PONY WALLS STHD14 OR (30) 16d HDU5-SDS2.5 (14) 1/4"x2-1/2" HD3 STHD14RJ W/ RIM SINKERS 2 OR W/SB5/8x24 OR PAB5 2 SDS @ INT. PONY WALLS HDU8-SDS2.5 (20) 1/4"x2-1/2" HD4 - W/SB7/8x24 OR PAB7 3 SDS @ INT. PONY WALLS HDU11-SDS2.5 HD5 - W/SB1x30 OR PAB8 4 (30) 1/4"x2-1/2" @ INT. PONY WALLS SDS HDU14-SDS2.5 HD6 - W/SB1x30 OR PAB8H 4 (36) 1/4"x2-1/2" @ INT. PONY WALLS SDS HD7 Note: Posts to be No. 1 and better HD19-SDS2.5 4 (5) 1" BOLTS W/ PAB 10 STRAP SCHEDULE (STRAP /ALL THREAD TO CLEAR SPAN ACROSS RIM TO WALL BELOW) (16) 16d DTT2Z (8) 1/4"x1-1/2" S1 MSTC28 SINKERS 2 OR W/ 1/2"0 ALL THREAD 2 SDS S2 MSTC40 (32) 16d 2 OR HDU2-SDS2.5 2 (6) 1/4"x2-1/2" SINKERS W/5/8"0 ALL THREAD SDS (48) 16d HDU5-SDS2.5 (14) 1/4"x2-1/2" S3 MSTC52 SINKERS 2 OR W/5/8"0 ALL THREAD 2 SDS S4 MSTC66 (68) 16d 2 OR HDU8-SDS2.5 3 (20) 1/4"x2-1/2" SINKERS W/7/8"0 ALL THREAD SDS S5 CMST14 (76) 16d 2 OR HDU11-SDS2.5 4 (30) 1/4"x2-1/2" SINKERS W/ VO ALL THREAD SDS S6 CMST12 (98) 16d 2 OR HDU14-SDS2.5 4 (36) 1/4"x2-1/2" SINKERS W/ VO ALL THREAD SDS HD19-SDS2.5 S7 Note: Posts to be No. 1 and better 4 (5) 1" BOLTS W/ 1-1/4"QJ ALL THREAD CITY APPROVED PLANS Reviewed far Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 10 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S BLOCKING KEY NOTES: MARK DESCRIPTION BLOCKING BETWEEN EVERY OTHER TRUSS BAYS 131 - W/ (6)10d TOENAILS FROM BLOCKING TO TOP PLATE, NAIL ROOF SHEATHING TO BLOCKING 3" O.C. 2-PLY OR 4x BLOCKING BETWEEN EVERY OTHER TRUSS BAYS W/ (2)A35 CLIPS FROM BLOCKING TO TOP PLATE, W/2 ROWS @ 3" O.C. (STAGGERED) B2 - -OR- BLOCKING BETWEEN EVERY TRUSS BAY W/ (6)10d TOENAILS FROM BLOCKING TO TOP PLATE, NAIL ROOF SHEATHING TO BLOCKING 3" O.C. 2-PLY OR 4x BLOCKING BETWEEN EVERY OTHER TRUSS BAYS B3 - W/ (2)A35 CLIPS FROM BLOCKING TO TOP PLATE, W/2 ROWS @ 3" O.C. (STAGGERED) 2-PLY OR 4x BLOCKING BETWEEN EVERY OTHER TRUSS BAYS B4 - W/ (3)A35 CLIPS FROM BLOCKING TO TOP PLATE, W/2 ROWS @ 3" O.C. (STAGGERED) TYP. NOTES: 1 FASTEN GABLE/RIM TO SHEAR WALLS BELOW W/ 10d TOENAILS @ 12" O.C. UNO 2 FASTEN TRUSS HEELS TO SHEAR WALLS W/ H2.5A AND (2) 10d TOENAILS @ EACH GABLE / DRAG TRUSS OR RIM KEY NOTES: T1 ATTACH GABLE/ DRAG TRUSS OR RIM TO TOP PLATE W/ 10d TOENAILS @ 6" O.C., EDGE NAIL SHEATHING ABOVE TO TRUSS OR RIM T2 - ATTACH GABLE/ DRAG TRUSS OR RIM TO TOP PLATE W/ 10d TOENAILS @ 4" O.C., EDGE NAIL SHEATHING ABOVE TO TRUSS OR RIM T3 - ATTACH GABLE/ DRAG TRUSS OR RIM TO TOP PLATE W/ 10d TOENAILS @ 3" O.C., EDGE NAIL SHEATHING ABOVE TO TRUSS OR RIM T4 - ATTACH GABLE/ DRAG TRUSS OR RIM TO TOP PLATE W/A35 @ 12" O.C., EDGE NAIL SHEATHING ABOVE TO TRUSS OR RIM ATTACH GABLE/ DRAG TRUSS OR RIM TO TOP PLATE T5 - W/ HGA10KT @ 12" O.C. W/ 1/4x3" SIDS SCREWS INTO TOP PLATE, EDGE NAIL SHEATHING ABOVE TO TRUSS OR RIM CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 11 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S ANCHOR BOLT KEY NOTES: Al - 1/2"0 ANCHOR BOLTS @ 12" O.C. A2 - 1/2"0 ANCHOR BOLTS @ 24" O.C. A3 - 1/2"0 ANCHOR BOLTS @ 36" O.C. A4 - 1/2"0 ANCHOR BOLTS @ 48" O.C. A5 - 1/2"0 ANCHOR BOLTS @ 60" O.C. TYP. NOTES: 1. Bolts shall not be placed more than 12" away from wall corners or sill plate ends. 2. Anchor bolts shall be spaced maximum 72" o.c. unless otherwise specified. 3 Sill plate anchor bolts must have plate washers per OSB shear wall schedule CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 12 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S WIND LOADING ANALYSIS - Main Wind-Force Resisting System Per ASCE 7-16 Code for Enclosed or Partially Enclosed Buildings Using Part 1 of ASCE Chapter 28 for Low-Rise Buildings (Envelope Procedure) Input Data: Wind Speed,V= 115 mph (Wind Map, Figure 26.5-1A-C) Bldg. Classification = II (Table 1.5-1 Risk Category) Wind Exposure Category= C (Sect. 26.7) B Ridge Height, hr= 23.67 ft. (hr- he) Eave Height, he = 16.67 ft. (he- hr) Building Width = 40.00 ft. (Normal to Building Ridge) Building Length = 40.00 ft. (Parallel to Building Ridge) L Roof Type = Gable (Gable or Monoslope) Topo. Factor, Kzt= 1.00 (Sect. 26.8.2& Figure 26.8-1) Plan Direct. Factor, Kd = 0.85 (Table 26.6-1) Enclosed? (Y/N) Y (Sect. 26.2) Hurricane Region?I N hr 0° h< 60' Resulting Parameters and Coefficients: Th. Roof Angle, 0 = 26.57 deg. L Mean Roof Ht., h = 20.17 ft. (h =(hr+he)/2,for angle>10 deg.) Elevation Check Criteria for a Low-Rise Building: (Section 26.2) 1. Is h <=60'? Yes, O.K. 2. Is h <= Lesser of L or B? Yes, O.K. External Pressure Coeff's., GCpf(Fig. 28.3-1): (For values, see following wind load tabulations.) Positive& Negative Internal Pressure Coefficients, GCpf (Table 26.13-1): +GCpf Coef. = 0.18 (positive internal pressure) -GCpf Coef. = 0.18 (negative internal pressure) If h < 15 then: Kh =2.01*(15/zg)1(2/(x) (Table 26.10-1, Footnote 1) If h - 15 then: Kh =2.01*(z/zg)1(2/a) (Table 26.10-1, Footnote 1) a = 9.50 (Table26.11-1) zg = 900 (Table 26.11-1) Kh = 0.90 (Kh = Kz evaluated at z= h) Velocity Pressure: qz=0.00256*Kz*Kzt*Kd*V"2 (Sect. 26.10.2, Eq. 26.10-1) qh = 26.00 psf qh =0.00256*Kh*Kzt*Kd*V^2 (qz evaluated at z= h) Design Net External Wind Pressures(Sect. 28.3.1): p=qh*[(GCpf)-(+/-GCpf)] (psf, Eq. 28.3-1) Wall and Roof End Zone Widths'a' and'2*a'(Fig. 28.3-1): a = 4.00 ft. 2*a = 8.00 ft. CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 13 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S MWFRS Wind Load for Load Case A MWFRS Wind Load for Load Case B Surface GCpf p= Net Pressures(psf) Surface *GCpf p = Net Pressures (psf) (w/+GCpi) (w/-GCpi) (w/+GCpi) (w/-GCpi) Zone 1 0.55 9.61 18.97 Zone 1 -0.45 -16.38 -7.02 Zone 2 -0.10 -7.26 2.10 Zone 2 -0.69 -22.62 -13.26 Zone 3 -0.45 -16.31 -6.95 Zone 3 -0.37 -14.30 -4.94 Zone 4 -0.39 -14.84 -5.48 Zone 4 -0.45 -16.38 -7.02 Zone 5 --- --- --- Zone 5 0.40 5.72 15.08 Zone 6 --- --- --- Zone 6 -0.29 -12.22 -2.86 Zone 1 E 0.73 14.24 23.60 Zone 1 E -0.48 -17.16 -7.80 Zone 2E -0.19 -9.63 -0.27 Zone 2E -1.07 -32.50 -23.14 Zone 3E -0.58 -19.89 -10.53 Zone 3E -0.53 -18.46 -9.10 Zone 4E -0.53 -18.59 -9.23 Zone 4E -0.48 -17.16 -7.80 Zone 5E --- --- --- Zone 5E 0.61 11.18 20.54 Zone 6E --- --- --- Zone 6E 1 -0.43 -15.86 -6.50 *Note: Use roof angle 0 =0 degrees for Longitudinal Direction. For Case A when GCpf is neg. in Zones 2/2E: For Case B when GCpf is neg. in Zones 2/2E: Zones 2/2E dist. = 20.00 ft. (Fig. 28.3-1) Zones 2/2E dist. =1 20.00 Ift. (Fig. 28.3-1) Remainder of roof Zones 2/2E extending to ridge line shall use roof Zones 3/3E pressure coefficients. MWFRS Wind Load for Load Case A, Torsional Case MWFRS Wind Load for Case B, Torsional Case Surface GCpf p= Net Pressure (psf) Surface GCpf p= Net Pressure (psf) w/+GCpi w/-GCpi w/+GCpi w/-GCpi Zone 1 T -- 2.40 4.74 Zone 1 T -- -4.09 -1.75 Zone 2T --- -1.81 0.53 Zone 2T --- -5.65 -3.31 Zone 3T --- -4.08 -1.74 Zone 3T --- -3.57 -1.23 Zone 4T --- -3.71 -1.37 Zone 4T --- -4.09 -1.75 Zone 5T --- --- --- Zone 5T --- 1.43 3.77 Zone 6T --- --- --- Zone 6T --- -3.05 -0.71�:J Notes: 1. For Load Case A(Transverse), Load Case B (Longitudinal), and Torsional Cases: Zone 1 is windward wall for interior zone. Zone 1 E is windward wall for end zone. Zone 2 is windward roof for interior zone. Zone 2E is windward roof for end zone. Zone 3 is leeward roof for interior zone. Zone 3E is leeward roof for end zone. Zone 4 is leeward wall for interior zone. Zone 4E is leeward wall for end zone. Zones 5 and 6 are sidewalls. Zone 5E &6E is sidewalls for end zone. Zone 1 T is windward wall for torsional case Zone 2T is windward roof for torsional case. Zone 3T is leeward roof for torsional case Zone 4T is leeward wall for torsional case. Zones 5T and 6T are sidewalls for torsional case. 2. (+)and (-)signs signify wind pressures acting toward &away from respective surfaces. 3. Building must be designed for all wind directions using the 8 load cases shown below. The load cases are applied to each building corner in turn as the reference corner. 4.Wind loads for torsional cases are 25% of respective transverse or longitudinal zone load values. Torsional loading shall apply to all 8 basic load cases applied at each reference corner. Exception: One-story buildings with "h" -30', buildings -2 stories framed with light frame construction, and buildings­2 stories designed with flexible diaphragms need not be designed for torsional load cases. 5. Per Code Section 28.3.4, the minimum wind load for MWFRS shall not be less than 16 psf. for wall pressure and 8psf for roof pressure CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 14 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 10% Checker: HMS Location: Twin Falls, Idaho PERFORMANCE 01/30/2025 E N G I N E E R S Low-Rise Buildings 4 h <=60' (D 4 D_ 0 (D 0 �J� w.d..d !�, C- 0 4 2 O Come, 0 0 Qrectm Load Case A 4 C3) (D 0 � 0 W .w dAwd 4 a Comer Windward =ard Dnckn IN come, 5 2 4 _. 