Loading...
HomeMy WebLinkAboutROW#2225 216 S Park Ave W - Approved f CjITTY OO�F���Q pA Right of Way Permit ERVI-� �� NG City of Twin Falls - Engineering Department: (208) 735-7248 Please submit application to: rowpermit(&-tfid.org Allow three (3) business days for review. Inspections: (208) 735-3446 Date of Application: 8/13/2024 Permit No. Contact Information: Contractor: Crown utilites LLC Project Foreman: will Cervantes Phone #: 208-358-6674 Email: willcervantes@crownutilitiesllc.com Utility Company: CenturyLink/Mountain LTD Contact Person:Mike McKeever Phone #: 208-960-8000 Email: michael.mckeever@lumen.com Property Owner: N/A Phone#: N/A Project Information: Start Date: 8/19/2024 Completion Date: 8/23/2024 Location of work (or address): 216 S Park Ave W Cross Streets: Washington St S and Rose St Building Permit# (if applicable): Plumbing Permit# (if applicable): Type of Work (Check all that apply): 0 Sewer (service lines, etc.) �9Driveway Private Utility Work (gas, cable, phone, electric, etc.) Water (fire line, etc.) /Approach 0 Sidewalk =Trenching/Boring =Curb & Gutter/Asphalt Patch-back =Other Raising MHs Description of work: Cutting around each MH(4 total)and raising them to grade and paving and or concreting the new area depending on city requirements. Attachments: FV7 Site Plan (showing proposed work area) =Construction Plans (w/typical sections) =Traffic Control Plan, including pedestrian routing (if applicable) =Public Service Announcement (PSA) (if applicable) Fees: StandardFee ............................................... $50 Utility Companies (with Franchise Agreements) "N/A Special Fees - • Special fees may apply on large utility projects and will be determined by the City Engineer per City code. As the applicant, I understand the conditions of this permit and will comply with the requirements set forth therein. I accept all liability during construction activities. The City of Twin Falls holds no liability in approving this permit. Non-compliance to these conditions may affect approval of future right-of-way permits. Megan Sorenson Digitally signed by Megan Sorenson g/13/2024 Applicant Signature: g Date:2024.08.13 13:14:28-06'00' Date: Print Name: Megan Newlan This permit is for the use of the City of Twin Falls right-of-way only. No survey has been conducted by the City to determine the location of the right-of-way in this permit. Verification of right-of-way is the responsibility of the applicant. This permit does not alter franchise agreements. This permit is valid for 90 days from the approval date. Office Use Only: $ PERMIT FEE: Collected by: Form of Payment: ate:8/13/2024 Traffic Technician Review: Traffic Control Plan PSA[:::]Comments: '- Traffic Technician Approval: -- Date: S �i qq Sreet Cull sification: Residential Q Collector/Arterial Q Alley 0 City Engineering Dept. - Approval Date City Engineering Dept. - Final Sign Off Date 22 111�1_5 Application Submittal, Traffic Control Plan & PSA Requirements: • The application submittal must be complete before it will be approved. • The work area map must include linework that indicates what is being installed as well as indicates how the utility line is being installed (boring, trenching, etc.). • If there will be lane restrictions or roadway closures, applicant must submit a traffic control plan for review and approval by the Engineering Department. • The contractor must submit a Public Service Announcement (PSA) if there are to be extended lane or roadway closures. The PSA must include: 1. The name of the contractor doing the work and for whom. 2. Dates and times of the beginning and end of the traffic control. 3. Location of project (nearest cross street) and alternate routes if necessary. 