Loading...
HomeMy WebLinkAboutVista Bonita Park Expansion_CMGC_SOQ_FABER CONSTRUCTION Y s l �YA I K _ � Jill Squalicum CreekPark Completed Faber VISTA BONITA PARK EXPANSION City of Twin Falls & Jensen-Belts Associates Faber Construction's Statement of Qualifications May 13, 2025 - 12PM TWIN FALLS rw BER y Idaho r JENSENBELTS r r Em Dear Wendy, Bruce &Selection Committee, May 13, 2025 Thank you for the opportunity to submit our SOQ for the Vista Bonita Park Expansion. At Faber, we believe parks are more than public spaces. They are places where people connect, relax, and grow together. This project reflects everything we value: family, community, and thoughtful development. We are ready to help the City of Twin Falls bring that vision to life. Proven Experience with Parks That Bring People Together We have delivered dozens of community-focused projects: splashpads, trails, shade structures, and restrooms. Our team understands how these elements come together to create safe, durable, and welcoming spaces for all ages. Parks are long-term investments in quality of life, and we approach them with the care and detail they deserve. Local Relationships That Strengthen the Work Our office and field management staff have built strong relationships with the local subcontractors. These teams know the land, the codes, and the community. They trust us because we show up ready, pay on time, and lead with respect. Our goal is to keep as much of the work local as possible. That supports the Twin Falls economy and reinforces the partnerships that make projects like this succeed. Collaboration That Protects Budget and Purpose This is public work, and we treat it with that responsibility in mind. From the first precon meeting through final turnover, we focus on delivering value. That means honest estimating, practical design input, and smart planning that City of Twin Falls protects your goals. We are problem solvers who listen first and adapt fast. Wendy Davis Ready for Phased Work with Many Moving Parts Parks and Recreation Director Vista Bonita includes roads, restrooms, a splashpad, landscaping, and more. Coordinating that kind of phased, multi-scope build takes foresight, clear 136 Maxwell Ave communication, and solid scheduling. We have delivered similar projects with Twin Falls, Idaho 83301 that level of variety and will bring a whole-project view to keep things moving Wdavis@tfid.org smoothly. We Build Trust by Showing Up Right We have built long-term trust with clients and partners by doing the small Jensen-Belts Associates things right every day. We communicate clearly. We solve problems without drama. We follow through. It is not flashy. But it works. And it is how we will Bruce Taylor show up for Twin Falls. Project Architect This Project Matters to Us 1509 Tyrell Ln. Ste 130 Vista Bonita is the kind of work we care about. It is rooted in community and Boise, Idaho 83706 built for the long term. We would be honored to help bring it to life. Bruce@jensenbelts.com Sincerely, j Faber Construction 275 North 3rd East Street Mountain Home, ID 83647 Todd Nyquist 360.354.3500 Commercial Construction Division Director Todd@faberconstruction.com faberconstruction.com 206.719.1012 ORIGINAL Faber Corporate Officer: Ben Faber Date: 5/13/2025 Name r Signature The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications lo- ♦ , c � _ a CONTENTS 1. COVER LETTER 2 2. CM INFORMATION 5 3. COMPANY PROFILE 12 4. PROJECT APPROACH 15 S. TOTAL PROJECT BUDGET CONTROL 33 6. SCHEDULING 37 7. HOME OFFICE SUPPORT 41 S. PAST PERFORMANCE 43 "Everyone I have worked with at Faber Construction has been exceptional. This includes the ownership, the project management staff, the superintendent and even their crews." Tex Ladish,Sumas Elementary School, Sr. Project Manager 4 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications Brad Little Governor State of Idaho Division of Occupational and Professional Licenses PUBLIC WORKS CONTRACTORS LICENSING CONSTRUCTION MANAGER 030190 06/26/2017 License Number OAginal License Issuetl This is to certify that ROBERT B FRASER has fulfilled the requirements of the law relating to licensing in Idaho Code,Title 54.Chapter 19&45 and is hereby granted this certificate. This license expires:0 713112 02 5 Licensee S ure Russell Barron,Administrator OPLDivision of Occupational and Professional Licenses ....w,,, 11341 W Chinden Blvd.Boise,ID 83720-0063 �rsstoxnr u / dopl.idaho.gov The person,firm,or corporation whose name appears on this certificate has complied with the provisions of the Idaho statutes and/or rules and regulations and is hereby authorized to engage in the activity as indicated below. FABER CONSTRUCTION CORP Public Works Contractor-Class Unlimited License 073162 Issued:26-Mar-2025 Expires:28-Feb-2026 Renewal Required ;--------------------------------------------- FABER CONSTRUCTION CORP Public Works Contractor-Class Unlimited License 073162 Expires:28-Feb-2026 Russell Barron Russell Barron Printed:26-Mar-2025 Administrator Administrator ---------------------------------------------- The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications Brad Little Governor State of Idaho Division of Occupational and Professional Licenses PUBLIC WORKS CONTRACTORS LICENSING CERTIFICATE OF AUTHORITY License issued pursuant to Title 54,Chapter 45,Idaho Code,as amended FABER CONSTRUCTION CORP Expiration Date,0713112025 ROBERT B FRASER has fulfilled the requirements for Licensing of Construction Managers in Idaho and may provide and hold itself out as providing Construction Management Services, Licensee Signature Russell Barron,Administrator 6 G. CONSTRUCTION MANAGER INFORMATION 1. Contact information for your firm's main office as follows: Firm Name: Faber Construction Mailing Address: 6951 Hannegan Road REQUEST FOR QUALIFICATIONS -6- Lynden, WA 98264 (City, State, Zip) Physical Address: 6951 Hannegan Road Lynden, WA 98264 (City, State, Zip) Telephone: 360.354.3500 Fax: 360.354.0335 E-mail Address: info@faberconstruction.com 2. Name, title, address, telephone, and fax number of the firm's officer responsible to the Owner for all work to be provided under this RFQ: Ben Faber Name/Title: Mailing Address: 6951 Hannegan Road Lynden, WA 98264 Physical Address: (city, State, Zip) 6951 Hannegan Road Lynden, WA 98264 (City, State, Zip) Telephone: 360.815.1326 Fax: 360.354.0335 E-mail Address: Ben@faberconstruction.com 3. Please check the appropriate box to identify the legal status of the entity making this proposal. Corporation Partnership Limited Liability Other (explain) Please provide the following license information: Idaho Public Works Construction Management License #:030190, held by Robert B. Fraser (name of licensed CM who will be responsible). Idaho Public Works Contractor License#:073162- UNLIMITED- 1 -3 REQUEST FOR QUALIFICATIONS -7- 4. Contact information of the office where your project team will be located and from which the work for this assignment will be conducted, if different than I." above. Firm Name: Faber Construction Mailing Address: 275 North 3rd East Street, Mountain Home, ID 83647 (City, State, Zip) Physical Address: 275 North 3rd East Street Mountain Home, ID 83647 (City, State, Zip) Telephone: 208.960.9166 Fax: 208.960.9166 E-mail Address: robf@faberconstruction 5. Provide a letter from Surety for the work you propose on. 6. State the contact information for your current insurance company(s) that provides coverage for your firm in the areas of liability, builder's risk and workers' compensation. Company Name: HUB INTERNATIONAL Agent Name: Chad Epple Address: 12100 NE 195th Street Suite 200 Bothell, WA 98011 (City, State, Zip) Telephone: 425.489.4500 Fax: N/A E-mail Address: chad.epple@hubinternational.com REQUEST FOR QUALIFICATIONS -8- HUB HUB International Limited 0 12100 NE 195th Street,Suite 200 Bothell,WA 98011 P:(425)489-4500 F:(425)485-8489 www.hubinternational.com 5/8/2025 Wendy Davis City of Twin Falls Parks& Recreation 136 Maxwell Avenue Twin Falls, ID 83301 Subject: Faber Construction Corporation - Bonding Capability Vista Bonita Park Expansion—CM/GC Services Dear Ms. Davis: We have been asked to provide information regarding the bond capacity of Faber Construction Corporation. Faber Construction Corporation has a tremendous amount of construction experience in completing projects on time and within budget. All projects have been completed by Faber Construction without the help of the surety company. They have always conducted business matters in a highly professional manner, and we hold their firm in high regard. The contractor is a frequent user of surety credit and qualifies for single projects in excess of$30,000,000 with an aggregate in excess of$100,000,000. We do not anticipate any problems providing the necessary performance and payment bonds. Please note that the decision to issue performance and payment bonds is a matter between Faber Construction and Ohio Casualty and will be subject to our standard underwriting at the time of the final bond request, which will include but not be limited to the acceptability of the contract documents, bond forms and financing. We assume no liability to third parties or to you if for any reason we do not execute said bonds. If we can be of any further assistance, please do not hesitate to contact me. Sincerely, The Ohio Casualty Insurance Company e4m f".� Chad M. Epple Attorney-in-fact '0� Liberty POWER OF ATTORNEY Mutual® Liberty Mutual Insurance Company Certificate No: 8213295-969315 SURETY The Ohio Casualty Insurance Company West American Insurance Company KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Adam Howard,Carol Lowell,Chad M.Epple,Dana Brown,Danielle Bergere,Emma C Doleshel Grant E.Ingalls Heather L.Allen Jim S.Kuich Jim W.Doyle Kirsten K. Jordan,Michael A.Murphy,Natalie C.Chau,Ted Baran,Theresa A.Lamb all of the city of Bothell state of WA each individually if there be more than one named,its true and lawful attomey-in-fad to make, execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,reoognizances and other surety obligations,in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 6th day of March , 2025 Liberty Mutual Insurance Company o°jY�;+oD 1 CNU`4rFo`q,a"t n Sc ,ill( ° AMPr&,Fo�Zco+ a• �a° N The Ohio Casualty Insurance Company a� DIAN a�c+ West American Insurance Company 912 00 9 1991 no )d" O 9a a C By: = c @ Nathan J.Zangede,Assistant Secretary o N State of PENNSYLVANIA G ss a� County o(MONTGOMERY o On this 6th day of March 2025 before me personally appeared Nathan J.Zangede,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Isurance to a —co Company,The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes s therein contained by signing on behalf of the corporations by himself as a duly authorized officer. C c IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year first above written. ¢O M P PAST tlC L Q4if'�Oo NWF F! Commonwealth of Pennsylvania-Notary Seal ° 'pli v Teresa Paslella,Notary Public — Montgomery County ` CC COF My commission expires March 28,2029 By• �iQ/' -R� p U�-' �P Commission number 1 Member,Pennsylvania Assooation of Notaries - I--a Pastella,Notary Public O�C 10 4? This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company,Liberty Mutual 3 a E•� Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: a K w ARTICLE IV—OFFICERS:Section 12.Power of Attorney. °C Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject to such limitation as the Chairman or the g L) President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal,acknowledge and deliver as surety 2any and all undertakings,bonds,recognizances and other surety obligations.Such attomeys-in-fact,subject to the limitations set forth in their respective powers of attorney,shall a have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.When so executed,such o a instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under the _ R provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. 