3 -b e Windward Comer Load Case B 6 4 4 4 --a) 4 3E 4E z 0 1E Case A Torsion V. Case B Torsion WINDDIRECTION WIND DIRECHON RANGE RANGE Transverse Direction Longitudinal Direction CITY APPROVED PLANS Reviewed far Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 15 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S WIND LOADING ANALYSIS -Wall Components and Cladding Per ASCE 7-16 Code for Buildings of Any Height Using Part 1 &3: Analytical Procedure(Section 30.3 &30.5) Input Data: Wind Speed, V= 115 mph (Wind Map, Figure 26.5-1A-C) Bldg. Classification = II (Table 1.5-1 Risk Category) Exposure Category= C (Sect. 26.7) B Ridge Height, hr= 23.667 ft. (hr>= he) Eave Height, he= 16.667 ft. (he<= hr) Building Width = 40 ft. (Normal to Building Ridge) Building Length = 40 ft. (Parallel to Building Ridge) L Roof Type= Gable (Gable or Monoslope) Topo. Factor, Kzt= 1 (Sect. 26.8.2& Figure 26.8-1) Plan Direct. Factor, Kd = 0.85 (Table 26.6-1) Enclosed? (Y/N) Y (Sect. 26.2) Hurricane Region? N 0 Component Name= Wall (Girt, Siding, Wall, or Fastener) hr Jh Effective Area,Ae= 27 ft.^2 (Area Tributary to C&C) The Note:Worst Case Ae=Span Length * Length/3 (Sec 26.2) Resulting Parameters and Coefficients: L Elevation Roof Angle, 0 = 19.29 deg. Mean Roof Ht., h = 20.17 ft. (h =(hr+he)/2,for roof angle>10 deg.) Wall External Pressure Coefficients, GCp: GCp Zone 4 Pos. = 0.92 (Fig. 30.3-1) GCp Zone 5 Pos. = 0.92 (Fig. 30.3-1) GCp Zone 4 Neg. = -1.02 (Fig. 30.3-1) GCp Zone 5 Neg. = -1.25 (Fig. 30.3-1) Positive&Negative Internal Pressure Coefficients, GCpi (Table 26.13-1): +GCpi Coef. = 0.18 (positive internal pressure) -GCpi Coef. = 0.18 (negative internal pressure) If z- 15 then: Kz=2.01*(15/zg)1(2/a) , If z> 15 then: Kz=2.01*(z/zg)1(2/a) (Table 26.10-1, Footnote 1) a = 9.50 (Table26.11-1) zg = 900 (Table 26.11-1) Kh = 0.90 (Kh = Kz evaluated at z= h) Velocity Pressure: qz=0.00256*Kz*Kzt*Kd*V^2 (Sect. 26.10.2, Eq. 26.10-1) qh = 26.00 psf qh =0.00256*Kh*Kzt*Kd*V^2 (qz evaluated at z= h) Design Net External Wind Pressures(Sect. 30.3.2 or 30.5.2): For h <=60 ft.: p=qh*((GCp)-(+/-GCpi)) (psf) For h > 60 ft.: p=q*(GCp)-qi*(+/-GCpi) (psf) where: q =qz for windward walls, q =qh for leeward walls and side walls qi =qh for all walls(conservatively assumed per Sect. 30.5.2) CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 1 Page 16 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Wind Load Tabulation for Wall Components &Cladding Component z Kh qh p= Net Design Pressures (psf) ft. (psf) Zone 4(+) Zone 4 -) Zone 5(+) Zone 5 - Wall 0 0.90 26.00 28.70 -31.30 28.70 -37.12 15.00 0.90 26.00 28.70 -31.30 28.70 -37.12 20.00 0.90 26.00 28.70 -31.30 28.70 -37.12 For z= hr: 23.67 0.90 26.00 28.70 -31.30 28.70 -37.12 For z=he: 16.67 0.90 26.00 28.70 -31.30 28.70 -37.12 Forz=h:l 20.17 0.90 1 26.00 28.70 -31.30 28.70 -37.12 Notes: 1. (+)and (-)signs signify wind pressures acting toward&awayfrom respective surfaces. 2.Width of Zone 5(end zones), 'a'= 1 4.00 Jft. (Fig. 30.3-1) 3. Per Code Section 30.2.2,the minimum wind load for C&C shall not be less than 16 psf. 4. References : a. ASCE 7-16, "Minimum Design Loads for Buildings and Other Structures". b. "Guide to the Use of the Wind Load Provisions of ASCE 7-02" by: Kishor C. Mehta and James M. Delahay(2004). CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 1 Page 17 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PER Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Wall Components and Cladding: 5 ) e a 5 5 0. Wall Zones for Buildings with h<=60 ft. I 1 I 1 1 1 I I 1 ! I I I I 1 1 i ! 1 1 i I 1 � 1 i IL I I I 1 I 1 I 1 WALL ELEVATION Wall Zones for Buildings with h>60 ft. CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 1 Page 18 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S WIND LOADING ANALYSIS - Roof Components and Cladding Per ASCE 7-16 Code for Bldgs. of Any Height with Gable Roof 0 <=45'or Monoslope Roof 0 <=30 Using Part 1 &3: Analytical Procedure(Section 30.3&30.5) Input Data: Wind Speed, V= 115 mph (Wind Map, Figure 26.5-1A-C) Bldg. Classification = II (Table 1-1 Occupancy Category) Exposure Category= C (Sect. 26.7) B Ridge Height, hr= 23.667 ft. (hr>= he) Eave Height, he= 16.667 ft. (he<= hr) Building Width = 40 ft. (Normal to Building Ridge) Building Length = 40 ft. (Parallel to Building Ridge) L Roof Type= Gable (Gable or Monoslope) Topo. Factor, Kzt= 1 (Sect. 26.8.2& Figure 26.8-1) Plan Direct. Factor, Kd = 0.85 (Table 26.6-1) Enclosed? (Y/N) Y (Sect. 26.2) Hurricane Region? N 0 Component Name= Joist (Purlin,Joist, Decking, or Fastener) hr :DThe Effective Area,Ae= 533.3333 ft.