4. A short description of the project or development. 5. . Public Service Announcements should be submitted with the right of way application. 6. For questions about Traffic Control Plans or PSA requirements, contact Robin Hite, Traffic Technician, at 208-735-7254 or via email rhite(atfid.orq. • The applicant must give the City of Twin Falls 48 hours notice before any lane or roadway closures are permitted. • The contractor shall not begin work until the submitted right of way permit has been approved. Construction Requirements: • The applicant is responsible for site safety during all construction activities. • Contractor shall notify DIGLINE at 1-800-342-1585 or through the WebTicket Program via their website at www.digline.com. Underground utilities must be located and marked prior to any trenching, boring, or excavation work. • Contractor shall perform all work in accordance with the latest City of Twin Falls adopted Idaho Standards for Public Works Construction (ISPWC) and the most current City of Twin Falls Revisions to the ISPWC (City Revisions). City Revisions to the ISPWC can be found on the City of Twin Falls website at www.tfid.org. • All construction materials (gravel, concrete, asphalt, etc.) must be from a City of Twin Falls Engineering Department approved source. This includes the asphalt patch-back adjacent to the curb & gutter. ��25 Trenching & Boring - Inspection & Testing Requirements: The contractor shall provide testing and inspection reports from an independent testing and inspection firm. The independent firm shall follow the required inspection & testing requirements listed below. All inspection & testing reports shall be submitted to the City of Twin Falls Engineering Department at engineerinqinspectors(a�_tfid.org. • Street -Trench Patch-Back Requirements: 1. Hire an independent firm to complete inspections & compaction testing required on gravel base for street section. 2. Submit all testing & inspection documents to engineerinqinspectors(a)-tfid.org. 3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for inspection of completed work and final sign off. 24-hour notice is required. (Refer to TFSD-301 (Typical Trench) and TFSD-303 (Street Cuts and Surface Repair Details) for trench patch-back requirements. Potholing for boring shall be held to the same requirements.) • Alley - Trench Patch-Back Requirements: 1. Hire an independent firm to complete inspections & compaction testing on gravel. 2. Submit all testing & inspection documents to engineerinqinspectors(a-)-tfid.org. 3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for inspection of completed work and final sign off. 24-hour notice is required. (Refer to TFSD-301 (Typical Trench) and TFSD-303 (Street Cuts and Surface Repair Details) for trench patch-back requirements. Potholing for boring shall be held to the same requirements.) Sidewalk / Curb & Gutter / Driveway Approach Requirements: *The contractor shall call the City of Twin Falls Engineering Department inspection line at 208-735-3446 for the following inspections: 1. Inspection of the compacted gravel base and concrete forms for sidewalk, curb & gutter, and driveway. 2. Inspection of compacted gravel base for the asphalt patch-back. 3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for inspection of completed work and final sign off. 24-hour notice is required. (Refer to TFSD-701 (6" Vertical Curb and Gutter), TFSD-702 (3" Rolled Curb and Gutter), and TFSD-709 (Concrete Sidewalk) standard drawings for construction requirements.) - W v ) `•'lam � `. �,�1 v •� 75:�ewea , �• �olvo 'C 3 � '* •11 t1 N Al.� A • - C• pr y i ANOR- + e T Mv m I ,. _ 3 y � � f • 11 a z, Russet St N 0 CD • c, .