Loading...
HomeMy WebLinkAbout240 Addison Avenue West, July 12, 2011 - Permit #110004 STORAGE TANK PERMIT FLAMMABLE AND/OR COMBUSTIBLE LIQUID TWIN FALLS FIRE DEPARTMENT IT IS UNDERSTOOD BY ALL THE UNDERSIGNED THAT THIS PERMIT IS ISSUED SUBJECT TO ALL APPLICABLE TWIN FALLS CITY FIRE CODES AND ORDINANCES, IT IS HEREBY AGREED THAT THE WORK CALLED FOR HEREIN SHALL BE DONE IN COMPLIANCE WITH THE SAME. THIS PERMIT IS NOT TRANSFERABLE. ALL CODE REQUIREMENTS MADE BY THIS OFFICE MUST BE IN WRITING AND ARE SUBJECT TO REVIEW AND APPEALS . APPEALS SHOULD BE ADDRESSED TO FIRE CHIEF RON CLARK AT 735-7231 OR CITY MANAGER TRAVIS ROTHWEILER AT 735-7272 . Special Provisions : Permit Date : July 12, 2011 Permit Number: 110004 Property Address : 240 Addison Avenue West Owner: Conrad & Bischoff Phone : (208) 522-4217 Add. : P. O. Box 50106 Idaho Falls, ID 83401 Contractor: Leonard Petroleum Phone : (208) 733-8511 Address : 1859 Highland Avenue East Twin Falls, ID 83301 WORK DESCRIPTION [] New installation (underground storage tank) $120 . 00 [] New installation (aboveground storage tank under 1100 gallons) 50 . 00 [X] Alter, modify, repair existing tank 50 . 00 [] Remove, abandon, place temporarily out of service 25 . 00 Total Permit Fee: $50 . 00 TANK REMOVAL INFORMATION Destination of tank (s) : Method of disposal of tank (s) : Signature of Applicant P GIT Y O/� d oAC� s� FP'e�oe FRV 1NG TWIN FALLS FIRE DEPARTMENT FLAMMABLE AND/OR COMBUSTIBLE LIQUID TANK AND EQUIPMENT PERMIT APPLICATION Owner Name C�CAJ1 90 AAJ6 Address 1�G -IAJ) T_yrN' fJIISj .L/)rJ/�c� Phone No. __)'r c"_, 73 3 - g y'2 7 Contractor Name ZZZfl,,/.YfoeO ec. .2uc- Address _ 11-A" , Phone No. - 73 3- f S*t/ The City of Twin Falls does Lequire that a permit be obtained to install, alter, remove , abandon, place temporarily out of service, or otherwise dispose of any flammable and/or combustible liquid tank and equipment . An investigation fee, equal to the amount of the appropriate fee, shall be assessed if construction has begun prior to obtaining said permit. Please refer to permit requirements handout for minimum plans necessary to make application. Legal description of property and address where work will be per- formed: New Installation Two sets of plans as per permit requirements are included with this application. rg Alter Remove Abandon Place Temporarily Out of Service 0 Two sets of details and specifications as per permit require- ments arre" included. Submitted by ! 6 rn t I Date - r Received by Date PERMIT APPROVAL CHECKLIST Approved Yes No Date Init. 1 . Zoning Code Review: A. Proper zone B. Special use or variance C. Setbacks/lot size D. Setbacks - Highway District E. Screening F. Off street parking G. Landscaping H. Other 2 . Engineering Code Review: A. Drain/irrigation B. Flood zone C. Issue address 3 . Fire Department Review: A. Uniform Fire Code B. Uniform Building Code P�Z -��..►11s�S� shoo , ' '%23CWe> . 01.1c �4S ASYjrw�-� k?'C:c N WPE6 IN O TWIN FALLS FIRE DEPARTMENT FLAMMABLE AND/OR COMBUSTIBLE LIQUID UNDER AND/OR ABOVEGROUND STORAGE TANK AND EQUIPMENT PERMIT REQUIREMEfNTS The City of Twin Falls does require that a permit be obtained to install, alter, remove, abandon, place temporarily out of service, or otherwise dispose of any flammable and/or combustible liquid tanks . An investigation fee, equal to the amount of the appropriate fee, shall be assessed if construction has begun prior to obtaining said permit. New Installations: Two ( 2 ) sets of the following plans are required for permit appli- cations . 1. Complete plot plan drawn to scale with the following informa- tion: A. North arrow. B. Scale of drawing. C. Legal description. D. Owner ' s name, address, and telephone number. E. Property line and lot dimensions . F. Street(s) name. G. Setbacks from property lines - front, sides , rear, tanks and pump buildings. H. Location of all buildings on property showing relationship, tank locations , and pump locations . I . Details and specifications of proposed type of corrosion protection. J. Details and specifications of piping and swing joint mate- rials. K. Dimensions and capacity (gallons ) of tanks. Alterations , Abandonment , Place Temporarily Out of Service of Existing Installations : Two ( 2 ) sets of the following are required for permit applications. 1 . Owner ' s name, address , and telephone number. 2 . Details and specifications of items to be altered, abandoned, or placed temporarily out of service. -2- Removal of Existing Tanks: 1 . Address of tank( s ) location. 2 . Number and size of tank( s) to be removed. 3 . Destination of removed tank( s ) . 4 . Method of tank disposal. Permit Fee Schedule New installation (underground storage tank) $120. 00 New installation (aboveground storage tank under 1100 gallons ) 50. 00 Alter, modify, repair existing tank or equipment 50. 00* Remove, abandon, place temporarily out of service 25. 00 *Includes two inspections ; any additional inspections will be $25 . 00 each as required. TANK REMOVAL Destination of tank( s ) : / Method of disposal of tank( s ) : Items to be altered, abandoned, or placed temporarily out of service: Leonard FEMOLEUM PROJECT DATA SHEET Project: Kicks 66 Diesel Line Extension Location: 240 Addison Avenue West Twin Falls, Idaho 208-733-3427 Specifications: Existing Product Pipe: Environ Double-Wall I V2" Flexible Fuel Piping with Dispenser Containment Sumps and Liquid Sensors New Diesel Product Pipe: OPW Flexworks Double-Wall 1 1/2" Flexible UL-971 Rated Piping Into Existing Dispenser Sumps with OPW Flexible Entry Contaim-nent Boots Dispenser Replacement: Existing Tokheim Dispensers will be replaced with new Dresser-Wayne Ovation 3+1 Blending Dispensers. All new dispensers will offer three grades of gasoline and diesel. Existing dispenser islands will remain. PFF77 LOW FIVHMES"I i 1859 Highland Ave. East PO. Box 1924 ® Twin Falls, Idaho 83303-1924 Phone 208733-8511 t i �.a NX IX r- p 4