Compressive Strength of Concrete Cylinders
Date: 03-23-20 EHM File No.: 161-17 Project Name: The Spring's at the Preserve -Twin Falls,
Contractors Name: Tom's Concrete Building Permit No.:
Inspectors Name: V.Walter Report to: Tensco
Mix Data Reported to EHM Engineers, Inc. 1
Concrete Supplier: Triple C Cement Type: I & II
Mix ID: 240205834 Sacks per Cubic Yard: 6
Design Strength,(psi): 4000 Maximum Aggregate Size: 3/4
Admixtures:Hot Water, 1% NCA, HRWR, Fly Ash
Sample Data Observed by EHM Engineers, Inc.
Location Sampled: Sidewalk—Clear Springs Loop—Sta. 10+50—West Side
Date Sampled: 03-23-20 Measured Specification
Truck No.: 4255 Slump, Inches: 4.25 3-5
Ticket No.: 51218713 Air Content, % 5.9 4-6
Time Batched: 0939 Air Temperature, F° 47 -
Time Sampled: 1020 Concrete Temperature, F° 70 40-80
Batch Size(cy): 10 Unit Weight, (pcf): - -
Date received: 03-24-20 Water added at site, gal.: 0 -
F7777Laboratory Test Results
Sample Date Sample Dimensions Area Ultimate Load, Compressive Bonded/
ID Tested Age(days) (inches) (in)2 (lbs.) Strength,)th, Unbonded
PR-A 1 03-30-20 4x8 12.56 39,730 3160 Unbonded
04 20-20 28 4x8 12.56 58,350 4640 Unbonded
04-20-20 28 4x8 12.56 54,780 4360 Unbonded
04-20-20 28 4x8 12.56 58,010 4620 Unbonded
E::� HOLD HOLD 4x8 12.56 - [ ��
Average 28 Day Compressive Strength (PSI): 4540
Reviewed by:
illiam J. Nenno C.E.T.
Laboratory Services Supervisor
621 North College Road—Suite 100
Twin Falls, Idaho 83301
Phone:208-734-4888 Fax:208-734-6049
EHM :i ce rs, Inc,.
MVING THE FUTURE ON A FOUNDATION OF EXCELLENCE
Compressive Strength of Concrete Cylinders
Date: 03-24-20 EHM File No.: 161-17 Project Name: The Spring's at the Preserve -Twin Falls,
Contractors Name: Tom's Concrete Building Permit No.:
Inspectors Name: V. Walter Report to: Tensco
ELMix Data Reported to EHM Engineers, Inc.
Concrete Supplier: Triple C Cement Type: I & II
Mix ID: 240205834 Sacks per Cubic Yard: 6
Design Strength,(psi): 4000 Maximum Aggregate Size: 3/4
Admixtures: Hot Water, 1% NCA, HRWR, Fly Ash
E77Sample Data Observed by EHM Engineers, Inc.
Location Sampled: Sidewalk—Clear Springs Loop—Sta. 15+00—West Side
Date Sampled: 03-24-20 Measured Specification
Truck No.: 9015182 Slump, Inches: 4.00 3-5
Ticket No.: 51218750 Air Content, % 6.3 4-6
Time Batched: 1017 Air Temperature, F° 46 -
Time Sampled: 1115 Concrete Temperature, F° 64 40-80
Batch Size(cy): 10 Unit Weight, (pcf): - -
Date received: 03-25-20 Water added at site, gal.: 0 -
Laboratory Test Results
ressive
Sample Date Sample Dimensions Area Ultimate Load, Comp Bonded/
ID Tested Age (days) (inches) (in)2 (lbs.) Steps)th, Unbonded
PR-A 03-31-20 7 4x8 12.56 44,540 3550 Unbonded
B 04-21-20 28 4x8 12.56 64,880 5160 Unbonded
04-21-20 28 48 12.56 61,060 4860 Unbonded
[E�
- D 04-21-20 28 4x8 12.56 68,280 5430 Unbonded
- E HOLD HOLD 4x8 12.56 F - -
Average 28 Day Compressive Strength (PSI): 5150
Reviewed by:
i liam J. Nenno C.E.T.
Laboratory Services Supervisor
621 North College Road—Suite 100
Twin Falls, Idaho 83301
Phone:208-734-4888 Fax: 208-734-6049
571 'HM Fti.izineers, Inc.