• - Otl3Htl L � zg ovoa _ - fir _ � 3Ntl13N0 �T nln m ti e' E 1 E i E , _ _ a; ♦, A. _ � ct-0TJy# �t m if a m r— _ a„q .�fill-, fz�� If ,Vp • • o��N �• $ F r u a'JOT O'OOT ai O'p l - V O:.E 333N X N - 0 t+ c �_. ROAD u 1 � Ir • i e _ � WORK •,�_ 7 I 7�'7 nIg � i ! AHEAD -_ .`. _ �_ � • 8 s:a dY - �a a•� .,.... -W20-1 _• ., :. oam2t &o :.. _. z (48x43 O) _ - a'. o'^ °pt � � .. _r.:•. NY 70 •^lam .. lion'v OI >7 O'GOT_ . i r T, l t 46 NEA t .. ice. v�q Y {! 1 •`lT?�i S.�i:'al .. 0 1' + :�. r.a' r"j•.��_ - _ _ _ 4 2v_2� jTp ASMLA OL :r•a '� : 3 :_ 3 �� rion.com Legend y ;Y� 1 Barrel r F Sign Stand o ; F+ Tubular Work Area 'I\]pt tl S,•lla <+wrr (0 8bx80 N2jOM � i _ avow O o n�„ _ w w w� o O Y� CO �Q 0 2 2 ON w-=J w x U L)a - 3a OD 100.0 ft' 100.0 ft � ,i F -0-100.0 ft 100.0 ft—�, • A 125.0 ft Min , co g D�A _ N X Shifting Taper f > cD o D x o w' Min F 4 Devices 0 3 p CD Max 35'Spacing r ROAD f WORK AHEAD W20-1 8x48 0) 3 ,XVI aD SUPFRt,s Z Raad Work Ahead ` - G rranrcc servms me Date:8/12/2024 Author:Mic Bock Project:Mountain LTD-S Park Ave W&Washington St S,Twin Falls-Flagging SPEEDUMrt I ITAPERLENGn11L FEET ROAD TYPE DISTANCE BETWEEN SIGNS comments: A B C -- '� -ALL SIGNS SHALL BE MUTCD COMPLIANT 40 MPH OR LESS ti43'(r0 "A d� �11n eaY o •IF ROAD WORK AHEAD SERVICES OR EQUIPMENT ARE NOT UTILIZED ON THIS 4i MPH OR MORE L=ws URBAN(LOW SPEED) 100 FT 100 FT 300 FT - " 1 �'P�y, gtiti PROJECT THEY WILL NOT BE LIABLE FOR ANY INCIDENTS THAT OCCUR IN N URBAN(HIGH SPEED) 350 FT 350 FT 350 FT ,,T i �I^�L SZOZ RELATION TO THIS PLAN a �`y°,M RURAL 500 FT 500 FT 500 FT s=poma was un o,� ua.wc.am.pKe � � pibwxwAstvng,wtlw anucpVeEoperaYng apee0nnp� EXPRESSWAY/FREEWAY 1000 FT 1500 FT 2040 FT _ www.invarion.com Legend ° a Barrel ISign Stand Tubular r ®Work Area i = (O St7 SO I-0zM - r OV3HV AHOM CD O WWW� S ❑Y� CO 0 - v air all 100.0 ft' 100.0 ftT- Park Ave • a • a - r. • -100.0 R 100.0 _ 125.0 ft Min X Nv moo Shifting Taper IN �z Da o o o> Min 4 Devices Max 35' Spacing oA : I � r - . r LFIF,D SUPFR`'O 9 _ F OAIL Road Work Ahead Y° - - - i Traffic Serwcm iM Date:8 12 2024 Author:Mic Bock Project:Mountain LTD-S Park Ave W&Washington S[S,Twin Falls-Fla_ / / j g Flagging SPEFDUMR TAPEII-_HI FEET DISTANCE BETWEEN SIGNS ROADTYPE B C q Comments: A - lN""� ALL SIGNS SHALL BE MUTCD COMPLIANT no MPH OR LESS I IL--WS=/60 6' URBAN(LOW SPEED) 100 FT 100 FT 10O FT Y� a'Vn' IF ROAD WORK AHEAD SERVICES OR EQUIPMENT ARE NOT UTILIZED ON THIS 45 MPH OR MORE L=WS URBAN HIGH SPEED 350 FT 350 FT 350 FT *� 1° PROJECT THEY WILL NOT BE LIABLE FOR ANY INCIDENTS THAT OCCUR IN ( I ��YIZga SZ02'av RELATION TO THIS PLAN am °'� RURAL 500 FT 15oo FT Isoo FT s'°°�Oe�e° °""" ""�`r"`°'•d1ere° EXPRESSWAY/FREEWAY 1000 Fi 1500 FT 2640 F7 yT' .�_, �0l www.invarion.com Legend tv •Barrel FSign Stand - w _ Tubular ®Work Area Sot Pit e i + (O 8t7x8b) ( T-OZM ' Otl3Htl N2iOM � Otloa O <@> Y O°aa o ��3a wX 100.0 ft 100.0 ft � r ; . 100.0 ft 100.0 ft ►. ° _ _ 00 125.0 ft Min f X� N moo £� - _ Shifting Taper F ..,__....T,,.-.,.-- gp o x o o y Min 4 Devices Max 35'Spacin 01 9, f: IF1ED SUPER`' '° - .,.....-.-. _. _ o z Road Work Ahead i9 _ = Tr.mc Serwem I- Date:8/12/2024 Author:Mic Bock Project:Mountain LTD-S Park Ave W&Washington St S,Twin Falls-Flagging SPEEDUMIr I TpPERIENGIHILI FEET DISTANCE BETWEEN SIGNS a ROAD TYPE Comments: A B C ALL SIGNS SHALL BE MUTCD COMPLIANT -,m MPH OR LESS t�vs/cD URBAN(LOW SPEED) 100 FT 100 FT 100 FT 'fp `'°ut Bef D IF ROAD WORK AHEAD SERVICES OR EQUIPMENT ARE NOT UTILIZED ON THIS 15 MPH OR MORE L=WS ( �350 FT 350 FT - r PROJECT THEY WILL NOT BE LIABLE FOR ANY INCIDENTS THAT OCCUR IN URBAN HIGH SPEED) �350 FT _ - - 11413N SZOZ"0 RELATION TO THIS PLAN �p�, �,y RURAL 500 FT 500 FT 500 FT 01 r EXPRESSWAY/FREEWAY 3000 FT 1500 FT 2640 FT m,cLmao, ne.a,ynea ocM„s : c EYk - a