HomeMy WebLinkAboutROW#2224 - Warren Ave - Approved CITY OF
TWIN FALLS
Right of WayPermit
City of Twin Falls - Engineering Department: (208) 735-7248
Please submit application to: rowpermit@ f dd.org
Allow three (3) business days for review.
Inspections: (208) 735-3446
Date of Application: ��9���`/�' Permit No.
Contact Information:
Contractor: 71- 6K eeehoi, Project Foreman: ,Sled et. Lek
Phone #: MU 2qO za /y Email: CanK&A-,yo !,;kT v
Utility Company: S�a..��,��� Contact Person: Fars
Phone #: 7.af S,j�_q�8'G Email:
Property Owner: Alt Phone#:
Project Information:
Start Date: �j�/Z Completion Date:e/yo
Location of work (or address): e
Cross Streets: �1 4 Dr and -e
Building Permit# (if applicable): Plumbing Permit# (if applicable):
Type of Work (Check all that apply):
0 Sewer (service lines, etc.) Private Utility Work (gas, cable, phone, electric, etc.)
Water (fire line, etc.) Driveway /Approach
Sidewalk ®Trenching/Boring
=Curb & Gutter/Asphalt Patch-back =Other
Description of work: A0vI). � si gke- , d°w� lwarr�n tA-K _
v wJ d 1,0e s
l
Attachments:
0 Site Plan (showing proposed work area)
onn aon Plans (w/typical sections)
® r? affic Control Plan, including pedestrian routing (if applicable)
0 Public Service Announcement (PSA) (if applicable)
Fees:
Standard Fee............................................... $50
Utility Companies (with Franchise Agreements) N/A-
Special Fees \
• Special fees may apply on large utility projects and will be determined by the City Engineer per
City code.
As the applicant, I understand the conditions of this permit and will comply with the
requirements set forth therein. I accept all liability during construction activities. The City of
Twin Falls holds no liability in approving this permit. Non-compliance to these conditions
may affect approval of futur =of-way permits.
Applicant Signature: Date: Z
Print Name:
This permit is for the use of the City of Twin Falls right-of-way only. No survey has been conducted by the City to
determine the location of the right-of-way in this permit. Verification of right-of-way is the responsibility of the applicant.
This permit does not alter franchise agreements. This permit is valid for 90 days from the approval date.
Office Use Only:
$ PERMIT FEE: Collected by: Form of Payment: Date:
Traffic Technician Review: Traffic Control Plan PSAE]Comments:
l Q
Traffic Technician Approval: �_�—�'—- Date: g/�z c� z
Street Classification: Residential Q Collector/Arterial Q Alley 0
a L13
*1
City Engineering "- Approval Date
City Engineering Dept. - Final Sign Off Date
Application Submittal, Traffic Control Plan & PSA Requirements:
• The application submittal must be complete before it will be approved.
• The work area map must include linework that indicates what is being installed as well as
indicates how the utility line is being installed (boring, trenching, etc.).
• If there will be lane restrictions or roadway closures, applicant must submit a traffic control plan
for review and approval by the Engineering Department.
• The contractor must submit a Public Service Announcement (PSA) if there are to be extended
lane or roadway closures. The PSA must include:
1. The name of the contractor doing the work and for whom.
2. Dates and times of the beginning and end of the traffic control.
3. Location of project (nearest cross street) and alternate routes if necessary.
4. A short description of the project or development.
5. . Public Service Announcements should be submitted with the right of way
application.
6. For questions about Traffic Control Plans or PSA requirements, contact Robin Hite,
Traffic Technician, at 208-735-7254 or via email rhite@tfid.org.
• The applicant must give the City of Twin Falls 48 hours notice before any lane or roadway
closures are permitted.
• The contractor shall not begin work until the submitted right of way permit has been approved.
Construction Requirements:
• The applicant is responsible for site safety during all construction activities.
• Contractor shall notify DIGLINE at 1-800-342-1585 or through the WebTicket Program via their
website at www.digline.com. Underground utilities must be located and marked prior to any
trenching, boring, or excavation work.