^2 (Area Tributary to C&C) Overhangs? (Y/N) Y (if used, overhangs on all sides) Note:Worst Case Ae=Span Length * Length/3 (Sec 26.2) L Resulting Parameters and Coefficients: Elevation Roof Angle, 0 = 19.29 deg. Mean Roof Ht., h = 20.17 ft. (h =(hr+he)/2,for roof angle>10 deg.) Roof External Pressure Coefficients, GCp: GCp Zone 1-3 Pos. = 0.30 (Fig. 30.3-2B) GCp Zone 1 Neg. = -0.80 (Fig. 30.3-2B) GCp Zone 2 Neg. = -2.20 (Fig. 30.3-2B) GCp Zone 3 Neg. = -2.50 (Fig. 30.3-2B) Positive&Negative Internal Pressure Coefficients, GCpi (Table 26.13-1): +GCpi Coef. = 0.18 (positive internal pressure) -GCpi Coef. = 0.18 (negative internal pressure) If z- 15 then: Kz=2.01*(15/zg)1(2/a) , If z> 15 then: Kz=2.01*(z/zg)1(2/a) (Table 26.10-1, Footnote 1) a = 9.50 (Table26.11-1) zg = 900 (Table 26.11-1) Kh = 0.90 (Kh = Kz evaluated at z= h) Velocity Pressure: qz=0.00256*Kz*Kzt*Kd*V^2 (Sect. 26.10.2, Eq. 26.10-1) qh = 26.00 psf qh =0.00256*Kh*Kzt*Kd*V^2 (qz evaluated at z= h) Design Net External Wind Pressures(Sect. 30.3.2 or 30.5.2): For h <=60 ft.: p=qh*((GCp)-(+/-GCpi)) (psf) For h > 60 ft.: p=q*(GCp)-qi*(+/-GCpi) (psf) where: q =qh for roof qi =qh for all walls(conservatively assumed per Sect. 30.5.2) CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 19 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Wind Load Tabulation for Roof Components&Cladding Component z Kh qh p= Net Design Pressures (psf) (ft.) (psf) Zone 1,2,3 (+) Zone 1 (-) Zone 2 (-) Zone 3 (-) Joist 0 0.90 26.00 12.48 -25.48 -61.88 -69.68 _ 15.00 0.90 26.00 12.48 -25.48 -61.88 -69.68 20.00 0.90 26.00 12.48 -25.48 -61.88 -69.68 For z= hr: 23.67 0.90 26.00 12.48 -25.48 -61.88 -69.68 For z= he: 16.67 0.90 26.00 12.48 -25.48 -61.88 -69.68 For z= h: 20.17 0.90 26.00 12.48 -25.48 -61.88 -69.68 Notes: 1. (+)and (-)signs signify wind pressures acting toward&away from respective surfaces. 2.Width of Zone 2 (edge), 'a'= 4.00 ft. 3.Width of Zone 3 (corner), 'a'= 1 4.00 ft. 4. For monoslope roofs with 0 <= 3 degrees, use Fig. 30.4-2A for'GCp'values with'qh'. 5. For buildings with h >60'and 0 > 10 degrees, use Fig. 30.6-1 for'GCpi'values with'qh'. 6. For all buildings with overhangs, use Fig. 30.4-213 for'GCp'values per Sect. 30.10. 7. If a parapet>= 3' in height is provided around perimeter of roof with 0 <= 10 degrees, Zone 3 shall be treated as Zone 2. 8. Per Code Section 30.2.2,the minimum wind load for C&C shall not be less than 16 psf. 9. References : a.ASCE 7-16, "Minimum Design Loads for Buildings and Other Structures". b. "Guide to the Use of the Wind Load Provisions of ASCE 7-02" by: Kishor C. Mehta and James M. Delahay(2004). CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 20 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Roof Components and Cladding: • M i I Y Y Y Y Y 1 J 7 7 2 1 -------------- I ! 1 ! I I 1 I I I I I I I 1 I O O ®: 01 T,0. Q :0 21 O := a O IS i I I I I 1 I 1 1 1 I I I -' - 1 .......... ------ ! I I 1 1 V Y, Y Y Y Y 3 11 , 7 7 2- g<=7 deg. 7 deg. <g<=27 deg. 27 deg. <g <=45 deg. Roof Zones for Buildings with h <=60 ft. (for Gable Roofs<=450 and Monoslope Roofs<=30) Ian 1a � v 30J- - _- - -�- -.3 .31 1 I 1 r ' s ' 1 1 2 0 2 I 1 I J L ROOF PLAN Roof Zones for Buildings with h >60 ft. (for Gable Roofs<= 10°and Monoslope Roofs<=3°) Check Roof Uplift Connection: Average Roof Pressure: -32.76 pdf Length of Roof Truss: 40 ft Truss Spacing: 2 ft Factored Force on Truss end: -786.227 Ibs DL truss reaction: 480 Ibs --> (Assume 7psf top chord dead load) CITY APPROVED PLANS Net Uplift: 306.23 Ibs Simpson H2.5A Cap.: 700 Ibs Reviewed for Cade Compliance OK PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 21 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Wind Shear Force Calculations From 'ASCE 7-16 Wind Loading Analysis': LOAD CASE 'A' LOAD CASE 'B' a = 4.00 feet 2a = 8.00 feet a = 4.00 psf 2a = 8.00 feet Z1 = 9.61 psf Z1 E = 14.24 psf Z1 = -16.38 psf Z1 E = -17.16 psf Z2 = -7.26 psf Z2E = -9.63 psf Z2 = -22.62 psf Z2E = -32.50 psf Z3 = -16.31 psf Z3E = -19.89 psf Z3 = -14.30 psf Z3E = -18.46 psf Z4 = -14.84 psf Z4E = -18.59 psf Z4 = -16.38 psf Z4E = -17.16 psf 'A' FACTORED LOADS 0.6*Wr = (Z2 +Z3) * 0.6 = 5.4 psf Wr, W rE 0.6*WrE = (Z2E + Z3E) * 0.6 = 6.2 psf 0.6*Ww = (Z1 +Z4) * 0.6 = 14.7 psf/ 0.6*WwE = 1Z1E + Z4E) * 0.6 = 19.7 psf 'B' FACTORED LOADS Ww' WwE 0.6*Wr = (Z2 + Z3) * 0.6 = 5.0 psf 0.6*WrE = (Z2E + Z3E) * 0.6 = 8.4 psf 0.6*Ww = (Z1 +Z4) * 0.6 = 0.0 psf/ 0.6*WwE = 1Z1E + Z4E) * 0•6 = 0.0 psf Wr, Wind Upr. Flr wall Wind We Shear, Wind Wall Force Wall Wall ht line Force Wall ht truss wall line Upper Force Line (psf) ht ft ft dist. ft + (psf) ft trib ft dist ft + # = (kips) X1-1 15.67 16.67 0 40.00 + 9.60 0 7.00 40 + 0.00 = 3.96 X2-1 15.21 16.67 0 75.00 + 9.60 0 7.00 75 + 0.00 = 7.27 Y1-1 15.67 16.67 0 40.00 + 9.60 0 7.00 40 + 0.00 = 3.96 Y2-1 15.67 16.67 0 40.00 + 9.60 0 7.00 40 + 0.00 = 3.96 CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 22 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Seismic Shear Force Calculations From 'ASCE7-16 Seismic Loading Analysis': n > > T>>o v N rn L V a