Loading...
HomeMy WebLinkAboutWOINTERNAL-14 City Work Order 172924 of CCTV Sewer Main - Due To Backup Status: C Priority: F3 Category: WASTEWATER Submit To: COOK, DAVID Initiated By: FREEMAN, ELMER Date: 3/18/2025 1:23:36PM Address: 245 Harrison St. Expense Type: MAINT Supervisor: FREEMAN, ELMER Submit To: COOK, DAVID Submit to Date: 3/18/2025 1:23:36PM Actual Start: 3/24/2025 9:02:18AM Actual Finish: 3/24/2025 12:56:53PM COMMENTS DATECREATED DCOOK Inspected going downstream. 6"clay line 635'long. I tried the inspection with the 3/19/2025 3:57:17PM regular tractor and wheels for the 6"set up. I could only make it 10'down the line. changed to the smaller tractor and it tipped over 3 times going into the line. Finely was about to get it to go down the line.At 233'ran into bubbles and couldn't see any more. brought the camera back.Will need to try again. DCOOK Inspected the line going upstream. 6"clay line. 635' long. I was able to get to the 360' 3/24/2025 12:56:25PM mark when the camera was stopped by something under water. I believe I saw the tap for the 245 Harrison home just before the camera went under water and was stopped. There are a couple of deep sags in the line.Also 2 broken spots.The broken spots and the first sag I didn't have any problems getting through. It is the sag upstream from the 245 Harrison tap that I couldn't get through. For an old clay line it is in good shape other that what was already talked about. ENTITYTYPE ENTITYUID LOCATION SSGRAVITYMAIN C4-109 C4-133 LABORNAME HOURS STARTDATE FINISHDATE COOK, DAVID 2.91 3/19/2025 1:03:OOPM 3/19/2025 3:57:OOPM COOK, DAVID 3.92 3/24/2025 9:02:OOAM 3/24/2025 12:57:OOPM Page 1 of 2 5/28/2025 5/28/202E DESCRIPTION HOURSREQUIRED STARTDATE FINISHDATE Page 2 of 2 5/28/2025