Loading...
HomeMy WebLinkAboutWOINTERNAL-59 City Work Order 1754 • • of • , To BackupCLOSED Priority: F3 Category: WASTEWATER Submit To: PUENTE, JUAN Initiated By: FREEMAN, ELMER Date: 4/16/2025 2:03:17PM Address: Adams St Expense Type: MAINT Supervisor: FREEMAN, ELMER Submit To: Submit to Date: 4/16/2025 2:03:17PM Actual Start: 4/28/2025 10:00:OOAM Actual Finish: 4/30/2025 4:00:OOPM COMMENTS DATECREATED jferguson Replaced 52 inches of broken 8"concrete pipe with 8"plastic and removed a large 5/1/2025 8:57:50AM amount of roots. Cut out the concrete pipe from the manhole barrel section and replaced with plastic pipe. Filled in all voids with water plug. ENTITYTYPE ENTITYUID LOCATION SSGRAVITYMAIN C3-135 C3-136 LABORNAME HOURS STARTDATE FINISHDATE FERGUSON,JAMES 29.00 4/28/2025 10:00:OOAM 4/30/2025 4:00:OOPM Crane, Devin 29.00 4/28/2025 10:00:OOAM 4/30/2025 4:00:OOPM 5/28/202E DESCRIPTION HOURSREQUIRED STARTDATE FINISHDATE Page 1 of 1 5/28/2025