Work Order 172924
of
CCTV Sewer Main - Due To Backup Status: C
Priority: F3 Category: WASTEWATER Submit To: COOK, DAVID
Initiated By: FREEMAN, ELMER Date: 3/18/2025 1:23:36PM
Address: 245 Harrison St. Expense Type: MAINT
Supervisor: FREEMAN, ELMER
Submit To: COOK, DAVID Submit to Date: 3/18/2025 1:23:36PM
Actual Start: 3/24/2025 9:02:18AM Actual Finish: 3/24/2025 12:56:53PM
COMMENTS DATECREATED
DCOOK Inspected going downstream. 6"clay line 635'long. I tried the inspection with the 3/19/2025 3:57:17PM
regular tractor and wheels for the 6"set up. I could only make it 10'down the line.
changed to the smaller tractor and it tipped over 3 times going into the line. Finely was
about to get it to go down the line.At 233'ran into bubbles and couldn't see any more.
brought the camera back.Will need to try again.
DCOOK Inspected the line going upstream. 6"clay line. 635' long. I was able to get to the 360' 3/24/2025 12:56:25PM
mark when the camera was stopped by something under water. I believe I saw the tap
for the 245 Harrison home just before the camera went under water and was stopped.
There are a couple of deep sags in the line.Also 2 broken spots.The broken spots and
the first sag I didn't have any problems getting through. It is the sag upstream from the
245 Harrison tap that I couldn't get through. For an old clay line it is in good shape
other that what was already talked about.
ENTITYTYPE ENTITYUID LOCATION
SSGRAVITYMAIN C4-109 C4-133
LABORNAME HOURS STARTDATE FINISHDATE
COOK, DAVID 2.91 3/19/2025 1:03:OOPM 3/19/2025 3:57:OOPM
COOK, DAVID 3.92 3/24/2025 9:02:OOAM 3/24/2025 12:57:OOPM
Page 1 of 2 7/23/2025
7/23/202E
DESCRIPTION HOURSREQUIRED STARTDATE FINISHDATE
Page 2 of 2 7/23/2025