iY d 2 EQ ( N (B (6 C L . L +J OQ + 0- T + U) QY11 U) l fA A I � Up B X1-1 17 40 40 + 18 0 0 + OSB 12.0 16.67 40.00 .03Wp + 0 =1 0.65 1 0.65 1 Wind X2-1 17 75 40 + 18 0 0 + GYP 8.0 16.67 75.00 .10Wp + 0 =1 3.47 1 3.47 Wind Y1-1 17 40 40 + 18 0 0 + OSB 12.0 16.67 40.00 .03W + 0 =1 0.65 1 0.65 Wind Y2-1 17 40 75 + 18 0 0 + OSB 12.0 16.67 40.00 .03Wp + 0 =1 1.01 1 1.01 Wind CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 23 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Description: X1-1 Shear Wall (1.5PANELS WALLF,LFNIF,NT LENGTH HEIGHT Wall 4.00 Perforated Shear Wall Calculation Sheet:This calculation is made in conformance to IBC Chapters 2305-2308 and AWC's"2021 SDPWS:Lateral Force Resisting Systems". Shear Wall Geometry and Loads: Segment Count: Total length of wall: 24.00 ft Walls: 1 Shear Wall Length,L: 4.00 ft Windows:0 Length of Full Height Segments,bi: 4.00 ft Doors:0 Wall Height, H: 12.67 ft Wind Force,V: 2638 Ibs wDL self= 152.004 plf WDL above= 68.00 plf OSB Thickness: 7/16 in Gyp Thickness: 1/2 in Wall Connected to Concrete Y y/n Perp/Parallel Framing Above? Perp to wall Unit Shear Calculations: Base Attachment Calcations: Area of Wall: 50.7 ftA2 Applied Moment on Wall: 33411.1 ft-Ibs Area of Openings: 0.0 ftA2 Resisting Moment of Wall:1 1056.0 ft-Ibs 08 Area of FHS: 50.7 ftA2 Net Tension:1 8089 Ibs 0.6 Co: 1.0000 (SDPWS Eq.4.3-6) (0.61D+0.6W) Base Unit Shear,Vb: 659.4 plf Anchorage Unit Shear: 1 659.41 plf 04 Adjusted Unit Shear,Vn: 659.4 plf. Roof Attachment Unit Shear:1 109.90 plf 0.2 Unit Shear Capacitv Calculation: Edge Element Calculations: 0 W/S Modifier: 2.0 Max Chord Compression: 8645 Ibs 0.00 1.00 2.00 3.00 4.00 5.00 Base Unit Shear: 1638 Max Collector Force: 0 Ibs Collector Force Diagram Adjusted Unit Shear: 819.0 (2)2x6 DF#2 CHORD OK (2)2x6 DF#2 TOP PLATE OK Lap Top Plate w/(0)0.131 Nails Min. Holdown Ta Type T= 4935 Ibs Simpson STHD14 4935 Strap OR: Simpson HDU5 4935 Holdown Blocking/Nailing Framing Attachment "No Blocking Required" Moment Truss Braced Frame Provide: (2) Moment Truss Braced Frame VA=3200# EA.4800#Total w/4 straps on each side of each panel CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 24 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Description: X2-1 Shear Wall WALL ELEMENT LENGTH HEIGHT Wall 23.50 Perforated Shear Wall Calculation Sheet:This calculation is made in conformance to IBC Chapters 2305-2308 and AWC's"2021 SDPWS:Lateral Force Resisting Systems". Shear Wall Forces Seament Count: Total length of wall: 23.50 ft Walls: 1 Shear Wall Length,L: 23.50 ft Windows:0 Length of Full Height Segments,bi: 23.50 ft Doors:0 Wall Height, H: 12.67 ft Wind Force,V: 2817 Ibs(Windward/Leeward Only) wDL self= 152.004 plf wDL above- 68.00 plf OSB Thickness: 7/16 in Gyp Thickness: 1/2 in Wall Connected to Concrete Y y/n Perp/Parallel Framing Above? Per to wall Unit Shear Calculations: Base Attachment Calcations: Area of Wall: 297.7 ftA2 Applied Moment on Wall: 35686.5 ft-Ibs Area of Openings: 0.0 ftA2 Resisting Moment of Wall: 36449.2 ft-Ibs ° Area of FHS: 297.7 ftA2 Net Tension: 0 Ibs 0.6 Co: 1.0000 (SDPWS Eq.4.3-6) (0.6D+0.6W) Base Unit Shear,Vb: 119.9 PIT Anchorage Unit Shear: 119.88 plf 0.4 Adjusted Unit Shear,Vn: 119.9 Plf Roof Attachment Unit Shear: 119.88 plf 0.2 Unit Shear Capacitv Calculation: Ed a Element Calculations: 0 W/S Modifier: 2.0 Max Chord Compression: 1811 Ibs 0.00 5 00 10.00 15.00 20.00 25.00 Base Unit Shear: 403 Max Collector Force: 0 Ibs Collector Force Diagram Adjusted Unit Shear: 201.6 (1)2x6 DF#2 CHORD OK (2)2x6 DF#2 TOP PLATE OK Lap Top Plate w/(0)0.131 Nails Min. Shear Transfer to Concrete: 1/2 Anchor Bolts @ 72"O.C. (3)Minimum (1/2"fD Anchor Bolt:Z=650 Ibs,Z'= 1040 Ibs) T= Not Req'd Ibs Gyp Board Wall Sheathing attachment Min Shear Wall Segment: 6.33 ft Provide: 1/2"GYP Board W/5d Cooler Nails or Screws,Unblocked @ 6'O.C. (BOTH Va= 200 WA SIDES) Blocking/Nailing Framing Attachment "No Blocking Required" CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 25 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Description: X2-1 (2) Shear Wall WALL ELEMENT LENGTH HEIGHT Wall 13.50 Perforated Shear Wall Calculation Sheet:This calculation is made in conformance to IBC Chapters 2305-2308 and AWC's"2021 SDPWS:Lateral Force Resisting Systems". Shear Wall Forces Seament Count: Total length of wall: 13.50 ft Walls: 1 Shear Wall Length,L: 13.50 ft Windows:0 Length of Full Height Segments,bi: 13.50 ft Doors:0 Wall Height, H: 12.67 ft Wind Force,V: 1618 Ibs(Windward/Leeward Only) wDL self= 152.004 plf wDL above- 331.50 plf OSB Thickness: 7/16 in Gyp Thickness: 1/2 in Wall