0 LL c ARTICLE All—Execution of Contracts:Section 5.Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president,and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings, bonds,recognizances and other surety obligations.Such attomeys-in-fact subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company.When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation—The President of the Company,acting pursuant to the Bylaws of the Company, authorizes Nathan J.Zangerle,Assistant Secretary to appoint such attomeys-in-fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Authorization—By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with the same force and effect as though manually affixed. I,Renee C.Llewellyn,the undersigned,Assistant Secretary,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 8th day of May 2025 P�1NSUR9 POSY INS&, a%NSUR jo°ap0 r'ro ctn cJ o°ap°q'r�2c+ VP c°ap°t,r yc a m : F 4F ? Fo to 1912 0 1919mi 1991 0 ,Gy`. �C S 1. O Q O O By. d"��`pq°NUB"aL =ct Nq MPS da; le �No"'Jo. .pa Renee C.Llewellyn,Assistant Secretary LMS-12873 LMIC OCIC WAIC Multi Cc 02124 7. If you answer Ito any of the following questions, provide complete explanation on a separate sheet. a. Has any one of your current or former sureties or bonding companies ever been required to perform under or canceled a bid bond, labor or material payment or a performance bond issued on your firm's behalf? £Yes £ No b. Has your firm ever been denied coverage or had coverage terminated or cancelled by any insurer during the past five (5) years? (If so, please state the company, date reason and specific details.) £Yes £ No C. Within the past five (5) years has your current firm or any predecessor organization been involved as a party or filed a claim in any bankruptcy, litigation, mediation or arbitration proceedings? £Yes £ No 8. Name, title and signature of your firm's officer who was responsible for the preparation and hereby verifies the accuracy of your proposal. Printed Name: Ben Faber Title: President Signature: Date: 8/30/2024 REQUEST FOR QUALIFICATIONS -9- The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications COMPANY PROFILE 12 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications 3. COMPANY PROFILE SHARED VALUES 10+ PARKS AND RECREATIONAL PROJECTS We understand how important the Vista Bonita Park Expansion is to the Twin Falls community. This project 31; YEARS OF COMMERCIAL EXPERIENCE will create a space where families gather, kids play, and neighbors connect. From day one, our focus is to work 175+ alongside the City to deliver a park that reflects shared DEVOTED TEAM MEMBERS values of stewardship, vitality, and smart investment in the future of Twin Falls. $120M+ ANNUAL REVENUE That commitment is backed by deep experience. With over three decades of commercial work and a portfolio of more than 10 completed park and recreation Our focus is to solicit 100%of projects, Faber brings strong preconstruction, phasing, our bids from the region in blue. and site coordination skills to this work. We understand , +� multi-scope sites with civil, landscape, and amenity features, and we tailor our process to keep projects 85 Miles -° clear, collaborative, and on schedule. For Faber, this is personal. We are not just builders. We are partners in delivering a project that fits the land, serves the people, and strengthens the small-town _. character that makes Twin Falls special. Shared Team Objectives PROXIMITY TO JOBSITE With our office in Mountain Home and our field staff in King Hill,our team Building a Park That Reflects Twin Falls' Identity is positioned well to serve daily oversight and clear communication.We're committed to regular in-person OAC meetings and building a strong, Delivering on "Grow With Us" in Real Time responsive partnership with the City.This allows us to provide the best possible management to this project. Aligning Design with Budget from Day One COMMITTED TO LOCAL TRADE PARTNERS Hiring Local to Strengthen the Regional Economy We work with trusted subcontractors across the Snake River Plain and understand the local pace,pricing,and delivery conditions.Our goal is to Making Value-Based Choices at Every Step bid this project with 100 percent regional participation,and we've already identified partners ready to get to work. EARLY TEAM INTEGRATION RESOURCES Faber brings 38 years of construction experience, much of it focused on projects that rely on early collaboration and careful Our Mountain Home office shares the backing and use of community resources. Preconstruction is a core strength support from our corporate resources which include the across nearly everything we build.We're especially excited about following team members: the negotiated delivery method,which lets us engage early in design to help unlock the full potential of the project.Our team is ready to LEADERSHIP TEAM MEMBERS support the schedule, budget,and scope by: PROJECT TEAMWORK PRINCIPLES 1s MANAGERS 22 SUPERINTENDENTS • Weekly OAC meetings for clear,steady communication. 10 PROJECT 5 ESTIMATORS Encourage open dialogue to build clear consensus. ENGINEERS • Foster team dynamics rooted in trust and accountability. PROJECT SAFETY 14 COORDINATORS 1 MANAGER 13 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications 2025 MONTHLY REVENUE PROJECTIONS $25,000,000.00 $20,000,000.00 $15,000,000.00 $10,000,000.00 $5,000,000.00 JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 FINANCIAL POSITION $175M Faber is a fiscally conservative company that $150M operates with minimal debt. We have never failed to complete a project and maintain $8 to$10 million in working capital. Subcontractors value $120M working with us because of our reliable on-time $101M payments and the stability we bring to every job. $67M $66M $47M $49M COMPLETED-REVENUE CONTRACTED BACKLOG ANTICIPATED M 0 11 2019 2020 2021 2022 2023 2024 2025 2026 2025 FABER AWARDS _ F � Public Building$5M -$20M Sedro-Woolley Waste Water Facility Public Building $2M -$5M Edmonds Library Renovation Highway/Transportation Under $5M Parkview Safe Routes to School Highway/Transportation $5M - $15M Lake Creek & Norway Park Fish Passage 14 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications A 0 PROJECT APPROACH 15 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications 4. PROJECT APPROACH PRECONSTRUCTION APPROACH We are excited to use the CM/GC delivery method for Vista Bonita. It allows us to work closely with the City of Twin Falls, Faber is committed to intentional Jensen-Belts Associates, and local stakeholders early in the and value-based development process, when collaboration has the most value. That early that strengthens Twin Falls for involvement helps us align with your goals, explore cost- generations to come. effective options, and stay within the target budget. Through structured team meetings and ongoing target value analysis, we will keep everyone informed, involved, and working together toward a successful project. Below are key values that will guide our preconstruction work: ACCOUNTABILITY PRECONSTRUCTION Hold us accountable as we will you. SERVICES DECISION-MAKING Weekly OAC Meetings Clear,timely and solution-oriented decisions. O Nurture a positive&collaborative team atmosphere and seek to EXCITEMENT& ENGAGEMENT Value Design(TVD)tantl your goals to achieve Target Get excited about this project being built! HONEST COMMUNICATION Scheduling We use the Critical Path Method,innovative Honest conversations to protect budget and schedule. 0 technology,and identify&mitigate risk to ensure a predictable schedule. CONSTANT COMMUNICATION Estimating During our weekly preconstruction OAC meetings we need buy-in Continuous estimating to maximize this projects value, from the entire project team to work collaboratively to achieve 0 while staying within budget and schedule.We get the the following: most for you. 01. Understanding Your Priorities Value Engineering From the start, we need to define what will make Vista Bonita Q We look for options and offer solutions to reduce cost a lasting success. Our goal is to design and build an efficient, while maximizing scope. durable park that supports everyday community use and includes as many of your wish list items as the budget allows. Constructability Reviews 0 We use our experience and expertise to confirm the 02. Using Our Precon Prowess To Advise buildability of this project. We will provide consistent updates and clear recommendations on budget, constructability, schedule, bid Bid Prep & Solicitation and value o We utilize our extensive,local subcontractor database packaging, opportunities that keep Vista Bonita 0 to select the trade partners that will deliver the best practical, buildable, and on track. results and price. 03. Establish Accurate GMP Risk Management As the scope takes shape, we will deliver full estimates at O We Identify and mitigate potential problems in the each design milestone and provide real-time cost feedback to design phase before boots touch the ground to keep options clear and the GMP reliable. minimize cost impacts. 04. Establish Reliable Schedule Site Logistics We will maintain and update the Critical Path schedule 0 Proper planning to enhance schedule,minimize throughout design to keep it accurate and predictable, with disruptions,and foster a positive relationship with the g g p p community. a final version submitted to the City of Twin Falls before construction begins. 16 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications CASE STUDY: BUILDING POSITIVE RELATIONSHIPS We build lasting relationships by leading with honesty, accountability, and follow-through. That mindset has helped us earn the trust of clients like Puget Sound Energy(PSE), where consistent performance and clear communication have turned one project into a long-term partnership. Baker River Clubhouse Negotiated GMP I $4.1M 1 2021 Our first project with PSE consisted of the upgrade and restoration,including an interpretive trail,of a 5-acre historic site.On this project,prior to the contract,we worked with PSE,SHKS Architects,and Site Workshop Landscape Architecture to find and offer several VE options and were able to create considerable savings.With such a great working relationship,as this project was still ongoing,PSE invited us directly to begin work on their next project. Snoqualmie Falls Boardwalk Hard Bid I $1.7M 1 2020 i. For our second project,we replaced an existing boardwalk that was in failing condition.As part of a 12-acre Snoqualmie Falls Hydroelectric Museum and Park,the boardwalk serves the public at the original powerplant.Two key challenges of this project were ' maintaining access to the river and working around high transmission lines,which meant our preconstruction efforts and working collaboratively with PSE were vital to delivering a successful project. i Lake Shannon Boat Launch Negotiated I $1.5M 12021 ' After having delivered two successful projects on time and within budget,our third project with PSE consisted of constructing a �* public day-use park at the current Lake Shannon boat launch site.We installed a parking lot,restrooms,and a picnic shelter for public use.This project helped PSE meet Federal Energy Regulatory Commission(FERC)requirements.Please see page 35 for more information on our VE efforts and page 46 for a full project profile. TARGET VALUE DESIGN Target Value Design (TVD) is a process that creates transparent goal setting from day one. We work with your team early to establish the budget, then design the project to fit within it. Instead of creating something first and hoping it works financially, we align cost, scope, and vision from the start so there are no surprises later. For Vista Bonita, we will work with the City and Jensen-Belts Associates from the start to set a clear budget target, then guide design decisions to stay within it. This shared approach builds trust, reduces changes, and keeps the focus on delivering the best possible park for the community. STEPS TO TARGET VALUE DESIGN 0 000 0 0 Q!y:) ® 0 iA SET THE TARGET DEFINE WHAT MAXIMIZE VALUE DECIDE TOGETHER BUDGET FIRST MATTERS MOST WITHIN BUDGET AS ONE TEAM Start by agreeing Work together to Develop the design Use open on a clear, realistic prioritize what is most while tracking costs communication and budget that guides important,whether in real time to make shared accountability to all decisions from the it is space, look, sure it stays within make timely, informed beginning. function,or timing. the budget. decisions together. 