Loading...
HomeMy WebLinkAbout20-1409 2322 Bisbee Place - Solar Plans EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE BREAKERS FUSES ID# EQUIPMENT MODEL QTY ID# EQUIPMENT MODEL QTY ID SIZE ID SIZE j+— Fa G T 1 SOLAR MODULE Jinko 320-Watt 27 6 SOLAR DISCONNECT GE 60 AMP Non Fused 1 2 POWER OPTIMIZER SEP 320 27 7 MAIN PANEL Eaton 400A Meter Main Load Ce ter 1 SOLAR 3 J BOX/CONVERSION TAYMAC 2 gang BELL BOX 2 8 COMMON CONNECTION Insulated Taps 1 4 PULL BOX KRAYLOY 12X12X6 1 s ISOLAR INVERTER I Storedge 7600 1 401 N MAIN ST All Solar Equipment and associated raceway equipment will be labeled MERIDIAN, ID 83642 with red and white weather proof stickers. RCE-38500 ELE 014096 ..:...:...:...:...:...:...:... 2 7 3 5 TYPICAL FOR(14)PANELS 1 TWO Strings to 6 Set er Solar Mete 1 � the inverter. Meter Li I STRING#1 2 DC 60A Main 4 3 O O P.O.C. Out to Grid 0 2322 Bisbee Place Feeder ---- ------ ---- Twin Falls ID A3 TYPICAL FOR(13)PANELS 1 ... 1. Side ... A Taps Ta s 8 STRING#2El 2 .. Common Connection Point is City or County Taps on Feeders.In accordance City with code 70S.12(B)(2) Jurisdiction Twin Falls Permit# Array Type Roof Top-Ballast Mount Conductor and Conduit Schedule LIGHTNING ELECTRODE NOTE EQUIPMENT TOTAL CONDUCTORS IN #6 STRANDED BARE- DEDICATED LIGHTNING ID# CONDUCTOR TYPE CONDUITTYPE CURRENT CARRYING GROUD THE CONDUIT ELECTRODE BONDING ARRAY TO EQUIPMENT 1 10 AWG SOLAR PV WIRE RAIL MOUNTED 2 N/A FREE AIR-DROP CABLE + GROUND. 2 10AWGTHWN 3/4"LFMC/AL FLEX 2 #10THWN 3 Building Plans have 3 10 AWG THWN 3/4"AL FLEX/EMT 4 #10 THWN 5 been reviewed and approved 4 8AWGTHWN 3/4"EMT 3 #10THWN 4 All Construction Subject to s 8AWGTHWN 3/4"EMT 3 #10THWN 4 Field Inspection N Page#:_ 1 Of 9 JOB SITE PI ANS Plans must be n Job Date: 4-30-20 Site for all insp ctions Ystem One Line Power Optirnizer maO For North America P320 / P340 / P370 / P400 / P405 / P505 m 25 7C7 EA YEAR ,"nW�ARRANTY O N m 70 PV power optimization at the module-level / Specifically designed to work with SolarEdge / Fast installation with a single bolt inverters / Next generation maintenance with module- Up to 25% more energy level monitoring / Superior efficiency (99.5%) / Meets NEC requirements for arc fault protection (AFCI) and Photovoltaic Rapid / Mitigates all types of module mismatch losses, Shutdown System (PVRSS) from manufacturing tolerance to partial shading / Module-level voltage shutdown for installer and firefighter safety / Flexible system design for maximum space utilization JOB SITE PLANS =90 solaredge.com Plans must be on Job so ar Site for all inspections Power Optimizer For North America P320 / P340 / P370 / P400 / P405 / P505 • 41 P371 '411 P505 moduleOptimizer model P320 (for high- (for higher- (for 72&96- P405 (for higher .1 power modules) .1 . modules) modules) INPUT Rated Input DC Powerl'I 320 340 370 400 405 505 W Absolute Maximum Input Voltage 48 60 80 125t21 87121 Vdc (Voc at lowest temperature) MPPT Operating Range 8-48 8-60 8-80 12.5-105 12.5-87 Vdc Maximum Short Circuit Current 11 10.1 14 Adc (Isc) Maximum DC Input Current 13.75 12.5 17.5 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 98.6 % Overvoltage Category II OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Adc Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Optimizer 1±0.1 Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B,IEC61000-6-2,IEC61000-6-3 Safety IEC62109-1(class II safety),UL1741 Material UL94 V-0,UV Resistant ROHS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System 1000 Vdc Voltage Compatible inverters All SolarEdge Single Phase and Three Phase inverters / Dimensions(W x L x H) 129x153x27.5/5.1x6x1.1 129x153x33 5/ 129x159x49.5 129x162x59/5.1x6x1.3. 