Connected to Concrete Y y/n Perp/Parallel Framing Above? Per to wall Unit Shear Calculations: Base Attachment Calcations: Area of Wall: 171.0 ftA2 Applied Moment on Wall: 20500.8 ft-Ibs Area of Openings: 0.0 ftA2 Resisting Moment of Wall: 26435.6 ft-Ibs 08 Area of FHS: 171.0 ftA2 Net Tension: 0 Ibs 0.6 Co: 1.0000 (SDPWS Eq.4.3-6) (0.6D+0.6W) Base Unit Shear,Vb: 119.9 PIT Anchorage Unit Shear: 119.88 plf 0.4 Adjusted Unit Shear,Vn: 119.9 Plf Roof Attachment Unit Shear: 119.88 plf 0.2 Unit Shear Capacitv Calculation: Eci a Element Calculations: 0 W/S Modifier: 2.0 Max Chord Compression: 2162 Ibs 0.00 5.00 10.00 15.00 Base Unit Shear: 403 Max Collector Force: 0 Ibs Collector Force Diagram Adjusted Unit Shear: 201.6 (1)2x6 DF#2 CHORD OK (2)2x6 DF#2 TOP PLATE OK Lap Top Plate w/(0)0.131 Nails Min. Shear Transfer to Concrete: 1/2 Anchor Bolts @ 72"O.C. (2)Minimum (1/2"fD Anchor Bolt:Z=650 Ibs,Z'= 1040 Ibs) T= Not Req'd Ibs Gyp Board Wall Sheathing attachment Min Shear Wall Segment: 6.33 ft Provide: 1/2"GYP Board W/5d Cooler Nails or Screws,Unblocked @ 6'O.C. (BOTH Va= 200 WA SIDES) Blocking/Nailing Framing Attachment "No Blocking Required" CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 26 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Description: Y1'1 Shear Wall WALL ELEMENT LENGTH HEIGHT Wall 33.00 Perforated Shear Wall Calculation Sheet:This calculation is made in conformance to IBC Chapters 2305-2308 and AWC's"2021 SDPWS:Lateral Force Resisting Systems". Shear Wall Forces Segment Count: Total length of wall: 33.00 ft Walls: 1 Shear Wall Length,L: 33.00 ft Windows:0 Length of Full Height Segments,bi: 33.00 ft Doors:0 Wall Height, H: 12.67 ft Wind Force,V: 3956 Ibs wDL self= 152.004 plf WDL above= 68.00 plf OSB Thickness: 7/16 in Gyp Thickness: 1/2 in Wall Connected to Concrete Y y/n Perp/Parallel Framing Above? Perp to wall Unit Shear Calculations: Base Attachment Calcations: 1 Area of Wall: 418.0 ftA2 Applied Moment on Wall: 50116.E ft-Ibs Area of Openings: 0.0 ftA2 Resisting Moment of Wall:1 71875.3 ft-Ibs D 8 Area of FHS: 418.0 ftA2 Net Tension:1 0 Ibs 0.6 Co: 1.0000 (SDPWS Eq.4.3-6) (0.61D+0.6W) Base Unit Shear,Vb: 119.9 plf Anchorage Unit Shear: 1 119.89 plf 04 Adjusted Unit Shear,Vn: 119.9 plf. Roof Attachment Unit Shear:1 9.89 plf 0.2 Unit Shear Capacitv Calculation: Edge Element Calculations: 0 W/S Modifier: 2.0 Max Chord Compression: 1811 Ibs 0.00 10.00 20.00 30.00 40.00 Base Unit Shear: 403 Max Collector Force: 0 Ibs Collector Force Diagram Adjusted Unit Shear: 201.6 (1)2x6 DF#2 CHORD OK (2)2x6 DF#2 TOP PLATE OK Lap Top Plate w/(0)0.131 Nails Min. Shear Transfer to Concrete: 1/2 Anchor Bolts @ 72"O.C. (4)Minimum (1/2"0 Anchor Bolt:Z=650 Ibs,Z'= 1040 Ibs) T= Not Req'd Ibs OSB Wall Sheathing attachment Min Shear Wall Segment: 3.62 ft Provide: 7/16"OSB W/8d Nails @ 6"O.C.UNBLOCKED Va= 201.6 WO OR: 7/16"OSB W/1'/2 16 Gage Staples @ 3"O.C. Va= 260.4 Blocking/Nailing Framing Attachment "No Blocking Required" CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 27 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 PERFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Description: Y2-1 Shear Wall WALL ELEMENT LENGTH HEIGHT Wall 40.00 Perforated Shear Wall Calculation Sheet:This calculation is made in conformance to IBC Chapters 2305-2308 and AWC's"2021 SDPWS:Lateral Force Resisting Systems". Shear Wall Forces Segment Count: Total length of wall: 40.00 ft Walls: 1 Shear Wall Length,L: 40.00 ft Windows:0 Length of Full Height Segments,bi: 40.00 ft Doors:0 Wall Height, H: 12.67 ft Wind Force,V: 3956 Ibs wDL self= 152.004 plf WDL above= 68.00 plf OSB Thickness: 7/16 in Gyp Thickness: 1/2 in Wall Connected to Concrete Y y/n Perp/Parallel Framing Above? Perp to wall Unit Shear Calculations: Base Attachment Calcations: 1 Area of Wall: 506.7 ftA2 Applied Moment on Wall: 50116.E ft-Ibs Area of Openings: 0.0 ftA2 Resisting Moment of Wall:1 105601.9 ft-Ibs D 8 Area of FHS: 506.7 ftA2 Net Tension:1 0 Ibs 0.6 Co: 1.0000 (SDPWS Eq.4.3-6) (0.61D+0.6W) Base Unit Shear,Vb: 98.9 plf Anchorage Unit Shear: 1 98.91 plf 04 Adjusted Unit Shear,Vn: 98.9 Plf. Roof Attachment Unit Shear:1 98.91 plf 0.2 Unit Shear Capacitv Calculation: Edge Element Calculations: 0 W/S Modifier: 2.0 Max Chord Compression: 1546 Ibs 0.00 10.00 20.00 30.00 40.00 50.00 Base Unit Shear: 403 Max Collector Force: 0 Ibs Collector Force Diagram Adjusted Unit Shear: 201.6 (1)2x6 DF#2 CHORD OK (2)2x6 DF#2 TOP PLATE OK Lap Top Plate w/(0)0.131 Nails Min. Shear Transfer to Concrete: 1/2 Anchor Bolts @ 72"O.C. (4)Minimum (1/2"0 Anchor Bolt:Z=650 Ibs,Z'= 1040 Ibs) T= Not Req'd Ibs OSB Wall