17 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications CASE STUDY: SUCCESSFUL T R ET VALUE DESIGN Y r .M 1j Y ;I SKY VALLEY PROJECT YOUTH CENTER INFORMATION The LEED Silver Sky Valley Youth Center is a teen shelter for the Volunteers Contract Type of America Western Washington (VOAWW). It's a 2-story, wood-framed, Negotiated GMP 3,000 sq ft. building comprised of bedrooms, counseling offices and gathering spaces. Initial N.T.E. $1,900,000 Upon qualification-based selection, we joined the team in the Design Development phase and jumped right into preconstruction efforts. Final GMP Transparency was key to our successful TVD efforts. VOAWW presented $1,851,000 their N.T.E., goals, desires and non-negotiables at the initial kickoff meeting and we began utilizing TVD to achieve and exceed those requirements. Preconstruction Timeline Throughout preconstruction we were open and honest with all of our January-June 2024 estimates, risk we identified and logged, potential scope add options tracked in our Design Betterment Log, and all schedule updates. Anticipated Completion May 2025 We steered the design to align with their budget, schedule and aesthetic goal and our final GMP came in almost$50K under the initial N.T.E. with Location rave reviews from the owner. Sultan,WA PRECONSTRUCTION SERVICES PROVIDED: Q Weekly OAC Meetings Q Development of Schedule OWNERREFERENCE Q Bid Package Prep &Solicitation Q Target Value Analysis Q Procurement Planning Q LEED Point Evaluation Jim Lorenz Volunteers of America Q Constructability Reviews Q Construction Logistics 206.730.1127 Q Value Management Services Q Project Management Procedures jlorenz@voaww.org "Faber has been quick to jump in,as necessary,to support the design team and to interact with the city in helping push to secure building permits.With Faber's support during preconstruction,we were able to maintain our project goals without compromising design or quality.After much hard work,Faber was able to hit our budget when they delivered their Guaranteed Maximum Price(GMP)for the project." -Jim Lorenz,Project Manager Volunteers of America Western Washington 18 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications PROJECT APPROACH We believe strong projects start with strong teams. From day one, we will work closely with the City of Twin Falls, Jensen-Belts Associates, and key stakeholders to build trust, share information early, and align around shared goals. This collaboration supports timely, informed decisions that keep design, budget, and schedule moving together. Our approach for each project phase is outlined below. Step One:Vision Validation Step Two: Budget and Scheduling Development SYNCING y VISION1 GOALS ESTABLISHING A CLEAR EXECUTION PLAN a Team & Project Alignment o Milestone Estimate Review& Modifications » In-depth discovery meetings with all parties » Subcontractor bid package solicitation and selection » Coordination within the project team » Leverage trusted trade partners'expertise » Pull Planning Session to determine Critical Path » Utilize Pantera Tools to drive competitive solicitation » Weekly precon OAC Meetings led by Rob Fraser » Discuss communication preferences o Detailed Project CPM Schedule Development a Establish Project Target Budget&Schedule o Discuss,Track, Document& Report » Followed by initial confirmation estimate&prelim schedule » Track&present cost choices in our CBA Log » Spot&resolve design snags in our Constructability Log a Conduct Preliminary Site Analysis » Identify and mitigate risks in our Risk Registrar » Create a plan to ensure site and community safety during construction of this project o In-Depth Project Document Review o Tech Tools Activation » Twin Fall's approval of overall execution plan » Integrate team into Procore,Matterport,Propeller&more. o Develop Logistics and Procurement Plans 3Everyone at the Table Upgrading the Plan with Expert Input W 0 Truly understand Twin Fall's matrices for success and craft a 0 Identifydesign conflictsand adjust1 real-world Y design1 .1 1 surprises during1 1 Step Three: Final Coordination Step Four: Project Execution = FINALIZING OUR SETUP TOP-NOTCH 3 o Finalize Pricing o Total Project Management and Oversight » Establish reliable,predictable GMP » Regular progress meetings to maintain alignment » Utilize competitive subcontractor bidding • Budget&Schedule tracking&reporting • Identify&mitigate risk to avoid disruptions o Finalize Schedule » Manage and oversee daily activities including: » Confirm and distribute detailed construction schedule • Site&safety management a • Subcontractor&material management a Continue Recurring Progress Meetings o Detailed Documentation and Review » Ensure entire project team remains up-to-date on all items » Harness Procore to ensure the following: a Finalize Design Documents • Cost Control • Schedule Compliance o Construction Coordination Meeting • Quality Control » Handoff session between precon and construction teams • Team alignment and knowledge a Permit Submission o Final Inspections&Closeout Documentation aLoading the Blueprint Meticulous Tracking&Reporting with Procore yaj 0 Finalized i documented design,budget '1ule items for e All project details live in Procore f1from the Fseamless handoff1 the construction1 ensure no snags project 1 duration of the project 19 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications BID PACKAGES & SOLICITATION We approach bid solicitation with a strong focus on —_ engaging qualified subcontractors from the Twin Falls region. For Vista Bonita, our goal is to maximize local participation to strengthen the economy, build community connection, and deliver the best value. We focus on early outreach, clear communication, UTILIZING TECH: PANTERA TOOLS and sharing detailed project information to ensure Pantera's Invitation-To-Bid (ITB)feature helps us streamline local trades are informed, prepared, and excited to be the bidding process and efficiently generate interest from involved. Our structured process is outlined below. local,qualified subcontractors.With ITB,we send customized invitations that include project details,scope,deadlines,and 01. Develop clearly defined,gap-free bid packages more to our database of over 5,000 subcontractors. Using Pantera,we ensure the following: 02. Engage our local network of vetted trade partners a Targeted Outreach • Transparency&Tracking 03. Host pre-bid meetings to create an inviting project Bid Comparison& 04. Use historical cost data and market trends Customized Invitations Evaluation 05. Incorporate ESDS compliance requirements • Automated Reminders a Prequalification& Compliance Management MAXIMIZING LOCAL PARTICIPATION SUB-910S REQUESTED We're committed to working with local businesses throughout this project. We SKY VALLEY YOUTH CENTER Bid Date:July 24,2024 at 2 Pm PST will take the following steps to do so: Projeet Description: Located on a 2.Saoe parcel draeed by voFunteers pf Pimento W4 iem washingw lvOAwwl,the sky valley 01. Personalized Outreach Youth C6nter mll mt adjacent to the sky alley Boys a Gid Club end other senrce buildings en the Campus in Sultan.washmgtw The project Inches construct of a 3.375 square foot 2-story Meet with our trusted, local trade partners to share insights about the project newsteu�retohouseas:.-Dedee,argenty"terf«yonn The fatuity wA contain a large g ilhenng space,a study area.a resrdene9l and gauge their Interest. style won three dry beroom, site Landscaping,nd two a"Old�wrll (taco tch three beds) P alto fall under the scope of vrork.The prated is being designed for 02.Town Hall Style Pre-Bid Meetings sustainatNhtytdtheatandandsofLEERS+rrer. Plans and specifinabons can be dgoally downloaded Establish a clear understanding of the project early on to support more °'`"�g°stoFab�e'�gb«s dbbelrn.�"grou"eq hnos:f"vruw.fabertonss! accurate bids, minimize delays, and ensure a smoother construction process. ebara 3C,2HC62CP n.rtNonotans_ta�lg and Comact.Peter Johnson,Preconsbucnon Manager 03.Advertise Bid Opportunities Through Local Channels P.a.r®}abertanetructonx We Ian to advertise bid opportunities through a multitude of mediums FABER CONSTRUCTION CORP N pp g MBFR $951 Hannegan Rd.Lynden,WA98264 including the DJC, the Times-News, and magicvalley.com. (360)354.3500.FAX:(360)354.0335 Yh me an Eqw dpOerNaYly Empbyw and re (tiles Nam Y evbwnnaaas nBE)V D1—&01tsged IDt1E),,liusin ss Enslp, l$BE), 04. Break Down Bid Packages Strategically ®,^ M,Me[,v. naDi.a�.d ae,na..sEmep,e, Break down bid packages strategically to create more opportunities for local �� W. ""D°""ABC and"GC AGC0 e FABERCC.at788 ($873614) subcontractors and suppliers to compete and contribute to the project. VALUE ENGINEERING RISK ANALYSIS Our goal is to design for value from the start, saving Our proactive risk plan identifies key issues early and money and avoiding costly redesigns with the following: outlines clear mitigation strategies for the following items: 01. Evaluate Cost Drivers 01. Material Availability Analyze key factors that affect the budget, such as materials, building systems, and construction methods. 02. Cost Escalations 02. Develop Value-Driven Alternatives 03. Labor Availability We find creative ways to improve function, increase 04. Site Conditions efficiency, and reduce long-term costs. 05. Permitting& Regulatory Compliance 03. Document and Implement Selected Options 06. Weather Impacts We log all VE options with cost and quality impacts,then track approved items through implementation. All these items are tracked in our Risk Registrar. 