HomeMy WebLinkAbout22-1197 2125 6th Ave N - Roof Evaluation RIGHT ANGLE ENGINEERING
April 18,2022
Design Criteria:
Wind Speed(ASD) - 115.0 mph
HorizonPWR Ground Snow Load- 36.0 psf
237 N 2nd E Risk Category-2
Rexburg,Idaho,83440 Exposure Category- C
RE: Structural Roof Evaluation for the Robert Boston Residence: 212 6th Ave N, Twin Falls, Idaho
We have evaluated the roof structure under the proposed solar panel array. The information used to
evaluate this structure was gathered during a field visit by HorizonPWR on behalf of Right Angle
Engineering. The design criteria used to analyze this structure are listed above and included with this
letter. The adopted building codes in this jurisdiction are: The 2018 International Residential Building
code and ASCE 7-16.
Array Name Connection Type Panel Quantity Min#Connections Reinforcements '
Array 1 Quickbolt QB2 13 24 None
Solar Panel Anchorage
The solar panel anchorage shall be installed according to the manufactures most current installation
manual. For the loads to be evenly distributed, the roof attachments should be staggered and spread
evenly throughout the panel array. Attachment points should be spaced at a maximum of 48 inches on CN
center. Roof anchors that are attached to the substructure should have a 5/16"or 18/8 SS lag screw with
2.5" minimum penetration centered on each truss top chord or rafter.
Conclusion
Based on our assessment, we have determined that the existing roof framing will safely and adequately
support the additional loads imposed by the solar panels without reinforcement. The equipment will not
create a negative impact on the building's structural design, including any additional loads imposed
(dead, snow, wind/seismic). A roof evaluation was performed with the required loading in accordance
with section 324.4 of the Residential Code
CITY APPROVED PLANS
Reviewed for Code Compliance
Regards, PLANS MUST BE ON JOB SITE
FOR ALL INSPECTIONS
S\oNAL FN
a��`GE N 3F ��
p v N O w
0
�r
sT 17961
��T q OF
OOUGL
04/18/2022
Robert D. Smythe, P.E.
Right Angle Engineering
Page 1 of 5
333 W 2230 N Suite 200 Provo,UT 84604 385.482.1266 rightangleeng.com
Scope of work and limitations
The evaluation is based on information provided by the client. All information is verified by the engineer
from pictures, video, and third party software. Verification of the field observations is the responsibility of
the contractor. The contractor shall verify the framing sizes, spacing, spans, and roof pitch noted in this
letter and/or sealed plans. The contractor shall notify the engineer if there are any discrepancies, or if
there is any damage to the structure (i.e., fire damage, water damage, dry rot, deflections, broken
member, broken connection, etc). The scope of work is strictly limited to the fastener attachments and
underlying roof framing directly under each solar array. Right Angle Engineering assumes no
responsibility for improper installation of solar panels or their components. Waterproofing around the roof
penetrations is the responsibility of others. Alterations to this engineering evaluation and/or sealed plans
shall not be made without direct written consent of the engineer of record.
CITY APPROVED PLANS
Reviewed for Code Compliance
PLANS MUST BE ON JOB SITE
FOR ALL INSPECTIONS
Page 2 of 5
Page 2 letter of approval
Job Details
Roof Snow Load -ASCE 7-16 Design Criteria
Ground Snow Load (p )
Section 7.2 9 36.0 psf Design Wind Speed 115.Omph
Exposure Factor(Ce) 0.9 Exposure Category C
Table 7.3-1
Thermal Factor(Cd 1.1 Risk Category 2
Table 7.3-2
Importance Factor(/S) 1 Mean Roof Height 30 ft
Table 1.5-2
Flat Roof Snow Load (pf) 24.95 psf Roof Type Gable Roof
Equation 7.3-1
Slippery Surface Slope Factor
(CS) 0.73 Building Type Enclosed
Figure 7.4-1
Non-Slippery Surface Slope
Factor(C ) 1
Figure 7.4-1 Roof Live Load
Roof Snow Load 24.95 psf Existing Roof Live Load 20 psf
Equation 7.4-1 ASCE 7-16 Table 4.3-1
Reduced Snow Load (Slippery
Surface) 18.3 psf
Equation 7.4-1
1 Roof Dead Load
Corrugated Metal 1.5 psf No Drywall 0.0 psf
5/8" Plywood Sheathing 2.0 psf Solar Panel Array 2.39 psf
Roof Framing 1.1 psf Dead Load Without Panels 5.8 psf
Insulation 1.2 psf Dead Load With Panels 8.19 psf
1 Roof Dead Load is taken from the worst case scenario dead load from all arrays of the job in order to
provide a more conservative evaluation.