Sheathing attachment Min Shear Wall Segment: 3.62 ft Provide: 7/16"OSB W/8d Nails @ 6"O.C.UNBLOCKED Va= 201.6 WO OR: 7/16"OSB W/1'/2 16 Gage Staples @ 3"O.C. Va= 260.4 Blocking/Nailing Framing Attachment "No Blocking Required" CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100,NAMPA,ID 83651 Page 28 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 IINFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Tall Wall Calculations LEFT WALL This spreadsheet is used for designing a stud wall according to the NDS. Inputs are in ITALICS and outputs are in BOLDFACE. Description: 12.667' Tall Wall King Stud(3'Max Opening) 12.667'Trimmer Type:2x Lumber(2"4') Type:2x Lumber(2"-4) Type:2x Lumber(2"-4') Species:DF-L Species:DF-L Species:DF-L Grade:No.2 Grade:No.2 Grade:No.2 nominal width t= 2 in 1.50 in t= 2 in 1.50 in t= 2 in 1.50 in nominal depth d= 6 in 5.50 in d= 6 in 5.50 in d= 6 in 5.50 in Span L= 12.667 ft 12.417 ft L= 12.667 ft 12.417 ft L= 12.667 ft 12.417 ft stud spacing s= 16 in w/o Plates s= 28.25 in w/o Plates s= 16 in w/o Plates Lateral pressure Wwnd= 18.78 psf Wwnd= 18.78 psf W And= 5.00 psf axial load P= 1232 Ibs P= 50 Ibs P= 1386 Ibs eccentricity e= 0 in e= 0 in e= 0 in Kce= 0.822 KcE= 0.822 KcE= 0.822 Buckling and crushing c= 0.8 c= 0.8 c= 0.8 interaction factor for w= 25.0 plf w= 44.2 plf w= 6.7 plf Fb Fv Fc-prll Fc-perp Fb Fv Fc-prll Fc-perp Fb Fv Fc-prll Fc-perp 900 psi 180 psi 1,350 psi 625 psi 900 psi 180 psi 1,350 psi 625 psi 900 psi 180 psi 1,350 psi 625 psi Cd= 1.60 1.60 1.60 1.60 1.60 1.60 1.15 1.15 1.15 CF= 1.30 1.10 1.30 1.10 1.30 1.10 Cr= 1.15 1.00 1.00 Cp= 0.26 0.26 0.34 Cm= 1.00 1.00 1.00 Cb= 1.07 1.07 1.07 E Emin E Emin E Emin 1,600,000 psi 580,000 psi 1,600,000 psi 580,000 psi 1,600,000 psi 580,000 psi Allowable Stress: F'b= Fb Cd CF Cr= 2,153 psi Fb Cd CF Cr= 1,872 psi Fb Cd CF Cr= 1,346 psi F' = F' Cd= 288 psi F' Cd= 288 psi F' Cd= 207 psi F%= Fc Cd CF= 2,376 psi F,Cd CF= 2,376 psi F,Cd CF= 1,708 psi FEE= (KBE E')/(/./d)2= 650 psi (K.E E')/(/Jd)2= 650 psi (KBE E')/(/Jd)2= 650 psi F'c= Fc Cd CF CP= 608 psi Fc Cd CF CP= 608 psi Fc Cd CF CP= 588 psi P�Pew= F.p.m Cb= 668 psi F.p.m Cb= 668 psi Fc p.m Cb= 668 psi E'= E= 1,600,000 psi E= 1,600,000 psi E= 1,600,000 psi le/d 27<50 OK 27<50 OK 27<50 OK Bending: M= w 1-2/8+P e/12= 483 lb ft w 1-2/8+P e/12= 852 lb ft w 1-2/8+P e/12= 128 lb ft fb= MIS= 766 psi <F'b OK MIS= 1352 psi <F'b OK MIS= 204 psi <F'b OK S= 7.56 in' S= 7.56 in' S= 7.56 in' Shear: V= w L/2= 155 Ibs w L/2= 274 Ibs w L/2= 41 Ibs L= 1.5 VIA= 28.26 psi <F'y OK 1.5 VIA= 49.90 psi <F'y OK 1.5 VIA= 7.53 psi <F'y OK A= 8.25 in A= 8.25 in A= 8.25 in Compression: f�= P/A= 149.3 psi <F'c OK P/A= 6.1 psi <F'c OK P/A= 168.0 psi <F'c OK f�P.m= P/A= 149.3 psi <F'c OK P/A= 6.1 psi <F'c OK P/A= 168.0 psi <F'c OK Combined: (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.52 <1.0 OK (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.73 <1.0 OK (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.29 <1.0 OK Deflection: o=22.5 w L°/E'1= 0.40 in = SPAN 22.5 w L°/E'1= 0.71 in = SPAN 22.5 w L°/E'1= 0.11 in = SPAN 1= 20.80 in" 370 1= 20.80 in" 210 1= 20.80 in" 1390 >1200K >120OK >120OK CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100, NAMPA,ID 83651 Page 29 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 IINFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Tall Wall Calculations TOP WALL This spreadsheet is used for designing a stud wall according to the NDS. Inputs are in ITALICS and outputs are in BOLDFACE. Description: 12.667' Tall Wall King Stud(12'Max Opening) 12.667'Trimmer Type:2x Lumber(2"4') Type:2x Lumber(2"-4) Type:2x Lumber(2"-4) Species:DF-L Species:DF-L Species:DF-L Grade:No.2 Grade:No.2 Grade:No.2 nominal width t= 2 in 1.50 in t= (3)2 in 4.50 in t= 2 in 1.50 in nominal depth d= 6 in 5.50 in d= 6 in 5.50 in d= 6 in 5.50 in Span L= 12.667 ft 12.417 ft L= 12.667 ft 12.417 it L= 12.667 ft 12.417 ft stud spacing s= 16 in w/o Plates s= 82.25 in w/o Plates s= 16 in w/o Plates Lateral pressure W And= 18.78 psf Wwnd= 18.78 psf W And= 5.00 psf axial load P= 224 Ibs P= 50 Ibs P= 1008 Ibs eccentricity e= 0 in e= 0 in e= 0 in Kce= 0.822 KcE= 0.822 KcE= 0.822 Buckling and crushing c= 0.8 c= 0.8 c= 0.8 interaction factor for w= 25.0 plf w= 128.7 plf w= 6.7 plf Fb Fv Fc-prll Fc-perp Fb Fv Fc-prll Fc-perp Fb Fv Fc-prll Fc-perp 900 psi 180 psi 1,350 psi 625 psi 900 psi 180 psi 1,350 psi 625 psi 900 psi 180 psi 1,350 psi 625 psi Cd= 1.60 1.60 1.60 1.60 1.60 1.60 1.15 1.15 1.15 CF= 1.30 1.10 1.30 1.10 1.30 1.10 Cr= 1.15 1.00 1.00 Cp= 0.26 0.26 0.34 Cm= 1.00 1.00 1.00 Cb= 1.07 1.07 1.07 E Emin E Emin E