20 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications OFFERING & TRACKING ALTERNATIVE SOLUTIONS We use the logs below to track meeting minutes, budget updates, schedule progress, RFIs, and more. These updates are reviewed and explained during our weekly progress meetings. This approach allows us to present and monitor alternative solutions in a clear and organized way. CONSTRUCTABILITY REVIEW LOG DRAWING CONTROL LOG We identify, document, and present design We will provide a detailed list of construction documents recommendations in this log(see page 22 for an and revisions as we progress through all phases of design. example). Only the alternatives agreed upon by the team and shown to add the most value will be implemented. RISK REGISTRAR We identify and track all potential risks, log them in our VALUE ENGINEERING LOG risk registrar, and then find solutions to mitigate them. Our team breaks down each line item to identify potential savings without eliminating critical elements of COST CONTROL LOG the project. We then track the status of these options in Under this GMP contract, Faber will maintain an open- our VE log which is shown on page 35. book policy, allowing you to view all updates at all times. QUALITY CONTROL DURING QA/QC ACTION ITEMS PRECONSTRUCTION Quality control during preconstruction starts with getting Constructability Analysis& Reviews the details right. For Vista Bonita, we will work closely Make sure the design is practical and buildable. with the City of Twin Falls and Jensen-Belts Associates Subcontractor Prequalification to review drawings, catch issues early, and ensure all Q Choose the right teams with the right experience materials and systems align with project goals. Our and strong track records. QA/QC plan will include project-specific checklists and scheduled inspection points to keep quality on track. Schedule Reviews Q Allocate time for proper inspections and We will coordinate early with subcontractors and quality checks. suppliers to set clear expectations. All quality efforts, Life Cycle Analysis including inspections and documentation, will be Q Assess long-term costs, durability, and tracked in Procore from preconstruction through sustainability of materials and systems. closeout. PROCUREMENT MANAGEMENT We identify needs early to define materials, equipment, and scope clearly. This helps avoid surprises with long- PROCUREMENT lead items, labor, or costs during construction. Rob Fraser, Preconstruction Manager Current Construction Environment: With • Identifies early procurement needs for critical ongoing labor shortages and cost fluctuations in materials and scopes during design materials like steel, irrigation components, and • Works with Nathan to verify pricing, labor availability, site furnishings, early procurement and supplier and market volatility coordination will be key to keeping Vista Bonita on Nate Jackson, Project Manager schedule and within budget. • Leads procurement strategy for materials and labor • Coordinates with design and field teams Long Lead Times: We identify critical items early, • Issues purchase orders, scopes subcontractor issue targeted procurement packages, and work packages closely with suppliers to secure timelines and keep Don Kiggins, Superintendent delivery on track. • Delivery and Sequencing Logistics 21 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications CONSTRUCTABILITY REVIEWS �� 3MD24 en conduct constdesign can b lity reviews to CONSTRUCTABILITV REVIEW LOG ensure the design can be built efficiently and effectively in the field. During these Pr.1-1 ID ° reviews, we present real-time alternative approaches for the full team to evaluate. ° This collaborative method allows the FooawMwsaF,Ea -N project team to apply solutions that a� m„pro., °,e,�a.,ee�,�•.°°"e„° "e-°„� °,•e.�� m - improve the budget, schedule, and safety ° before issues become costly. re. 5 CD ° ne 11 re ° °° To the left is an example of our „ Constructability Review Log from a recent CM/GC project. In this log, we use our expertise to recommend improvements focused on the following aspects: .I r Budget • Schedule . - - Quality t ciose1 im•.�mq'ic•,msN IIIweiK It thtl ,in,n,nonvarki ,nm ie ° ea "-eea N I Ease of Construction �' "am°°'re ereommeoen"°°°'°'°�1er Scope Completeness&Interpretability STAKEHOLDER ENGAGEMENT Throughout every phase of construction, our team will keep the City of Twin Falls and all stakeholders fully informed on project progress. We are committed to open, honest, and timely communication at every step. WEEKLY OAC MEETINGS Our team will lead weekly OAC progress meetings to review the past month's progress, provide budget and schedule updates, share the three- Wr— , week lookahead, highlight upcoming milestones, and discuss safety and community engagement efforts. These meetings are a space for open "� dialogue, and we actively welcome your input. REAL-TIME DOCUMENTATION AND COMMUNICATION Project Engineer, Thomas Tillman, will ensure all items relating to schedules, ' budget, submittals, RFIs, photos, contracts, and more are documented and uploaded to our project management software, Procore, as well as you web- based FTP site. These items are constantly updated and are able to live- viewed from design through post-construction. CONSISTENT SITE WALKS We will schedule key milestone site walks such as post-foundation, pre-roof, and rough MEP to give the City a clear view of progress and invite valuable I feedback. These walkthroughs help ensure alignment with project goals, uphold quality standards, address issues early, and build confidence in the finished product. 22 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications CONSTRUCTION APPROACH Once construction begins, our experienced team will lead with clear communication, hands-on site management, and a commitment to transparency. We will maintain an open-book budget, provide live-tracked documentation and reporting, Faber is committed to preserving and prioritize safety and quality control every step of the way. natural beauty while expanding access to outdoor recreation. EXPERT PROJECT MANAGERS Our team brings integrity,work ethic,teamwork,service,and creativity to every phase of the job.These values guide how we plan, communicate,solve problems,and deliver results. 01. Urivaled Experience CONSTRUCTION Our project managers have a long track record of delivering SERVICES beyond expectations. Their experience and local insight allow them to make confident decisions and solve problems Project Management quickly. We are expertly precise and pointed when managing 02. Soft Skills, Second to None the budget,schedule,risk,and quality. For Vista Bonita, open communication will be a top priority. Scheduling We will hold regular in-person meetings to keep the City fully We implement our executive schedule and present informed and involved at every stage.You can expect full 0 three week look-ahead schedules at our regular transparency and a collaborative,team-first approach from progress meetings. start to finish. 03. Utilizing the Latest Technology Safety We ensure buy-in from all Faber employees and trade We use leading technology to track, document, and 0 partners utilizing our accident prevention program and communicate clearly. This helps us deliver the consistency safety checklist. and care our clients expect from Faber. Cost Control UTILIZING TECHNOLOGY 0 We use innovativeeensure the project remains withict n management ement skills to ensure the project remains within the GMP with no surprises. �n..r.ro.r.ao wmws...ncrc coos Documenting& Reporting 0 We track and document all project items regarding budget,schedule,RFls and more in Procore for you to view at all times. Site Management PROCORE 0 We guarantees high-level site and safety management while coordinating and sequencing trades and We use Procore, a project management platform that gives your team deliveries. real-time access to costs, progress, and updates throughout construction. At regular meetings,we review any changes, upcoming tasks, and how Quality Control everything compares to the budget.This transparency keeps everyone 0 Our three phase quality control program is integrated informed, builds trust, and helps us stay aligned every step of the way. from day one and ensures we exceed quality expectations. Using Procore,we will also track the following,available for your viewing at any time: Community Relationships 0 Our team keeps the public updated on activities to Line Item Costs Invoices Labor POs Permits promote a positive relationship for the duration of Purchase Orders Progress Billing Subcontracts Fee construction. 23 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications SITE SAFETY PROGRAM SAFETY CHECKLIST Safety is a top priority at Faber, especially on community- centered projects like Vista Bonita. Our site-specific safety Site-specific orientation for Faber plan will focus not only on protecting workers, but also 0 Construction team members and on safeguarding the public throughout construction. We subcontractors as they join the project will establish clear protocols for site access,fencing, signage, and phasing to ensure the park remains secure Up-to-date and maintained training for all and the community stays safe. Our Safety Manager and 0 workers Superintendent Don will lead daily efforts to uphold these standards with all Faber employees and subcontractors. 0 On-going,daily safety management The graphic below outlines key elements of our active site performed by the superintendent safety program. 0 Several monthly site audits are performed j by the Safety Manager .r a� r-..ice� ---����.G.. 1"=�•�T_` "-- -- All workers must report any and all near 0 misses and accidents - 0 Weekly site-specific toolbox meetings Mandatory fencing around the entire site SIGNAGE:Control zones are placed clearly mark potential Signage around perimeter to inform the hazards to keep workers&pedestrians safe. 0 public on construction activities FENCING:6'chain link fence surrounding construction site for site and pedestrian safety. QUALITY CONTROL CRANE SAFETY:Crane safety program,certifications, We are committed to building Vista Bonita to the inspections,required documentation,and specialized training. g highest quality standards. Superintendent Don will lead SITE MANAGEMENT our QA/QC process with a hands-on approach and close attention to detail. Effective site management starts in preconstruction Pre-Installation with a clear logistics plan that reduces risk, supports We'll engage early to build trust and align workflow, and respects the surrounding neighborhood. expectations. Pre-install meetings will cover At Vista Bonita, we aim to be good neighbors by safety, materials, and methods to ensure quality. minimizing disruptions and building community trust. Below are the steps Don will take to ensure a safe, Material Verification efficient, and well-managed site: °- Our team reviews materials on-site before install 01. Communication and Coordination ' to ensure they match submittals and integrate Develop and coordinate an in-depth site logistics plan to smoothly, preventing issues early. minimize disruptions, and provide regular updates for the community about the schedule, disruptions, and safety Initial Work Inspection measures. E We inspect completed work early to confirm 02. Detailed Progress Monitoring and Reporting a quality, catch issues, and keep progress aligned Conduct daily walk throughs to ensure quality and safety with project goals. standards.Track and log detailed records of current progress completed work and all site and safety inspections. Continued & Close Out Inspections We hold trade partners to high standards, 03. Educate and Supervise Workers O reviewing work against benchmarks and Inform and enforce site-specific conduct rules to all works correcting as needed.At closeout, a detailed and host regular progress meetings with key subcontractors punch list ensures every scope is complete and and initial project meetings with all workers. built to last. 24 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications COST CONTROL SCHEDULE CONTROL Controlling cost starts with smart planning, but it Schedule success starts in preconstruction and is takes steady execution to stay on track. While most maintained through clear planning and coordination. cost certainty is locked in during preconstruction, For Vista Bonita, we are already building a detailed CPM we continue to manage risk and protect the budget schedule that includes long lead items, phasing, trade throughout construction. Our team maintains a close timelines, and key milestones. As design evolves, we will watch on cost impacts using detailed tracking, real- refine the schedule with input from the City of Twin Falls, time reporting, and schedule alignment to avoid delays Jensen-Belts Associates, and all stakeholders to keep and scope creep. the full team aligned. We