5.1x6.3x1.9 5.1x6.4x2.3 mm/in Weight(including cables) 630/1.4 750/1.7 845/1.9 1064/2.3 gr/lb Input Connector MC40) Single or dual MC4t31 p MC4t31(4) Input Wire Length 0.16/0.52 m/ft Output Wire Type/Connector Double Insulated/MC4 Output Wire Length 0.9/2.95 1.2/3.9 m/ft Operating Temperature Range(') -40-+85/-40-+185 °C/"F Protection Rating IP68/NEMA6P Relative Humidity 0-100 % °)Rated power of the module at STC will not exceed the optimizer"Rated Input DC Power".Modules with up to+5%power tolerance are allowed (2)NEC 2017 requires max input voltage be not more than 80V 131 For other connector types please contact SolarEdge (4)For dual version for parallel connection of two modules use the P405.In the case of an odd number of PV modules in one string,installing one P405 dual version power optimizer (1)For ambient temperature above+85°C/+185°F power de-rating is applied.Refer to Power Optimizers Temperature De-Rating Technical Note for more details. DesignPV System • Single Singlea SolarEdge Inverter(6)(7) HD-Wave phase Three Phase 208V4:1 Minimum String Length 7320,P340,P370,P400 8 10 18 (Power Optimizers) P405/P505 6 8 14 Maximum String Length 25 25 5018i (Power Optimizers) 5700(6000 with Maximum Power per String SE7600-US-SE11400- 5250 6000191 1275001) W US) Parallel Strings of Different Lengths Yes or Orientations �o For detailed string sizing information refer to:http://www.solaredge.com/sites/default/files/string_sizing-na.pdf of It is not allowed to mix P405/P505 with P320/P340/P370/P400 in one string e A string with more than 30 optimizers does not meet NEC rapid shutdown requirements;safety voltage will be above the 30V requirement For SE14.4KUS/SE43.2KUS:It is allowed to install up to 6,500W per string when 3 strings are connected to the inverter(3 strings r unit Tor w the maximum power difference between the strings is up to 1,000W 0 For SE30KUS/SE33.3KUS/SE66.6KUS/SE100KUS:It is allowed to install up to 15,000W per string when 3 strings are connected to the inverjec(d,-Stri5f-r a {or$E(C.�KUS/SE1 KUS) and when the maximum power difference between the strings is up to 2,000W J lJ CS J I C LH IV J Plans must be on Job (� l ®SolarEdge Technologies Ltd.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trade arks of,Sglped t Oe aPlo?K� "`ectio ns `` �JUS Ro H S All other trademarks mentioned herein are trademarks of their respective owners.Date:08/2019/V02/ENG NAM.Subject to change without notice. JI L p Intertek jinkosolar.us Jin«O Building Your Trust in Solar • le 60M G2 MM - 315 - 335 Watt KEY FEATURES --•� 1111 Diamond Cell Technology Uniquely designed high performance 5 busbarmono PERC halfcell Higher Module Power ----: O Decrease in current loss yields highermodule efficiency =.. Shade Tolerance ■ More shade tolerance due to twin arrays PID FREE PIE"E Reinforced cellpreventspotentialinduced degradation 444 Strength and Durability saoora Certified forhigh snow(5400Pa)and wind (2400 Pa)loads • IS09001:2008 Quality Standards • IS014001:2004 Environmental Standards • OHSAS18001 Occupational Health&Safety Standards • IEC61215,IEC61730 certified products LINEAR PFRFO RMANC E WARRANTY • UL1703 certified products 10 Year Product Warranty • 25 Year 1-mear Power Warranty Nomenclature: JKM335M-60HBL Code Cell TTTCode Backsheet Code Cell 100% lmearperformance warranty null Full null White null Normal 97% Addn� Standard performance warranty H Half B Black L Diamond na 1 va Itte &0m Jmko 90% S°jais a �ureark C V� US a � CE a '�nry LISTED 80.2% v years 1 5 1 25 Plans must be on Job Site for all inspections Engineering Drawings 1 011 • - • • mia.