Emin 1,600,000 psi 580,000 psi 1,600,000 psi 580,000 psi 1,600,000 psi 580,000 psi Allowable Stress: F'b= Fb Cd CF Cr= 2,153 psi Fb Cd CF Cr= 1,872 psi Fb Cd CF Cr= 1,346 psi F' = F' Cd= 288 psi F' Cd= 288 psi F' Cd= 207 psi F%= Fc Cd CF= 2,376 psi F,Cd CF= 2,376 psi F,Cd CF= 1,708 psi FEE= (KBE E')/(/./d)2= 650 psi (K.E E')/(/Jd)2= 650 psi (KBE E')/(/Jd)2= 650 psi F'c= Fc Cd CF CP= 608 psi Fc Cd CF CP= 608 psi Fc Cd CF CP= 588 psi P�Pew= F.p.m Cb= 668 psi F.p.m Cb= 668 psi Fc p.m Cb= 668 psi E'= E= 1,600,000 psi E= 1,600,000 psi E= 1,600,000 psi le/d 27<50 OK 27<50 OK 27<50 OK Bending: M= w 1-2/8+P e/12= 483 lb ft w 1-2/8+P e/12= 2481 lb ft w 1-2/8+P e/12= 128 lb ft fb= MIS= 766 psi <F'b OK MIS= 1312 psi <F'b OK MIS= 204 psi <F'b OK S= 7.56 in' S= 22.69 in' S= 7.56 in' Shear: V= w L/2= 155 Ibs w L/2= 799 Ibs w L/2= 41 Ibs L= 1.5 VIA= 28.26 psi <F'y OK 1.5 VIA= 48.43 psi <F'y OK 1.5 VIA= 7.53 psi <F'y OK A= 8.25 in A= 24.75 in A= 8.25 in Compression: f�= P/A= 27.2 psi <F'c OK P/A= 2.0 psi <F'c OK P/A= 122.2 psi <F'c OK f�P.m= P/A= 27.2 psi <F'c OK P/A= 2.0 psi <F'c OK P/A= 122.2 psi <F'c OK Combined: (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.37 <1.0 OK (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.70 <1.0 OK (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.23 <1.0 OK Deflection: o=22.5 w L°/E'1= 0.40 in = SPAN 22.5 w L°/E'1= 0.69 in = SPAN 22.5 w L°/E'1= 0.11 in = SPAN 1= 20.80 in" 370 1= 62.39 in" 216 1= 20.80 in" 1390 >1200K >120OK >120OK CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100, NAMPA,ID 83651 Page 30 of 31 Project Name: Hardcastle Project Engineering: DM Project#: 2025-16812 IINFORMANCE Checker: HMS Location: Twin Falls, Idaho 01/30/2025 E N G I N E E R S Tall Wall Calculations TOP WALL This spreadsheet is used for designing a stud wall according to the NDS. Inputs are in ITALICS and outputs are in BOLDFACE. Description: 12.667' Tall Wall King Stud(16'Max Opening) 12.667'Trimmer Type:2x Lumber(2"-4') Type:2x Lumber(2"-4) Type:2x Lumber(2"-4) Species:DF-L Species:DF-L Species:DF-L Grade:No.2 Grade:No.2 Grade:No.2 nominal width t= 2 in 1.50 in t= (3)2 in 4.50 in t= 2 in 1.50 in nominal depth d= 6 in 5.50 in d= 6 in 5.50 in d= 6 in 5.50 in Span L= 12.667 ft 12.417 ft L= 12.667 ft 12.417 ft L= 12.667 ft 12.417 ft stud spacing s= 16 in w/o Plates s= 106.25 in w/o Plates s= 16 in w/o Plates Lateral pressure W And= 18.78 psf Wwnd= 18.78 psf W And= 5.00 psf axial load P= 224 Ibs P= 50 Ibs P= 1344 Ibs eccentricity e= 0 in e= 0 in e= 0 in Kce= 0.822 KcE= 0.822 KcE= 0.822 Buckling and crushing c= 0.8 c= 0.8 c= 0.8 interaction factor for w= 25.0 plf w= 166.3 plf w= 6.7 plf Fb Fv Fc-prll Fc-perp Fb Fv Fc-prll Fc-perp Fb Fv Fc-prll Fc-perp 900 psi 180 psi 1,350 psi 625 psi 900 psi 180 psi 1,350 psi 625 psi 900 psi 180 psi 1,350 psi 625 psi Cd= 1.60 1.60 1.60 1.60 1.60 1.60 1.15 1.15 1.15 CF= 1.30 1.10 1.30 1.10 1.30 1.10 Cr= 1.15 1.00 1.00 Cp= 0.26 0.26 0.34 Cm= 1.00 1.00 1.00 Cb= 1.07 1.07 1.07 E Emin E Emin E Emin 1,600,000 psi 580,000 psi 1,600,000 psi 580,000 psi 1,600,000 psi 580,000 psi Allowable Stress: F'b= Fb Cd CF Cr= 2,153 psi Fb Cd CF Cr= 1,872 psi Fb Cd CF Cr= 1,346 psi F' = F' Cd= 288 psi F' Cd= 288 psi F' Cd= 207 psi F%= Fc Cd CF= 2,376 psi F,Cd CF= 2,376 psi F,Cd CF= 1,708 psi FEE= (KBE E')/(/./d)2= 650 psi (K.E E')/(/Jd)2= 650 psi (KBE E')/(/Jd)2= 650 psi F'c= Fc Cd CF CP= 608 psi Fc Cd CF CP= 608 psi Fc Cd CF CP= 588 psi P�Pew= F.p.m Cb= 668 psi F.p.m Cb= 668 psi Fc p.m Cb= 668 psi E'= E= 1,600,000 psi E= 1,600,000 psi E= 1,600,000 psi le/d 27<50 OK 27<50 OK 27<50 OK Bending: M= w 1-2/8+P e/12= 483 lb ft w 1-2/8+P e/12= 3205 lb ft w 1-2/8+P e/12= 128 lb ft fb= MIS= 766 psi <F'b OK MIS= 1695 psi <F'b OK MIS= 204 psi <F'b OK S= 7.56 in' S= 22.69 in' S= 7.56 in' Shear: V= w L/2= 155 Ibs w L/2= 1032 Ibs w L/2= 41 Ibs L= 1.5 VIA= 28.26 psi <F'v OK 1.5 VIA= 62.56 psi <F'v OK 1.5 VIA= 7.53 psi <F'v OK A= 8.25 in A= 24.75 in A= 8.25 in Compression: f�= P/A= 27.2 psi <F'c OK P/A= 2.0 psi <F'c OK P/A= 162.9 psi <F'c OK f�P.m= P/A= 27.2 psi <F'c OK P/A= 2.0 psi <F'c OK P/A= 162.9 psi <F'c OK Combined: (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.37 <1.0 OK (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.91 <1.0 OK (fc/Fc)2+(fb/[Fb(1-(fc/FcE)])= 0.28 <1.0 OK Deflection: o=22.5 w L°/E'1= 0.40 in = SPAN 22.5 w L°/E'1= 0.89 in = SPAN 22.5 w L°/E'1= 0.11 in = SPAN 1= 20.80 in" 370 1= 62.39 in" 167 1= 20.80 in" 1390 >1200K >120OK >120OK CITY APPROVED PLANS Reviewed for Code Compliance PLANS MUST BE ON JOB SITE FOR ALL INSPECTIONS (208)475-0040 315 11th AVE S,SUITE 100, NAMPA,ID 83651 Page 31 of 31