rely on a skilled, prequalified workforce and a Once construction begins, we manage progress using proactive approach to field coordination. During three-week lookaheads, monthly CPM updates, and construction, we enforce cost control through accurate weekly team meetings. Microsoft Project and Procore forecasting, tight change management, and consistent provide visibility, real-time tracking, and the flexibility communication with the City. These efforts ensure to adjust as needed. This approach helps us anticipate that the value we established early carries through to issues early and stay focused on delivering the project project completion. on time. Please see Section 5 for an in-depth review of our Please see Section 6 for an in-depth review of our budget control practices, and how we can ensure you scheduling systems, preliminary schedule, and how will not experience any surprises when it comes to the our use of innovative technology sets us apart from the budget of this project. pack. DOCUMENTING AND REPORTING We consistently track and organize all key project information, including meeting notes, budget updates, schedule progress, and field activity. While this information is available online at any time, we also walk through updates during weekly progress meetings to keep the City informed and involved. These meetings are a two-way conversation, allowing space for input, questions, and shared decision-making. Here is how we plan to track, document, and report throughout the project: MEETING MINUTES & RFIs At every weekly progress meetings we note and provide meeting minutes, including the 12 Outlook.com list of action items,to all stakeholders upon meeting completion. PROCORE� From our kickoff meeting forward, using Procore, any and all RFIs are submitted and assigned to whoever is requested. After setting a due date for a response, Procore will provide a daily reminder to the recipient until they provide an answer.These RFIs live in Procore through the duration of the project and ensure nothing gets lost or forgotten. BUDGET AND SCHEDULE PROCORE° We use Procore to provide live updates and tracking of all budget/schedule information and potential changes. Our executive schedule and the weekly updated 3-week look ahead schedules live in Procore and can be viewed at all times. PROJECT UPDATES PROCORE° Our Superintendents take a minimum of 3 project update pictures per day which can be viewed by all stakeholders. These pictures are taken to showcase progress, and to ensure quality standards are being met. 25 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications THE FABER TEAM This team knows how to build parks that serve communities. They have delivered public spaces that bring people together, and they understand the care it takes to build in growing, close-knit places like Twin Falls. They bring experience, humility, and steady leadership from the first preconstruction meeting through final walk. You will see the same team throughout the project, committed to clear communication, shared goals, and a park the community can be proud of. City of Twin Falls r Architect Jensen-Belts Associates Faber Construction Todd Nyquist, Principal-In-Charge • Provides Overall Project Oversight • Team Leadership Support Rob Fraser,Construction Manager Nate Jackson, Project Manager • Point of Contact, Preliminary N.T.E.Validation&Estimate,Continuous Point of Contact,Cost Tracking and Budget Compliance,Schedule Cost Tracking&Feedback,Value Engineering Pricing&Tracking Management and Critical Path Oversight, QA/QC Precon:50% Construction:20% Precon:35% Construction: 75% Nate Jackson, Project Manager Don Kiggins, Superintendent • Schedule&Budget Development, Risk Management, Procurement Daily Site Management,Subcontractor Coordination, Community Strategy, Constructability Reviews,Target Value Design Coordination,Safety, Mobilization Planning,Sequencing, QA/QC Precon:35% Construction: 75% Precon: 15% Construction: 100% Thomas Tillman, Project Engineer Thomas Tillman, Project Engineer • Document Control, Design Coordination Support,Submittal Log • Submittal &RFI Management,Schedule Tracking&Coordination, Setup, Quantity Takeoffs, Meeting Minutes&Follow-Up Quality Control Documentation,Cost Tracking Support Precon:35% Construction:35% Precon:35% Construction:35% Don Kiggins, Superintendent Angie Cibert, Project Coordinator • Site Logistics Planning,Constructability Input, Phasing Strategies, Contract&Insurance Tracking, Document Management&Filing, Safety Planning,Trade Partner Coordination Subcontractor Compliance Monitoring, Pay Application Support Precon: 15% Construction: 100% Precon:20% Construction:20% Support Michael Hanna Nathan Ginetz Peter Johnson, DBIA Kelly Todd Civil Estimator Vertical Estimator Chief Estimator Safety Manager 26 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications r 1 ••• has over of •mmercial construction experience • has led many of Faber's most complex site and public projects. His open and honest communication helps build lasting relationships with owners, designers, and trade partners. Todd worked his way • from the field through hard work and . strong ability to problem- solve. His role for this project will include direct oversight of the Vista Bonita Park Expansion, support broad civil and site experience, participate in OAC meetings, and serve in an advisory role throughout the project. TODWS RELEVANT PROJECTS TODD NYQUIST PROJECT EXECUTIVE University of Idaho } „°Ky CERTIFICATES/LICENSES • OSHA 10 Outreach Training Program _ • First Aid/CPR ALDERCREST ELEMENTARY SCHOOL Renovation & modernization of previously shuttered campus. REFERENCES Project Relevancy: $3.7M 1 3 Month Schedule I Alderwood, WA Denny Clouse, Operations Manager Paving&Striping I Landscaping and Irrigation Systems I Public Works North City Water District Sun Shade Structures and Picnic Shelters I Playground Installation 206.366.1842 PSE BAKER RIVER CLUBHOUSE VISITORS CENTER Ruben Sanchez,Capital Projects Coordinator Historic Restoration & Renovation of previously shuttered campus. City of Everett Project Relevancy: Negotiated I $4.1M I Concrete, WA 425.257.6293 Public Works I Public Restroom and ADA-Compliant Facility Integration Site Utilities and Septic System for Off-Grid Operations I Signage Jeff Balentine, Capital Projects Coordinator Granite Falls School District PSE SNOQUALMIE FALLS BOARDWALK 425.647.9815 Reconstruction of aged and failing Boardwalk and Observation Deck. Project Relevancy: $1.6M I Snoqualmie Falls, WA Sensitive Site Logistics I Public Safety I Over 1.5 M visitors per year WHY TODD? Lighting and Electrical for Public Spaces I Retaining Walls • Vast complex parks and recreational project experience PSE LAKE SHANNON BOAT LAUNCH • Hands-on knowledge of alternative Public day use picnic area and boat ramp. delivery methods with GMPs Project Relevancy: Negotiated I $1.6M I Concrete, WA • Ensures project success New Electrical Service I Site Work I Storm Water Control I Restrooms Picnic Shelter I Parking Lot Construction and ADA Compliance 27 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications Rob brings over 25 years of construction management experience, with deep knowledge of southern Idaho's subcontractor market and civil sitework. His collaborative, team-first approach helps guide clients through early •- • • confidence. For Vista Bonita, Rob will lead the preconstruction process in close coordination with the City of Twin Falls and Jensen-Belts Associates. He will support design progression, guide contract development, and oversee estimating, CIPM scheduling, and QA/QC planning. Rob's steady leadership will help ensure the project starts strong and stays aligned with the City's goals. ROB'S RELEVANT PROJECTS ROB FRASER IV . 'I1 0 ® - 1 ' &9 CONSTRUCTION MANAGER Bachelor of History University of IdahoIT. ` r �.. Construction Management(Minor) Boise State University i CERTIFICATES/LICENSES • Construction Manager- CMAA MAIN AVENUE LOFTS Ground up apartment building, site development, and utilities. • Idaho Public Works License- Project Relevancy: Design-Build I $12M 1 2022 1 Twin Falls, ID Construction Management Work With City of Twin Falls I Extensive Preconstruction • Nevada State Contractors License Demolition of Existing Building I Design Development I Led Design REFERENCES CROSS HATCH APARTMENTS C. Fred Cornforth, CEO Fully amenitized high-end podium mixed-use building. Castle Creek Construction Management Project Relevancy: CM/GC I $30M 1 2023 1 Garden City, ID 208.459.8522 Extensive Preconstruction Services I Site Work I Utility Coordination Robert A Wright, President Construction Contract Administration I Led Design Wright Brothers, The Building Company EAGLE LAKES SUBDIVISION 208.939.0377 Apartment subdivision in Eagle, Idaho along the Boise River. Bob Smith, Vice President Project Relevancy: CM/GC I $2.3M I Eagle, ID Hutchinson Smith Architects Design Development I Construction Drawings I Permitting 208.338.1212 Extensive Site Work I Parking Lot I MEP Integration WHY ROB? THE GROVE @ RIVERSIDE MULTI-FAMILY • Prioritizes client values & vision in 48 multi-family housing units in heart of the Snake River Valley. design approach Project Relevancy: CM/GC I $12M I Rexburg, ID • Over 25 years of Design/Build Led Design and Construction Administration I Design Development experience in Southern Idaho Extensive Preconstruction Services I Common Areas 28 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications Nate brings over : years of •-rience in construction Associates,estimating,and project delivery,with a strong track record of keeping integrity, problem-solving mindset, and attention to detail, Nate leads with a collaborative approach that keeps teams aligned and goals on projects on time, on budget, and well-coordinated. Known for his For Vista Bonita, Nate will manage the overall project schedule and budget, lead constructability reviews,support value engineering efforts, and guide risk management planning. He will also coordinate subcontractor procurement and maintain strong working relationships with the City,Jensen-Belts • all project partners. NATE'S RELEVANT PROJECTS NATE JACKSON PROJECT MANAGER CAL Christian Northwestern CERTIFICATES/LICENSES � �f • OSHA-10 VANCE US AIR FORCE BASE COMMISSARY REFERENCES 22,964 SF structural steel framed facility. Erik Stewart Project Relevancy: $3.2M 1 22,964 SF I Enid, OK Premiere Builders Inc Public Works I PEMB I Office Spaces I Secure Site Development 903.900.8551 Focus on Function I Long-Term Utility Infrastructure Greg Alexander EDMOND HOSPITAL ADDITION Vintage Realty 36,000 SF structural steel framed, 80-room hospital addition. 