HomeMy WebLinkAboutWOINTERNAL-24 City
Work Order 98928
of
ReplaceCLOSED
Priority: F3 Category: WASTEWATER Submit To: FREEMAN, ELME
Initiated By: COOK, DAVID Date: 6/30/2021 4:35:38PM
Address: borah ave Expense Type: MAINT
Supervisor: FREEMAN, ELMER
Submit To: FREEMAN, ELMER Submit to Date: 6/30/2021 4:35:38PM
Actual Start: 2/25/2025 10:40:OOAM Actual Finish: 2/25/2025 12:59:30PM
COMMENTS DATECREATED
DCOOK TVed going downstream. 8"conc line. 190'long. Not taps are on this line.Aggregate 2/25/2025 12:59:27PM
missing throughout the line. A sag is in the line for the last 50'. Grit in the bottom of the
line stopped the camera. called Chris to run the line. I fallow the jet nozzle out of the
line.With e water level down I saw a hole in the bottom of the line at the 183' mark.
There is a void in the hole also.
ENTITYTYPE ENTITYUID LOCATION
SSGRAVITYMAIN C3-114 C3-263
LABORNAME HOURS STARTDATE FINISHDATE
COOK, DAVID 2.33 2/25/2025 10:40:OOAM 2/25/2025 12:59:OOPM
5/28/202E
DESCRIPTION HOURSREQUIRED STARTDATE FINISHDATE
Page 1 of 1 5/28/2025