Loading...
HomeMy WebLinkAboutROW#2285 679 Pole Line Rd - Approved CITY;OF 'WIN FALLS Nobw Wayof Ri htg Permit `�SeRVIG Q� City of Twin Falls - Engineering Department: (208) 735-7248 Please submit application to: rowpermit(&tfid.orq Allow three (3) business days for review. Inspections: (208) 735-3446 Date of Application: 11i1i2024 Permit No. Contact Information: Contractor: WESTERN MOUNTAIN INC Project Foreman: RANDY LOVELESS Phone #: 208 312-2527 Email: CAMIE.MURAD@WESTERNMOUNTAININC.COM Utility Company: PMT Contact Person:BRIAN COWGER Phone #: 208 933-7124 Email: BCOWGER@PMT.COOP Property Owner: PROJECT MUTUAL TELEPHONE Phone#: 208 436-7151 Project Information: Start Date: 11/15/2024 Completion Date: 12/27/2024 Location Of work(or address): 679 POLE LINE ROAD,COMMERCIAL TIRE Cross Streets: FILMORE STREET and POLE LINE Building Permit# (if applicable): Plumbing Permit# (if applicable): Type of Work (Check all that apply): = Sewer (service lines, etc.) Private Utility Work (gas, cable, phone, electric, etc.) = Water(fire line, etc.) HDriveway/Approach =Sidewalk =Trenching/Boring =Curb & Gutter/Asphalt Patch-back =Other Description Of work: PLACE A FIBER OPTIC CABLE IN EXISITING DUCT FROM EXSISTING HANDHOLE TO THE BUILDING.WE WILL NEED TO PLACE A NEW DUCT FROM OUR HANDHOLE TO THE EXISTING DUCT,APX 10'. RWA SIGNS WILL BE PLACED ON BOTH SIDE OF WORK, NO TRAFFIC PATTERNS SHOULD BE AFFECTED. Attachments: = Site Plan (showing proposed work area) =Construction Plans (w/typical sections) =Traffic Control Plan, including pedestrian routing (if applicable) =Public Service Announcement (PSA) (if applicable) Fees: Standard Fee ............................................... �. Utility Companies (with Franchise Agreements) ' Nr Special Fees • Special fees may apply on large utility projects and will be determined by the City Engineer per City code. as g� As the applicant, I understand the conditions of this permit and will comply with the requirements set forth therein. I accept all liability during construction activities. The City of Twin Falls holds no liability in approving this permit., felon-compliance to these conditions { may affect approval of hAure right-of-way perm' Applicant Signature: Date: 11/1/2024 I 1 Print Name: BRIAN COWGER This permit is for the use of the City of Twin Falls right-of-way only. No survey has been conducted by the City to determine the location of the right-of-way in this permit.Verification of right-of-way is the responsibility of the applicant. j This permit does not alter franchise agreements. This permit is valid for 90 days from the approval date. I Office Use Only: $ PERMIT FEE: Collected by: Form of Payment: Date:11/1/2024 Traffic Technician Review: Traffic Control Plan®PSA[:�]Comments: Traffic Technician Approval: Date: ZZ� Street Classifica i n: Residential Collector/Arterial=Alley � l City Engineering Dept. -Approval Date City Engineering Dept. - Final Sign Off Date e'9a 3s Application Submittal, Traffic Control Plan & PSA Requirements: • The application submittal must be complete before it will be approved. • The work area map must include linework that indicates what is being installed as well as indicates how the utility line is being installed (boring, trenching, etc.). • If there will be lane restrictions or roadway closures, applicant must submit a traffic control plan for review and approval by the Engineering Department. • The contractor must submit a Public Service Announcement (PSA) if there are to be extended lane or roadway closures. The PSA must include: 1. The name of the contractor doing the work and for whom. 2. Dates and times of the beginning and end of the traffic control. 3. Location of project (nearest cross street) and alternate routes if necessary. 4. A short description of the project or development. 5. .Public Service Announcements should be submitted with the right of way application. 