214.705.4431 Project Relevancy: $9.6M 1 36,000 SF I Edmond, OK Public Works I PEMB I Utility Coordination I Occupied Hospital John Hough Administrative Spaces I Efficient and Functional Spaces John K Hough Const Inc. DAYS INN ALL-SUITES HOTEL 855.713.1088 Ground up, 48,700 sf, 65-suite rooms hotel. Project Relevancy: $12M 1 48,700 SF I Yuma, AZ Negotiated GMP I Extensive Preconstruction Services I Led Design WHY NATE? Site Work I Permitting I Parking Lot I Contract Administration • Understanding budget constraints to maximize betterments PICCADILLY'S CAFETERIA& RESTAURANT • Strong communication and Ground up, structural steel framed restaurant. leadership skills Project Relevancy: $1.6M 1 5,400 SF I Modesto, CA • Proactive problem solver PEMB I Negotiated GMP I Extensive Preconstruction Services Site Work I Permitting I Parking Lot I Contract Administration 29 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications rT Don brings over 20 years of hands-on construction experience in southern Idaho. A proud local, Don understands the land,the climate, and the people. He brings that knowledge to every detail of site management. Known for his steady leadership, clear 1 ° communication, and practical problem s• _ Don helps --• 1 = �jteams focused and work moving . For Vista Bonita, Don will oversee daily site operations, manage quality control, enforce safety standards, and maintain project efficiency. He is the first one on site each day, providing reliable oversight to ensure the job stays safe, on schedule, and built to last. DON'S RELEVANT PROJECTS DON KIGGINS SUPERINTENDENT Structural & Civil Engineering Idaho State University - CERTIFICATES/LICENSES • OSHA 10-Hour • OSHA 40-Hour HAZWOPER Certified • OSHA 8-Hour Supervisor HAZWOPER AMAZON PRIME AIR CARGO FACILITY • MSHA 20-Hour Ground up air cargo facility inside the Boise Airport. Project Relevancy: $14M 70,000 SF 1 2023 1 Boise, ID REFERENCES Office Spaces I Site Work Sequencing& Phasing I Paving Tim Corder, Sr. Co-Owner MEP Integration &Coordination I Utility Coordination & Infrastructure Corder and White Construction 208.599.2923 ELMORE COUNTY FAIRGROUNDS RV CAMPGROUND Installation of a 80 unit RV campground inlcuding full site amentities. Ray Warner, Superintendent Project Relevancy: $2.3M 80 Spaces 1 2020 1 Glenns Ferry, ID Warner Excavation Public Works I Site Work MEP&Overall Coordination I Paving 208.565.7487 Utility Coordination & Infrastructure I Excavation Stacey Claus, Superintendent LINCOLN COURTS NORTH JP2 Construction Ground up construction of 30 unit multi-family complex. 208.724.1763 Project Relevancy: $3.5M 1 36,000 SF 1 2024 1 Jerome, ID Site Work I MEP&Overall Coordination I Complex phasing and scheduling WHY DON? Coordination with Jurisdictional Agencies I Subcontractor Management • Innovative thinking& problem- KINPORT SUBSTATION solving attitude High-fencing around Idaho Power Substation. • Builds positive relationships with the team,subcontractord and community Project Relevancy: $6.4M 1 22,929 SF I On-Going Bellingham, WA • Safety first mindset Public Works I Heavy Infrastructure &Site Systems Sequencing Coordination with Utility Providers I Site Work 30 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications consistencyThomas combines his background in Civil Engineering and Construction Management with strong field experience to keep every detail of the project organized and on track. His precision and budget, -• quality, • safety metrics includinghave made him a key part of successful fast-paced projects, of • Resort. For Vista Bonita,Thomas will manage project documentation through Procore, • • • accessible toAssociates, • all stakeholders. alignedattention to detail and proactive communication will help keep the entire team throughout construction. TOM'S RELEVANT PROJECTS THOMAS TILLMAN �7 SR. PROJECT ENGINEER Om o Unihytranslt Civil Engineering Everett Community College E�1,1970 Construction Management ' Edmonds Community College `' r`• CERTIFICATES/LICENSES COMMUNITY TRANSIT HQ RENOVATION • 16hr AGC Educational Foundation Full renovation of the Community Transit headquarters. GC/CM Workshop Project Relevancy: $27M 1 70,000 SF 1 2022 1 Everett, WA REFERENCES Public Works I Complex Sequencing and Phasing I Code Compliance Ryan Little, Owner Agency Coordination and Oversight I Operational Functionality Reliable Labor Services COMMUNITY TRANSIT VEHICLE STORAGE AND FACILITY 425.350.8967 Vehicle storage,training facility and building renovations. Aaron Grey, Project Coordinator Project Relevancy: $7.7M 1 4.5 acres I On-Going I Everett, WA T&C Permabuilt Public Works I Vehicle Storage and Maintenance I Parking Lot 360.202.4869 Agency Coordination and Oversight I Operational Functionality Dan Jerome, Project Manager ANGEL OF THE WINDS RV RESORT Community Transit Fast-tracked construction of a state-of-the-art RV resort. 425.330.7846 Project Relevancy: $12M 1 20,000 SF 1 2024 1 Arlington, WA Accelerated Schedule I MEP Coordination I Preconstruction Efforts WHY THOMAS? Office Spaces I Long-Term Utility Infrastructure I Focus on Function • Expertise with innovative technology HOLDEN VILLAGE PORTAL MUSEUM to enhance project efficiency • Significant experience with ground Museum and a program space for Holden Village on Lake Chelan. up construction regarding admin Project Relevancy: $2.1M 1 10,000 SF 1 20251 Chelan, WA buildings GC/CM I Negotiated GMP I Panelized Structure I MEP Coordination Multifunctional Building Use I Accelerated Schedule 31 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications r1Angie requirementsyears of experience-several of those with her own construction company. She brings a depth of industry knowledge and construction management experience providing a key factor to our projects staying on budget and schedule. Her day-to-day activities include collaborating with the project team to ensure cost, schedule, meetings, deliverables and • documented. ANGIE'S RELEVANT PROJECTS ANGIE CIBERT PROJECT COORDINATOR Ait.7i w- CERTIFICATES/LICENSES •, �' _t. I " • CAD Design 20/20 y sr i t • Notary ate► � :. .� :_ . ir.,,„i,i� PSE BAKER RIVER CLUBHOUSE VISITORS CENTER REFERENCES Historic Restoration & Renovation of previously shuttered campus. Ruben Sanches, Project Manager Project Relevancy: Negotiated I $4.1M I Concrete, WA City of Everett Interpretive Loop Trail with Hardscapes and Interpretive Exhibits 425.754.3513 New Underground Utilities&Site Work I Landscaping Diane Pottinger, District Manager COMMUNITY TRANSIT VEHICLE STORAGE AND FACILITY North City Water District Vehicle storage,training facility and building renovations. 206.362.8100 Project Relevancy: $7.7M 110 acres I On-Going I Everett, WA Cindy Nakahara, Office Manager Public Works I Vehicle Storage and Maintenance I Parking Lot Scapes & Co Inc. Agency Coordination and Oversight I Operational Functionality 425.397.7665 NORTH CITY WATER DISTRICT MAINTENANCE FACILITY Public works fleet maintenance and administrative building. WHY ANGIE? Project Relevancy: $4.9M 1 18,365 SF 1 20201 Shoreline, WA Public Works I Site Work I Paving and Striping • 25 years of construction Utility Coordination I Secure Site Development I Office Spaces management experience • Hands-on knowledge of complex ANGEL OF THE WINDS RV RESORT PEMB fleet services projects Fast-tracked construction of a state-of-the-art RV resort. • Expertise with innovative technology Project Relevancy: $12M 1 20,000 SF 1 2024 1 Arlington, WA to enhance project efficiency Accelerated Schedule I MEP Coordination I Preconstruction Efforts Office Spaces I Long-Term Utility Infrastructure I Focus on Function 32 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications i 0 TOTAL PROJECT BUDGET CONTROL 33 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications S. TOTAL PROJECT BUDGET CONTROL REAL-TIME ESTIMATING & BUDGET CONTROL & PREDICTABILITY LOCAL MARKET CONDITIONS We know how important it is to align expectations with what the budget can truly support. At each OAC Our team uses ongoing cost estimates instead of only meeting, we share transparent, up-to-date estimates estimating at certain milestones.This ensures there are and honest reporting to keep everyone on the same no surprises when setting the Guaranteed Maximum page. Our approach keeps the budget steady and Price. By using Target Value Design (TVD)and constant predictable by following the steps below: estimating, we bring the following value to your project: 01. Predictable Budget PERMIT DOCUMENT REVIEW With constant estimates and open books, the entire • Confirmation Estimate project team is keenly aware of where the estimate sits Z 60% • Constructability Review of All Specs at any given time. W • VE Option Offers&Selections 02. More Wish List Items W • Strategic Procurement Planning Since we are continuously aware of where the estimate CONSTRUCTION DOCUMENTS sits, we are able to add wish list items in earlier and for better pricing. We want to get the most for you! W • Solidify Design Documents with Team 90% • Develop&Solicit Bid Packages LOCAL MARKET CONDITIONS • Continuous&Final Cost Estimate Our team is based in the area and understands the • Establish Mini-MACCs&Final GMP local market inside and out. As design progresses, _J we provide reliable cost input by staying on top of the 0 following factors: Z CONSTRUCTION Management in ntrolrting&Live Viewing 01. MaterialAvailability �p:� ;=��� , po ' Co 02. Trade Partner Interest and Capacity cConstant IdentificationMitigation 03. Long Lead Item Procurement StrategiesUpdates VALUE ENGINEERING Our preconstruction team, led by Rob Fraser, will WHAT WE'LL OFFER carefully review the design as it develops to identify our team aims to maximize scope for the lowest cost and recommend options that maximize value while through Value Engineering.We will offer only options that maintaining the high level of quality we are known for. preserve the following aspects of the fleet services building: 01. Identify Key Items _ As we move through the design phase, our team reviews each line item in detail to uncover opportunities for �I I potential cost savings. LONGEVITY PERFORMANCE 02. Evaluate, Develop and Present Offers We evaluate, develop, and present VE options beginning with the highest-cost Items. Our team • outlines the benefits and potential drawbacks of each MAINTAINABILITY RELIABILITY option. From there, you select the options that best align with your goals. All options are tracked in our VE Log which you can find an example of on page 35. 03. Incorporate Accepted Offers Our team will incorporate the selected options into the design to ensure the project stays within the GMP and AESTHETICS delivers the best overall value. 34 The City of Twin Falls Vista Bonita Park Expansion-Cli Services Faber Construction's Statement of Qualifications VE CASE STUDY: LAKE SHANNON BOAT LAUNCH PSE LAKE SHANNON BOAT LAUNCH e For this project we worked with Puget Sound Energy for 12 months in Preconstruction to achieve Target Value Design and p __ bring the estimated $2M - budget down to $1.5M. To do so, we brought on our civil team to lead the charge, worked extensivley with a civil engineer, utilized local subcontractors and were able to meet their goal and a Saved $100,000 by utilizing local subcontractors. PSE wanted build a successful project. to utilize top soil on site, however after performing constructability CONSTRUCTION COSTS reviews and feasibility studies, we found there was no top soil on site. We were able to utilize our local subcontractor relationships to to bring $1R5M in top soil from a nearby project which reduced the cost by$100K. VE SAVINGS Saved $16,000 on erosion control efforts. $4509000+ a Saved $30,000 with site balancing efforts. • Saved $20,000 with earthwork efforts. VE LOG EXAMPLE PROJECT NAME: Value Englneering Log Building Area 2,080.00 SF Updated: 3/26/2024 Baseline DID Budget 2,350,000.00 $ 1,157.84 Coet/SF CBA I Data Div. I Description ROM Status Approved Pending Rejected STATUS Comments # Estimate A P R Owner Arch Faber Landscape,trash,cleaning,gravel romp, 001 7/27 XX 'By Owner'Items-Targeted Savings $ (50,000) $ (50,000) $ $ gabion step,others? Need foundation asbuilts to see'rf space 002 8/15 06 16"Red-165 ILO 14'Red-190 $ (1,610) P $ $ (1,610) $ X allows.Would shrink crawl space by-2". 003. 7/27 06 2x6 Walls w/Exterior Insulation ILO SIPS $ 13,776 $ $ $ 13,776 003b 7/27 06 2x6 Walls w/2x4 Furring ILO SIPS $ (10,464) $ (10,464) $ $ Verify with Structural if OK,if approved,this X ]rejected. will be accepted and 003b and 004 will be 003c 7/27 06 2x8 Walls w/ZIP Panels ILO SIPS(R-42 Assembly) $ (50,951) P $ $ (50,951) $ 004 8/17 06 Car Decking and R-50 Roof ILO Roof SIPS $ (20,394) A $ (20,394) $ $ 005 7/27 06 Industrial finish GLB vs.Architectural Grade $ (1,815) $ $ $ (11815) Review whh Struct.10k allowance for 006 7/27 06 PT Wood Structure&10k Deck Mtrl allowance ILO Steel $ (84,713) A $ (84,713) $ $ X materials.Concerns on snow drift load. 007 8/15 07 Self Adhered WRB ILO Liquid Applied $ (22,839) A $ (22,839) $ $ 008 8/25 07 All Sheet Metal Siding ILO Wood and Metal $ (67,563) $ $ $ (67,563) Confirm type of wood siding-Other DOES 8/25 07 Wood for Siding&Soffits Supplied by Holden $ (29,342) $ $ $ (29,342) options/grades? 