HomeMy WebLinkAboutWOINTERNAL-59 City
Work Order 1754 • • of
• , To BackupCLOSED
Priority: F3 Category: WASTEWATER Submit To: PUENTE, JUAN
Initiated By: FREEMAN, ELMER Date: 4/16/2025 2:03:17PM
Address: Adams St Expense Type: MAINT
Supervisor: FREEMAN, ELMER
Submit To: Submit to Date: 4/16/2025 2:03:17PM
Actual Start: 4/28/2025 10:00:OOAM Actual Finish: 4/30/2025 4:00:OOPM
COMMENTS DATECREATED
jferguson Replaced 52 inches of broken 8"concrete pipe with 8"plastic and removed a large 5/1/2025 8:57:50AM
amount of roots. Cut out the concrete pipe from the manhole barrel section and
replaced with plastic pipe. Filled in all voids with water plug.
ENTITYTYPE ENTITYUID LOCATION
SSGRAVITYMAIN C3-135 C3-136
LABORNAME HOURS STARTDATE FINISHDATE
FERGUSON,JAMES 29.00 4/28/2025 10:00:OOAM 4/30/2025 4:00:OOPM
Crane, Devin 29.00 4/28/2025 10:00:OOAM 4/30/2025 4:00:OOPM
5/28/202E
DESCRIPTION HOURSREQUIRED STARTDATE FINISHDATE
Page 1 of 1 5/28/2025