6. For questions about Traffic Control Plans or PSA requirements, contact Robin Hite, Traffic Technician, at 208-735-7254 or via email rhite(aMid.org. • The applicant must give the City of Twin Falls 48 hours notice before any lane or roadway closures are permitted. • The contractor shall not begin work until the submitted right of way permit has been approved. Construction Requirements: • The applicant is responsible for site safety during all construction activities. • Contractor shall notify DIGLINE at 1-800-342-1585 or through the WebTicket Program via their website at www.digline.com. Underground utilities must be located and marked prior to any trenching, boring, or excavation work. • Contractor shall perform all work in accordance with the latest City of Twin Falls adopted Idaho Standards for Public Works Construction (ISPWC) and the most current City of Twin Falls Revisions to the ISPWC (City Revisions). City Revisions to the ISPWC can be found on the City of Twin Falls website at www.tfid.org. • All construction materials (gravel, concrete, asphalt, etc.) must be from a City of Twin Falls Engineering Department approved source. This includes the asphalt patch-back adjacent to the curb & gutter. Trenching & Boring - Inspection & Testing Requirements: The contractor shall provide testing and inspection reports from an independent testing and inspection firm. The independent firm shall follow the required inspection & testing requirements listed below. All inspection & testing reports shall be submitted to the City of Twin Falls Engineering Department at en_gineeringinspectors(a�,tfid.org. • Street -Trench Patch-Back Requirements: 1. Hire an independent firm to complete inspections & compaction testing required on gravel base for street section. 2. Submit all testing & inspection documents to engineerinqinspectors(dtfid.org. 3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for inspection of completed work and final sign off. 24-hour notice is required. (Refer to TFSD-301 (Typical Trench) and TFSD-303 (Street Cuts and Surface Repair Details) for trench patch-back requirements. Potholing for boring shall be held to the same requirements.) • Alley -Trench Patch-Back Requirements: 1. Hire an independent firm to complete inspections & compaction testing on gravel. 2. Submit all testing & inspection documents to engineerinqinspectorsCaD_tfid.org. 3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for inspection of completed work and final sign off. 24-hour notice is required. (Refer to TFSD-301 (Typical Trench) and TFSD-303 (Street Cuts and Surface Repair Details) for trench patch-back requirements. Potholing for boring shall be held to the same requirements.) Sidewalk / Curb & Gutter / Driveway Approach Requirements: *The contractor shall call the City of Twin Falls Engineering Department inspection line at 208-735-3446 for the following inspections: 1. Inspection of the compacted gravel base and concrete forms for sidewalk, curb & gutter, and driveway. 2. Inspection of compacted gravel base for the asphalt patch-back. 3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for inspection of completed work and final sign off. 24-hour notice is required. (Refer to TFSD-701 (6" Vertical Curb and Gutter), TFSD-702 (3" Rolled Curb and Gutter), and TFSD-709 (Concrete Sidewalk) standard drawings for construction requirements.) -T T-ID f alopp, clip •�" a e tt� ' w Q 'k . CL ,a W p1y c _m �Mp ,` . CD mg- cu rju 7 eta r'; •'- all • { 441 t d1i Kelly Wright From: Brian Cowger <bcowger@pmt.coop> Sent: Friday, November 1, 2024 11:00 AM To: ROW Permit Subject: 679 POLE LINE ROAD, COMMERCIAL TIRE Attachments: 679 POLE LINE ROAD, COMMERCIAL TIRE PERMIT APP.pdf [EXTERNAL SENDER] Attached is the permit application for 679 Pole Line Road,Commercial Tire. PMT will be placing a Fiber Optic cable form our existing handhole to the building.There is an existing duct in place near our handhole to the building that we will need to dig down and locate the end of to place a 1" duct from our handhole over to the existing duct.All work and equipment will be kept in the ROW, no traffic patterns should be affected. Road Work Ahead signs will be placed on both sides of the work area. If you have any questions let me know. Thanks, Brian Cowger � 111� Outside Plant Engineer 1 j l Phone:208-933-7124 We Connect Email:bcowger(ft mt.coop www.pmt.org 1