009 7/27 08 Targeted Window&Door Savings $ (30,000) A $ (30,000) $ $ X 010 7/27 09 GWB Wall finish ILO DF Wall Panels $ (46,490) $ $ $ (46,490) 011 7/27 09 Standard Engineered Wood ILO End Grain DF Flooring $ (105,260) A $ (105,260) $ $ 012 8/15 07 No FRP&Engineered Hardwood ILO Ceramic Tile in RR $ (13,187) A $ (13,187) $ $ Target$23/SF Installed vs.$68 013 8/25 09 Gyperete ILO Warmboard Type Product $ (15,338) P $ $ (15,338) $ X X Part of larger HVAC discussion 014 8/25 09 Concrete Micro-topping over Gyperete ILO Flooring $ (127,043) $ $ $(127,043) 015 8/16 21 Fire Protection Alt-No coverage outside+Wet System $ (26,450) $ $ $ (26,450) Requirement cf Assembly occupancy?Part &)r 8/25 23 Eliminate DOAS $ (75,000) P $ $ (63,250) $ X X of larger HVAC discussion 017 8/25 00 Design Contingency-35% $ 75,000 $ 75,000 $ $ 618 8/25 00 Escalation Contingency-5% $ 105,000 $ 105,000 $ $ SUBTOTAL (572,932) (156A%) 1 (131,148) 1284.828) Coat/SF BASELINE DD BUDGET 2,350,000 $ 1,158 SF CURRENTBUDGEr 2,193,144 $ 1,080 SF TARGET BUDGET 2,101,050 $ 1.035 SF VARIANCE(Current to Tarli 92,094 $ 45 SF 35 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications COST CONTROL COST CONTROL CASE STUDY Controlling the project's budget is our responsibility 'I11il! ll from start to finish, and doing it well depends on full transparency. We make sure there are no surprises by keeping communication clear and consistent throughout -------- ---- T l iiicc� the process. Our approach to building a predictable ��. �� , C i�c=.l! M Z=Mll budget includes the following steps: - Sr- 01. Develop Budget Based On Historicals 02. Confirm Through Subcontractor Relationships ;. 03. Identify& Mitigate Risk POINT ROBERTS WATER DISTRICT 04. Continuous Estimating OFFICE & SHOP TEAM DYNAMIC In order to maintain cost control on our Point Roberts Water District Office and Shop project,the following Our team will collaborate closely with all stakeholders, difficult logistics had to be expertly managed: using our expertise to review constructability and offer Logistic#1:Contract converted from Hard bid to Design- consistent cost feedback as the design evolves. Build so our team could step in and help administer a 01. Value Management Options design that met and stayed within their budget. Rob,Jeffery, and Peter maintain detailed logs and lead Logistic#2:The project location required our crews discussions around design improvements, helping the City to travel across the border into Canada and then back clearly visualize the finished project from the very start. across the border into USA during the COVID pandemic which caused border closings. 02. Risk Management Regarding Budget Peter and Nate will identify budget risks, evaluate Logistic#3:Construction of this project also took c place during the height of supply chain issues and cost impacts, and develop, present, and implement procurement problems from COVID. strategies to mitigate them. Once in place, they will continue to monitor costs closely and keep the team Our team overcame and delivered a project with expert updated on progress. level management on budget as seen below. 03. Transparent Monitoring and Tracking original Contract Amount Final Contract Amount Thomas tracks and reports ALL construction costs, including line item costs, fees, permits, and more within $1,414,600 $1,437,547 our open-book budget in Procore and your FTP Site. IF r, W.P.C.CO. Y '`"ill,✓�� "" ., 36 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications 1 0 SCHEDULING 37 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications S. SCHEDULING SCHEDULING SYSTEMS UTILIZING TECHNOLOGY Our scheduling philosophy relies on two key principles to ensure our projects are delivered on time. MS Project Constant Reporting: We believe teamwork and dialogue are the foundation of a successful project. Our team provides weekly short-interval and monthly CPM MICROSOFT PROJECT updates where we implore the City of Twin Falls to give As experts with Critical Path Method scheduling,we us feedback. These continuously updated schedules utilize Microsoft Project to easily identify and signify are field-driven, providing you with information on what the necessary tasks that must be completed for a is actually happening on-site and how it compares to successful project outcome. Our team shares this information with you,every step of the way, and paper. welcomes discourse while advising with our expertise and experience in managing similar scoped projects. Remaining Fluid: We remain predictable by maintaining a fluid schedule. From the initial design meetings our team produces a rough schedule based on historicals PROCEORE° which we begin to hone in as the designs do. We recognize and abide by your needs, and continue to PROCORE identify risk, such as longlead items, shutdowns, and any other potentially disruptive activities to ensure the Procore allows access to all stakeholders to view our executive team is informed and the project stays on time. schedule, weekly-short interval schedules, RFls regarding schedule and all daily project progress pictures taken by our superintendent.This way,you are able to see how the project PREDICTABLE SCHEDULES is aligning in real-time to the schedule put forth. By fully comprehending the importance of staying on schedule, we pride ourselves on taking the appropriate steps to achieve that metric. We combine our team's DURING DESIGN project management expertise, with the use of 1. Develop preliminary schedule with project team. innovative technology like Microsoft Project, Procore, 2. Develop a detailed construction schedule to include and Matterport to mitigate potential risk and maintain a all coordination and long-lead items. predictable schedule. 3. Conduct a scheduling meeting with all selected subcontractors for their input, review, and buy-in. 01. Use state-of-the-art software 4. Finalize the schedule and directly integrate the 02. Identify risk such as long-lead items schedule in all subcontracts and scoping documents. 03. Weekly short-interval schedules 04. Monthly CPM schedule updates DURING CONSTRUCTION 05. Regular progress meetings Create and utilize a 3-week look-ahead schedule which is created and discussed at weekly OAC meetings. Upon the commencement of construction, our Weekly mandatory scheduling meeting for all major superintendent will work with our project manager to subcontractors. manage the CPM schedule, coordinate and maintain • Faber ensures contract schedule compliance by all subcontractor schedules and communicate all putting the necessary people and systems in place. scheduling events with all stakeholders throughout the projects entirety. 38 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications PROJECT SPOTLIGHT: DELIVERING ON A DEADLINE .,R. ANGEL OF THE WINDS RV RESORT For the construction of the Angel of the Winds RV Resort, Faber was responsible for building 4 washrooms, 8 yurts, 9 picnic & barbeque structures, and a state-of-the-art clubhouse. For this size and scoped project, we estimated a 12-month schedule, but the owners needed it done in 9 1/2 months. ,L To achieve the ultimate goal, we broke our entire scope down - into sections. Then, we created individual schedules for the ..r washrooms, yurts, and picnic areas, and the clubhouse was broken into four separate schedules. We precisely coordinated with our subcontractors to the point where we were scheduling to the 4 hours. - , We were able to reach the ultimate goal while maintaining great relationships with the owners, stakeholders, and design team. Duration Cost Location 9 Months $12M Arlington, WA PROJECT SPOTLIGHT: EXCEEDING EXPECTATIONS u LOOKOUT MOUNTAIN PRESERVE TRAILHEAD The Lookout Mountain Preserve Trailhead sits in the heart of Lookout Mountain and provides access to some of the best mountain biking and hiking trails in the area. The scope of work for this project included a new parking lot and approach, installation of a prefabricated restroom, informational kiosk, landscaping, and tie-ins to the City of Bellingham's sewer and water. Our meticulous planning by our project team allowed us to finish this project 1 month ahead of schedule and deliver a meaningful project to the community to allow them to recreate in the hills around Lake Whatcom in Bellingham, WA. Ahead of Schedule Cost Location 1 Month $440K Bellingham, WA 39 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications CONTRACT SCHEDULE COMPLIANCE For Vista Bonita, it is critical that we begin shaping the schedule actively and anticipate issues before the project schedule early and continue refining they affect progress. Staying ahead of long lead it throughout preconstruction to ensure contract times and addressing them early will be key to schedule compliance. During weekly OAC meetings, keeping the work on track. we will align goals and expectations, create milestones and deadlines, identify risks, and The schedule is monitored and updated continuously maintain transparent communication so the full team to support risk mitigation, quality control, and timely stays informed and connected. delivery. Through Procore, the City will have access to the executive schedule and 3-week lookaheads We use the Critical Path Method to determine the throughout the entire project. most efficient duration for the project. Gantt charts will be shared regularly to show both the executive Project Manager Nate Jackson and Superintendent schedule and weekly 3-week lookaheads, helping Don Kiggins will lead this effort, maintaining open the City of Twin Falls stay up to date on progress and communication and flagging critical lead items early. upcoming activities. We will act proactively, even before contract award if needed,to help ensure Vista Bonita is delivered on Our team collaborates closely with the City,Jensen- time and without surprises. Belts Associates, and all project partners to manage KEYS TO CONTRACT SCHEDULE COMPLIANCE DETAILED PLANNING CLEAR COMMUNICATION Clearly defined schedules that all parties are constantly Regular communication between owners, architects, informed and updated on. stakeholders and subcontractors. PROJECT MANAGEMENT& MONITORING TRACKING AND DOCUMENTING Use innovative technology, regular progress meetings and Thorough tracking and documenting of all project our database to ensure compliance. activities, communication and changes. RESOURCE MANAGEMENT RISK MANAGEMENT Constant communication with subs, identification and Identify any and all potential risks early into mitigation of long lead items and procurement strategies. preconstruction and adopting strategies to mitigate them. Pictured above is the Eagle Lakes Subdivision led by our Preconstruction Manager, Rob Fraser.This project consisted of mass grading, pumping and remediation, construction of an island and associated landscaping and features designed for the planned development of multi and single-family communities. 