• Contractor shall perform all work in accordance with the latest City of Twin Falls adopted Idaho
Standards for Public Works Construction (ISPWC) and the most current City of Twin Falls
Revisions to the ISPWC (City Revisions). City Revisions to the ISPWC can be found on the
City of Twin Falls website at www.tfid.org.
• All construction materials (gravel, concrete, asphalt, etc.) must be from a City of Twin Falls
Engineering Department approved source. This includes the asphalt patch-back adjacent to
the curb & gutter.
Trenching & Boring - Inspection & Testing Requirements:
The contractor shall provide testing and inspection reports from an independent testing and
inspection firm. The independent firm shall follow the required inspection & testing requirements
listed below. All inspection & testing reports shall be submitted to the City of Twin Falls Engineering
Department at engineeringinspectors@tfid.org.
• Street - Trench Patch-Back Requirements:
1. Hire an independent firm to complete inspections & compaction testing required on gravel
base for street section.
2. Submit all testing & inspection documents to engineeringinspectors@tfid.org.
3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for
inspection of completed work and final sign off. 24-hour notice is required.
(Refer to TFSD-301 (Typical Trench) and TFSD-303 (Street Cuts and Surface Repair Details)
for trench patch-back requirements. Potholing for boring shall be held to the same
requirements.)
• Alley - Trench Patch-Back Requirements:
1. Hire an independent firm to complete inspections & compaction testing on gravel.
2. Submit all testing & inspection documents to engineeringinspectorsp—tfid.org.
3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for
inspection of completed work and final sign off. 24-hour notice is required.
(Refer to TFSD-301 (Typical Trench) and TFSD-303 (Street Cuts and Surface Repair Details)
for trench patch-back requirements. Potholing for boring shall be held to the same
requirements.)
Sidewalk / Curb & Gutter / Driveway Approach Requirements:
*The contractor shall call the City of Twin Falls Engineering Department inspection line at
208-735-3446 for the following inspections:
1. Inspection of the compacted gravel base and concrete forms for sidewalk, curb & gutter, and
d riveway.
2. Inspection of compacted gravel base for the asphalt patch-back.
3. The contractor shall call the Engineering Department inspection line at 208-735-3446 for
inspection of completed work and final sign off. 24-hour notice is required.
(Refer to TFSD-701 (6" Vertical Curb and Gutter), TFSD-702 (Y Rolled Curb and Gutter), and
TFSD-709 (Concrete Sidewalk) standard drawings for construction requirements.)
Legend . www.invarion.com
T Sign Stand
Tubular
® w Work Area
7
S
Nc)t to Sc�l`,
-imp
,.Y
_
c r�
h
yry�e
aaa<e D,
- �• -'"� A�?'3�, - _ z � �_i �T'ems`'
JE
x���S1FIED SDpy.RD�
2
AW Nrk Mna
T'ak xrim k = Data:8/8/2D24 quthw:M,c Bock Project:The Connection-Warren Ave B:EasNantl Dr,Twin Falls-Shoulder Wark�u®wa �mT,ExBiH/� CommelUs: N'EEI s DLATANCEBFTWEENSKdES ROADTYpE -
ALL SIGNS SHALL BE MUTCO COMPLIANT A B
C
•IF ROAD WORK AMEAD SERVICES OR EQUIPMEW ARE NOT UTILIZED ON THIS @� tATBAM(IOW SPEED) :108R L)DR R~
tire, PROTECT THEY WILL NOT BE IIA8LE FOR ANY INCIDENTS THAT OCCUR IN M URBAN(NIGH SPEED) i50R 350R 350R�T43tl 52aZB RELATION TO THIS PLAN PUPAL SBBR FrR
�a.r .w r� wMaw FKPXE59NAY/7AEEWA1 IABBR 15oDFr 26WR
W \/ IN I
a X , i
W � lil
'a
IN
, �
IN
11`4
tj
I
i
fJ>a
a
I �
! 3
r = on
i guy* sat
_
-
T