CITY APPROVED PLANS
Reviewed for Code Compliance
PLANS MUST BE ON JOB SITE
FOR ALL INSPECTIONS
Page 3 of 5
Page 3 letter of approval
Array 1
Array Details Beam Stresses
Roof Pitch 26.0' Beam Span 96", 96" Panel Portrait
Orientation
Panel Quantity 13 Spacing 24.0" #of Panels on 2
Rafter
Panel Area 228.57 ft2 Roof Framing 2x4 Rafter Panel Distance 7.199999999
Type DF#2 From Eave 9999991,
Wind Calculations -ASCE 7-16 Panel Area
GC Zone 2 2 5 Shear Capacity 190.0 Ibs
Figure 30.3-(2A-5B) NDS 2015 Table 12k
GCp. -0.18 Pullout Capacity 266.0 Ibs/in
Table 26.13-1
Kh 0.98 Minimum#of Connections 24
Table 26.10-1
Kht 1 Lag Screw Embedment 2.5"
Equation 26.8-1
Kd 0.85 Total Pullout Capacity 665.0 Ibs
Table 26.6-1
Velocity Pressure 28.2 psf
Equation 26.10-1
Zone 2 Pressure -65.43 psf
Equation 30.7-1
CITY APPROVED PLANS
Reviewed for Code Compliance
PLANS MUST BE ON JOB SITE
FOR ALL INSPECTIONS
Page 4 of 5
Page 4 letter of approval
.I F O R T E M) MEMBER REPORT PASSED
Roof,roof:J Dist with solar panels
1plel2x4DFNo.2@24'OC
Sloped Length:20'21/4"
+ +
0JEM-0
12 '
5.85 F_
z' 81 8
a o a
All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Member Length:20'3 15116"
Design Results Actual @ Location Allowed Result LDF Load:combination(Pattern) System:Roof
Member Reaction(Ibs) 528 @ 10' 3650(3.50") Passed(14%) -- lA D+1.0 S(Adj Spans) Member Type:joist
Shear(Ibs) 300 @ 10'4 7/8" 725 Passed(415/6 Building Use:Residential) 1.15 1.0 D+1.0 S(Adj Spans) Building Code:IBC 2018
Moment(Ft-Ibs) -452 @ 10' 456 Passed(99%) 1.15 1.0 D+1.0 S(Adj Spans) Design Methodology!Aso
Live Load Defl.(in) 0.421 @ 14'2 5/8" 0.442 Passed(L/252) -- 1.0 D+1.0 S(Alt Spans) Member Pitch:5,85112
Total Load Defl.(in) 0.511 @ 14'3 9/16" 0.589 Passed(1-1207) 1.0 D+1.0 5(Alt Spans)
•Deflection criteria:U.(L/240)and TL(L/180).
•Overhang deflection criteria:LL(21-1240)and TL(2L/180).
•Allowed moment does not reflect the adjustment for the beam stability factor.
•A 15%increase in the moment capacity has been added to account for repetitive member usage.
•Applicable calculations are based on NDS.
Bearing LengtlrgDead
s to Supports(Ibs)
s4pports Total Available Requiredoof Live Snow Total Accessories
1-Beveled Plate-DF 3.50" 3.50" 1.50" 21/-4 246 396/-4 Blocking
2-Beveled Plate-DF 3.50' 3.50" 1.50' 181 338 709 Blocking
3-Beveled Plate-DF 3.50' 3.50" 1.50" 143 1 172 369 Blocking
•Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Lateral Bracing Bracing l ntervals Comments,
Top Edge(Lu) 11'11"o/c
Bottom Edge(Lu) 1'6"o/c
-Maximum allowable bracing intervals based on applied load.
Dead Roof Live Snaw CITY APPROVED PLANS
Vertical Loads location(Side) Spacing (0.90) (rwwsnow:1.25) (1.15) Commerds Reviewed for Code Compliance
1-Uniform(PSF) 0 to 18' 24" 8.2 - - DL
PLANS MUST BE ON JOB SITE
2-Uniform(PSF) 0 to 7 3/16' 24" - 20.0 24.9 DL+SL below
panels FOR ALL INSPECTIONS
3-Point flb) 1'7 3/16" N/A 23 - 157 solar and SL
4-Point(lb) 1 6'5 9/16" N/A 23 - 157 solar and SL
5-Uniform(PSF) 30'3 7/8"to 18' 24" - 20.0 24.9 DL+SL above
panels
Member Notes
Roof joist with solar panels
Weyediaeuser Notes
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.Weyerhaeuser expressly disclaims any other warranties
related to the software.Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is
responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to
www.weyerhaeuser.com/woodproducta/document-library.
The product application,input design loads,dimensions and support information have been provided by Imported test Software Operator
ForteWEB software Operator Job Notes 4/18/2022 10:10:50 PM UTC
Taylor Smythe Roof j aist before and after solar panels are added
Right Angle Engineering ForteWEB v3.2,Engine:V8.2.0.17,Data:V8.1.0.16
(925)787-3067
taylor@rightangleeng.com Weyerhaeuser File Name:Robert Boston-1-1 mportedDesignAll
Page 1/1
Page 5 of 5
Page 5 letter of approval