BUILDING THE FUTURE ON A FOUNOATION OF EXCELLENCE
Compressive Strength of Concrete Cylinders
Date: 03-25-20 EHM File No.: 161-17 Project Name: The Spring's at the Preserve -Twin Falls,
Contractors Name: Tom's Concrete Building Permit No.:
Inspectors Name: J. Cazeau Report to: Tensco
Mix Data Reported to EHM Engineers, Inc.
Concrete Supplier: Triple C Cement Type: I & II
Mix ID: 240205834 Sacks per Cubic Yard: 6
Design Strength,(psi): 4000 Maximum Aggregate Size: 3/4
Admixtures: Hot Water, 1% NCA, HRWR, Fly Ash
Sample Data Observed by EHM Engineers, Inc.
Location Sampled: Sidewalk—Clear Springs Loop—South-North Side
Date Sampled: 03-25-20 Measured Specification
Truck No.: 3950320 Slump, Inches: 4.50 3-5
Ticket No.: 5121210 Air Content, % 5.6 4-6
Time Batched: 0905 Air Temperature, F° 36 -
Time Sampled: 0955 Concrete Temperature, V 71 40-80
Batch Size(cy): 10 Unit Weight, (pcf): - -
Date received: 03-26-20 Water added at site, gal.: 0 -
F177Laboratory Test Results —
ressive
Sample Date Sample Dimensions Area Ultimate Load, Comp Bonded/
ID Tested Age(days) (inches) (in)2 (lbs.) Strength, Unbonded
PR-A 04-01-207 4x8 12.56 46,480 ---� 3700 Unbonded
04-22-20 28 48 12.56 65,710 5250 Unbonded
04-22-20 28 4x8 12.56 65,990 5250 Unbonded
04-22 20 28 4x8 12.56 64,700 11 5150 J Unbonded
�E HOLD HOLD 4x8 _ [-- 12.56 C— _ _=- ----IF
Average 28 Day Compressive Strength (PSI): 5220
Review e by:
rlliam .J. Nenno C.E.T.
Laboratory Services Supervisor
621 North College Road—Suite 100
Twin Falls, Idaho 83301
Phone:208-734-4888 Fax:208-734-6049
EHM En neers, Inc.
SUJLC*NG THE FUTURE ONT-40UNDATION OF EXCELLENCE
Compressive Strength of Concrete Cylinders
Date: 04-01-20 EHM File No.: 161-17 Project Name: The Spring's at the Preserve - Twin Falls,
Contractors Name: Tom's Concrete Building Permit No.:
Inspectors Name: B. Kruger Report to: Tensco
Mix Data Reported to EHM Engineers, Inc.
Concrete Supplier: Triple C Cement Type: I & II
Mix ID: 240205834 Sacks per Cubic Yard: 6
Design Strength, (psi): 4000 Maximum Aggregate Size: 3/4
Admixtures: Hot Water, 1% NCA, HRWR, Fly Ash
Sample Data Observed by EHM Engineers, Inc.
Location Sampled: Sidewalk—Clear Springs Loop—sta. 21+00-North Side
Date Sampled: 04-01-20 Measured Specification
Truck No.: 4255212 Slump, Inches: 3.75 3-5
Ticket No.: 5121205 Air Content, % 6.2 4-6
Time Batched: 0929 Air Temperature, F° 36 -
Time Sampled: 1041 Concrete Temperature, F° 66 40-80
Batch Size(cy): 10 Unit Weight, (pcf): - -
Date received: 04-02-20 Water added at site, gal.: 0 -
Laboratory Test Results
Compressive
Sample Date Sample Dimensions Area Ultimate Load, Bonded/
ID Tested Age(days) (inches) (in)2 (Ibs.) Strength, Unbonded
PR-A 04 08 20 4x8 12.56 48,100 3830 Unbonded
04-29-20 28 4x8 12.56 66,210 11 5270 Unbonded
04-29-20 28 4x8 12.56 64,280 5120 Unbonded
04-29-20 28 4x8 12.56 65,440 J 5210 Unbonded
�E HOLD HOLD 4x8 iC--
Average 28 Day Compressive Strength (PSI): 5200
Reviewed by:
illiam .J. Nenno C.E.T.
Laboratory Services Supervisor