—) Current-Voltage&Power-Voltage Temperature Dependence Curves 315( VV) of Isc,Voc,Pmax i 160 160 12 350 EE i 140 0 ly _ 1 300 120 n �] 8 250 ISC j 100 Q 200 o VoC 6 O 80 150 m Pmax _.._. 1 v 4 100" E 60 O LLLLI o_m 2 50 Z 40 LLLLI 0 0 20 LLLLI0 5 10 15 20 25 30 35 40 -50 -25 0 25 50 75 100 Front Side Back Voltage(V) Cell Temperature(C) Mechanical Characteristics m Cell Type Mono PERC Diamond Cell(158.75 x 158.75 mm) No.om Dime sions Half-cells 120(6x20) Dimensions 1684x1002x35mm(66.30x39.45x1.38 inch) Weight 19.0 kg(41.9 Ibs) m "" Front Glass 3.2mm,Anti-Reflection Coating, High Transmission,Low Iron,Tempered Glass Packaging Configuration Frame Anodized Aluminum Alloy (Two pallets=One stack) Junction Box M&MIWIP67 Rated 30pcs/pallet,60pcs/stack,780pcs/40'HQ Container Output Cables 12AWG,Anode 1525mm(60.04 in), Cathode 1525mm(60.04 in)or Customized Length Type 1 SPECIFICATIONS Module Type JKM315M-60HL JKM320M-60HL JKM325M-60HL JKM330M-60HL JKM335M-60HL STC NOCT STC NOCT STC NOCT STC NOCT STC NOCT Maximum Power(Pmax) 315Wp 235Wp 320Wp 239Wp 325Wp 242Wp 330Wp 246Wp 335Wp 25OWp Maximum Power Voltage(Vmp) 33.2V 31.2V 33AV 31 AV 33.6V 31.6V 33.8V 31.8V 34.OV 32.OV Maximum Power Current(Imp) 9.49A 7.56A 9.59A 7.62A 9.68A 7.66A 9.77A 7.74A 9.87A 7.82A Open-circuit Voltage(Voc) 40.7V 37.6V 40.9V 37.8V 41.1V 38.OV 41.3V 38.2V 41.5V 38AV Short-circuit Current(Isc) 10.04A 8.33A 10.15A 8.44A 10.20A 8.54A 10.31A 8.65A 10.36A 8.74A Module Efficiency STC(%) 18.67% ' 18.96% 19.26% 119.56% 19.85% Operating Temperature(°C) -40°C-+85°C Maximum System Voltage 1000VDC(UL)/1000VDC(IEC) Maximum Series Fuse Rating 20A Power Tolerance _ 0-+3% Temperature Coefficients of Pmax -0.36%/°C Temperature Coefficients Temperature Coefficients of Isc 0.048%/°C Nominal Operating Cell Temperature (NOCT) STC: :Irradiance 1000W/m2 Cell Temperature 25*C AM=1.5 NOCT: .:Irradiance 800W/mz a Ambient Temperature 20*C AM=1.5 'A Wind Speed 1m/s * Power measurement tolerance:±3% CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT. JOB SITE PLANS ©Jinko Solar Co., Ltd. All rights reserved. Specifications included in this datasheet are subject to change AtithoPIA' ust be on Job JKM315-335M-60HL-Al-US Site for all inspections (Mike Shetler) Site Layout: V V�- II II IL 4.1 IL "Ib � i1 } 14? \7 L Solar Inverter - Inside of Garage. 71.�--------------------- Meter Main 400A 400A" A- Solar Disconnect �_ - "% �x 4 L 6 1 10 6 6 Ir 7 JOB SITE PLANS Treasu re Val' Aut�ority So 1 00-t Plans must be on Job z 0 7 Site for all inspections Conduit/Raceways Layout: IL q Raceway: T 3/4" LFMC on roof 3/4" al flex in attic 3/4" EMT on surface runs t L S. ----------- J W-V U M, 7 eas e Vary So Aut�ority JOB SITE PLANS 77 Plans must be on Job �11 7 Site for all inspections Fire Set Back's Layout: 1< A, IL Minimum 36" walking path on the sides of the array. This is a Flat Roof. ------- --- • CIIII 7k I ji i; 1A6 Minimum 12" from the top and bottom edges of the roof. M 1 1, -1 M pre So: Auttority JOB SITE PLANS M I 1, 7 1.,j4 Plans must be on Job Site for all inspections Grounding and Bonding Layout: Nv X N Bonding Electrode: Lightening Ground from Array to the Main Electrical Panel. 64e ui oo ---------- 4,A- 1.-4 1 JOB SITE PLANS 77 Treasure Va*y So Authority Plans must be on Job e1z'n 7 Site for all inspections