40 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications HOME OFFICE SUPPORT 41 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications 7■ HOME OFFICE SUPPORT Our Mountain Home Office team, backed with years of construction experience, is excited to showcase our ability to deliver successful projects and meet your needs. We are excited to create a staple in the City of Twin Falls that the community will be proud of and utilize for years to come. 1 r•: Todd Nyquist Rob Fraser Nate Jackson Thomas Tillman Commercial Division Sr. Project Manager Project Manager Asst. Project Manager Director PAY REQUESTS FLOW CHART JacksonNate • draft Payment Application 1 Angle Cibert to review forof • 1 ' • • Fraser to review & approval Angie Cibert to 1 submitowner 1 Upon payment from Owner Faber Accounting Department to record payment and issue payment to subcontractors. 42 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications PAST PERFORMANCE 43 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications MWA lip 1 1 r �F SENATOR HENRY M. JACKSON PARK RENOVATION RESTROOMS ROBUST LANDSCAPING PROJECT INFORMATION Start Date: SITE GRADING RECREATIONAL SPACES Spring 2015 PUBLIC WORK PARK PROJECT End Date: April 2016 Total Construction Value: $2.1M This project breathed new life into the unused and aged Senator Henry M. Jackson Park with updated park facilities and the Size: space and programs for people to come together and recreate. 4.5 acres Community gardens, shelters, basketball courts, and a new playground were installed to promote the community working Location: together. The late Senator Jackson was influential in the fields Everett, WA of energy,environment,and natural resources.These attributes are reflected in the parks'sustainable features- rains gardens, OWNER REFERENCE pervious concrete, buildings and seating constructed of gabion walls and steel framing,and more. Dean Shaunessy, Project Coordinator Faber demolished the existing site and performed new site City of Everett grading, stormwater improvements, utilities, parking lot and (425) 257-8325 sidewalk improvements, fencing, new restrooms, shelters, gardening building, community gardens and landscaping. The new Senator Henry M. Jackson Park revitalizes the community with a safer and fun place to spend time. 44 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications EVERETT W A S H I N G T O N Date:8/26/2024 RE: FABER CONSTRUCTION Subj:Letter of Reference To whom it may concern: For over a decade,Faber Construction has proven to be a reliable and respected General Contractor for the City of Everett. Faber Construction has proven that they can bring value to a competitive public bid market and complete projects with integrity and fairness. Listed below are projects Faber has successfully delivered to the City of Everett within budget and on schedule: • Evergreen Way&Pecks Drive-Intersection Improvements [$200 K] • Senator Henry M.Jackson Park Renovations [$2.1 M] • Water Main Replacement"Q" [$ 700 K] • Sewer Regulators R4& R39 [$ 1.55 M] • Evergreen Branch Library Expansion- [$5,25 M] As a result of the trusted service that Faber Construction has provided to the City of Everett, 1 personally ensure that Faber's senior management is notified of any hard bid and/or GC/CM opportunities that Faber Construction may be able to further provide value to the City and our community. Regardless of the nature of the work,primarily civil, improvements to utilities and/or roadways,public spaces,and facility buildings structures,such as the Henry M.Jackson Park and the Evergreen Branch Library,Faber's field and office staff has always provided the highest level of aptitude and professionalism to the public works procurement process. Facilities Administration I look forward to working with Faber Construction whenever possible and recommend them as a qualified and quality General Contractor. 802 E.Mukilteo Blvd Q Building 100 Best regards, Everett,WA 98203 p 0 425.257.6290 Ruben Sanchez ® everetlwa.gov Planning&Capital Dev.Manager everetlwa.gov City of Everett 45 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications a { + V i i iji�• , y uF LAKE SHANNON BOAT LAUNCH KEY TEAM MEMBERS Todd Nyquist, Sr. Project Manager REST. , , ROBUST With an established relationship with PSE,Todd worked with them and our in-house civil team to achieve Target Value F_ SITE -K RECREATIONAL SPACES -I Design and significant savings in Value Engineering efforts. Todd was the point of contact for this project. PUBLIC WORK PICNIC SHELTER PROJECT INFORMATION ELECTRICAL STORM WATER CONTROL Start Date: ADA COMPLIANT WITH HARDSCAPES AND AMENITIES March 2021 The Lake Shannon Boat Launch project consisted of making End Date:November 2021 vast improvements to a gravel boat launch, a gravel parking lot, new truck and trailer parking areas, new day use area, Total Construction Value: walkways, informational kiosks, premanufactured vault toilets, picnic shelter, picnic tables,shade features, and BBQ pits. $1.55M Size: At the time of our first communication for this project, we 4.72 acres were currently working on another project with PSE when their Asset Manager reached out and asked us to help them refine Location: the design of this project and bring down the budget to meet Concrete, WA their goal. Instantly, Todd brought on our civil team to use their expertise to conduct constructability reviews, and feasibility Delivery Method: studies and offer VE options to meet their budgetary goals, Negotiated Bid while maintaining scope. After 12 months of VE efforts from both our civil and vertical OWNER REFERENCE side, we brought the budget down by $450,000, from $2M to $1.55M.Some accepted options include changes to the picnic Jory Oppenheimer, Project Manager shelter, restrooms, roofing material, erosion control, earthwork, Puget Sound Energy site balancing, fine grading, and utilizing local subcontractors and companies to source top soil which saved$100,000 alone. (425) 495-6644 46 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications QPUGET SOUND ENERGY LETTER OF REFERENCE RE: Baker River Clubhouse Visitors Center& Lake Shannon Day-Use Park To whom it may concern: Puget Sound Energy (PSE) is extremely satisfied with Faber Construction's rehabilitation of the Baker River Clubhouse building into a new visitor center and interpretive trail, as well as their work in constructing a new day-use park along PSE's Lake Shannon Reservoir. Throughout both projects, PSE greatly appreciated Faber Construction's teamwork and responsiveness to our requests and questions. Their willingness to work as a true team member with the entire project team (the architectural design firm, Faber Construction's many subcontractors,the design firm's subcontractors, and PSE),their practical and cost-effective VE ideas/solutions, and their overall high quality of work provided for successful projects. For the Baker River Clubhouse Visitors Center, Faber Construction successfully overcame many challenges in improving the approximate two acres surrounding the visitor center and transforming an unoccupied 1914 concrete building into an amazing visitor/exhibition center. These obstacles included restoring an historic structure,temporarily shutting the project down mid-construction for one-year at PSE's request, and working through Covid-19 and supply-chain shortages with minimal delays. For the Lake Shannon Day-Use Park, Faber Construction efficiently took a previously undeveloped area adjacent to Lake Shannon and constructed a beautiful park with several amenities that the public will enjoy for many years. Jory Oppenheimer Project Manager Puget Sound Energy 47 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications b AL _ `F hot SQUALICUM CREEK PARK PHASE 4 F- EARTHWORK -I F- RECREATIONAL SPACES PROJECT INFORMATION _ PROJECT Start Date: L PUBLIC May 2021 The Squalicum Creek Park Project consisted of a 320' natural End Date: turf baseball/softball field and stormwater infiltration systems November 2021 which included gradingforthree stormwater infiltration systems. The work included grubbing and earthwork, fine grading, Total Construction Value: backstop and backboard, ball field fence and mow strip, field $1.3M drainage, concrete flatwork, signage,trail restoration, irrigation system, electrical conduit, site restoration and compliance with permits. Size: 3.7 acres Although this project featured many unforeseen circumstances regarding a complex system of underground sport utilities and Location: buried concrete and other materials, the Lead Consultant for Bellingham, WA the Landscape Architect on this project had this to say about our performance, "I was the Lead Consultant for the design of Phase 3 for Squalicum Creek Park in Bellingham, WA., with OWNER REFERENCE Faber Construction serving as the general contractor.The scope of work included site work„ athletic field construction, utility Jonathan Schilk, Design and Development Division work, irrigation and landscaping, and stormwater infiltration City of Bellingham basin construction. (360) 778-7000 My experience with Faber Construction and their project management team was an enjoyable collaboration. They performed high quality, accurate work while the park remained open,were very responsive to the Owner's needs and concerns, worked collaboratively to minimize change orders,and provided fair and reasonable costs changes were required. I look forward to another opportunity to work with them and wholeheartedly recommend them as a responsive,professional, and honest contractor that will serve your needs. 48 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications OF 5ELLi,V ti Cy u 3 ISHINGt0 Parks and Recreation Department City of Bellingham Date: August 20, 2024 Re: Letter of Reference Squalicum Creek Park Phase 4 Project No. P00461730C/Bid No. 1 B-2021 To whom it may concern, Faber Construction was the general contractor for the subject project, which had two main components: a 320' natural turf baseball/softball field and stormwater infiltration basins. The construction project began May 2021 and then accepted October 2021, at a total cost of approximately$1.3 million. The sport field work included: grubbing and earthwork, fine grading, natural turf infield*and outfield, back stop and back board, ball field fence and mow strip,field drainage, base lines, dug outs and bleachers, concrete flatwork, signage, trail and turf grass restoration, tree planting, irrigation system, electrical conduit, site restoration, and compliance with building and stormwater permit conditions. The construction of stormwater facilities involved grading for three stormwater infiltration basins, and then restore the site with specified topsoil and seeding. The Faber Brothers project manager and site superintendent were easy to work. They were unfazed by working around the existing complex system of underground sport field utilities and frequent discoveries of buried concrete and other materials during earthwork. Faber Brothers staff also responded quickly to resolve issues and concerns raised during construction of the project. Sincerely, 17-)_ --4—,— Jonathan Schilk, RLA Design and Development Division *The work involved Faber Brothers placing City-provided skinned infield mix. However,the supplier could not provide the material as required.Consequently,the City directed Faber Brothers to install natural turf grass in lieu of skinned infield. Main Office Operations Arne Hannah Aquatic Center Bayview Cemetery 210 Lottie Street 1400 Woburn Street 114 Potter Street 1420 Woburn Street Bellingham,WA 98225 Bellingham,WA 98229 Bellingham,WA 98229 Bellingham,WA 98229 Phone:(360)778-7000 Phone:(360)778-7100 Phone:(360)778-7665 Phone:(360)778-7150 Fax:(360)778-7001 Fax:(360)778-7101 Fax:(360)778-7062 Fax:(360)778-7151 Email:parks@cob.org Email:parks@cob.org Email:aquatics@cob.org Email:bayview@cob.org www.cob.org/parks www.cob.org/parks www.cob.org/ahac www.cob.org/bayview 49 The City of Twin Falls Vista Bonita Park Expansion-CM/GC Services Faber Construction's Statement of Qualifications THANK YOU . 50